SOUTH BEND REDEVELOPMENT COMMISSION
SCHEDULED REGULAR MEETING
May 11, 2023 – 9:30 am
https://tinyurl.com/RedevelopmentCommission or BPW 13th Floor
Presiding: Marcia Jones, President
The meeting was called to order at 9:35 a.m.
1. ROLL CALL
Members Present: Marcia Jones, President – IP
Troy Warner, Vice-President –
V
Vivian Sallie, Secretary - IP
Eli Wax, Commissioner - IP
David Relos, Commissioner –
IP = In Person V = Virtual
Members Absent:
Legal Counsel: Sandra Kennedy, Esq.
Danielle Campbell, Asst. City Attorney
Redevelopment
Staff:
Mary Brazinsky, Board Secretary
Joseph Molnar, RDC Staff
Others Present:
Caleb Bauer
Erik Glavich
Rosa Tomas
Charlotte Brach
Zach Hurst
Patrick Sherman
Conrad Damian
Matt Barrett
Katrina Marquardt
Mark Peterson
Jordan Smith
Brad Emberton
DCI
DCI
DCI
Engineering
Engineering
Public Works
Resident
Resident
Resident
WNDU
Resident
615 W Colfax Ave
South Bend Redevelopment Commission Regular Meeting – May 11, 2023
2. Approval of Minutes
• Approval of Minutes of the Regular Meeting of Thursday, April 27, 2023
Upon a motion by Commissioner Relos, seconded by Secretary Sallie, the
motion carried unanimously, the Commission approved the minutes of the
regular meeting of Thursday, April 27, 2023.
3. Approval of Claims
• None
4. Old Business
5. New Business
A. River East Development Area
1. Budget Request (LaSalle Park Improvements)
Patrick Sherman, Manager Public Works, Presented a Budget Request (LaSalle
Park Improvements). This budget request is for improvements to the park by
Charles Black Center. The city is looking to add exterior restrooms that were
requested by the community. The design will include adding paths, a skating loop,
and a park pavilion. Bid requests were advertised and two bids have been
received through the Board of Public Works. Both of the bids were above our
engineers’ estimates. This budget request is to bridge that funding gap in order
for the project to proceed ($905k). The EPA has mandated a soil management
plan on the site and there are certain restrictions on digging and excavation and
soil removal that adds a higher level of risk for the contractors. That is the primary
reason besides the complex bidding environment.
Secretary Sallie asked what the time frame for the project would be.
Mr. Sherman stated that we have been planning the project since 2020. If we can
award the bid, the project should begin this year and hope to be completed by the
end of 2023.
Commissioner Wax asked in light of the higher than anticipated construction costs,
is this still considered a good value? Does administration feel like this is the right
way to go?
Caleb Bauer stated that part of the rationale for requesting this is to be able to
afford this project, it had to undergo remediation at LaSalle Park. This has been a
long ongoing project. As part of the goal, once remediation is complete, we can
finally move forward with improvements to the part that the community has been
asking for now in the past several years. Yes, we do have a challenging bidding
environment and I think generally on pricing, we are seeing things stabilize but
because of the environmental limitations of what a contractor can do, regardless of
South Bend Redevelopment Commission Regular Meeting – May 11, 2023
the pricing environment, this was always going to come in a little higher that just
looking at materials and labor due to the higher risk for a contractor to do the work.
The project is still a priority for the city. To take out the bathrooms which could
potentially get this closer to the original estimate really was a lot to be desired for
the park and access to the park due to the kids going into the community center
on the weekends and evenings. Having restaurants and facilities really makes a
big difference. It has become a standard expectation for all of our parks. All of the
other SP150 or SP parks and trails parks, putting in outdoor bathroom facilities
has become a top priority. Also, a bathroom is required within 300 feet of a splash
pad; the bathrooms are a code requirement.
Commissioner Wax asked where the code comes from.
Mr. Sherman notes it is an Indiana State Code for pools.
Commissioner Relos asked if all the remediation has been completed.
Mr. Sherman stated yes.
