HomeMy WebLinkAboutAward Quote - Carriage Hills Well #4 Roofing System Replacement - Dudeck Roofing
ELIZABETH A. MARADIK JOSEPH R. MOLNAR GARY A. GILOT ALEXANDRA DOLZ-LANE MURRAY L. MILLER
1316 COUNTY-CITY BUILDING
227 W. JEFFERSON BOULEVARD
SOUTH BEND, INDIANA 46601-1830
PHONE 574/ 235-9251
FAX 574/ 235-9171
CITY OF SOUTH BEND JAMES MUELLER, MAYOR
BOARD OF PUBLIC WORKS
September 12, 2023
Mr. Carl Mankowski
Dudeck Roofing & Sheet Metal, Inc.
1634 Franklin St.
South Bend, IN 46619
carl@dudeckroofing.com
RE: Quotation Award – Carriage Hills Well #4 Roofing System Replacement
Dear Mr. Mankowski:
At its September 12, 2023 meeting, the Board of Public Works awarded the above
referenced quotation to you in the amount of $17,800.
Please forward the following documents in one submittal by September 26, 2023 to my
attention for Board of Public Works approval at lhensley@southbendin.gov :
1) One (1) signed original of the Contract (enclosed); and
2) Certificate of Insurance naming the City of South Bend as an additional insured.
If you have any further questions, please call this office at (574) 235-9251.
Sincerely,
/s/ Theresa Heffner
Theresa Heffner, Clerk
Enclosures
TH/lh
City of South Bend
P ublic Works
Excellence
Accountability
Innovation
Inclusion
Empowerment
Visit
County-City Building
227 W Jefferson Blvd, Suite 1300 N
South Bend, IN 46601
Phone
311 inside City limits
(574) 233-0311 outside City limits
Email: 311@southbendin.gov
Website: Southbendin.gov
Memorandum
To: Board of Public Works
City of South Bend
1316 County City Building
227 West Jefferson Blvd.
South Bend, IN 46601
From: Eugene E. Pietsch III
Maintenance Manager
Water Works – Water Treatment
830 North Michigan Street
South Bend, IN 46601
Subject: Carriage Hills Well #4 Roof Replacement
Date: August 29, 2023
Dear Board Members,
The Division of Water Works – Water Treatment, North Pumping Station is requesting
approval for the replacement of the failing roof at Carriage Hills Wellfield for Wellhouse
#4. The current roof has deteriorated over time and needs replacement to continue to
help protect the equipment inside of the structure against rain, sunlight, wind, and
extremes of temperature.
We have requested estimates for the roof replacement and have received 2 quotes and one
response declining to provide a quote. Reviewing the quotes, we have found that Dudeck
Roofing and Sheet Metal has the most competitive price of $17,800. The roofing system
includes a 20-ye ar warranty covering materials and labor after completion . Slatile provided an
estimate for $21,000 that included a 10-year manufacturer warranty with options to add a 15-
year warranty for $500 or to add a 20-year warranty for $800. Midland Engineering was
solicited for a quote but declined to provide one for this roof replacement.
We kindly request your consideration and approval of the proposal from Dudeck Roofing and
Sheet Metal to replace the roof at Carriage Hills Well #4.
Thank you for your time and consideration.
Regards,
Eugene E. Pietsch
Eugene E. Pietsch III
BOARD OF PUBLIC WORKS
CITY OF SOUTH BEND, INDIANA
PUBLIC WORKS CONTRACT
This Agreement is made and entered into this 12th Day of September, 2023, by and
between Dudeck Roofing & Sheet Metal, Inc., (the “Contractor”), and the Board of Public Works
(the "Board”).
The Contractor covenants and agrees to make the following improvement, as fully set out in the
Request for Quotations, Standard Specifications, Special Provisions, Plans, and Bid Proposals, all
of which are set forth as a part of this Contract, for:
DESCRIPTION: CARRIAGE HILLS WELL #4 ROOFING SYSTEM
REPLACEMENT
COMPLETION DATE: SEE SPECIFICATIONS
AMOUNT: $17,800
FUNDING: PR-00027378
The unit prices for this improvement were those prices as received and accepted by the Board on
the 16th Day of August, 2023.
The Contractor further agrees to notify the assigned Engineer when this improvement is
completed. This notification shall be in the form of a Project Completion Affidavit, signed by the
Contractor. Upon final acceptance of the improvement by the Engineer, the Contractor’s final
estimate will be presented to the Board for final Payment with one (1) copy of the Project
Completion Affidavit and one (1) copy of a Waiver of Lien.
Each of the Parties, by signing below, represents and warrants to the other Party that he/she/it has
the authority to bind the named person or entity to this Agreement.
