HomeMy WebLinkAboutChange Order No 3 - North Water Treatment Plant Improvements Proj No. 119-011 - Bowen Engineering Corp.1316 COUNTY -CITY BUILDING 227 W. JEFFERSON BOULEVARD SOUTH BEND, INDIANA 46601-1830 PHONE 574/235-9251 FAx 574/235-9171 CITY OF SOUTH BEND TAMES MUELLER, MAYOR BOARD OF PUBLIC WORKS August 22, 2023 Mr. Mitchell Stull Bowen Engineering Corporation 8802 N. Meridian St. Indianapolis, IN 46260 mstullkbowenen ing eering com RE: Change Order No. 3 — North Water Treatment Plant Improvements Project No. 119-011 Dear Mr. Stull: At its August 22, 2023 meeting, the Board of Public Works approved the above referenced Change Order be increased by $5,687 with an additional one hundred eighty-one (181) days, bringing the revised contract amount to $3,557,327 with a new completion date of November 30, 2023. Enclosed is a copy of the Change Order for your records. If you have any further questions, please call this office at (574) 235-9251. Sincerely, Is/ Theresa Heffner Theresa Heffner, Clerk Enclosures TH/lh ELIZABETH A. MARADIK JOSEPH R. MOLNAR GARY A. GILOT ALEXANDRA DOLZ-LANE MURRAY L. MILLER INTER -OFFICE MEMORANDUM DEPARTMENT OF PUBLIC WORKS DIVISION OF ENGINEERING TO: Theresa Heffner, Clerk Board of Public Works FROM: Becca Plantz, Project Engineer SUBJECT: Change Order 3 Project No. 119-011 DATE: August 11, 2023 This contract was originally awarded as an open market contract after being opened first on November 9, 2021. The open market contract was awarded on April 26, 2022, and owner direction was provided to wait until after the summer season to shut the plant down. Additional field orders from the owner and research for discussions to finalize requests for information support the reason for extending the substantial completion to October 31, 2023, or scope complete to the point that the plant can come back on in this time. Field orders and RFIs resulting in delay include replacing manways on each vessel per R-Stamp standards, applying to be removed from the state registered list of vessels prior to repairs, and filter clarifications on pre -conditioned media. The final completion is being set for November 30, 2023, to encompass discharge water head pipe replacement. The increase of this change order in the amount of $5,687 is a net total of field orders and savings found in the allowances and unit price items. Increased costs are associated with the need to replace the hatches on each vessel, the testing required for this level of replacement, repair and replacement of the degrading discharge head in the upper level, and a support gravel size change during media placement. The physical rehabilitation of the vessels is nearing completion with less structural concerns encountered than prepared for, resulting in savings identified in the allowances and unit prices designed for this scope. Please call with your questions (5998). DATE: PROJECT NO: PROJECT NAME: CONTRACT DATE: CHANGE ORDER NO. CITY OF SOUTH BEND DEPARTMENT OF PUBLIC WORKS PROJECT CHANGE ORDER 08/10/2023 North Water Treatment Plant Improvements 4/26/2022 3 SUBJECT OF CHANGE ORDER: Extending the completion date for field orders and time for research to finalize responses to requests for information. Includes unit price savings and the addition of the discharge water head replacement. The original contract sum $ 3,582,800.00 Net change by previously authorized change orders $ (31,160.00) The contract sum prior to this change order $ 3,551,640.00 By this Change Order, the project amount is ® Increased ❑ Decreased $ 5,687.00 The new contract sum including this change order This Change Order represents a total change of Total change for entire project Original contracted completion date/time Extension of date/time by previous change orders Date/time extension by this change order New completion date/time CONTRACTOR Contractor Signature Mitchell Stull, Sr. Project Engineer Printed Name and Title Bowen Engineering Company name 8802 N. Meridian St Address 3,557,327.00 0.16 % 1.07) % Substantial: 8/ 15/22, Final 9/ 15/2022 260 days 181 