SOUTH BEND REDEVELOPMENT COMMISSION
SCHEDULED REGULAR MEETING
July 13, 2023 – 9:30 am
https://tinyurl.com/RedevelopmentCommission or BPW 13th Floor
Presiding: Marcia Jones, President
The meeting was called to order at 9:30 a.m.
1. ROLL CALL
Members Present: Marcia Jones, President – IP
Troy Warner, Vice-President – IP
Vivian Sallie, Secretary - IP
Eli Wax, Commissioner - IP
David Relos, Commissioner – IP
IP = In Person V = Virtual
Members Absent: Leslie Wesley, Commissioner - V
Legal Counsel: Sandra Kennedy, Esq.
Danielle Campbell, Asst. City Attorney
Redevelopment
Staff:
Mary Brazinsky, Board Secretary
Joseph Molnar, RDC Staff
Others Present:
Caleb Bauer
Erik Glavich
Tim Corcoran
Rosa Tomas
Michael Divita
Amy Paul
Charlotte Brach
Zach Hurst
Leslie Biek
Alyson Herzig
Todd Jensen
Brandon Shields
Mark Hillman
Nicolas Munsen
Ophelia Rogers
Desmond Upchurch
DCI
DCI
DCI
DCI
DCI
DCI
Engineering
Engineering
Engineering
Neighborhoods
KCG
Advantix
COSB Legal Intern
ND legal student
Resident
Resident
South Bend Redevelopment Commission Regular Meeting – July 13, 2023
2. Approval of Minutes
• Approval of Minutes of the Regular Meeting of Thursday, June 22, 2023
Upon a motion by Commissioner Relos, seconded by Vice-President Warner, the
motion carried unanimously, the Commission approved the minutes of the regular
meeting of Thursday, June 22, 2023.
3. Approval of Claims
A. Claims Allowance 7.7.23
Upon a motion by Commissioner Relos, seconded by Vice-President Warner, the
motion carried unanimously, the Commission approved the claims allowance of
July 7, 2023.
4. Old Business
5. New Business
A. River West Development Area
1. Budget Request (Coal Line Trail Phase II)
Tim Corcoran Presented a Budget Request (Coal Line Trail Phase II). This budget
request for $87k is for technical issues with the current phase with cost overruns
for rivet removal and swing bollard, also water hookup provision. The main item
is due to major flooding in 2018 where the water was coming from outside of the
city limits. There is a natural and unnatural drainage pattern. Some of it was a
factor of the railroad right away when it was a railroad. This part was not in the
original design of the trail, and this was an unknown issue. The city is working to
figure out a solution to deal with the drainage that represents approximately $60k.
A change order for this project has been issued. Commission approval is
requested.
Commissioner Relos asked if the waters is doing swales to try to redirect runoff
from the old St. Joe High School Football Field.
Mr. Corcoran stated yes. When the railroad came in, they built up the railroad
and it acts like a dam. The water is running between the condominiums and on
along the North Shore homes. There is actually a swale between them that is
pretty deep. We later found that some of the pipes that empty stormwater back to
the river were clogged and started to fill the area. As you move east, water runoff
from St. Joe High School at the softball diamond were a dry creek line in the back.
That was being trapped and would overflow during flood events causing a lot of
problems for residents along the trail.
Commissioner Relos asked if we are trying to direct the water to the river.
South Bend Redevelopment Commission Regular Meeting – July 13, 2023
Mr. Corcoran stated yes.
Secretary Sallie asked if the $60k was for fixing the water issue.
Mr. Corcoran stated yes, that is the city expense, but Notre Dame has pitched in
almost $40k to the total cost which is around $90k. This project is an 80/20
match. There is some contingency built in to cover other changes should they
come up.
Vice-President Warner stated he is familiar with this issue and there are a whole
lot of varied factors including the drop from Michigan Street down through the high
school to the athletic fields. It is a slope back there. This includes some
mysterious drainpipes with water running down the hill. In 2018 they found a few
spots to cross over into the alley and into the backyard and homes on Angela. He
was out there on Monday, and they are working a couple water lines that they did
not anticipate having to deal with. The neighborhood is putting a unity garden
where the athletic and softball field is, and engineers are working to get the water
line to be able to use there. The neighborhood has been asking for a fix to this
water problem for a long time; it is a critical fix.
Mr. Corcoran stated that during the flood there was a resident that lived on Angela
that took incredibly detailed photos of everything step by step, which helped us.
