HomeMy WebLinkAboutOpening of Qualifications - WWTP CSO Tank RFQ Guaranteed Savings Contract Proj No. 121-071-A - Bowen EnigneeringrL 1� C1,10V �' d' Resourceful. Responsive. Results. July 11, 2023 Kieran Fahey, Director, Long -Term Control Plan Department of Public Works City of South Bend Re: City of South Bend, Indiana Request for Qualifications from Providers of a Guaranteed Savings Contract. Kieran and South Bend Team: Please see Bowen's attached qualifications to successfully complete improvements to the City of South Bend's WWTP/CSO 045 EQ Basin and Clarifier Upgrade Projects. We are committed to being your most Resourceful and Responsive Provider while delivering the Results you and your team expect. Bowen is uniquely qualified to support you with this project: Because Bowen's local Northern Indiana team is on the project, your project will benefit from existing strong relationships, active jobsite presence, and a dedicated local team with backup from our Indianapolis Headquarters Office. % Because Bowen has successfully completed past projects at the City of South Bend WWTP, your projects will benefit from lessons learned and better understanding of the existing facility. This experience will allow our team to successfully meet your goal of constructing a new CSO EQ Basin and Clarifier Upgrades supporting your wastewater system by December 2025 (See Preliminary Schedule in the Technical Approach Section). Because Bowen has successful experience partnering with American Structurepoint and Arcadis, you will get optimized collaboration and decision making for the best project outcomes and long-term operability. 9-P Because we are the #1 Water and Wastewater GSC Provider in Indiana, your team will get a nationally recognized and resourced Provider partner that has implemented a successful GSC with the City of South Bend and American Structurepoint (Pinhook WTP Upgrade GSC). The Bowen team looks forward to the opportunity to deliver another excellent construction experience for the City of South Bend. Through our collaborative GSC process, you can be assured that your Combined Sewer Overflow 045 EQ Basin and Clarifier Upgrade Projects will be successful and tailored to the specific needs of you and your capable team. Respectfully, ohn Dettman, Vice President Project Executive Sponsor 317.409.4840 Resourceful. Responsive. Results. 200 Billings Street, Valparaiso, IN 46383 eve Nutt, Vice President Performance Contracting 317.519.1716 www.bowensqp.com vif I S�7 A A -7 1 V-7' BOWEN ENGINEERING CORPORATION JL 8802 N Meridian St., Indianapolis, IN 46260 #'. *.111% Steve Nutt, Vice President of Performance Contracting INN ku Cl/ M: 317.576.8748 snutt@bowenengineering.com Resourceful. Responsive. Results. Bowen agrees and accepts all General Requirements laid out in the Request for Qualification (RFQ) Guidelines. Executive Summary 0 Company Background and Qualifications ► Company History and Mission, Vision, and Values ► Provider Information ► Provider's Qualifications and Management ► Resumes for Your Proposed Staff References ► List of Indiana Wastewater GSCs (IC 36-1-12.5) ► References with Contact Information Technical Approach 3 ► Provider's Technical Abilities ► Preliminary Execution Plans and VE for Consideration ► Preliminary P6 Schedule for CSO Project ► Preliminary P6 Schedule for Clarifier Project ► Wastewater and CSO Experience of our Northern Indiana Team ► Experience Collaborating with American Structurepoint ► Experience Collaborating with Arcadis Project Implementation 4 ► Provider Involvement ► Project Management ► Subcontractor Approach ► Other Subcontractor Involvement Financial Approach 5 ► Plan to Obtain Best Pricing ► Plan to offer GMP with no Change Orders ► Provider's approach to Open -Book Pricing ► Proof of 100% Performance and Payment Bond Guarantee Management 6 ► Plan to Address the Guarantee ► Methodology for Energy Baseline ► Guarantee Management Cost/Delivery ► Energy Savings Estimate Process ► Operational & Maintenance Savings Process ► Future Capital Expenditure Savings Process Refer to signed Affidavit attached with Bowen's response (these 3 pages are an attachment to our response and are not included in our page count) BOWEN EXECUTIVE SUMMARY Thank you for the opportunity to present this response to your Request for Qualification (RFQ) that demonstrates Bowen's qualifications related to a Guaranteed Savings Contract (GSC) for your project. The Executive Summary section will provide you with the top reasons why choosing the Bowen team will result in an excellent construction experience for the City of South Bend. Project Overview It is our understanding that the City of South Bend intends to select a GSC Provider to implement improvements to their Wastewater Treatment Plant (WWTP). Primarily, to construct a new CSO diversion structure, new interceptors to divert flow, a 40MGD influent pump station, a 3-million-gallon equalization basin, a control building, and a standby power generator. In addition to the CSO 045 Basin Project, the City intends to implement upgrades to the WWTP Clarifiers 1, 2 and 3. In the following pages, we will explain how this scope best fits into Indiana Code 36-1-12.5 and why Bowen is the best Provider for your project. The Indiana Guaranteed Savings Contract legislation will allow the City of South Bend to capitalize on a collaborative approach while taking advantage of design innovations, construction expertise, and cost savings. By choosing Bowen, you can expect the below benefits. ► Minimum Risk — The City of South Bend can shift the project risk to the Provider for both the budget and schedule. Bowen guarantees the Guaranteed Max Price (GMP) with no change orders and have yet to miss a schedule deadline on one of our (100+) GSC projects. This is unique to other responders that might offer a shared risk model, meaning multiple GMP methods. Bowen could offer these options as well and would be happy to discuss them if requested. It is Bowen's opinion that a true GSC model should have no risk of a change order and Bowen is prepared to take the construction risk and eliminate any project headaches. (Financial Approach) ► Speed and Efficiency — The Bowen team is prepared and ready to fast track your project with our proven team, proven process and successful past experience. We will use our collaborative pre - contract storyboard approach to set key dates, collaborate on procurement to avoid supply chain challenges and share expectations to help keep the design, scoping and construction process on schedule. What makes our team unique is our previous experience with South Bend and its engineering partners. Specifically, Bowen has worked with the City of South Bend on multiple past WWTP projects including upgrades to Clarifiers 4 and 5, along with a recent GSC project at the Pinhook WTP. These were successful projects that produced quality, finished products involving great communication and collaboration with the staff of South Bend, the design engineers and Bowen. Bowen also has successful experience with American Structurepoint and Arcadis GSC projects. To benefit your next GSC project, Bowen has proactively collaborated with Dutchland to ensure that we can provide value engineering options while meeting or exceeding your project delivery timeline. See Dutchland documents in Technical Approach. (Technical Approach and Project Implementation) ► Lowest Possible Cost — We can obtain the best price for South Bend through constant interaction with the vendors and subcontractors and our ability to self -perform a significant portion of this project. We have a trusted process in place for collaborative Value Engineering and lessons learned that have proven Bowen's ability to keep projects at or under budget. This process has been proven on previous traditional and GSC projects for South Bend and the Northwestern Indiana region. Bowen will offer our Open Book Guaranteed Maximum pricing with 100% of the savings going to South Bend. Bowen proposes an 8% fee for overhead and profit on all GSC projects implemented under this RFQ. (Financial Approach) BOWEN EXECUTIVE SUMMARY ► Experienced Project Team — Bowen is led by a talented team, located in Northern Indiana, who exemplifies our company core values. Your project manager, Pat Stanford, has been managing projects for Bowen in Northern Indiana for the past 20+ years. His regional experience and knowledge of South Bend standards and the quality of work expected is unmatched by our competitors. His and his team's relationships with local subcontractors and vendors have taken years to build and will ensure your upcoming projects run smoothly. Lastly, the open and transparent lines of communication Pat has built with South Bend staff and their engineering partners will prove invaluable for your wastewater system upgrades. To further support your projects, Bowen's headquarters is located in Indianapolis with 510 active employees that reside in Indiana. With the Indiana -based Bowen team you will have full control of your entire construction process with a finished product that is tailored to your needs. (Background & Qualifications, Technical Approach and Project Implementation) ► Quality Projects - Bowen has utilized our knowledge and experience to become the leading Provider of Indiana Guaranteed Savings Contracts (GSCs) for water and wastewater improvements. Our project teams are continually being asked to come back for future work. These are the communities that have implemented multiple Bowen GSCs (Valparaiso, Westville, Plainfield, Goshen, Lafayette, West Lafayette, Fishers, Butler, Hobart, Delphi, Muncie, Lebanon, Rossville, and Greenwood). (References) ► Experience with the Proposed Scope - Bowen has successful experience with CSO Storage and Clarifier Upgrades throughout Indiana. Many of these projects were implemented by Bowen through the GSC procurement method. Our regional wastewater system experience with traditional procurement and GSCs is unmatched by any other Provider. In addition, Bowen has Clarifier Upgrades experience at South Bend's WWTP and Dutchland experience while successfully completing a 2-million-gallon tank installation. All of our estimating resources will come from our headquarters in Indianapolis and they are ready to hit the ground running to once again collaborate with your team. (Technical Approach and References) ► Regional Organization - Due to our ongoing success in Northern Indiana, we have been able to keep a core group of people working and living in the area for 30+ years. Bowen can provide you with the best responsiveness during construction, the best long-term relationships with local subs/vendors and the most Indiana back up support from our headquarters in Indianapolis. (Technical Approach and Project Implementation) Company Background and Qualifications Key Section Items ► 55 Years of Experience in Indiana ► Top 25 Best Places to Work in the Nation ► 94 Graduate Engineers on Staff ► 16 Licensed Professional Engineers on Staff ► Bowen local office is 54 miles from South Bend WWTP ► Bowen's HQ Office is Located in Indianapolis, IN ► Bowen's Entire Equipment Yard is located in Fairland, IN BOWEN #1 Provider of Indiana Water/Wastewater GSCs BOWEN COMPANY BACKGROUND & QUALIFICATIONS a) Provide a history of the Provider with a statement about company mission, vision, and values. Bowen is an employee -owned company that has specialized in the construction of municipal utility infrastructure and treatment plants since 1967. With more than 330 salaried employees and 700 craft personnel, Bowen is well-resourced to deliver high -quality utility infrastructure projects for municipal utilities. Mission Statement Bowen will provide unique solutions to the environmental challenges faced by our Customers, while providing an exciting future for our employees. We will incorporate construction expertise, engineering knowledge, and creative spirit to deliver innovative, high value projects solutions in the Water, Wastewater, Power, Industrial Process, and Performance Contracting Markets. Vision Statement for Performance Contracting To serve our customers and maintain Indiana Market Leadership while growing our offerings to further benefit our customers through Alternative Procurement. Our company's success, mission and vision are all built on a solid set of core values that have defined Bowen's culture since 1967. BOWEN CORE VALUES: ► Zero Injury and Genuine Concern for Others ► Never Walk Away from a Problem ► Enthusiastic Teamwork and Celebration ► Continuous Improvement ► Excellent and Ethical Business Practices ► Service to the Customer Above All Else ► Shared Opportunity and Ownership Bowen values are shared among all employees, consistently practiced from the CEO down to the craftsmen in the field, and form the cornerstone of our success. Our steadfast commitment to customer satisfaction has resulted in a reputation that is unmatched. b) Include the following information on the Provider: i) Name of Company: Bowen Engineering Corporation ii) Address: 8802 North Meridian Street, Indianapolis, IN 46260 Northern IN Office: 200 Billings Street, Valparaiso, IN 46383 iii) Telephone Number: 317.842.2616 iv) Fax Number: 317.576.8848 v) Contact Person: Steve Nutt / snutt@bowenengineering.com / M 317.519.1716 BOWEN COMPANY BACKGROUND &QUALIFICATIONS c) Provider's Qualifications and Management i) Number of years company has operated in Indiana Bowen is truly a Hoosier company with the vast majority of its employees living and working in Indiana. Bowen Engineering Corporation has been headquartered in Indiana since 1967, for 55 years. In addition, Bowen has a Northern office located in Valparaiso. Bowen's headquarters are in Indianapolis. All of Bowen's estimating resources are located in Indianapolis, close to both American Structurepoint and Arcadis's Indianapolis -based offices. ii) Number of employees residing in Indiana Bowen has 510 active employees that reside in Indiana. This number includes all active craft labor. The number of full time employees (FTEs) that reside in Indiana is 241. Bowen's northern Indiana team includes your project team of Pat Stanford, Tony Abitua, Brian Hattabaugh, Mitchell Stull, and Margaret Burroughs. iii) Company Officers President & Chief Executive Officer - A. Douglas Bowen Chief Financial Officer - Carey Weddle Vice President - John Dettman iv) List the personnel employed by the Provider responsible for this project. Include a resume for each person listing education, experience, work history, and responsibilities on this project. Pat Stanford, Project Manager, regularly completes work in Northern Indiana, often on GSC- type projects. As you know, Pat and Tony have completed several successful projects for the City of South Bend. Upon selection, Bowen will utilize Doug Stout's estimating team to begin the GMP process. Doug is Bowen's estimating manager and has estimated multiple GSC projects in Indiana. Once the construction phase begins, Bowen brings the deepest bench of GSC superintendents and foremen in the industry. As the VP of Performance Contracting, Steve Nutt brings 28+ years of GSC experience to South Bend, ensuring you maximize the benefits of the GSC process. See resumes are on the following pages. v) The most recent audited Financial Report. Please find the 2022-2021 audited financial statements for Bowen Engineering Corporation (Bowen) at the end of this section. This report has been certified by our accounting firm, Blue and Company, LLC. We continue to have excellent support from both our bank and bonding agency. Office: 219.661.9770 Mobile: 219.746.7165 Email: patS@bowenengineering. Com 34 YEARS OF EXPERIENCE Pat Stanford Project Manager Experience Key Projects • $1.78M - City of South Bend Pinhook WTP Improvements GSC - South Bend, IN • $6.8M - City of Delphi Capital Drinking Water Improvements Ph. 2 - Delphi, IN • $6.1 M - City of Delphi Capital Drinking Water Improvements Ph. 1 - Delphi, IN • $7.5M - Town of Hebron WWTF Upgrade - Hebron, IN • $6M - City of South Bend WWTP Clarifier Upgrades - South Bend, IN • $2M - Valparaiso Village Station - Valparaiso, IN • $5.6M - INAW Hobart Watermain Replacement - Hobart, IN • $7.5M - Rensselaer New Wet Weather Treatment Facility - Rensselaer, IN • $3.6M - Remington New Water Treatment Plant - Remington, IN • $2.7M - City of Valparaiso UV and Influent Lift Station Upgrades - Valparaiso, IN • $14.5M - City of Valparaiso Water System Upgrades - Valparaiso, IN • $2.5M - Lowell Wastewater Treatment Plant - Lowell, IN • $5.3M - Water Treatment Plant - Michigan City, Indiana • $6M - Chicago Fluoride Feed Improvements • $3M - Wastewater Treatment Plant - New Lenox, Illinois • $2.5M - INAWC Water Treatment Plant - Gary, Indiana • $1.5M - BP AMOCO Wastewater Treatment Plant - Whiting, Indiana • $1 M - Water Treatment Plant - Maywood, Illinois • $0.5M - Flint Hill Clarifier Rehabilitation • $8.9M - Wastewater Treatment Plant - New Buffalo • $2.5M - ILAWC (Design Build) - Lincoln, Illinois • $1 OM - CAT Trail Water Treatment Plant - Construction Mgr. • $2M - Wastewater Treatment Plant - Demotte, Indiana • $2.2M - Wastewater Treatment Plant - Elgin, Illinois • $2M - INAWC Water Treatment Plant (Design Build) • $0.6M - Wastewater Treatment Plant - Gary, Indiana • $1.8M-ALCOA- Lafayette, Indiana • $5.5M - Wastewater Treatment Plant - Avon, Indiana • $2.79M - Battle Ground WWTP Rehabilitation GSC — Battle Ground, IN • $3.3M - Goshen WWTP GSC — Goshen, IN • $1.1 M - Wastewater Treatment Plant - Connersville, Indiana • $1 M - Wastewater Treatment Plant - Portland, Indiana • $0.9M - CSO Rehab, Chem. Feed and Digester Improvements - Fort Wayne, Indiana Project Manager Bowen Engineering Corporation, 2000-Present Project Engineer Bowen Engineering Corporation - Indianapolis, Indiana, 1998-2000 Project Engineer / Estimator B.G. Danis - Dayton, Ohio, 1988-1989 Purdue University - West Lafayette, Indiana B.S. Environmental Science Professional Training / Certification 30-Hour OSHA Certification Bowen Leadership Program Accountability Training Office: 219.661.9770 Mobile: 219.746.6017 Email: tabitua @bowenengineering.com 35 YEARS OF EXPERIENCE Tony Abitua Superintendent Experience Superintendent Bowen Engineering Corporation, 1998-Present Key Projects • $1.78M - City of South Bend Pinhook WTP Improvements GSC - South Bend, IN • $6M - City of South Bend WWTP Clarifier Upgrades - South Bend, IN • $1.8M - City of South Bend WTP Filter GSC - South Bend, IN • $3.8M - Hobart Lift Station and Force Main GSC - Hobart, IN • $2M - Valparaiso Village Station - Valparaiso, IN • $13AM - Valparaiso WTP Improvements - Valparaiso, IN • $2M - Valparaiso Influent Lift Station Upgrades - Valparaiso, IN • $1.8M - Lebanon WWTP Improvements - Lebanon, IN • $7.5M - Rensselaer New Wet Weather Treatment Facility - Rensselaer, IN • $3.6M - Remington New Water Treatment Plant - Remington, IN • $0.9M - Dyer WWTP Sludge Dewatering - Dyer, IN • $0.6M - Lowell WWTP - Lowell, IN • $2.79M Battle Ground WWTP Rehabilitation GSC — Battle Ground, IN • $3.2M - Goshen Digester Improvements - Goshen, IN • WWTP - Chesterton, Indiana • WWTP - Crown Point, Indiana • WWTP - Hebron, Indiana • WWTP - Gary, Indiana • WTP - Gary, Indiana SUN Technical Services, Inc. Commission/Construction Supervisor - 1993 - 1998 Key Projects • Quad Cities Nuclear Power Station NUTECH Engineering Commission/Construction Supervisor - 1987- 1993 Key Projects • Quad Cities Nuclear Power Station • Byron & Braidwood Nuclear Power Station • Zion Nuclear Power Station • Dresden Nuclear Power Station Nuclear Power Services, Inc Commission/Construction Supervisor - 1986 - 1987 Key Projects • Braidwood Nuclear Power Station • Byron Nuclear Power Station Larkin High School Diploma 1975 Professional Training/Certifications 30-Hour OSHA Cert. First Aid & CPR Mobile: 317.601.2475 Email: mtafflinger @bowenengineering.com 22YEARS OF EXPERIENCE Matthew Taff linger Superintendent Experience Superintendent Bowen Engineering Corporation, 2012 - present Laborer Foreman Bowen Engineering Corporation, 2005 - 2012 Key Projects • $1.6M - CEG Stop 11 - Indianapolis, IN • $19.7M - NJAW Swimming River WTP - Swimming River, NJ • $11.7M - Lafayette Pearl River Storage Relocation - Lafayette, IN • $1.7M - Lafayette Williams Street Sewer - Lafayette, IN • $23.1 M - Lafayette Greenbush CSO Storage Tank - Lafayette, IN • $3.5M - Lafayette Valley Street Sewer - Lafayette, IN • $15.6M - Lafayette Brown Street Phase 1 and Phase 2 - Lafayette, IN • $3.6M - Lafayette Greenbush Sewer Line - Lafayette, IN • $2.1 M - Lafayette Fairway and Sheraton Lift Station - West Lafayette, IN • $37M - Lafayette GSC CSO Separation and Storm Park - Lafayette, IN • $24.5M - CEG Southport and Belmont Flow Equalization - Indianapolis, IN • $10.6M - Bargersville WTP Upgrades - Bargersville, IN • $2M - CEG IU Health Neuroscience Chilled and Steam Water Lines - Indianapolis, IN • $2M - Brownsburg WWTP - Brownsburg, IN • $24.5M - CEG/Indianapolis Airport Authority Energy Plant Utility Connector- Indianapolis, IN • $6M - Roche Diagnostics Chilled Water Line - Indianapolis, IN • $10.5M - IWC (CEG) White River WTP - UV Disinfection - Indianapolis, IN • $41.3M - Columbus, IN WWTP and Sewer Collection System - Columbus, IN Laborer Robinson Electric Laborer Miller Pipeline Education / Certifications Laborers LU 120 Professional Training / Certifications OSHA 30 Hour Training Office: 317.842.2616 Mobile: 317.646.2064 Email: jweber@bowenengineering.com 13 YEARS OF EXPERIENCE 6 6 In summary, the City of Lafayette is very pleased with the work performed by Bowen Engineering and the team environment of the Guaranteed Savings Contract Process. Bowen should be proud of its staff for the excellent efforts in always getting the job done. Brad W. Talley 77 Superintendent City of Lafayette WPCD Jared Weber Project Manager Experience Project Manager Bowen Engineering Corporation, 2015-Present Project Engineer Bowen Engineering Corporation, 2008-2015 Key Projects • $11.7M - City of Lafayette Pearl River Storage Facility - Lafayette, IN 0 $1.5M - City of Lafayette Williams Street Sewer - Lafayette, IN 0 $3.2M - City of Lafayette Pearl River Sewer Relocation - Lafayette, IN 0 $12.5M - City of Lafayette Pearl River Storage Tank - Lafayette, IN 0 $10.5M - City of Lafayette Murdock Park Booster Station - Lafayette, IN 0 $23.1 M - City of Lafayette Greenbush CSO Storage Tank - Lafayette, IN 0 $62M - City of Lafayette GSC CSO Separation, Water, Sewer Updates - Lafayette, IN 0 City of Lafayette Emergency Repairs - Lafayette, IN 0 $2.1 M - Sheraton and Fairway Knolls Lift Station - West Lafayette, IN 0 $95K - North Regional Lift Station - West Lafayette, IN 0 $2.3M - City of Valparaiso CSO Disinfection - Valparaiso, IN 0 $1.3M - NJAW Birch Creek GAC Improvements - Swedesboro, NJ 0 $814K - NJAW Woodlane WTP Improvements - Woodlane, NJ 0 $563K - Am. Water Ft. Leavenworth Sludge Collector System - Leavenworth County, KS 0 $1.3M - Indiana American Water Ogden Dunes Filter Rehabilitation - Portage, IN • $15.2M -American Water Fort Rucker Alabama Capital Upgrades - Ft. Rucker, AL • $11 AM - Indiana American Water London Road WTP - Greenwood, IN (Awarded DBIA National Award in 2010) $77M - Horizon Wind Energy Meadow Lake Wind Farm - Wolcott, IN $4M - Illinois American Water, East St. Louis/Granite City PAC Feed Improvements - St.Louis, MO Indiana State University - Terre Haute, Indiana B.S. Construction Management Sigma Lambda Chi, Construction Honors Society Professional Training / Certifications OSHA 30 Bowen Achievements Bowen 101 Production Management SQP Training Engineered Systems Trainer Operations Plan Committee Mobile: 317.650.8313 Email: mstUll @bowenengineering.com 8 YEARS OF EXPERIENCE Mitchell Stull Sr. Project Engineer Experience Sr. Project Engineer Bowen Engineering Corporation, 2015-Present Key Projects • $1.78M - City of South Bend Pinhook WTP Improvements GSC - South Bend, IN • $3.5M - South Bend North WTP Improvements - South Bend, IN • $0.5M - INAW CR550 Pump Station - Valparaiso, IN • $1.8M - Valparaiso Wells Phase 1 - Valparaiso, IN • $6.8M - City of Delphi Capital Drinking Water Improvements Ph. 2 - Delphi, IN • $6.1 M - City of Delphi Capital Drinking Water Improvements Ph. 1 - Delphi, IN • $7.5M - Town of Hebron WWTF Upgrade - Hebron, IN • $6M - City of South Bend WWTP Clarifier Upgrades - South Bend, IN • $2.4M - La Crosse WTP Div. A • $5.5M - INAW Borman Hypo Conversion • $8.8M - CEG WR CCS Phase III Miley Ave Sewer - Indianapolis, IN • $3.6M - INAWC Hobart Watermain Replacement - Hobart, IN • $1.9M - Lebanon WWTP Improvements - Lebanon, IN • $2.OM - Valparaiso Village Station - Valparaiso, IN • $0.7M - Lowell WTP - Lowell, IN • $1.OM - Dyer WWTP Sludge Dewatering - Dyer, IN • $3.8M - Hobart Sanitary Sewer Improvements Phase I - Hobart, IN • $0.6M - Schererville WWTP Anaerobic Digester Cover - Schererville, IN • $1.3M - East Chicago Pump Station - East Chicago, IN • $1.4M - Boreman Park Filter Backwash - Gary, IN • $0.8M - Lowell Solids Contact Clarifier Installation - Lowell, IN • $1.8M - Olive WTP Improvements - South Bend, IN • $6.1 M Delphi Watermain Extensions PHI - Delphi, IN • $7.5M - Hebron WWTF Modifications - Hebron, IN • $15M - Valparaiso WTP Improvements - Valparaiso, IN • $2.5M - Valparaiso Influent Lift Station Upgrades - Valparaiso, IN • $7.5M - Rensselaer New Wet Weather Treatment Facility - Rensselaer, IN • $3.6M - Remington New Water Treatment Plant - Remington, IN • $0.3M - Schaumburg Dystor Covers - Schaumburg, IL • $12M - Fillmore Residence High -End Residential Apt. Complex - Denver, CO • $230M - New Hydro Electric Dam - Cannelton, IN Purdue University - West Lafayette, Indiana B.S. Building Construction Management Minor: Building Information Modeling Internships Walsh Construction - Cannelton, IN GE Johnson - Denver. CO Office: 317.842.2616 Mobile: 317.519.1716 Email: snutt@bowenengineering Com 28 YEARS OF EXPERIENCE Steve Nutt VP of Performance Contracting Experience Vice President of Performance Contracting Bowen Engineering Corporation, 2007-Present Key Projects • $1.78M City of South Bend Pinhook WTP Improvements GSC - South Bend, IN • $19M Valparaiso WTP/WWTP GSCs - Valparaiso, IN • $13M Scottsburg WWTP BOT - Scottsburg, IN • $18M WWRSD WWTP BOT - Cambridge City, IN • $5M Lebanon Water BOT - Lebanon, IN • $100M+ Muncie WWTP & Sewer GSCs - Muncie, IN • $100M+ Lafayette WWTP, Water, Sewer GSCs - Lafayette, IN • $75M Plainfield WWTP, Water, Sewer GSCs — Plainfield, IN • $60M Greenwood Sewer GSCs - Greenwood, IN • $42M West Lafayette WWTP, Sewer, Lift Station GSCs - West Lafayette, IN • $150M+ Multiple Municipal WWTP, Water, Sewer GSCs - Indiana Vice President A. Hattersley & Sons, Inc. - Fort Wayne, Indiana, 2004-2007 Founding Partner / Director of Sales AECI (an Exelon Company) - Indianapolis, Indiana, 1997-2004 Account Executive Landis & Gyr (Siemens) - Indianapolis, Indiana, 1996-1997 Account Executive Johnson Controls, Inc. - Indianapolis, Indiana, 1994-1996 District Finance Manager / Negotiator, Key Account Manager Xerox Corporation, 1987-1994 Western Michigan University - Kalamazoo, Michigan B.S. Business Administration Professional Training / Certifications Exelon: Holden Total Sales Effectiveness & Performance Training Xerox: Finance Management; Sales Management; Strategic Selling BOWEN COMPANY BACKGROUND & QUALIFICATIONS vi. The Provider must be certified and meet the requirements of IC 4-13.6-4 and the RFQ submitted must include a copy of the firm's certification of qualification issued under IC 4-13.6-4. Bowen is certified for Professional Services, including energy audits, and for the construction of utility infrastructure projects. These two certifications meet the intent of IC 4-13.6-4. Below is a picture of our Indiana Providers certification from the DLGF. STArI'E OF IIVn.,A D�F BOWEN ENGINEERING CORPORATION has metal[ requirements pr cnbed by law (IC36-I-I2.5) as a GUARANTEED ENERGY SAVINGS QUALIFIED PROVIDER and is maei e-heat. b—p—d-s.I by the ot— fthe Stt—find— WMI SS WHEREOF the Indiana Dgnrftn nt oflacal Government Financeganb this ceati5cate under its seal iu the City of bdmnapuh., April 1, 2020_ Enpi— Septrmber 16, 2024_ Daniel Shaclde, Cammissi— vii. Identify Professional Engineers directly employed by the Provider responsible for this project. Include License number of the person responsible for the project. Doug Stout is the Professional Engineer (IN 10303062) responsible for this project. Bowen has 16+ additional Licensed Professional Engineers on staff. viii. Describe if the Provider is a manufacturer, contractor, or engineering firm. Clearly delineate what services or projects the Provider is including from their own company as a part of the project. In addition to being a Qualified Provider, Bowen is a self -performing water and wastewater contractor. It is our intention to not only self -perform 100% of the Provider and General Contractor duties, but also self -perform the construction work within our capabilities. For your project, we expect to self -perform site work, concrete, process mechanical piping, and process equipment installation. We will accomplish this through our project managers, project engineers, superintendents, foremen, carpenters, operators, pipe -fitters, millwrights, boilermakers, iron workers and laborers. References CITY.. "...These projects were completed on schedule and under budget. Some of these scheduIeshavebeen verydeman ding T ��Aj� M and Bowen has always risen to the occasion. The City appreciates Bowen's team reIationshipaswehave been ableto lAl'1`l creatively Value Engineer project savings and use the fundstodoadditional much- needed work. Bowen operational staff has been extremely responsive to the needs of the City and have even helped out in emergency situations." 9G5` 1 Contracts "In summary, the City of Lafayette is very pleased with the work performed by Bowen Engineering and the team Brad Talley environment of the Guaranteed Savings Contract process. Bowen should be proud of its staff for the excellent wwTP Superintendent efforts in always getting the job done." 765.807.1800 "I could go on in detail about the positive as- "A positive working relationship was started pects of this contracting process, your firm several years ago when Bowen was selected and the successes within the City projects. by Butler to complete the replacement of their We completed the wastewater plant project 6 water treatment plant, utilizing the guaranteed months earlier than comparable public bidding, a savings program procurement method. That obtained approval to use an SRF loan, had no project was completed on -time and on -budget claims or accidents, came in under budget and and the new water plant has functioned above Tv� ZGSC were able to advance some portions of future expectations since Bowen completed the job." Contracts phases using project savings. Each of these topics has a story line of its own. Suffice it to Tim Belcher say that I hope the City of Plainfield can utilize Dave M. Wagner City Engineer C GSC Bowen Engineering Corporation and the guar- V Contracts Millennium Environmental LLC 317.839.2561 anteed savings method of project delivery on 317.876.6233 many future projects." "Bowen Engineering has been a valued partner in the GSC process and has delivered on their commitments as allowed by the GSC rule. Our VCU selection committee recommended Bowen as the GSC provider due to their overall presentation, experience and successful track record within the GSC process." VIBRANT- VISIONARY % GSC Steve C. Poulos Contracts Valparaiso City Utilities Director VALPARAI50 219.462.6174 BOWEN #1 Provider of Indiana Water/Wastewater GSCs %71 BOWEN REFERENCES Provide references with contact information for Indiana Guaranteed Savings Contract projects completed. Include the location, scope of work, and personnel responsible. Provide a list of all of the water/wastewater utility projects the Provider has completed under the terms of IC 36-1-12.5 (Indiana Guaranteed Savings Contracts). Bowen has delivered over 100 Water and Wastewater Guaranteed Savings Contract projects for 30+ communities in the state of Indiana (under IC 36-1-12.5). Time and again we have worked to create incredible outcomes and build the trust which drives repeat partnership. Our decades of experience with GSCs and dedication in this contracting method has led to more signed contracts than all of our competition combined. On these projects, we have had zero change orders. In most cases, we have turned project savings and leftover contingency into a reduction in contract price or additional scope on needed projects. This process has added value to municipalities across Indiana. Bowen has successfully completed GSC with the City of South Bend (Pinhook WTP Improvements GSC). The GSC Project utilized an EJCDC C-525 Cost -Plus agreement. Future GSCs with Bowen Engineering will save South Bend time and legal efforts by using this same form of agreement. We believe we can leverage our past experience with South Bend to provide you maximum value and collaboration on your future GSC projects. In addition to our South Bend GSC experience, we've condensed the list of all completed GSC projects onto the following page. In addition to the list, the GSC and BOT projects below are currently in the GMP phase or are still under construction. ► City of Valparaiso Well Replacements Project ► City of Lafayette Miscellaneous WWTP Improvements ► City of Westville WWTP Rehabilitation, Lift Station & Forcemain ► Town of Upland WWTP Rehabilitation ► Town of Plainfield North WWTP CSO (Aqua -Aerobic AquaDisk Filters) ► Merrillville Conservancy District Lift Station Rehab (GMP Phase) ► City of Butler WWTP Rehabilitation ► Shelbyville Regional Lift Station Rehabilitation (GMP Phase) ► City of Butler Stormwater Improvements ► City of Butler Sanitary Sewer and Water ► Muncie Sanitary District Multiple Sewer GSCs ► Western Wayne Sanitary District New WWTP BOT ► South Dearborn Regional Sewer District WWTP Rehabilitation ► City of Scottsburg WWTP Expansion BOT ► City of West Lafayette CSO Interceptor ► City of Hobart New Regional Lift Station BOT (GMP Phase) On the pages following the full list of Guaranteed Savings projects, we have listed some of our key GSC projects demonstrating Bowen's Pat Stanford and our local Northern Indiana staff's experience managing projects. 66 The Town of Plainfield and Bowen have partnered on multiple projects 100+ using GSC delivery. I can say without hesitation that over my 25 years of contracting experience I have not had a more satisfying and INDIANA GSC rewarding public contracting experience .... Bowen's abilities have been BOW N PROJECTS innovative, professional and prompt... Suffice it to say that I hope the Town of Plainfield can utilize Bowen and the GSC method of project 0 delivery on many future projects. Tim Belcher, Town of Plainfield " BOWEN GSC CHANGE ORDERS Bowen invites you to reach out to past Bowen GSC customers to hear first hand how the delivery O BOWEN GSC References method and Bowen's team -oriented collaboration resulted in successful project outcomes. 