HomeMy WebLinkAboutOpening of Bids - 2023 Curb and Sidewalk Program Proj No. 123-001 - Milestone ContractorsH A� .r w s CITY OF SOUTH BEND, INDIANA ' CONTRACTOR'S BID FOR PUBLIC WORK CHECKLIST FOR BIDDERS Project Name 2023 Curb and Sidewalk Program Project No. 123-001 For Bids Due August 8t', 2023 From time to time the South Bend Board of Public Works finds it necessary to reject a bid because it does not comply with statutory requirements. In preparing your bid, please use the following checklist in order to make sure that your bid is done in the proper manner. Proper bid security included. The bidder has the option of providing either a Certified Check X or Bid Bond. Bid prepared on the City of South Bend Contractor's Bid for Public Work Form, completely X executed. Contractor's Non -Collusion and Non -Debarment Affidavit, Certification Regarding Investments with Iran, Employment Eligibility Verification, Non -Discrimination Commitment, and X Certification of use of United States Steel Products or Foundry Products. Proof of M/WBE Utilization Plans [MBE-1.0 and WBE-1.0]. Also provide Evidence of Good Faith Efforts Forms [MBE-2.0 and WBE-2.0] and M/WBE Contacted Forms [MBE-2.1 and X WBE-2.1]. X Acknowledge Receipt of 1 Addendum(s) included with the bid. X All required additional information is included with the bid. Proposal statements and other affidavits all signed by the proper party with name either X printed or typed underneath signature. X This checklist submitted with the Bid. This checklist is provided for bidder's use in assuring compliance with required documentation; however, it does not include all specifications requirements and does not relieve the bidder of the need to read and comply with the specifications. Bidder: Milestone Contractors North I Date: 8/8/2023 By Authorized Representative; Signature: Print Name & Title: aun P. Hilary, Director of Estimating Version 09/29/2021 Contractor's Bid for Public Works - 1 CITY OF SOUTH BEND, INDIANA CONTRACTOR'S BID FOR PUBLIC WORK RESPONSIBLE BIDDER CHECKLIST Project Name 2023 Curb and Sidewalk Program Project No. 123-001 For Bids Due August 8t', 2023 Contractor Name: Milestone Contractors North, Inc. The City seeks to enhance its ability to identify responsive and responsible bidders on all City public works projects by institution of comprehensive submission requirements in compliance with State law. Quality workmanship, efficient operation, safety, and timely completion of projects requires that all bidders meet certain minimum requirements to be responsive and responsible bidders. THIS FORM MUST BE SUBMITTED WITH YOUR BID. INSTRUCTIONS: If you are a pre -qualified bidder, complete Section I only. If you are not a pre -qualified bidder, complete Section II only. Section II acts as an application for pre -qualification. Submission of Section II will allow the bidder to be considered for pre -qualification for bids with the City of South Bend Department of Public Works. Pre - qualified bidders will then be exempt from a portion of the submission requirements outlined in Section 6- 63 of The Responsible Bidding Ordinance No. 10594-18 (hereinafter, "Responsible Bidding Ordinance") for a period of twelve (12) months. Thereafter, contractors who are pre -qualified must submit a complete application for continuation of "pre - qualified" standing, on a form provided by the City ("Responsible Bidder Checklist (1) Pre -Qualified Bidders") by December 31 sc for the upcoming calendar year, or within twelve (12) months of obtaining pre - qualified standing. If the status of any item changes within the twelve (12) months, it is the responsibility of the contractor to notify the City. Failure by any pre -qualified contractor to submit its complete application for continuation of "pre -qualified" standing within the time prescribed above shall result in automatic removal of the designation, effective January 1 of the following year, or immediately following the twelve (12) months of pre -qualified standing. However, the "removed" contractor or subcontractor shall still be permitted to bid on City public works projects, though the contractor must submit all required documents under 6-63 until "pre -qualified" status is re-established. Please Note: The City reserves the right to request supplemental information from the bidder, additional verification of any information provided by the bidder, and may also conduct random inquiries of the bidder's current and previous customers regardless of pre -qualified standing. It is the sole responsibility of the potential bidder to comply with all submission requirements applicable to the bidder in Section 6-63 of the Responsible Bidding Ordinance no later than the date of the public bid opening. Version 02/23/2022 General Conditions -10 POST BID SUBMISSIONS: Post -bid submissions must be submitted in accordance with Section 6-64 of the Responsible Bidding Ordinance. The post -bid submission requirements are as follows: 1. All bidders shall collect, maintain, and provide upon request, a current written list that discloses the name, address, licensing status, and type of work for any subcontractor from whom the bidder has accepted a bid and/or intends to hire on any part of the public work project, including individuals performing work as independent contractors. 2. Each subcontractor, whose portion of the project is estimated to be at least one -hundred fifty thousand dollars ($150,000.00), shall be required to adhere to the requirements of Section I of the Responsible Bidder Ordinance as though it were bidding directly to the City, except that the subcontractor shall submit the required information (including the name, address, and type of work) to the successful bidder prior to the commencement of work. 3. Failure of a subcontractor to submit the required information shall not disqualify the successful bidder from performing work on the project and shall not constitute a contractual default and/or breach by the successful bidder. However, the City may withhold all payment otherwise due for work performed by a subcontractor, until the subcontractor submits the required information and the City approves such information. 4. The disclosure of a subcontractor list ("Disclosed Subcontractor(s)") to the City by a bidder shall not create any rights in the Disclosed Subcontractor(s). Thus, a bidder may substitute another subcontractor for a Disclosed Subcontractor by giving the City, upon request, written notice of the name, address, licensing status, and type of work of the substitute subcontractor. 5. The successful bidder and all subcontractors on a public works project are required to submit certified payroll utilizing the federal form known as WH-347 or a similar form on a bi-weekly basis, submitted within 10 days after the end of each bi-weekly payroll period. Certified payrolls shall identify the job title and craft for each employee. Certified payrolls shall be submitted electronically. Please Note: Submissions deemed inadequate, incomplete, or untimely by the City may result in the automatic disqualification of the bid. The City, after review of complete and timely submissions, shall, in its sole discretion, after taking into account all information in the submission requirements, determine whether a bidder is responsive and responsible, and provide a Pre -Qualification Verification Letter. The City specifically reserves the right to utilize all information provided in the contractor's submission and any information obtained by the City through its own independent verification of the information provided by the contractor. Version 02/23/2022 General Conditions -11 PRE -QUALIFIED BIDDER CHECKLIST (a) Acknowledgements: (i) X By checking this box, I hereby acknowledge that I am a pre -qualified bidder with the City of South Bend and that I have met the pre -qualification requirements within the last twelve (12) months. A copy of my Pre -Qualification verification letter is attached. (ii) X By checking this box, I hereby acknowledge that the City reserves the right to request supplemental information, additional verification of any information provided by me, and may also conduct random inquiries of my current and prior customers. (b) Attachments: (i) X Indiana Secretary of State's on-line records (ie. Business verification) dated within sixty (60) days of the submission of said document showing that business is in existence, current with the Indiana Secretary of State's Business Entity Report, and eligible for a certificate of good standing. (Not applicable to individuals, sole proprietors or partnerships). (ii) X Statement on staffing capabilities, including labor sources. This statement indicates and ensures I have sufficient employees on staff to complete the work. It outlines how I intend to meet the staffing needs of the work. (iii) X List of projects of similar size and scope of work performed in all areas, including the State of Indiana, within the last three (3) years. (iv) X For every project, submit evidence of participation in apprenticeship and training programs, applicable to the work to be performed on the project, which are approved by and registered with the United States Department of Labor's Office of Apprenticeship, or its successor organization. Version 02/23/2022 General Conditions -12 II. PRE -QUALIFICATION CHECKLIST (FOR BIDDERS THAT ARE NOT PRE -QUALIFIED) (a) Acknowledgements: (i) _ By checking this box, I hereby acknowledge that I am not a pre -qualified bidder with the City of South Bend. (ii) _ By checking this box, I hereby acknowledge that the City reserves the right to request supplemental information, additional verification of any information provided, and may also conduct random inquiries of my current and prior customers. The City reserved the right to utilize all information provided in this submission and all information obtained in inquiries or requests to determine if a bidder is responsive and responsible. Additionally, I acknowledge that all information provided to the City shall be regarded as public records. (iii) _ By checking this box, I hereby acknowledge that copies of all Applicable apprenticeship certificates or standards for training programs applicable to the work performed on the project may be requested at any time and shall be furnished upon request. (iv) _ By checking this box, I hereby acknowledge and ensure that I and all sub- contractors, from whom I have accepted a bid and/or intend to hire to perform work on the public work project, are properly licensed. Furthermore, I acknowledge my understanding that it is my responsibility to ensure that all sub -contractors have the necessary licenses to undertake the work called for in this bid. If a sub- contractor loses their license at any point, it is the responsibility of that sub- contractor to notify the City. (b) Attachments: (i) _ Indiana Secretary of State's on-line records (ie. Business verification) dated within sixty (60) days of the submission of said document showing that business is in existence, current with the Indiana Secretary of State's Business Entity Report, and eligible for a certificate of good standing. (Not applicable to individuals, sole proprietors or partnerships). (ii) _ List identifying all former business names. (iii) _ Any determinations by a court or governmental agency any violations of federal state, or local laws including, but not limited to, violations of contracting or antitrust laws, tax or licensing laws, environmental laws, Occupational Safety and Health Act (OSHA), or federal Davis -Bacon and related Acts, within the preceding five (5) years. (iv) _ Statement about staffing capabilities, including labor sources. This statement indicates and ensures I have sufficient employees on staff to complete the work I am bidding on OR outlines how I intend to meet the staffing needs of the work. (v) _ Statement that individuals who will perform work on the public work project on my behalf will be properly classified as an employee or as an independent contractor under all applicable state and federal laws and local ordinances. (vi) _ For every project, submit evidence of participation in apprenticeship and training programs, applicable to the work to be performed on the project, which are approved by and registered with the United States Department of Labor's Office of Apprenticeship, or its successor organization. (vii) _ Copy of a written plan for employee drug testing that covers all of my employees who will perform work on the public work project and meets or exceeds the requirements set forth in IC 4-13-18-5 or IC 4-13-18-6. (viii) _ Evidence that I am utilizing a surety company which is on the Bureau of Fiscal Service "Department of Treasury's Listing of Approved Sureties" as required in the bid specifications or contract. Version 02/23/2022 General Conditions - 13 (ix) _ Written statement of any federal, state or local tax liens or tax delinquencies owed to any federal, state or local taxing body in the preceding three years. (i) _ List of projects of similar size and scope of work performed in all areas, including the State of Indiana, within three (3) years prior to the date on which the bid is due. Milestone Contractors North, Inc. (Name of Company) 24358 SR 23 (Address of Company) South Bend (City) Indiana (State) 574-288-4811 (Telephone Number) Version 02/23/2022 General Conditions - 14 1316 COUNTY -CITY BUILDING 227 W. JEFFERSON BOULEVARD SOUTH BEND, INDIANA 46601-1830 PHONE 574/235-9251 FAx 574/ 235-9171 TDD 574/ 235-5567 CITY OF SOUTH BEND JAWS MUELLER, MAYOR BOARD OF PUBLIC WORKS Date: August 2, 2023 To: All Planholders From Theresa Heffner, Clerk, Board of Public Works Subject Addendum Number: 1 Project Name: 2023 Curb and Sidewalk Program Project Number: 123-001 ACKNOWLEDGEMENT OF RECEIPT OF ADDENDUM Date Received: 8/2/2023 This addendum is being forwarded to you for the above referenced project. Please sign below and acknowledge receipt of this Addendum by faxing this sheet to the Board of Public Works at (574) 235-9171 within 48 hours of receipt. A copy MUST also be included with your bid package upon submittal. THIS ADDENDUM MAY AFFECT YOUR BID. Notes: The attached documents are hereby added to the Specifications and Contract Documents and become a part of herein. Company: Milestone Contractors North Authorized Signature: Hilary, Director of Estimating Date: Version 4/2/2015 Responsible Bidding Practices and Submission Requirements for Pre -Qualified Bidder Checklist (b) Attachments (i) Attached Staffing Capabilities: Milestone Contractors North, Inc. is signatory with the following unions which supply our workforce — Laborers International Union, Teamsters, Operating Engineers and Cement Masons. (iii) See Forms 96 and 96a (iv) All individuals who will perform worn on the public works project on behalf of Milestone Contractors North, Inc. will be properly classified under applicable state and federal laws and local ordinances. Dated: August St', 2023 P. Hilary, Director of Estimating INDIANA LABORERS' TRAINING TR UST FUND David A. Flye Secretary -Treasurer Jerry J. Bolk Ricky Henson, Jr. Ramon Mendoza, Jr. Brian Short Danny L. Stults P.O. Box 758 - Bedford, Indiana 47421 (812)279-9751 November 14, 2022 To Whom It May Concern: Sean Coakley Director John A Brown Chairman Kelly Abel Michael Ferrara Stan Meyer Nick Timmerman Jim Wiseman FAX: (912) 279-5545 Toll Free (800) 742-4086 This letter is to confirm that "Milestone North Inc" is a signatory contractor in good standing with the Indiana Laborers' Training Trust Fund. The above -mentioned company is a participant in the Joint Apprenticeship and Training Committee through this Union and has been an active participant in good standing for each of the past five plus consecutive years, and is currently eligible to use our apprentices on a project. Further, our organization's program is approved by the U.S. Veterans Administration to participate in the GI educational benefits program. A copy of our approval letters are attached along with the collective bargaining agreement stating the ratios of Journey workers to Apprentices; which is one (1) Apprentice for every five (5) Journey workers and thereafter may not employ more that (1) Apprentice for every (3) Journey workers. Sincerely, Sean Coakley, Director SC:ap www. fndianalaborerstraining. org uu ut �p�r�tticc�l� -d g�tg akv joft. INDIANA LABORER'S TRAINING TRUST FUND BEDFORD, INDIANA for the trade classification of CONSTRUCTION CRAFT LABORER Reyislereo( as part of fhe Xafionaj ,1'pprenlice,60 .l royram in accororance uriiA lie basic sfano6rd of apprenlicesAip es1a6l'sAeo,r 6y the r3ecrelary of Babor December 14, 1995afz zwe IN040-0528 -Tsv t.&w X. 2t.wlot'Bu sou of d fiwu x oml?wtak� STATE OF INDIA -�t4p%� DEPARTMENT OF VETERANS AFFAIRS STATE APPROVING AGENCY 402 WEST WASHINGTON STREET ROOM W- 469 INDIANAPOLIS, INDIANA46204-2738 Jeremy Brewer Apprenticeship Coordinator Indiana Laborers Training Trust Fund -Apprenticeship 439 Patton Hill Rd. Bedford, IN 47421 Dear Jeremy Brewer, Eric Holcomb, Governor Jarnes M. Brown, Director January 9, 2019 The Indiana State Approving Agency conducted a supervisory visit on 01 2019 at Indiana Laborers Training Trust Fund -Apprenticeship. The purpose of the visit was to provide training to the Certifying Officials and review enrollment certifications, record retention and reporting procedures. The organization demonstrated proper record maintenance and record maintenance and reporting procedures: During the visit, we discussed the importance of reporting hours on a monthly basis, good record keeping techniques, and how to report a leave of absence or completion via VA Form 22-1999b. We also updated the Certifying Officials via VA Form 22-8794, work processes, and wage scale. If you need any assistance or have any questions regarding this technical visit please contact me directly attgdffm@dv&in.gov or (317) 232-3 916. Thank you for the courtesy extended during my visit. The education and training opportunities that your organization continues to provide veterans and their dependents are appreciated. Sincerely, Taniqua Un fS.n Program Director Phonc (317)-234-6062 Toll Free (800)M00- 4520 Fax (317)-234-8744 STATE OF INDIANA DEPARTMENT OF VETERANS AFFAIRS STATE APPROVING AGENCY 402 WEST WASHINGTON STREET ROOM W468 INDIANAPOLIS, INDIANA 46204-2738 Jeremy Brewer Apprenticeship Coordinator Indiana Laborers Training Trust Fund -Apprenticeship 439 Patton Hilt Rd. Bedford, IN 47421 Dear Jeremy Brewer, Eric Ho)oomb,, Govemo� James M. Brown, Director January 9, 2019 This will acknowledge receipt of your updated Wage Scale fnr the Construction Craft Laborer program offered by Indiana Laborers Training Trust Fund -Apprenticeship. The State Approving Agency has reviewed the document as listed below: Wage Scale: Construction Craft Laborer FACILITY CODE: 30004114 To the best of my knowledge Indiana Laborers Training Trust Fund Apprenticeship does not utilize erroneous or misleading advertisement, either by actual statement; omission, or intimation. It is understood by Indiana Laborers Training Trust Fund -Apprenticeship that they will maintain a complete record of all advertising utilized by or on behalf of the Indiana Laborers Training Trust Fund -Apprenticeship in regards to their training programs during the preceding 12 months. Indiana Laborers Training Trust Fund -Apprenticeship's advertising will be available for review by any and all future supervisory visits by the SAA, or the U.S. Department of Veteran Affairs. Please Review the entire packet for content and accuracy. Approval is granted pursuant to the provisions of Title 38, U.S. Code 3687, with an effective date of April 1, 2018. If you have any questions, please feel free to give me a call at 317-232-3916 or email me at tgdffin@dva.in.gov. Thank you for what you do for our Veterans, and have a great day! Sincerely, Taniqua Griffin Program Director State Approving Agency Cc: VAROlELR qpp� DVAEQ r�,o�Nq 9 s�A 001No STATE OF INDIAN DEPARTMENT OF VETERANS AFFAIRS STATE APPROVING AGENCY 402 WEST WASHINGTON STREET ROOM W-459 INDIANAPOLIS, INDIANA46204-2738 Jeremy Brewer Apprenticeship Coordinator Indiana Laborers Training Trust Fund Apprenticeship 439 Patton Hill Rd. Bedford, IN 47421 Dear Jeremy Brewer, Ede Holcomb, Governor James M. Brown, DirecEoi January 9, 2019 This will admowledge receipt of your revised Work Processes for the Construction Craft Laborer program offered at Hoosier Energy, located in Bedford, Indiana. The State Approving Agency has reviewed the document as listed below: Construction Craft Laborer FACILITY CODE: 30004114 4,000-7800 hours 47-2061.00 To the best of my knowledge Indiana Laborers Training Trust Fund -Apprenticeship does not utilize erroneous or misleading advertisement, either by actual statement, omission, or intimation. It is understood by Indiana Laborers Training Trust Fund -Apprenticeship that they will maintain a complete record' of all advertising utilized by or on behalf of the company in regards to their training programs during the preceding 12 months. The company's advertising will be available for review by any and all fiAwe supervisory visits by the SAA, or the U.S. Department of Veteran Affairs. This approval is made pursuant to and under the provisions of Title 38, U. S. Code 3687, with an effective date of January 8, 2019. If you have any questions, please contact me at 317-232-3916. Sincerely, Taniqua Griffin Program Director State Approving Agency Cc:VAROlELR Phone (317)-234-6062 Toll Free (800)-400-4520 Fax (317)-234-8744 Apprentice Status Report By Indenture Date Apprentices Indentured Between 1/1/2018 And 7113/2022 Apprentke Program: IN2 Year Apprentice Status Apprentices Percentage 2018 2019 Active 68 8.05 % Active Duty 2 0.24 % Adv. W ]ourneyman 89 10.53 % Deoeased 5 0.59 % Graduated 71 MO % Inactive 10 1.18 % fume" 2 0.24 % Mad. Susp. 1 0.12 % Reinstate 6 0.71 % Suspended 7 0.83 % Tenrinated 5% 64.62 % Voluntary withdraw 381 4.50 % Total Indentured 845_ Active 165 17.65 % Adv. to Journeyman 72 7.70 % Deceased 8 0.86 % Graduated 51 5.45 % Inactive 11 1.18 % Joumeyman 12 1.28 % Med. Susp. 2 0.21 % Reinstate 15 1.60 % Suspended 3 0.32 % Terminated 528 56.47 % Vduntary withdraw 1 681 7.27 96 Total Indentured 935 Printed: Wednesday, July 13. 2022 Page 1 of 2 Apprentice Status Report By Indenture Date Apprentices Indentured Between 11112018 And 7/13/2022 Apprentice Program: IN2 Year Apprentice Status Apprentices Percentage 2020 2021 2022 Active 242 36.28 % Adv. to Journeyman 33 4.95 % Deceased 2 0.30 % Graduated 3 0.45 % 3oumeyman 1 0.15 % Med. Susp. 4 0.60 % Not Registered 1 0.15 % Reinstate 12 1.80 % Suspended 3 0.45 % Terminated 329 49.33 % Voluntary withdraw 1 37 5.55 % Total Indentured 667 Active 472 60.90 % Active Duty 1 0.13 % Adv. to Joumeyman 23 2.97 % Deceased 2 0.26 % Med. Susp, 3 0.39 % Reinstate 20 2.58 % Suspended 2 0.26 % Terminated 220 28.39 % Voluntary withdraw 321 4.13 % Total Indentured 775 Active 538 86.77 % Adv. to Joumeyman 4 0.65 % Graduated 1 0.16 % Med. Susp. 2 0.32 % Not Registered 5 0.81 % Reinstate 33 5.32 % Terminated 32 5.16 % Voluntary withdraw 51 0.81 % Total Indentured 620 Printed: Wednesday. July 13.2022 Page 2 of 2 Date: 11-10-2022 To whom it may concern: Countless individuals, businesses, and communities — in the private and public sector, alike — recognize the added value of doing business with contractors who support Workforce Development through their participation in United States Department of Labor (USDOL) approved apprenticeship programs. USDOL-approved apprenticeship programs ensure that the young people of Indiana have the opportunity to develop a portable skill set that remains with them throughout their careers in the construction industry. The training provided by these programs addresses the evolving concerns of communities, businesses and industry for the development of a quality skilled craft workforce that meets their needs, whether the projects are public or private in nature. To that end, please be advised that Milestone Contractors North, Inc. is signatory to a collective bargaining agreement (CBA) with the International Union of Operating Engineers Local 150, This CBA requires the above -referenced employer to participate in Local 150's USDOL- approved Apprenticeship and Shill Improvement Program. It is understood and agreed that the Employer shall be bound by the terms and provisions of the Agreement and Declaration of Trust of the Apprenticeship Fund, and all amendments heretofore or hereafter made thereto, as though the same were fully incorporated herein. The Employer further agrees to be bound by the terms of the Apprenticeship Standards established by Joint Apprenticeship Training Committee of the Northern Illinois and Northern Indiana Apprenticeship and Skill Improvement Program, as approved by the United States Department of Labor, Bureau of Apprenticeship Training. Sincerely, f James Gardner Business Agent\ Organizer Operating Engineers Local 150, AFL-CIO District 6 1001 N. Michigan Street Lakeville, Indiana 46536 574/784-3694 office 574/784-8035 fax 574/215-8901 cell ��ardn" `erC�loca11.5fl:or�;. jr,it, z��IIn 'our= ofAm tticz.5hip CLUB-&ai ttitg LOCAL 150 OPEWING ENGINEERS, NORTHERN ILLINOIS AND NORTHERN INDIANA APPRENTICESHIP AND SKILL IMPROMMENT PROGRAM for the trade classification of OPERATING ENGINEER , e6 rai &mm ittee of . me. nos hiv Mirch •� 1968 Revised: September 2(1E, 1971 Chan On13T) BECMARY Of LAWR at-w-u - aL� - __ _ ASSISTANT 5£CRSTZW FOR MANPOWER V-ILL-91366.1 (formerly V-ILL-90966.1) FZSWFRY Ma J� r Ifs MANPOWER AOWNI572 'if qR r �{ BUWAUAOMMISTRATOR, BUREAU OF APPRBdMSHIP AND TRAIN WB - IUOE OPERATING ENGINEERS LOCAL 150 APPRENTICESHIP FUND A joint effort Labor and Management to further aim of Industry www.asipIocal150.gf James M. Sweeney/Chairman Thursday, November 100', 2022 To whom It may concern, David M. SneltenlSecretary Milestone Contractors North, Inc. is a signatory contractor to the I.U.O.E Local 150, and therefore, also participates In the I.U.O.E Local 150 Apprenticeship and Skill Improvement Program (ASIP), located at 19800 W. South Arsenal Rd, In Wilmington, IL. The Local 150 ASIP is a DOL Registered Apprenticeship Program overseen by the DOL's Office of Apprenticeship (OA). Listed below are the number of graduates of Its program during the years 2015 — 2019. • 2020 -105 • 2019 - 48 • 2018 - 88 • 2017 - 73 * 2016 - 28 • 2015 - 21 If there are any questions regarding the I.U.O.E Local 150 Apprenticeship, please feel free to contact me directly. Mark Kara Assistant Coordinator Operating Engineers Local 150 Apprenticeship 19800 W. South Arsenal Rd. Wilmington, IL 60481 mkara@asiplocaliSO.org Tel: 815-722-3201 x6003 Fax:815-423-5749 Plasterers' & Cement Masons' Apprenticeship Coordinator Local Union #692 To Whom it May Concern: 2022 0 Gavin= o - %y 1864 mot~ - rf��MAI AyS�4 Phone. (219) 707-7767 Email: bkris1offOPlcmiocal692.org November 10, 2022, This letter is to certify that Milestone Contractors North, Inc. is and has been a signatory contractor with OPCMIA Local 692 and has participated in the Plasterers & Cement Masons Apprenticeship Training Program for many years. Milestone Contractors North, Inc. is a valued Contractor in good standing with Local 692 and the JATC. All our apprentices are registered with the United States Department of Labor. I may be reached at (219) 707-7767 if additional information is needed. Further, our organization's program is approved by the U.S. Veterans Administration to participate in the GI Education Benefit Program. Thank you, Brian Kristoff Apprentice Coordinator Plasterers & Cement Masons 9200 Louisiana Street • Merrillville, Indiana 46410 WWW.PLCML0CAL692.0RG .rw CITY OF SOUTH BEND, INDIANA CONTRACTOR'S BID FOR PUBLIC WORK Project Name 2023 Curb and Sidewalk Program Project No. 123-001 For Bids Due August 8t', 2023 PART I (Must be completed for all bids. Please type or print) Date: 8/8/2023 Bidder (Firm): Milestone Contractors North, Inc. Address: 24358 SR 23 City/State/Zip: South Bend, IN 46614 Telephone Number: ( 574 ) 288-4811 Agent of Bidder (if Applicable): Pursuant to notices given, the undersigned offers to furnish labor and/or material necessary to complete the public works project of: 2022 Curb and Sidewalk Construction — Round 2 the City of South Bend, Indiana, in accordance with plans and specifications prepared by: City of South Bend Department of Public Works, Division of Engineering and dated 7/11/2023 for the sum of (enter the Total Bid as shown on the Proposal) One million eighty nine thousand three hundred forty six dollars and zero cents ($ 1,089,346.00 ) (Enter sum of Total Base Bid plus Alternates shown on Proposal) (Numerical) The undersigned further agrees to furnish a bond or certified check with this bid for an amount specified in the notice of the letting. If alternative bids apply, the undersigned submits a proposal for each in accordance with the notice. Any addendums attached will be specifically referenced at the applicable page. If additional units of material included in the contract are ied, the cost of units must be the same as that shown in the original contract if accepted by the Cq,6��Sduth Bend. If the bid is to be awarded on a unit basis, the itemization of the units shall be shown a parate attachment. By (Signature) / Dustin P. Hilary, Director of Estimating _ (Printed Name of Person Signing) ACCEPTANCE The above bid is accepted this day of Subject to the following conditions: BOARD OF PUBLIC WORKS Elizabeth A. Maradik, President Gary A. Gilot, Member Murray L. Miller, Member all Joseph R. Molnar, Vice President Jordan V. Gathers, Member Attest: Theresa Heffner, Clerk Version 09/29/2021 Contractor's Bid for Public Works - 2 PART 11 (For projects of $100,000 or more — IC 36-1-12-4) These statements to be submitted under oath by each bidder with and as part of his/her/its bid. Attach additional pages for each section as needed. SECTION I EXPERIENCE QUESTIONNAIRE 1. Attach information regarding projects your organization has completed for the period of one (1) year prior to the date of the current bid. 2. Attach a listing of public works projects currently in process of construction by your organization. 3. Attach information regarding any failure to complete any work awarded to you and the location thereof. 4. Attach references from private firms for which you have performed work. SECTION II PLAN AND EQUIPMENT QUESTIONNAIRE 1. Attach an explanation of your plan or layout for performing proposed work. (Examples could include a narrative of when you could begin work, complete the project, number of workers, etc. and any other information which you believe would enable the City of South Bend to consider your bid.) 2. Attach a listing of the names and addresses of all subcontractors (i.e. persons or firms outside your own firm who have performed part of the work) that you have used on public works projects during the past five (5) years along with a brief description of the work done by each subcontractor. 3. If you intend to sublet any portion of the work, attach the name and address of each subcontractor, equipment to be used by the subcontractor, and whether you will require a bond. However, if you are unable to currently provide a listing, please understand a listing must be provided prior to contract approval. Until the completion of the proposed project, you are under a continuing obligation to immediately notify the City of South Bend in the event that you subsequently determine that you will use a subcontractor on the proposed project. 4. Attach a listing of equipment you have available to use for the proposed project. 5. Have you entered into contracts or received offers for all materials which substantiate the prices used in preparing your proposal? If not, attach an explanation for the rationale used which would corroborate the prices listed. SECTION III CONTRACTOR'S FINANCIAL STATEMENT Attachment of bidder's financial statement is mandatory. Any bid submitted without said financial statement as required by statute shall thereby be rendered invalid. The financial statement provided hereunder to the City of South Bend awarding the contract must be specific enough in detail so that said City of South Bend can make a proper determination of the bidder's capability for completing the project if awarded. Version 09/29/2021 Contractor's Bid for Public Works - 3 When the prospective Contractor is unable to certify to any of the statements below, it shall attach an explanation to this Affidavit. CONTRACTOR'S NON -COLLUSION AND NON -DEBARMENT AFFIDAVIT, CERTIFICATION REGARDING INVESTMENT WITH IRAN, EMPLOYMENT ELIGIBILITY VERIFICATION, NON- DISCRIMINATION COMMITMENT AND CERTIFICATION OF USE OF UNITED STATES STEEL PRODUCTS OR FOUNDRY PRODUCTS (Must be completed for all quotes and bids. Please type or print) STATE OF Indiana ) ) SS: St. Joseph COUNTY ) The undersigned Contractor, being duly sworn upon his/her/its oath, affirms under the penalties of perjury that: 1. Contractor has not, nor has any other member, representative, or agent of the firm, company, corporation or partnership represented by him, entered into any combination, collusion or agreement with any person relative to the price to be bid by anyone at such letting nor to prevent any person from bidding nor to induce anyone to refrain from bidding, and that this bid is made without reference to any other bid and without any agreement, understanding or combination with any other person in reference to such bidding. Contractor further says that no person or persons, firms, or corporation has, have or will receive directly or indirectly, any rebate, fee, gift, commission or thing of value on account of such sale; and 2. Contractor certifies by submission of this proposal that neither contractor nor any of its principals are presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from participation in this transaction by any Federal department or agency; and 3. Contractor has not, nor has any successor to, nor an affiliate of, Contractor, engaged in investment activities in Iran. a. For purposes of this Certification, "Iran" means the government of Iran and any agency or instrumentality of Iran, or as otherwise defined at Ind. Code § 5-22-16.5-5, as amended from time -to -time. b. As provided by Ind. Code § 5-22-16.5-8, as amended from time -to -time, a Contractor is engaged in investment activities in Iran if either: i. Contractor, its successor or its affiliate, provides goods or services of twenty million dollars ($20,000,000) or more in value in the energy sector of Iran; or ii. Contractor, its successor or its affiliate, is a financial institution that extends twenty million dollars ($20,000,000) or more in credit to another person for forty-five (45) days or more, if that person will (i) use the credit to provides goods and services in the energy sector in Iran; and (ii) at the time the financial institution extends credit, is a person identified on list published by the Indiana Department of Administration. 4. Contractor does not knowingly employ or contract with an unauthorized alien, nor retain any employee or contract with a person that the Contractor subsequently learns is an unauthorized alien. Version 09/29/2021 Contractor's Bid for Public Works - 4 may result in forfeiture of contractual payments. I hereby affirm under the penalties of perjury that the facts and information contained in the foregoing bid for public works are true and correct. Dated this 8th day of August , 2023 I I I I uil�i ntract o id (Firm) `� ��N -Lr, a ctors LO •,• ........,yo o`��pORAT� •• s % nature of Contractor/Bidder or Its Agent e ?, • ; n �•;•• SEA"".. Dustin P. Hilary, Director of Estimating o •� N Printed Name and Title bN b` Q,'``� Subscribed and sworn to before me this 8th day of Au u t , 20 23 My Commission Expires 6/5/2030 — 4i�16 �. &�— - Notary 1ic Alisha r eger County of Residence LaPorte ALISHA KRUEGER 'a�S►RY p�B`/�, My Commission Expires *' SEAL :*= June 5,2030 Commission Number NPM544 9FgF�P?. La Porte County Version 09/29/2021 Contractor's Bid for Public Works - 6 Contractor agrees that he/she/it shall enroll in and verify the work eligibility status of all of Contractor's newly hired employees through the E-Verify Program as defined by I.C. 22-5-1.7-3. Contractor's documentation of enrollment and participation in the E-Verify Program is included and attached as part of this bid/quote; and 5. Contractor shall require his/her/its subcontractors performing work under this public contract to certify that the subcontractors do not knowingly employ or contract with an unauthorized alien, nor retain any employee or contract with a person that the subcontractor subsequently learns is an unauthorized alien, and that the subcontractor has enrolled in and is participating in the E-Verify Program. The Contractor agrees to maintain this certification throughout the term of the contract with the City of South Bend, and understands that the City may terminate the contract for default if the Contractor fails to cure a breach of this provision no later than thirty (30) days after being notified by the City. 6. Persons, firms, partnerships, corporations, associations, or joint venturers awarded a contract by the City of South Bend through its agencies, boards, or commissions shall not discriminate against any employee or applicant for employment in the performance of a City contract with respect to hire, tenure, terms, conditions, or privileges of contract or employment, or any matter directly or indirectly related to contracting or employment because of race, sex, religion, color, national origin, ancestry, gender expression, gender identity, sexual orientation, or due to age or disability that does not affect that person's ability to perform the work. In awarding contracts for the purchase of work, labor, services, supplies, equipment, materials, or any combination of the foregoing including, but not limited to, public works contracts awarded under public bidding laws or other contracts in which public bids are not required by law, the City, its agencies, boards, or commissions will consider the Contractor's good faith efforts to obtain participation by those subcontractors certified by the State of Indiana as a Minority Business ("MBE") or as a Women's Business Enterprise ("WBE") as a factor in determining the lowest, responsible, responsive bidder. Contractors seeking the award of a City contract cannot be required to award a subcontract to an MWBE; however, they may not unlawfully discriminate against said MBE/WBE. On goal -eligible contracts, Contractors are required to either meet both MBE and WBE utilization goals or demonstrate that the Contractor has made good faith efforts to obtain participation from MBE and WBE subcontractors. A finding of noncompliance or a discriminatory practice shall prohibit that Contractor from being awarded a City contract for a period of one (1) year from the date of such determination, and such determination may also be grounds for terminating the contact to which the discriminatory practice or noncompliance pertains. 7. The undersigned Contractor agrees that the following nondiscrimination commitment shall be made a part of any contract which it may henceforth enter into with the City of South Bend, Indiana or any of its agencies, boards or commissions. Contractor agrees not to discriminate against or intimidate any employee or applicant for employment in the performance of this contract with privileges of employment, or any matter directly or indirectly related to employment, because of race, religion, color, sex, gender expression, gender identity, sexual orientation, handicap, national origin or ancestry. Breach of this provision may be regarded as material breach of contract. I, the undersigned bidder or agent as contractor on a public works project, understand my statutory obligations to the use of steel products or foundry products made in the United States (I.C. 5-16-8-1). I hereby certify that I and all subcontractors employed by me for this project will use steel products or foundry products made in the United States on this project if awarded. I understand I have an affirmative duty to notify the City in my bid that my proposal does not include the use of steel products or foundry products made in the United States. I understand it is my sole obligation and responsibility to provide a justification to the City, subject to review and approval, why the cost of United States made steel or foundry products is unreasonable. Prior to award and upon submission of bid which does not use steel products or foundry products made in the United States, the City, through its director of public works, shall make a determination if the price of United States made steel or foundry is unreasonable. I understand that violations hereunder Version 09/29/2021 Contractor's Bid for Public Works - 5 BID/PROPOSAL CITY OF SOUTH BEND Proiect Name: 203 Curb and Sidewalk Program Proiect No.: 123-001 For Bid Due: August 8th. 2023 Contractor Name: Milestone Contractors North. Inc. DIVISION A Item No. Description Qty Unit Unit Price Total Amount 1 CONCRETE SIDEWALK, REMOVE 133 SY $ 55.00 $ 7,315.00 2 CONCRETE SIDEWALK, 4-IN 133 SY $ 95.00 $ 12,635.00 3 CONCRETE CURB, REMOVE 296 LF $ 28.00 $ 8,288.00 4 1 CONCRETE CURB, MODIFIED 2961 LF $ 98.00 $ 29,008.00 5 CONCRETE APPROACH, REMOVE 14 SY $ 110.00 $ 1,540.00 6 PCCP FOR APPROACHES, 6-IN 14 SY $ 215.00 $ 3,010.00 7 CONCRETE CURB RAMP, REMOVE 21 SY $ 132.00 $ 2,772.00 8 ONE-WAY PERPENDICULAR CURB RAMP 9 SY $ 300.00 $ 2,700.00 9 PAIRED PERPENDICULAR CURB RAMP 12 SY $ 300.00 $ 3,600.00 10 TOPSOIL AND SEEDING 205 SY $ 48.00 $ 9,840.00 11 TREE REMOVE 30-IN 0 EA $ - $ - 12 PLANT, DECIDUOUS TREE, SINGLE STEM. 2-IN TO 2.5-IN 0 EA $ $ DIVISION A TOTAL $ 80,708.00 DIVISION B Item No. Description Qty Unit Unit Price Total Amount 1 CONCRETE SIDEWALK, REMOVE 877 SY $ 42.00 $ 36,834.00 2 CONCRETE SIDEWALK, 4-IN 898 SY $ 85.00 $ 76,330.00 3 CONCRETE CURB, REMOVE 1616 LF $ 21.00 $ 33,936.00 4 CONCRETE CURB, MODIFIED 1616 LF $ 72.00 $ 116,352.00 5 CONCRETE APPROACH, REMOVE 75 SY Is 100.00 $ 7,500.00 6 BRICK APPROACH, REMOVE 13 SY $ 100.00 $ 1,300.00 7 ASPHALT APPROACH, REMOVE 21 SY $ 100.00 $ 2,100.00 8 PCCP FOR APPROACHES, 6-IN 88 SY $ 160.00 $ 14,080.00 9 CONCRETE CURB RAMP, REMOVE 21 SY $ 140.00 $ 2,940.00 10 ONE-WAY PERPENDICULAR CURB RAMP 21 SY $ 365.00 $ 7,665.00 11 TOPSOIL AND SEEDING 1028 SY $ 39.00 $ 40,092.00 12 TREE, REMOVE, 10-IN 2 EA $ 700.00 $ 1,400.00 13 TREE, REMOVE, 18-IN 6 EA $ 1,000.00 $ 6,000.00 14 ITREE, REMOVE, 48-IN 1 EA $ 1,400.00 $ 1,400.00 15 STUMP, REMOVE 2 EA $ 400.00 $ 800.00 16 PLANT, DECIDUOUS TREE, SINGLE STEM. 2-IN TO 2.5-IN 18 EA $ 835.00 $ 15,030.00 DIVISION B TOTAL $ 363,759.00 BID/PROPOSAL CITY OF SOUTH BEND Project Name: 203 Curb and Sidewalk Program Project No.: 123-001 For Bid Due: August 8th, 2023 Contractor Name: Milestone Contractors North Inc. DIVISION C Item No. Description Qty Unit Unit Price Total Amount 1 CONCRETE SIDEWALK, REMOVE 551 SY $ 43.00 $ 23,693.00 2 CONCRETE SIDEWALK, 4-IN 551 SY $ 88.00 $ 48,488.00 3 CONCRETE CURB, REMOVE 1355 LF $ 19.00 $ 25,745.00 4 CONCRETE CURB, MODIFIED 1355 LF $ 64.00 $ 86,720.00 5 CONCRETE APPROACH, REMOVE 38 SY $ 125.00 $ 4,750.00 6 GRAVEL APPROACH, REMOVE 44 SY $ 125.00 $ 5,500.00 7 PCCP FOR APPROACHES, 6-IN 62 SY $ 200.00 $ 12,400.00 8 CURB RAMP, REMOVE 6 SY $ 250.00 $ 1,500.00 9 PAIRED PERPENDICULAR CURB RAMP 6 SY $ 365.00 $ 2,190.00 10 TOPSOIL AND SEEDING 769 SY $ 38.00 $ 29,222.00 11 TREE, REMOVE, 30-IN 6 EA $ 1,400.00 $ 8,400.00 12 STUMP, REMOVE 2 EA $ 300.00 $ 600.00 13 PLANT, DECIDUOUS TREE, SINGLE STEM, 2-IN TO 2.5-IN 12 EA $ 975.00 $ 11,700.00 DIVISION C TOTAL $ 260,908.00 DIVISION D Item No. Description Qty Unit Unit Price Total Amount 1 CONCRETE SIDEWALK, REMOVE 482 SY $ 62.00 $ 29,884.00 2 CONCRETE SIDEWALK, 4-IN 480 SY $ 95.00 $ 45,600.00 3 CONCRETE CURB, REMOVE 639 LF $ 24.00 $ 15,336.00 4 CONCRETE CURB, MODIFIED 639 LF $ 80.00 $ 51,120.00 5 CONCRETE APPROACH, REMOVE 45 SY $ 100.00 $ 4,500.00 6 PCCP FOR APPROACHES, 6-IN 34 SY $ 220.00 $ 7,480.00 7 TOPSOIL AND SEEDING 558 SY $ 45.00 $ 25,110.00 8 TREE, REMOVE, 18-IN 2 EA $ 1,200.00 $ 2,400.00 9 TREE, REMOVE, 30-IN 3 EA $ 1,600.00 $ 4,800.00 10 PLANT, DECIDUOUS TREE, SINGLE STEM, 2-IN TO 2.5-IN 10 EA $ 1,015.00 $ 10,150.00 DIVISION D TOTAL $ 196,380.00 BID/PROPOSAL CITY OF SOUTH BEND Proiect Name: 203 Curb and Sidewalk Program Proiect No.: 123-001 For Bid Due: August 8th, 2023 Contractor Name: Milestone Contractors North, Inc. DIVISION E ow.3 4 Item No. Description Qty Unit Unit Price Total Amount 1 CONCRETE SIDEWALK, REMOVE 394 SY $ 50.00 $ 19,700.00 2 CONCRETE SIDEWALK, 4-IN 394 SY $ 85.00 $ 33,490.00 3 CONCRETE CURB, REMOVE 729 LF $ 23.00 $ 16,767.00 4 ICONCRETE CURB, MODIFIED 729 LF $ 76.00 $ 55,404.00 5 CONCRETE APPROACH, REMOVE 63 SY $ 110.00 $ 6,930.00 6 PCCP FOR APPROACHES, 6-IN 63 SY $ 175.00 $ 11,025.00 7 CURB RAMP, REMOVE 23 SY $ 135.00 $ 3,105.00 8 ONE-WAY PERPENDICULAR CURB RAMP 12 SY $ 365.00 $ 4,380.00 9 PAIRED PERPENDICULAR CURB RAMP 11 SY $ 365.00 $ 4,015.00 10 TOPSOIL AND SEEDING 525 SY $ 35.00 $ 18,375.00 11 TREE, REMOVE, 6-IN 3 EA $ 250.00 $ 750.00 12 TREE, REMOVE, 18-IN 3 EA $ 650.00 $ 1,950.00 13 PLANT, DECIDUOUS TREE, SINGLE STEM, 2-IN TO 2.5-IN 12 EA $ 975.00 $ 11,700.00 Bidder (Firm): Address: 24358 SR 23 City/State/Zip: South Bend, IN 46614 _ Telephone Number: By ��N ontractoi, ♦ Off• '• ✓ �' C-0 R P 0194T ': • SEA - • �147 s DIVISION E TOTAL $ 187,591.00 Dustin P. Hilary, Director of Estimating CITY OF SOUTH BEND j w ! MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN FORM MBE-1.0 , MBE UTILIZATION PLAN This completed form should be supplied with Bids that pertain to City of South Bend Public Works Projects involving MBE participation. It is the bidder's sole responsibility to verify whether any listed minority -owned business meets the MBE qualifications. Project Number: 123-007 Project Name: _ 2023 Curb and Sidewalk Program Bidder: Milestone Contractors North, Inc. Total Bid Amount: $1,089,346.00 2 pages Division A— MBE Goal: 3.40% Division A Bid Amount: $80,708.00 Percentage Name & Address of MBE Primary Contact Person Scope of Work to be Performed Dollar Amount of MBE l of Total (Name/Telephone) (Attach scope/schedule if you need additional space) Component Bid/Proposal C. Lee Contruction Services, Inc. Frederick "Chip" Lee Hauling $1,375.00 1.70% 1011 S. Lake Street Gary, IN 46403 219-922-7733 Hauling $1,375.00 o 1.70/o 1st Class Logistics, LLC 24423 IN 23 Bernard Coutee South Bend, IN 46614 574-993-0071 Division B — MBE Goal: 3.72% Name & Address of MBE C. Lee Contruction Services, Inc. 1011 S. Lake Street Gary, IN 46403 1st Class Logistics, LLC 24423 IN 23 Primary Contact Person (Name/Telephone) Frederick "Chip" Lee 219-922-7733 Bernard Coutee 574-993-0071 Division B Bid Amount: $363,759.00 Scope of Work to be Performed (Attach scope/schedule if you need additional space) Hauling Hauling Version 09/29/2021 Contractor's Bid for Public Works - 10 Dollar Amount of MBE Percentage Component MAIMof Total $6,766.00 1.86% $6,766.00 1.86% Division C — MBE Goal: 3.62% Name & Address of MBE C. Lee Contruction Services, Inc. 1011 S. Lake Street r- IKI eann3 1st Class Logistics, LLC 24423 IN 23 CITY OF SOUTH BEND MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN FORM MBE-1.0 MBE UTILIZATION PLAN Division C Bid Amount: $260,908.00 Scope of Work to be Performed (Attach scope/schedule if you need additional space) -i - Frederick "Chip" Lee ` Hauling 219-922-7733 f Bernard Coutee Hauling 574-993-0071 Primary Contact Person (Name/Telephone) Dollar Amount of MBE Percentage Component of Total Bid/Proosa $4,725.00 1.81 % $4,725.00 1.81 % Division D— MBE Goal: 3.54% Division D Bid Amount: $196,380.00 Primary Contact Person Scope of Work to be Performed Dollar Amount of MBE Name &Address of MBE (Name[Telephone) (Attach scope/schedule if you need additional space) Component C. Lee Contruction Services, Inc. 1011 S. Lake Street Gary, IN 46403 1st Class Logistics, LLC 24423 IN 23 Division E — MBE Goal: 3.72% Frederick "Chip" Lee Hauling 219-922-7733 Bernard Coutee Hauling 574-993-0071 Name & Address of MBE ` Primary Contact Person (Name/Telephone) C. Lee Contruction Services, Inc. Frederick "Chip„ Lee 1011 S. Lake Street 219-922-7733 Gary, IN 46403 1st Class Logistics, LLC Bernard Coutee 24423 IN 23 574-993-0071 ,South Bend, IN 46614 Submitted by: Dustin P. Hilary, Director of Estimating Print Name Division E Bid Amount: $187,591.00 $3,480.00 $3,480.00 Percentage of Total 1.77% 1.77% Scope of Work to be Performed Dollar Amount of MBE Percentage (Attach scope/schedule if you need additional space) Component of Total T Bid/Proposal Hauling $3,490.00 1.86% I Hauling $3,490.00 1.86% I Version 09/29/2021 Contractor's Bid for Public Works -11 8/8/2023 Date CITY OF SOUTH BEND ° o MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN FORM WBE-1.0 IBGS� WBE UTILIZATION PLAN This completed form should be supplied with Bids that pertain to City of South Bend Public Works Projects involving WBE participation. It is the bidder's sole responsibility to verify whether any listed woman -owned business meets the WBE qualifications. Project Number: 123-001 Project Name: 2023 Curb and Sidewalk Program Bidder: Milestone Contractors North Inc. Total Bid Amount: $1,089,346.00 2 pages Division A — WBE Goal: 4.91 % Division A Bid Amount: $80,708.00 Percentage Name & Address of WBE Primary Contact Person Scope of Work to be Performed Dollar Amount of WBE of Total (Name/Telephone) (Attach scope/schedule if you need additional space) Component Bid/Proposal Slusser's Green Thumb, Inc. 125 Montgomery Street Nelson Slusser Seeding &Trees o $2,142.45 2.65/o Logansport, IN 46947 574-722-3102 V & R Trucking, Inc. Veda Godette Hauling $1,821.00 2.26% 1845 North Elmer Street 574-234-1268 South Bend. IN 46628 _ Division B — WBE Goal: 5.25% Name & Address of WBE Division B Bid Amount: $363,759.00 Primary Contact Person Scope of Work to be Performed (Namelfelephone) (Attach scope/schedule if you need additional space) Slusser's Green Thumb, Inc. Nelson Slusser 125 Montgomery Street Seeding & Trees Logansport, IN 46947 574-722-3102 Version 09/29/2021 Contractor's Bid for Public Works - 12 Dollar Amount of WBE Component $19,097.35 Percentage of Total Bid/Proposal 5.25% I TF3 CITY OF SOUTH BEND MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN. FORM WBE-1.0 WBE UTILIZATION PLAN Division C — MBE Goal: 5.15% Division C Bid Amount: _ $260,908.00 Name & Address of WBE Primary Contact Person Scope of Work to be Performed (Name/Telephone) (Attach scope/schedule if you need additional space) Slusser's Green Thumb, Inc. I I Nelson Slusser Seeding &Trees ` 125 Montgomery Street 574-722-3102 1 nanmoart- IN 46947 Division D — WBE Goal: 5.08% Name & Address of WBE Primary Contact Person ` (Name/Telephone) Slusser's Green Thumb, Inc. 125 Montgomery Street Logansport, IN 46947 Division E — MBE Goal: 5.25% Name & Address of WBE Dollar Amount of WBE Percentage Component of Total I Bid/Proposa $13,436.76 Division D Bid Amount: $196,380.00 Scope of Work to be Performed Dollar Amount of WBE Percentage Attach scope/schedule a/schedule if you need additional space) Component of Total ( P Y P ) P Rirof Total I Nelson Slusser Seeding & Trees 574-722-3102 Primary Contact Person (Name/Telephone) Slusser's Green Thumb, Inc. Nelson Slusser 125 Montgomery Street 574-722-3102 Logansport, IN 46947 Division E Bid Amount: $187,591.00 $9,976.10 1 5.08% Scope of Work to be Performed Dollar Amount of WBE Percentage (Attach scope/schedule if you need additional space) Component of Total Bid/Proposal Seeding & Trees $9,848.53 5.25% I Submitted by: Dustin P. Hilary, Director of Estimating Print Name S' n Version 09/29/2021 Contractor's Bid for Public Works -13 8/8/2023 Date a4 CITY OF SOUTH BEND MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN FORM MBE-2.0 ,865 . EVIDENCE OF GOOD FAITH EFFORTS This completed form should be included as part of the Bids documents related to City of South Bend Public Works Projects requiring Good Faith Efforts to obtain MBE participation. Project Number: 123-001 Project Name: Bidder: Contact Person: Address: City: 2023 Curb and Sidewalk Milestone Contractors North. Inc. Dustin P. Hil 2.4358 SR 23 South Bend State: indiana Date: 8/8/2023 Telephone: 574-2 88-4811 Zip: 46614 Email: dhilary@milestonelp.com To determine whether a bidder has demonstrated good faith efforts to reach the MBE utilization goals set forth in the City of South Bend Public Works Project Specifications, the City and its agencies, boards, or commissions, REQUIRE ALL of the following Good Faith Efforts as listed in the table below*: EVIDENCE OF GOOD FAITH EFFORTS MBE LIST(S): The bidder reviewed 1) the City of South Bend's Minority and Women Business Enterprise Inclusion Program Plan; 2) the list of certified MWBEs provided by the City; and 3) the Indiana Department of Administration list of Minority and Women Owned Businesses (both certified and non -certified) found at: htt[)://vwwv.in.aov/idoal. i GOOD FAITH EFFORTS TO OBTAIN MBE PARTICIPATION I The bidder shall initial each item below, as evidence of its good faith efforts to obtain MBE participation in the awarded contract. I affirm that I reviewed the City of South Bend's Minority and Women Business Enterprise Inclusion Program Plan and the Indiana Department of Administration's certified list of Indiana Minority and Women Business Enterprises, found on their website (hfti)://www.in.00v/idoa;,. I affirm that I have made good faith efforts to select portions of the contract work to be performed by MWBEs, including, where appropriate, breaking out contract work items into economically feasible units to facilitate MBE participation. I affirm that I have made good faith efforts to solicit through all reasonable and available means the interest of all MBEs in the scopes of work of the contract. I affirm that I attended all pre -bid meetings scheduled by the City of South Bend to inform MBEs of contracting and subcontracting opportunities. I affirm that I advertised in general circulation and/or trade association publications concerning subcontract opportunities and allowed MBEs reasonable time to respond to such advertisements. I affirm that I performed any and all necessary steps to provide written notices in a manner reasonably calculated to inform MBEs of subcontracting opportunities and allowed sufficient time for MBEs to participate effectively. I affirm that I followed up on initial solicitations with interested MBEs. I affirm that I negotiated with interested MBEs in good faith, including providing such MBEs with adequate information about the plans, specifications and other requirements of the subcontract. I affirm that I have made good faith efforts to assist interested MBEs in obtaining bonding, lines of credit, or insurance as required by the City or the bidder, where appropriate. Version 09/29/2021 Contractor's Bid for Public Works -14 CITY OF SOUTH BEND MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN FORM MBE-2.0 EVIDENCE OF GOOD FAITH EFFORTS I affirm that I have made good faith efforts to assist interested MBEs in obtaining necessary equipment, supplies, materials, or related assistances or services, where appropriate. I affirm that I did not reject any MBEs as unqualified without sound business reasons based on a thorough investigation of their capabilities. CONTRACT RECORDS: The bidder has maintained the following records for each MBE that has bid on the subcontracting opportunity: 1. Name, address, and telephone number; 2. A description of information provided by the bidder or subcontractor; and 3. A statement of whether an agreement was reached, and if not, why not, including any reasons for concluding that the MBE was unqualified to perform the job. *Proper demonstration of Good Faith Efforts requires your initials next to all of the above poxes. Any omissions shall be considered grounds for rejection of the bid by the Board of Public Works. The City of South Bend reserves the right to request additional information. Version 09/29/2021 Contractor's Bid for Public Works -15 OTH CITY OF SOUTH BEND f MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN FORM WBE-2.0ess�� EVIDENCE OF GOOD FAITH EFFORTS This completed form should be included as part of the Bids documents related to City of South Bend Public Works Projects requiring Good Faith Efforts to obtain MWBE participation. Project Number: Project Name Bidder: 123-001 2023 Curb and Sidewalk Milestone Contractors North, Inc. Date: 8/8/2023 Contact Person: Dustin P. Hilary Telephone Address: 24358 SR 23 City: Email: South Bend State: Indiana dhilaryamilestonelp.com 574-288-4811 Zip: 46614 To determine whether a bidder has demonstrated good faith efforts to reach the WBE utilization goals set forth in the City of South Bend Public Works Project Specifications, the City and its agencies, boards, or commissions, REQUIRE ALL of the following Good Faith Efforts as listed in the table below*: I I EVIDENCE OF GOOD FAITH EFFORTS I WBE LIST(S): The bidder reviewed 1) the City of South Bend's Minority and Women Business Enterprise Inclusion Program Plan; 2) the list of certified MWBEs provided by the City; and 3) the Indiana Department of Administration list of Minority and Women Owned Businesses (both certified and non -certified) found at: htto://www.in.aov/idoa/. GOOD FAITH EFFORTS TO OBTAIN WBE PARTICIPATION The bidder shall initial each item below, as evidence of its good faith efforts to obtain WBE participation in the awarded contract. I affirm that I reviewed the City of South Bend's Minority and Women Business Enterprise Inclusion Program Plan and the Indiana Department of Administration's certified list of Indiana Minority and Women Business Enterprises, found on their website (hfD://www.in.Qov/idoa). I affirm that I have made good faith efforts to select portions of the contract work to be performed by WBEs, including, where appropriate, breaking out contract work items into economically feasible units to facilitate WBE participation. affirm that I have made good faith efforts to solicit through all reasonable and available means the interest of all WBEs in the scopes of work of the contract. I affirm that I attended all pre -bid meetings scheduled by the City of South Bend to inform WBEs of contracting and subcontracting opportunities. I affirm that I advertised in general circulation and/or trade association publications concerning subcontract opportunities and allowed WBEs reasonable time to respond to such advertisements. I affirm that I performed any and all necessary steps to provide written notices in a manner reasonably calculated to inform WBEs of subcontracting opportunities and allowed sufficient time for WBEs to participate effectively. I affirm that I followed up on initial solicitations with interested WBEs. I affirm that I negotiated with interested WBEs in good faith, including providing such WBEs with adequate information about the plans, specifications and other requirements of the subcontract. I affirm that I have made good faith efforts to assist interested WBEs in obtaining bonding, lines of credit, or insurance as required by the City or the bidder, where appropriate. Version 09/29/2021 Contractor's Bid for Public Works -16 H CITY OF SOUTH BEND MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN FORM WBE-2.0 ; EVIDENCE OF GOOD FAITH EFFORTS I affirm that I have made good faith efforts to assist interested WBEs in obtaining necessary equipment, supplies, materials, or related assistances or services, where appropriate. I affirm that I did not reject any WBEs as unqualified without sound business reasons f� based on a thorough investigation of their capabilities. CONTRACT RECORDS: The bidder has maintained the following records for each WBE that has bid on the subcontracting opportunity: 1. Name, address, and telephone number; 2. A description of information provided by the bidder or subcontractor; and 3. A statement of whether an agreement was reached, and if not, why not, including any reasons for I concluding that the MWBE was unqualified to perform the job. *Proper demonstration of Good Faith Efforts requires your initials next to all of the above boxes. Any omissions shall be considered grounds for rejection of the bid by the Board of Public Works. The City of South Bend reserves the right to request additional information. Version 09/29/2021 Contractor's Bid for Public Works - 17 vTri B 4 X. G . a CITY OF SOUTH BEND MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN FORM MBE-2.1 MBE CONTACTED This completed form should be supplied with Bids that pertain to City of South Bend Public Works Projects requiring Good Faith Efforts to contact MBEs. It is the bidder's sole responsibility to verify whether any listed minority -owned business meets the MBE qualifications. Attach additional pages if necessary. PAGE 1 OF 1 Project Number: 123-001 MBE Participation Goal Varies Project Name: 3 Curb and Sidewalk Program Bidder: Milestone Contractors North, Inc. By: Director of Estimating8/8/2023 i ature) Dustin P. Hilary (Title) (Date) M irm C. Lee Construction Services Inc. caner or Contact at MBE Firm Frederick "Chip" Lee Telephone: 219-922-7733 Fax: 219-888-9564 Email: chir)[r?.,cleecsi.com TYPE OF WORK SOLICITED FOR THIS PROJECT Hauling RESULTS OF CONTACT WITH THE MBE FIRM: If we're awarded the croiect, we'll enter into a Haulinn Agreement with C. Lee Construction Services, Inc. MBE Firm 1st Class Logistics, LLC Owner or Contact at MBE Firm Bernard Coutee Telephone: 574-993-0071 Fax: Email: lstclasslogistics20l3@gmail.com TYPE OF WORK SOLICITED FOR THIS PROJECT: Hauling RESULTS OF CONTACT WITH THE MBE FIRM: If we're awarded the project, we'll enter into a Hauling Agreement with 1 st Class Logistics, LLC. Version 09/29/2021 Contractor's Bid for Public Works - 18 CITY OF SOUTH BENDf .: o MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLANS FORM MBE-2.1 �t WBE CONTACTED This completed form should be supplied with Bids that pertain to City of South Bend Public Works Projects requiring Good Faith Efforts to contact WBEs. It is the bidder's sole responsibility to verify whether any listed woman -owned business meets the WBE qualifications. Attach additional pages if necessary. PAGE 1 OF 1 Project Number: 123-001 WBE Participation Goal _Varies Project Name: 02 urb and Sidewalk Program Bidder: Mi stone Contract ffFi Inc. By: Director of Estimating Dustin P. Hilary (Title) ",It, �rr1rm Slusser's Green Thumb, Inc. Owner or Contact at WBE Firm Nelson Slusser Telephone: 574-722-3102 Fax: Email: nts@slussers.com TYPE OF WORK SOLICITED FOR THIS PROJECT: Seeding & Trees _ RESULTS OF CONTACT WITH THE WBE FIRM: If we're awarded the project we'll enter into a Subcontract with Slusser's Green Thumb, Inc. WBE Firm V & R Truckinq__ Inc. Owner or Contact at WBE Firm Veda Godette Telephone: 574-234-1268 Fax: 574-234-0748 TYPE OF WORK SOLICITED FOR THIS PROJECT: Haulin RESULTS OF CONTACT WITH THE WBE FIRM: (Date) Email: rficihtinAidsh@aol.com If we're awarded the project, we'll enter into a Hauling Agreement with V & R Trucking. Inc. Version 09/29/2021 Contractor's Bid for Public Works -19 CNASURETY Bond No. Bid Bond CONTRACTOR: SURETY: Continental Casualty Company (Name, legal status and address) (Name, legal status and principal place of business) Milestone Contractors North, Inc. 151 N. Franklin Street 24358 State Road 23 17th Floor South Bend, IN 46614 Chicago, IL 60606 This document has important legal consequences. Consultation with OWNER: an attorney is encouraged with (Name, legal status and address) respect to its completion or modification. City of South Bend Any singular reference to 227 W. Jefferson Blvd. Contractor, Surety, Owner or South Bend, IN 46601 other party shall be considered plural where applicable. BOND AMOUNT: 5% Five Percent of the Base Bid Plus Any Alternates PROJECT: (Name, location or address, and Project number, if any) 2023 Curb and Sidewalk Program; Project No. 123-001 The Contractor and Surety are bound to the Owner in the amount set forth above, for the payment of which the Contractor and Surety bind themselves, their heirs, executors, administrators, successors and assigns, jointly and severally, as provided herein. The conditions of this Bond are such that if the Owner accepts the bid of the Contractor within the time specified in the bid documents, or within such time period as may be agreed to by the Owner and Contractor, and the Contractor either (1) enters into a contract with the Owner in accordance with the terms of such bid, and gives such bond or bonds as may be specified in the bidding or Contract Documents, with a surety admitted in the jurisdiction of the Project and otherwise acceptable to the Owner, for the faithful performance of such Contract and for the prompt payment of labor and material furnished in the prosecution thereof, or (2) pays to the Owner the difference, not to exceed the amount of this Bond, between the amount specified in said bid and such larger amount for which the Owner may in good faith contract with another party to perform the work covered by said bid, then this obligation shall be null and void, otherwise to remain in full force and effect. The Surety hereby waives any notice of an agreement between the Owner and Contractor to extend the time in which the Owner may accept the bid. Waiver of notice by the Surety shall not apply to any extension exceeding sixty (60) days in the aggregate beyond the time for acceptance of bids specified in the bid documents, and the Owner and Contractor shall obtain the Surety's consent for an extension beyond sixty (60) days. If this Bond is issued in connection with a subcontractor's bid to a Contractor, the term Contractor in this Bond shall be deemed to be Subcontractor and the term Owner shall be deemed to be Contractor. When this Bond has been furnished to comply with a statutory or other legal requirement in the location of ttRibtj�M��j� any provision in this Bond conflicting with said statutory or legal requirement shall be deemed deleted he,tors provisions conforming to such statutory or other legal requirement shall be deemed incorporated herein.�.`�Vlte�r'so furnished, the intent is that this Bond shall be construed as a statutory bond and not as a common law lbrll `OV 0 RATE 5 Signed and sealed this _ 8th day of August 2023 ., SEAL ` Milestone ctors North, Inc. �� Z: (Principa WR (Witness isha Krueger g : (nt �s ' ilary, Director of Estimatin COFiFtJ6i�lT$ YSeal) (Witness) Jarah M. Schill (Title) ANelp M. Riley, Printed in cooperation with the American Institute of Architects (AIA). The language In this document conforms to the language used in AIA Document A310 - Bid Bond - 2010 Edition. POINTR OF ATTORNEY APPOWMG INDIN7DUAL ATTORNEY -IN FACT Know .dill Men By These Presents, That Continental Casualty Company, an Illinois iusurance company, National Fire Insurance Company of Hartford, an Illinois insurance company, and America Casualty Company of Reading, Pemrsylv=* a Pennsyhm" insurance company (herein► called "the CNA Companies"), are duly organized and existing insurance companies having their principal offices in the City ofChicago, and State of Minois, and that they do by virtue of the signatures and scats herein affixed hereby make, constitute and appoint Angela M. Riley. Indh•idaally of Indianapolis, IN their true and lawful Attorneys) -in -Fact with full power and authority hereby conferred to sign seal and execute for and on their behalf bowls;, undertakings and other obligatory instruments of similar nature - In Unlimited Amotutts - SxvW800dl+w Bid Bond fsfotip h Milestone Contractors North, Inc. Obi% City of South Bend and to bind thews tbareby as fully and to the same extent as if saach instruments were signed by a duly au*crized offrar of their insurance companies and all the acts of said Attorney, pursuant to the authority hereby given is hereby ratified and confirmed. This Power of Attomey is made and executed ptusaant to and by authority of the By -Laws and Reaahrtioas, printed on the revvrse hereof; duly adapted, as indicated, by the Boards of Directors of the & nrance companies. In Witsess Whereof, the CNA Companies have caused them presents to be signed by their Vice President and their corporate seals to be hereto affixed on this M day of May. 2023. 3M' �+�►o�*it � �'ecsst°av� rat r�7 •Qe w � Continental Casualty Cry National Fire kmaxxt Company of Hanford American Casualty Company of Reading, Pennsylvania Z`�F L=Ty KaStm —7 DICE President State of South Dakota, County of Minnehaha, as: On this 9th day of May, 2023, before we personally came Larry Kasten to me known, who, being by use duly sworn, did depose and say. that he resides in the City of Sioux Falls, State of South Dakota; that he is a Vice President of Continental Casualty Company, an Illinois insurance Company, National Fire Insurance Company of Hartford, an Illnaois hmraace company. and American Casualty Company of Reading, Pennsylvania, a Pennsylvania insurance company described in and which executed the above insumzent; that he knows the seals of said inwrance commies; that the seals affixed to the said instrument are such corporate seals; that they wwt so affixed pursuant to authority given by the Boards of Directors of said bmnance companits and that he signed his name thereto pursuant to like authority, and acknowledges same to be the an and deed of said insurance companies. -- it Jr%tt Moa�t+r ruauc -5Y t,,aaern My Commission Expires March 2, 2026 M. Bent Notary Public CMTiFICATE I, D. Johnson, Assistant Secretary of Continental Casualty Company, an Illinois insurance company, National fire Insurance Company of Hartford, an Illinois insurance company, and American Casualty Company of Reading. Pennsyhan* a Pennsylvania insurance company do hereby certify that the Power of Attorney herein above set forth is still its ford and further certify that the By -Laws and Rsxolutions of the Board of Directors of the insurance companies printed on the retiWW hereof is still in force. In testimony whereof I bn-e hereu nw vabunbed my name and affixed the seal of the said insurance companies this 8th day of August , 2023. �� c►�swtx} � ,xsw���ogwwwzo �� 4 owears. Continmtal Casualty Company National Fire lu==e Company of Hartford American Casualty Company of Reading, Pennsylvania <---o - (- - D. Johnson Assistant Sectary Form F6853-4-2623 Go to w'ww..crsastirtrtv.00m > owner / Obligee Services > validate Bond Coverage, if you want to verify bond authenticity. Aathoriziag By -Lath and Resolutions Thn Power of Attmroey is signed by Larry Xastsa, We Pmidmt of each of the CNA Companies (as defined is the Powys of Attoensy), who has been atiboriaed pwa= to the blow Bylaws and Aesointions to a mewA power of auummys m behalf of each of the CNA Coampaznes. ADOPTED BY THE BOARD OF DIRECTORS OF CONTINENTAL CASUALTY COMPANY: Tbis Power of Attorney is made and exerted pumant to and by authority of the following resokciao duly adopted by the Board of Disecion of the Company at a meeiiag bald on May 12,1995: 'RESOLVED:.That my Seoaoa or Gmap Vice Pmidast may anthoeize m o$rer to sip speciSe doeamenb, ageesmmU and iastrsmrah oar belatf of rime Company pptided dint the name vS scuds aathorip:ed of5m and a desaiptiou of tie docoamt% agreements or iestrixuaeot$ that :gush officer may sip will bt provided is writing by the Senior or Grow We Pt*31 eat to rise Seavuryof d w Companypuiou to inch eimmfica bommiog effeeth-*." This Fowes of Attorney is signed and sealed by facsimile under and by the and ority of tht Allowing Resohiioa adopted by die Board of Dirators ofdw Coeapany by tnanimmas written consent dated the 2Sa day of Apnl, 2012: "%%areas, the byiaws ofdw Company or sp=& resohtioa of the Board of Diaeetoes has authorized va ww offken (the "Authorized Officers") to necute various poUciers, boods, undablimp And other ob4g4my instralments of line uafty; and Whereas, from time to time, the sipainre of the Authorized Offi w% in addition to being provided in origasai, hard copy foes nat, tray be prosided via facsimik or otherwise sea ao elechvaic fM=* (eollecuvelythat the Ekctr=k Si 4w* o(ary Aura =xtd Ofiracw shall be vafid and binding on tbt Caaopany." Ibis Power of ,Attorney may be Biped by digital sig:naiure and sealed by a digital or odseswiss electroaec fomsatted corporate seal tender and by the authority of the Wowing Resoktim adoptedby the Bond of Dirtcires of the by ursminmoses written consort dated the 27th day of Apnl, 2022: "RESOLVED: That it is in the but intavo of the Company to periodically xatify mad ernfrm any corpor+me documaests signed by digital sa;m*um and m ratify and confirm the use of a digital orodwraim electrook-keesatted corpona seal, each to be eomsidartd the act and deed of the Company." ADOPTED BY THE BOARD OF DIRECTORS OF NATIONAL FAM D URANCE OO)VANY OF HARTFORD; This Power of Attorney is grade and executed pursuant to and by authority of the follawnog resolution duty adopted by the Board of Directors of dus Company by anammons written consent dated May 10,1995: 'RESOLVED: That my Senior or Group Vice Resident array nAorm m eBWft to sip speeifrc document$, agrono ate and ia*uu%ents m behalf of the Co=paay pn6dad that the mamt of suet: m 6orized officer and a desaipeion of the docieumts, agemmash or ksbwwats that such officer vuy sip w91 be pmMkd in writing by the Senior or Group Vert President to the Static y of the Company prior m so& ovation becoming effeetisY.7 This Pourer of Amawy is signed and nakd by faesiam7e under and by tbs and-ity of ** 611owing Rtwktiou adopted by dye Board of Directors of the Company by unammoas written consent dated the 25o day of April, 2012: '1JL'hereas, the bylaws ofdat Cossqumy or specific resolution of toil Board of Diwom has as bxued various officm (d* "Aathozized OSom") t9 MKIAe Varian$ policies, bonds, undwuldngs and other obligatory inshoasents of I** nuum and Whereas, from time to tint, the sigoaturae of due Au&oti=d Officers, is addition to being ptmidtd in original, hand copy f+ornmat, may be pm ided via facsianik or otherwise in antiodnenc format (cdlectn*, "Eaea+onx Sigaatam'X Now therefore bt it ms&*& that the Electronic Signature of atny* AudwuzW 0ffiew shall be valid and binding an the Company,* This Power of Attornry may be signed by digital sigsatntt and sealed by a digital or othsrwne eltctsoaie•fotmattad corporals seal under and by the authority of the Wowing Rowhition adoptedby the Board of Directors of the Conspaty by unanimous writers consent dated dae 21th day odApral, 2022: 'RESOLVED: That it is in the best interest of the Company to periodically ratify and -a&- any earporm dmments signed by digital sipaftm and to ratify and coof ono tha use of a digital or otherwise ekctroak-loesmatted corporals seat, tech to be oonsi vW tht wand deed of the Company." ADOPTED BY THE BOARD OF DIRECTORS OF AMUJCAN CASUALTY COMPANY OF READING. FENNSYLVANIA: This Power of Amnwy is made and extorted prrsunt to and by avi otity of the fdlowing moktion duly adopted by the Bond of Dh-,W s of the Company by unacimous written consent dated May 10,1993: "RESOLVED: sat my Semoror Group Vice President may authorize an officer to sign specific documents, agremments and insummrnts oar babatf of the Company pm -;dud that the name of suel► authorized officer and a description of tie docuansrts, agreements or iashsmmenb that meh offm may sign wsil be provided in urrr.. g by the Senior or Group Viet President to the Seamny of tbt Company prior io such a texuim becoming dkcf -*." This Fou+rtr of Atsomey is signed and seated by (w ianle under and by else authority of the following Rswhtion adopted by the Bond of D"don of the Company by aaanimoos written consent dated ffie 2S6 day of April, 2012: 'Wherstas, die bylaws of the Company or specific molufm of fist Board of Directors has uthorioa various offsem (that "Au&oAzed Officers') to vmcu t Various policies, bonds, vndesulaags and other obligatory imtr,msmts of tam native; and Whereas, from time to firm, the sipatun of the Authorized Offieets, in addition to bring pm-.ded in original, hard copy format, may be pemjdad via faesivale or odmwut is an ekes ooie format (colleetn-ely, "Eketro ok Swuvzes")i Now d efon bo it nnahv& that the Ekehonic Signaram of nay Authorized Offim shall be valid and binding on die Company.' This Powys of Attorney may be sigma by digital sipatun and sealed by a digital at otherwise tleehvc&-5otmatted vo porm seal miler and by elms authority of the following R*wkstion adopted by the Board of Directors of the Company by unanimous written consent dated the 27th day of April. 2022: 'RESOLVED: That it is in the best interest of the Company to periodically ratify and eeofum my corporate doctmwats signed by digital sipmhaes and to gasify and confirm the use of a digital or od mwiw electsock-formatted corporals scat, each so be considered the act and deed of the Company." CONTRACTORS BID FOR PUBLIC WORK - FORM 96 �s; JState Form 52414 (R2 / 2-13) / Form 96 (Revised 2013) Prescribed by State Board of Accounts PART (To be completed for all bids. Please type or print) Date (month, day, year): August 8th, 2023 1. Governmental Unit (Owner): City of South Bend, Indiana 2. County: St. J 3. Bidder (Firm): Milestone Contractors North, Inc. Address: 24358 SR 23 City/State/ZlPcode: South Bend, IN 46614 4. Telephone Number: (574) 288-4811 5. Agent of Bidder (if applicable): Pursuant to notices given, the undersigned offers to furnish labor and/or material necessary to complete the public works project of 2023 CURB.AND SIDEWALK PROGRAM - Project No. 123-001 (Governmental Unit) in accordance with plans and specifications prepared by A & Z Engineering See Attached and dated July 11 th, 2023 for the sum of $ See Attached The undersigned further agrees to furnish a bond or certified check with this bid for an amount specified in the notice of the letting. If alternative bids apply, the undersigned submits a proposal for each in accordance with the notice. Any addendums attached will be specifically referenced at the applicable page. If additional units of material included in the contract are needed, the cost of units must be the same as that shown in the original contract if accepted by the governmental unit. If the bid is to be awarded on a unit basis. the itemization of the units shall be shown on a separate attachment. The contractor and his subcontractors, if any, shall not discriminate against or intimidate any employee, or applicant for employment, to be employed in the performance of this contract, with respect to any matter directly or indirectly related to employment because of race, religion, color, sex, national origin or ancestry. Breach of this covenant may be regarded as a material breach of the contract. CERTIFICATION OF USE OF UNITED STATES STEEL PRODUCTS (If applicable) I, the undersigned bidder or agent as a contractor on a public works project, understand my statutory obligation to use steel products made in the United States (I.C. 5-16-8-2). 