HomeMy WebLinkAboutChange Order No 1 & PCA - Pinhook WTP Guaranteed Savings Contract Proj No. 119-003 - Bowen1316 COUNTY -CITY BUILDING 227 W. JEFFERSON BOULEVARD SOUTH BEND, INDIANA 46601-1830 PHONE 574/235-9251 FAx 574/235-9171 CITY OF SOUTH BEND TAMES MUELLER, MAYOR BOARD OF PUBLIC WORKS September 12, 2023 Mr. Pat Stanford Bowen Engineering Corporation 8802 N. Meridian St. Indianapolis, IN 46260 PatSkBowenEn ing eering com RE: Change Order No. 1 (Final)/Project Completion Affidavit Pinhook Water Treatment Plant Guaranteed Savings Contract - Project No. 119-003 Dear Mr. Stanford: At its September 12, 2023 meeting, the Board of Public Works approved the Final Change Order for this project, be decreased by $470 with an increase of four hundred seventy- eight (478) days. The final contract amount is $1,784,530 with a completion date of March 23, 2023. In addition, the Project Completion Affidavit for this project was approved in the amount of $1,784,530. Copies of the Change Order and Project Completion Affidavit are enclosed for your records. If you have any further questions, please call this office at (574) 235-9251. Sincerely, /s/ Theresa Hefner Theresa Heffner, Clerk Enclosures TH/lh ELIZABETH A. MARADIK JOSEPH R. MOLNAR GARY A. GILOT ALEXANDRA DOLZ-LANE MURRAY L. MILLER INTER -OFFICE MEMORANDUM DEPARTMENT OF PUBLIC WORKS DIVISION OF ENGINEERING TO: Theresa Heffner, Clerk Board of Public Works FROM: Rebecca Plantz, Project Engineer SUBJECT: Project Completion, Project No. 119-003 Pinhook Water Treatment Plant Guaranteed Savings Contract DATE: August 31, 2023 The Guaranteed Savings Contract with Bowen Engineering, Corporation was effective on February 9, 2021, setting the guaranteed maximum price for the cost of work at $1,785,000, including Bowen's fixed fee of $132,200. The scope of work based on American Structurepoint Basis of Design, Preliminary Drawings, and Valve Priority Matrix was filter rehabilitation, valve replacement, and clearwell cleaning. The performance guarantee was projected over a 20-year window through stipulated savings. Savings were estimated based on an energy baseline on valves leaking finished water, backwash pumps running more than necessary, and historical data. These savings will be reported to the Department of Local Government Finance by Bowen on the City's behalf for the next 20 years as required by IC 36-1-12.5-10. One element on the return on savings in the GSC approach came from the filter rehabilitation where the original scope was identified as media retainer cap replacements. Soon after notice to proceed, it was found that the caps could be rehabilitated through an acid clean rather than replacement. Overall, the filter throughput was improved. All valves that were originally prioritized were replaced except for the filter bypass valve and air scour systems. Savings also allowed a list of structural and general building improvements to be completed. The GSC approach promoted collaborative problem solving, permitted flexibility as unknowns arise, addressed far more scope than expected, avoided budget overrun, avoided multiple shutdowns, and established a base contract for future projects. This project was awarded prior to the enactment of the City's MWBE program and therefore, no goals were associated with this project. Overall, the success of the Pinhook Water Treatment Plant Guaranteed Savings Contract provided benefits to the asset and funds supporting it. Please call with your questions (5998). F -$OUTAR BF^ 2 CITY OF SOUTH BEND, INDIANA ° DEPARTMENT OF PUBLIC WORKS U PROJECT CHANGE ORDER 1SO_ DATE: April 25, 2023 PROJECT NO: 119-003 PROJECT NAME: Pinhook WTP Improvements - Guaranteed Energy Savings Contract CONTRACT DATE: February 9, 2021 CHANGE ORDER NO: 1 - Final SUBJECT OF CHANGE ORDER: Final Chanqe Order - Quantity Adiustment The original contract sum Net change by previously authorized change orders The contract sum prior to this change order By this Change Order, the project amount is The new contract sum including this change order This Change Order represents a total change of Total change for entire project Original contracted completion date/time Extension of date/time by previous change orders Date/time extension by this change order New completion date/time CONTRACTOR Contractor Signature Printed Name and Title Company Name Address City, State, Zip $ 1,785,000.00 $ 0.00 $ 1,785,000.00 Increased 0 Decreased $ (470.00) $ 1,784,530.00 0.026 % 0.026 % November 30, 2021 0 days 478 days March 23, 2023 RECOMMENDED FOR APPROVAL CONSTRUCTION MANAGER CITY OF SOUTH BEND BOARD OF PUBLIC WORKS CITY OF SOUTH BEND, INDIANA BOARD OF PUBLIC WORKS 1 Elizabeth A. Maradik, President � M. _%7�E__i Gary A. Gilot, Member Murray