Loading...
HomeMy WebLinkAboutOpening of Bids - Small Drainage Improvements-Beale Street & Chapin Street Proj No. 121-006B - Selge ConstructionCITY OF SOUTH BEND, INDIANA CONTRACTOR'S BID FOR PUBLIC WORT{ Project Name CITY OF SOUTH BEND 2021 DRAINGE IMPROVEMENTS — BID B Project No. 121-006B For Bids Due MAY 9,-2023 PART I (Must be completed for all bids. Please type or print) Date: May 9, 2023 Bidder (Firm) E elge Construction CO., Inc. Address: 2833 South 11th Street City/State/Zip: Niles, MI 49120 Telephone Number: 269 269-684-0842 Agent of Bidder (if Applicable): Pursuant to notices given, the undersigned offers to furnish labor and/or material necessary to complete the public works project of: City of South Bend 2021 Drainage Improvements - Bid B the City of South Bend, Indiana, in accordance with plans and specifications prepared by: Jones Petrie Rafinski and dated May 2023 for the sum of (enter the Total Bid as shown on the Proposal) Four Hundred F& Five Thousand Five Hundred Ninety Eight Dollars and $ 455 598.20 (Enter sum of Total Base Bid plus Alternates shown on Proposal) Twenty Cen s (Numerical) The undersigned further agrees to furnish a bond or certified check with this bid for an amount specified in the notice of the letting. If alternative bids apply, the undersigned submits a proposal for each in accordance with the notice. Any addendums attached will be specifically referenced at the applicable page. If additional units of material included in the contract are needed, the cost of units must be the same as that shown in the original contract if accepted by the City of South Bend. If the bid is to be awarded on a unit basis, the itemization of the units shall be shown on a separate attachment. 7 By �• (Signature) Justin Butler, Vice President (Printed Name of Person Signing) The above bid is accepted this Subject to the following conditions: BOARD OF PUBLIC WORKS Elizabeth A. Maradik, President Gary A. Gilot, Member Murray L. Miller, Member ACCEPTANCE day of Joseph R. Molnar, Member Jordan V. Gathers, Member Attest: Theresa Heffner, Clerk Version 09/29/2021 Contractor's Bid for Public Works - 2 20 r x • CITY OF SOUTH BEND, INDIANA CONTRACTOR'S BID FOR PUBLIC WORK CHECKLIST FOR BIDDERS Project Name CITY OF SOUTH BEND 2021 DRAINGE IMPROVEMENTS — BID B Project No. 121-006B For Bids Due MAY 9, 2023 From time to time the South Bend Board of Public Works finds it necessary to reject a bid because it does not comply with statutory requirements. In preparing your bid, please use the following checklist in order to make sure that your bid is done in the proper manner. Proper bid security included. The bidder has the option of providing either a Certified Check X or Bid Bond. Bid prepared on the City of South Bend Contractor's Bid for Public Work Form, completely X executed. Contractor's Non -Collusion and Non -Debarment Affidavit, Certification Regarding Investments with Iran, Employment Eligibility Verification, Non -Discrimination Commitment, and X Certification of use of United States Steel Products or Foundry Products. Proof of M/WBE Utilization Plans [MBE-1.0 and WBE-1.0]. Also provide Evidence of Good Faith Efforts Forms [MBE-2.0 and WBE-2.0] and M/WBE Contacted Forms [MBE-2.1 and X WBE-2.1]. X Acknowledge Receipt of 2 Addendum(s) included with the bid. X All required additional information is included with the bid. Proposal statements and other affidavits all signed by the proper party with name either X printed or typed underneath signature. x This checklist submitted with the Bid. This checklist is provided for bidder's use in assuring compliance with required documentation; however, it does not include all specifications requirements and does not relieve the bidder of the need to read and comply with the specifications. Bidder: Selge Construction Co., Inc. By Authorized Representative: Signature: Print Name & Title;�Aistin Butler, Vice President Version 09/29/2021 Contractor's Bid for Public Works -1 Date: May 9, 2023 PART II (For projects of $100,00o or more — IC 36-1-12-4) These statements to be submitted under oath by each bidder with and as part of his/her/its bid. Attach additional pages for each section as needed. SECTION I EXPERIENCE QUESTIONNAIRE 1. Attach information regarding projects your organization has completed for the period of one (1) year prior to the date of the current bid. SEE ATTACHED 2. Attach a listing of public works projects currently in process of construction by your organization. SEE ATTACHED 3. Attach information regarding any failure to complete any work awarded to you and the location thereof. None 4. Attach references from private firms for which you have performed work. SEE ATTACHED SECTION II PLAN AND EQUIPMENT QUESTIONNAIRE 1. Attach an explanation of your plan or layout for performing proposed work. (Examples could include a narrative of when you could begin work, complete the project, number of workers, etc. and any other information which you believe would enable the City of South Bend to consider your bid.) Work will be completed in an orderly manner, according to specifications and as best suits the Owner and its Engineer. 2. Attach a listing of the names and addresses of all subcontractors (i.e. persons or firms outside your own firm who have performed part of the work) that you have used on public works projects during the past five (5) years along with a brief description of the work done by each subcontractor. SEE ATTACHED 3. If you intend to sublet any portion of the work, attach the name and address of each subcontractor, equipment to be used by the subcontractor, and whether you will require a bond. However, if you are unable to currently provide a listing, please understand a listing must be provided prior to contract approval. Until the completion of the proposed project, you are under a continuing obligation to immediately notify the City of South Bend in the event that you subsequently determine that you will use a subcontractor on the proposed project. Subcontracts list to be determined. Bond not required 4. Attach a listing of equipment you have available to use for the proposed project. SEE ATTACHED 5. Have you entered into contracts or received offers for all materials which substantiate the prices used in preparing your proposal? If not, attach an explanation for the rationale used which would corroborate the prices listed. YES SECTION III CONTRACTOR'S FINANCIAL STATEMENT Attachment of bidder's financial statement is mandatory. Any bid submitted without said financial statement as required by statute shall thereby be rendered invalid. The financial statement provided hereunder to the City of South Bend awarding the contract must be specific enough in detail so that said City of South Bend can make a proper determination of the bidder's capability for completing the project if awarded. SEE ATTACHED Version 09/29/2021 Contractor's Bid for Public Works - 3 When the prospective Contractor is unable to certify to any of the statements below, it shall attach an explanation to this Affidavit CONTRACTOR'S NON -COLLUSION AND NON -DEBARMENT AFFIDAVIT, CERTIFICATION REGARDING INVESTMENT WITH IRAN, EMPLOYMENT ELIGIBILITY VERIFICATION, NON- DISCRIMINATION COMMITMENT AND CERTIFICATION OF USE OF UNITED STATES STEEL PRODUCTS OR FOUNDRY PRODUCTS (Must be completed for all quotes and bids. Please type or print) STATE OF Michigan ) )SS - Berrien COUNTY ) The undersigned Contractor, being duly sworn upon his/her/its oath, affirms under the penalties of perjury that: 1. Contractor has not, nor has any other member, representative, or agent of the firm, company, corporation or partnership represented by him, entered into any combination, collusion or agreement with any person relative to the price to be bid by anyone at such letting nor to prevent any person from bidding nor to induce anyone to refrain from bidding, and that this bid is made without reference to any other bid and without any agreement, understanding or combination with any other person in reference to such bidding. Contractor further says that no person or persons, firms, or corporation has, have or will receive directly or indirectly, any rebate, fee, gift, commission or thing of value on account of such sale; and 2. Contractor certifies by submission of this proposal that neither contractor nor any of its principals are presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from participation in this transaction by any Federal department or agency; and 3. Contractor has not, nor has any successor to, nor an affiliate of, Contractor, engaged in investment activities in Iran. a. For purposes ofthis Certification, "Iran" means the government of Iran and any agency or instrumentality of Iran, or as otherwise defined at Ind. Code § 5-22-16.5-5, as amended from time -to -time. b. As provided by Ind. Code § 5-22-16.5-8, as amended from time -to -time, a Contractor is engaged in investment activities in Iran if either: i. Contractor, its successor or its affiliate, provides goods or services of twenty million dollars ($20,000,000) or more in value in the energy sector of Iran; or ii. Contractor, its successor or its affiliate, is a financial institution that extends twenty million dollars ($20,000,000) or more in credit to another person for forty-five (45) days or more, if that person will (i) use the credit to provides goods and services in the energy sector in Iran; and (ii) at the time the financial institution extends credit, is a person identified on list published by the Indiana Department of Administration. 4. Contractor does not knowingly employ or contract with an unauthorized alien, nor retain any employee or contract with a person that the Contractor subsequently learns is an unauthorized alien. Version 09/29/2021 Contractor's Bid for Public Works - 4 Contractor agrees that he/she/it shall enroll in and verify the work eligibility status of all of Contractor's newly hired employees through the E-Verify Program as defined by I.C. 22-5-1.7-3. Contractor's documentation of enrollment and participation in the E-Verify Program is included and attached as part of this bid/quote; and 5. Contractor shall require his/her/its subcontractors performing work under this public contract to certify that the subcontractors do not knowingly employ or contract with an unauthorized alien, nor retain any employee or contract with a person that the subcontractor subsequently learns is an unauthorized alien, and that the subcontractor has enrolled in and is participating in the E-Verify Program. The Contractor agrees to maintain this certification throughout the term of the contract with the City of South Bend, and understands that the City may terminate the contract for default if the Contractor fails to cure a breach of this provision no later than thirty (30) days after being notified by the City. 6. Persons, firms, partnerships, corporations, associations, or joint venturers awarded a contract by the City of South Bend through its agencies, boards, or commissions shall not discriminate against any employee or applicant for employment in the performance of a City contract with respect to hire, tenure, terms, conditions, or privileges of contract or employment, or any matter directly or indirectly related to contracting or employment because of race, sex, religion, color, national origin, ancestry, gender expression, gender identity, sexual orientation, or due to age or disability that does not affect that person's ability to perform the work. In awarding contracts for the purchase of work, labor, services, supplies, equipment, materials, or any combination of the foregoing including, but not limited to, public works contracts awarded under public bidding laws or other contracts in which public bids are not required by law, the City, its agencies, boards, or commissions will consider the Contractor's good faith efforts to obtain participation by those subcontractors certified by the State of Indiana as a Minority Business ("MBE") or as a Women's Business Enterprise ("WBE") as a factor in determining the lowest, responsible, responsive bidder. Contractors seeking the award of a City contract cannot be required to award a subcontract to an MWBE; however, they may not unlawfully discriminate against said MBE/WBE. On goal -eligible contracts, Contractors are required to either meet both MBE and WBE utilization goals or demonstrate that the Contractor has made good faith efforts to obtain participation from MBE and WBE subcontractors. A finding of noncompliance or a discriminatory practice shall prohibit that Contractor from being awarded a City contract for a period of one (1) year from the date of such determination, and such determination may also be grounds for terminating the contact to which the discriminatory practice or noncompliance pertains. 7. The undersigned Contractor agrees that the following nondiscrimination commitment shall be made a part of any contract which it may henceforth enter into with the City of South Bend, Indiana or any of its agencies, boards or commissions. Contractor agrees not to discriminate against or intimidate any employee or applicant for employment in the performance of this contract with privileges of employment, or any matter directly or indirectly related to employment, because of race, religion, color, sex, gender expression, gender identity, sexual orientation, handicap, national origin or ancestry. Breach of this provision may be regarded as material breach of contract. I, the undersigned bidder or agent as contractor on a public works project, understand my statutory obligations to the use of steel products or foundry products made in the United States (I.C. 5-16-8-1). I hereby certify that I and all subcontractors employed by me for this project will use steel products or foundry products made in the United States on this project if awarded. I understand I have an affirmative duty to notify the City in my bid that my proposal does not include the use of steel products or foundry products made in the United States. I understand it is my sole obligation and responsibility to provide a justification to the City, subject to review and approval, why the cost of United States made steel or foundry products is unreasonable. Prior to award and upon submission of bid which does not use steel products or foundry products made in the United States, the City, through its director of public works, shall make a determination if the price of United States made steel or foundry is unreasonable. I understand that violations hereunder Version 09/29/2021 Contractor's Bid for Public Works - 5 may result in forfeiture of contractual payments. I hereby affirm under the penalties of perjury that the facts and information contained in the foregoing bid for public works are true and correct. Dated this 9th day of May 20,23 Subscribed and sworn to before me this 9th My Commission Expires 10/27/2027 County of Residence Selge Construction Co., Inc. Contractor/Bidder {Firm} %gnature of Contractor/Bidder or Its Agent Justin Butler, Vice President Printed Name and Title of May , 20 23 1107451 Berrien Version 09/29/2021 Contractor's Bid for Public Works - 6 BID/PROPOSAL CITY OF SOUTH BEND Project Name: CITY OF SOUTH BEND 2021 DRAINGE IMPROVEMENTS — BID B Project Number: 121-006B For Bids Due: MAY 9, 2023 Contractor Name: Selqe Construction Co., Inc. DIVISION 1 — BEALE STREET IMPROVEMENTS Item No. Description Quantity Unit Unit Price Total Amount 1 CONSTRUCTION ENGINEERING AND STAKING 1 LSUM $ 3,000.00 $ 3,0000.00 2 MOBILIZATION AND DEMOBILIZATION 1 LSUM $ 20,900.00 $ 20 900.00 3 MAINTENANCE OF TRAFFIC 1 LSUM $ 20,246.00 $ 20,246.00 4 VIDEO RECORD 1 LSUM $ 500.00 $ 500.00 5 CLEARING OF RIGHT-OF-WAY (W/IN PROJECT LIMITS) 1 LSUM $ 70,968.00 $ 70,968.00 6 CONCRETE, PAVEMENT REMOVE 105 SYS $ 25.00 $ 2,625.00 7 CONCRETE, CURB REMOVE 178 LFT $ 25.00 $ 4,450.00 8 SURFACE MILLING, ASPHALT 1.5 IN 1065 SFT $ 3.75 $ 3,993.75 9 COMMON EXCAVATION, ASPHALT REMOVE 176 SYS $ 30.00 $ 5,280.00 10 CLEAR AND GRUB 1620 SFT $ 1.00 $ 1 ,620.00 11 TREE REMOVE 4 EACH $ 2,200.00 $ 8,800.00 12 COMPACTED AGGREGATE, No. 53 30 CYS $ 80.00 $ 2,400.00 13 HMA SURFACE TYPE B, 1.5" 25 TON $ 439.00 $ 10,975.00 14 HMA INTERMEDIATE, TYPE B, 2.5" 25 TON $ 345.00 $8.625.00 15 HMA BASE, TYPE B, 4" 40 TON $ 251.00 $ 10,040.00 16 SIDEWALK, CONCRETE, 4 IN 103 SYS $ 92.00 $ 9,476.00 17 CONCRETE CURB 178 LIFT $ 35.65 1$ 6,345.70 18 PVC STORM SEWER PIPE, 10 IN 60 LFT $ 270.00 $ 16,200.00 19 MORTAR -SEAL EXISTING PIPE IN STRUCTURE 1 EACH $ 3,000•00 $ 3,000.00 20 STORM INLET 1 EACH $ 6,750.00 $ 6,750.00 21 TURF SOD, AND TOPSOIL 180 SYS $ 24.25 $ 4,365.00 22 OVERSTORY TREE, 2-1/2" CAL 4 EACH $ 805.00 $ 3,220.00 23 `_ TREE WATER BAG 4 1 EACH $ 30.00 $ 120.00 24 TEMPORARY EROSION CONTROL 1 LSUM $ 1,000.00 $ 1,000.00 DIVISION I TOTAL $ 224,6VU.45 Version 09/29/2021 Contractor's Bid for Public Works - 7 BID/PROPOSAL CITY OF SOUTH BEND Project Name: CITY OF SOUTH BEND 2021 DRAINGE IMPROVEMENTS — BID B Project Number: 121-006B For Bids Due: MAY 9, 2023 Contractor Name: $el a Construction Co. Inc. DIVISION 2 — CHAPIN STREET IMPROVEMENTS Item Description Quantity Unit Unit Price Total Amount No. I 1 CONSTRUCTION ENGINEERING 1 LSUM $ 3,000.00 $ 3,000.00 2 MOBILIZATION AND DEMOBILIZATION 1 LSUM $ 20,900.00 $ 20,900.00 3 RAAmirchIAnirr nCTGArcir 1 I CIIM $19,086.00 1 $ 19,086.00 4 VIDEO RECORD 1 LSUM $ 500.00 $ 500.00 5 CLEARING OF RIGHT-OF-WAY (W/IN PROJECT LIMITS) 1 LSUM .$ 70,968.00 $ 70,968.00 6 CONCRETE, PAVEMENT REMOVE 112 SYS $ 25.00 $ 2,800.00 7 CONCRETE, CURB REMOVE 200 LFT $ 25.00 $ 5,000.00 8 SURFACE MILLING, ASPHALT 1.5 IN 775 SFT $ 3.75 $ 2,906.25 9 COMMON EXCAVATION, ASPHALT REMOVE 215 SYS $ 30.00 $ 6,450.00 10 CLEAR AND GRUB 1240 SFT $ 1.00 $ 1,240.00 11 TREE REMOVE 4 EACH $ 1,250.00 $ 5,000.00 12 COMPACTED AGGREGATE, No. 53 35 CYS $ 80.00 $ 2,800.00 13 HMA SURFACE, TYPE B, 1.5" 25 TON $ 439.00 $ 10,975.00 14 HMA INTERMEDIATE, TYPE B, 2.5" 30 TON $ 345.00 $ 10,350.00 15 HMA BASE, TYPE B, 4" 48 TON $ 251.00 $ 12,048.00 16 SIDEWALK, CONCRETE, 4 IN 120 SYS $ 92.00 $ 11,040.00 17 CONCRETE CURB 200 LFT $ 35.65 $ 7,130.00 18 DRYWELL STRUCTURE, 3600 GAL 1 EACH $ 29,500.00 $ 29,500.00 29 TURF SOD, AND TOPSOIL 138 SYS $ 29.75 $ 4,105.50 20 OVERSTORY TREE, 2-1/2" CAL 5 EACH $ 750.00 $ 3,750.00 21 TREE WATERING BAG 5 1 EACH $ 30.00 $ 150.00 22 TEMPORARY EROSION CONTROL 1 LSUM $ 1,000.00 $ 1,000.00 DIVISION 2 TOTAL $ 230,698.75 Version 09/29/2021 Contractor's Bid for Public Works - 8 BID/PROPOSAL r CITY OF SOUTH BEND K Project Name: CITY OF SOUTH BEND 2021 DRAINGE IMPROVEMENTS — BID B Project Number: 121-006B For Bids Due: MAY 9, 2023 Contractor Name: Selae Construction Co., Inc. Bidder (Firm): Address: City/State/Zip: DIVISION 1 TOTAL $ 224,899.45 DIVISION 2 TOTAL $ 230,698.75 PROJECT TOTAL $ 455,598.20 Selge Construction Co., Inc. 2833 South 11th Street Niles, MI 49120 Telephone Number: (269 ) 684-0842 By (Signature) Justin Butler, Vice President (Printed Name of Person Signing) Version 09/29/2021 Contractor's Bid for Public Works - 9 CITY OF SOUTH BEND MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN ACE FORM MBE-1.0 • �,,,� MBE UTILIZATION PLAN This completed form should be supplied with Bids that pertain to City of South Bend Public Works Projects involving MBE participation. It is the bidder's sole responsibility to verify whether any listed minority -owned business meets the MBE qualifications. Project Number: Bidder: 121-0066 Project Name: SOUTH BEND 2021 DRAINGE IMPROVEMENTS — BID B DIVISION I BEALE ST Selge Construction Co., Inc. Total Bid Amount: $ 224,899.45 MBE Goal: 2.3% Page 1 of 1 Name & Address of MBE Primary Contact Person (Name/Telephone) Scope of Work to be Performed (Attach scope/schedule if you need additional space) Dollar Amount of MBE Component Percentage of Total Bid/Proposal 1st Class Logistics 2213 St. Charles Ave South Bend, IN 46614 Bernard Coutee 574-993-0071 Hauling "Please see attached letter $ 968.00 0.43% Submitted by: Justin Butler, Vice President May 9, 2023 Print Name Sim ure Date Version 09/29/2021 Contractor's Bid for Public Works -10 L A. CITY OF SOUTH BEND c MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN FORM WBE-1.0 F WBE UTILIZATION PLAN This completed form should be supplied with Bids that pertain to City of South Bend Public Works Projects involving WBE participation. It is the bidder's sole responsibility to verify whether any listed woman -owned business meets the WBE qualifications. Project Number: 121-006B Project Name: SOUTH BEND 2021 DRAINGE IMPROVEMENTS — BID B DIVISION I BEALE ST Bidder: Selge Construction Co., Inc. Total Bid Amount: $ 224,899.45 _ WBE Goal: 4.7% Page 1 of 1 Name & Address of WBE Primary Contact Person Scope of Work to be Performed Dollar Amount of WBE Percentage of Total (Namelrelephone) (Attach scope/schedule if you need additional space) Component Bid/Proposal Slusser's Green Thumb, Inc. Carolyn Slusser Sodding and Trees $ 7,705.00 3.43% 125 Montgomery Street 574-722-3102 P.O. Box 33 Logansport, IN 46947 State Barricading, Inc. Mary Michalski Maintenance of Traffic $ 10,246.00 4.56% 24963 US 20 West 574-287-2078 South Bend, IN 46628 Submitted by: Justin Butler, Vice President May 9, 2023 Print Name 'Signature Date Version 09/29/2021 Contractor's Bid for Public Works -11 CITY OF SOUTH BEND p MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN FORM MBE-1.0 MBE UTILIZATION PLAN This completed form should be supplied with Bids that pertain to City of South Bend Public Works Projects involving MBE participation. It is the bidder's sole responsibility to verify whether any listed minority -owned business meets the MBE qualifications. Project Number: Bidder: 121-006B Project Name: SOUTH BEND 2021 DRAINGE IMPROVEMENTS — BID B DIVISION II CHAPIN ST Selge Construction Co., Inc. Total Bid Amount: $ 230.698.75 MBE Goal: 2.4% Page 1 of 1 Name & Address of MBE Primary Contact Person (Name/Telephone) Scope of Work to be Performed (Attach scope/schedule if you need additional space) Dollar Amount of MBE Component Percentage of Total Bid/Proposal 1 st Class Logistics 2213 St. Charles Ave South Bend, IN 46614 Bernard Coutee 574-993-0071 Hauling ** Please see attached letter $ 968.00 0.42% Submitted by: Justin Butler, Vice President Print Name May 9, 2023 Si mature Date Version 09/29/2021 Contractor's Bid for Public Works -12 CITY OF SOUTH BEND a MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN FORM WBE-1.0 WBE UTILIZATION PLAN This completed form should be supplied with Bids that pertain to City of South Bend Public Works Projects involving WBE participation. It is the bidder's sole responsibility to verify whether any listed woman -owned business meets the WBE qualifications. Project Number: 121-006B Project Name: SOUTH BEND 2021 DRAINGE IMPROVEMENTS — BID B DIVISION II CHAPIN ST Bidder: Selge Construction Co., Inc. Total Bid Amount: $ 230,698.75 WBE Goal: 4.8% Page 1 of 1 Name & Address of WBE Primary Contact Person Scope of Work to be Performed Dollar Amount of WBE Percentage of Total (Name/Telephone) (Attach scope/schedule if you need additional space) Component Bid/Proposal State Barricading, Inc. Mary Michalski Maintenance of Traffic $ 9,086.00 3.94% 24963 US 20 West 574-287-2078 South Bend, IN 46628 Slusser's Green Thumb, Inc. Carolyn Slusser Sodding and Trees $ 8,005.00 3.47% 125 Montgomery Street 574-722-3102 P.O. Box 33 Logansport, IN 46947 Submitted by: Justin Butler, Vice President Print Name nelture Version 09/29/2021 Contractor's Bid for Public Works -13 May 9, 2023 Date CITY OF SOUTH BEND MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN FORM MBE-2.0 EVIDENCE OF GOOD FAITH EFFORTS This completed form should be included as part of the Bids documents related to City of South Bend Public Works Projects requiring Good Faith Efforts to obtain MBE participation. Project Number: 121-006B Date: May 9, 2023 Project Name: SOUTH BEND 2021 DRAINGE IMPROVEMENTS — BID B DIVISION I BEALE Bidder: Selge Construction Co., Inc. _ Contact Person: Justin Butler, Vice President Telephone: 269-684-0842 Address: 2833 South 11th Street City: Niles State: Michigan Zip: 49120 Email: jbutler@selgeconstruction.com To determine whether a bidder has demonstrated good faith efforts to reach the MBE utilization goals set forth in the City of South Bend Public Works Project Specifications, the City and its agencies, boards, or commissions, REQUIRE ALL of the following Good Faith Efforts as listed in the table below': EVIDENCE OF GOOD FAITH EFFORTS MBE LIST(S): The bidder reviewed 1) the City of South Bend's Minority and Women Business Enterprise Inclusion Program Plan; 2) the list of certified MWBEs provided by the City; and 3) the Indiana Department of Administration list of Minority and Women Owned Businesses (both certified and non -certified) found at: htt:Ilwww.in, ov/idoa/. GOOD FAITH EFFORTS TO OBTAIN MBE PARTICIPATION The bidder shall initial each item below, as evidence of its good faith efforts to obtain MBE participation in the awarded contract. I affirm that I reviewed the City of South Bend's Minority and Women Business Enterprise Inclusion Program Plan and the Indiana Department of Administration's certified list of Indiana Minority and Women Business Enterprises, found on their website / h :/1www.in. ov1idoa . I affirm that I have made good faith efforts to select portions of the contract work to be performed by MWBEs, including, where appropriate, breaking out contract work items into f economically feasible units to facilitate MBE participation. I affirm that I have made good faith efforts to solicit through all reasonable and available J means the interest of all MBEs in the scopes of work of the contract. j I affirm that I attended all pre -bid meetings scheduled by the City of South Bend to inform s MBEs of contracting and subcontracting opportunities. u` I affirm that I advertised in general circulation and/or trade association publications /i concerning subcontract opportunities and allowed MBEs reasonable time to respond to fj such advertisements. �1 I affirm that I performed any and all necessary steps to provide written notices in a manner reasonably calculated to inform MBEs of subcontracting opportunities and allowed sufficient time for MBEs to participate effectively - I affirm that I followed up on initial solicitations with interested MBEs. l I affirm that I negotiated with interested MBEs in good faith, including providing such MBEs with adequate information about the plans, specifications and other requirements of the I subcontract. j1 I affirm that I have made good faith efforts to assist interested MBEs in obtaining bonding, '1 lines of credit, or insurance as required by the City or the bidder, where appropriate. Version 09/29/2021 Contractor's Bid for Public Works - 14 CITY OF SOUTH BEND MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN >> FORM MBE-2.0 , '- EVIDENCE OF GOOD FAITH EFFORTS I affirm that I have made good faith efforts to assist interested MBEs in obtaining necessary equipment, supplies, materials, or related assistances or services, where appropriate. I affirm that I did not reject any MBEs as unqualified without sound business reasons based on a thorough investigation of their capabilities. CONTRACT RECORDS: The bidder has maintained the following records for each MBE that has bid on the subcontracting opportunity: 1. Name, address, and telephone number; 2. A description of information provided by the bidder or subcontractor; and 3. A statement of whether an agreement was reached, and if not, why not, including any reasons for concluding that the MBE was unqualified to perform the job. *Proper demonstration of Good Faith Efforts requires your initials next to all of the above boxes. Any omissions shall be considered grounds for rejection of the bid by the Board of Public Works. The City of South Bend reserves the right to request additional information. Version 09/29/2021 Contractor's Bid for Public Works - 15 CITY OF SOUTH BEND MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN , ,,,; : r� FORM WBE-2.0 '. EVIDENCE OF GOOD FAITH EFFORTS This completed form should be included as part of the Bids documents related to City of South Bend Public Works Projects requiring Good Faith Efforts to obtain MWBE participation. Project Number: 121-006B Date: May 9, 2023 Project Name: SOUTH BEND 2021 DRAINGE IMPROVEMENTS — BID B DIVISION I BEALE Bidder: Selge Construction Co., Inc. Contact Person: Justin Butler, Vice President Telephone: 269-684-0842 Address: 2833 South 11th Street City: Niles State: Michigan Zip: 49120 Email: jbutier@selgeconstruction.com To determine whether a bidder has demonstrated good faith efforts to reach the WBE utilization goals set forth in the City of South Bend Public Works Project Specifications, the City and its agencies, boards, or commissions, REQUIRE ALL of the following Good Faith Efforts as listed in the table below*: 4 EVIDENCE OF GOOD FAITH EFFORTS WBE LIST($): The bidder reviewed 1) the City of South Bend's Minority and Women Business Enterprise Inclusion Program Plan; 2) the list of certified MWBEs provided by the City; and 3) the Indiana Department of Administration list of Minority and Women Owned Businesses (both certified and non -certified) found at: hftp://www.in.gov/idoa/. GOOD FAITH EFFORTS TO OBTAIN WBE PARTICIPATION The bidder shall initial each item below, as evidence of its good faith efforts to obtain WBE participation in the awarded contract. I affirm that I reviewed the City of South Bend's Minority and Women Business Enterprise Inclusion Program Plan and the Indiana Department of Administration's certified list of Indiana Minority and Women Business Enterprises, found on their website htt ://www.in. ovlidoa . I affirm that I have made good faith efforts to select portions of the contract work to be performed by WBEs, including, where appropriate, breaking out contract work items into economically feasible units to facilitate WBE participation. I affirm that I have made good faith efforts to solicit through all reasonable and available means the interest of all WBEs in the scopes of work of the contract. I affirm that I attended all pre -bid meetings scheduled by the City of South Bend to inform WBEs of contracting and subcontracting opportunities. I affirm that I advertised in general circulation and/or trade association publications concerning subcontract opportunities and allowed WBEs reasonable time to respond to such advertisements. I affirm that I performed any and all necessary steps to provide written notices in a manner reasonably calculated to inform WBEs of subcontracting opportunities and allowed sufficient time for WBEs to participate effectively. u I affirm that I followed up on initial solicitations with interested WBEs. I affirm that I negotiated with interested WBEs in good faith, including providing such WBEs with adequate information about the plans, specifications and other requirements of the subcontract. I affirm that I have made good faith efforts to assist interested WBEs in obtaining bonding, ✓� lines of credit, or insurance as required by the City or the bidder, where appropriate. �, Version 09/29/2021 Contractor's Bid for Public Works - 16 CITY OF SOUTH BEND MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN FORM WBE-2.0 EVIDENCE OF GOOD FAITH EFFORTS I affirm that I have made good faith efforts to assist interested WBEs in obtaining necessary equipment, supplies, materials, or related assistances or services, where appropriate. t I affirm that I did not reject any WBEs as unqualified without sound business reasons based on a thorough investigation of their capabiiites. CONTRACT RECORDS: The bidder has maintained the following records for each WBE that has bid on the subcontracting opportunity: 1. Name, address, and telephone number; 2. A description of information provided by the bidder or subcontractor; and 3. A statement of whether an agreement was reached, and if not, why not, including any reasons for concluding that the MWBE was unqualified to perform the job. *Proper demonstration of Goad Faith Efforts requires your initials next to all of the above boxes. Any omissions shall be considered grounds for rejection of the bid by the Board of Public Works. The City of South Bend reserves the right to request additional information. Version 09/29/2021 Contractor's Bid for Public Works -17 a rsrs CITY OF SOUTH BEND MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN FORM MBE-2.0 EVIDENCE OF GOOD FAITH EFFORTS This completed form should be included as part of the Bids documents related to City of South Bend Public Works Projects requiring Good Faith Efforts to obtain MBE participation. Project Number: 121-006B Date: May 9, 2023 Project Name: SOUTH BEND 2021 DRAINGE IMPROVEMENTS — BID B DIVISION II CHAPIN Bidder: Selge Construction Co., Inc. Contact Person: Justin Butler, Vice President Telephone: 269-684-0842 Address: City: 2833 South 11th Street Niles State: Michigan Email: jbutler@selgeconstruction.com To determine whether a bidder has demonstrated good faith efforts to reach the MBE utilization goals set forth in the City of South Bend Public Works Project Specifications, the City and its agencies, boards, or commissions, REQUIRE ALL of the following Good Faith Efforts as listed in the table below": Zips 49120 EVIDENCE OF GOOD FAITH EFFORTS MBE LIST(S): The bidder reviewed 1) the City of South Bend's Minority and Women Business Enterprise Inclusion Program Plan; 2) the listof certified MWBEs provided by the City; and 3) the Indiana Department of Administration list of Minority and Women Owned Businesses (both certified and non -certified) found at: hftD://www.in.gov/idoa/. GOOD FAITH EFFORTS TO OBTAIN MBE PARTICIPATION The bidder shall initial each item below, as evidence of its good faith efforts to obtain MBE participation in the awarded contract. I affirm that I reviewed the City of South Bend's Minority and Women Business Enterprise Inclusion Program Plan and the Indiana Department of Administration's certified list of Indiana Minority and Women Business Enterprises, found on their website (http://www.in.govfjdoa). I affirm that I have made good faith efforts to select portions of the contract work to be performed by MWBEs, including, where appropriate, breaking out contract work items into !!! economically feasible units to facilitate MBE participation. I affirm that I have made good faith efforts to solicit through all reasonable and available means the interest of all MBEs in the scopes of work of the contract. I affirm that I attended all pre -bid meetings scheduled by the City of South Bend to inform MBEs of contracting and subcontracting opportunities. I affirm that I advertised in general circulation and/or trade association publications concerning subcontract opportunities and allowed MBEs reasonable time to respond to r• such advertisements. 1 I affirm that I performed any and all necessary steps to provide written notices in a manner reasonably calculated to inform MBEs of subcontracting opportunities and allowed +r sufficient time for MBEs to participate effectively. f, 1 it r� I affirm that I followed up on initial solicitations with interested MBEs. f• . I affirm that I negotiated with interested MBEs in good faith, including providing such MBEs 1� l with adequate information about the plans, specifications and other requirements of the J n subcontract. I affirm that I have made good faith efforts to assist interested MBEs in obtaining bonding, lines of credit, or insurance as required by the City or the bidder, where appropriate. I N Version 09/29/2021 Contractor's Bid for Public Works -18 CITY OF SOUTH BEND MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN FORM MBE-2.0 EVIDENCE OF GOOD FAITH EFFORTS I aff rm that I have made good faith efforts to assist interested MBEs in obtaining necessary equipment, supplies, materials, or related assistances or services, where appropriate. I affirm that I did not reject any MBEs as unqualified without sound business reasons based on a thorough investigation of their capabilities. CONTRACT RECORDS: The bidder has maintained the following records for each MBE that has bid on the subcontracting opportunity: 1. Name, address, and telephone number; 2. A description of information provided by the bidder or subcontractor; and 3. A statement of whether an agreement was reached, and if not, why not, including any reasons for concluding that the MBE was unqualified to perform the job. *Proper demonstration of Good Faith Efforts requires your initials next to all of the above boxes. Any omissions shall be considered grounds for rejection of the bid by the Board of Public Works. The City of South Bend reserves the right to request additional information. Version 09/29/2021 Contractor's Bid for Public Works - 19 CITY OF SOUTH BEND MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN Are'. Y FORM MBE-2.1_ MBE CONTACTED This completed form should be included as part of the Bids documents related to City of South Bend Public Works Projects requiring Good Faith Efforts to obtain MWBE participation. Project Number: 121-006B Date: May 9, 2023 Project Name: SOUTH BEND 2021 DRAINGE IMPROVEMENTS — BID B DIVISION II CHAPIN Bidder: Selge Construction Co., Inc. Contact Person: Justin Butler, Vice President Telephone: 269-684-0842 Address: 2833 South 11th Street City: Niles State: Michigan Zip: 49120 Email: jbutler@selgeconstruction.com To determine whether a bidder has demonstrated good faith efforts to reach the WBE utilization goals set forth in the City of South Bend Public Works Project Specifications, the City and its agencies, boards, or commissions, REQUIRE ALL of the following Good Faith Efforts as listed in the table below*: EVIDENCE OF GOOD FAITH EFFORTS WBE LIST(S): The bidder reviewed 1) the City of South Bend's Minority and Women Business Enterprise Inclusion Program Plan; 2) the list of certified MWBEs provided by the City; and 3) the Indiana Department of Administration list of Minority and Women Owned Businesses (both certified and non -certified) found at: htto://www.in.00v/idoa/. GOOD FAITH EFFORTS TO OBTAIN WBE PARTICIPATION The bidder shall initial each item below, as evidence of its good faith efforts to obtain WBE participation in the awarded contract. I affirm that I reviewed the City of South Bend's Minority and Women Business Enterprise Inclusion Program Plan and the Indiana Department of Administration's certified list of Indiana Minority and Women Business Enterprises, found on their website 1,(http:/Iwww-in.gov/idoa). I affirm that I have made good faith efforts to select portions of the contract work to be 4 performed by WBEs, including, where appropriate, breaking out contract work items into economically feasible units to facilitate WBE participation. �f 1 affirm that I have made good faith efforts to solicit through all reasonable and available means the interest of all WBEs in the scopes of work of the contract. I affirm that I attended all pre -bid meetings scheduled by the City of South Bend to inform WBEs of contracting and subcontracting opportunities. I affirm that I advertised in general circulation and/or trade association publications P concerning subcontract opportunities and allowed WBEs reasonable time to respond to J� such advertisements. I affirm that I performed any and all necessary steps to provide written notices in a manner reasonably calculated to inform WBEs of subcontracting opportunities and allowed sufficient time for WBEs to participate effectively. 111/ 1 affirm that I followed up on initial solicitations with interested WBEs. I affirm that I negotiated with interested WBEs in good faith, including providing such WBEs 1 with adequate information about the plans, specifications and other requirements of the 1� subcontract. f / I affirm that I have made good faith efforts to assist interested WBEs in obtaining bonding, „ lines of credit, or insurance as required by the City or the bidder, where appropriate. Version 09/29/2021 Contractor's Bid for Public Works - 20 CITY OF SOUTH BEND MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN FORM MBE-2.1 MBE CONTACTED I affirm that I have made good faith efforts to assist interested WBEs in obtaining necessary equipment, supplies, materials, or related assistances or services, where appropriate. f1 affirm that I did not reject any WBEs as unqualified without sound business reasons based on a thorough investigation of their capabilities. CONTRACT RECORDS: The bidder has maintained the following records for each WBE that has bid on the subcontracting opportunity: 1. Name, address, and telephone number; 2. A description of information provided by the bidder or subcontractor; and 3. A statement of whether an agreement was reached, and if not, why not, including any reasons for concluding that the MWBE was unqualified to perform the job. *Proper demonstration of Good Faith Efforts requires your initials next to all of the above boxes. Any omissions shall be considered grounds for rejection of the bid by the Board of Public Works. The City of South Bend reserves the right to request additional information. Version 09/29/2021 Contractor's Bid for Public Works - 21 CITY OF SOUTH BEND MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN • •"' FORM MBE-2.1 r MBE CONTACTED This completed form should be supplied with Bids that pertain to City of South Bend Public Works Projects requiring Good Faith Efforts to contact MBEs. It is the bidder's sole responsibility to verify whether any listed minority -owned business meets the MBE qualifications. Attach additional pages if necessary. PAGE 1 OF 1 Project Number: 121-006B MBE Participation Goal 2.3% Project Name: SOUTH BEND 2021 DRAINGE IMPROVEMENTS — BID B DIVISION I BEALE ST Bidder: 5eigp Constfuction Co., Inc. By: Justin Butler, Vice President May 9 2023 ( cg.nature) (Title) (Date) MBE Firm Owner or Contact at MBE Firm Telephone: Fax: Email: TYPE OF WORK SOLICITED FOR THIS PROJECT: "Please see attached list of South Bend Certified Directory RESULTS OF CONTACT WITH THE MBE FIRM: MBE Firm Owner or Contact at MBE Firm Telephone: Fax: Email: TYPE OF WORK SOLICITED FOR THIS PROJECT: RESULTS OF CONTACT WITH THE MBE FIRM: Version 09/29/2021 Contractor's Bid for Public Works - 22 CITY OF SOUTH BEND MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN let - k FORM MBE-2.1 , Y. OW MBE CONTACTED This completed form should be supplied with Bids that pertain to City of South Bend Public Works Projects requiring Good Faith Efforts to contact WBEs. It is the bidder's sole responsibility to verify whether any listed woman -owned business meets the WBE qualifications. Attach additional pages if necessary. PAGE 1 OF 1 Project Number: 121-006B WBE Participation Goal 4.7% Project Name: SOUTH BEND 2021 DRAINGE IMPROVEMENTS — BID B DIVISION I BEALE ST Bidder: / Selge Construction Co., Inc. By: _," . Justin Butler, Vice President May 9, 2023 (Signature) (Title) (Date) WBE Firm Owner or Contact at WBE Firm Telephone: Fax: Email: TYPE OF WORK SOLICITED FOR THIS PROJECT: **Please see attached list of South Bend Certified Directory RESULTS OF CONTACT WITH THE WBE FIRM: WBE Firm Owner or Contact at WBE Firm Telephone: Fax: Email: TYPE OF WORK SOLICITED FOR THIS PROJECT: RESULTS OF CONTACT WITH THE WBE FIRM: Version 09/29/2021 Contractor's Bid for Public Works - 23 x CITY OF SOUTH BEND MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN w • ^`: A FORM MBE-2.1 .yry r MBE CONTACTED This completed form should be supplied with Bids that pertain to City of South Bend Public Works Projects requiring Good Faith Efforts to contact MBEs. It is the bidder's sole responsibility to verify whether any listed minority -owned business meets the MBE qualifications. Attach additional pages if necessary. PAGE__I_OF 1 Project Number: 121-006B _ MBE Participation Goal 2.4% Project Name: SOUTH BEND 2021 DRAINGE IMPROVEMENTS — BID B DIVISION II CHAPIN Bidder: Selge Construction Co., Inc. By: � f Justin Butler Vice President May 9, 2023 (Si nature) (Title) (Date) MBE Firm Owner or Contact at MBE Firm Telephone: Fax: Email: TYPE OF WORK SOLICITED FOR THIS PROJECT: ** Please see attached list of the South Bend Certified Directory. RESULTS OF CONTACT WITH THE MBE FIRM: MBE Firm Owner or Contact at MBE Firm Telephone: Fax: Email: TYPE OF WORK SOLICITED FOR THIS PROJECT: RESULTS OF CONTACT WITH THE MBE FIRM: Version 09/29/2021 Contractor's Bid for Public Works - 24 CITY OF SOUTH BEND t MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN FORM MBE-2.1 Jew WBE CONTACTED This completed form should be supplied with Bids that pertain to City of South Bend Public Works Projects requiring Good Faith Efforts to contact WBEs. It is the bidder's sole responsibility to verify whether any listed woman -owned business meets the WBE qualifications. Attach additional pages if necessary. PAGE 1 OF 1 Project Number: _ 121-006B WBE Participation Goal 4.8% Project Name: SOUTH BEND 2021 DRAINGE IMPROVEMENTS — BID B DIVISION II CHAPIN Bidder: Selge Construction Co., Inc. By: Justin Butler, Vice President May 9, 2023 (,Signature) (Title) (Date) WBE Firm Owner or Contact at WBE Firm Telephone: Fax: Email: TYPE OF WORK SOLICITED FOR THIS PROJECT: **Please see attached list of South Bend Certified Directory RESULTS OF CONTACT WITH THE WBE FIRM: WBE Firm Owner or Contact at WBE Firm Telephone: Fax: Email: TYPE OF WORK SOLICITED FOR THIS PROJECT: RESULTS OF CONTACT WITH THE WBE FIRM: Version 09/29/2021 Contractor's Bid for Public Works - 25 Document A310 TM - 2010 Conforms with The American Institute of Architects AIA Document 310 Bid Bond CONTRACTOR: (Nana, legal shafts and address) Selge Construction Co., Inc. 2833 South 11 th Street Niles, MI 49120 OWNER: (Nmm. legal stares and addiuu) SURETY: (Name, legal slams and princlVal place of hrerbre»cr) The Cincinnati Insurance Company P.O. Box 145496 Cincinnati, OH 45250-5496 Mailing Address for Notices same as above City of South Bend - Board of Public Works 227 W Jefferson Blvd South Bend, 46601 BOND AMOUNT: 5% Five Percent of Amount Bid PROJECT: (Nana, location or adoh' m and Project eneniber, t/'any) Small Drainage Improvements - Beale Street & Chapin Street Project No. 121-006B This document has important legal consequences. Consultation with an attorney Is encouraged with respect to its completion or modification. Any singular reference to Contractor, surety, Owner or other party shall be considered plural where applicable. The Contractor and Surety arc bound to tite Owner in the amount set forth above. for Ilia paynictit of which the Contractor and Surety bind tihemsctvcs, tlicir heirs, executors, administrators, successors and assigns, jointly and soveraIly. as provided herein. Tito conditions of ibis Bond are such that if the Owner accepts the bid of the Contractor with iu the Iime spec ificd in the {aid documents, or wiIhiit such time period as may be agreed to by Ilia Ovoiorand Contractor, and the Contractor either (1) enters into a coal met with the Owrierin accordance with the terms of such bid, and gives such bond or bonds as may be specified in the biddinS orCoitirnct 1?ocutnoil ts, with a surety adinined iit the jurisdiction of the ProjccI attd otherwise acceptable to tite 0% uer, for Ilic tailliful perforinance of such Contract and for the prompt payment of Inbor and material fit mished iit the prose oil lion thereof or (2) pays to Ilie Qwit er the difference, not to exceed the amount of this Bond, between the aniouut specified is said bid and such larger amount far ~loch Cite 0%vner in ay in good faith contmet with nnotlie r Isarty to perrorni the wort: covered by %aid bid, then Ellis obligation %hall be null and void, otherwise to remain in lull force and eIIecl. The Surety hereby %waives any notice of mt agreement betweers Lila Owner and Contractor to extend the time in which the Owner may accept the bid. Waiveroi'notiees by Elie Surety shall tint apply to any extension exceeding sixty (fill) days in the aggregate beyond the lime for uccr,ptontm ol'bids specified in tilts hid dstcutnents, and Elie Owner and Conlractor shall obtain [lie Suret}'scunsent lisr an extension beyond sixty (60) days. If this Bond is issued is connection %%ith a subcontractor's bid to a Contractor, the term Contractor in this Bond shall be doomed to be Subcontractor and the term Owner slimil be deemed to be Contractor. When this Mind Ims been Ibmixhed it) comply ►rilh a statutory or other legal requirement in the hu:ution ot'the Project; any pmvisitin in this Blind conilicling with said xtalulory or legal requirement shall be deemed deleted hercirom and prwisions conl'orming it, such statutory or other legal rvquirement shall be deemed inofrporaled herein. When so llnttished, the intent is that this rinnd shall be construed as a sialatory hood and not as a common law K)nd. Si,anod and scaled this 9th day of May, 2023. -----_ rfb"ime-w Allison Swinehart lWimes) David J. Roth S-00541AS 8110 Selqe Construction Co., Inc. (Principal) oat) Cloak Justin Butler, Vice President The Cincinnati Insurance Company ,� (Srnre0 �,/ (Seal) coxroxAT SEA L By: /+�G.etic A (nde)Tracie House, Attorney -in -Fact ? THE CINCINNATI INSURANCE COMPANY THE CINCINNATI CASUALTY COMPANY Fairfield, Ohio POWER OF ATTORNEY KNOW ALL MEN BY THESE PRESENTS: That THE CINCINNATI INSURANCE COMPANY and THE CINCINNATI CASUALTY COMPANY, corporations organized under the laws of the State of Ohio, and having their principal offices in the City of Fairfield, Ohio (herein collectively called the 'Companies"), do hereby constitute and appoint Tracie House its true and legal Attorney -In -Fact to sign and deliver on behalf of the Companies as Surety, at any place within the United States, the following surety bond: Surety Bond Number: Bid Bond Principal: Selge Construction Co., Inc. Obligee: City of South Bend - Board of Public Works This appointment is made under and by authority of the following resolutions adopted by the Boards of Directors of The Cincinnati Insurance Company and The Cincinnati Casualty Company, which resolutions are now in full force and effect, reading as follows: RESOLVED, that the President or any Senior Vice President be hereby authorized, and empowered to appoint Attorneys -in -Fact of the Company to execute any and all bonds, policies, undertakings, or other like instruments on behalf of the Corporation, and may authorize any officer or any such Attorney -In -Fact to affix the corporate seal; and may with or without cause modify or revoke any such appointment or authority. Any such writings so executed by such Attorneys -in -Fact shall be binding upon the Company as if they had been duly executed and acknowledged by the regularly elected officers of the Company. RESOLVED, that the signature of the President or any Senior Vice President and the seal of the Company may be affixed by facsimile on any power of attorney granted, and the signature of the Secretary or Assistant Vice -President and the Seal of the Company may be affixed by facsimile to any certificate of any such power and any such power of certificate bearing such facsimile signature and seal shall be valid and binding on the Company. Any such power so executed and sealed and certified by certificate so executed and sealed shall, with respect to any bond or undertaking to which it is attached, continue to be valid and binding on the Company. IN WITNESS WHEREOF, the Companies have caused these presents to be sealed with their corporate seals, duly attested by their President or any Senior Vice President this 16th day of March, 2021. e e STATE OF OHIO )SS: COUNTY OF BUTLER ) THE CINCINNATI INSURANCE COMPANY THE CINCINNATI CASUALTY COMPANY On this 16th day of March, 2021 before me came the above -named President or Senior Vice President of The Cincinnati Insurance Company and The Cincinnati Casualty Company, to me personally known to be the officer described herein, and acknowledged that the seals affixed to the preceding instrument are the corporate seals of said Companies and the corporate seals and the signature of the officer were duly affixed and subscribed to said instrument by the authority and direction of said corporations. Keith C996tt, Attorney at Law Notary Public —State of Ohio My commission has no expiration date. Section 147.03 O.R.C. I, the undersigned Secretary or Assistant Vice -President of The Cincinnati insurance Company and The Cincinnati Casualty Company, hereby certify that the above is the Original Power of Attorney issued by said Companies, and do hereby further certify that the said Power of Attorney is still in full force and effect. Given under my hand and seal of said Companies at Fairfield, Ohio, this 9th day of May 12023 . e e C�:/ _10 BN-1457-S (3/21) 1316 COUNTY -CITY BUILDING 227 W.JEFFERsoN BOULEVARD SOUTH BEND, INDIANA 46601-1830 PHONE 574/235-9251 FAx 574/235-9171 TDD 574/ 235-5567 CITY OF SOUTH BEND, TAMES MUELLER, MAYOR BOARD OF PUBLIC WORKS Date: May 1, 2023 To: All Planholders From Theresa Heffner, CIE Subject Addendum Number: Project Name Board of Public Works 2021 Drainage Improvements Bid Package B — Beale St & Chapin St Project Number: 121-006B ACKNOWLE GEMENT OF RECEIPT OF ADDENDUM Date Received: Uoa This addendum is being forwarded to you for the above referenced project. Please sign below and acknowledge receipt of this Addendum by faxing this sheet to the Board of Public Works at (574) 235-9171 within 48 hours of receipt. A copy MUST also be included with your bid package upon submittal. THIS ADDENDUM MAY AFFECT YOUR BID. Notes: The attached documents are hereby added to the Specifications and Contract Documents and become a part of herein. Company: Authorized Signature: Date: Version 4/2/2015 1316 COUNTY -CITY BUILDING 227 W.JEFFERSON BOULEVARD SOUTH BEND, INDIANA 46601-1830 Date: To: From Subject d+ .� rxes PHONE 574/235-9251 FAX 574/ 235-9171 TDD 574/ 235-5567 CITY OF SOUTH BEND, JAMES MUELLER, MAYOR BOARD OF PUBLIC WORKS May 8, 2023 All Planholders Theresa Heffner, Clerk, Board of Public Works Addendum Number: 2 Project Name: 2021 Drainage Improvements Bid Package B — Beale St & Chapin St Project Number: 121-006B ACKNOWLEDGEMENT OF RECEIPT OF ADDENDUM Date Received: This addendum is being forwarded to you for the above referenced project. Please sign below and acknowledge receipt of this Addendum by faxing this sheet to the Board of Public Works at (574) 235-9171 within 48 hours of receipt. A copy MUST also be included with your bid package upon submittal. THIS ADDENDUM MAY AFFECT YOUR BID. Notes: The attached documents are hereby added to the Specifications and Contract Documents and become a part of herein. Company: f ' Authorized Si tore: Date: (:�'1 J Version 4/2/2015 I Part II, Section I Experience Questionnaire 1. What public works projects has your organization completed forthe period of one (1) year prior to the date of the current bid? CONTRACT WHEN NAME AND ADDRESS AMOUNT CLASS OF WORK COMPLETED OF OWNER $536,041.05 IRONWORKS DEV UTILITIES PHASE 2 2021 CITY OF MISHAWAKA I600 E 3RD ST., MISHAWAKA, IN 46545 - 574-258-1618 $319,951.66 HOME STREET LIFT STATION 2021 CITY OF MISHAWAKA I600 E 3RD ST., MISHAWAKA, IN 46545 - 574-258-1618 $4,847,000 00 NILES -AEP SERVICE CENTER 2021 E & L CONSTRUCTION, 3040 AIRPARK DR., FLINT, MI 48507 810-744-4300 $1.987.254.40 JA DRIVE & LEXINGTON AVE STREETSCAPES 2021 CITY OF ELKHART 1229 S. 2ND ST., ELKHART, IN 46516 574-294-5471 $548.625.75 BURNS BUILDING UTILITY EXTENSION 2021 CITY OF SOUTH BEND / 227 W. JEFFERSON BLVD., SOUTH BEND, IN 46601-574-235-9216 $105,063.00 ST JOE RIVER BACKWATER VALVES 2021 CITY OF SOUTH BEND 1227 W. JEFFERSON BLVD., SOUTH BEND, IN 46601-574-235-9216 $2,129.633.19 BUFFALO STREET PLAZA 2021 CITY OF WARSAW / PO BOX 817, WARSAW, IN 46581-574-372-9545 $1.230,212.00 LCRUD CONTRACT C REG B W WTP IMPROVE 2021 LaGRANGE COUNTY REGIONAL UTILITY DISTRICT, LAGRANGE, IN $1,746,269 80 ROCK RUN SEWER IMPROVEMENT C 2021 CITY OF GOSHEN, 220 S. MAIN ST.. GOSHEN, IN 574-5335621 $109.925.00 CSO3 BACKWATER VALVE REPAIR 2021 CITY OF SOUTH BEND / 227 W. JEFFERSON BLVD., SOUTH BEND, IN 46601-574-235-9216 $4.115,879 34 CASS - DOWNTOWN STREETSCAPES 2021 VILLAGE OF CASSOPOLIS, 117 S. BROADWAY, MI 49031 $2,487,84422 CASS -STONE BEACH IMPROVEMENTS 2021 VILLAGE OF CASSOPOLIS, 117 S. BROADWAY, MI 49031 $288,49120 DAWN ESTATES LIFT STATION REPLACEMEN' 2021 TOWN OF MIDDLEBURY /418 N MAIN ST, MIDDLEBURY, IN 48540 $1,148,483.84 EAST GOSHEN WM REPLACEMENT 2021 CITY OF GOSHEN, 220 S. MAIN ST., GOSHEN, IN 574533-8621 $219,471.00 LIFT STATION 12 REPLACEMENT 2021 CITY OF ELKHART / 229 S. 2ND ST, ELKHART, IN 46516 574-2945471 $253,390.00 C-1 UFT STATION 2021 ONTWA TOWNSHIP / 26225 US HWY 12, EDWARDSBURG, MI 49112 $113.786.40 WATER SERVICE REPLACEMENT 2021 CITY OF ST JOSEPH 1700 BROAD STREET, ST JOSEPH, MI 49085 $855,000.00 HILLS AT ST. JOE FARM & CURB 2021 THE VILLAGE DEVELOPMENT LLC / 52127 FALL CREEK DR, GRANGER, IN 4653(1-574-315-9668 $398,008 00 LS & MANHOLE IMPROVEMENTS 2021 VILLAGE OF MARTIN / 1609 N MAIN ST., MARTIN, MI 49070 $758,650.00 HILLS RESIDENTIAL DEVELOPMENT LIFT STA' 2021 THE VILLAGE DEVELOPMENT LLC 152127 FALL CREEK DR, GRANGER, IN 48530574-315-9668 $486,924.45 WATER SYSTEM IMPR COLFAX & MESSNER D 2021 BENTON CHARTER TWP / 1725 TERRITORIAL ROAD, BENTON HARBOR, MI 49022 $162,750 00 GOSHEN POND DAM IMPROVEMENTS 2021 ELKHART COUNTY PARK & RECREATION BOARD 1211 W LINCOLN AVE., GOSHEN IN 46526 $125,142.00 LAUREL WOODS DRAINAGE IMPR 2021 CITY OF SOUTH BEND 1227 W. JEFFERSON BLVD., SOUTH BEND, IN 46601 574-235-9216 $24,630.00 2010 SUPERIOR ST SEWER REPAIR 2021 CITY OF ELKHART / 229 S. 2ND ST., ELKHART, IN 46516 574-294-5471 $449,065.00 COLFAX LIFT STATION 2022 CITY OF SOUTH BEND /227 W. JEFFERSON BLVD., SOUTH BEND, IN 46601-574-235-9216 $731,154.00 PARK SHORE DR & EAST ST ROAD IMPR 2022 THE VILLAGE DEVELOPMENT LLC / 52127 FALL CREEK DR, GRANGER, IN 46530574-315-9688 $4,554,745.00 CONTRACT 3 NE SECTION SS IMPR 2022 CITY OF BENTON HARBOR /200 E WALL ST, BENTON HARBOR, MI 49022 $4.031.520.00 CRAWFORD PARK CONNECTOR SEWER 2022 CITY OF MISHAWAKA / 600 E 3RD ST-, MISHAWAKA, IN 46545 - 574-258-1618 $2,452,855A2 CONCRETE PAVEMENT 2022 INDOT R41066A- LOCATION: ELKHART, IN $1.637,11'1.00 LAKESIDE SEWER RELOCATION 2022 CITY OF LAPORTE / 801 MICHIGAN AVE, LAPORTE, IN 46350 $1,928,235.00 LIFT STATION REPLACEMENT & IMPROVEMEN 2022 COLOMA CHARTER TOWNSHIP /4919 PAW PAW LAKE ROAD, COLOMA, MI 49038 $944,657.00 YELLOW LAKE PROJECT 2022 BUCHANAN LAND LLC / 540 W. MADISON, SUITE 2500, CHICAGO, IL 60661 $2,785.222.00 SOUTH MAIN ST STREETSCAPES PROJECT 2022 CITY OF ELKHART / 229 S. 2ND ST., ELKHART, IN 46516 574-294-5471 $246,810.00 DRAINAGE IMPR - KALEY & MARIN ST 2022 CITY OF SOUTH BEND 1227 W. JEFFERSON BLVD., SOUTH BEND, IN 46601 574-235-9216 $17.200.00 CR 17 METER PIT INSTALLATION 2022 CITY OF ELKHART / 229 S. 2ND ST., ELKHART, IN 46516 574-2945471 $73.750.00 GRAVITY SEWER & GRINDER RELOCATION 2022 MARY FRANK SCHOOL / 13111 ADAMS RD, GRANGER IN 46530 $159,850 00 PARKING LOT & ADA COMPLIANT TRAIL 2022 IDNR /402 W WASHINGTON ST. INDIANAPOLIS IN 46204 $159,880 00 JA DRIVE NODE REPAIL 2022 CITY OF ELKHART 1229 S. 2ND ST, ELKHART, IN 46516 574-294-5471 $1.393,847.00 JOHNSTON ST SEWER EXTENSION 2022 CITY OF ELKHART 1229 S. 2ND ST., ELKHART, IN 46516 574-294 5471 $150,913.00 STUDEBAKER FOUNTAIN WATER IMPROVEME 2022 CITY OF SOUTH BEND / 227 W. JEFFERSON BLVD., SOUTH BEND, IN 46601-574-235-9216 $1,115.879.00 W WTP CONTRACT A 2023 ST JOSEPH COUNTY BOARD OF PUBLIC WORKS 1612 E MAIN ST, CENTERVILLE, MI 49032 $1.294.195.00 LIFT STATION IMPROVEMENTS CONTRACT B 2023 ST JOSEPH COUNTY BOARD OF PUBLIC WORKS / 612 E MAIN ST, CENTERVILLE, MI 49032 $960,541.00 LIFT STATION 51, 52.53 2023 NEW BUFFALO TWP 117425 RED ARROW HIGHWAY, NEW BUFFALO MI 49117 $124.980 00 CSO 18 BACKWATER VALVE REPLACEMENT 2023 CITY OF SOUTH BEND / 227 W. JEFFERSON BLVD., SOUTH BEND, IN 46601 574-235-9216 $71.043.00 BIG & TALL SEWER EXTENSION 2023 CITY OF ELKHART / 229 S. 2ND ST., ELKHART, IN 46516 574-2945471 2. Attach a listing of public works projects currently in process of construction by your organization. Contract Amount 2 820 177 Class of Work WW Treatment Expected Completion Date Spring 2023 Name and Address of Owner LaGrange CRUD IN 682 1 461 885 Lift Station Summer 2023 LaGran e CRUD IN 683 3.696.528 SW Quad Road Sewer Water Spring 2023 Town of Middleb IN 687 1.623.701 INDOT Bike & Ped. Facilities Spring 2023 INDOT R-38064 689 2.693.838 Front Main Church Sts. Im rov Summer 2023 Cfty of Mishawaka, IN 703 4 593 517 Northshore-Eastshore Collect Spring 2023 Turke Creek RSD IN 708 290.120 Elkhart CnIX Courthouse Pro' Summer 2023 Elkhart County. IN 710 830 456 2.907 973 INDOT Bike & Ped Facilities Ci1y Wide Water Service Rep] Fall 2023 Spring 2023 INDOT R-37502 714 Benton Charter Tn. MI 718 $5.797,216 Conrail LS & Interceptor Impr Summer 2023 Benton Charter Tn. MI 720 5 455 897 Sewer Improvements Summer 2023 City of Mishawak IN 723 1 667 547 Lift Station Summer 2023 Ci1y of Mishawaka IN 725 15 448 283 WW Collection Systems - A Winter 2024 TCRSD — N.Webster IN 731 11 253 814 WW Collection Systems — C Winter 2024 TCRSD — N.Webster, IN 732 145 710 Water Main Replacement Summer 2023 City of South Bend IN 733 1 696 461 INDOT Coal Line Trail Ph II Spring 2024 INDOT R-38065C 734 12 756 24 453 887 Smart Park Devel❑ ment Lift Station Replacement Spring 2024 Summer 2023 MEC — Cass MI 735 City of Elkhart TN 737 355 000 Sewer Point Repairs Summer 2023 VisuSewer—Dow iac MI 740 1 7Q1 749 Parking Improvements Winter 2023 City of Mishawaka. IN 741 220 230 Groundwater Lift Station Im r Winter 2023 Cily of Elkhart IN 742 13 8 750 Potawatomi Zoo Drainage Im r Summer 2023 1PR — South Bend IN 743 1 750 570 2023 Traffic Calmi pig Fall 2023 Cit y of South Bend 1N 748 "Attachment Section 1 No. 4 List references of private firms for which you have performed work. South Bend Orthopedics Pokagon Gaming Authority Elm Road Medical Campus 1111 Wilson Road 53880 Carmichael Drive New Buffalo, MI 49117 South Bend, IN 46635 AM General Precision Wall Systems Rolland Miller Jim Mroz 13200 McKinley Highway 3801 S. Main St Mishawaka, IN 46545 South Bend, IN 46601 South Bend Ethanol M.A.A.C. 3201 W. Calvert Street PO Box 262 South Bend, IN 46613 Niles, MI 49120 Notre Dame Federal Credit Union AEP Niles Service Center Bob Green 2603 Walton Rd PO Box 7818 Niles, MI 49120 Notre Dame, IN 46556 Flaherty & Collins Gospel City Church Art Smith 52277 Hickory Road One Indiana Square, Suite 3000 Granger, IN 46530 Indianapolis, IN 46204 Aeroplex Syracuse & Wawasee Park Foundation FM Stone Real Estate Jerry Wright 421 S. Second St. 1013 N. Long Drive Elkhart, IN 46516 Syracuse, IN 46567 DJ Landscaping C&S Machine 4436 Broadmoor Ave 2929 Sarratore Dr Grand Rapids, MI 49512 Niles, MI 49120 Altera David Kline 600-888 Dunsmuir Street Vancouver, BC 6C3K4 GOVERNMENTAL REFERENCES Selge Construction Eric Horvath, Director of Public Works 574-235-9251 City of South Bend 227 W. Jefferson Blvd., Ste 1300 South Bend, IN 46601 Toy Villa, Construction Manager 574-235-9251 City of South Bend 227 W. Jefferson Blvd. 1316 County -City Building South Bend, IN 46601 Sky Medors, Engineer 574-235-9626 St. Joseph County 227 W. Jefferson Blvd. South Bend, IN 46601 Tim Woodward 260-856-4341 Turkey Creek Regional Sewer District 4852 N. 1200 W Cromwell, IN 46732 Steve Haversperger, Area Engineer 219-362-6125 INDOT, LaPorte District PO Box 429 LaPorte, IN 46352 Brigid Forlenza 269-663-2347 Ontwa Township PO Box 209 Edwardsburg, MI 49112 Mike Koch, Area Engineer 260-484-9541 INDOT, Fort Wayne District 5333 Hatfield Road Fort Wayne, IN 46805 OVER Chris Jamrose, Director of Engineering 574-258-1619 City of Mishawaka 600 East Third Street Mishawaka, IN 46546-0363 Tory Irwin, Engineering Service Mgr. 574-293-2572 City of Elkhart Municipal Building 229 S. Second Street Elkhart, IN 46516 Dustin Sailor, Engineer 574-534-2201 City of Goshen 204 E. Jefferson St., Suite 1 Goshen, IN 46526 Mary Cripe, Town Manager 574-825-1499 Town of Middlebury 418 N. Main Street Middlebury, IN 46540 Joe Ray, Director Public Works 269-683-4100 City of Niles 333 N. Second Street Niles, MI 49120 Paul Warnke, Board President 574-586-7249 Koontz Lake Regional Sewer District 10870 Cherokee Rd. PO Box 204 Walkerton, IN 46574 James Emans, P.E. 574-267-6885 City of Warsaw 102 S. Buffalo Street Warsaw, IN 46580 ENGINEERING REFERENCES Selge Construction Rich Zielinski 317-547-5580 American Structurepoint 7260 Shadeland Station, Suite 100 Indianapolis, IN 46256 Jeremy Roschyk 574-288-4580 Donahue & Associates 100 N. Michigan, Ste 510 South Bend, IN 46601 Andy Lemberis 574-236-4400 DLZ Indiana, LLC 2211 East Jefferson Blvd. South Bend, IN 46615 Paul Hummel 574-234-3167 Lawson Fisher Associates, P.C. 525 West Washington Avenue South Bend, IN 46601 David Harvey Fleis & Vanderbrink Engineering, Inc. 2960 Lucerne Drive, S.E. Grand Rapids, MI 49546 Kenneth Jones 574-293-7762 Jones, Petrie, Rafinski, Inc. 200 Nibco Parkway Dr Elkhart, IN 46516 Matt Davis 269-927-0100 Wightman and Associates, Inc. 2303 Pipestone Road Benton Harbor, MI 49022 Jason Durr 574-282-8001 Christopher B. Burke Engineering, LLC 220 West Colfax Avenue, Suite 500 South Bend, IN 46601 Daryl Knip 574-232-8700 Abonmarche Consultants of IN, Inc. 750 Lincolnway East South Bend, IN 46601 SECTION II - PLAN AND EQUIPMENT QUESTIONNAIRE 2. SUBCONTRACTORS LIST WORK PERFORMED: Bailey Aggregates Aggregate Trucking 12609 Indianapolis Rd Yoder, IN 46798-9733 Brusky Construction Aggregate Trucking 70569 Elizabeth St Niles, MI 49120 V & R Trucking Aggregate Trucking 1845 Elmer St South Bend, IN46628 Niblock Excavating, Inc. Asphalt Construction PO Box 211 Bristol, IN 46507 Rieth-Riley Construction Co., Inc. Asphalt Construction PO Box 477 Goshen, IN 46527-0477 Milestone Contractors North Asphalt Construction 1700 E. Main St. Griffith, IN 46319-2999 Michigan Paving & Materials Co. Asphalt Construction 2300 Gendenning Kalamazoo, MI 49003 Abonmarche Consultants, LLC. Construction Engineering 750 Lincolnway East South Bend, IN 46601 Jones Petrie Rafmski, Inc. Construction Engineering 412 S. Lafayette Blvd South Bend, IN 46601 SUBCONTRACTOR LIST (continued) WORK PERFORMED Wightman & Associates Construction Engineering 2303 Pipestone Rd Benton Harbor, MI 49022 Deversified Dewatering Dewatering 9150 96t' Ave. Zeeland, MI 49464 Bender Electric Electrical Wiring PO Box 143 Cassopolis, MI 49031 Hawk Enterprises, Inc. Electrical/Signal/Signage 1850 E. North Street Crown Point, IN 46307 Custom Fence Co Fencing PO Box 526 Niles, MI 49120 Mike's Fencing Fencing 68021 SR 19 North Nappanee, IN 46550 Milestone Fence Fencing 13399 McKinley Hwy Mishawaka, IN 46545 C-Tech Corporation Guard Rails 5300 W. 100 N. Boggstown, IN 46110-9706 Lowe Construction Jack and Bore 2535 Bader Road Horton, MI 49246 Weaver Consultants, LLC Laboratory Testing 7121 Grape Rd Granger, IN 46530 SUBCONTRACTOR LIST continued WORK PERFORMED Acorn Landscaping, LLC Landscape/Restoration 24930 Kern Rd. South Bend, IN 46614-9787 Fuerbringer Landscaping & Design, Inc. Landscape/Restoration 25530 Brick Road South Bend, IN 46628 Slussers Green Thumb, Inc. Landscape/Restoration PO Box 33 Logansport, IN 46947-0033 Turf Services Landscape/Restoration 57780 Sink Road Dowagiac, MI 49047 Ferguson Waterworks #1934 Lift Station Installation 1077 Oliver Plow Ct South Bend, IN 46601 Best Sweeping Specialists, Inc. Road Sweeping/Dust Control 632 S. Sixth Street Goshen, IN 46526 A-1 Striping Service, Inc. Road Striping 56825 Spirea Rd. New Carlisle, IN 46552 The Airmarking Co., Inc. Road Striping 1544 North State Road 25 Rochester, IN 46975 Michiana Contracting, Inc. Traffic Signal Work PO Box 929 Plymouth, IN 46563 Rathco Traffic Control 6742 Lovers Lane Portage, MI 49002 3 SUBCONTRACTOR LIST continued WORK PERFORMED Give `Em A Brake Traffic Control 2610 Sanford Ave Grandville, MI 49418 State Barricading, Inc. Traffic Control 24963 U.S. 20 West South Bend, IN 46628 KC Tree Tree Removal 1320 Third Street Osceola, IN 46561 Payne's Services Tree Removal 30296 Redfield St Niles, MI 49120 Construction Video Media Video Taping 111 E. Newberry St. Romeo, MI 48065 Watson Tree Service, Inc. Tree Removal 2953 E. Detroit Road Niles, MI 49120 S/T Bancroft Electric Electrical 25020 SR 2 South Bend, IN 46619 2022 C! Selge Construction Co., Inc. Equipment List QUANTITY DESCRIPTION AND CAPACITY OF ITEMS JOHN DEERE 544L WHEEL LOADER YEAR 2 2021 1 VOLVO EWR170E WHEELED EXCAVATOR 2021 1 TRAIL KING TKT16 TILT 2021 1 TOWMASTER T16T DECKOVER TRAILER 2021 1 JOHN DEERE 245G LC EXCAVATOR 2020 1 VOLVO ECR355E EXCAVATOR 2020 1 IMPACT CONSTRUCTION TRAILER 2020 1 JOHN DEERE 345G LC EXCAVATOR 2020 1 2020 JOHN DEERE 650K II CRAWLER DOZER W/GPS 2020 1 VOLVO ECR145E EXCAVATOR 2020 1 DUAL SOCK TRACKER FOR JD EXCAVATOR 2019 1 YANMAR V1035 MINI EXCAVATOR 2019 2 JOHN DEERE 544K II 4WD LOADERS 2018 2 JOHN DEERE 624K II 4WD LOADERS 2018 1 2"-8" DIP BUTT FUSION MACHINE 2018 1 DCI FS FALCON LOATING SYSTEM 2018 1 VERMEER D40X55 S3 DIRECTIONAL DRILL 2018 2 HAMM 1-1101 SMOOTH DRUM COMPACTOR/ ROLLER 2018 1 2018 BOMAD BW 120 COMPACTOR / ROLLER 2018 1 GODWIN CD150M TRASH/BY-PASS PUMP 2018 1 YANMAR V1055 MINI EXCAVATOR 2018 1 ROFHDR ROADWIDENER 2017 1 JOHN DEERE 344K LOADER 2017 1 MULTIQUIP CONCRETE MIXER 2017 5 ARTIC HD 17 SNOW PLOWS 2017 1 ARTIC HD14 SNOW BOX 2017 1 ROAD WIDENER W/DUAL REMOVE 2017 1 VS 63-20-D Grout Machine 2016 1 YANMAR V1080 MINI EXCAVATOR 2016 1 KENWORTH T-800 CUMMINS TRACTOR 2016 1 DITCH WITCH TRACKER WITH BEACON/DISPLAY 2016 9 CATERPILLAR COMPACT TRACK LOADERS 2016 1 McLAUGHLIN VX30-500 VACUUM EXCAVATOR 2016 1 PERCUSSION DRILL 2016 2 YANMAR Vio35-6 MINI EXCAVATORS 2016 1 YANMAR Vio45 MINI EXCAVATOR 2016 1 MACK DUMP TRUCK MODEL GU813 2015 1 ETNYRE TRAILER WITH 4TH FLIP AXLE 2015 1 JOHN DEERE 245 LC EXCAVATOR 2015 3 ARTIC SNOW PUSHER PLOWS W/QUICK COUPLERS 2015 2 YANMAR V1055 MINI EXCAVATOR 2015 3 WESTERN PLOWS 2015 1 ISCO FUSION MACHINE 2014 2 JOHN DEERE 245 LC EXCAVATOR 2014 1 JOHN DEERE 544K 4WD LOADER 2014 2 MOVAX-SP60 HAMMERS 2013 1 KOMATSU PC490LC-10 EXCAVATOR 2012 1 KOMATSU PC390LC-10 EXCAVATOR 2012 1 IJOHN DEERE 700K DOZER 1 2012 1 IJOHN DEERE 650K DOZER 2012 QUANTITY DESCRIPTION AND CAPACITY OF ITEMS YEAR 3 JOHN DEERE 544K LOADERS 2012 1 CATERPILLAR CH 85E TRACTOR 2010 2 ROME SCRAPER PANS 2010 1 12" - 36" BUTT FUSION MACHINE 2009 1 VERMEER D100 X 120 NAVIGATOR W. ATTACHMENTS 2009 1 YANMAR V1075 EXCAVATOR 2008 1 MR MANHOLE CUTTER EXTRACTOR & AUGER 2008 1 CATERPILLAR 328D EXCAVATOR 2007 1 CATERPILLAR 321CLCR EXCAVATOR 2007 1 CATERPILLAR 314 CLCR EXCAVATOR 2007 1 D36X50 NAVIGATOR 2006 1 DUAL ELECTRIC MAST SYSTEM (LAZER FOR DOZER 2006 2 DITCH WITCH VAC SYSTEM W/TRAILER 2006 1 ROADTEC RX700-4 MILLING MACHINE 2006 1 IHI IC30-2 CRAWLER CARRIER 2006 1 JOHN DEERE 450D EXCAVATOR 2006 1 KENWORTH DUMP TRUCK 2006 1 DITCH WITCH JT27T2 WITH ATTACH./PIPE 2005 1 DITCH WITCH JT2020 WITH ATTACH./PIPE 2005 3 JOHN DEERE LOADERS MODEL 544J 2005 1 FELCO MINI CONVEYOR 2005 1 DITCH WITCH SK500 UNIT W/AUGER & TRENCHER 2004 2 FELCO COMPACTION BUCKETS 2004 1 SCISSOR LIFT 2004 1 CATERPILLAR CH85 CHALLENGER TRACTOR 2003 2 MISKIN SP-C17 SCRAPERS 2003 1 DYNA-PACK MODEL CC122 VIBRATORY ROLLER 2003 1 AMERICAN AUGER BORING MACHINE 2003 1 KUBOTA L3010HST TRACTOR 2002 1 TRAILER EXPESS 18' FLATBED TANDEM AXLE TRAILER 2002 1 TC-600 TEXTURE/CURE MACHINE & ACCESSORIES 2002 1 CURB FORM C55629 2002 1 FELCO 30 X 60 COMPACTOR BUCKET 2002 1 KOMATSU WA120-3 WHEEL LOADER 2001 1 EASI-POUR COMPACT 880 SLIPFORM TRIMMER/PAVER 2001 1 KOMATSU PC128US -2 006487 EXCAVATOR 2001 1 KOMATSU PC228US LC-3 020533 EXCAVATOR 2001 1 BOBCAT SKID STEER LOADER, MODEL 773K 2001 1 TREMIX COMPACTOR MODEL MV80 2001 3 JOHN DEERE 1-650H, 2-550H CRAWLER DOZERS 2001 1 KENWORTH DUMP TRUCK 2001 1 FREIGHTLINER FL80 DUMP TRUCK 2000 1 FREIGHTLINER FL112 DUMP TRUCK 2000 1 PMD 800 VAC-TRON VACUUM 2000 1 VERMEER T-555 TRACK TRENCHER 2000 1 DITCH WITCH JT7020 BORING UNIT 2000 1 MCS-325 PORTABLE BENTONITE MIXING & RECYCLING SYSTEM 2000 1 VOLVO L70D WHEEL LOADER 2000 1 CATERPILLAR 930 WHEEL LOADER 2000 1 DITCH WITCH JET TRAC MODEL 920L W/ MUD MIXER, SUBSITE ATT. 1999 1 ROSCO RB48 SWEEPER, WITH SNOW PLOW 1999 1 STERLING L8513 DUMP TRUCK 1999 1 920L DITCH WITCH DIRECTION BORZ SYSTEM 1999 QUANTITY DESCRIPTION AND CAPACITY OF ITEMS YEAR 1 CHAMPION 730A VHP MOTOR GRADER 1999 1 CMI SF3002 SLIPFORM PAVER 1999 1 FORD F800 DUMP TRUCK 1998 1 ICLEAN EARTH SFE-JET-VAC 1998 1 MCELROY#412 HYDRAULIC FUSION UNIT 1998 1 BELSHE T9 TRAILER 1998 2 928G CATERPILLAR WHEEL LOADERS 1998 1 NPK 8XA HYDRAULIC HAMMER 1998 1 EX750 - HITACHI EXCAVATOR 1998 1 FELCO VIBRATORY COMPACTOR BUCKET 1998 1 JCB 411 TOOL CARRIER, WITH FORKS 1998 1 INTERNATIONAL 4900 6 X 6 WATER TRUCK 1998 1 MACK CL713 TRACTOR 1997 1 VERMEER D-24x40 NAVIGATOR DIRECTIONAL BORE SYSTEM 1997 1 FINN HYDROSEEDER W/ ATTACH., GROUNDHOG 1997 1 MACK CL713 DUMP TRUCK 1996 1 MACK RD68 TRACTOR 1996 1 MACK TRACTOR MODEL CL713 1996 1 CATERPILLAR MODEL CS433 COMPACTOR 1996 1 PEMBERTON 72" DITCH CL. BUCKET FOR CAT 300LE 1996 1 PC200-6 KOMATSU EXCAVATOR 1996 1 MACK TRACTOR, MODEL CL713 1995 1 VERMEER 4" LW HAMMERHEAD MOLE 1995 1 VERMEER 3" HAMMERHEAD MOLE 1995 1 DITCH WITCH DIRECTIONAL BORE SYSTEM 1995 1 MELROE 853C BOBCAT 1995 1 CATERPILLAR HYD. EXCAVATOR MODEL 325L 1994 1 CATERPILLAR HYD EXCAVATOR MODEL 330L 3CY 1994 1 JOHN DEERE 624G LOADER 3 1/2 YD. 1994 1 JOHN DEERE 955 4WD TRACTOR W/TILLER AND BROOM 1994 1 FELCO BEDDING CONVEYOR, STAND. SLIDER, W/2' EXTENSION 1994 1 FORD TRACTOR MODEL LN 8000 1993 1 GMC WHITE TRACTOR TRUCK 1993 1 CATERPILLAR D5C DOZER 1992 1 JOHN DEERE 955 TRACTOR W/TILLER, BOX SCRAPER, BROOM 1991 1 FELCO ROLLER BEDDING CONVEYOR W/6 CY HOPPER 1991 1 JOHN DEERE 544 RUBBER TIRE LOADERS 1990 1 JOHN DEERE 455G CRAWLER LOADER 1989 1 KOEHRING 6644 HYD. EXCAVATOR 3 1/2 YD. 1988 1 FORD F800 UTILITY TRAILER WITH HI RANGER 1985 1 JOHN DEERE 570A ROAD GRADER 1980 1 KOEHRING 866 HYD. BACK HOE 4 YD. 1979 1 CATERPILLAR D4C DOZER SERIES 3 1979 1 FERGUSON TANDEM DRUM VIBRATOR ROLLER 1979 1 HARTMAN FABCO CONVEYOR 1 1979 1 EARTH BORING MACHINE 48" AND ACCESSORIES 1975 QUANTITY DESCRIPTION AND CAPACITY OF ITEMS YEAR 1 INTERNATIONAL T.D. DOZER 1972 1 BLAW-KNOX RW 195 ROAD WIDNER 1970 2 KOEHRING 505 HYD. BACK HOE 2 1/2 YD. 1969 & 70 WITH 6 CYLINDER HOPPER 150 KW CAT. GENERATOR, ELECTRIC PUMPS, DEEP WELLS, HYDRAULIC CLAM, ETC., COMPLETE ONAN 30 KW STANDBY POWER ENGINE GENERATOR, TRAILER MOUNTED, W/CABLE & DIESEL FUEL TANKS, SUBMERSIBLE SEWER PUMP CEMENT SAWS, AIR COMPRESSORS, WELL POINT PUMPS, WELL POINTING EQUIPMENT, 4000 GAL. WATER TANKER & JET PUMP, BROOMS, SHOP TRAILERS, 3 FIELD OFFICE TRAILERS, COMPACTORS, POWER MORTAR MIXERS, TAMPERS, LASER BEAMS, SMALL TOOLS, 3 TANDEM DUMP TRUCKS, 1 SEMI - DUMP TRAILER, 4 LOWBOY TRAILERS, 3 TRUCK TRACTORS, PORTABLE TRAFFIC LIGHTS, PORTABLE FLASHING SIGN, STEEL SHEETS, GENERATORS, PAVING BREAKERS, ROCK DRILLS, TRENCH BOXES, WELLS CARGO PUMP TRAILER, 3 WELLS CARGO TOOL TRAILERS, WELLS CARGO CYCLE WAGON, 1 FRUEHAUF TRAILER, HENDERSON BLADE RAKE, PROSSER PUMPS, VIBRATORY ASPHALT PLATE, 1255HP DIALGRADE LASERS, INGERSOLL-RAND LIGHT TOWER, TAG TRAILER, ROSCO SWEEPER, FORKLIFT, CURB FORMS, DITCH WITCH SUB SITES, GENERATORS, VARIOUS BUCKETS, DUAL ELECTRIC MAST SYSTEM (LAZIER FOR DOZER), VARIOUS TRAILERS, TEREX PAVING KIT, REROUND TOOL, SCRAPER TOOL, ELECTRIC PROCESSOR, 24" DIPS INSERT SET, HEATER ASSEMBLY FOR FUSION MACHINE, AUGER VERMEER DIRECTIONAL DRILL, LOCATORS 4 Selge Construction Company, Inc. Financial Report February 28, 2022 Contents Independent auditor's report 1-2 Financial statements Balance sheets 3 Statements of income 4 Statements of stockholders' equity Statements of cash flows Notes to financial statements 7-15 Supplementary information Schedules of construction and general and administrative expenses 16 Independent Auditor's Report Board of Directors Selge Construction Company, Inc. s RSM RSM US LLP Opinion We have audited the financial statements of Selge Construction Company, Inc. (the Company), which comprise the balance sheets as of February 28, 2022 and 2021, the related statements of income, stockholders' equity, and cash flows for the years then ended, and the related notes to the financial statements. In our opinion, the accompanying financial statements present fairly, in all material respects, the financial position of the Company as of February 28, 2022 and 2021, and the results of its operations and its cash flows for the years then ended in accordance with accounting principles generally accepted in the United States of America. Basis for Opinion We conducted our audits in accordance with auditing standards generally accepted in the United States of America (GAAS). Our responsibilities under those standards are further described in the Auditor's Responsibilities for the Audit of the Financial Statements section of our report. We are required to be independent of the Company and to meet our other ethical responsibilities, in accordance with the relevant ethical requirements relating to our audits. We believe that the audit evidence we have obtained is sufficient and appropriate to provide a basis for our audit opinion. Responsibilities of Management for the Financial Statements Management is responsible for the preparation and fair presentation of the financial statements in accordance with accounting principles generally accepted in the United States of America, and for the design, implementation, and maintenance of internal control relevant to the preparation and fair presentation of financial statements that are free from material misstatement, whether due to fraud or error. In preparing the financial statements, management is required to evaluate whether there are conditions or events, considered in the aggregate, that raise substantial doubt about the Company's ability to continue as a going concern within one year after the date that the financial statements are issued (or within one year after the date that the financial statements are available to be issued when applicable). Auditor's Responsibilities for the Audit of the Financial Statements Our objectives are to obtain reasonable assurance about whether the financial statements as a whole are free from material misstatement, whether due to fraud or error, and to issue an auditor's report that includes our opinion. Reasonable assurance is a high level of assurance but is not absolute assurance and therefore is not a guarantee that an audit conducted in accordance with GAAS will always detect a material misstatement when it exists. The risk of not detecting a material misstatement resulting from fraud is higher than for one resulting from error, as fraud may involve collusion, forgery, intentional omissions, misrepresentations, or the override of internal control. Misstatements are considered material if there is a substantial likelihood that, individually or in the aggregate, they would influence the judgment made by a reasonable user based on the financial statements. THE POWER OF BEING UNDERSTOOD AUDIT I TAX I CONSULTING RSMU5LLPIsthe U.S.mentberfirnofRSMlnlernaticnal,aglehalnetworkoflndependenijudit,I-- and consultingfims Vsilrsmuscam/ahoutusfor nrore.Mf rnatronregardingRSMUSLLPand RSM International In performing an audit in accordance with GAAS, we: • Exercise professional judgment and maintain professional skepticism throughout the audit. • Identify and assess the risks of material misstatement of the financial statements, whether due to fraud or error, and design and perform audit procedures responsive to those risks. Such procedures include examining, on a test basis, evidence regarding the amounts and disclosures in the financial statements. • Obtain an understanding of internal control relevant to the audit in order to design audit procedures that are appropriate in the circumstances, but not for the purpose of expressing an opinion on the effectiveness of the Company's internal control. Accordingly, no such opinion is expressed. • Evaluate the appropriateness of accounting policies used and the reasonableness of significant accounting estimates made by management, as well as evaluate the overall presentation of the financial statements. • Conclude whether, in our judgment, there are conditions or events, considered in the aggregate, that raise substantial doubt about the Company's ability to continue as a going concern for a reasonable period of time. We are required to communicate with those charged with governance regarding, among other matters, the planned scope and timing of the audit, significant audit findings, and certain internal control —related matters that we identified during the audit. Other Matters Our audit was conducted for the purpose of forming an opinion on the financial statements as a whole. The accompanying supplementary schedule of construction and general and administrative expenses is presented for purposes of additional analysis is not a required part of the financial statements. Such information is the responsibility of management and was derived from and relates directly to the underlying accounting and other records used to prepare the financial statements. The information has been subjected to the auditing procedures applied in the audit of the financial statements and certain additional procedures, including comparing and reconciling such information directly to the underlying accounting and other records used to prepare the financial statements or to the financial statements themselves, and other additional procedures in accordance with auditing standards generally accepted in the United States of America. In our opinion, the information is fairly stated in all material respects in relation to the financial statements as a whole. South Bend, Indiana May 20, 2022 2 Cert'fiied Dlredory as of 1/l/2020 .—w.��n... F,..,.. c.-.., r.�..- a�..�,.�,Mw o......a..,. ..,.... r.., .w.f�nr. ,..... ..-.. ,. ne....., ..w.a�,..r ... ... _. ... a4 oH.+--...,,..,� :■'i�i� �� '" Ir:�riii�r'itt���iY� �Lr�i^r���W�r fi'��i•�ii ti �il�Iri��1'�ii�1�" r7r7i� :.�w�l��ri�� � � �i1�"�ii(ir7�, i�i�■� iilr7 � �ril�I�Tilr■irri r'�.r.'��lrT:r7r�ii iii�yr�� r,r���,���� �� t�T�li�®�I�rTiri iriil� ri"ri.��rr�`L:■i�`i illti.'_����i�7�ii• .. ��ii�ii����r'�ir7ir'��i� "'ifs■, il�i�1�7 I�I.r7 �i�i,7ir�i r�tiirrwl��Ti�i�,^ �Wi�iiY�i�.—��1�:■ir"�ii m ��� . rl`�w�G�'�itirl�iii r�ll®riii'iIGGi• iGi'" ��i�wr47 iilli�.����il'I� �i"rili >ii'i•I����i� � _ ���- -_ I�i�fr�l r��+s�i�ii■ �r7fi'wi1�'`'��i�il"ii{■ �Irrrri l�Ti©I� ..��rrr-i•�r'ilTl.Ii gJ�liiii���L�iirri �w��.■ iri7 ^ ®I��r�7�W�'i� �I��':� ir'r7r�ii�G��r'�LI■riw1 ... ,:w71W'�ri"i-���� .... - - i��i■■■r;l�r"�+''� i�rr����"■ir' r7 ©1���`�7® "_ ` ' �iriw'����r'�il'ii■fi�Yii�yi��r�iL7Viw1 Crim Frickson From: Crissy Frickson Sent: Wednesday, April 26, 2023 3:52 PM To: lstclasslogistics20l3@gmail.com; Teresa Butler; kculp@emnet.net; jshilderbrandt@gmail.com; tmcclane@gslconsulting.com; Caylee Carlson; macraytonconst@att.com; mcintyrejonesinc@aol.com;jnnfrram@aol.com Subject: RFQ: South Bend 2021 Small Drain Improv. Beale St. & Chapin Good Morning, We are bidding the City of South Bend 2021 Small Drainage Improvements — Bid B, Beale St. & Chapin project. We would like you to quote this project. Please forward your quote by noon on Friday, May 5 to estimatin sel econstruction.com. Please see the links below for the plans, specs and any addendums. Plans: 0 https://selgeconstruction-my.sharepoint.com/:b:/P/cloud/EXZSwh.-aWBGpv- niMTMamUBFRM0rW4iUk2HSixwas9t ?e=YAdUOi Specs: c'- Small Drainage Improvements -Beale Street & Chapin Street - Proiect No. 121-006B - S ecs. df Thank you Crissy Frickson Office Manager Lv Project Management Administrator Selge Construction 28 2 S. 11th St. Niles, MI 49120 (w)269-684-0842 www.selgeconstruction.com Crissy Frickson From: Crissy Frickson Sent: Wednesday, April 26, 2023 3:53 PM To: kennedyexpressline@yahoo.com; James Michalski; jdw@slussers.com Subject: RFQ: South Bend 2021 Small Drain Improv. Bid B, Beale St. & Chapin Good Morning, We are bidding the City of South Bend 2021 Small Drainage Improvements — Bid B, Beale St. & Chapin project. We would like you to quote this project. Please forward your quote by noon on Friday, May 5 to estimating(@seigeconstructon.com. Please see the links below for the plans, specs and any addendums. Plans: ©htt s: sel econstruction-m .share oint.com :b: Claud El{ZSwh -aWBG n'MTMamUBFRM0rW4'Uk2WSixwts9t ?e=YAdUO' Specs: S Small Drainage lm rovements-Beale Street & Chapin Street - Project No. 121-0068 - S ecs. df Thank you CONSTRUCTION Crissy Frickson Office Manager Project Management Administrator Selge Construction 2833 S. 11th St. Niles, MI 49120 (w)269-684-0842 www.selgeconstruction.com Crissy Frickson From: Crissy Frickson Sent: Wednesday, April 26, 2023 3:54 PM To: RFightinglrish@aol.com; estimating Subject: RFQ: South Bend 2021 Small Drain Improv. Bid B, Beale St. & Chapin Good Morning, We are bidding the City of South Bend 2021 Small Drainage Improvements — Bid B, Beale St. & Chapin project. We would like you to quote this project. Please forward your quote by noon on Friday, May 5 to estimatingU@selgeconstruction.com. Please see the links below for the plans, specs and any addendums. Plans: ° h. s:llseleeconstruction-my.sharepoint.coml.blap/cloud/EXZSwhg-aWBGpv- n'MTMamUBFRMOrW4iUk2HSixw2s9t ?e=YAdUO' Specs: W Small Drainage Improvements -Beale Street & Chapin Street - Proiect No. 121-006B - Specs.pdf Thank you �m CONSTRUCTION Crissy Frickson Office Manager Project Management Administrator Selge Construction 2833 S. 11th St. Niles, MI 49120 (w)269-684-0842 www.selgeconstruction.com Crissy Frickson From: Microsoft Outlook To: mcintyrejonesinc@aol.com;jnnfrram@aol.com Sent: Wednesday, April 26, 2023 4:25 PM Subject: Undeliverable: RFQ: South Bend 2021 Small Drain Improv. Beale St. & Chapin Office 365 Your message couldn't be delivered to the recipients shown below. When Office 365 tried to send your message, the receiving email server outside Office 365 reported an error. cfrickson Office 365 Multiple recipients Sender Action Required Policy violation or system error Couldn't deliver the message to the following recipients: mcintyrejonesinc@aol.com, jnnfrram@aol.com How to Fix It Check the "Reported Error" from the "Error Details" section shown below for more information about the problem. The error might tell you what went wrong and how to fix it. For example, if the error states that the message was blocked due to a potential virus or because the message was too large, try sending the message again without attachments. If you're not able to fix the problem, it's likely that only the recipient's email admin can fix it. Contact the recipient by some other means (by phone, for example) and ask them to tell their email admin about the problem. Give them the "Reported Error" from the "Error Details" section below. Was this helpful? Senn feedback to Microsoft. More Info for Email Admins 1 Crissy Frickson From: Teresa Butler <tc@bucconstructionsupply.com> Sent: Monday, May 8, 2023 10:16 AM To: Crissy Frickson Subject: Re: RFQ: SBend 2021 Small Drainage Improv. Beale & Chapin CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe. Good Morning Crissy, Hope all is well. We decided not to quote this project. Good Luck with you bid. Thank you, Teresa Butler BUC Construction Supply, Inc. DBEW c: 765-412-3484 e: tc@bucconstructionsupply.com From: Crissy Frickson <cfrickson@selgeconstruction.com> Sent: Monday, May 8, 2023 8:24 AM To: Teresa Butler <tc@bucconstructionsupply.com> Subject: RFQ: SBend 2021 Small Drainage Improv. Beale & Chapin Good Morning, Will you be quoting the South Bend 2021 Small Drainage Improvements, Bid B Beale & Chapin project? We received the Johnson & Fellows St. quote but haven't received the Beale & Chapin. Thank you, L . CONSTRUCTION ��. Good Morning, Crissy Frickson Office Manager Project Management Administrator Selge Construction 2833 S. 11th St. Niles, MI 49120 (w)269-684-0842 www.selgeconstruction.com We are bidding the City of South Bend 2021 Small Drainage Improvements — Bid B, Beale St. & Chapin project. We would like you to quote this project. Please forward your quote by noon on Friday, May 5 to estimatin sel econstruction.com. Please see the links below for the plans, specs and any addendums. Plans: ° httns lleconstruction-mv.sharepoint.coml:b:Iplcloud1Ex25wh-aWBGgv- noMTMamUBFRMOrW4iUk2HSixwzs9t ?e=YAdUOi 1 Status code: 550 5.0.350 The error reported by the receiving server wasn't specific enough to determine the exact nature of the problem. These errors often indicate the message violates a security or policy setting configured on the recipient's email servers. If the sender is unable to fix the problem by modifying their message, then it's likely a problem that only the recipient's email admin can fix. Try the following: Check the error for information about the problem - The "Reported Error" returned by the external email server can be found in the "Error Details" section below. This error might tell you what went wrong and provide clues for how to fix it. For example, if the error states the message was rejected due a Sender Policy Framework (SPF) issue, then you'll have to work with your domain registrar to correctly configure your domain's SPF records. Check the error for information about where the problem is happening - For example, look for a domain name like contoso.com. A domain name in the error might suggest who is responsible for the error. It could be the recipient's email server, or it could be a third -party service that your organization or the recipient's organization is using to process or filter email messages. If you can't fix the problem, contact the responsible party's email admin - Give them the error code and error message from this non -delivery report (NDR) to help them troubleshoot the issue. For security or policy violation issues, it might be sufficient for them to just add your sending IP addresses or domain to their allowed senders list. It's likely that only the recipient's email admin can fix the problem. Unfortunately, it's unlikely Office 365 Support will be able to help with these kinds of externally reported errors. Original Message Details Created Date: 4/26/2023 7:51:42 PM Sender Address: cfrickson@selgeconstruction.com Recipient Address: mcintyrejonesinc@aol.com, jnnfrram@aol.com Subject: RFQ: South Bend 2021 Small Drain Improv. Beale St. & Chapin Error Details Error: 550 5.0.350 Remote server returned an error -> 554 delivery error.• dd No valid recipients found - atlas 103.aol.mail.bf1.yahoo.com Retry count: 2 Message rejected by: mtaproxy218.aol.mail.bf1.yahoo.com Notification Details Sent by: CH2PR04M86774.namprd04.prod.outlook. com Message Hops LOCAUQ South Bend Tribune I The Herald Times The Times -Mail I Evening World The Reporter Times Account Number: 547240 Customer Name: Selge Construction Co. Customer Address: Selge Construction Co. 2833 S. 11TH STREET NILES MI 49120 Contact Name: Selge Construction Co. Contact Phone: 5746840842 Contact Email: PO Number: Print Product SBN South Bend Tribune SBN southbendtribune.com #Insertions Start - End 05/02/2023 - 05/03/2023 05/02/2023 - 05/03/2023 Category Bids & Proposals Bids & Proposals Total Order Confirmation $11.10 Order Confirmation Not an Invoice Date: 04/26/2023 Order Number: 8756709 Prepayment $ 0.00 Amount: Column Count: 1.0000 Line Count: 15.0000 Height in Inches: 0.0000 1/2 Ad P review Selge Construction Co., Inc is requesting subcontractor bids from qualified MBE/WBE/VBE subcontractors, suppliers, manufacturers, and truckers for the CITY OF SOUTH BEND - 2021 DRAINAGE IMPROVEMENTS - BID B, BEALE ST & CHAPIN # 121- 006B, Interested businesses please contact our main office at (269) 684-0842. Proposals will be accepted until noon, Friday,, May 5,f 20230 Hspaxlp 2x 5:2 5:3 2/2 • Slusser's Green Thumb, Inc. Phone: (574) 722-3102 126 Montgomery Street Toll Free: (800) 762-7442 Post Office Box 33 Fax: (574) 722-2993 Logansport, Indiana 46947-0033 Estimating Fax: (574) 722-1628 Website: www.slussers.com Seeding - Sodding, Eroslon Control, Landscaping Email: info@slussers.com FS*LUSSERS Prequalified -Certified Indiana "WBE" Contractor QUO TA TION Customer: SELCON Quoted: May 6, 2023 Quote No. 2021 BIDB Selge Construction, Inc. Bids: May 9, 2023 Project: S. Bend 2021 Drainage Improvements - Bid B 2833 South 11 th Street Location: St. Joseph County, Indiana, USA Niles MI 49120A421 Estimated by: John Williamson, Extension 3210 Phone: (269) 684-0842 Revised: Fax: (269) 684-0846 Revisions: Attn: Estimating LINE ITEM BID ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE AMOUNT DIV. #1 - Beale Street Improvements 1 21 Turf Sod wl 30 Day Watering - Partial 180.000 SY $ 24.25 $ 4,365.00 (Topsoil or ground prep not included) 2 22 Overstory Tree, 2.5" Cal 4.000 EA $ 805.00 $ 3,220.00 3 23 Tree Watering Bag 4.000 EA $ 30.00 $ 120.00 Total: $ 7,705.00 DIV. #2 - Chapin Street Improvements 1 29 Turf Sod w/ 30 Day Watering - Partial 138.000 SY $ 29.75 $ 4,105.50 (Topsoil or ground prep not included) 2 20 Overstory Tree, 2.5" Cal 5.000 EA $ 750.00 $ 3,750.00 3 21 Tree Watering Bag 5.000 EA $ 30.00 $ 150.00 Total: $ 8,005.50 OPTIONAL 1 1 Optional Ground Prep for Turf Sod Div. #1 180.000 SY $ 2.65 $ 477.00 2 2 Optional Ground Prep for Turf Sod Div. #2 138,000 SY $ 2.88 $ 397.44 Accepted by: "'SPECIAL NOTATIONS'**"* Selge Construction, Inc. Date Subtotal: SPECIFIC CONDITIONS ARE LISTED ON THE NEXT PAGE Sales Tax: Equal Opportunity Employer Total: SLUSSERS SPECIAL CONDITIONS Concerning the Attached Quotation Quote Number: 2021BIDB STANDARD NOTATIONS; 1. Special note concerning seeding. Slussees will install seed year-round, However, we will not guarantee seeding performed May 15th through August 15th, and October 1 through March 1. Seeding during this period is very risky due to extreme climatic conditions {heat(drought/cold/etc,} This note does not apply to prairie or wetland seeding unless specified otherwise. 2. This quote is valid for a period of 60 days. 3. Lawn maintenance to include mowing or spraying is not included in this quotation. 4. Topsoil, topsoil placement and any necessary amendments are not included in this quotation. 5. Quantities on this quotation are approximate. Areas will be measured and invoiced per unit prices. 6. Performance & Payment bonds are available but not included in this quotation. 7. Clearing, grubbing, removal of rocks, debris and existing vegetation is not included in this quotation 8. Seeding or sodding off right-of-way or outside of the construction limits is not included in this quotation. 9. Inorganic and Organic soil amendments are not included in this quotation. 10, Turf Sod partial price does not include topsoil, topsoil placement, ground preparation, or notching 11. Turf Sod partial price includes supplying and installing 100% Kentucky Bluegrass variety sod and watering for 30 days per Indot specifications 12. Tree price includes supplying and installing 2.5" Caliper size tree, staking, hardwood mulch, and a 1 year warranty. 13. Optional ground prep price for turf sod does not include topsoil, topsoil placement, grading, or removal of existing vegetation. 14. Optional ground prep price for turf sod includes sod notching, fine raking, knocking down dirt clods, and removal of rocks only. 15. Removal or transplanting existing landscape material is not included in this quotation. 16. Steel landscape edging is not included in this quotation. 17. Supplying or installing topsoil, planting soil, engineering soil, or subsoil is not included in this quotation. 18. Maintenance or warranty bond for turf sod or trees is not included in this quotation. 19. Sodding price does not include a 1 year warranty or a 1 year maintenance. 20. Indiana State Sales Tax has not been included in pricing. 21. Traffic control is the responsibility of the contra ctorlowner. smky Quote safflefffiffs IN& `The Road To Success Is Always Under Construction' Date- 4/26/2023 24963 US 20 West lob South Bond 2021 South Bend, Indiana, 46628 Drainage Phone: 574 287-2078 Improvements- Bid B.seals St>l<Chapin St, Fax. 574 287-1744 Project No.121-006B. CRY Of South Bend, IN. TO All Bidders MY lhteMM# ! Bescriptlon BnitPrice Line Total Division 1- Beale Street Improvements: 1 LS 3 Maintenance Of Traffic- As Shown $10,246.00 Lump Sum $10,246.00 On Plan, Consists Of. 4 EA- Construction Sign, A 6 EA- Type III Barricade W/ Sign 6 EA- Type I II Barricade 30 EA- Detour Route Marker Assembly Labor For One (1) Initial Set Up & One (1) Final Pick Up. Daily Rental Items, If Needed.• Drums, Daily Rental, If Needed $1.15PerDay, Each Delivery Of Daily Rental Items, Per Each Requested Delivery (Includes $795.00 Per Delivery Pick Up) WBEDBE"Equa/ OpportunityEmpioyerS-Indiana LaboreiS-ATSSA Certified'' Page 1 Of2 swe Baffle8difix im The Road To Success Is Always Under Construction" 24963 US 20 West South Bend, Indiana, 46628 Phone. 574 287-2078 Fax 574 287-1744 Q41 1 LS Line Rem # Description OUR Hen i Division 2- Chapin Sheet Improvements., 3 Maintenance Of Traffic- As Shown $9,086.00 Lump Sum On Plan, Consists Of: 8 EA- Construction Sign, A 2 EA- Type I II Barricade W/ Sign 4 EA- Type III Barricade 26 EA- Detour Route Marker Assembly Labor For One (1) Initial Set Up & One (1) Final Pick Up. Daily Rental Items, lfNeeded Drums, Daily Rental, If Needed $1.15PerDay, Each Deli very Of Daily Rental Items, Per Each Requested Delivery (Includes $795.00 Per Delivery Pick Up) Quote Date: 4/26/2023 Job South Bend 2021 drainage Improvements- Bid B. Beale St a Chapin St, Project He.121-006B. CRY Of South Bond, IN. TO All Bidders 11 Line Total $9,086.00 WBEDBE*Equa/ Opportunity Employers*Indiana Laborers *A TSSA Certified* Page 2 Of2 Thank you foryourbusiness! Quotation prepared by: Subtotal This is a quotation on the goods named, subject to the conditions noted below: (Quotation Valid For 60C/D's From Initial Quotation, Any Equipment Not Listed Herein, Or Requested By Contractor Will Be Charged Out As Extra, At Contractors Expense.) To accept this quotation, sign here and return: Name: Company Crissy Frickson From: Bernard Coutee<lstclasslogistics20l3@gmaii.com> Sent: Monday, May 8, 2023 8:29 AM To: Crissy Frickson Subject: Re: RFQ: South Bend 2021 Drainage Improv. Beale & Chapin Attachments: image002.png CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe. Good morning Crissy Yes I will send a quote. In the mean feel free to use trucking rates from prior quotes sent this year. Thanks Bernard Coutee Chief Executive Officer 1st Class Logistics LLC South Bend IN. 574-993-0071 lstcla sslogistics. o rp, On Mon, May 8, 2023, 7:25 AM Crissy Frickson <cfricksonC selgeconstruction.com> wrote: Good Morning, Will you be quoting the South Bend 2021 Small Drainage Improvements, Bid B Beale & Chapin project? We are looking for trucking prices. Thank you, Crissy Frickson Office Manager Project Management Administrator Selge Construction 2833 S. 11th St. Niles, MI 49120 (w)269-684-0842 www. seloeco nstructio n. com 1 Bid Memo *State of Indiana Certified MBE -DBE* FIN 46-3085979 Date: 4/5/2023 Project: 2023 Traffic Calming Project location: South Bend, IN Project No..122-014C Quote prepared for: Selge Construction 2023 Tri-axle hourly rates Regular rate $117.00 Overtime rate $131.00 2023 Quad -axle hourly rates Regular rate $121.00 Overtime rate $135.00 2023 Flatbed hourly rates Regular rate $130.00 ■ Overtime consists of anything over 8 hrs daily and all day Saturday 2, 4 and 8 hour rule applies for daily hourly minimums 4, and 8 hour daily minimums for flatbed hauling, local hauling, legal loads only Sunday rates add $36.00 per hour, per truck to overtime rates. 8 hr. Minimum 15 minutes travel time added daily to each truck at regular rate s Trucks will be upon availability, 1st Class does not have control of scheduling To avoid 2 hour show up time please call our office 2 hours before start times for any job cancellations or delays 1 st Class shall be compensated for all time spent on the jobsite Truck orders requires 48 to 72 hour notice if possible • Invoices are due NET 15 • Signatory to Teamsters Local 364 Union Any questions contact Bernard Coutee... 574-993-0071 Justin Butler From: Angelo Mazzocchi <amazzocchi@rieth-riley.com> Sent: Monday, May 8, 2023 11:36 AM To: Justin Butler Subject: RE: MBE Trucking CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe. After reviewing job cost our trucking dollars are very minimal on this proposal, therefore the work would likely be self - performed so we're unable to offer any MBE trucking dollars —Thanks RIFEfL I F� Y CnHsrRycrrnh Ca Inrc ANOELO M. MAaOCCHi Fr�ar�rfFsrMr3tw - 25200 SR 23 South Bermt K 46614 Work(574) 255-8321 e t 23318 Mloh ia (574) 532-C333 RIETH-IL E Y i �, wwwr+ath-raeyavrn 110% Employee Owned This e-mail and any attachments thereto, are intended only for use by the addressee(s) named herein and may contain legally privileged and/or confidential information. If you are not the intended recipient of this e-mail (or the person responsible for delivering this document to the intended recipient), you are hereby notified that any dissemination, distribution, printing or copying of this e-mail, and any attachment thereto, is strictly prohibited. If you have received this e-mail in error, please respond to the individual sending the message, and permanently delete the original and any copy of any e-mail and printout thereof. From: Justin Butler <jbutler@selgeconstruction.com> Sent: Monday, May 8, 2023 9:28 AM To: Angelo Mazzocchi <amazzocchi@rieth-riley.com> Subject: MBE Trucking Angelo, Can you provide MBE trucking for the beale and chapin project? Justin Butler Selge Construction Co., Inc. 5ELGL ]P�w_WR Selge Construction Co., Inc. 2833 S. 111h Street -Niles, Michigan 49120 P:269.684.0842 F:269.684.0846 �ti�t w.sclKscnnstructin4i.esnr� City of South Bend 1316 County -City Building 227 W. Jefferson Boulevard South Bend, Indiana 46601 RE: MBE/WBE GOALS CITY OF SOUTH BEND 2021 DRAINAGE IMPROVEMENTS BID B, PROJECT NO.121-006B To Whom It May Concern: The contract special provisions for the above referenced project, has applied certain WBE/MBE goals for both Division 1 and Division 2. Division 1 has stated goals of 2.3% for MBE and 4.7% for WBE. Division 2 has stated goals of 2.4% for MBE and 4.8% for VIBE. As you will see from our bidding documents, the WBE goal has been exceeded in both divisions. We were unable to meet the stated goals of MBE for both Divisions. It is our best estimation that the contract will require approximately 8 hours of dump truck hauling to complete the project. At the time of bidding, we were able to provide 8 hours of an MBE hauling business (Pt Class Logistics). This equates to $968.00 of MBE. Due to the limited contract work items of this job, there are no other MBE subcontractors or suppliers to perform any other portions of the work. We attempted to attain additional MBE dollars from our paving subcontractor Rieth-Riley Construction. They were unable to provide any MBE dollars within their scope (see attached). Thank you for your understanding in this matter. Sincerely, Justin Butler CITY OF SOUTH BEND, INDIANA CONTRACTOR'S BID FOR PUBLIC WORK RESPONSIBLE BIDDER CHECKLIST Project Name CITY OF SOUTH BEND 2021 DRAINGE IMPROVEMENTS — BID B Project No. For Bids Due 121-006B MAY 9, 2023 Contractor Name: Selge Construction Co., Inc. The City seeks to enhance its ability to identify responsive and responsible bidders on all City public works projects by institution of comprehensive submission requirements in compliance with State law. Quality workmanship, efficient operation, safety, and timely completion of projects requires that all bidders meet certain minimum requirements to be responsive and responsible bidders. THIS FORM MUST BE SUBMITTED WITH YOUR BID. INSTRUCTIONS: If you are a pre -qualified bidder, complete Section I only. If you are not a pre -qualified bidder, complete Section II only. Section II acts as an application for pre -qualification. Submission of Section II will allow the bidder to be considered for pre -qualification for bids with the City of South Bend Department of Public Works. Pre - qualified bidders will then be exempt from a portion of the submission requirements outlined in Section 6- 63 of The Responsible Bidding Ordinance No. 10594-18 (hereinafter, "Responsible Bidding Ordinance") for a period of twelve (12) months. Thereafter, contractors who are pre -qualified must submit a complete application for continuation of "pre - qualified standing, on a form provided by the City ("Responsible Bidder Checklist (1) Pre -Qualified Bidders") by December 31 st for the upcoming calendar year, or within twelve (12) months of obtaining pre - qualified standing. If the status of any item changes within the twelve (12) months, it is the responsibility of the contractor to notify the City. Failure by any pre -qualified contractor to submit its complete application for continuation of "pre -qualified" standing within the time prescribed above shall result in automatic removal of the designation, effective January 1 of the following year, or immediately following the twelve (12) months of pre -qualified standing. However, the "removed" contractor or subcontractor shall still be permitted to bid on City public works projects, though the contractor must submit all required documents under 6-63 until "pre -qualified" status is re-established. Please Note: The City reserves the right to request supplemental information from the bidder, additional verification of any information provided by the bidder, and may also conduct random inquiries of the bidder's current and previous customers regardless of pre -qualified standing. It is the sole responsibility of the potential bidder to comply with all submission requirements applicable to the bidder in Section 6-63 of the Responsible Bidding Ordinance no later than the date of the public bid opening. Version 10/13/2021 General Conditions - 10 POST BID SUBMISSIONS: Post -bid submissions must be submitted in accordance with Section 6-64 of the Responsible Bidding Ordinance. The post -bid submission requirements are as follows: 1. All bidders shall collect, maintain, and provide upon request, a current written list that discloses the name, address, licensing status, and type of work for any subcontractor from whom the bidder has accepted a bid and/or intends to hire on any part of the public work project, including individuals performing work as independent contractors. 2. Each subcontractor, whose portion of the project is estimated to be at least one -hundred fifty thousand dollars ($150,000.00), shall be required to adhere to the requirements of Section I of the Responsible Bidder Ordinance as though it were bidding directly to the City, except that the subcontractor shall submit the required information (including the name, address, and type of work) to the successful bidder prior to the commencement of work. 3. Failure of a subcontractor to submit the required information shall not disqualify the successful bidder from performing work on the project and shall not constitute a contractual default and/or breach by the successful bidder. However, the City may withhold all payment otherwise due for work performed by a subcontractor, until the subcontractor submits the required information and the City approves such information. 4. The disclosure of a subcontractor list ("Disclosed Subcontractor(s)") to the City by a bidder shall not create any rights in the Disclosed Subcontractor(s). Thus, a bidder may substitute another subcontractor for a Disclosed Subcontractor by giving the City, upon request, written notice of the name, address, licensing status, and type of work of the substitute subcontractor. 5. The successful bidder and all subcontractors on a public works project are required to submit certified payroll utilizing the federal form known as WH-347 or a similar form on a bi-weekly basis, submitted within 10 days after the end of each bi-weekly payroll period. Certified payrolls shall identify the job title and craft for each employee. Certified payrolls shall be submitted electronically. Please Note: Submissions deemed inadequate, incomplete, or untimely by the City may result in the automatic disqualification of the bid. The City, after review of complete and timely submissions, shall, in its sole discretion, after taking into account all information in the submission requirements, determine whether a bidder is responsive and responsible, and provide a Pre -Qualification Verification Letter. The City specifically reserves the right to utilize all information provided in the contractor's submission and any information obtained by the City through its own independent verification of the information provided by the contractor. Version 10/13/2021 General Conditions -11 PRE -QUALIFIED BIDDER CHECKLIST (a) Acknowledgements: (i) x By checking this box, I hereby acknowledge that I am a pre -qualified bidder with the City of South Bend and that I have met the pre -qualification requirements within the last twelve (12) months. A copy of my Pre -Qualification verification letter is attached. (ii) x By checking this box, I hereby acknowledge that the City reserves the right to request supplemental information, additional verification of any information provided by me, and may also conduct random inquiries of my current and prior customers. (b) Attachments: (i) x Indiana Secretary of State's on-line records (ie. Business verification) dated within sixty (60) days of the submission of said document showing that business is in existence, current with the Indiana Secretary of State's Business Entity Report, and eligible for a certificate of good standing. (Not applicable to individuals, sole proprietors or partnerships). (ii) x Statement on staffing capabilities, including labor sources. This statement indicates and ensures I have sufficient employees on staff to complete the work. It outlines how I intend to meet the staffing needs of the work. (iii) x List of projects of similar size and scope of work performed in all areas, including the State of Indiana, within the last three (3) years. (iv) x For every project, submit evidence of participation in apprenticeship and training programs, applicable to the work to be performed on the project, which are approved by and registered with the United States Department of Labor's Office of Apprenticeship, or its successor organization. Version 10/13/2021 General Conditions - 12 II. PRE -QUALIFICATION CHECKLIST (FOR BIDDERS THAT ARE NOT PRE -QUALIFIED) (a) Acknowledgements: (i) _ By checking this box, I hereby acknowledge that I am not a pre -qualified bidder with the City of South Bend. (ii) _ By checking this box, I hereby acknowledge that the City reserves the right to request supplemental information, additional verification of any information provided, and may also conduct random inquiries of my current and prior customers. The City reserved the right to utilize all information provided in this submission and all information obtained in inquiries or requests to determine if a bidder is responsive and responsible. Additionally, I acknowledge that all information provided to the City shall be regarded as public records. (iii) _ By checking this box, I hereby acknowledge that copies of all Applicable apprenticeship certificates or standards for training programs applicable to the work performed on the project may be requested at any time and shall be furnished upon request. (iv) _ By checking this box, I hereby acknowledge and ensure that I and all sub- contractors, from whom I have accepted a bid and/or intend to hire to perform work on the public work project, are properly licensed. Furthermore, I acknowledge my understanding that it is my responsibility to ensure that all sub -contractors have the necessary licenses to undertake the work called for in this bid. If a sub- contractor loses their license at any point, it is the responsibility of that sub- contractor to notify the City. (b) Attachments: (i) Indiana Secretary of State's on-line records (ie. Business verification) dated within _ sixty (60) days of the submission of said document showing that business is in existence, current with the Indiana Secretary of State's Business Entity Report, and eligible for a certificate of good standing. (Not applicable to individuals, sole proprietors or partnerships). (ii) List identifying all former business names. (iii) Any determinations by a court or governmental agency any violations of federal state, or local laws including, but not limited to, violations of contracting or antitrust laws, tax or licensing laws, environmental laws, Occupational Safety and Health Act (OSHA), or federal Davis -Bacon and related Acts, within the preceding five (5) (iv) years. Statement about staffing capabilities, including labor sources. This statement _ indicates and ensures I have sufficient employees on staff to complete the work I am bidding on OR outlines how I intend to meet the staffing needs of the work. (v) Statement that individuals who will perform work on the public work project on my _ behalf will be properly classified as an employee or as an independent contractor under all applicable state and federal laws and local ordinances. (vi) For every project, submit evidence of participation in apprenticeship and training programs, applicable to the work to be performed on the project, which are approved by and registered with the United States Department of Labor's Office of Apprenticeship, or its successor organization. (vii) Copy of a written plan for employee drug testing that covers all of my employees _ who will perform work on the public work project and meets or exceeds the requirements set forth in IC 4-13-18-5 or IC 4-13-18-6. (viii) Evidence that I am utilizing a surety company which is on the Bureau of Fiscal Service "Department of Treasury's Listing of Approved Sureties" as required in the bid specifications or contract. Version 10/13/2021 General Conditions -13 (ix) Written statement of any federal, state or local tax liens or tax delinquencies owed to any federal, state or local taxing body in the preceding three years. (i) List of projects of similar size and scope of work performed in all areas, including the State of Indiana, within three (3) years prior to the date on which the bid is due. Date: May 9 2023 (Si ere) Justin Butler, Vice President (Print Name Here) Selge Construction Co., Inc. (Name of Company) 2833 South 11th Street (Address of Company) Niles (City) Michigan (State) 269-684-0842 (Telephone Number) Version 10/13/2021 General Conditions -14 CITY OF SOUTH BEND JAMES MUELL.ER, MAYOR DEPARTMENT OF PUBLIC WORKS Eluc HORVATfl, DIRECTOR December 14, 2022 Allison Swinehart Selge Construction Co., Inc. aswinehart(oel econstruction.com RE: Pre -Qualification Verification Dear Ms. Swinehart: This letter serves as verification of Pre -Qualification status of your company for bidding with the City of South Bend. This Pre -Qualification status is effective for twelve (12) months from the date of this letter. Thereafter you are required to re -submit a complete application for continuation of pre -qualification status prior to December 31 for the upcoming calendar year. A copy of this Verification Letter must be included with every bid exceeding $150,000 submitted to the City of South Bend Board of Public Works.. along with your Pre -Qualified Bidder Checklist and attachments. If you have any further questions regarding this matter, please call this office at (574) 235- 9251. Sincerely, z Liz Horvath, Permit Manager State of Indiana Office of the Secretary of State Certified Copies To Whom These Presents Come, Greeting: I, DIEGO MORALES, Secretary of State of Indiana, do hereby certify that I am, by virtue of the laws of the State of Indiana, the custodian of the corporate records and the proper official to execute this certificate. I further certify that this is a true and complete copy of this 2 page document consisting of the following records filed in this office: Certification Date: April 10, 2023 Business Name: SELGE CONSTRUCTION CO INC Business ID: 197203-307 Transaction Business Entity Report Date Filed No. of pages 01/11/2022 2 Total No. of pages 2 In Witness Whereof, I have caused to be affixed my signature and the seal of the State of Indiana, at the City of Indianapolis, April 10, 2023 DIEGO MORALES SECRETARY OF STATE 197203-307 / 15596152 All certificates should be validated here: https://bsd.sos.in.gov/ValidateCertifiicate Expires on May 10, 2023. Page 1 Of 3 CertificateED:15596152 BUSINESS ENTITY REPORT ?'a..N12 arm PRLNCTPAL OF'F`ICE ?.DDRM BUSINESS ID BUSINESS TYPE BUSINESS NAME ENTITY CREATION DATE JURISDICTION OF FORMATION PRINCIPAL OFFICE ADDRESS APPROVED AND FILED HOW SULLIVAN INDIANA SECRETARY OF STATE 01/11/2022 03:32 PM 197203-307 Foreign For -Profit Corporation SELGE CONSTRUCTION CO INC 03/15/1972 Michigan 2833 S. I ith Street, NILES, MI, 49120, USA 2022/2023 EFFECTIVE DATE 01/11/2022 EFFECTIVE TIM 3:32 PM REGISTERED OFFICE AND AUi3MSS REGISTERED AGENT TYPE Individual NAME BRENT E. INABNIT ADDRESS 210 S. MICHIGAN AYE, SOUTH BEND, IN, 46624, USA Page 2 Of 3 CertificateID:15596152_ _ _ APPROVED AND FILED HOLLI SULLIVAN INDIANA SECRETARY OF STATE 01/11/2022 03:32 PM : jjf3708S* IN ORMA1 TON - TITLE President NAME Jim Boyles ADDRESS 2833 S 11TH ST., NILES, MI, 49120, USA TITLE Secretary NAME Allison Swinehart ADDRESS 2833 S. I ith Street, Niles, MI, 49120, USA TITLE CEO NAME Marvin L Selge JR ADDRESS 2833 S. I Ith Street, Niles, MI, 49120, USA TITLE NAME ADDRESS Vice President Justin Butler 2833 S. I ith Street, Niles, MI, 49120, USA IN WITNESS WHEREOF, THE UNDERSIGNED HEREBY VERIFIES, SUBJECT TO THE PENALTIES OF PERJURY, THAT THE STATEMENTS CONTAINED HEREIN ARE TRUE, THIS DAY January 11, 2022. THE UNDERSIGNED ACKNOWLEDGES THAT A PERSON COMMITS A CLASS A MISDEMEANOR BY SIGNING A DOCUMENT THAT THE PERSON KNOWS IS FALSE IN A MATERIAL RESPECT WITH THE INTENT THAT THE DOCUMENT BE DELIVERED TO THE SECRETARY OF STATE FOR FILING. SIGNATURE TITLE ALLISON SWINEHART Secretary Business ID : 197203-307 Filing No.: 9281142 Page 3 Of 3 CertificateID:15596152_ Sege Construction Staf ng Capabllides and Employee Statement At Sere CMSM:aion we am proud to be put of the ChziWan L'A=Assodadw (om) Local Union M Being past of the CL.A pwMa an owed woxit&= d at has gone through ssgosous mining and PmVide; pr=hm Pay and !benefits to evetyooe on stsf£ our team is campsised of 75 individuals (15 office metnima qnd 69 field p=onng, The team is made up of shale, (Female, anal Minority aiembers. ne average employee st Selge Commuction has been vkj the company for 14ytam . &cb Person on your project nail he pmpmy c}assificd as an employee under all apprw ahle state and federal laws and local oediaances. Ihexe wl not be any temporaq 12borers on this px*cL Selge h2s mever defaulted on a convect and are do not bid airy wodc that are cannot eompiete. Based on aaaur c,=ent a6edule and capahMties, vre grill utilize 1QD°/a Sege employees and es pment for pour Pm1ea We do net foresee any issues being able to complae the project laid& the designated sr w&& Let d= be no doubt that Sdge Coonateucfioa has sufficieat employy= and resources to complete the wCA are are . SELGE CONSTRUCTION CO., INC. COMPLETED PROJECT DESCRIPTIONS Description: Studebaker Fountain Water Improvement (722) - Owner: City of South Bend Installation of Water Service and Sanitary Lateral. Installation of new water softener and injection system for pump house. All Restoration and Hard surface. $1509,913.00. Completed: 2022. Description: Johnson St Sewer Extension (721) - Owner: City of Elkhart. Installation of 140OLF +/- of 12" sanitary sewer and associated laterals. Including all grading, concrete flatwork, and complete restoration. $1,393,846.00. Completed: 2022. Description: JA Drive Node Repair (719) — Owner: City of Elkhart. Installation of new Riprap diversion in Elkhart River. $159,880.00. Completed: 2022. Description: Parking Lot & ADA Compliant Trail (717) — Owner: Indiana Dept. of Natural Resources. Installation of approximately 1,400LF of gravel pathway. $159,850.00. Completed: 2022. Description: 2021 Drainage Improvements - Kaley & Marion St (706) — Owner: City of South Bend. Installation of new drainage structures, new concrete curb, and asphalt re -surfacing. $246,810.00. Completed: 2022. Description: Laurel Woods Drainage Improvements (702) — Owner: City of South Bend. Excavation of existing retention pond and site storm system. $125,142.00. Completed: 2022. Description: South Main Streetscapes Project (694) — Owner: City of Elkhart. Installation of 2700 LF of 24" perforated storm sewer and all appurtenances. Installation of 36" sanitary sewer. Complete construction of new concrete sidewalks, driveways, and asphalt paving. $2,785,222.00. Completed: 2022. Description: Buchanan - Yellow Lake Project (692) — Owner: Buchanan Land, LLC. Complete construction of approximately 5 miles of gravel pathway through woods. $944,657.00. Completed: 2022. Description: Lift Station Replacement & Improvements (688) — Owner: Colorna Charter Township. installation of 6 new lift stations, including SCADA system upgrades. $1,928,234.00. Completed: 2022. Description: Lakeside Sewer Relocation (674) — Owner: City of Laporte. Installation of 4500 LF of Low- pressure sewer and 38 grinder pumps. One complete lift station replacement. $1,637,111.00. Completed: 2022. Description: I DOT R41066A — Elkhart SR 19 Concrete Pavement (672) — Owner: Indiana Department of Transportation. 12" Concrete paving patching on State Highway. S2,172,788.00. Completed: 2022 Description: Contract 3 NE Section SS Improvements (669) — Owner: City of Benton Harbor. Complete Construction of new Roadways including Sanitary Sewer, Storm Sewer, Water Main, Concrete Curbs and Driveways. $4,554,745.00. Completed: 2022. Description: Park Shore Drive & East Street Improvements (668) — Owner: Village of Cassopolis. Drainage improvements and new road reconstruction. $731,154.00. Completed: 2022. Description: Colfax Lift Station (665) — Owner: City of South Bend. Installation of new Lift Station and all appurtenances. $449,064.00. Completed: 2022. Description: Crawford Park Connector Sewer (630) — Owner: City of Mishawaka. Complete Construction of new combined sewer overflow structures and river outflow. $4,031,520.00 Completed; 2022 Description: Cass Stone Lake Beach (659) — Owner: Village of Cassopolis. Complete Construction of new public beach, pier, and pavilion. Brick Paving and Concrete Walls. $2,487,844.00. Completed: 2021 Description: Cass Downtown Streetscapes (658) — Owner: Village of Cassopolis. Complete Reconstruction of Roadway. Including: Storm Sewer and Water Main, Brick Paving, and all appurtenances. $4,115,879.00. Completed: 2021 2 Description: Steuben Lakes — NED Phase 1 WW Collection System (610) — Owner: LaGrange County Regional Utility District. Installation of 120,000 LF of low-pressure sewer, 290 grinder pump units, 3 new lift stations and one upgrade to existing lift station. $10,144,631.00. Completed: 2021 Description: Buffalo Street Plaza (643) — Owner: City of Warsaw. Installation of helical piles to support deck, retaining walls, decorative concrete, site lighting, pavilion, and an interactive fountain. $2,129,833.00 Completed: 2021 Description: AEP Service Center (628) — Owner: E&L Construction. All site work, underground utilities, site concrete and asphalt pavement for new 35-acre AEP facility. $4,847,000.00 Completed 2021 Description: C-1 Lift Station (670) — Owner: Ontwa Township. Equipment upgrade & to existing lift station. $253,390.00 Completed: 2021 Description: Hills at St. Joe Farm & Curb (676) — Owner: The Village Development LLC. Complete construction of 2,000 LF of new roadway including sanitary sewer, storm sewer and water main. $855,000.00 Completed: 2021 Description: Lift Station & Manhole Improvements (677) — Owner: Village of Martin. Rehabilitation of 2 existing sanitary lift stations. $398,008.00 Completed: 2021 Description: Hills Residential Development Lift Station (681) — Owner: The Village Development LLC. Installation of new sanitary lift station and 9,200 LF of forcemain. $758,650.00 Completed: 2021 Description: Goshen Pond Dam Improvements (701) — Owner: Elkhart County Park & Recreation Board. Removal and replacement of existing toe drain at the base of dam. $162,750.00 Completed: 2021 Description: Ironworks Dev Utilities Phase H (589) — Owner: City of Mishawaka. New sanitary sewer, water main and storm sewer for development at the Ironworks site. $536,041.00 Completed: 2021 Description: Home Street Lift Station (617) — Owner: City of Mishawaka. Removal and replacement of sanitary lift station. $319,952.00 Completed: 2021 Description: Burns Building Utility Extension (632) — Owner: City of South Bend. Extension of sanitary sewer and water main to a new convenience store. $548,626.00 Completed: 2021 Description: St. Joe River Backwater Valve Replacement (642) — Owner: City of South Bend. Installation of 2 new 36" backwater valve and 1 new 42" backwater valve. $105,063.00 Completed: 2021 Description: LCRUD Contract C Regional B Wastewater Treatment Plant Improvements (645) — Owner: LaGrange County Regional Utility District. Construction of two new buildings, installation of new blowers and all associated yard piping to connect to existing equipment. $1,230,212.00 Completed: 2021 Description: CS03 Backwater Valve Repair (652) — Owner: City of South Bend. Removal and replacement of existing sanitary lift station. $109,925.00 Completed: 2021 Description: Dawn Estates Lift Station Replacement (662) — Owner: Town of Middlebury. Removal and replacement of existing sanitary lift station. $288,491.00 Completed: 2021 Description: Lift Station 12 Replacement (667) — Owner: City of Elkhart. Removal and replacement of existing sanitary lift station. $219,474.00 Completed: 2021 Description: Water System Improvements Colfax & Messner (693) — Owner: Benton Charter Township. Installation of 1,600 LF of water main and restoration including concrete pavement. $486,924.00 Completed: 2021 Description: Rock Run Sewer Improvement C (649) — Owner: City of Goshen. Installation of 2,500 LF of 24" & 42" sanitary sewer, concrete siphon chambers and associated restoration. $1,746,290.00 Completed: 2021 Description: East Goshen Water Main Replacement (664) — Owner: City of Goshen. Installation of 4,000 LF of water main, 50 water services and associated street repairs. $1,148,484.00 Completed: 2021 Description: JA Drive & Lexington Streetscapes (629) — Owner: City of Elkhart. Complete reconstruction of the streets including new underground utilities, decorative sidewalk and new streetlights. $1,987,254.00 Completed: 2020 Description: Wawasee Conklin Bay Trail (633) -- Owner: Syracuse-Wawasee Park Foundation. hista3lation of 1,700 LF of boardwalk and 2,500 LF of 10 concrete pathways. $2,254,710.00 Completed: 2020 Description: CR 46 RR Crossing SS Repair (638) — Owner: New Paris Conservancy District. Installation of sanitary sewer beneath the railroad crossing. $248,929.00 Completed: 2020 Description: Laurel Road Trail Construction (639) — Owner: City of South Bend. Installation of concrete pathway. $120,352.75 Completed: 2020 Description: 2020 Concrete Repair (640) — Owner: City of Goshen. Removal and replacement of concrete pavement patches at various locations in Goshen. $905,050.00 Completed: 2020 Description: Brandywine High School Tennis Courts (646) — Owner: Brandywine Community Schools. Installation of new tennis courts including all site work. $500,000.00 Completed: 2020 Description: Press Ganey Concrete Replacement (647) — Owner: PAI Properties, LLC. Removal of existing parking lot and replacement with concrete pavement. $223,000.00 Completed: 2020 Description: Hydrant Replacement (648) — Owner: City of South Bend. Removal and relocation of 6 fire hydrants. $62,727.00 Completed: 2020 Description: Prairie Creek Run Phase II Water Services (656) — Owner: Elkhart Highway Dept. Installation of 13 new water services. $173,678.00 Completed: 2020 Description: Steuben Lakes Pump 1(660) — Owner: Steuben Lakes Regional Waste District. Installation of new lift station and associated bypass pumping. $185,550.00 Completed: 2020 Description: Zigler/Filbert Street Improvements (663) — Owner: Town of New Carlisle. Installation of new water main, storm sewers and road reconstruction. $753,811.00 Completed: 2020 Description: 117 Jackson Avenue (671) — Owner: City of Elkhart. Remove and replace existing manhole. $38,174.00 Completed: 2020 Description: Jackson Boulevard Streetscapes (587) — Owner: City of Elkhart. Remove and reconstruct the entire area including sewers, concrete, curbs, brick work. $5,237,724.00 Completed: 2020 Description: Region C — Wastewater Project — Contract A -Wastewater Treatment Plant (598) — Owner: LaGrange County Regional Utility District. Erection of 1800 square foot maintenance building and 1800 square foot blower/headworks building. Installation of 0.200 MGD extended aeration activated sludge process with aerobic sludge digestion. Main pump station, cast in place concrete tankage, UV disinfection, post aeration and effluent meter. $4,644,845.00 Completed: 2020 Description: Carriage Hills Sanitary Sewer Extension (625) —Owner: St. Joseph County Regional Water and Sewer District. Installation of 15,500 LF of sanitary sewer main and laterals for the Carriage Hills Subdivision. $2,188,635 Completed: 2020 Description: The Mill At Ironworks, Mishawaka, IN (571) — Owner: F&H Mishawaka Development, LLC. Subcontracted by Flaherty & Collins to complete demolition and removal of paving, site clearing and rough grading. Installation of Water, Sanitary Sewer and Storm Drainage. $1,413,067.00 Completed: 2019 Description: Ironworks Development Area Utility Design — Phase H (589) — Owner: City of Mishawaka. Installation of approximately 700 feet of storm sewer and structures, 825 feet of sanitary sewer and structures. Electrical and utility conduit, lighting foundations and appurtenances. $549,451.30 Completed: 2019 Description: Lincolnway West & Charles Martin Drive Improvements (592) — Owner: City of South Bend, IN Installation of storm sewer, structures, drains, curb, sidewalk and brickwork. $1,175,078.00 Completed: 2019 Description: 2018 Lift Station Improvements (597) — Owner: Town of Bremen, IN Removal and installation of lift stations, lift station pumps, electrical system and back-up generator and sanitary sewer and forcemain installation. $638,196.00 Completed: 2019 Description: Buffalo Street Plaza (572) — Owner: City of Warsaw, IN. Installation of boardwalk plaza and greenspace located at Buffalo and East Canal Street. $2,347,947.00 Completed: 2019 6 On -The -job Training 7 E3 HOME HELP CONTACT MENU Welcome ALLISON SJINEHART Home / PartnershloAareements Partnership Agreements Firm Name: Selge Construction Co., Inc. Year. 2023 Training Program: O.rT Pmnnram & Pannerahro Agreement odf Stop 1: Determine Total Number of Hours worked In High way construction trades on INDOT federal-ffid oontracts(etiher as prime contractor or sub contractor during the past three years. Do not include hours worked on statEi4nded and privets work.) Hours Worked During 2020 Hours 2021 Hours 2022 Hours Total 0 403 12 Step 2: Step 3: Add the total number of hours from each year and divide It by three (3): 0 403 12 2020 2021 2022 Murdply the "Average Hours" by five percent (5%): 138 5% Average Hours 415 /3 138 a Average Hours 6 2023 Training Goal Approved Training Program: Labof g.aAmnnz2021 Io 107a.Pd' Reafstered Aprrerdica Stds.gdf Work pFAC&5s kahnre d Rd[ Work Pfom -t oye-atorq Oi here by agree an tyre terms and cond'A;nns rantaimed herein and affirm under penalty and the pre)ury that the Mformatton stated above Is true and accurate. Prepared on 1/11/2023 11:04:33 AM bySWINEHART.ALLISON Approved on ZM2023 835:53 AM by Daniels, Kathryn • Fields with the color background are required Endlana Department of Transportation Version:1.0.0 1/1 U. S. Department of Labor Office of Apprenticeship Date: December 8, 2022 From: Tiffanie L. Clawson Indiana State Director Office of Apprenticeship Subject: Program Verification To: Bruce Dickie Selge Construction Company, Inc. 2833 South 11 th Street Niles, MI 49120 Thank you for participating in the National Apprenticeship Program. You have been registered with the US Department of Labor, Office of Apprenticeship since 2009. Your program has two occupations registered, Construction Craft Laborer and Heavy Construction Equipment Operator. Both occupations have active apprentices registered with the US DOL and utilize NCCER as the RTI Provider. Thank you again for your participation in Registered Apprenticeship with the US Department of Labor, Office of Apprenticeship. If 1 can provide additional information or service, please feel free to contact me. Sigreteiy, � +�.y^ Ti a L. Clawson Indiana State Director U.S. Department of Labor Office of Apprenticeship 317-226-7003 — Office 269-601-2820 — Cell clawson.tifFanie.l@dol.gov uS DOL/ On APPRMCESHIPUSA I I N Phone: (317) 226-7003 46 East Ohio Street, Rm 511 "id1M'm'0r=d4*' — Cell: (269) 601-2820 Indianapolis, IN 46204 Clawson.tdfanie.l@dol.gov ite� jkate� Department f of office of 0[pprrttttrrqbt'P certificate of RrOaration of 0[pprentiroijip program Mq 1$ 2009 OcIle M100809210 /2erfislro/ion :fin. Se4e Construction Company, Inc. Mks, 94tichfgan for Me Trade Classifuation of Consirtwuon Craft La6orer le9isfereo(as par�f of f�e Xafionaj�pprenflcesl-lrp c�ysfem in accoro(ance uvY •fjie basic sfano�zro(,Y of 'Qpprenfrces�rp esfa�'fsSed rt - fie csecrefary of ,6a4-or < qly- � `Ai dCf Y•�r7., of .L (.�nl' i .efj A 1f _ .tiY �' i r L; ,�� %k riN�zLrN•M•. (if`iee�f .//ppren/iec.r�ip CONSENT RESOLUTIONS OF THE SHAREHOLDERS AND DIRECTORS OF SELGE CONSTRUCTION CO., INC. The Shareholders and Board of Directors of Selge Construction Co., Inc., a Michigan corporation, take the following actions pursuant to Section 407 and Section 525 of the Michigan Business Corporation Act: Financial Statement The financial statements have been reviewed by all shareholders and officers and approved as presented. 2. Board of Directors The following persons were elected to serve as directors of the Corporation until the next annual shareholders meeting or until their successors are elected and take office: Marvin L. Selge, Jr. 3. Officers The following person shall hold the offices set forth opposite their names until their successors are elected and shall qualify: Name Office James Boyles President Justin E. Butler Vice President Allison Swinehart Secretary Marvin L. Selge, Jr. Treasurer 4. Authorization to Sign Construction Documents The President, James Boyles, the Vice President, Justin E. Butler, the Treasurer, Marvin L. Selge, Jr., the Secretary, Allison Swinehart, and the Project Managers, Robert P. Kuhns, Robert S. Riley, Christian Baybutt, Ronald J. White, Jr., Thomas A. Lentz, Mathew Huss, Andrew Boyles and Kyle Silveus are all authorized to sign construction documents on behalf of the Corporation. The signature of the President, the Vice President, the Treasurer, the Secretary, or the Project Manager shall be sufficient to bind the Corporation as to any construction documents submitted. 5. Ratification of Past Acts The Shareholders and Directors hereby ratify and reaffirm all corporate actions of the officers and directors of the Corporation taken between the date of the last meeting and the date of this Resolution. 6. Authorization The officers of the Corporation are authorized and empowered for and on behalf of the Corporation to do any and all acts and things and execute any and all additional instruments, papers or documents that may be or become necessary, desirable, or appropriate to carry out, put into effect, and make operative any portion of portions of these Resolutions. DATED: September 1. 2021 L. 5 GE, 4JMRP- "Shareholders" "Director" 6V71 U 7 M7, IGI l._� CERTIFIED RESOLUTION L ALMON S'WINEHART, hereby certify that I am the duly elected and acting Secretary of SELGE CONSTRUCTION CO., INC., a N[ichiga3n corporation, and that the following resolution was duly adopted by unanimous consent of the Shareholders and Directors of said Corporation, on September 1, 2021, and that said resolution is in full force and effect: 1. Board of Directors. The following persona was elected to serve as director of the Corporation until the next annual shareholders meeting or until their successors are elected and take office: Marvin L. Selge, Jr. 2. Officers. The following persons shall hold the offices set forth opposite their names until their successors are elected and shall qualify: N- James Boyles Justin E. Butler Allison Swian<ehart Marvin L. Selge, Jr. wee President Vice President Secretary Treasurer IN WITNESS WHEREOF, I have signed this Certified Resolution this 1st day of September, 2021. AiusoN SWDIEHART 3 STATE OF INDIANA OFFICE OF THE SECRETARY OF STATE CERTIFICATE OF AUTHORIZATION To Whom These Presents Come, Greetings: 1, TODD ROKITA, Secretary of State of Indiana, do hereby certify that I am, by virtue of the laws of the State of Indiana, the custodian of the corporate records, and proper official to execute this certificate. I further certify that records of this office disclose that SELGE CONSTRUCTION CO INC duly filed the requisite documents to commence business activities under the laws of State of Indiana on March 15,1972, and was in existence or authorized to transact business in the State of Indiana on February 10, 2010. I further certify this For -Profit Foreign Corporation has filed its most recent report required by Indiana law with the Secretary of State, or is not yet required to file such report, and that no notice of withdrawal, dissolution or expiration has been filed or taken place. In Witness Whereof, I have hereunto set my hand and affixed the seal of the State of Indiana, at the city of Indianapolis, this Tenth Day of February, 2010. W470 d IT;4 TODD ROKITA, Secretary of State 197203-307 / 2010021072953' (DedTrtCeOf'1TtTiT�t ISSUED BY Atboteutet 3h Zrwz INDIANAPOLIS, IN September27, 2022 TO SELGE CONSTRUCTION CO., INC. NILES, MI who has filed with the Department a Contractor's Statement of Experience and Financial Condition as regrJired under Indiana Code &23tD: is hereby quallfsed to hid at any Department ofTranspartaton le#ting En C4asses of Work and within the amount and other fknitation of each classification as listed tsetow, for �loh period as the unoampfetedwaAt on hand from all sources does not exceed theAggregate amount C1asslficatlon references by name or symbol are in accordanoe wRh the definitions in the Cardractar's Statement of Experrenceand Fnancial Condition.ttis certificate supersedes any certificate previously issued, but Is sub}ecttorevislon or revocation according tothe law, If and when changes In the iinancla! mndltion of the contracting hrm or other facts justify such revision or revocation. Valid September 27, 2022 Thru June 30, 2023 Aggregate Bidding Capacity: 89,269,000.{ 0112 TRENCHLESS PIPE INSTALLATION ....................... ................................ :........ ...:............ $89.269,000.00 0188 FORCE MAINS AND LIFT STATIONS............................................................................... $89,269,000.00 0290 SEWER AND PIPE CLEANING AND LINING................................................................... $89,269,000.00 A(B) CONCRETE PAVEMENT: LIMITED................................................................................... $20,000,000.00 C(A) HEAVY GRADING.............................................................................................................. $89,269,000.00 E(E) SMALL STRUCTURES AND DRAINAGE ITEMS.............................................................. $89,269,000.00 E(F) SURFACE MASONRYAND MISCELLANEOUS CONCRETE ........................................... $20,000,000.00 E(H) DEEP SEWER AND/OR EXCAVATION ........... ............................ :...................................... $89,269,000.00 E(T) DEMOLITION .............................................. ......................................... .............................. $20,000,000.00 C'.� r/V.aAtwJ� PREQUALIFICATION ENGNEER Sbte fans 2DSW (Ri ! bob) COMMOSIONER