1 hereby certify that I and all subcontractors employed by me for this project will use U.S. steel products on this project if awarded. I understand that violations hereunder may result in forfeiture of contractual payments. ACCEPTANCE The above bid is accepted this day of subject to the following conditions: Contracting Authority Members: PART II (For projects of $150.000 or more — IC 36-1-12-4) Governmental Unit: Clty of South Bend, Indiana Bidder (Firm) Milestone Contractors North, Inc. Date (month, day, year): Auk ust 8th, 2023 These statements to be submitted under oath by each bidder with and as a part of his bid. Attach additional pages for each section as needed. SECTION I EXPERIENCE QUESTIONNAIRE 1. What public works projects has your organization completed for the period of one (1) year prior to the date of the current bid? Completion Contract Amount Class of Work Date Name and Address of Owner 6,959,600.00 Resurface November 2022 Lake County Hwy Dept 5,589,894.00 Resurface October 2022 INDOT 5,457,310.00 ! Resurface November 2022 Town of Merrillville 2,101,053.00 Resurface October 2022 Town of St. John 2. What public works projects are now in process of construction by your organization? Expected Contract Amount Class of Work Completion Name and Address of Owner Date 24,738,412.00 Sidewalk Removal/Replacement September 2023 Town of Griffith 15, 394, 787.00 Concrete Pavement Restoration May 2024 I N DOT 7,020,500.00 Resurface October 2023 Lake Coun Hwy Dept 3,241,287.00 Resurface October 2023 City of Crown Point 3. Have you ever failed to complete any work awarded to you? No If so, where and why? 4. List references from private firms for which you have performed work. Gatlin Plumbing & Heating, Inc. 1111 E. Main St., Griffith, IN Ms. Patti Centrowski Gough, Inc. 2200 E. 88th Dr., Merrillville, IN Mr. Raymond Gough Dyer Construction Co., 1716 Sheffield Avenue, Dyer, IN Ms. Janet Furman Grimmer Construction Co., Inc. 2619 Main St., Highland, IN Mr. Greg Grimmer SECTION II PLAN AND EQUIPMENT QUESTIONNAIRE 1. Explain your plan or layout for performing proposed work. (Examples could include a narrative of when you could begin work, complete the project, number of workers, etc. and any other information which you believe would enable the governmental unit to consider your bid.) As required by owner 2. Please list the names and addresses of all subcontractors (i.e. persons or firms outside your own firm who have performed part of the work) that you have used on public works projects during the past five (5) years along with a brief description of the work done by each subcontractor. See attached list If you intend to sublet any portion of the work, state the name and address of each subcontractor, equipment to be used by the subcontractor, and whether you will require a bond. However, if you are unable to currently provide a listing, please understand a listing must be provided prior to contract approval. Until the completion of the proposed project, you are under a continuing obligation to immediately notify the governmental unit in the event that you subsequently determine that you will use a subcontractor on the proposed project. Will supply upon award of contract 4. What equipment do you have available to use for the proposed project? Any equipment to be used by subcontractors may also be required to be listed by the governmental unit. See attached list 5. Have you entered into contracts or received offers for all materials which substantiate the prices used in preparing your proposal? If not, please explain the rationale used which would corroborate the prices listed. Yes, we received quotes from potential subcontractors and suppliers SECTION III CONTRACTOR'S FINANCIAL STATEMENT Attachment of bidder's financial statement is mandatory. Any bid submitted without said financial statement as required by statute shall thereby be rendered invalid. The financial statement provided hereunder to the governing body awarding the contract must be specific enough in detail so that said governing body can make a proper determination of the bidder's capability for completing the project if awarded. SECTION IV CONTRACTOR'S NON — COLLUSION AFFIDAVIT The undersigned bidder or agent, being duly sworn on oath, says that he has not, nor has any other member, representative, or agent of the firm, company, corporation or partnership represented by him, entered into any combination, collusion or agreement with any person relative to the price to be bid by anyone at such letting nor to prevent any person from bidding nor to include anyone to refrain from bidding, and that this bid is made without reference to any other bid and without any agreement, understanding or combination with any other person in reference to such bidding. He further says that no person or persons, firms, or corporation has, have or will receive directly or indirectly, any rebate, fee, gift, commission or thing of value on account of such sale. SECTION V OATH AND AFFIRMATION I HEREBY AFFIRM UNDER THE PENALTIES FOR PERJURY THAT THE FACTS AND INFORMATION CONTAINED IN THE FOREGOING BID FOR PUBLIC WORKS ARE TRUE AND CORRECT. Dated at South Bend this 'S� tracito 1* Js Co • rs 'ems ;• (3(tP0RA s Ln ���• SEAL �� fill II%%X ` V By. STATE OF Indiana ) COUNTY OF St. Joseph ss ) day of August 2023 North, Inc. n P. Hilary, Director of Estimati (Title of Person Signing) ACKNOWLEDGEMENT Before me, a Notary Public, personally appeared the above -named Dustin P. Hi swore that the statements contained in the foregoing document are true and correct. Subscribed and sworn to before me this 8th day of August 2023 My Commission Expires: June 5, 2030 County of Residence: LaPorte ;n► Y �U + y Cofflis pA Expires ?}*° SEAL 2 ju Commission Number NP0653544 114 La Pais County and Part of State Form 52414 (R2 / 2-13)1 Form 96 (Revised 2013) Milestone Contractors North, Inc. (Contractor) 24358 SR 23 (Address) South Bend, IN 46614 FOR PUBLIC WORKS PROJECTS OF City of South Bend, Indiana 2023 CURB AND SIDEWALK PROGRAM Project No. 123-001 Filed August 8th , 2023 Action taken General Form No. 96-a Prescribed by the state Board of Accounts of Indiana. Revised 1949. Standard Questionnaires and Financial Statement for Bidders Prescribed by THE STATE BOARD OF ACCOUNTS OF INDL4NA For use in investigating and determining the qualifications of bidders on public construction when the aggregate cost of any such work or improvement will be Five Thousand Dollars or more. These statements to be submitted under oath by each bidder with and as a part of his bid, as provided by Chapter 306, page 1248, Acts of 1947 Submitted to Citv of South Bend, Indiana By Milestone Contractors North, Inc. Address 24358 SR 23, South Bend, IN 46614 Date submitted August 8th, 2023 Filed A.E. BOYCE CO., MUNCIE, IND. tA Corporation 1 The undersigned hereby declares that the foregoing is a true statement of the financial condition of the individual, co -partnership or corporation herein first named, as of the date herein first given; that this statement is for the expres urpose of inducing the party to whom it is submitted to award the submittor a contract; and that any depository, vendor or otberei herein named is hereby authorized to supply such party with any information necessary to verify this statement. / NOTE: A co -partnership must give firm name and signatures of all partners. A corporation must give full corporate name, signature of official `11111111 and affix corporate seal. / Z Dustin P. Hilary. Director�of n�ct��� {I o;. &?0RATf ': , Affidavit for Individual STATE OF :n ss: SEALS COUNTY OF being duly sworn, deposEa�r►d���� foregoing financial statement, taken from his books, is a true and accurate statement of his financial condition as of the/d��and that the answers to the foregoing interrogatories are true. (Applicant must sign here) Subscribed and sworn to before me this _day of 20. Notary Public Affidavit for Co -Partnership STATE OF ss COUNTY OF being duly sworn, deposes and says that he is a member of the firm of . that he is familiar with the books of the said firm showing its financial condition; that the foregoing financial statement, taken from the books of the said firm , is a true and accurate statement of the financial condition of the said firm as of the date thereof and that the answers to the foregoing interrogatories are true. (Member of firm must sign here) Subscribed and sworn to before me this day of 20 Notary Public Affidavit for Corporation STATE OF Indiana { COUNTY OF St. Jospah ss Dustin P. Hilary_ being duly sworn, deposes and says that he is Director of Estimatins o ilestone Contractors North Inc. , the corporation described in and which executed the foregoing statement; that he is famili it e books of the said corporation showing its financial condition; that the foregoing financial statement, taken from the books o - e s ' corporation, is a true and accurate statement of the financial condition of said corporation as of the date thereof and that the ems the foregoing interrogatories are true. Subscribed and sworn to before me this day of Auzu st, 2023. Alisha Krueger, Notary Public iY p`e, ALISHA KRUEGER i°• '%;: My Commission Expires '• SEAL':* June 5,2030 *-9Z Commission Number NP0653544 La Porte County 15 .►1111fI11Ifill Dustin P. Hilary, l ti,V= fry n: C�RpORgj� •':S ► :�'• SEAL ''1*1 1 II a o ````` State of Indiana Office of the Secretary of State CERTIFICATE OF EXISTENCE To Whom These Presents Come, Greeting: I, DIEGO MORALES, Secretary of State of Indiana, do hereby certify that I am, by virtue of the laws of the State of Indiana, the custodian of the corporate records and the proper official to execute this certificate. I further certify that records of this office disclose that MILESTONE CONTRACTORS NORTH, INC. duly filed the requisite documents to commence business activities under the laws of the State of Indiana on March 29, 1966, and was in existence or authorized to transact business in the State of Indiana on July 17, 2023. I further certify this Domestic For -Profit Corporation has filed its most recent report required by Indiana law with the Secretary of State, or is not yet required to file such report, and that no notice of withdrawal, dissolution, or expiration has been filed or taken place. All fees, taxes, interest, and penalties owed to Indiana by the domestic or foreign entity and collected by the Secretary of State have been paid. STdT�• 1$0S In Witness Whereof, I have caused to be affixed my signature and the seal of the State of Indiana, at the City of Indianapolis, July 17, 2023 DIEGO MORALES SECRETARY OF STATE 194484-057 / 20233280363 All certificates should be validated here: https://bsd.sos.in.gov/ValidateCertificate Expires on August 16, 2023. State of Indiana Office of the Secretary of State Certificate of Amendment of WALSH & KELLY INC 1, CONNIE 1AWSON, Secretary of State, hereby certify that Articles of Amendment of the above Domestic For -Profit Corporation.'have been presented to me at my office, accompanied by the fees prescribed by law and that the- documentation presented conforms to law as prescribed by the provisions of the Indiana Code. The name following said transaction will be: MILESTONE CONTRACTORS NORTH, INC. NOW, THEREFORE, with this document I certify that said transaction will become effective Monday, February 01, 2021. In Witness Whereof, I have caused to be affixed my signature and the seal of the State of Indiana, at the City of Indianapolis, February 01, 2021 dnze'gz� (%3 m CONNIE I.AWSON SECRETARY OF STATE 194484-057 / 8878219 To ensure the certificate's validity, go to https://bsd.sos.in.gov/PublicBusinessSearch State of Indiana Office of the Secretary of State Certificate of Assumed Business Name of MILESTONE CONTRACTORS NORTH, INC. I, CONNIE LAWSON, Secretary of State, hereby certify that a Certificate of Assumed Business Name of the above Domestic For -Profit Corporation has been presented to me at my office, accompanied by the fees prescribed by law and that the documentation presented conforms to law as prescribed by the provisions of the Indiana Code. Following said transaction, the above named entity will transact business under (fie assumed business name(s) of: r WALSN.& KELLY NOW, THEREFORE, with this document I certify that said transaction will become effective Monday, February 01, 2021. In Witness Whereof, I have caused to be affixed my signature and the seal of the State of Indiana, at the City of Indianapolis, February 02, 2021. CONNIE IAWSON SECREIARY Of STAIE 194484-057 / 8878234 To ensure the certificate's validity, go to https:// bsd.sos.in.gov/PubliCBusinessSearch W-9 Request for Taxpayer Give Form to the Number and Certification requester. Do not (Rev. October2018) identification send to the IRS. Department of the Treasury Internal Revenue Service III -Go to www.1rs gov1FormlW for instructions and the latest information. 1 Name (as shown on your income tax return). Name is required on this line; do not leave this line blank. MILESTONE CONTRACTORS NORTH, INC 2 Business nameldisregarded entity name, if different from above M 3 Check appropriate box for federal tax classification of the person whose name is entered on line 1. Check only one of the 4 Exemptions (codes apply only to certain entities, not Individuals; see rnfollowing seven boxes. ko Instructions on page 3): a 0 ❑ 1ndividuaVaole proprietor or ❑ C Corporation 0 S Corporation ❑ Partnership TruaVestate 0 � single -member LLC Exempt payee code ('rf any) ❑ Limited liability company. Enter the tax classification (C=C corporation, S=S corporation, P=Partnership) ► 0 2 Note: Check the appropriate box in the line above for the tax classification of the single -member owner. Do not check 1: 1ii LLC if the LLC is classified as a single -member LLC that Is disregarded from the owner unless the owner of the LLC Is Exemption from FATCA reporting code (if any) C 5 another LLC that Is not disregarded from the owner for U.S. federal tax purposes, Otherwise, a single -member LLC that a is disregarded from the owner should check the appropriate box for the tax classification of Its owner. ❑ Other(seeInstructions) ► Waa�sroacc«manwntan�eeouaaeseus� y 5 Address (number, street, and W. or suite no.) See Instructions. Requestees name and address (optional) 1700 EAST MAIN STREET 6 City, state, and ZIP code GRIFFITH IN 46319 7 List account numbers) here (optiono EVtW Taxpayer Identification Number IN) Enter your TIN in the appropriate box. The TIN provided must match the name given on line 1 to avoid —1 Social aecurigr number backup wlien, sole For Individuals, this Is generally your social security ebony number (SSN). However, for a — m resident alien, sole proprietor, or disregarded entity, see the instructions for Part I, later. For other entitles, it Is your employer Identification number (EIN). If you do not have a number, see How to get a TIN, later. FT7 Note: If the account is in more than one name, see the Instructions for line 1. Also see What Name and IEmpioyer identiRca0an number Number To Give the Requester for guidelines on whose number to enter, � 13151 — 1 1 2 0 6 8 5` Certification Under penalties of perjury, I certify that: 1. The number shown on this form is my correct taxpayer identification number (or I am waiting for a number to be issued to me); and 2. 1 am not subject to backup withholding because: (a)1 am exempt from backup withholding, or (b) I have not been notified by the Internal Revenue Service (IRS) that I am subject to backup withholding as a result of a failure to report all Interest or dividends, or (c) the IRS has notified me that I am no longer subject to backup withholding; and 3.1 am a U.S. citizen or other U.S. person (defined below); and 4. The FATCA code(s) entered on this form (if any) indicating that I am exempt from FATCA reporting is correct. certification Instructions. You must cross out ftem 2 above If you have been notified by the IRS that you are currently subject to backup withholding because you have failed to report all Interest and dividends on your tax return. For real estate transactions, Item 2 does not apply. For mortgage interest paid, acquisition or abandonment of secured property, cancellation of debt, contributions to an individual retirement arrangement QRA), and generally, payments other than Interest and dividends, you are not required to sign the certification, but you must provide your correct TIN. See the instructions for Part 11, later. sign signature of Here I u.s. parson ► General Instructions Section references are to the Intemal Revenue Code unless otherwise noted. Future developments. For the latest information about developments related to Form W-9 and its instructions, such as legislation enacted after they were published, go to www.1rs.gov1FormW9. Purpose of Form An individual or entity (Form W-9 requester) who is required to file an Information return with the IRS must obtain your correct taxpayer identification number (TIN) which may be your social security number (SSN), Individual taxpayer identification number QTIM, adoption taxpayer Identification number (ATIN), or employer Identification number (EIN), to report on an information return the amount paid to you, or other amount reportable on an information return. Examples of information returns Include, but are not limited to, the following. • Form 1099-INT (Interest earned or paid) Date► 1/� aoaa) • Form 1099-DIV (dividends, Including those from stocks or mutual funds) • Form 1099-miSC (various types of income, prizes, awards, or gross proceeds) • Form 1099-B (stock or mutual fund sales and certain other transactions by brokers) • Form 1099-S (proceeds from real estate transactions) • Form 1099-K (merchant card and third party network transactions) • Form 1098 (home mortgage Interest), 1098-E (student loan interest), 1098-T (tuition) • Form 1099-C (canceled debt) • Form 1099-A (acquisition or abandonment of secured property) Use Form W-9 only If you are a U.S. person (including a resident alien), to provide your correct TIN. If you do not return Form W-9 to the requester with a TIN, you might be subject to backup withholding. See What is backup withholding, later. Cat No. 10231X Form w-9 (Rev.10-2018) CERTIFICATE OF QUALIFICATION to provide CONSTRUCTION SERVICES for PUBLIC WORKS PROJECTS to the STATE OF INDIANA This Certification Board, having duly considered application for qualification in terms of apparent experience and financial resources; and under the applicable Indiana Code 4-13.6-4 and adopted rules of this Board, hereby issues a Certificate of Qualification to provide construction services to the State of Indiana for Public Works Projects to: MILESTONE CONTRACTORS NORTH INC 1700 E MAIN ST GRIFFITH IN 46319 Phone 219-924-5900 Fax 219-924-8768 Company Official TODD FAWVER for the twenty-seven month period stated herein, unless revoked by this Board for cause, and in the classifications of services stated below. This certificate supercedes any previous certificate. 1611.01 Concrete Construction of Roads & Curbing 1611.02 Asphalt Construction of Roads and Parking Lots CERTIFICATION DATE 2/1/2023 EXPIRATION DATE 6/1/2025 THIS CERTIFICATE ISSUED BY THE STATE OF INDIANA, PUBLIC WORKS DIVISION CERTIFICATION BOARD, 402 WEST WASHINGTON STREET, ROOM W467, INDIANAPOLIS, INDIANA 46204, ALSO ACTS AS THE OFFICIAL NOTICE OF EXPIRATION. Tracy L. Cross, Exalltive Secretary Certification Board DAPW PQ2 State Forth 3983R Rev. 07106 WRITTEN CONSENT TO RESOLUTIONS of the BOARD OF DIRECTORS of MILESTONE CONTRACTORS NORTH, INC. The undersigned, being all of the Directors of MILESTONE CONTRACTORS NORTH, INC., an Indiana Corporation, hereby consent to the following actions to be taken by the Corporation without a meeting of the Board of Directors under the applicable provisions of the Indiana Business Corporation Law, as amended: RESOLVED that the following be, and hereby are, elected officers of the Corporation, to hold the office until the next regular meeting of the Board of Directors and until their successors are duly elected and have qualified: Todd A. Fawver President Charles Potts Jr. Chief Operating Officer, Construction John P. Vercruysse Executive Vice President Mark Andrews Executive Vice President David L. Franz Vice President John M. Peisker Vice President, Production Patrick J. Walters Vice President, Finance Brad McCall Vice President, Estimating Derek Merida Vice President, Bridge Operations David M. Kozyra Vice President/Area Manager Griffith Lynn J. Bauer Vice President/Area Manager South Bend Danielle Payne Assistant Controller, Secretary and Treasurer RESOLVED FURTHER that the above officers be, and they hereby are, authorized to execute all contracts or similar documents on behalf of the Corporation. In addition to the above officers the following are hereby appointed as authorized signers on behalf of the Corporation: David J. Misirly Senior Estimator Gregory A. Hoffman Director of Estimating, Griffith Dustin P. Hilary Director of Estimating, South Bend Mark E. Krachenfels Construction Manager RESOLVED FURTHER that the actions of the Officers of the Corporation taken since the last meeting of the Board of Directors be, and the same hereby are, fully ratified and approved. RESOLVED FURTHER that this consent shall be in lieu of an annual meeting of the Board of Directors of the Corporation and shall be filed in the minute book of the Corporation in place of any such annual minutes. <<SIGNATURES ON THE NEXT PAGE>> EXECUTED this 26th day of August, 2021. 2l YA '7�(� -_ Fred Fehsenfeld, Jr. Geoffrey C. Dillon James ehsenfeld J&6 P. Vercruysse P,i; Milestone DATE: May 24, 2022 TO: All Employees RE: EEO Officer Appointment Margaret Garner has been appointed Equal Employment Opportunity Officer for Milestone Contractors. It is her responsibility to coordinate, advise and assist management and supervisors in their responsibilities of assuring all applicants and employees' equal opportunities in all aspects of their employment. She will review complaints that allege discrimination because of race, religion, color, sex, sexual orientation, gender identity, age, national origin, disability, housing status or veteran status. Employees of Milestone Contractors are to submit any issues or concerns to Margaret. We are committed to comply with the provisions of the Civil Rights Act of 1964 and 1991, plus all Executive Orders issued relating to Equal Employment. Margaret's contact information is listed below. Milestone Contractors 5757 Decatur Blvd, Suite 250 Indianapolis, IN 46241 m arner milestone) .cor (317) 616-4937 2-1w- - - - - CJ Potts, Chief Operating Officer Milestone EQUAL EMPLOYMENT OPPORTUNITY/ AFFIRMATIVE ACTION POLICY STATEMENT It is the policy of Milestone Contractors to afford equal opportunity for employment to all individuals regardless of race, color, religion, sex, sexual orientation, gender identity, national origin, age, disability, housing status, or veterans' status. The corporation is committed to this policy by our status as a federally assisted government contractor. We are far more strongly bound to the policy by the fact that adherence to the principles involved is the only acceptable American way of life. Therefore, it is the policy of this corporation to assure that applicants are employed, and that employees are treated during employment without regard to race, color, religion, sex, sexual orientation, gender identity, national origin, age, disability, housing status, or veterans' status. Such action shall include: employment, upgrading, demotion, or transfer; recruitment or recruitment advertising; layoff or termination; rates of pay or other forms of compensation; and selection for training, including apprenticeship, pre - apprenticeship, and/or on-the-job training. The successful achievement of a nondiscriminatory employment program requires a maximum of cooperation between management and employees. In fulfilling its' part in this cooperative effort, management is obliged to lead the way by establishing and implementing affirmative procedures and practices which will ensure our objective, namely equitable employment opportunity for all. (Minority and female employees are encouraged to participate in all company activities and refer applicants.) I have designated Margaret Garner to direct the establishment of and to monitor the implementation of personnel procedures to guide our affirmative action program. This official is charged with designing and implementing audit and reporting systems that will keep management informed on a regular basis of the status of equal employment opportunity and affirmative action. She can be reached at (317)616-4937. Supervision has been made to understand that their work performance is being evaluated based on their equal employment opportunity efforts and results, as well as other criteria. It shall be a responsibility of the supervision to take actions to prevent harassment of employees placed through affirmative action efforts. We shall comply with the Civic Rights Act of 1964, as amended, the Federal Highway Act of 1968, the Executive Order #11246 and #11375, the Rehabilitation Act of 1973, as amended, the Vietnam Era Veterans Readjustment Assistance Act of 1974, as amended, the Indiana Civil Rights Act and other applicable Federal and State Laws and regulations pertaining to equality of Opportunities and Affirmative Action policies. We have developed an Affirmative Action Program for Veterans and Individuals with Disabilities. C1 Potts, Chief Operating Officer Margaret Garner, HR Area Partner/EEO Officer January 2023 rd'umte of u ISSUED BY INDIANAPOLIS, IN October20, 2022 TO MILESTONE CONTRACTORS NORTH, INC. GRIFFITH, IN who has filed with the Department a rraciors Statemerf of Experience and Financial Condition as required under Miana Code 8-23-10, is hereby qualified to bid at any Department of Transportation letting in Classes of Work and within the amount and other limitation of each dassification as listed below, for such period as the ucompleled work on hand from all sources does not exceed the Aggregate amount Classification references by name or symbol are in accordance with the definitions in the Corirador'sStatement ofExperience and Financial C:ondition. This certificate supersedes any certificate previously issued, but is subject to revision or revocation according to the law, I and when changes in the financial condition of the contradinq firm or other facts justify such revision or revocation, Valid October 20, 2022 Thru September 30, 2023 Aggregate Bidding Capacity: 327,748,000.00 A(B) CONCRETE PAVEMENT: LIMITED................................................................................... $25,000,000.00 B(A) ASPHALT PAVEMENT: W/INDOT CERTIFIED HMA PLANT ............................................. $99,999,999.00 C(B) LIGHT GRADING............................................................................................................... $99,999,999.00 E(E) SMALL STRUCTURES AND DRAINAGE ITEMS.............................................................. $25,000,000.00 E(F) SURFACE MASONRY AND MISCELLANEOUS CONCRETE ........................................... $60,000,000.00 E(G) TRAFFIC CONTROL: PAVEMENT MARKINGS................................................................ $25,000,000.00 E(H) DEEP SEWER AND/OR EXCAVATION.............................................................................. $25,000,000.00 E(Q) CONCRETE PAVEMENT: REPAIRS................................................................................. $25,000,000.00 E(R) ASPHALT PAVEMENT MILLING....................................................................................... $50,000,000.00 tl� - PRE;,L;J,;FI,CA'I1 ,6 E16G1 ,EER StMe H= 205do tA3 i 646 tv---4 ,, & YMI55!y P- EP