L. Miller, Member Joseph R. Molnar, Vice President Alexandra Dolz-Lane, Member Attest: Theresa M. Heffner, Clerk Date: September 12, 2023 CITY OF SOUTH BEND, INDIANA BOARD OF PUBLIC WORKS PROJECT COMPLETION AFFIDAVIT PROJECT NAME Pinhook WTP Improvements - Guaranteed Energy Savings Contract PROJECT NO 119-003 FINAL COST $1,784,530.00 CONTRACT SIGNED FebruaEy 9 2021 MAINTENANCE AGREEMENT ENDS PROJECT DESCRIPTION Water treatment plant improvements includins filter rehabilitation and other plant component WITNESSETH: replacements or repairs The work under the above contract between the City of South Bend and the undersigned contractor having been completed, the City of South Bend, its officials and agents are hereby released from all claims and demands whatsoever arising under or by such contract, and that the contractor performed the work within the scope of the Specifications and Standards of the City of South Bend which were a part of the above Contract. Executed this 28th day of __ August .20 23 Signature Pat Stanford, Project Manager Printed Name Bowen Engineering Corporation Company Name 8802 N. Meridian Street Company Address Indianapolis, IN 46260 City, State, Zip WITNESSESS: Before me, the undersigned Notary Public in and for said country and state, personally appeared Pat Stanford , and acknowledged his/her signature to the above Project Completion Affidavit on the 28th day of August , 20 23 June 4, 2024 Notary Signature My Commission Expires Margaret Burroughs Printed Name County of Residence Newton `Sr ��■��nrnnrr If the Contractor is a corporation, the following certificate will be executed. ,..■ "'►., I, Carey Weddle certify that I am Secretary of the Corporation executim'�IC5A� �[Pat Stanford who signed this release on behalf of the con#a {3 .�'; Pr Manager of said Corporation; that said release was duly signed ]rt; d behalf of sea'. -;per Corporation by Authority of its governing body, and is within the scope of corporate powers: ; �; j : Q � o : C) Sec tary's Signature V Carp*ate SealQ Carey Weddle r d CJ/AtV N Printed Name '•,��� ' • ... • ��L �,.• DEPARTMENT OF PUBLIC WORKS APPROVAL ��''+■�Arr�►+►'`� This project is acceptable for final approval and we recommend to the Board of Public Works that it be ordained so. Date: Construction Manager CITY OF SOUTH BEND, INDIANA BOARD OF PUBLIC WORKS VlLa Elizabeth A. Maradik, President Gary A. Gilot, Member 11,;,M 14 V I Joseph R. Molnar, Vice President Alexandra Dolz-Lane, Member Murray L. Miller, Member Attest: Theresa M. Heffner, Clerk Date: September 12, 2023 BOWEN Engineering Corporation WAIVER OF LIEN {X} Final { ) Partial {X} Payment to Follow State of Indiana, County of Newton , SS: Patrick Stanford being duly sworn states that he/she is the Project Manager (Name of Officer) (Title) of Bowen Engineering Corporation having contracted with City of South Bend, IN (Contractor) (Owner) to furnish certain materials and/or labor as follows: Supervision, Labor, Equipment and Material (Description) for a project known as Pinhook WTP Improvements located at 2800 Riverside Drive, South Bend, IN 46628 and owned by City of South Bend, IN (Owner) and does hereby further state on the behalf of the aforementioned Contractor: (PARTIAL WAIVER) that there is due from the Owner the sum of { } receipt of which is hereby acknowledged; or { } the payment of which has been promised as the sole consideration for this Affidavit and Partial Waiver of Lien which is given solely with respect to said amount, and which waiver shall be effective only upon receipt of payment thereof by the undersigned. (FINAL WAIVER) that the final balance due from the contractor is the sum of TWENTY FIVE THOUSAND FOUR HUNDRED SEVENTY EIGHT DOLLARS ($25,478.00) { } receipt of which is hereby acknowledged; or {X} the payment of which has been promised as the sole consideration for this Affidavit and Final Waiver of Lien which shall become effective only upon receipt of such payment. THEREFORE, the undersigned waives and releases unto the Owner of said premises, any and all lien or claim whatsoever on the above -described property and improvements thereon on account of LABOR or material or both, furnished by the undersigned thereto, subject to limitations or conditions expressed herein, if any; and further certifies that no other party has any claim or right to alien on account of any work performed or material furnished to the undersigned for said project, and within the scope of this affidavit and waiver. Bowen Engineering Corporation By (Firm) (Patrick Stanford, Project Manager) WITNESS MY HAND AND NOTORIAL SEAL, this 5TH day of April 20 23 (Notary Public) My Commission Expires June 5, 2024 Printed Margaret Burroughs Residing in Newton County 