Upon a motion by Secretary Sallie, seconded by Commissioner Relos, the motion
carried unanimously, the Commission approved Budget Request (Coal Line Trail
Phase II) submitted on Thursday, July 13, 2023.
2. Real Estate Purchase Agreement (KCG)
Joe Molnar Presented a Real Estate Purchase Agreement (KCG). This
agreement is with KCG development out of Indianapolis. They are looking at a
property at 1202 S Lafayette which is south of downtown just a few blocks south
of Sample Street. They are proposing a $13M investment on the site which is
currently fully RDC owned. They are applying for the 2023 LIHTC credits. The
end result would be fifty housing unit apartment building all affordable income
restricted split between 30 percent, 50 percent, and 60 percent area median
income. They are targeting 55 and up age housing bracket. A senior plus
housing unit. A rough preliminary site plan was shown with parking behind the
building. Staff proposed a $1,000 purchase price for the property however, the
deal would only go through if LIHTC was awarded. It they are not successful in
the application we would not be obligated to transfer the property. The agreement
anticipates minimum investment of $13M by the developer and fifty housing units
must be completed within thirty months of the commencement and closing.
Todd Jensen, KCG, Vice-President, Development noted that they are excited to
be working with the city on this tax credit application. The city has been very
supportive in providing the items needed for the application as well as financial
support and an incentive package that scores points on the application giving
them the best chance to receive the tax credits. He hopes all goes well at the
awards in November 2023.
South Bend Redevelopment Commission Regular Meeting – July 13, 2023
Mr. Molnar presented a brief overview of the LIHTC calendar. Council items were
presented in June/July 2023. Purchase Agreements in July 2023. Applications
submitted to LIHTC by the end of July 2023 with scoring announced November
2023.
Upon a motion by Commissioner Relos, seconded by Commissioner Wax, the
motion carried unanimously, the Commission approved Real Estate Purchase
Agreement (KCG) submitted on Thursday, July 13, 2023.
3. Real Estate Purchase Agreement (Advantix)
Joe Molnar Presented a Real Estate Purchase Agreement (Advantix). Advantix is
a non-profit based out of Evansville Indiana. This project is a scattered site
development project (maps of the sites provided). This LIHTC project will be on
thirty-seven separate city owned properties, and it will consist of fifty housing
units. The units will be split between thirty percent, fifty percent and eighty
percent income restricted to the area median income. The units are spread over
quite a few different neighborhoods with the majority of the concentration in the
north. There are some in Kennedy Park, City Cemetery, Muessel Grove, LaSalle
Park, and these will go through Board of Public Works as they own those
properties. The majority of them are small former single-family plots that were
picked up through tax sale primarily and other state programs. RDC does own
the one singular large site that Advantix is looking forward to in keeping cost
down. The BPW purchase agreement was approved last Tuesday. The total
project envisions a $12.5M investment. The properties were shown to the
commissioners. A preliminary site plan was shown including twelve townhomes,
seven facing Lincoln Way West, five facing W Marion as well as the offices for the
whole fifty-unit development in the north portion of the property. Advantix plans to
use the catalog of well-designed buildings that the city planners have put
together. They are looking into a new program so a renter with fifteen years of
rent payments could purchase the property. The details are a little rough as no
one has gotten to the fifteen years yet.
RDC commitments are the property sale of $1,000. There would be no property
transfer unless the state approved the LIHTC credits on the RDC site. The
trapezoid site has a minimum of $1M investment and a minimum of ten housing
units. We do think twelve is a possibility, but we included some flexibility in the
plan. Council items were presented in June/July 2023. Purchase Agreements in
July 2023. Applications submitted to LIHTC by the end of July 2023 with scoring
announced November 2023.
Brandon Shields, Broker Division Business Development Manager, Advantix
noted it has been a long journey, but the city has been extremely helpful and
supportive, and they are grateful for the opportunity. Sometimes scattered sites
can be a little tricky, but they look forward to development on these forgotten
places throughout the years.
South Bend Redevelopment Commission Regular Meeting – July 13, 2023
Commissioner Wax confirmed the timelines, assuming the tax credits are
awarded; closing would be before the end of December 2023?
Mr. Molnar stated closing would be within six months of the November 2023
award date. The state has restricted timelines of the award for six months for
each project to get their financing in line and then to complete the projects within
two years.
Commissioner Relos asked if the state has defined on the lease to own homes
after fifteen years? Is the property deeded to them or is there a balance due that
they have to produce as they have the option to buy?
Mr. Molnar stated that the state will run the program and it is on a to be
determined basis. Mr. Shields confirmed that it is to be determined.