0 p BOWEN GSC CHANGE ORDERS #1 WATER/WASTEWATER GSC PROVIDER IN INDIANA or Utility District hd L Town of Battleground Location M Battleground, IN No. of GSC Projects I 1 ContactMunicipality Name (During • • Steve Egley InformationProject (765) 418-7884 Manager Pat Stanford Revolving • • Yes Year 2012-2014 Value $2,794,500 System System Town of Bremen Bremen, IN I 1 Matthew Cunningham (547) 546-2044 Dan Bernath I Yes 2010-2011 $2,086,000 City of Butler Butler, IN 6 Scott Lanning (260) 868-2805 Matt Meyer I Yes (1 of 6) 2010, 2013-2015, 2021-Current $18,130,571 I • Carmel Utilities Carmel, IN I 1 I Mike Hendricks (317) 571-2634 Mark Cvetkovich I Yes 2020-2021 $1,176,700 Columbus City Utilties Columbus, IN 3 Ashley Getz (812) 372-8861 Mark Cvetkovich Yes (2 of 3) 2008-2010, 2022-Current $26,530,000 City of Crawfordsville Crawfordsville, IN I 1 I Terri Gadd (765) 364-5150 Mark Cvetkovich Yes I 2016-2018 $11,749,675 Town of Danville Danville, IN I 1 I Barry Lofton (317) 945-6071 Alan Dale Yes I 2023-Current $5,000,000 City of Delphi Delphi, IN 2 Craig Myers (765) 564-3944 Pat Stanford Yes (2 of 2) 2019-2021 $15,048,527 • City of Fishers Fishers, IN 4 I Jonothan Valenta (317) 595-3139 Dan Bernath No I 2013-2015, 2019-2021 $8,643,275 I • City of Garrett Garrett, IN I 1 I Bruce Schlosser (260) 357-5449 Mark Cvetkovich I No I 2013-2014 $3,397,000 Goshen Utilities Goshen, IN 1 I Dustin Sailor (574) 537-3814 Paul Creasy I Yes I 2011-2012 $1,868,000 City of Greenfield Greenfield, IN 1 I Mike Fruth (317) 477-4320 Dan Bernath I No I 2007 $691,775 City of Greenwood Greenwood, IN 2 I Keith Meier (317) 888-1254 Paul Creasey Yes (2 of 2) I 2018-2022 $59,531,273 Hobart Utilities Hobart, IN 2 I Phil Scoon (219) 942-3293 Pat Stanford No I 2012, 2019-2020 $4,082,099 I • City of Huntington Huntington, IN 1 I Adam Cuttriss (260) 356-1400 Mark Cvetkovich I Yes I 2012-2014 $10,375,000 City of Kokomo Kokomo, IN I 1 I Carey Stranahan (765) 456-7400 Dan Bernath I No I 2016 $737,718 Lafayette Renew Lafayette, IN 19 I Brad Talley (765) 807-1800 Jared Weber I No I 2008, 2012-Current $125,838,738 South Dearborn Regional Sewer District Lawerenceburg, IN 1 I Chris Lagaley (765) 480-7354 Dan Bernath I Yes I 2022-Current $24,326,862 Lebanon Utilties Lebanon, IN 4 I Ryan Ottinger (765) 482-5100 Dan Bernath I No I 2011-2012, 2014-2018 $10,880,652 City of Montpelier Montpelier, IN 1 I Mayor Kathy Bantz (765) 728-5642 Darrin Lowe I Yes I 2019 $3,839,500 Muncie Sanitary District Muncie, IN 15 I John Barlow (765) 747-4894 Paul Creasey No 2014-2022 $122,644,759 Town of Plainfield Plainfield, IN 22 I Tim Belcher (317) 754-5396 Dan Bernath Yes (2 of 22) 2009-Current $75,709,803 Town of Rossville Rossville, IN 2 I Chad Colby (765) 379-2645 Matt Meyer Yes (2 of 2) 2016-2019 $4,835,453 Rushville Utilties Rushville, IN I 1 I Less Day (765) 932-4124 Mark Cvetkovich Yes 2016-2017 $3,629,580 Town of Russiaville Russiaville, IN I 1 Craig Thompson (765) 883-5739 Mark Cvetkovich I Yes I 2012-2013 $826,500 Shelbyville Water Resource Recovery Facility Shelbyville, IN 2 Kevin Kredit (317) 392-5131 Dan Bernath I No I 2018-2019 $2,658,542 South Bend Municipal Utilities South Bend, IN 1 I Bradley VanOosterum (574) 233-0311 Pat Stanford I No I 2021-Current $1,785,000 Town of Upland Upland, IN 1 I Brad Felver (202) 555-1212 Matt Meyer I Yes I 2022-Current $57351,293 Tipton Municipal Utilities Tipton, IN 1 I Rex Boyer (765) 675-7629 Mark Cvetkovich I Yes I 2014-2016 $5,539,874 Valparaiso City Utilities Valparaiso, IN 4 Steve Poulos (219) 462-6174 Pat Stanford I No I 2014-2018 $19,235,072 I • Town of Van Buren Van Buren, IN I 1 I Michelle Sexton (765) 934-3991 Paul Creasey I No I 2018-2019 $656,546 City of West Lafayette West Lafayette, IN 4 I Dave Henderson (765) 775-5145 Mark Cvetkovich I Yes (1 of 4) I 2015-2017, 2022-Current $42,544,600 City of Westfield Westfield, IN I 1 I Kurt Wanniger (317) 896-5452 Dan Bernath No I 2005-2007 $3,369,967 Town of Westville Westville, IN 2 Mike Albert (219) 785-2123 Pat Stanford Yes (2 of 2) I 2021-Current $15,007,253 Town of Yorktown Yorktown, IN 1 Pete Olson (765) 759-4003 Dan Bernath No I 2011-2013 $172777000 SHADED CELLS = MULTIPLE GUARANTEED SAVINGS CONTRACT COMMUNITIES (13) Revision: 10.4.2022 City of South Bend PROJECT SCOPE GSC Pinkhook WTP Improvements / South Bend, IN Project Size: $1,785,000 / February 2021 - January 2022 • Filter Rehabilitation • Valve Replacement The Pinhook Water Treatment Plant was experiencing several issues related to • Ceearwell Cleaning aging filters and equipment and selected selected Bowen to update and repair • I&C Allowance - $10,000 the plant. This process involved completing filter rehabilitation by removing the existing media, cant strips, and caps and then installing a new IMS 200 caps, PROJECT SPECS cant strips, and reinstalling the existing media after its been fixed. In addition, Bowen replaced several valves and actuators, and cleaned the clearwell. • Install new cap and cant strip Project Challenges: • Install new filter media • Bowen completed all changes while working in an active facility • Replace valves • Replace actuators Bowen Resourceful: • Utilized craft's expert knowledge to discover problematic areas within plant PROD ECT TEAM and fix them efficiently Bowen Responsive: • Project Manager: Pat Stanford Stull S • Bowen collaborated closely with owner to create a plan of action in solving . Superintendent: Tony • Project Engineer: Mitchell l WTP issues Abitua • Engineering: American Structurepoint • City of South Bend Contact: Bowen Results: • Bowen overcame schedule / budget constraints to successfully achieve Bradley VanOosterum - 574.233.0311 the project on time, and returned savings back to the City. B EN RESOURCEFUL. RESPONSIVE. RESULTS. www.bowenSQP.com r Multiple Guaranteed Savings Contract Community Muncie Sanitary District Gmuncie GSC WPCF Upgrades / Muncie, IN SANITARY DISTRICT Project Size: $76,033,776 / July 2016 - June 2020 Bowen, teaming with lead designer United Consulting, used a collaborative approach on this GSC project to provide the Muncie Sanitary District with the following upgrades: G Installation of a Wet Weather Storage Basin and Pumping Station to alleviate CSO events G Installation of the initial phase of a large diameter sewer interceptor that will eventually connect the Downtown combined sewers to the treatment plant G Installation of a new WPCF Ultraviolet Effluent Disinfection System that is more efficient and much safer to the public at -large than the existing gas chlorination system G Upgrading a portion of the Levee System that protects the WPCF (D The Madison St. Underpass stormwater drainage G New MSD Sanitation PEMB Facility Project Challenges: • Work in known contaminated soil areas (Metals, PCBs) • Wet Weather Storage Basin dirt work scope was directly impacted by weather conditions Bowen Resourceful, Responsive, Results: • Found major value engineering options to reroute plant flow at the new UV Facility, saving both time and cost for the Owner • Bowen conducted daily collaborative efforts with plant staff to conduct work scope efficiently • Ahead of schedule completion dates, returning significant savings to MSD B EN RESOURCEFUL. RESPONSIVE. RESULTS. Project Scope • Site Work • Civil/Concrete Work • Underground Piping • Pre -Engineered Buildings • Equipment Setting • UV Disinfection Equipment • Mechanical/Piping • D.I., FRP (Hobas) • Architectural/Finishing Work Project Specs • 100,000 CY of excavation backfill • 5,000 SFof sheet piling • 6,700 CY of concrete • 1,064 CY - largest single pour • 700 TONS of rebar • 90,000 SF of formwork • 5,200 LF piping (largest 110" FRP) • 370,000 SF of EPDM Liner (Wet Weather Storage Basin) • 3 Buildings Project Team • Bowen Project Manager: Paul Creasey • Client Contact: Bill Smith, Past President Muncie Sanitary Board 765.747.4742 • Engineering: United Consulting (Lead Designer) ■ HNTB Corporation ■ Lochmueller Group ■ Greeley & Hansen www.bowenengineering.com City of Lebanon BOT Booster Station, Water Main and Storage Tank Project Size: $5,991,450 / Completed August 2022 Lebanon Utilities selected Bowen for a BOT to increase the storage volume of finished water inside the distribution system and raise residual chlorine levels. Bowen set precast wall panels and then post tensioned them to create the walls, and then built an aluminum geodesic dome on top of the tank. The final product holds 2 million gallons of water and is connected to the system with a new 16" water main. A new prefabricated booster station pumps water from the storage tank into the distribution system during peak usage times. The remainder of the volume is held in reserve for unforeseen needs. Project Challenges: • Greenfield site at the low end of Abner Longley Park. The area had swamp conditions at project start. Bowen installed field tiles and storm structures to control surface drainage. • Bowen's first time installing 35' long precast wall panels and post tensioning. Dutchland assisted in the erection of the panels over a three day period. • Transporting the prefabricated booster station onto the jobsite required temporary roads and changed the original design of the road to allow the truck and trailer to access the site. Bowen Resourceful: • Original design was over budget. Bowen proposed a prefabricated booster station to cut cost. Bowen Responsive: • Bowen made efforts to over communicate with Lebanon and BF&S as many team members were new to this contracting method. Collaboration was key to maintain schedule and quality. Bowen Results: • On time completion despite material and shipping delays. Bowen ordered materials months in advance to ensure materials were onsite when they needed to be. B EN RESOURCEFUL. RESPONSIVE. RESULTS. PROJECT SCOPE • Site Work • Civil/Concrete Work • Underground Piping • Pre -Engineered Building(s) • Equipment Setting • Mechanical/Piping PROJECT SPECS • 2500 LF of 16" Main • 1 New Booster Station • Critical Lift of 45,000 Ibs PROJECT ATTRIBUTES • Zero Injury • Zero Incident • On Time (inc. proj. w/ sched. shifts due to owner changes that were still complete within agreed adjusted time) • Build -Operate -Transfer • Modular Assembly or Fabrication • Critical Lifts PROJECT TEAM • Project Manager: Dan Bernath • Superintendent: John Eastes • Engineering Partner: BF&S • Technology Partner: EFI, Dutchland Tank Connections • Client Contact: Ryan Ottinger 765-482-8751 rottinger@lebanon- utilities.com • Consultant: GM Development www.bowensqp.com Multiple Guaranteed Savings Contract Community City of Lafayette `LAFAYETTE GSC Greenbush CSO Storage Tank; Lafayette, IN RENEW WATER .ENVIRONMEM.COMMUNIN Project Size: $23,100,932 4 October 2017 - May 2019 Bowen, teaming with Greeley and Hansen, constructed a 4.2 million gallon concrete holding tank designed to eliminate overflows to the Wabash River. The buried tank is located at an old city dumpsite. Bowen mitigated and restored the site to pave the way for a future city park. Project Challenges: • Dewatering - The project site is located 200 yards from the Wabash River and less than 100 feet away from a creek with direct connection to the Wabash. The tank sits 30ft below grade and requires constant dewatering. Bowen engineered and constructed a dewatering discharge point to take the 20.7 MGD we needed to keep the excavation dry. • Site restoration - The site used to be a city dump and was recently used to store yard waste. Handling the waste material and developing a site for a future park location has been a challenge Bowen has overcome. Bowen Resourceful: • The existing site was void of topsoil. Bowen is using the existing mulch pile and compositing the mulch to turn it into viable topsoil to grow grass. • To blend into the future park, the electrical building will have architectural concrete work and exposed concrete cladding. Bowen Responsive: • Bowen has closely monitored river levels, placing sandbags to protect the transformer and building berms during near -record river levels in early 2018 Bowen Results: • Awarded the 2019 Concrete Achievement Award from the Indiana Ready Mix Concrete Association (IRMCA) for excellence in concrete construction IRMFYM A BOWEN INDIANA REAIXED CONCRETE ASSOCIATION RESOURCEFUL. RESPONSIVE. RESULTS. PROJECT SCOPE • Site Work • Civil / Concrete Work • Underground Piping • Structural Steel Erection • Equipment Setting • (4) Grande Flushing Gates • (1) Tipping Bucket for Flush Water • (4) Sets of Fine Screens • (2) Flygt Dewatering Pumps • Mechanical / Piping • Architectural / Finishing Work PROJECT SPECS • 141,646 CY of excavation • 816 - 50, 45, and 30 FT Piles • 9,978 CY of concrete • 990 tons of rebar • 108,788 SF of formwork • 719 LF of 110" piping • 4 building structures PROJECT TEAM • Bowen OM: Chris Manges • Bowen PM: Jared Weber • Client Contact: Brad Talley 765.807.1800 • Engineering: Greeley and Hansen www.bowenengineering.com ismric ne o1 die xam� �fr�ore�a��,� Battle Ground, IN Battle Ground, Indiana s H PROJECT SPECS GSC WWTP Upgrades / Battleground, IN Project Size: $2,794,500 Scope: • New WWTP headworks w/ fine Bowen, used a collaborative approach to bring this project in under budget and screening under schedule. A success story from the project was the ability to re -use fill dirt • New energy efficient sewage pumps from a neighboring project which saved the Town money. • New clarifiers • Rehab of aeration basins G New UV Disinfection • Renovation G New Headworks Process Material: G New Clarifiers • Ultra Violet (UV) equipment • Fine Screens • Sewage pumps !! Our project presented a significant number of issues. We Project Highlights needed a total update of our existing WWTP, replacing • SRF Financed Project and upgrading existing equipment that had deteriorated • Open -Book Pricing over 40 years of service. We also added new technologies • UV Disinfection such as screening and UV disinfection. All of this had • Complete New Headworks to be built within the same plant footprint, constrained Project Team by the surrounding flood plain, while maintaining waste • Project Manager: Pat Stanford treatment operations. • Superintendent: Jake Wade • Superintendent: Tony Abitua Bowen personnel brought a great depth of experience to this process. Initially, they helped to refine the design and identify cost savings that could bring the project down to our budget threshold. This kind of design revision would be unheard of in the "bid/build" world. During this stage, Bowen identified additional opportunities for Green Project Reserve- helping us to secure a financing discount with SRF. I I Steve Egly Town Council President B EN 765-567-2603 Rev. 6/10/2015 RESOURCEFUL. RESPONSIVE. RESULTS. www.bowenengineering.com BOWEN REFERENCES In addition, provide references of projects completed with a similar scope of work to the described WWTP/CSO 045 EQ Basin and Clarifier Upgrade Projects. Include the location, scope of work, and personnel responsible. Bowen has built 1967 G G G tanks since: Cast -in -Place Post -Tensioned Pre -Load Recent Tank Projects • CEG River Road WTP Phase II Clearwell Expansion (2020) • City of Lafayette Greenbush CSO Storage Tank (2019) • Indianapolis Airport Authority Stormwater Deicing (2019) • Muncie Sanitary District WPCF Upgrades (2019) • Goshen, IN CSO Detention (2012) • Washington, IN CSO (2012) • CEG White River Station Reservoir (2001) • CEG Belmont AWT Plant Upgrades (2006) • CEG Southport AWT Plant Upgrades (2006) • CEG White River North Groundwater Treatment Plant (2006) • CEG South Well Field Reservoir (2005) • CEG White River Station Reservoir (2001) • TN American Water Citico Station Sedimentation Basin 2014-2016 • Aqua Marion, OH WTP Sedimentation Basin 2013-2014 • Veolia Water South Well Field Sludge Thickening 2009 • Indianapolis Water Company White River Residual Handling, 2003 • City of Lebanon Dutchland Storage Tank, 2022 • City of Delphi 2 Pre -Stressed Concrete Tanks, 2019- 2020 SQP Insights: Continuous Improvement and Lessons Learned • Coordinate closely with engineer to layout construction joints in walls to optimize production and quality • Try to get slab pours as large as possible and avoid checker -boarding pours ® ® • Groundwater control is key. For dewatering activities, arrange for temporary power for pumps in lieu of generators when possible. • Work early with concrete supplier and design engineer to ensure proper mix design and availability in the market. Have supplier run a concrete curing curve to understand cure times. BOWEN REFERENCES BowEN Tank Experience Resourceful. Responsive. Results. City of Lafayette CSO Storage Tank / Lafayette, IN Project Schedule: 2017 - 2019 • 4.2 MG underground CSO concrete tank • 41,646 CY excavation; 9,978 CY concrete • 816 - 50, 45, and 30 FT piles • 990 TONS rebar; 108,788 SF formwork • 719 LF of 110" piping • (4) Grande Flushing Gates, (1) Tipping bucket for flush water, (4) sets of fine screens, (2) Flygt Dewatering Pumps Muncie Sanitary District WPCF / Muncie, IN Project Schedule: 2016 - 2019 • Settling Tank: 1.9 MG • Wet Weather Storage Basin: 17 MG • 370,000 SF of EPDM Liner for basin • 100,000 CY excavation; 6,700 CY concrete • 700 TONS rebar; 90,000 SF formwork Indianapolis Airport Authority Stormwater Deicing / Indianapolis, IN Project Schedule: 2018-2019 • 10 MG concrete tank • Post -tensioned roof deck • Largest pour: 4,000 CY of concrete TN American Water Citico Station WTP / Chattanooga, TN Project Schedule: 2015 - 2016 • Sedimentation basin to increase water treatment capacity • Multiple tie-ins • Reduced construction joints in re -sequenced pours to expedite schedule • 3,392 CY of concrete; 110 Tons of rebar Aqua Marion WTP / Marion, OH Project Schedule: 2016 • Sedimentation basin constructed and in service within 5 months • Zero impact to daily plant's ability to service customers • 2,500 CY of concrete • 700 Tons of rebar www.bowenengineering.com - 317.842.2616 Indianapolis, IN - Columbus, OH - Evansville, IN Baltimore, MD - Nitro, WV Technical Approach Key Section Items ► Successful GSC Experience with WTP improvements ► Successful Experience with Local Subcontractors ► 180 Water and Wastewater Projects in the Past 10 years ► 100+ Design Build or GSC Collaborative Projects with Engineers BOWEN #1 Provider of Indiana Water/Wastewater GSCs BOWEN TECHNICAL APPROACH 3a) The scope of the Project will be based on the document provided by the Owner in Exhibit A. 3b) Providers are encouraged to present evidence of their team's technical ability relative to such anticipated scope of work by providing a list of water and wastewater experience of the team. Pat Stanford's team has extensive experience with critical wastewater infrastructure projects throughout Northern Indiana, including having executed projects on South Bend's infrastructure. Please refer to the Execution Plan documents in the following pages for an overview of our planned approach for your future GSC projects, as well as an overview of our history with your engineering partners, American Structurepoint and Arcadis. We have identified a high-level work sequence, manpower estimates, equipment, challenges and risks, opportunities, preliminary VE concepts and critical path deliveries. As the project advances, we will continue to develop our detailed execution plans to ensure South Bend's goals are met at every phase. Following our execution plans, you will find an extensive list of recent projects from our Northern Indiana office showing Bowen's regional experience and competitiveness. Bowen's approach to project management has always been one of communication, collaboration, and cooperation. Our rich history of partnership with the South Bend team, proximity as a local contractor and experience with your engineers and plant staff will further enhance your projects. What sets Bowen apart from other contractors is that the team has a broad range of self -performing capabilities, including: Dewatering, Sheet Piles, Site -Work, Concrete, Equipment and Mechanical and Piping Systems. These self -performing capabilities will further reduce the job costs for South Bend while giving our project team more control over the outcome of your project. Because of the complex nature of infrastructure projects, unforeseen challenges will always take place. The Bowen team is committed to recognizing problems early and taking swift, appropriate corrective action. This behavior has become one of Bowen's core values: "Never walk away from a problem." We recognize and share South Bend's desire to do all we can to achieve the project goals. In today's economic climate, a major contributor to minimize the construction timeline and cost control success is a well -developed procurement plan. During project kickoff and storyboarding sessions, the team will continually refine the approach to procurement. Refer to the next page to see Bowen's Northern Indiana Experience since 2011. eowEN TECHNICAL APPROACH Bowen Northern Indiana Experience since 2011 Owner Type of Work Project Cost Year Michigan City Department of Water Works Water System $ 804,600.00 2011 NIPSCO Water System $ 6,491,315.00 2012 Fox River Water Reclamation Wastewater System $ 178,000.00 2012 Town of Battle Ground Wastewater System $ 2,771,727.00 2012 NIPSCO Water System $ 834,523.00 2012 Indiana American Water Co. Water System $ 1,187,653.00 2013 Dyer Construction (City of Hammond) Wastewater System $ 3,460,202.00 2013 Indiana American Water Co. Water System $ 40,300.00 2014 Indiana American Water Co. Water System $ 17,350.00 2014 Fox River Water Reclamation Water System $ 2,450,495.00 2014 Valparaiso City Utilities Wastewater System $ 551,023.00 2015 Valparaiso City Utilities Water System $ 13,235,122.00 2015 Valparaiso City Utilities Wastewater System $ 1,980,159.00 2015 Evoqua Water Technologies (Schaumburg) Wastewater System $ 347,615.85 2015 Town of Remington, IN Water System $ 3,613,176.00 2016 City of Rensselaer, IN Wastewater System $ 7,891,197.00 2016 Indiana American Water Co. Water System $ 3,075,755.96 2017 Indiana American Water Co. Water System $ 48,312.00 2017 Lebanon Utilities Wastewater System $ 1,820,298.00 2017 Valparaiso City Utilities Water System $ 1,651,289.00 2017 Valparaiso City Utilities Water System $ 126,639.00 2017 Town ofSchererville, IN Wastewater System $ 39,542.00 2017 Town of Lowell, IN Wastewater System $ 673,600.00 2017 Town of Dyer, IN Wastewater System $ 1,021,443.86 2017 City of Hobart, IN Water System $ 3,587,846.00 2018 Town ofSchererville, IN Wastewater System $ 583,300.00 2018 East Chicago Water Dept. Water System $ 1,318,865.47 2018 Indiana American Water Co. Water System $ 2,414,953.56 2019 City of Delphi, IN Water System $ 5,287,835.00 2019 Town ofLowell, IN Wastewater System $ 801,120.00 2019 City of Crown Point, IN Water System $ 201,869.00 2019 City of Delphi, IN Water System $ 7,635,012.00 2020 Illinois American Water Co. Water System $ 2,871,361.00 2020 Utilities, Inc. Water System $ 146,468.00 2020 City of South Bend, IN Water System $ 1,392,592.00 2020 Town of Hebron, IN Wastewater System $ 7,651,176.00 2020 Town of Lowell, IN Water System $ 239,581.00 2020 Community Utilities of IN, Inc. Water System $ 1,874,709.61 2021 Utilities, Inc. Wastewater System $ 238,748.00 2021 Utilities, Inc. Water System $ 3,049,542.00 2021 Indiana American Water Co. Water System $ 6,246,653.00 2021 City of South Bend, IN Water System $ 1,785,000.00 2021 Town of Westvil le, IN Wastewater System $ 4,794,965.00 2021 City of South Bend, IN Wastewater System $ 4,475,585.23 2021 Town of LaCrosse, IN Wastewater System $ 2,454,193.00 2021 Town ofLowell, IN Water System $ 290,793.00 2021 Kingsford Heights, IN Water System $ 244,041.00 2022 City of South Bend, IN Water System $ 3,582,800.00 2022 Town of Lowell, IN Wastewater System $ 1,740,000.00 2022 Prairie Path Water Company Wastewater System $ 5,209,803.00 2022 Town of Westville, IN Wastewater System $ 10,212,286.00 2022 $ 134,642,435.54 BOWEN 30 Providers shall demonstrate their understanding of the Project. 3d) Providers are required to detail their plan to construct the Project. This plan shall include construction approach for components such as, but not limited to: equipment, structure, and material procurement; utility coordination and acquisition of temporary electrical power; site dewatering; demolition; excavation means and methods; combined sewer flow bypass plan that maintains flow to the WWTP (<77 MGD) and allows for appropriate combined sewer overflows (>77 MGD); structure and piping construction sequence; equipment installation; startup and testing; paving; and site restoration. 3e) Providers shall provide their approach to minimize the construction timeline and submit a construction schedule. The construction must be completed by the City's Long Term Control Plan compliance deadline of December of 2025. The system must be operational by this deadline. C50 EQ Basin Project oE AMEfi[CAN No STRUCTUREPOINT INC Preliminary Summary of Sequence • Mobilize, install SWPPP, reroute pedestrian path (to be done by Owner), clear and grub • Dewatering install and initial drawdown • Install utility relocates • Pump station and diversion structure • Outfall structure • CSO 045 EQ Basin • Pumps and mechanical completion • Control building and generator • Bypass and tie-in 96" effluent pipe and manhole • Restoration and demobilize Manpower • 15-25: Operators, Laborers, Carpenters, Pipefitters • Superintendent Key Local Subcontractors • Sweney Electric • Dutchland (Bowen recommends due to space limitations) Equipment Preferences (All Bowen -Owned) • 120 TN Manitowoc Crane • CAT 349 Style Excavator • CAT 930 Wheel Loader • CAT 308 Mini Excavator • CAT 279 Skid Steer • CZM EK 125 Bowen Dewatering Drill Rig • CAT 336 Excavator with Sheeting Hammer Attachments • ICE B4 Sheeting Hammer and Power Pack • Bowen Fleet Dewatering Casings and Pumps Challenges and Risks • Dewatering operations will require a site -specific plan • Maintaining plant flow through bypass operations and utilizing existing site piping • Construction laydown and work zone space • Safely accommodating the public trail Opportunities • Reuse of existing 96" line for normal flow pipeline to eliminate new 96" effluent and manhole - $100-150K savings (see orange markup on following page) • Alternate routing of new 96" effluent line to reduce bypass pumping duration - $100-150K savings (see dark blue markup on following page) • Reorient 96" diversion structure effluent and maintain existing outfall structure - $500-600K savings (see teal markup on following page) • Reduce footprint of excavation of pump station and diversion structure - $150-250K savings (see red markup on following page) • Reorient control building and generator to eliminate 48" reroute - $100-150K savings (see red markup on following page) • Allow abandonment of existing outfall stucture in lieu of complete demolition - $100-150K savings • Allow use of permanent pumps for bypassing pumping operation - $100-150K savings • The above items could reduce the project schedule up to 2 months depending on value engineering items implemented • Bowen will provide a site -specific plan for self -performing dewatering operations based on the recent Clarifier 4 and 5 Project. This will allow the best control of dewatering and allow any unused dewatering costs to be returned to South Bend. • Leverage Bowen's relationship with local unions • Bowen's ability and experience of self -performing the installation of the Dutchland Tank will save project costs and reduce schedule • Bowen has other items that could possibly impact the project schedule and cost, in addition to the above items Recent Relevant Experience • Indianapolis Deep Rock Tunnel Fall Creek CSO Phase 2 and 3 • West Lafayette DeHart CSO Tunnel Storage • Lebanon, IN Booster Station and Dutchland Tank • Lafayette Greenbush CSO Tank Project • IAA Seerley Basin Contract 1A Deicing Tank Project BOWE7V GENERAL NOTES: \ I\ 1. SEE DEMOLITION PLAN ON SHEET C-05 FOR \ \ REMOVAL AND ABANDONMENT INFORMATION. 100 YR. \ 100 YR. 2. FENCE WILL BE INSTALLED IN SUCH MANNER FLOODPLAIN I \.�FLOODPLAIN AS TO PROTECT TREE, IN SHOWN LOCATION. \ \ I \ A I \ APP. R I \ \ PROJECT VALUE ENGINEERING CONSIDERATIONS vv II Benefits of VE Consideration Reduces excavation foot print - Reduces shoring requirements II - Eliminates 60" pipeline run between s °°_y =\ _ diversion structure and lift station.___ - \ \ II - Reduces de -watering efforts (MATCH EXISTING) u u u u II II II RELOCATED 10'— II II ASPHALT PATH II II II II II II II II II II � II II GE c _ — new manhole no longer regruied PROPOSED BILE GA \\ �� This line does not require \\ �— location any more. \\ a` I >\\ RESTORED 10' ASPHALT PATH II II / II II I II / II II II I II II II APP. II II II o PROPOSED 20' W O / DOUBLE GATE 05 IIikE SEE NOTE 2 VA VA I I VA I�r I vv 1 I vA PROPOSED \\ f 1 I EO BASIN p AA PROPOSED I. TRANSFORMER 10' SETBACK _ PROPOSED \\ T}� CONTROL BUILDING II GRAVELvA / \\ PROPOSED INFLUENT \\ LIFT STATION j � \ ,BOLLARDS (TYP.) \ i 0 b � i i 100 YR. 1 PROPOSED 6' BARBED WIRE FENCE FLOODPLAIN� / �100 /(MATCH EXISTING) YR. FLOODWAY I111111 I I I I I I I II I �1 1 1 II I ( 1 0 i i i 100 YR. FLOODWAY I' J /--flBER OPTIC MH / (DO NOT DISTURB) / `APP. R � W CITY OF SOUTH BEND It STRUCTUREPOINT • River Road I SO, 2001 Indianapolis, Indiana 46240 — 31].54].5580I FAX 31-3.0270 �a�,�arep�aLeom ST. JOSEPH RIVER I I APP. R IN TEK STRUCTURE ST. JOSEPH RIVER / PROPOSED / OVERFLOW STRUCTURE j i / PROPOSED / / DIVERSION STRUCTURE / i r / 100 YR. / FLOOD EL. 668 / / i SOUTH BEND CSO 045 EQ BASIN AT WWTP SOUTH BEND, INDIANA XXIXX120XX CERTIFIED BY ISSUANCE INDEX DATE: 3131 /2023 PROJECT PHASE: 60% PLANS Project Number 202001456 SITE PLAN )SED CONDITI C-07 BOWFIN DIVERSION STRUCTURE VALUE ENGINEERING CONSIDERATIONS GRAVEL WM New manhole _ not required #7 New manhole not required #6 � Lk WV70F,214 Benefit of Value Engineering Consideration - Eliminates cost of 96" overflow pipeline - Eliminates precast manhole structure # 6 & 7 - Significant reduction in bypass pumping requirements - Significant reduction in de -watering efforts - Significant reduction in the amount excavating required - Significant reduction in shoring needs - Reduction of work in the 100 year flood plain Benefit of Value Engineering Consideration - Eliminates 96" Effluent pipeline - Eliminates precast manhole structure number 6 - Reduction in bypass pumping needs �_APP. R ST. Keep existing overflow modify / update equipment, but leave existing structure in place GRAVEL I I ,o New normal flow pipeline, Benefit of Value Engineering Consideration - Reduction in bypass pumping efforts J Z---/ / ►_ Modify / update as required BOWEN TECHNICAL APPROACH kDutchlandLLC Innovation. Experience. Eco-friendly. 160 Route 41 I Gap, PA 17527-9410 Phone 717.442.8282 1 Fax 717.442.9330 www.dutchlandinc.com ®OO South Bend Indiana Bo w e n- D u t c h la n d A d v a n t a g e s June 26, 2023 Bowen Engineering Corporation 8802 North Meridian St. Indianapolis IN 4626o ATTN: Steve Nutt Bowen and Dutchland are interested in teaming up for the construction of the South Bend CSO 045 EQ Basin at WWTP. The scope of work provided by this team includes the structural design of the precast post -tensioned concrete EQ Basin, the precast manufacturing of the tank wall panels, the cast -in -place tank base slab and the erection of the precast tank. Dutchland engineers will provide calculations and shop drawings of the precast EQ Basin sealed by a professional engineer licensed in the state of Indiana. Dutchland will also manufacture the precast panels. Bowen will install the cast -in -place base slab. Bowen will also erect the precast wall panels and grout the joints between wall panels. Dutchland certified crew will post -tension the tank walls. The tank will be completed by Bowen with the grouting and sealing of the base -to -wall joint. Dutchland will provide a two year warranty on the tank. The customer may choose to upgrade to a five year tank warranty. The Bowen — Dutchland team brings several advantages to the construction of the CSO 045 EQ Basin: • Bowen-Dutchland is an experienced tank construction team. We used this same model to successfully construct the Abner Longley Tank in Lebanon Indiana. Bowen and Dutchland have demonstrated that we work together to address each aspect of tank construction. Bowen is the only contractor that has installed a Dutchland designed and manufactured tank in Indiana. Dutchland has also been a subcontracted tank supplier on other Bowen tank projects around the country. • The team will bring schedule benefits to the EQ Basin construction. On site construction time is compressed because precast manufacturing occurs off site, and simultaneous with on site construction steps. The precast wall panels will be in production while the site is excavated and the subgrade is prepared. Precast tank construction is a proven time saver in cases where a deep foundation is needed to support the tank. • It appears that the EQ Basin excavation may need to be dewatered until the tank is leak tested and backfilled. By reducing on site construction time, and the reliable leak test pass record of precast tanks, the team can provide significant saving in dewatering energy expenditure and cost. • Reduced on site construction time will also reduce the amount of time that the WWTP flow will need to be routed through temporary piping. Precast tank construction is largely confined to the actual tank site after the precast panels have been erected. This frees up the construction site and will allow the permanent line work to be performed without interruption, while the EQ Basin is still under construction. • Due to reduced concrete volume and efficient mix design, precast concrete tank construction has lower greenhouse gas emissions than comparable construction techniques. ENVIRONMENTAL ENGINEERING CONCRETE STRUCTURES BOWEN TECHNICAL APPROACH • Manufacturing the EQ Basin walls off site significantly reduces the number of truck deliveries through the neighborhoods surrounding the construction site. • Precast, post -tensioned tank construction produces durable, low maintenance concrete tanks. Thank you for considering Dutchland to participate in this project with Bowen. Sincerely, Ken Sullivan Regional Sales Manager Dutchland LLC 6/27/2023 Page 2 of 2 BOWEN 160 Route 41 I Gap, PA 17527-9410 4,DutchlandLLC Phone 717.442.8282 1 Fax 717.442.9330 Innovation. Experience. Eco-friendly. www.dutchlandinc.com ®OO South Bend Indiana A W WA D 1 1 S Advantages July 5, 2023 Bowen Engineering Corporation 8802 North Meridian St. Indianapolis IN 46260 ATTN: Steve Nutt Below is a list of AWWA D115 (Dutchland type tank) over AWWA Diio (wire wound tanks). Please feel free to use any of these points in your South Bend RFQ submission. • D115 construction allows for a more open construction site since manufacturing of precast elements occurs offsite. Wire wound tank construction generally precast and store wall panels onsite. • Prestressing D115 tanks typically require less space than winding prestressing wire. This can result in lower excavation and SOE costs. • D115 tanks have no cold joints. D115 wall panels are