Loading...
HomeMy WebLinkAboutDraft 03072023 IPC Documents 1 of 6March Report (Feb 1-28) Inclusive Procurement Contracting Board Department of Public Works Report 1. BPW Awarded Contracts (February 2023) Five (5) Projects Awarded, Three (3) Projects had goals Two (2) Projects met goals. One (1) Project met goals by demonstrrating GFE. BPW Meeting 2/14/2023 MarMain Apartments Roof Replacement (Bid) Slatile Roofing and Sheet Metal for $436,012 Goals were met: 0.6 % M and 2.1% W Walker Field House Restoration Project (Quote) Acculevel Commercial Group, Inc. for $74,040 Goals were met by demonstrating Good Faith Efforts Pure Green Farms Basin Seeding (Quote) Naturally Native Nursery for $4,000 Project does not have goals; Quote less than $50,000 Nexus Center Site and Building Improvements (Open Market) R. Yoder Construction, Inc. for $293,270 Goals were met: 0.6 % M and 2.1% W BPW Meeting 2/28/2023 Miami Hills TIF Project (Open Market) H&H Renovations, Inc. for $1,584,305 Project does not have goals; Scope of work outside of NAICS codes within the program plan. 2. Project Completion Affidavits for February 2023 Two (2) Projects closed out BPW Meeting 2/14/2023 Change in utilization plan?Notes: Reason for change in utilization plan / If no goals why? No Projects Closed out BPW Meeting 2/28/2023 East Bank Trail Over Leeper Ave. Bridge Repairs No Goals met witout change in Utilization Plan Morris Performing Arts Center - Main Level Slab Replacement Yes Work anticipated was not needed. Larson Danielson utilized an MBE for all cleanup in lieu of K&S Engineers. 3. Total Dollars Committed by MWBE Goals 2023 Awarded Paid MBE $16,866.84 9,760.00$ WBE $34,110.00 341,013.00$ 50,976.84$ 350,773.00$ 4. Challenges (if any) N/A 5. Projects on the Horizon February (RTA) BPW Meeting 2/28/2023 2023 Street and Sewer Material Bid Opened 2/14/2023 2023 Asphalt Material Bid Opened 2/14/2023 2023 Guardrail Installation and Replacement Opened 2/14/2023