days Substantial: 10/31/23, Final 11/30/2023 RECOMMENDED FOR APPROVAL I- " PROJECT MANAGER CITY OF SOUTH BEND BOARD OF PUBLIC WORKS Approved Date: CITY OF SOUTH BEND, INDIANA BOARD OF PUBLIC WORKS Elizabeth A. Maradik, President Gary A. Gilot, Member Indianapolis, IN, 46260 City, State, Zip Murray L. Miller, Member Joseph R. Molnar, Vice President Alexandra Dolz-Lane, Member 4 Attest: Theresa M. Heffner, Clerk Date: August 22, 2023 July 6, 2022 City of South Bend Attn: Rebecca Plantz 227 West Jefferson Boulevard South Bend, IN 46601-1830 BdWiEN Engineering Corporation CONTRACTORS • ENGINEERS RE: South Bend North Treatment Plant Improvements Bowen Project Number: 15 — 22 — 042 PCO-02 Filter Vessel Spring Assisted Manways, Revision 2 Rebecca: Bowen Engineering (BEC) is pleased to submit this proposal for the Owner's review of the associated additional work. Scope: - Remove and replace ten (10) spring assisted manways on the five (5) filter vessels (two (2) per vessel) of the North Station for the lump sum cost listed below. - Revision No. 2 includes cost for 3rd party NDE Testing Lump Sum Cost: Clarifications: - BEC Cost o Labor & Equipment : $ 72,957.00 o Material $ 69,676.07 o Mark -Up $ 21,255.93 - Lump Sum Cost $ 163,889.00 - Existing hatches will be replaced in kind. (See attached marked -up catalog for reference) - Repairs will conform to the current edition of the National Board Inspection Code (NBIC) and the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code (BPVC). - Bowen Engineering/Locke AMI are authorized to complete R-stamp repairs. - Manways will be cut at the existing tank nozzle / manway hub connection weld. New manways will be welded at the same existing tank nozzle. (See attached marked up drawing for reference) - This proposal assumes no repairs or alterations to the tank shell will be required. - No pressure testing has been included other than an in-service test. - One mobilization has been included. Additional mobilization if required will incur additional costs. - No overtime has been included. - Additional contract time will be required. A revised substantial completion date will be mutually agreed to. CONTRAETOR OF CHOICE 8802 North Meridian St. • Indianapolis, IN 46260 AYfY� 317.842.2616 phone • 317.841.4257 fax • BowenEngineering.com PAGE 1OF2 HdWEN Engineering Corporation CONTRACTORS • ENGINEERS Please review, and if you have any questions, please do not hesitate to contact me. Sincerely, Mitchell Stull Senior Project Engineer Mobile: 317-650-8313 1 Email: mstull@bowenengineering.com CC: Bradley VanOosterum — City of South Bend, Mark Rackow — Black & Veatch, Pat Stanford — BEC, Tony Abitua — BEC, Margaret Burroughs — BEC CONTRACTOR OF CHOICE 8802 North Meridian St. • Indianapolis, IN 46260 • 317.842.2616 phone • 317.841.4257 fax • www.BowenEngineering.com PAGE 2OF2 August 9, 2023 City of South Bend Attn: Rebecca Plantz 227 West Jefferson Boulevard South Bend, IN 46601-1830 EldwiEN • Engineering Corporation CONTRACTORS • ENGINEERS RE: South Bend North Treatment Plant Improvements Bowen Project Number: 15 — 22 — 042 PCO-03 Pine Repair + Vessel #3 thru #5 FW Header Replacement — Revised Price No. 3 Rebecca: Bowen Engineering (BEC) is pleased to submit this proposal for the Owner's review and approval for the additional scope of work of replacing a portion of the 30" stainless steel fabricated pipe on the common finish water header at the North Station. Lump Sum Cost: $ 192,753.00 Scope: - Remove existing stainless steel fabricated 30" 90' Bend, 30" x 18" reducing tee, and 30" x 24" reducer and replace in kind with new and an additional 24" flange. - Add 24" stub end and flange on existing pipe. - Remove existing 30" and 18" stub ends and replace with new. Cut and prep pipe as required. - Heli arc all welds, argon purge. - Material of construction 0 1 EA — 30" 316L stainless steel SCH 10 fabricated 30" 90° Bend, 30" x 18" reducing tee, and 30" x 24" reducer. 0 1 EA — 30" 316L stainless steel SCH 10 Type A stub end 0 1 EA — 24" 316L stainless steel SCH 10 Type A stub end 0 1 EA — 18" 316L stainless steel SCH 10 Type A stub end 0 1 EA — 30" 150# galvanized back up flange. 0 1 EA — 24" 150# galvanized back up flange. 0 1 EA — 18" 150# galvanized back up flange. 0 1 EA — 30" bolt back with gasket 0 1 EA — 24" bolt back with gasket 0 1 EA — 18" bolt back with gasket Optional Credit-01 As an optional deduct, if the replacement of the 30" and 18" stub end is eliminated from the scope of work, the credit value for this scope reduction would be $30,839.00 (Adjusted proposal value with credit considered would be $161,914.00). Attached is a one -line sketch of the proposed piping replacement associated with this proposal. CONTRACTOR OF CHOICE 8802 North Meridian St. • Indianapolis, IN 46260 317.842.2616 phone • 317.841.4257 fax • BowenEngineering.com PAGE 1 OF 2 BOWEN Engineering Corporation CONTRACTORS • ENGINEERS Clarifications: - No pressure testing has been included other than an in-service test. - No weld inspection / NDE Testing has been included. - One mobilization has been included. Additional mobilization if required will incur additional costs. - No overtime / premium time has been included. - Pipeline can be isolated for the duration required to complete the scope of work. - Plant personnel will be responsible for isolation of areas as required to complete the scope of work. - Zimmerman is a trusted contractor of the City of South Bend. Therefore, to reduce the cost of the proposal, BEC has eliminated supervision cost to oversee Zimmerman and will not be onsite. - Additional contract time will be required. A revised substantial completion date will be mutually agreed to. Thank you for the opportunity, Mitchell Stull, Senior Project Engineer Mobile: 317-650-8313 1 Email: mstull@bowenengineering.com CONTRACTOR OF CHOICE 8802 North Meridian St. • Indianapolis, IN 46260 • 317.842.2616 phone • 317.841.4257 fax • www.BowenEngineering.com PAGE 2 OF 2 July 6, 2023 City of South Bend Attn: Rebecca Plantz 227 West Jefferson Boulevard South Bend, IN 46601-1830 BdWiEN Engineering Corporation C CONTRACTORS • ENGINEERS RE: South Bend North Treatment Plant Improvements Bowen Project Number: 15 — 22 — 042 PCO-06 Unused Allowance + Unit Price Budeet Rebecca: Please see the attached breakdown of the unused allowance and unit price budgets dollars that will be coming back to the City of South Bend. Total PCO Lump Sum Credit: $357,428.00 Please review, and if you have any questions, do not hesitate to contact me. Sincerely, Mitchell Stull Senior Project Engineer Mobile: 317-650-8313 Email: mstull@bowenengineering.com EQNTRAETDR ❑F CHOICE I 01F 8802 North Meridian St. • Indianapolis, IN 46260 317.842.2616 phone • 317.841.4257 fax • Bowen Engineering.com PAGE 1 OF 1 119-011, (15-22-042) South Bend North Filter Project — PCO-06 Unused Allowance + Unit Price Budget 1 OF 1 Combined Filter Allowances Unit Price Weld Work Total Internal Components (Hungerford & Terry Material Cost) Internal Components (Bowen Labor Complete) Gravel Retaining Screen Angle Refurbishment Plug Welds Stud and Clip Repairs Pipe Hanger / Manway Weld Outs $ 500,000.00 $ 369,500.00 Notes 7/6/2023 $ (305,870.00) Billed under Lump Sum tab. Allowances adjusted and billed out per each filter $ (54,970.00) Billed under Lump Sum tab. Allowances adjusted and billed out per each filter $ (10,000.00) Billed under Lump Sum tab. Allowances adjusted and billed out per each filter $ (51,985.00) Billed under Unit Price tab of the Pay Application per each filter $ (83,135.00) Billed under ASI-2 under the Unit Price Tab of the Pay Application $ (6,112.00) Billed under ASI-3 under the Unit Price Tab of the Pay Application PCO-06 Unused Allowance + Unit Price Budget $ 357,428.00 June 27, 2023 City of South Bend Attn: Rebecca Plantz 227 West Jefferson Boulevard South Bend, IN 46601-1830 BdWiEN Engineering Corporation CONTRACTORS • ENGINEERS RE: South Bend North Treatment Plant Improvements Bowen Project Number: 15 — 22 — 042 PCO-07 Red Flint Option #3— Suaaort Gravel Rebecca: Bowen Engineering (BEC) is submitting this proposal for alternate 5th layer support gravel. After review by the City of South Bend and Black & Veatch, Bowen was released to order the material. Different pricing and material options were provided during the selection process of the alternate 5th layer material. Option #3, supplied by the manufacturer Red Flit, was selected on 06/13/2023 via email. Lump Sum: $6,473.00 Please review, and if you have any questions, please do not hesitate to contact me. Sincerely, Mitchell Stull Senior Project Engineer Mobile: 317-650-8313 1 Email: mstull@bowenengineering.com CQNTR,4CTOR OF CHOICE ""`w 8802 North Meridian St. • Indianapolis, IN 46260 AYfA� 317.842.2616 phone • 317.841.4257 fax • BowenEngineering.com PAGE 1 OF 1 City of South Bend Department of Administration & Finance Change Order Request Form Changing the line amount: You can only change a line amount if it has NOT been invoiced against. • If the line has NOT been invoiced — reduce the line amount to equal what it should be. • If the line has been invoiced — cancel the delivery remainder and finalize the individual line, then add a new line for the amount that should be remaining. Multiple PO lines: If you have changes to more than two lines on the same PO, fill out a separate section for each line affected by the change order. Project POs: For change orders on project -related POs, this form must be approved by the Project Accounting Team as described in Supplement 508. PO Number PO-0016353 Line Number 5 Original Dollar Amount $0.00 New Dollar Amount For liquidation request, enter $0 $5,687.00 Reason Code if changed) na Financial Dimensions (fund-dept- division -subdivision -main account 622-06-604-620-442005 Project Code if applicable) PROJ-56 Description of change (include budget impact) Decrease in the contract as a net total of field orders and savings under the allowances and unit prices. APPROVED BY PROJECT ACCOUNTING TEAM (if applicable) Ron O'Connor 08-14-2023 PO Number Line Number Original Dollar Amount New Dollar Amount For liquidation request, enter $0 Reason Code if changed) Financial Dimensions (fund-dept- division-subdivision-main account Project Code if applicable) Description of change (include budget impact) APPROVED BY PROJECT ACCOUNTING TEAM (if applicable) PO Number Line Number Original Dollar Amount 2023 08 August 14 PO-16353 Bowne Engineering PO Change Order Request Form - Increase Line #5 - RP 1 of 3 BOARD OF PUBLIC WORKS AGENDA ITEM REVIEW REQUEST FORM Date 08/11 /2023 Name Becca Plantz Department Public Works BPW Date 08/22/2023 Phone Extension 5998 Review and Approval Required Prior to Submittal to Board Diversity Compliance and Inclusion Officer ❑ Officer Name BPW Attorney ❑ Attorney Name Dept. Attorney ❑ Attorney Name Purchasing ❑ Michael Schmidt Check the Appropriate Item Type — Required. for All Submissions ❑ Professional Services Agreement ❑ Contract ❑ Proposal ❑ Open Market Contract ❑ Amendment/Addendum ❑ Special Purchase, QPA ❑ Bid Opening ❑ Bid Award ❑ Req. to Advertise ❑ Title Sheet ❑ Quote Opening ❑ Quote Award ❑ Reject Bids/Quotes ❑ Proposal Opening ❑ C/O & PCA No. ❑ PCA ® Chg. Order, No. 3 ❑ Traffic Control ❑ Resolution n Other: n Ease./Encroach Information Company or Vendor Name Bowen Engineering Corporation ❑ Yes❑ If Yes, Approved by Purchasing New Vendor ❑ No ❑ MBE/WBE Contractor Completed E-Verify Form Attached ❑ WBE ❑ Nos Project Name North Water Treatment Plant Improvements Project Number 119-011 Funding Source River West TIF & Water Works Capital Account No. PO-16353 Amount Terms of Contract Purpose/Description Extending the completion date in the contract to encompass field orders and time for research and discussions to finalize responses to requests for information. Decreasing the contract amount according to net savings. For Change Orders Only Amount of ® Increase $5,687.00 ❑ Decrease $ Previous Amount $ 3,551,640.00 Current Percent of Change New Amount Total Percent of Change: Time Extension Amount New Completion Date: Increase Decrease $ 3,557,327.00 Increase Decrease 181 Days Substantial: 10/3 %0.16 (1.07%) )23. Final: 11/30/2023