cast in a single pour. Wire wound precast wall panels are erected and then multiple layers of prestressing wires are applied and coated with shotcrete, which creates cold joints. • Dutchland D115 precast panels use self -consolidating concrete (SCC) with air entrainment but have very little air entrapment. Air entrapment is inherent in the shotcrete process. Poured SCC is very dense, durable concrete. Air entrapment can result in concrete that is more porous than SCC, and therefore less durable. o Air entrainment is designed into concrete to enhance durability. Air entrained concrete has discrete, not -connected air bubbles within the cured concrete. It contains air, but is not porous. o Entrapped air is introduced when shotcrete is sprayed onto the wall surface. Air voids can be connected to each other, which can lead to porous, less durable concrete. • Precast D115 wall panels are cast in forms and then cure in an unrestrained condition in the yard. Concrete shrinks as it cures. Unrestrained precast panels allow the concrete to shrink with less cracking compared to a final shotcrete layer (which is not prestressed). • Plastic ducting and pressure grouting incorporated in DI15 prestressing tendons provide better corrosion resistance to steel strand than shotcrete applied to wire prestressing. • Precast D115 panels are cast in shops with very extensive QC/QA procedures. • Dutchland precast D115 panels are cast in temperature -controlled buildings, which is a less weather dependent type of construction than wire winding, in which all operations are performed outdoors onsite. • Precast DI15 tanks can more easily accommodate large penetrations in tank walls, as well as external structure like drop boxes. Following is a rough preliminary duration schedule to design, manufacture and construct the South Bend CSO tank. Bowen and Dutchland can work together to improve most of the schedule items shown below. Preliminary Durations: Description Duration Location Notes Submittal Drawings 8 Weeks Offsite From start of design ENVIRONMENTAL ENGINEERING CONCRETE STRUCTURES BOWEN s �W a nH Ii2 —n 5 �n = F R Li a � II �D Oi 0 Fn F ?5 To F O m n 0 - _ b -e E O y bb N p Iyy.I o � W � C ti J Project: THE INWRMAIION NwNEO NEreors coupcliuoo o a m 3 e N OVERALL PLAN SOUTH BEND Dutchland�c ev WUT S- AL Eo raNx Innovation. Experience. Eco-friendly. OR oouceo EXCEPT BOWEN Precast Production 6-8 Weeks Offsite From start offabrication Can run concurrently with Base Slab Installation Base Slab Install/Cure 4-6 Weeks Onsite From Dutchland mobilization to site Can run concurrently with Precast Production Precast Installation 1 Week Onsite Installation to commence once fabrication is complete Tension/Grout/Seal 3-5 Weeks Onsite Tank ready for leak -test Structure Please let us know if you would like to further explore any of these items. Sincerely, Ken Sullivan Regional Sales Manager Dutchland LLC BOWEI'V At 870 Board of Public Works Selection Ratified A1880 Guaranteed Maximum Price (Finalize Scope, Financing, Schedt A1000 Board of Public Works Approve Contract with Selected Provider A1010 Mobilize A1570 Startup & Testing A1020 Substanihal Completion A1030 Punchlist A1040 Final Completion At 940 Contractual Substanital Completion At700 Concrete Design A1710 Rebar A1760 Misc Metals At900 MasonryBrickBbdc A1910 HVAC Units & Materials A1920 Precast Roofing Panels At 640 RCP Pipe At650 Ductile Iron Pipe A1660 Concrete Manholes At670 At680 Dutchland Tank Lift Station Pumps A1720 Hydraulic Actuated Gates At 730 Mechanical Bar Screen At740 Valves At750 Flex Connectors At 770 Radial Flushing Equipmer A1780 MCC At790 Equipment Controls A1810 Generator A1820 PLC Panel A1830 Transformer At840 Lighting Panels At850 Power Panels At860 Field Instruments A1050 Mobilize A1060 Install Erosion Control A1070 Install & Move TemporaryWalk Path A1080 Site Clearing/Grubbing A1090 Coordinate Install Temporary& Permanent Power A1100 Install Dewatering System & Coordinate Discharge Points A1110 Relocate 48" interceptor A1120 Relocate 16" Watermain A1130 Demo Partial Flow Structure & SVDhon Pipe A1150 Excavate A1160 Install Supports for 96" CSO Pipe A1170 F/R/P Foundation A1180 F/R/P Walls A1690 Install 12' Manhole Structure #7 A1300 F/R/P Bump Out Portion of Diversion Structure A1200 MechanicalActivities A1190 Backfill A1210 Pull Shoring At220 Install Temporary Shoring A1230 Selective Demo for Exisifinq Overflow Structure Remaining Level of Effort ♦ ♦ Milestone t� Actual Work Remaining Work 0 08-Aug-23* ♦ Board of Public Works Selection Ratified � Guaranteed Maximum Price (Finalize Scope, Financing, Schedule, & Vp) ♦ Board of public \l orks4prove 6ntra� with Splected;Providgr -------•----------------------•-------------------------------------------------------------------- ------------- •------- --------------------------- ------ 1 ! Mobilize 0 Startup&Testing; ♦ Su,bstanitalCompletion 0 ''Punchlist ♦', Final Cbmpletipn i ♦ 0 Concre� Design � Rebar 0 Misc Metals -------' - -------'----- • = masonry Brick/$Iock HVAC Units & Matorials 0 Precast Roofing panels RGP Pipe; -------•----- - --- --------------------- -------------------------------------------- ------------- ------------- ------ ------ --------------------------- Ductile Iron Pipe 1 Concrete Manholes 4utchlaod Tank Lift Station Pumps ------' H drauli A ------- ------------------------ ------%------- ------------- ------ ------ --------------------- y F ctuated Gates Mechanical BerScreen Valves Flex Connectors Radial FlushingiEquipment MCC. Equipmont Controls Trarisfer Swiloh Generator ------- ------- ------- -------'--------' -------'-------------- ' -------------------------' '-------- ------------ ------ ------------- ------ ------------- --------- PLC Panel Transformer Lighting Panels Power Panels Field Instruments ------------------ --------------------------------------------- --------------------------------------------------------------------------------------------------------------------- ----- Mobilize ❑ Install Erasion Control p Install;&MovoTem*aryW;alkPatb p Site,Cleadnp/Grubbing - --- p �Y anentPPwer ; -----•-------.- .- o coordinate Install Tem or = ; Install Dewatering System & Coordinate Discharge Points 0 Relocate 48"interceptor E6 Relocate 15" Watermain -------' --- ---------'----- -- ------------------ ------ -------; y' non ' Demo Partial Flow Structure & S p Pipe ! 0 Install TemporaryiShoring System Excavate ❑ Install 9upporlsfor96"CSOPipe -------> _ _ _ --------------------------- t� F/R/P Foun datlon F/R/P Walls ❑ Install 12' f�lanhole,Struchjre #7 F/R/P Bump Out Portion of D'Nersion Structure O MechaniglActivities •------- T, -------------- ;-------------------------------------------- ----------�- ' --------------------t------------------------ --------------' ---- ----- O BacrII f O Pull Shoring 0 Install TempiraryShoring iO Selective; Demo for Existing Overflow Structure 20 08-Aug-23 05-Sep-23 2 weeks added for V.E. Discussions 0 12-Sep-23* 0 01-Nov-23 10 30-Apr-25 13-May-25 0 13-May-25 30 14-May-25 25-Jun-25 0 25-Jun-25 0 17-Deo-25* 45 19-Sep-23 20-Nov-23 30 19-Sep-23 30-Oct-23 20-Nov-23 20-Nov-23 45 19-Sep-23 45 19-Sep-23 120 19-Sep-23 08-Mar-24 60 19-Sep 23 13-Dec-23 *1 -• •- 60 19-Sep-23 13-Dec-23 13-Dec-23 60 19-Sep-23 60 19-Sep-23 13-Deo-23 :0 150 19-Sep-23 0 19-Apr-24 180 19-Sep-23 03-Jun-24 150 19-Se 23 p 19- r-24 Ap 90 19-Sep-23 26-Jan-24 120 19-Sep-23 08-Mar-24 90 19-Sep-23 26-Jan-24 150 19-Sep-23 19-Apr-24 0 . • 200 19-Sep-23 01-Jul-24 150 19-Sep-23 19-Apr-24 180 19-Sep-23 03-Jun-24 240 19-Sep-23 27-Aug-24 200 19-Sep-23 01-Jul-24 180 19-Sep-23 03-Jun-24 120 19-Sep-23 08-Mar-24 150 19-Sep-23 19-Apr-24 90 19-Sep-23 26-Jan-24 35 • �- 5 01-Nov-23* 07-Nov-23 5 08-Nov-23 14-Nov-23 10 15-Nov-23 30-Nov-23 5 01-De23 07-De23 10 08-Dec-23 21-Dec-23 53 D- 0 20 22-Dec-23 22-Jan-24 20 23-Jan-24 19-Feb 24 10 20-Feb-24 04-Mar-24 3 05-Mar-24 07-Mar-24 11-Apr-24 178 25 0: 08-Mar-24 25 12-Apr-24 16-May-24 5 17-May-24 23-May-24 13 24-May-24 12-Jun-24 35 13-Jun-24 01-Aug-24 5 02-Aug-24 08-Aug-24 10 09-Aug-24 I 22-Aug-24 I 40 23-Aug-24 18-Oct-24 Includes Pumps, Screen, Gates, & Piping 10 21-Oct-24 01-Nov-24 10 04-Nov-24 15-Nov-24 • 15 12-Apr-24 02-May-24 I 16-Mav-24 10 03-Mav-24 City of South Bend CSO 045 EQ Basin Preliminary Proposal Schedule Data Date: 29-Jun-23 Run Date: 29-Jun-23 BOWEIV Activity ID Activity Name Original Duratior I Start Finish Notebook 1 2024 2025 Aug Sep Oct Nov Dec Jan Feb Mar Apr May I Jun I Jul Aug Sep Oct Nov Dec Jan I Feb Mar LApr I May Jun I Jul Aug I Sep Oct Nov Dec At240 At250 At 260 At280 At 320 A1310 At930 A1330 A1290 At270 A1890 Excavate 10 1 17-May-24 31-May-24 Excavate ❑ F/R/P Foundation FIRIP Walls Bypass ❑ Install 12'I Manhole Structure #61 p', Install',96" Pipe D MechanicalActivities ❑ Tie in to Diversion Strucuture ❑ Demo Rost of Exisiting Overfiab Structure ❑ Backfilli Pull $horing', ❑ Excavate ❑ Underslab Piping F/R/1'Found6tion O t an k Installation p Install Influent Piping to Ed Basin ❑ Install EfQuent Piping to FQ Basin O', F/R/P Basin Drainage Control Structure p Backfill ! ! ! O Install Basin Rushing Equipment ❑; Electrical ■! Excavate 1 F/RIP Foundation -- ------------ ------ ------ ❑ Install Undelgroun Utilities 0 F/PJP Slab bn Grade p F/" Equipment Pads O Install MasonryWalls 0 Install Precast Roofing ------------------------------+----- + p Install Finishes (Dogis, sgns,etc.) ;❑ HVAC ❑ Electrical: Y F/R/P Generator Pad 1 Set Generator, --------------------------------------+-------+-------------- ------ ----------------------------------------- --------------------------- ------ ----- ------ -------------------- I ;F/F2IP Yransforfner Pad ❑', Install;Transfbrmer p Fnal;Backfill&Grading ete, a ❑ Cqncr Paving: : : : : : : : : : t7- Restore Asphalt WalkPath 1 Install Double Gate; ❑ : Install 6' Fencing 1 Seeding F/R/P Foundation 5 03-Jun-24 07Jun-24 F/R/P Walls 15 10-Jun-24 28Jun-24 Bypass 25 09-Aug-24 13-Sep-24 Install 12' Manhole Structure #6 5 09-Au -24 9 15-Au -24 9 Install 96" Pipe 10 16-Aug-24 29-Aug-24 Mechanical Activities 3 30-Au -24 9 04-Se 24 P- Tie in to Diversion Strucuture 5 05-Se -24 P 11Se 24 P- Demo Rest of Exisiting Overflow Structure 5 12-Sep-24 18Sep-24 Backfill 5 19-Se -24 P 25Se -24 P Pull Shoring 5 26 Sep-24 02-Oct-24 • Basin At340 At 350 At360 A1370 At 380 At 390 A1400 A1410 Al420 A1950 Excavate 101 5 0 • 03-Oct-24 09-Oct-24 Underslab Piping 5 10-Oct-24 16-Oct-24 FIR/PFoundation 10 17-Oct-24 30-Oct-24 Tank Installation 35 31-Oct-24 20-DeG24 Install Influent Piping to EQ Basin 8 23-Deo-24 03Jan-25 Instal Effluent Piping to EQ Basin 8 06-Jan-25 15Jan-25 F/F2/P Basin Drainage Control Structure 10 16-Jan-25 29Jan-25 Backfill 5 30-Jan-25 05-Feb-25 Install Basin Flushing Equipment 10 06-Feb-25 19-Feb 25 Electrical 5 20-Feb-25 26-Feb-25 49 20-Feb-25 Control Buildinq A1430 A1440 A1450 A1460 A1470 A1480 A1490 At 500 A1510 At520 At 530 At540 A1550 A1560 Excavate 3 20-Feb-25 24-Feb-25 F/R/P Foundation 3 25-Feb-25 27-Feb-25 Instal Underground Utilities 3 28-Feb-25 04-Mar-25 F/R/P Slab on Grade 3 05-Mar-25 07-Mar-25 FIR/P Equipment Pads 2 10-Mar-25 11-Mar-25 Install Masonry Walls 10 10-Mar-25 21-Mar-25 Install Precast Roofing 4 24-Mar-25 27-Mar-25 Install Finishes (Doors, sgns,etc.) 4 28-Mar-25 02-Apr-25 WAC 4 03-Apr-25 08-Apr-25 Electrical 5 09 r-25 AP 15- r-25 AP F/R/P Generator Pad 3 16-Apr-25 18-Apr-25 Set Generator 2 21-Apr-25 22-Apr-25 F/R/P Transformer Pad 2 23-Apr-25 24-Apr-25 1 Install Transformer 3 25-Apr-25 29-Apr-25 Site Restoration At580 At590 At600 A1610 All 620 At630 FinalBackfill &Grading 22 3 30-Apr-25 30-Apr-25 0 02-May-25 Concrete Paving 7 05-May-25 13-May-25 Restore Asphalt Walk Path 4 14-May-25 19-May-25 Install 20' Double Gate 2 20-May-25 21-May-25 Install 6' Fencing 3 22-May-25 27-May-25 Seeding 3 28 May-25 30-May-25 Remaining Level of Effort ♦ ♦ Milestone Actual Work O Remaining Work Critical Remaining Work City of South Bend CSO 045 EQ Basin Preliminary Proposal Schedule Data Date: 29-Jun-23 Run Date: 29-Jun-23 Page 2 of 2 BpWFN _ WWTP Clarifier 1, Z, and 3 Upgrades 0 ARCADIS Preliminary Summary of Phase I Sequence • Mobilize erosion control and utility relocates • Install perimeter dewatering system • Isolate influent channel using existing stop logs • Drain tanks and perform field investigation • Demolition of existing clarifier equipment • Install interior tank dewatering system • Perform interior tank demolition and piling install • Install underslab 36" and 14" pipe • Install interior cast in place concrete • Perform cracks, spall, and concrete anchor repairs • Install clarifier equipment, weirs, and baffles • Install influent gates and meters • Sequence selective demolition and perform clarifier startup • Restoration, punchlist, demobilization Manpower • 10-15: Operators, Laborers, Carpenters, Pipefitters • Superintendent Equipment Preferences (All Bowen -Owned) • 120 TN Manitowoc Crane • CAT 930 Wheel Loader • CAT 308 Mini Excavator • CAT 279 Skid Steer • CAT 1055 Telehandler • CZM EK 125 Bowen Dewatering Drill Rig • Bowen Fleet Dewatering Casings and Pumps Key Local Subcontractors • Sweney Electric Challenges and Risks • Dewatering • 36" pipe installation and piling • Maintaining flow of plant operations • Existing utility and pile location Opportunities • Bowen's past experience and relationship with staff and knowledge of existing plant • Work with local union trades • Bowen will provide a site -specific plan for self -performing dewatering operations based on the recent Clarifier 4 and 5 Project. This plan will minimize dewatering risk during interior piping and piling installation • Bowen will coordinate with plant personnel for the installation of the existing stop logs to isolate the existing influent final clarifier channel • Bowen will utilize GPR to locate existing pile and existing plant utilities to facilitate the dewatering and piling installations • Utilize shared resources of manpower and equipment between final clarifier and CSO project (i.e. Crane, Dewatering Rig, Material Handling Equipment) Preliminary VE Concepts • Evaluate alternative piling installations • All contingency, including allocated dewatering and operational risk, will be returned to the Owner when not utilized Recent Relevant Experience • South Bend, IN - Final Clarifiers 4 and 5 • Westville, IN, WWTP GSC - 2 New Clarifiers • Peotone, IL - 2 New Clarifiers • Momence, IL - 1 New Clarifier • Lowell, IN, WTP - 2 New Clarifiers • Battleground, IN - 2 New Clarifiers • 50+ Clarifiers in Past 10 Years Around Central Indiana BOW. 'IV Activity ID Activity Name Original Start Finish Notebook Duration 2024 • Board of Public Works Selection Ratified J� 0 08-Aug-23" ♦ Board of Public Works Selection Ratified 0 Guaranteed Maximun ice (Finalize Scope, Financing, Schedule, and V.E.) ! ♦ Board: of Public Works Approve Contractwith %lcted Provider -------`--------------`-------------`--------------'--------------''----------------------------'------------------------------------------------------------------- Mobilize ♦Substantial Completi Pu Fir j = Clarifier Equipment Elect icat Materials Install Deep Well Dewatering System ♦ Mobilize: lslafe Clarifiers 1-3--------- ------------- ---- o p ',Final Sitework E—i Seeding Drain &Clean - C1 --------------'----------------------------- Demo - C1 Em Install Well Point Dewatering System; C1 I� $awcutforUnderslabPiping-C1 iiiiiiiiiiin InstallPlleS-C1 Excavate for 36'Influent & 14, RAS Pipe -C1 Mi InstallUnderUab Piping - C1 ;Install New Clarifier Equipment- C1 0 Electrical-C1 Paint New Clarifier Equipri C1 Install Weirs, Baifles f)CBS- C1 ! InstallGroutFill-Q1 i Startup&Test.C1 Drain & Clean - C2 Dena - C2 -----------------------------I--------------I----------------------- ---I- -------- Install Well PointDewa-- S tem-iC2----------- ;---------------------------------------- g Ys Spwcut for Underslab Piping- C2 mop Install Pii - C2 Excavate for 36'! Influent & 14'! RAS Pipe - W Install Underfila b Piping - C2 j Install New Clarifier Equipment - C2 Electrical - C2 Paint New Clarifier Equipment - C2 O Install Weirs, Baffler, DCBs- C2 ! ! ! ! ! ! O In ill - C2, -----Grout F ! ! ! ! Startup&Test-G2 10 Drain & Cleean - C3 Demo - C3 �; Install Well F�oint Dewatering System -C3 -----------------------------------------;-------------------------------------- ;------------ -'---------- ----- '--------------;-------------- SawcutforUnderslabPiping -C3 Mili Install Piles-C3 Excavate for 36" Influent & 14" RAS Pipe - C$ Install Underslab Piping - C3 Install New C : larifier Equipment- C3 --------- ! ! EI Electrical - C3 Paint NewClarfierEquipment-C onisit Install Weirs, Baffles, DOBs Install Grout Fill - C3' Startup&Test-l3 A1210 Al330 Guaranteed Maximum Price (Finalize Scope, Financing, Schedule, and V.E.) 20 08-Aug-23 05-Sep-23 2 weeks added for VE. Discussions A1340 Board of Public Works Approve Contract with Selcted Provider 0 12-Sep-23* A1220 Mobilize 0 13-Sep-23 A1230 Substantial Completion 0 19-Sep-24 A1240 Punchlist 30 20-Sep-24 31-Oct 24 Al250 Final Completion 0 31-Oct-24 13-Sep-23 29-Apr-24 Procurement A1260 Clarifier Equipment Electrical Materials .029 160 A1390 60 5 0 13-Sep-23 07-Deo-23 • 08-Nov-23 14-Nov-23 08-Nov-23 Siteworkr A1290 Install Deep Well Dewatering System Al350 Mobilize A1400 Isolate Clarifiers 1-3 5 5 08-Nav-23 20-Sep-24 14-Nov-23 26-Sep-24 (Includes: Handrail, Concrete Sidewalk, etc.) A1270 Final Sitework Al280 Seeding 5 27-Sep-24 03-Oct-24 175 Clarifier No. Al000 1 Drain & Clean - C1 5 o 15-Nov-23 21-Nov-23 A1010 Demo - C1 30 22-Nov-23 08-Jan-24 A1410 Install Well Point Dewatering System - C1 10 20-Feb-24 