Loading...
HomeMy WebLinkAbout6B3log�3� SOUTH B@ F % Z Department of yr,Z Community Investment Memorandum February 28, 2013 TO: South Bend Redevelopment Commission FROM: Bill Schalliol SUBJECT: Professional Service Proposal - Danch Harner & Associates US 31 Industrial Park Section 1 Replat Attached to this memorandum is a professional service proposal from Danch, Harper & Associates to provide subdivision services for Lots 6 & 7 of the US 31 Industrial Park Section 1. The Redevelopment Commission was the original developer of this industrial park and this action will help to correct an issue with ownership, maintenance and control of the park's three common area retention ponds. The professional service proposal will provide survey and replat services to prepare a Two Lot/One Outlot Minor Subdivision for Lots # 6 & 7 of the U.S. 31 Industrial Park Section 1 Subdivision. The purpose of the Minor Subdivision is to split off from the buildable portion of the lots the existing retention basin. The proposed Outlot that will contain the retention basin will be owned by the City of South Bend. City Ordinances require the Minor Subdivision process for splitting the property as described above. The cost for the preparation of the Minor Subdivision, all required paper work, setting of property corners, attendance at required Plat Committee meetings, filing and recording fees would be $6,985. Staff requests approval of the proposal. 227 W. JEFFERSON BLVD. SOUTH BEND, IN 46601 1 P: 574 - 235 -9371 1 FAX: 574 - 235 -9021 1 SOUTHBENDIN.GOV M14Danch, Harner & Associates, Inc. Michael J. Danch, L.A. Ron Harper, P.S. Mr. Bill Schalliol- Assistant Director Community & Economic Development Department of South Bend 12°i Floor County -City Building 227 West Jefferson Blvd. South Bend, Indiana 46601 Land Surveyors • Professional Engineers Landscape Architects • Land Planners RE: Preparation of a Two Lot /One Outlot Minor Subdivision, Lots 6 and 7, U.S. 31 Ind. Park Section One, South Bend, Indiana: Dear Mr. Schalliol: February 8, 2013 Please accept this letter as our written cost proposal to provide your Department with Survey services to prepare a Two Lot /One Outlet Subdivision for Lots # 6 and #7 of the U.S. 31 Industrial Park Section One Subdivision. The purpose of the Subdivision is to split off from the buildable portions of lots 6 and 7 the existing retention basin. The proposed Outlot that will contain the retention basin will be owned by the City of South Bend. City Ordinances require the Minor Subdivision process for splitting the property as described above. Our cost estimate for the preparation of the Subdivision is shown below: A). Preparation of a Two Lot/ One Outlet Minor Subdivision for Lots # 6 and #7 of U.S. 31 Industrial Park, Section One; 1). The cost for the preparation of the Subdivision, all required paper work, setting of property comers, attendance at required Plat Committee meetings, filing and recording fees would be $ 6,985. If this proposal is acceptable, we will require a copy of the deed for the properties. With project approval by February 151', we could have crew on site within 8 -12 working days or less, and submit the subdivision for approval by March I 1 °i with approval on May 2nd. Any requested drawing revisions by any review agency would be done at our standard hourly rates, which are attached. If you have any questions concerning this matter, please feel free to give me a call at (574) 2344003. Sincerely, Approved By: Ke" J. 1?",d Date: Michael J. Danch President Danch, Hamer & Associates, Inc. "C" B. Schalliol Subdivision for Lots 6 and 7 U.S. 31 Sub. /Sec. One Md. 1643 Commerce Drive • South Bend, IN 46628 208 West Mars • Berrien Springs, MI 49103 Office: (574) 234 -4003 / (800) 594 -4003 • Fax: (574) 234 -4119 Office: (269) 471 -3010 • Fax: (269) 471 -7237 -2— Februarc 15, 3013 DANCH, HARNER & ASSOCIATES, INC. EFFECTIVE DATE: JANUARY 2013 SCHEDULE OF HOURLY RATES AND DIRECT EXPENSES CLASSIFICATION HOURLY BILLING RATE Senior Professional Engineer $138.00 Engineering Designer $80.00 Project Engineer $70.00 Senior Professional Land Surveyor $138.00 Senior Survey/Engineering Tech $80.00 Survey/ En ineerin Tech $55.00 Senior Professional Landscape Architect $138.00 Survey Manager $70.00 Two Person Field Crew $120.00 Princi al $138.00 Clerical $45.00 ITEM UNITS UNIT PRICE Mileage Miles $0.50 Copies* Each $0.25 Standard Size Prints 24 x 36 Each $4.00 Oversize Prints Square Foot $1.00 Vellums 24 x 36 size) Each $10.00 Overnight Travel: Meals Cost Lodging Cost Public Transportation Cost *Note: Copies include 81/2 x 11, 81/2 x 14, or 11 x 17 size sheets. US 31 Industrial Park Drainage Ponds i IF4 a z4 ! R } r(r s f • ..I ... -. '� • r _ [ r� p 1 4 t Q J p.. r