10769 Broadway, #325, Crown Point, IN 46307 219-661-9770 Fax:219-661-9766 4D City of South Bend Department of Administration & Finance Change Order Request Form Changing the line amount: You can only change a line amount if it has NOT been invoiced against. • If the line has NOT been invoiced — reduce the line amount to equal what it should be. • If the line has been invoiced — cancel the delivery remainder and finalize the individual line, then add a new line for the amount that should be remaining. Multiple PO lines: If you have changes to more than two lines on the same PO, fill out a separate section for each line affected by the change order. Project POs: For change orders on project -related POs, this form must be approved by the Project Accounting Team as described in Supplement 508. PO Number PO-7431 Line Number 1 Original Dollar Amount $470.00 New Dollar Amount For liquidation request, enter $0 $0.00 Reason Code if changed) Financial Dimensions (fund-dept- division -subdivision -main account 622-06-604-620-442005 Project Code if applicable) PROJ-65 Description of change (include bud et impact) Final change order to deduct contract for savings that were not used in the GSC. APPROVED BY PROJECT ACCOUNTING TEAM (if applicable) PO Number Line Number Original Dollar Amount New Dollar Amount For liquidation request, enter $0 Reason Code if changed) Financial Dimensions (fund-dept- division-subdivision-main account Project Code if applicable) Description of change (include budget impact) APPROVED BY PROJECT ACCOUNTING TEAM (if applicable) PO Number Line Number Original Dollar Amount Change Order Request Form (002) 1 of 3 City of South Bend Purchase order Vendor: BOWEN ENGINEERING CORP 10769 BROADWAY #325 CROWN POINT, IN 46307 USA Ship to: PO number: Po-0007431 PO version: t Date: 2/9/2021 Vendor account: V-00000243 Project number: PROJ00000065 Engineering Division 227 West Jefferson Blvd, Suite 1300 N South Bend, IN 46601 USA Notice and Instructions to Vendor: 1. This Purchase ❑rder is goveried by -re City cf Sou:h Ee id Standard Purchasing Terms and Conditions, which are set fci'r a` http:/hvwwsou:hberdin.gov/pots and ircc: rporated iere. i i b, refe-ance. 2. The City's In<:iana sales tax exempt o i n am:-er s 0003122131-001. 3. The -_.it,'s fe<:e-al ider-ifica:ior rur-ber is 35-6001201. 4. All paymer- an,: pe-rorrianoe obl rations cf the City a-9 sub:ect `,) t`ie a cp-op-iatio,i an,' a•.ai'ability of funds. 5. If a cash discount is a% able. please indica-e the a:-y licab e d scoL.n: terns an each invoice. 6. All s iiprients must ircluda a iteri zed :-acki x; slip detai inr: tha i-.er-s s upped. 7. The rumber s:a-ed above n-L.s: appear cn al i wo :-es. cla n-s.:-ac<aaes. packing slips. and correspondence. 8. For ncst efficient p-ocessi i . p ease sub ni- nvoices n P D or cther alac-.rori:- forria::-:i an -a I :o accou its :^Vabl9, D•scutnbendin.ao;. Line number Quantity Unit Deseziption Unit price Amou t 1,785,000.0 EA P i i ioo•<'v'v-F = 1.00 1,785,000.00 0 Charges: $0.00 Total in U5D - $1,795,00700 fit�&J- "a� Michael Schmidt, Director of Purchasing Phone: (574) 235-9977 Email: mschmidt@southbendin.gov BOARD OF PUBLIC WORKS AGENDA ITEM REVIEW REQUEST FORM Date 08/28/2023 Name Becca Plantz Department Public Works BPW Date 09/012/2023 Phone Extension 5998 Review and Approval Required Prior to Submittal to Board Diversity Compliance and Inclusion Officer ❑ Officer Name Cynthia Simmons BPW Attorney ❑ Attorney Name Dept. Attorney ❑ Attorney Name Purchasing ❑ Michael Schmidt Check the Appropriate Item Type — Required. for All Submissions ❑ Professional Services Agreement ❑ Contract ❑ Proposal ❑ Open Market Contract ❑ Amendment/Addendum ❑ Special Purchase, QPA ❑ Bid Opening ❑ Bid Award ❑ Req. to Advertise ❑ Title Sheet ❑ Quote Opening ❑ Quote Award ❑ Reject Bids/Quotes ❑ Proposal Opening ❑ C/O & PCA No. ® PCA ® Chg. Order, No. 1 ❑ Traffic Control ❑ Resolution n Other: n Ease./Encroach Company or Vendor Name New Vendor MBE/WBE Contractor Project Name Project Number Funding Source Account No. Amount Terms of Contract Purpose/Description Information Bowen Engineering Comoration ❑ Yes❑ If Yes, Approved by Purchasing ❑ No ❑ WBE Completed E-Verify Form Attached ❑ Nos Pinhook Water Treatment Plant Guaranteed Savings Contract 119-003 Water Capital PROJ-65, PO-7431 Guaranteed Maximum Guaranteed Savings Contract with Bowen Engineering for water treatment plant improvements at the Pinhook WTP. For Change Orders Onl Amount of ❑ Increase $ ® Decrease ($ 470) Previous Amount $ 1,785,000.00 Current Percent of Change New Amount Total Percent of Change: Time Extension Amount New Completion Date: Increase Decrease $ 1,784,530.00 Increase Decrease 478 days March 23.2023 0.026% (0.026%