04-Mar-24 A1020 Sawcutfor Underslab Piping -C1 15 05-Mar-24 25-Mar-24 A1480 Install Piles-C1 10 26-Mar-24 08-Apr-24 A1470 Excavate for 36" Influent & 14" RAS Pipe -C1 10 09-Apr-24 22-Apr-24 A1030 Install Underslab Piping - C1 5 23-Apr-24 29-Apr-24 A1040 Install New Clarifier Equipment- C1 20 30-Apr-24 28-May-24 A1440 Electrical-C1 15 30-Apr-24 20-May-24 A1050 Paint New Clarifier Equipment- C1 20 29-May-24 25-Jun-24 Al060 Install Weirs, Baffles DCBs- C1 10 26-Jun-24 10-Juf24 A1300 Install Grout Fill-C1 5 11-Jul-24 17-Jul24 Al360 Startup & Test -C1 5 18-Jul-24 24-Jul24 Clarifier A1070 • 2 Drain &Clean - C2 160 5 0• 09Jan-24 15-Jan-24 A1080 Demo - C2 30 16Jan-24 26-Feb-24 A1420 Install Well Point Dewatering System - C2 10 19-Mar-24 01-Apr-24 Al090 Sawcut for Underslab Piping - C2 15 02-Apr-24 22-Apr-24 A1430 Install Piles - C2 10 23-Apr-24 06-May-24 A1490 Excavate for 36" Influent & 14" RAS Pipe - C2 10 07-May-24 20-May-24 A1100 Install Underslab Piping - C2 5 21-May-24 28-May-24 A1110 Install New Clarifier Equipment - C2 20 29-Ma -24 25-Jun-24 Al530 Electrical - C2 15 29-May-24 18-Jun-24 Al120 Paint New Clarifier Equipment- C2 20 21 24-Jul-24 A1130 Install Weirs, Baffles DCBs- C2 10 25Jul-24 07-Au9-24 A1310 Install Grout Fill - C2 5 08-Aug-24 14-Aug-24 A1370 Startup &Test- C2 5 15-Au9-24 21-Aug-24 Al140 Drain & Clean - C3 5 27-Feb-24 04-Mar-24 A1150 Demo - C3 30 05-Mar-24 15-Apr-24 A1500 Install Well Point Dewatering System -C3 10 16-Apr-24 29-Apr-24 A1160 Sawcutfor Underslab PipingC3 15 30- r-24 %W 20-Ma -24 Y A1510 Install Piles-C3 10 21-May-24 04-Jun-24 Al520 Excavate for 36" Influent & 14" RAS Pipe - C3 10 05Jun-24 18-Jun-24 A1170 Install Underslab Piping - C3 5 19Jun-24 25-Jun-24 A1180 Install New Clarifier Equipment- C3 20 21 24-Jul-24 A1540 Electrical-C3 15 26Jun-24 17-Jul-24 Al190 Paint New ClarifierEquipment-C3 20 25Jul-24 21-Aug-24 Al200 Install Weirs, Baffles DCBs- C3 10 22-Aug-24 05-Sep-24 A1320 Install Grout Fill - C3 5 06-Sep-24 12-Sep-24 Al380 Startup&Test-C3 5 13-Seo-24 19-Seo-24 Remaining Level of Effort ♦ ♦ Milestone City of South Bend WWTP Final Clarifiers No. 1-3 Improvements Preliminary Actual Work Proposal Schedule aBOWEN O Remaining Work Data Date: 29-Jun-23 Run Date: 29-Jun-23 _ Critical Remaining Work Page 1 of 1 BOWEN S ; 3) TECHNICAL APPROACH ARCADIE ST116CTUREP01NT 3f) American Structurepoint and Arcadis will be the engineers of record to work with the selected Provider. Explain the Provider's experiences collaborating with Engineers on past design build or guaranteed savings contract wastewater or combined sewer overflow projects. Bowen is the industry leader in Guaranteed Savings projects in Indiana. Everyone of these projects has afforded Bowen the opportunity to collaborate with Owners and Engineers during the design phase. Over 30% of Bowen's work since 1999 has been delivered via Alternative Delivery with preconstruction collaboration with the Design Engineer. As outlined in the executive summary, Bowen and Pat Stanford's successful experience working with American Structurepoint and Arcadis will contribute maximum value on your project. Bowen's role in GSC projects is to collaborate with the Engineer of Record in the shared mission of serving the Owner's best interests. Bowen's approach to collaborative teamwork over the course of this project include. Design -Assist Phase Project Kick-off Meeting and Partnering Session • Meetings with Engineering team during conceptual/process design • Provide resources to address South Bend operators' needs and questions • Establishing weekly "Rhythm Calls" to discuss design progress • Providing on -going design reviews looking for constructibility and value engineering opportunities • Providing estimating and project controls resources for cost and schedule impact comparisons • Assist in prioritizing design documents to fit schedule needs (e.g.: support of early release of equipment) The constructability input incorporated, and collaborative relationship developed during the design development process, leads to a smooth and efficient construction process. Construction Phase • Active, collaborative planning for scope of work • Advanced notification of any design/construction resolutions needed (no fire drills) • On -going feedback with Engineering Partners for construction details refinement • Daily Progress Meetings ("End of Shift Meetings") that can be attended by any team member • Monthly reporting on project contingency use and project cost savings/over-runs • Active, collaborative planning for commissioning and start up of new facilities See our collaborative experience on the following pages. BOWEN ■ STRUCTUREPOINT BOWEN + $■ STRUCTUREPOINT PROJECT AND PARTNERING EXPERIENCE PROJECT NAME TOTAL CONTRACTS LOCATION PROJECT DELIVERY Ford Thunderbird Site Demolition for Lauth $6,000,000 Indianapolis, IN Traditional 16 Tech Development (3 Phases) $17,000,000 Indianapolis, IN Design -Build Citizens Energy Group Shelby County Lift Station & Force Main $7,400,000 Pleasant View, IN Design -Build IU Health Ring Road Extension $13,000,000 Indianapolis, IN Design -Build Citizens Energy Group Lift Station 101 $2,800,000 Indianapolis, IN Traditional IU Health Enabling Infrastructure $25,000,000 Indianapolis, IN Design -Build City of South Bend Water Treatment Plant Filter Project $1,800,000 South Bend, IN Guaranteed Savings Contract Citizens Energy Group Cooper Road 2 Million Gallon Tank $2,000,000 Indianapolis, IN Design -Build Aqua Indiana Avon Wastewater Plant Expansion $11,400,000 Avon, IN Design -Build City of Lafayette Loeb Stadium $4,200,000 Lafayette, IN Guaranteed Savings Contract ConAgra Foods Lift Station (with Poindexter Excavating) $150,000 Indianapolis, IN Traditional Evansville Water and Sewer Utility Dewatering (with ESG) $1,200,000 Evansville, IN Design -Build Citizens Energy Group White River Alum Storage Building $2,000,000 Indianapolis, IN Traditional 15 13$94M SHARED MARKET EXPERIENCE • Municipal Water Years of Total • Municipal Wastewater Projects Partnership --ontracts • Stormwater Management IIrs'—=1 "-!. I Both Bowen and American Structurepoint Complete Work Across the United States BOWEN f ARCADIS \, �1lkl B iFN + 9ARC,ADIS PROJECT AND PARTNERING EXPERIENCE PROJECT•. DELIVERY City of Columbus Jackson Pike Wastewater Co -generation $30,000,000 Columbus, OH Traditional Town of Brownsburg Wastewater and Sewer Expansion $17,000,000 Brownsburg, IN Traditional City of Valparaiso WTP Improvements $13,000,000 Valparaiso, IN GSC Citizens Energy Group White River to Canal Pump Station $10,000,000 Indianapolis, IN Design -Assist City of South Bend Wastewater Clarifier Rehabilitation $6,000,000 South Bend, IN Traditional Indianapolis Water Company (Now CEG) White River Improvements $5,000,000 Indianapolis, IN Traditional Indiana American Water Wildcat Creek Chemical Feed Upgrades $5,000,000 Kokomo, IN Design -Build Indiana American Water Crawfordsville High Service Pump Station $2,000,000 Crawfordsville, IN Traditional Indiana American Water Kokomo Chem Feed & Electrical Upgrades $800,000 Kokomo, IN Traditional Citizens Energy Group River Safety Signage $250,000 Indianapolis, IN Design -Build Blowers 1 A & 1B Rehab (WWTP) $2,200,000 South Bend, IN Traditional 10 2O 87M SHARED MARKET EXPERIENCE • Municipal Water Treatment • Water Distribution • Municipal Wastewater Treatment • Wastewater Years of Projects partnership Total Contracts • Biogas / Cogeneration Collections SHARED CORE VALUES • Zero Injury and Genuine Concern for Others • People First • Never Walk Away from a Problem • °'"aARCADIS Client Success Integrity • Excellent and Ethical Business Practices • Service to Customer Above All Else BOWEN • Sustainability • Enthusiastic Teamwork and Celebration • Collaboration • Continuous Improvement • Shared Opportunity & Ownership "Arcadis has recently designed multiple projects in collaboration with Bowen using Alternative Project Delivery approaches, most recently with the White River Intake and Pump Station. Each project gave us the opportunity to have a real partner in Bowen — excellent collaboration & communication enabled the team to get past technical and schedule challenges to deliver a high -quality product to the Owner, on time and on budget." Stephane Jousset, Arcadis Project Implementation Key Section Items ► 100+ GSCs utilizing Bowen's story boarding process (all on or ahead of schedule) ► Flexibility on Sub -Contracted Services ► Ability to Self -Perform to Reduce the Budget BOWEIV #1 Provider of Indiana Water/Wastewater GSCs BOWEN PROJECT IMPLEMENTATION 4a) Provider's Involvement: Per IC 36-1-12.5-3 the Provider must perform at least 20% of the contract value with its own workforce. Please define how you will meet or exceed this requirement on a percentage basis relative to the work to be completed by your own workforce. As a Provider, Bowen will self -perform 100% of the Provider responsibilities. As a General Contractor, the work that we perform with our own work force averages 80% or more on the past 100 GSC projects provided by Bowen. As a provider, construction manager, and contractor, Bowen greatly exceeds the 20% requirement. The project scope will be comprised of dewatering, site civil/concrete, piping, and process equipment setting. These are all areas we self -perform with our own labor; we feel the percent self -perform on this project exceeds 80%. In addition to Bowen's ability to staff your project, we also have the capability to provide Bowen owned equipment for your project. We take pride in the fact that we own a large portion of equipment you would potentially see on this project. Having a large equipment fleet has always been in the company plan of Bowen since Bob Bowen bought the first crane back in 1971. Our ability to utilize our own equipment will result in lower project costs compared to rentals or other provider's internal equipment costs. Choosing a provider that has the largest Indiana -based equipment fleet will benefit your project. 4b) Project Management: Describe how the project would be managed by the Provider. Describe method and means of communication plan for the City. Provide project management documentation on past projects completed by the Provider. Project Management drives production efficiency and project quality. Bowen utilizes its Lean Construction SQP approach which stands for Safety, Quality, and Production. During implementation, Bowen's Project Manager (Pat Stanford) will be South Bend's single point of contact. He will be in charge of the schedule and will partner with American Structurepoint and Arcadis to lay out a unified communication plan and schedule for the team. Communication will be handled through regular construction meetings to update South Bend team members on the progress of construction. Records of the meeting minutes will be distributed along with action items, responsible persons, and due dates at every meeting. Bowen is committed to never walking away from a problem, and we believe savings loss constitutes a problem that is our responsibility to solve. As such, we've created a rigorous model for our process flows with the goal of preemptively eliminating opportunities for error. Our pre -planning and 4 week look ahead boards will intercept problems early, and will allow the team to mitigate the challenge. From daily huddles where we share safety and quality concerns down to the end of shift meeting, Bowen processes are detailed, rigorous, and built for success. These standards are why our customers keep coming back for more. Bowen has the demonstrated experience to complete both small and large projects on time and on budget. Since 2011, Bowen has received multiple ACEC and IWEA awards with our GSC customers. Recognition for projects of this magnitude is a result of our diligent efforts, careful planning, and skilled execution. ......................................... BOWEN HAS BEEN BOWEN PROJECT IMPLEMENTATION :SQP LEANPLEMENTING PROCESSES ON ITS PROJECTS FOR 25+YEARS Bowen SQP Lean Construction Process Bowen SQP Lean Construction execution process is Bowen's construction execution approach. Bowen SQP is construction's equivalent of Toyota's "lean manufacturing" that Bowen has been using on all of our projects for over 25 years. Bowen SQP Lean Construction allows for continuous improvement of our projects along with the delivery process we use for implementation. This strategy is part of the Bowen culture and utilized on all Bowen projects. Genuine concern for others, and the safety of everyone connected to our projects is, and will always be, a core value for Bowen. Bowen has maintained a TRIR and EMR of <1.0 for over a decade running. Bowen was recognized for our safety program while receiving one of our most recent Top Notch Indiana Contractor of the Year awards. Imoo, n BOWEN SAFETY, QUALITY, PRODUCTION (SQP): IC LEAN CONSTRUCTION METHODOLOGY TO FACILITATE PLANNING, ®� ELIMINATE WASTE, PROMOTE COMMUNICATION, DRIVE ACCOUNTABILITY, AND CREATE CONTINUOUS IMPROVEMENT ....................................... BOWEN WILL WORK WITH SOUTH BEND'S DESIRED SYSTEMS. TYPICALLY WE FACILITATE CONSTRUCTION AND COMMUNICATION WITH THE FOLLOWING TOOLS ORACLE' VIEWPOINT CONS I AUTOCAD REVIT Q PlanGrid IUMI BOWEN PROJECT IMPLEMENTATION Below is a typical schematic overview of the delivery process with major actions of Bowen shown in red, and the Utility in gold. This process has been used on past Guaranteed Saving Contracts completed by Bowen, but can be modified to fit the needs of the City. Bowen Performance Contracting Team Implementation ........................... ► Establish timing and design of project meetings ► Invoicing ► Clean work -site program ► Safety program enforcement & postings ► Documentation of field tests as required by contract ................................. ► IDEM Permitting ► Sanitary/Water for new services ► Gas or electricity services required beyond existing ► Review of state and local permitting and submittal requirements ► Review of any local zoning issues for new construction ► On -site fuel storage permitting / requirements ► Identification of construction v. operating permit requirements ► Identify final lead times for permitting processes and constraints before permits are issued ► Mobilize consultants ► Installation verification ► Punch Lists ► Conduct & Document field tests as required by contract ► Collect post - construction data ► ................................: Customer training ► Final billing & invoicing ► Manuals/Submittals ► Transfer warranties ► As -built drawings ► Certificate of completion %741eowEN PROJECT IMPLEMENTATION Seven Elements of Planning Excellent project coordination does not happen by accident. It requires intensive planning prior to project execution. Bowen uses the "Seven Elements" method of pre -planning to ensure all aspects of the project are considered, communicated, and planned. We address each of these areas individually since they vary widely from one project to the next. By carefully analyzing our resource allocation, the information flows into our next pre -construction process: storyboarding. Storyboarding is the detailed division of tasks by function and requirements to complete the project. By combining the seven elements of planning and storyboarding, Bowen is able to properly plan projects, staff them appropriately and thoroughly address critical path items. 4c) General Construction Subcontractor: Identify the General Contractor Team Member who will perform the general construction and the approximate percentage of the contract value that such effort might represent. Explain the Provider's ability to work with such General Construction Team Member including experience working together on past projects. Bowen is a Provider of Indiana Guaranteed Savings Contracts and also a General Contractor who would perform 100% of the general construction for South Bend. We are also a self -performing General Contractor. Bowen has been a self -performing General Contractor in the water and wastewater improvements industry for 55 years. This is truly the key to our success. We can provide more value in the design phase due to having hands on craft at the table during value engineering meetings. This lowers the cost of your project by not having to pay multiple layers of mark-up. As a self -performing General Contractor we will provide: ► A single point of contact for all issues and communications ► Cost reductions eliminating a layer of mark-ups ► Will provide knowledge of your facility with our experienced staff ► Tailor a final solution that meets or exceeds your staff's expectations SAFETY INFORMATION EQUIPMENT MANPOWER TOOLS WORKSPACE MATERIALS BOWEN PROJECT IMPLEMENTATION To increase your confidence in our competitive advantage as a self -performing Provider as well as our long standing NW Indiana presence, below is a list of our past and current traditional projects with the City of South Bend: 1998 - $2.4M Pinhook Renovations (WTP) 1999 - $5.5M Secondary Clarifier Improvements (WWTP) 2000 - $2.1 M Blower Replacement/Generator Improvements (WWTP) 2010 - $2.2M Blowers 1A & 1 B Rehab (WWTP) 2019 - $1.8M Olive St. Filter Improvements (WTP) 2020 - $4.27M Final Clarifier Improvements (WWTP) 2021 - $1.78 Pinhook GSC Improvements (WTP) 2022 - $3.58M North WTP Improvements 4d) Other Subcontractor's Involvement: Identify which portions of the project the Provider intends to implement with subcontractors and how the subcontractors will interact with the Team. There are some items that Bowen does not perform with our own work force. Electrical, masonry, and HVAC are examples of what Bowen would subcontract on this project, which are a very low percentage of the overall project cost. Bowen will still be the single point of contact and accountable for all subcontracted work. We manage our subcontractors as if they were our craft. We hold them to the same safety standards and the same schedule standards. Below is one example of a key, local partner we would consider to ensure a successful project outcome. ► Sweney Electric (Multiple Northern Indiana GSC Experience) South Bend will have input and the final decision on any subcontractors and vendors used on the team. BOWEN PROJECT IMPLEMENTATION 4e) Explain how Provider intends to comply with the City Ordinance 14.5 related to utilization of minority or women owned businesses. ' Diverse and Local Participation Initiatives Nearly 50 company representatives attending a Bowen / American Water Project Outreach Event for a Previous Project Bowen supports City of South Bend's mission to positively engage diverse and minority and women owned subcontractors and suppliers to grow the communities we live and work in every day. We regularly work with private water and energy clients and municipalities nationwide to reach diversity participation goals. We will do the same on your project. Project Results. When appropriate, Bowen hosts a Project Outreach Event to inform M/WBE suppliers about project bid opportunities. At these events Bowen's team discusses project scope and answers attendee questions. Bowen advertises projects in a variety of ways, including: • Direct Reach Out • Local and National Diversity Councils • Subcontractor Associations • Via E-mail lists from National, State and City agencies • Promoting and participating in any diversity -focused events and initiatives of your organization Industry Advancement. Bowen believes empowering Minority and Women Owned Businesses does not end with a signed contract on a project. To further their success in the industry, Bowen takes on a mentor relationship with many of these companies to share our knowledge and resources we've attained over 50+ years in business. This includes meeting frequently to: • align business goals • share bid opportunities • understand their company growth strategies • provide guidance in gaining access to bonding, insurance, and other resources that some large prime contractors can easily take for granted Example Partner Certifying Entities • �MSDC W B E N C National Minority Supplier ����*� I ■ i V\ WOMEN'S BUSINESS ENTERPRISE oeeeiopme�i coo�ai � NATIONALCOUNCIL U.S. Department VA Veterans (Bowen is MSMSDC Member) ioi..oa<ps. spccaap rocprxpa. of Affairs BOWEN (See Below South Bend Memorandum that Speaks to Bowen Meeting M/WBE Goals on Previous Bid) INTER -OFFICE MEMORANDUM DEPARTMENT OF PUBLIC WORKS DIVISION OF ENVIRONMENTAL SERVICES TO: Members of the Board of Public Works CfIY LI"ri1 11 RLNR MDIANA UMRDiWPNRLRWUR S rjaa 16;_1 (n. F'�iriklLA Mmdik_h 3eM bxph R. H.ier. Viw RwihM Michael Schmidt, Assistant City Attorney Public Works a, ,r nM ..fmJe x emx Theresa Heffner, Board of Public Works Clerk Kura, L.Hlkr. Hember A� 1Mne ]A. Ilrins, Clvk FROM: Jacob M. Klosinski, P.E., Assistant City Engineer SUBJECT: 119-069B WWTP Final Clarifiers 1, 2, and 3 Improvements DATE: Agenda Request — Reject Bids December 13, 2022 The Board of Public Works opened and read bids at the November 22, 2022 Board of Public Works meeting for the subject project. One bid was received, and the bid ranked as follows: CONTRACTOR BASE BID PRICE Bowen Engineering Corporation $12,385.000.00 Assessment The lone bidder, Bowen Engineering Corporation, submitted complete documentation with their bid proposal. The MBE Goal (0.66%) and WBE Goal (2.20%) for the project were met at 1.70% and 2.26%, respectively. Participation included process pipe supply and construction equipment rental. The bid pricing submitted by Bowen Engineering Corporation exceeded the Engineer's Estimate of Probably Construction Costs and the available project budget for this project. Only two bidders. Bowen Engineering Corporation and Kokcsing Industrial obtained plans for the subject project. Contractors and suppliers have indicated that there are large water and wastewater infrastructure improvements bidding throughout the State of Indiana and neighboring states. With heavy infrastructure spending slated for Indianapolis, Evansville, Columbus, Hobart, Huntington and other communities over the upcoming months_ contractors are being selective of their project bids and targeting larger project. Post-COVID supply chain shortages and material price increases have impacted all water and wastewater bids over the past 12-18 months, and pricing is high. No local South Bend contractors are bidding Wastewater Treatment Plant work as general contractors except for electrical, HVAC preventative maintenance, small process mechanical piping repairs, and SCADA integration services. General Contractors bidding on Wastewater and Water capital projects of this magnitude are based outside of our area resulting in higher costs to mobilize for multi -season and multi -year projects. Recommendation — Reject Bid(s) The Division of Engineering_ and Division of Utilities recommend the Board of Public Works formally reject bids received for Project No. 119-069B WWTP Final Clarifiers 1.2. and 3 Improvements. The project will be re-evaluated with the intention of rebidding the project. Bidding the project may be delayed until Q1-2023. Other means for procurement will also be considered in the review. For questions, contact Jacob M. Klosinski (Ext. 9496) at the Division of Engineering. Financial Approach Key Items ► 55 years of experience working with Indiana Suppliers and Subcontractors ► $15,000,000+ dollars of Value Engineering Cost Reductions for past GSC Clients ► $80,000 Utility Rebate for the City of Huntington GSC Project No. $50,000 Utility Rebate for the City of Plainfield GSC Project ► $56,000 Utility Rebate for the City of West Lafayette GSC Project ► $1,200 Utility Rebate for the Town of Rossville GSC Project No. $100,000 OED Grant for the City of Kokomo Centrifuge Project ► 100+ GSC Projects with Bowen's Proven Open Book Pricing Model (Most in the Industry) BOWEN #1 Provider of Indiana Water/Wastewater GSCs eowEn► FINANCIAL APPROACH 5a) Describe in detail the process the Provider intends to utilize to obtain the best prices for the City. Explain why this approach is better than other available approaches. Bowen has implemented (8) projects, including (1) GSC project, with South Bend totaling over $23M. 1998 - $2.4M Pinhook Renovations (WTP) • 1999 - $5.5M Secondary Clarifier Improvements (WWTP) 2000 - $2.1 M Blower Replacement/Generator Improvements (WWTP) 2010 - $2.2M Blowers 1A & 1 B Rehab (WWTP) • 2019 - $1.8M Olive St. Filter Improvements (WTP) • 2020 - $4.27M Final Clarifier Improvements (WWTP) 2021 - $1.78 Pinhook GSC Improvements (WTP) • 2022 - $3.58M North WTP Improvements Bowen's GSC Value Engineering with American Structurepoint and the City of South Bend avoided multiple shutdowns and provided project savings that were reinvested into significant additional scope (at cost, with no additional fee) allowing the Pinhook WTP to run better than expected when the project was completed. Bowen's success on the above traditional low -bid projects is a testament of our ability to reduce project costs for the City of South Bend. After selection, Bowen will coordinate with South Bend and engineering partners to hold a project kick-off meeting. At this meeting, we will collaborate on our estimating timeline and design goals going forward. At an agreed upon design percentage, Bowen will deliver a Guaranteed Maximum Price (GMP) proposal. Budget pricing, value engineering, and general guidance are all done at risk up until this point in the process, with no obligation to our customers. Bowen has delivered a GMP proposal with as little as 30% design on past projects when needed. We guarantee that the price will not go over the GMP. Bowen will strive to obtain the best prices throughout the entire GSC process. Estimating (GMP development) and Construction. In the estimating stage, the following makes Bowen's approach the best in the industry: ► Equipment Lead Time Matrix - The current supply chain is very unstable. Key equipment lead times can play a significant factor in how a project gets built and budgeted. ► Estimating Experience — Bowen's estimating team has been fine tuning production numbers for the past 55 years, longer than any other provider. Specifically, Bowen has collaborated on over 100+ GSC projects. ► Value Engineering — Bowen shines during the design phase by having 94 graduate engineers on staff to help/assist and provide ideas on process equipment with actual costs. This allows the team to make the most informed design decisions. ► Mark Up Reduction — Bowen is a Provider, Construction Manager and Self -Performing Contractor that allows us to eliminate or reduce multiple layers of mark up on GSCs. Bowen proposes an 8% fee for overhead and profit on all GSC projects implemented under the South Bend GSC Contract. eowEry FINANCIAL APPROACH Bowen does not stop working to obtain the best overall price beyond the estimating stage. We continue to do so in the construction phase following the storyboarding session. To date, Bowen has delivered every GSC project scope with no change orders. Our approach to obtaining construction phase savings for South Bend includes: ► Construction Engineering — Bowen has some of the most experienced superintendents in the industry allowing us to find better ways to construct your project even in the field. ► Production Savings — Our project managers and project engineers are meeting every morning on your job site to discuss better ways to install, which results in project savings for our customer. ► Subcontractor Scope Management — Our project managers and purchasing managers go through finite scope reviews with our subcontracting partners to ensure no double -ups or gaps. ► Utility Rebate Savings — Bowen's energy engineers (Teddy Deahl and Brian Stater) have over 22 years of utility rebate and grant experience. This experience assisted the City of Huntington in receiving an $80,000 custom utility rebate, the City of Plainfield receiving a $50,000 custom utility rebate, the City of West Lafayette receiving a $56,000 utility rebate, and recently, the town of Rossville receiving a $1,200 utility rebate. Related to your project, Bowen is a NIPSCO Trade Ally. 5b) Explain how the Provider plans to offer a Guaranteed Maximum Price, with no change orders, for this project. Bowen's agreement states that we can't drive a change order and our price is guaranteed. We haven't had a contractor driven change order on any of our 100+ Guaranteed Savings Contracts. Bowen firmly stands behind our guaranteed maximum price (GMP). We are able to confidently offer the guaranteed price by working with South Bend and Engineering partners through the design period. Our tried and true approach and process will have the following components: ► Establish a Baseline at Concept Level Design: Our group of highly experienced estimators are exceptionally talented at developing high level pricing for projects such as yours. ► Refining the Baseline Budget through 30% and 60% design: Our collaborative approach will have our Senior Estimators and Design Assist Manager in the room with South Bend and Engineering Partners for design update meetings. Their responsibility is to listen for, and evaluate changes to the concept(s) and offer solutions, price impact opinions, and alternatives as necessary. eowEn► FINANCIAL APPROACH ► Include Outside Expertise: We will use our relationships with process equipment manufacturers, and local subcontractors to validate budgets and changes throughout the design phase. ► Complete Guaranteed Maximum Price (GMP) at 60% Design: Our collaboration and past pricing iterations for your future projects through 60% gives us the confidence we need to offer the GMP. We will include a "Risk Register" to assign appropriate responsibility and contingency for each point of risk. The contingency will be presented as a stand alone number for transparency purposes. 5c) Explain your firm's approach to open book pricing allowing the City to view the Pricing structure (mark up covering overhead and profit) of the Qualified Provider and subcontractors. Explain your firm's approach to open book pricing allowing the City to view the contingency for the project. Explain your firm's approach to open book pricing allowing the City to view savings from value engineering or other project cost reductions. Bowen supplies an open book pricing sheet similar to the one found at the end of this section on a monthly basis or as requested by South Bend. This allows South Bend and Engineering Partners to track our cost for subcontractors, vendors, material suppliers, and labor versus the original budget. We also include a contingency use log to show where and how these dollars are spent or saved. Our commitment to South Bend is that 100% of savings derived from the pricing sheet and contingency will be for the use of South Bend. Furthermore, these savings can be used as directed by South Bend on additional "wish list" items that are related to the WWTP/CSO 045 EQ Basin and Clarifier Upgrade Projects for NO additional fee. This is our idea of true transparency that incentivizes our team to maximize savings. 5d) Provide proof that the Provider can furnish a Performance Bond and a Payment Bond in the amount of 100 percent of the project. Bowen has been bonding projects in Indiana without an issue for the past 50+ years. Please see a letter from our bonding agency (Dimond Bros.) at the end of this section. BOWEN FINANCIAL APPROACH: BONDING LETTER CNASURETY January 25, 2023 RE: Bowen Engineering Corporation 8802 North Meridian Street Indianapolis, IN 46260 To whom it may concern: Bowen Engineering Corporation is a highly regarded and valued client of Continental Casualty Company (a CNA Surety Company). Continental Casualty Company has an A.M. Best Rating of A XV and is listed on the U.S. Treasury Department's Listing of Approved Sureties. We have had the privilege of providing bonds to Bowen Engineering Corporation for many years. Based on their current financial position, we would consider providing surety bonds up to $250,000,000 single project and a $500,000,000 total work program. Naturally, we would expect that the execution of any final bonds would be subject to a review of the final contract terms, conditions, and financing by our client and ourselves. Any arrangement for bonds required by the contract is a matter between Bowen Engineering Corporation and Continental Casualty Company and we assume no liability to you or third parties, if for any reason we do not execute these bonds. If you have any questions regarding this company and their performance history or capabilities, please feel free to give me a call at (317) 853-3668. Continental Casualty Company Robert L. Sherfick Attorney -In -Fact * FINANCIAL APPROACH BOWEN Job Name Valparaiso M luevt Lift Station Upgrades Projen OPaabons Manager Jobn Detmmn Project Mmmger Pat Samford JOb 1l 141504E Project Engmew Mich Sw0 Date 07129115 Project Coordmamr Margaret Burtougbs Last UP— 12MV16 Projw Supmn dent Tony Abitua P�• gJ � � EXAMPLE OPEN BOOK PRICING SHEET BO EN ring cvrpvrenvn MIMI $ 1,941,370 $ 1,729,94'1 $ 3M,320 $ 182,897 $ 1,732,077 Con[metAmouvt: $2,130,007.00 Diff— - SAVE LOSE Contreetor Pre: $193,63].00 TOTAL: 211423 0 Cost to Date: $1,732,936.00 Lett to Pwrkase: 211,423 Cost INt to spend: 511.00 —1- SavWgs: UO3,4.34.00 %Bought Out 89.11% Guarantee Management Key Section Items ► 100+ Successful Indiana GSC Guarantees for Water and Wastewater projects ► 20+ Indiana GSCs Achieved Green Project Reserve Financing from SRF ► 10+ Years of Experience from Teddy Deahl with Energy Engineering & Grants ► 28+ Years of Experience from Steve Nutt working with Indiana GSCs (IC 36-1-12.5) ► Award Winning Provider of Utility Savings Rebates BOWEIV #1 Provider of Indiana Water/Wastewater GSCs BowEn► GUARANTEE MANAGEMENT 6a) Explain how the Provider plans to address the guarantee for this type of project and how it meets Indiana requirements of IC 36-1-12.5. Bowen plans to address the guarantee for this project by utilizing the same process that we have used on our past Guaranteed Savings Contracts for wastewater improvements. Steve Nutt, Bowen's VP of Performance Contracting, has worked with the Indiana GSC code for over 28 years, 15 of those years have been with Bowen Engineering. Teddy Deahl, Bowen's Energy Engineer, has been working with the same code for 10 years while at Bowen. Prior to that, Teddy worked for the Indiana Department of Energy. South Bend can utilize Bowen's past experience to assist your team in putting together a final GSC agreement with the associated conservation measures. Any wastewater Guaranteed Savings Contract needs to show that the amount that the governing body would spend on the project will not exceed the amount of savings from energy, water, wastewater and other operating costs over 20 years. Operating costs savings includes reduction of future labor costs, future cost or revenues for contracted services and future related capital expenditures. Based on our preliminary information along with our Indiana Guaranteed Saving Contract experience, we are confident that we can deliver a Savings Guarantee to South Bend that meets the requirements of 36-1-12.5. 