Ophelia Rogers, resident, asked when these companies come to South Bend do
they bring their own construction crews, or do they use any of the local unions in
the city?
Mr. Bauer stated that it would depend on the developer. In the case of Advantix,
they are from the Evansville Housing Authority, and they do their own
construction. They have staff that book throughout the state. As far as KCG goes,
they may be looking for builders.
Mr. Jensen, KCG, noted they have their own builders, but it is their intention to
use local materials and labor. It just makes sense for the projects.
Upon a motion by Commissioner Relos, seconded by Secretary Sallie, the motion
carried unanimously, the Commission approved Real Estate Purchase Agreement
(Advantix) submitted on Thursday, July 13, 2023.
4. MOU (Valerie Loew 2023 – 2028)
Joe Molnar Presented MOU (Valerie Loew 2023 – 2028). This is a local artist that
has used artifacts from the former Fat Daddy’s building that the city has saved.
She creates molds and uses them in her artistic projects. She originally did this in
2021 and the city has formed a good relationship with Ms. Loew. She asked if
she could use them again. This agreement states that she would be allowed to
use and return the molds as needed in the next five years. She will not hold the
molds but use them for brief periods. We are happy to help a South Bend artist.
Commission approval is requested.
Upon a motion by Commissioner Wax, seconded by Vice-President Warner, the
motion carried unanimously, the Commission approved MOU (Valerie Loew 2023
– 2028) submitted on Thursday, July 13, 2023.
South Bend Redevelopment Commission Regular Meeting – July 13, 2023
5. First Amendment to Real Estate Purchase Agreement (The Monreaux)
Joe Molnar Presented First Amendment to Real Estate Purchase Agreement (The
Monreaux). This is one of the LIHTC projects from July 2022. This project is a
minimum investment of $16M with sixty housing units of which forty-six will be
affordable. The award was delayed until February 2023. There are no changes
to the commitments, this just extends their timeline to March 31, 2024.
Commission approval is requested.
Mr. Bauer noted that technically the tax credits will actually be awarded in this
coming round. They are guaranteed to be awarded. This gives the developer
one additional year. We will be bringing a development agreement before you in
the next couple of months, but we are finalizing the negotiations portions.
Upon a motion by Commissioner Wax, seconded by Secretary Sallie, the motion
carried unanimously, the Commission approved First Amendment to Real Estate
Purchase Agreement (The Monreaux) submitted on Thursday, July 13, 2023.
6. Progress Reports
A. Tax Abatement
1. Erik Glavich noted that the Common Council confirmed three tax abatements.
Two of the abatements were ten-year real property tax abatements for LIHTC
projects for both KCG and Advantix.
• Confirming Tax Abatement for property located at 1202 S Lafayette Blvd.
• Designating Tax Abatement for property located at 1144 Corby Blvd. Five
Corners partnering with Holladay property. One for one-hundred eight
apartment building and the next is for condo/retail space. The for-sale
condo space is not included in the abatements.
• Confirming Tax Abatement for property located at 1405 Portage
Avenue/Peak Investment and Asset Management, LLC. The old speedway
gas station will be torn down and will be building two new retail complexes
with six stores. Two stores will be along Portage Avenue.
(Portage/Elwood). Macog has funds for storage tank remediation through
the state of Indiana.
• Confirming Tax Abatement for property commonly known as multiple
properties
• Designating Tax Abatement for property located at 1901 N. Bendix Drive
for Crossroads Solar that almost exclusively hires felons returning to the
workplace. They have grown and are at compacity.
B. Common Council
C. Other
1. Desmond Upchurch, resident, 327 S Francis Street, asked if we have an
exact amount of what is affordable.
Mr. Bauer noted that it is 80% of the HUD table which is $43,700 per year
in income. The rent that is affordable is based on HUD percentages.
South Bend Redevelopment Commission Regular Meeting – July 13, 2023
Mr. Upchurch asked are they going to be offset by a certain range?
Mr. Bauer noted the HUD housing table starting at the 80% AMI down to
the 30% AMI ranges.
Mr. Upchurch asked for the exact numbers not the percentages to tell the
citizens of South Bend. Typically, a resident does not look at the HUD
percentages, they just want to know why their rent amount went up.
Mr. Bauer states that each community is different. The AMI for St Joseph
County for 60% AMI for a 2-bedroom apartment is $1,053 per month. This
is the HUD fair market housing table.
7.Next Commission Meeting:
Thursday, July 27, 2023
8.Adjournment
Thursday, July 13, 2023, 10:21 a.m.