Commissioner Relos noted there are certain areas where they can’t remediate
because of the cap, so it is capped, and it is dicey to dig sewer lines.
Mr. Bauer stated any excavation work has to follow the zone master plan that is
approved by the EPA. Which means that the soil is to remain on site or get
trucked to a specific landfill for soils.
Secretary Sallie noted for events that happen there now there are porta potties.
The bathrooms would replace those which is nice, or the kids would have to go
into the music center which is not always open.
Vice-President Warner stated he approves of keeping the bathrooms as those are
a necessity in the community and thinks it is worth spending a little extra money.
Upon a motion by Commissioner Relos, seconded by Vice-President Warner,
the motion carried unanimously, the Commission approved Budget Request
(LaSalle Park Improvements submitted on Thursday, May 11, 2023.
2. Purchase Agreement (Salvation Army Building Only)
Joe Molnar Presented a Purchase Agreement (Salvation Army Building Only).
Today the city is looking at a proposed real estate purchase agreement for the
former Salvation Army building at 510 S. Main Street. Mr. Molnar showed a
proposed outline of the parcels. The city purchased the building in 2019 as a
temporary location for weather amnesty. The city has used this site for a
temporary homeless shelter during the winter months for the last four years in the
northern half of the building. The city had light renovations in the building to make
it possible to use for weather amnesty. The city has partnered with Center for the
Homeless and has provided $1M in support for them to expand at their current
location to accommodate amnesty services.
South Bend Redevelopment Commission Regular Meeting – May 11, 2023
In the future, with the build out at Center for the Homeless, they will provide
seventy-five beds each winter for the homeless. The city feels that if an issue
arises at the center, the matter can be handled quicker than at the former
Salvation Army building.
The Momentum Group, the proposed buyer of the Salvation Army building, intends
to redevelop the building into a mixed-use site consisting of retail space, office
space and a large commissary kitchen. A rendering of the space was provided.
The building would receive a new facelift including new glass. The details of the
purchase agreement is a sale price of $1,000 and construction must begin within
twelve months of the closing date. Momentum wants to begin quickly. The
agreement states thirty days for due diligence and thirty days to close.
Construction is to be completed within thirty-six months of closing with a minimum
investment of $6M in private investment. The company also received a Ready
grant for this project which is not part of the $6M private investment. If the
improvements are not completed, the Redevelopment Commission has the right to
retake possession of the building.
Mr. Molnar states there is a lot of proposed development on the South side of
downtown. Real America Diamond View site was awarded the LIHTC grant in
January 2023. That project will be one hundred twenty-seven units in which sixty
will be affordable income.
A vacant apartment building downtown just received a tax abatement and will be
renovated into twelve new apartments of which three are affordable income
restricted.
The Devereaux Peters/Mon roe site, which also received the LIHTC grant, will build
sixty units of mostly affordable housing.
Including the former Salvation Army purchase agreement, there will be a lot of
construction in the two blocks. The total of all four projects is approximately
$46.5M in two blocks and that is probably low. The total is one hundred ninety-
nine residential units of which one hundred and nine will be affordable housing
units.
Brad Emberton representing the Momentum Group asked the Commissioner’s if
they had any questions.
Secretary Sallie asked for an overview from his perspective of how they see their
proposal improving the South Side area and the building.
South Bend Redevelopment Commission Regular Meeting – May 11, 2023
Mr. Emberton stated that they have been excited about development in the
downtown area for quite a while. They are currently developing the Soma
Apartments adjacent to the former Salvation Army building to the south. There are
three property owners in the immediate area of the building. His team feels that
together this will dramatically change the south end of downtown. The density of
people that are in this area is vacant. Creating activity in the southern part of
downtown is a great answer to the current office environment. While their plans
do include some traditional office space on the second floor the first floor will
primarily be a co-working with a focus around an entrepreneurial center where we
do programming and offer services to people, classes, and training related to
entrepreneurialship.
Commissioner Relos asked why the purchase agreement is for only part of the
site.
Mr. Molnar states that they will be coming back for the rest of this once we are
finished paving the parking lot.
Mr. Emberton states that they wanted to get started on some due diligence to
complete the overall development of half the block. They want to get started as
quickly as possible on the north portion which will still be retail. For what we are
currently doing, we will not need access to that portion right now.
Mr. Bauer states that portion and the parking lot to the south will potentially be
coming before the Redevelopment Commission in the future as it relates to this
development
Vice-President Warner asked for more information on the commissary kitchen;
what will it look like and what will the function be.
Mr. Emberton stated that it will be a private commissary kitchen, not for public use.
This will be leased space by the Navarre hospitality partners. Navarre hospitality
currently has seven restaurants that are able to do private events and prep work
for their restaurants. This space will be for both catering and to serve their
restaurants. That will take up about seventy-five to eighty percent of the building
and the left is open for retail space which is approximately 2,000 square feet of the
entire development. That will make retail space walkable to the community.
Commissioner Wax asked it this project will be asking for a tax abatement.
Mr. Emberton noted that they are in discussions with the city at this time with no
exact agreement, but they would like to be able to. He thinks this big project will
be an important part of the transformation in that area.
Commissioner Wax asked staff questions about the contract such as attorney fee
provisions in the purchase agreement.
South Bend Redevelopment Commission Regular Meeting – May 11, 2023
Mr. Bauer stated that he believes we have updated the development agreement
moving forward but that change is not included in real estate purchase
agreements. It is something that we will take a look into.
Commissioner Wax asked if progress reports are required other than the
certificate of completion within the time frame.
Mr. Molnar stated that in a purchase agreement we do not typically have progress
reports as we have a commencement date. We work through the building
department with the permits being pulled and the dollar amounts, and we ensure
that they did spend the amount stated in the agreement.
Mr. Bauer states that the Center for the Homeless renovation is ongoing, and they
are on track for the weather amnesty site Winter 2023. It remains a priority of the
administration to work on citing the low barrier intake center. That was a
recommendation from the implementation group a few years ago. Citing a facility
like that is difficult as there are a lot of challenges and needs for a site like that.
We are still working on identifying the perfect site and I think there has been good
progress. We hope to have more to share in the near future with an intake center.
Between those two pieces we have a short-term solution with Center for the
Homeless really adjusting their mission. We are excited about their new weather
amnesty space and what they will be able to offer and then the longer-term
solution adding an intake center into the broader service strategy is still a goal of
the administration.
Commissioner Relos stated that it is exciting to see this project move forward as it
will be difficult to renovate that space with the older kitchen and a lot of little
rooms.
Mr. Molnar stated that the southern portion of the building is interesting. It is
chopped up, but this project will address that.
Mr. Emberton stated that the goal is to open the space up and expose the
structure of the building using that as a design element.
Upon a motion by Commissioner Wax, seconded by Commissioner Relos, the
motion carried unanimously, the Commission approved Purchase Agreement
(Salvation Army Building Only) submitted on Thursday, May 11, 2023.
South Bend Redevelopment Commission Regular Meeting – May 11, 2023
6. Progress Reports
A. Tax Abatement
1. Erik Glavich stated that Council approved two declaratory resolutions for tax
abatements for the new owners of the South Bend Ethanol Plants. Bio North
America purchased the plant and closed it on May 1st. They will be investing
$230M into the facility to modernize the existing operating and providing long term
viability of the facility. They will also be adding to the production of renewable
natural gas. They will be converting what is currently waste into a new pipeline
running natural gas and injecting it right into the NIPSCO system. They will build
ten new buildings and bring in new manufacturing equipment. One abatement
was a five-year personal tax abatement and the other was an eight-year real
property abatement.
B. Common Council
C. Other
1. Joe Molnar noted that we have signed a 2-year extension with Fat Bird restaurant
that is currently on the Palais ground floor. They completed their three-year lease
in June with an optional two-year lease which required only staff signatures. They
have been good tenants. This does have a three percent rent increase over the
next two years.
7. Next Commission Meeting:
Thursday, May 25, 2023
8. Adjournment
Thursday, May 11, 2023, 10:02 a.m.