6b) Describe the methodology used to compute the savings baseline. Base year energy use is defined as energy consumption or demand during a period of any length before implementation of a conservation measure. Electric bills from the current wastewater system being impacted by the work will be collected. From there we would estimate a base usage over the past two years. This would be the baseline when evaluating the Energy Conservation Measures (ECMs) provided in the GMP phase of the process. Examples of wastewater treatment plant baselines are available upon request. Below is an example of one of the South Bend Pinhook WTP GSC calculations that Bowen estimated the water savings from replacing aging backwash valves. City of South Bend, IN ECM: Replace gaging backwash valves that leak, causing finished water to be wasted and the backwash pumps to run more. Assumptions: 1.J {8I BBc kwash valves are 24" 2.] ESti mated 3% leakage from A not fu I ly c los d valve 3.] 3% leakage eq uates to rough ly 150 gal Ions per m i n ute of lost fl n ishd water 4.] Average cost of fi n ishd water=$0.24/1000gal (Based on 2015 data) S.J Assumed total kWh rate of $0.10 6.J m l Backwash waste pump/Q rai nage Wet Wel I =60 H P 7.J Facility. Pinhook Water Treatment Plant Drainage Wet Well Pumps - Electrical Savings Current Motor Hours/Yr Motor Lead Annual Operational ID Motor HP Efficiency Operation Factor kWh $/kWh Cost/Yr Purls pill 60 70% 1E4.25 (1.91 9,557 $ c.09C $ 860.1E z nnp,42 60 70% 164.25 (1.91 9,557 $ c.09C $ 860.1E Elettricai5avings= FS 1,720.33 Flnlshed Water Savings Fin ishd Water xecoverd by fixing I❑ the lea valves Ilons Price per 10M) gal ❑ erational J8)24"Valves 788e0000 $ 0.24 5 18,921.6c Finished WaterSavings= $ 18,921.6c Annual 5avingsfrom Backwash Valve Replacement= $ 2Q,641.99 BOWEN GUARANTEE MANAGEMENT Before a final contract is developed, specific calculations, baselines and documentation will be produced. This could include the above conservation measure savings. As it relates to this project, a conservation measure would be a technology upgrade or an alteration of a structure or system which reduces energy or water consumption costs, wastewater costs, or other operating costs. All other work required to properly implement the conservation measure would be included in the guarantee because it is "causally connected" (I.C.36-1-12.5-0.7). To implement the GSC project for South Bend, Bowen would recommend the following process: 1. Our engineers collaborate with the Engineering Partners to evaluate the system 2. A final list of conservation measures is generated 3. South Bend, American Structurepoint, Arcadis, and Bowen finalize scope 4. Determine if NIPSCO rebates are available and complete applications* 5. Value engineering is evaluated to reduce costs 6. Bowen delivers a report with guaranteed costs and savings 7. A project agreement is negotiated and authorized 8. The project construction begins utilizing open book pricing 9. Project savings are documented during monthly meetings 10. At completion all project savings and contingency are returned 11. One year after project completion Bowen sends the first savings report to the DLGF. *Bowen is a NIPSCO (processed through TRC) Trade Ally for utility rebates. The Bowen process is very flexible and can be modified to fit the specific needs of South Bend. 6c) Describe the cost for guarantee management, schedule for delivery, and describe the report. The initial contract including project savings will be sent to the Indiana Department of Local Government Finance (DLGF) no later than 60 days after Bowen has received an authorized contract. Based upon the expected scope of work for South Bend, the guarantee and reporting would be at no additional cost. One year after substantial completion of the project, Bowen will deliver the first audited report. This document would also be sent by Bowen to the DLGF after authorization by the District. The report will be completed and sent out annually during the term of the guarantee. Bowen has been successfully reporting Indiana GSCs for our clients since 2008. All of Bowen's Guarantee reports have been approved by the Office of Local Government Finance Authority. Bowen's history and experience reporting Indiana water and wastewater projects are unmatched by any other Provider. BOWEN GUARANTEE MANAGEMENT 7d) Note how a savings estimate will be prepared and applied to the process. In the past, Indiana Guaranteed Savings Contract clients went through a burdensome process mandated by the provider, for the tracking and reporting of guaranteed energy savings. This process required: ► Reporting utility bills on a monthly basis ► Immediate reporting of changes in the facility ► Reporting of changes in the schedule of operation ► Expensive tracking costs with low value Bowen uses a process already implemented on most Indiana Guaranteed Saving Contracts. Our process uses detailed energy calculations, documented by industry engineering standards, which are stipulated. This method: ► Is per the statute IC 36-1-12.5-3.7 & IC 36-1-12.5-11 ► Uses Industry Engineering Standards per IC 36-1-12.5-2.5 ► Proves the Energy Savings upfront ► Is less burdensome on your staff ► Allows owners complete flexibility in operating their plants ► Drastically reduces the cost for reporting Most importantly, utility infrastructure is a dynamic asset that can change dramatically over the next 20 years. Using a stipulated approach eliminates the need for continuous and expensive recalculation of how those changes affect the guarantee. Bowen's staff also has experience with specific measurement and verification of energy savings and this approach can be implemented by Bowen if needed. Bowen performs our energy calculations with our own engineering staff. Teddy Deahl is Bowen's "Certified Energy Manager" through the Association of Energy Engineering. Teddy Deahl has 10 years worth of reporting experience that extends back to when he used to work at the Office of Energy Development, where the GSC program resided until July of 2015. Teddy has successful experience assisting our customers with Utility Rebates and can do the same with South Bend. Related to your project, Bowen is a NIPSCO Trade Ally. BOWEN GUARANTEE MANAGEMENT 7e) Note how an Operations & Maintenance estimate will be prepared and applied to the project. Bowen estimates operational and maintenance savings that show actual expenditures from the municipal utility's assets that are being replaced as part of the guaranteed savings project. By replacing assets that have experienced numerous repairs over the years, the utility will reduce maintenance costs and can use those savings as a source to justify the project. 70 Note how a Future Capital Expenditure Savings estimate will be prepared and applied to the process. Per the statute, we use Industry Engineering Standards, in most cases RS means estimating and historical data. For each component in the system that is being replaced, the annual savings value is calculated. The total of all of these components is the cost avoidance for the conservation measure. Bowen will apply this method to preparing a future related capital expenditure savings estimate. Pictures and One Operational Savings Calculation Below Are From The City of West Lafayette DeHart CSO Storage Tank/Tunnel GSC Project West Lafayette, IN Energy Conservation Measure: The Dehart project will save the City Emergency Response time and Maintenanoa time due to Overflow events A—mptions: vuerfl-7ntswereaoeraged tocome up with 001 $20/hr. cost per man hour 1 h r. ti me al lotment was—u med fora regular mai ntenance wl I Rggu lar mai ntenance cal Is are made (3l t imes per year 1/2 h r. t I me al lot ment was amu med for an emergency cal I Man Hours Annual Stop page Cost per man ID Tri s Time hr hour Annual Cost Emergency r 30 0.5 $ 20.00 $ 300.00 Maintenance 3 1 $ 20.00 S fi0.00 COSTSAVIN65= $ 360.00 .Variahilify= 9035 GUARANTEED ANNUAL SAVINGS = $ 324 When the prospective Contractor is unable to certify to any of the statements below, it shall attach an explanation to this Affidavit. CONTRACTOR'S NON -COLLUSION AND NON -DEBARMENT AFFIDAVIT, CERTIFICATION REGARDING INVESTMENT WITH IRAN, EMPLOYMENT ELIGIBILITY VERIFICATION, NON-DISCRIMINATION COMMITMENT AND CERTIFICATION OF USE OF UNITED STATES STEEL PRODUCTS OR FOUNDRY PRODUCTS (Must be completed for all quotes and bids. Please type or print) STATE OF Indiana SS: Marion COUNTY The undersigned Contractor, being duly sworn upon his/her/its oath, affirms under the penalties of perjury that: 1. Contractor has not, nor has any other member, representative, or agent of the firm, company, corporation or partnership represented by him, entered into any combination, collusion or agreement with any person relative to the price to be bid by anyone at such letting nor to prevent any person from bidding nor to induce anyone to refrain from bidding, and that this bid is made without reference to any other bid and without any agreement, understanding or combination with any other person in reference to such bidding. Contractor further says that no person or persons, firms, or corporation has, have or will receive directly or indirectly, any rebate, fee, gift, commission or thing of value on account of such sale; and 2. Contractor certifies by submission of this proposal that neither contractor nor any of its principals are presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from participation in this transaction by any Federal department or agency; and 3. Contractor has not, nor has any successor to, nor an affiliate of, Contractor, engaged in investment activities in Iran. a. For purposes of this Certification, "Iran" means the government of Iran and any agency or instrumentality of Iran, or as otherwise defined at Ind. Code § 5-22-16.5-5, as amended from time -to -time. b. As provided by Ind. Code § 5-22-16.5-8, as amended from time -to -time, a Contractor is engaged in investment activities in Iran if either: i. Contractor, its successor or its affiliate, provides goods or services of twenty million dollars ($20,000,000) or more in value in the energy sector of Iran; or ii. Contractor, its successor or its affiliate, is a financial institution that extends twenty million dollars ($20,000,000) or more in credit to another person for forty-five (45) days or more, if that person will (i) use the credit to provides goods and services in Non -Collusion Non -Debarment Affidavit Non Iran Form the energy sector in Iran; and (ii) at the time the financial institution extends credit, is a person identified on list published by the Indiana Department of Administration. 4. Contractor does not knowingly employ or contract with an unauthorized alien, nor retain any employee or contract with a person that the Contractor subsequently learns is an unauthorized alien. Contractor agrees that he/she/it shall enroll in and verify the work eligibility status of all of Contractor's newly hired employees through the E-Verify Program as defined by I.C. 22-5-1.7-3. Contractor's documentation of enrollment and participation in the E-Verify Program is included and attached as part of this bid/quote; and 5. Contractor shall require his/her/its subcontractors performing work under this public contract to certify that the subcontractors do not knowingly employ or contract with an unauthorized alien, nor retain any employee or contract with a person that the subcontractor subsequently learns is an unauthorized alien, and that the subcontractor has enrolled in and is participating in the E-Verify Program. The Contractor agrees to maintain this certification throughout the term of the contract with the City of South Bend, and understands that the City may terminate the contract for default if the Contractor fails to cure a breach of this provision no later than thirty (30) days after being notified by the City. 6. Persons, partnerships, corporations, associations, or joint venturers awarded a contract by the City of South Bend through its agencies, boards, or commissions shall not discriminate against any employee or applicant for employment in the performance of a City contract with respect to hire, tenure, terms, conditions, or privileges of employment, or any matter directly or indirectly related to employment because of race, sex, religion, color, national origin, ancestry, age, gender expression, gender identity, sexual orientation or disability that does not affect that person's ability to perform the work. In awarding contracts for the purchase of work, labor, services, supplies, equipment, materials, or any combination of the foregoing including, but not limited to, public works contracts awarded under public bidding laws or other contracts in which public bids are not required by law, the City, its agencies, boards, or commissions may consider the Contractor's good faith efforts to obtain participation by those Contractors certified by the State of Indiana as a Minority Business ("MBE") or as a Women's Business Enterprise ("WBE") as a factor in determining the lowest, responsible, responsive bidder. In no event shall persons or entities seeking the award of a City contract be required to award a subcontract to an MBE/WBE; however, it may not unlawfully discriminate against said WBE/MBE. A finding of a discriminatory practice by the City's MBE/WBE Utilization Board shall prohibit that person or entity from being awarded a City contract for a period of one (1) year from the date of such determination, and such determination may also be grounds for terminating the contact for which the discriminatory practice or noncompliance pertains. 7. The undersigned contractor agrees that the following nondiscrimination commitment shall be made a part of any contract which it may henceforth enter into with the City of South Bend, Indiana or any of its agencies, boards or commissions. Non -Collusion Non -Debarment Affidavit Non Iran Form Contractor agrees not to discriminate against or intimidate any employee or applicant for employment in the performance of this contract with privileges of employment, or any matter directly or indirectly related to employment, because of race, religion, color, sex, gender expression, gender identity, sexual orientation, handicap, national origin or ancestry. Breach of this provision may be regarded as material breach of contract. I, the undersigned bidder or agent as contractor on a public works project, understand my statutory obligations to the use of steel products or foundry products made in the United States (I.C. 5-16-8-1). I hereby certify that I and all subcontractors employed by me for this project will use steel products or foundry products made in the United States on this project if awarded. I understand I have an affirmative duty to notify the City in my bid that my proposal does not include the use of steel products or foundry products made in the United States. I understand it is my sole obligation and responsibility to provide a justification to the City, subject to review and approval, why the cost of United States made steel or foundry products is unreasonable. Prior to award and upon submission of bid which does not use steel products or foundry products made in the United States, the City, through its director of public works, shall make a determination if the price of United States made steel or foundry is unreasonable. I understand that violations hereunder may result in forfeiture of contractual payments. I hereby affirm under the penalties of perjury that the facts and information contained in the foregoing bid for public works are true and correct. Dated this 11th day of Jul_, 2023 Bowen Engineering Corporation Contractor/Bidder (Firm) Signature of Contr or/Bidder or Its Agent Chris Manges Operations Manager Printed Name and Title Subscribed and sworn to before me this 11th day of July , 20 23 My Commission Expires Dglg4`a�{ County of Residence Non -Collusion Non -Debarment Affidavit Non Iran Form Notary Public Marion '011"<ti,,,,f�f�t.,��., E ..,. TA i• , P fu ri �, rn z. tP BOARD OF PUBLIC WORKS AGENDA ITEM REVIEW REQUEST FORM Date 6/28/2023 Department Public Name Kieran Fahey Works BPW Date 7/11/2023 Phone Extension 5993 Review and Approval Required Prior to Submittal to Board Diversity Compliance ❑ Officer Name and Inclusion Officer BPW Attorney ® Attorney Name M Schmidt Dept. Attorney ® Attorney Name M Schmidt Purchasing ❑ Check the Appropriate Item Type — Required. for All Submissions Professional Services Agreement ❑ Contract ❑ Proposal ❑ Open Market Contract ❑ Amendment/Addendum ❑ Special Purchase, QPA ❑ Bid Opening ❑ Bid Award ❑ Req. to Advertise ❑ Title Sheet ❑ Quote Opening ❑ Quote Award ❑ Reject Bids/Quotes ❑ Proposal Opening ❑ C/O & PCA No. ❑ PCA ❑ Chg. Order, No. ❑ Traffic Control ❑ Resolution ❑ Other: Opening of ❑ Ease./Encroach Qualifications for WWTP CSO tank via GSC contract Required Information Company or Vendor Name New Vendor MBE/WBE Contractor Project Name Project Number Funding Source Account No. Amount Yes ❑ If Yes, Approved by Purchasing No El MBE ❑ WBE Completed E-Verify Form Attached ❑❑ Nos WWTP CSO tank RFQ Guaranteed savings contract 121-071 Funding applied for to IFA NA NA Terms of Contract Agenda Request for the Opening of Qualifications for the WWTP CSO Tank RFQ Guaranteed Savings Contract — Project No. 121-071-a Guaranteed Savings Contract for construction of CSO storage tank at South Bend's WWTP. Purpose/Description As above For Chance Orders Onl Amount of ❑ Increase $ ❑ Decrease ($ ) Previous Amount $ Increase % Current Percent of Change: Decrease % New Amount $