BOARD OF PUBLIC WORKS DUDECK ROOFING & SHEET
METAL, INC.
President Member Printed Name
Member Member Signature
Member Attest: Clerk
September 12, 2023
1634 Franklin St
South Bend, IN 46619
Phone 574.234.7912
email: carl@dudeckroofing.com
Singly Ply – Modified - Slate – Tile – Copper – Shingles – Shakes - Repairs
August 16, 2023
South Bend Waterworks
830 N Michigan St
South Bend, IN 46601
Attention: Eugene Pietsch
Reference: Erskine Well House Reroof
Dear Mr. Pietsch:
As you have requested, our proposal to install a new EPDM roof on the Carriage Hills Well House,
approximately 680 square feet (sf) of roof.
We propose to furnish all labor, tools, material and equipment necessary to perform work as described in
this proposal, for the Contract Price listed below. An outline of the products to be used and description of
the work that serves as a basis for the Contract Price below are as follows:
A. Products
1. Insulation adhesive: 2-part low-rise foam urethane adhesive
2. Insulation: 2 staggered layers of 2” thick Polyisocyanurate (ISO) insulation
3. Taper system: ISO tapered to ¼” per foot
4. Roof system singly-ply sheet: Johns-Manville EPDM NR 60 mil; .060” thick, non-reinforced,
cured EPDM (Ethylene Propylene Diene Monomer) membrane
5. Roof system sheet attachment:
a. Field: Fully adhered with bonding adhesive
b. Metal edging: Bonded to 24 gage steel flashing nailed along length 4” o.c.
6. Sheet metal flashing:
a. Gutters and counter flashing: Shop fabricated in 12’ lengths from 24 gage, prefinished
steel. Color to be selected by DRSM as best possible match to existing systems if owner
does not choose specific color.
b. Sealants: Premium gun-grade polyurethane and butyl sealants.
B. Preparation for New Roof System:
1. Remove existing roof down to concrete decking and dispose of off-site
2. Remove existing PVC drain line and existing drain hardware, cover hole with 24ga steel
matching surrounding soffit color, and fill void with expanding foam insulation
3. Install new wood nailer at roof edges to match elevation of new roof
South Bend Water Works
Erskine Well House Reroof
August 16, 2023
pg. 2 of 3
C. New roof system installation
1. Over the concrete deck, adhere the 2 staggered layers of 2” ISO base layer
2. Over the 4” base ISO, install tapered ISO to provide positive drainage to gutter
3. Adhere EPDM roofing membrane to the tapered ISO
4. Flash roof penetrations, gutter apron, gravel stop, and curb walls according to manufacturer’s
detail drawings and technical specifications
5. Upon completion provide the manufacturer’s twenty-year warranty covering materials and
labor.
D. Sheet Metal
1. Install new 6” shop-fabricated box gutter, approximately 30lf on east side
2. Install new 4”x4” box-style downspout
a. Terminate downspout at same location as existing PVC drain line
3. Install new gravel stop at roof perimeter
CONTRACT PRICE: SEVENTEEN THOUSAND, EIGHT HUNDRED DOLLARS ($17,800.00)
EXCLUSIONS: We specifically exclude masonry work, concrete work, and drainage system work
downstream of the downspout outlets
We appreciate your confidence in Dudeck Roofing & Sheet Metal and your consideration of our firm for
this project. If you have any questions concerning this proposal, or the scope of our services, please
contact us at your convenience.
Sincerely,
Dudeck Roofing & Sheet Metal, Inc.
Carl Mankowski
Project Manager
South Bend Water Works
Erskine Well House Reroof
August 16, 2023
pg. 3 of 3
PROPOSAL ACCEPTANCE:
This Proposal and the Terms and Conditions of this Proposal, listed below, are:
Accepted this day of , 20
(Indicate Options and/or Alternates Accepted)
(Print or Type Firm Name or Body Name)
(Signature of Authorized Representative)
TERMS AND CONDITIONS:
If the work is completed within 30 days of its commencement, payment in full is due upon receipt of
invoice. In all other cases payment for the work completed shall be due upon receipt of invoice covering
portion of work completed every 30th day after work commences while work is ongoing with final
payment due upon receipt of invoice covering final billing at completion of the contract. Non-payment in
accordance with the above shall be cause for terminating performance. If payments are not made when
due: interest, cost incidental to collection and attorney’s fees shall be added to the unpaid balance.
Interest shall accrue at the rate of 1.5 % per month. Not liable for failure to perform caused by strikes,
fire, adverse weather or anything beyond our control. Proposal limited to 30 days acceptance.
.
