HomeMy WebLinkAboutPetition for Variance - BZA Replacement for Fire Station No. 8 Proj No. 122-034 – SBFDuTH INTER -OFFICE MEMORANDUM
r
U\
DEPARTMENT OF PUBLIC WORKS
x �4i5 k DIVISION OF ENGINEERING
TO: Theresa Heffner, Clerk
Board of Public Works
FROM: Zach Hurst, Project Engineer
SUBJECT: Board of Zoning Appeals, Petition for Variance: Fire Station #8
DATE: 05/15/2023
The City of South Bend, through its Redevelopment Commission, is funding the
replacement of existing Fire Station No. 8, located on Twyckenham Drive, south of
Ewing Avenue.
Built in 1957, the fire station is an integral part of the surrounding neighborhood.
However, the fire station is undersized, does not offer equal facilities, and does not
defend against the cancerous contaminants firefighters face during their duties.
To that end, the South Bend Fire Department wishes to replace the fire station on the
same parcel. To achieve this, the design consultant (Danch Harner and Associates,
through Shive Hattery) must apply for variances and a special exception to replace the
building at the same location.
The special exception is to construct a fire station in a suburban neighborhood
district. The variances requested include: minimum building setback, minimum side
yard parking setback, maximum allowed driveway width, and number of
driveways.
The City recently held an open house at the station, where the attached site plan,
showing the list of variances, was displayed. All residents within 500' of the station were
notified of the event, and welcomed to voice their concerns. No residents spoke against
the proposed replacement of the fire station.
The South Bend Fire Department requests that Board of Public Works sign the
enclosed Petition for Variance as the property owner.
Page 1 of 1
City of South Bend 227 W. Jefferson - Suite 1400S
South Bend, IN 46601
BOARD OF ZONING APPEALS zoning@south bend in.gov
Petition for•- -• •
Property Information
Tax Kev Number. 018-7173-6156
Address: 2402 South Twyckenham Drive
Owner: Civil City of South Bend
Zoning: S1 Suburban Neighborhood 1
Project Summary:
The City of South Bend is replacing the existing Fire Station # 8 with a new Fire Station to serve
this portion of the City. The new facility requires approval of a Special Exception and a few
Variances to remain on the same property.
Requested Action
❑✓ Special Exception — complete and attach Criteria for Decision Making
Use requested: Fire Station in a "S1" Suburban Neiqhborhood 1 District
❑✓ Variance(s) - List variances below, complete and attach Criteria for Decision Making
Variance(s) requested:
1). From the required minimum 15 ft. Building Setback along York Road to a minimum of
10 ft. as shown.
2). From the required minimum 20 ft. Side -yard Parking Setback along the South property
line to a minimum of 15 ft. as shown for a proposed parking bay.
3). From the maximum allowed 24 ft. wide driveway opening width to 46 ft. on the York
Road frontage and to 43 ft on the Twyckenham Drive frontage as shown.
4). Request to allow to have a second driveway access from the property to Twyckenham
Drive as shown.
Required Documents
❑✓ Completed Application (including Criteria for Decision Making and Contact Information)
❑✓ Site Plan drawn to scale
❑✓ Filing Fee
SFMI Exception - iapplicabie
A Special Exception may only be granted upon making a written determination, based upon the
evidence presented at a public hearing. Please address how the project meets the following criteria.
(1) The proposed use will not be injurious to the public health, safety, comfort,
community moral standards, convenience or general welfare, because:
The proposed fire station is replacing the existing fire station and is being
brought up to today's standards and will better serve the neighborhood and
enhance the public's health, safety and welfare.
(2) The proposed use will not injure or adversely affect the use of the adjacent area
or property values therein, because:
The proposed fire station is replacing an old facility. It is not a new use to the
property. There should be no adverse affect with the building of a new fire
station.
(3) The proposed use will be consistent with the character of the district in which it is
located and the land uses authorized therein, because:
The new fire station will be consistent with the neighborhood as the proposed
use is an updated facility which will better serve the entire area around the
facility.
(4) The proposed use is compatible with the recommendations of the Comprehensive
Plan, because:
It is not shown specifically on the City's comprehensive plan. But due to the
fact that the proposed fire station is a replacement of an old and outdated fire
station facility it makes sense the new fire station is compatible with the intent
of the City's latest comprehensive plan.
Variance(s) - if applicable
State statutes and the Zoning Ordinance require that certain standards must be met before a
variance can be approved. Please address how the project meets the following criteria:
(1) The approval will not be injurious to the public health, safety, morals and general
welfare of the community, because:
The requested variances for setbacks, driveway width, parking location and
number of requested driveway openings, are a function of the fire station facility.
The design was done to have the minimal impact on adjacent residential homes.
As this new facility is replacing an existing fire station, the public's health, safety
and welfare should not be adversely affected.
(2) The use and value of the area adjacent to the property included in the variance will
not be affected in a substantially adverse manner, because:
As mentioned above, the design and placement of the new facility, parking area
and driveways were done to maximize the buffer area between the new fire
station its site improvements and the existing residential homes to the southwest
of the property.
(3) The strict application of the terms of this Chapter would result in practical
difficulties in the use of the property, because:
The strict application of the zoning development standards would make the
ability of the new fire station to function efficiently which could negatively impact
how quickly fire equipment and personnel can respond to a request for help for a
fire or health emergency for city residents.
(4) The variance granted is the minimum necessary, because:
The requested variances are the minimum necessary to allow for the new facility
to fit within the boundaries of the existing fire station property. The property does
have a unique configuration as it borders on three public streets and the
proposed design of the site was used to provide the maximum buffer for existing
residential homes.
(5) The variance does not correct a hardship caused by a former or current owner of
the property, because:
The proposed new fire station is a replacement of an old facility which does not
function efficiently anymore and does not serve the neighborhood with the latest
equipment and personnel for any potential safety emergencies.
Contact• •
Property owner(s) of the petition site:
Name: Civil City of South Bend
Address: 227 W. Jefferson Blvd., Suite 1200 County -City Bldg
South Bend, Indiana 46601
Name:
Address:
Name:
Address:
Contact Person:
Name: Michael Danch - Danch, Harner & Associates, Inc.
Address: 1643 Commerce Drive
South Bend, Indiana 46628
Phone Number: 574-234-4003
E-mail: mdanch@danchharner.com
By signing this petition, the Petitioner/Property Owners of the above described Real
Estate acknowledge they are responsible for understanding and complying with the
South Bend Zoning Ordinance and any other ordinance governing the property.
Failure of staff to notify the petitioner of a requirement does not imply approval or
waiver from anything contained within the ordinance.
The undersigned authorizes the contact person listed above to represent this petition
before the South Bend Plan Commission and Common Council and to answer any and
all questions related to this petition.
CITY OF SOUTH BEND, INDIANA
Property Owner (s) Signatures: BOARD OF PUBLIC WORKS
V'aNk
Elizabeth A. Maradik, President
49�� Q'ft:lat
Gary A. Gilot, Member
Murray L. Miller, Member
Joseph R. Molnar, Vice President
INS
Jordan�V. Gathers, Member
Attest: Theresa M. Heffner, Clerk
Date: May 23, 2023
3
a
h
0
N
N
N
LEGAL DESCRIPTION:
LOT NUMBERED 250 AS SHOWN ON THE RECORDED PLAT OF THE RIDGEDALE
5TH ADDITION TO THE CITY OF SOUTH BEND.
Q
ANY INFORMATION ON THIS DRAWING IS N
h BY ANY PERSON, FIRM OR CORPORATION OF
PROJECT OR FOR ANY USE ON ANY OTHER
n VERIFICATION AND ADOPTION BY THE ENGINE
SPECIFIC PURPOSE INTENDED WILL BE AT THE U`,
OR LEGAL EXPOSURE TO THE ENGINEER, ARCHIT
PRELIMINARY BZA
PART OF THE NORTHWEST QUARTER OF SECTION 19,
CITY OF SOUTH BEND, PORTAGE TOWNSHIP,
SITE
TOWNSHIP
ST. JOSEPH
ALTGELD STREET (60.W R/W)
PLAN
37 NORTH, RANGE 3 EAST,
COUNTY, INDIANA.
Q
SITE
N �
SPECIAL EXCEPTION AND VARIANCE REQUESTS:
A. SPECIAL EXCEPTION REQUEST:
1. SPECIAL EXCEPTION: REQUEST APPROVAL OF A SPECIAL
EXCEPTION TO ALLOW A FIRE STATION FACILITY IN A "S-1"
SUBURBAN NEIGHBORHOOD DISTRICT.
B. VARIANCE REQUESTS:
1. FROM THE REQUIRED MINIMUM 15 FT. BUILDING SETBACK ALONG
YORK ROAD TO A MINIMUM OF 10 FT. AS SHOWN.
2. FROM THE REQUIRED MINIMUM 20 FT. SIDE -YARD PARKING
SETBACK ALONG THE SOUTH PROPERTY LINE TO A MINIMUM OF
15 FT. AS SHOWN FOR A PROPOSED PARKING BAY.
3. FROM THE MAXIMUM ALLOWED 24 FT. WIDE DRIVEWAY OPENING
WIDTH TO 46 FT. ON THE YORK ROAD FRONTAGE AND 43 FT.
ON THE TWYCKENHAM DRIVE FRONTAGE AS SHOWN.
4. REQUEST TO ALLOW TO HAVE A SECOND DRIVEWAY ACCESS FROM
THE PROPERTY TO TWYCKENHAM DRIVE AS SHOWN.
KEY NOTES/LEGEND:
1O PROPOSED ASPHALT PAVEMENT. SEE
SHEET C5.0 FOR DETAIL.
O2 PROPOSED CONCRETE SIDEWALK. SEE
SHEET C5.0 FOR DETAIL.
� 1
a
30 PARKING STRIPING. 4" WIDE, COLOR: WHITE.
4O ADA SIGNAGE AND PAVEMENT MARKINGS (TYP.)-SEE
SHEET C5.0 FOR DETAILS.
PROPERTY SETBACKS:
Q
O25' FRONT YARD SETBACK
O15' SIDE YARD SETBACK
CO 20' REAR YARD SETBACK
EXISTING LEGEND
L SET P.K. NAIL
"
PINE TREE
BUSH
TREE
FOUNTAIN/IRR.
o
BOLLARD/POLE
LIGHT POLE
UTILITY POLE
F
GUY ANCHOR
a
SIGN
o
WELL
X
VALVE
�
FIRE HYDRANT
❑
CURB INLET
®
DRYWELL
ss
SANITARY MANHOLE
®
STORM MANHOLE
O
CLEAN -OUT
®
FIBER OPTIC MANHOLE
o FOUND IRON
(M) MEASURED DISTANCE
(R) RECORD DISTANCE
®
GAS METER
)
WATER MANHOLE
D
END SECTION
0
ELEC. VAULT
❑0
ELEC. TRANSFORMER
T
PHONE VAULT
'0-**
k
SPOT ELEVATION
SET FLUSH, 5 8"
p CAPPED REBA
IN. REG. F-0044
MI. REG. #22436
X SOIL BORING
WATER METER
0 CABLE PED.
PHONE PED.
ELEC. PED.
� MAILBOX
F-] A/C UNIT
- EX. ELEVATION
— — — — WIRE FENCE
CHAIN LINK FENCE
WOOD FENCE
oHE GHE
ELECTRIC
UGe uce
ELECTRIC
UT UT
PHONE
UG UG
GAS
CTv Gry
CABLE TV
w w
WATER
Fo Fo Fo
FIBER OPTIC
STORM LINE
SANITARY LIP
y11aI:\'[III 1
SITE LOCATION MAP
N.T.S.
0 10' 20' 30'
SCALE 1" = 10'
DANCH, HARNER & ASSOCIATES, INC.
1643 COMMERCE DRIVE
SOUTH BEND, IN. 46628
(574) 234-4003
ATTN: MICHAEL DANCH
ALL UNDERGROUND UTILITIES MUST BE FIELD VERIFIED BY THE
CONTRACTOR BEFORE ANY CONSTRUCTION MAY BEGIN.
19
mer
BOARD OF PUBLIC WORKS
AGENDA ITEM REVIEW REQUEST FORM
Date 05/15/2023
Name Zach Hurst Department DPW
BPW Date 05/23/2023 Phone Extension 3057
Review and Approval Required Prior to Submittal to Board
Diversity Compliance ❑
Officer Name
and Inclusion Officer
BPW Attorney
❑ Attorney Name
Dept. Attorney ❑ Attorney Name
Purchasing ❑
Check the Appropriate Item I
Professional Services Agreement ❑ Contract
❑ Open Market Contract
❑ Bid Opening
❑ Quote Opening
❑ Proposal Opening
❑ Chg. Order, No.
® Other: BZA Petition for
Company or Vendor Name
New Vendor
MBE/WBE Contractor
Project Name
Project Number
Funding Source
Account No.
Amount
Terms of Contract
Purpose/Description
❑ Amendment/Addendum
❑ Bid Award
❑ Quote Award
❑ C/O & PCA No.
❑ Traffic Control
Information
South Bend Fire Department
All Submissions
U Proposal
❑ Special Purchase, QPA
❑ Req. to Advertise ❑ Title Sheet
❑ Reject Bids/Quotes
❑ PCA
❑ Resolution
❑ Ease./Encroach
❑ Yes ❑ If Yes, Approved by Purchasing
❑ No
❑ WBE Completed E-Verify Form Attached El Yes
❑ No
Fire Station 8 Replacement
122-034
N/A
Board of Zoning Appeals Petition for Variance for replacement of Fire Statiol
Number 8
For Change Orders Only
Amount of ❑ Increase $
❑ Decrease ($ )
Previous Amount $
Increase %
Current Percent of Change: Decrease ( %)
New Amount $
Increase %
Total Percent of Change: Decrease ( %)
Time Extension Amount:
New Completion Date: