HomeMy WebLinkAboutChange Order No 2 - 2022 Contractor Paving, Round III Proj No. 122-048 - Reith-Riley Construction  ELIZABETH A. MARADIK JOSEPH R. MOLNAR GARY A. GILOT JORDAN V. GATHERS MURRAY L. MILLER 1316 COUNTY-CITY BUILDING 227 W. JEFFERSON BOULEVARD SOUTH BEND, INDIANA 46601-1830 PHONE 574/ 235-9251 FAX 574/ 235-9171 CITY OF SOUTH BEND JAMES MUELLER, MAYOR BOARD OF PUBLIC WORKS July 11, 2023 Mr. Ruben Alvarado Rieth-Riley Construction Co., Inc. 25200 State Road 23 South Bend, IN 46614 hgritton@rieth-riley.com; ralvarado@rieth-riley.com RE: Change Order No. 2 – 2022 Contractor Paving, Round III – Project No. 122-048 Dear Mr. Alvarado: At its July 11, 2023 meeting, the Board of Public Works approved the above referenced Change Order be increased by $13,380.75 with an additional twenty-eight (28) days, bringing the revised contract amount to $2,301,706.75 with a new completion date of July 28, 2023. Enclosed is a copy of the Change Order for your records. If you have any further questions, please call this office at (574) 235-9251. Sincerely, /s/ Theresa Heffner Theresa Heffner, Clerk Enclosures TH/lh INTER-OFFICE MEMORANDUM DEPARTMENT OF PUBLIC WORKS DIVISION OF ENGINEERING TO: Theresa Heffner, Clerk Board of Public Works FROM: Scott Kreeger, Project Engineer SUBJECT: 122-048 2022 Contractor Paving Round 3 CO#2 DATE: 6/22/2023 Change order #2 for the 2022 Contractor Paving Round 3 project includes the additional costs due to the discovery of the unmarked Choice light conduit, addition of pedestrian push buttons, and the new striping configured for Miami Street. A complete breakdown of the costs along with a brief description of the work will be included in an attachment to this memo. City of South Bend Project No. 122-0486/27/20232022 Contractor Paving, Round 3Line Item Qty Unit Price TotalAdd Ped Push Button Pedestals 9 EA $3,757.33 $33,816.00Add Handhole 1 EA $4,913.00$4,913.00Choice Light Delay 1 LS $12,975.00$12,975.00Delete Headers 1 LS -$91,214.28-$91,214.28Add Line Item: Crosswalk 24", White728 LFT $13.70$9,969.96Add Line Item: Sign Post48 LFT $29.70$1,425.60Add Line Item: No Right Turn5 EA $115.50$577.50Add Line Item: Speed Limit Sign1 EA $115.50$115.50Add Line Item: Manhole Casting Repair 16 EA $1,950.00 $31,200.00Striping Adjustments 1 LS $9,602.47 $9,602.47CO Total = $13,380.75Change Order #2NotesScope: Various existing line item quantity adjustments per striping plan changes.Scope: Eliminated from project.Unforeseen: Remobilization charges due to unforeseen utility delays.Scope: Added for pedestrian crossing concerns.Scope: Added to tie-in pedestrian push button pedestal electrical.Scope: Adjustments needed for existing structure castings in roadway.Scope: Added for changes in striping plan. July 11, 2023 BOARD OF PUBLIC WORKS AGENDA ITEM REVIEW REQUEST FORM Date 6/22/2023 Name Scott Kreeger Department Public Works BPW Date 7/11/2023 Phone Extension 9245 Required Prior to Submittal to Board BPW Attorney Attorney Name Michael Schmidt Dept. Attorney Attorney Name Purchasing Mickey Lovy Check the Appropriate Item Type – Required for All Submissions Professional Services Agreement Contract Proposal Open Market Contract Amendment/Addendum Special Purchase, QPA Bid Opening Bid Award Req. to Advertise Title Sheet Quote Opening Quote Award Reject Bids/Quotes Proposal Opening C/O & PCA No. PCA Chg. Order, No. 2 Traffic Control Resolution Other: Ease./Encroach Required Information Company or Vendor Name Rieth Riley Construction Co., Inc. New Vendor Yes If Yes, Approved by Purchasing No MBE/WBE Contractor MBE WBE Completed E-Verify Form Attached Yes No Project Name 2022 Contractor Paving Round 3 Project Number 122-048 (DFO PROJ00000352) Funding Source River West TIF , Southside Development Account No. 324-10-102-121-442001, 430-442001 Amount $13,380.75 Terms of Contract Purpose/Description Change Order #2 – Additional message boards during the duration of the project. For Change Orders Only Amount of Increase Decrease $ 13,380.75 ($ ) Previous Amount $ 2,288,326 Current Percent of Change: Increase Decrease 0.58% ( %) New Amount $ 2,301,706.75 Total Percent of Change: Increase Decrease 1.51% ( %) Time Extension Amount: 28 days New Completion Date: 7/28/2023