Proposal Submitted to:
South Bend Water Works
Attn: Eugene Pietsch
830 North Michigan Street
South Bend, IN 46601
Phone: 5742359482 E-Mail Address: epietsch@southbendin.gov
Eugene,
Below is our proposal for the re-roofing work at the Carriage Hills Wellhouse #4
Scope of Work:
1. Remove existing roof system to expose concrete deck.
2. Dry deck as needed for proper adhesion of new roof system.
3. Remove existing drain and downspout system
3.1. We will cap off the underside of the existing drain with metal, concrete fasteners and
sealant
4. Add wood nailer to the north, west and south edges of the roof to allow for tapered insulation
5. Adhere 1/8” per foot tapered poly-iso to concrete deck with low-rise two part insulation adhesive.
6. Fully adhere .060m EPDM roof system to the tapered insulation.
7. Install pipe boot and flash curb per manufactures specs.
7.1. We will be adding some custom fabricated metal corners to the curb for extra strength
and water tightness.
8. Add drip edge to all walls.
8.1. We will use white metal and seal to the roofing membrane using the appropriate
coverstrip.
9. Install gutter on the the east wall with a single downspout at the North East corner of the
building.
9.1. Fascia metal behind the gutter is not required by the roofing manufacture and will not
be present.
10. Remove all roofing generated debris and dispose of following local rules and regulations at a
properly licensed landfill.
11. Provide Manufacture’s 10yr NDL Warranty
Clarifications:
12. If a different metal color option is desired it is possible that the price might increase.
13. Slatile will complete the work within their schedule.
14. Add $500 if a 15yr NDL warranty is desire or $800 for a 20 yr NDL Warranty
Price: $21,000 (Twenty one thousand dollars)
_______________________________________________________________________ (Acceptance Signature) (Date)
_______________________________________________________________________ (Printed Name) (Position)
Job Location: Date: August 23, 2023
Carriage Hills
52311 Shenandoah Dr.
South Bend, IN 46635
1703 SOUTH IRONWOOD DRIVE
SOUTH BEND, IN 46613
WWW.SLATILE.COM
574-233-7485 - PHONE
574-233-7531 - FAX
Our price includes all necessary equipment and building permits to complete your project. All work will follow national building codes and all local codes. •
Due to the fact that our proposed repairs tie into an existing system, we cannot guarantee against further leaks or any unforeseen conditions related to the
watertight integrity of the entire system. We will guarantee our work for a period of 6 months from date of completion. • By signing above you acknowledge
that you are authorized to approve this work. • The project will be billed upon completion. Slatile is not responsible for errors or omissions. All payments are
due upon final inspection by the owner and/or their representative and a representative of Slatile Roofing and Sheet Metal Co., Inc. There will be a late fee of
1.5% per month for overdue payments plus any associated attorney and/or court fees associated with securing payment. • This price is subject to review
after 30 days.
Michael Albert
Service Department Manager
Phone: 574-233-7485 x3313
Email: michael.albert@slatile.com
Slatile Roofing and Sheet Metal Co., INC
Established 1924
Phone: 574-233-7485
Fax: 574-233-7531
BOARD OF PUBLIC WORKS
AGENDA ITEM REVIEW REQUEST FORM
Date 08/29/2023
Name Department Water
BPW Date 09/12/2023 Phone Extension 4210
Review and Approval Required Prior to Submittal to Board Diversity Compliance
and Inclusion Officer Officer Name BPW Attorney Attorney Name
Dept. Attorney Attorney Name Schmidt, Michael
Purchasing
Check the Appropriate Item Type – Required for All Submissions
Professional Services Agreement Contract Proposal
Open Market Contract Amendment/Addendum Special Purchase, QPA
Bid Opening Bid Award Req. to Advertise Title Sheet
Quote Opening Quote Award Reject Bids/Quotes
Proposal Opening C/O & PCA No. PCA
Chg. Order, No. Traffic Control Resolution
Other: Ease./Encroach
Required Information
Company or Vendor Name Dudeck Roofing & Sheet Metal
New Vendor Yes If Yes, Approved by Purchasing
No
MBE/WBE Contractor MBE
WBE Completed E-Verify Form Attached Yes
No
Project Name Carriage Hills Well #4 Roofing System Replacement
Project Number
Funding Source O&M
Account No. 0620-06-604-603-431000
Amount $17,800.00
Terms of Contract
Purpose/Description Replacement of failing roof on building.
_____________________________________________________________
For Change Orders Only
Amount of
Increase
Decrease
$
($ )
Previous Amount $
Current Percent of Change:
Increase
Decrease
%
( %)
New Amount $
Total Percent of Change:
Increase
Decrease
%
( %)
Time Extension Amount:
New Completion Date: