HomeMy WebLinkAbout09-05-01 Personnel & Finance tommgttte pout:
ikrisoratel anti finattre (ommttt*e.
The September 5,2001 meeting of the Personnel and Finance Committee was called to order by its
Chairperson, Council Member James Aranowski at 3:01 p.m. in the Council Informal Meeting
Room.
Persons in attendance included Council Members Aranowski, Varner, Coleman, and White;
Mayor Stephen J. Luecke, Public Works Director Gary Gilot, City Engineer Carl Littrell, Director
of Central Services Matt Chlebowski, Fiscal Officer Joe Kuzmits, Director of the Division of
Environmental Services John J. Dillon, Director of Bureau of Sewers and Streets Sam Hensley,
Director of Budgeting & Financial Reporting Tom Skarbek, Director of the Bureau of Water
Works John Stancati, Utilities Finance Director Rozanne Hayden, Dave Sypniewski and Kathleen
Cekanski-Farrand, Council Attorney.
Council Member Aranowski welcomed everyone to the Committee meeting and called for a
presentation on the proposed 2002 budget for Public Works.
Mr. Gary Gilot, Director of Public Works, provided an overview of the public works operations.
Mr. Gilot noted that his first 1 1/2 years have been challenging. Mr. Gilot noted that there are
approximately 400 people who work in Public Works.
The # 1 problem is the lack of resources for streets in light of the drop in revenue from the local
road and street funds. He suggested that the City lobby in Indianapolis to address the local road
and street allocations.
Council Member Coleman noted that the Council will have its quarterly meeting with the State
Senators and State Representatives and that this revenue concern could be addressed at that venue.
Mr. Gilot noted that Michigan increased its gas tax by 3-4 cents. Streets are rated on a ten (10)
point system and Mr. Gilot's goal is to maintain city streets at a"7"or above.
Mayor Luecke stated that reassessment will also complicate this situation, as well as the loss of
state cash reserves. The Mayor is a member of the"Metro Mayors"and have lobbied for additional
road and street monies.
2002 Engineering Division Budget (General Fund # 101-0602)
2001 Budget: $ 6,951,575 Expenditure increase, excluding capital: 5.4 %
2002 Budget: $ 6,825,708 Total Expenditure increase: $ 351,593
City Engineer Carl Littrell then summarized the information provided in the footnotes on the
"Summary of Major Changes" sheet. Mr. Littrell noted that the City has already realized savings
from monies allocated for consulting services by the hiring of an in-house engineer. This engineer
is being used on CDBG projects. With the retirement of Joseph Doran, that part-time position has
been eliminated.
Mr. Littrell stated that the Traffic and Lighting Division has been transferred to the Street
Department. The budget reflects an 18%increase of the actual current expenditure level of hydrant
cost. The budget also reflects an increase of$ 85,000 due to the costs of gas and electricity for the
top three (3) floors of the County-City Building, which is based on an estimate from the County
Auditor.
Personnel and Finance Committee
September 5, 2001
Page 2
The construction on the Public Works Service Center is approximately three (3) weeks behind due
to unexpected environmental delays. During the course of construction, five (5) underground
storage tanks were located. Mr. Littrell noted that the City has negotiated with AEP and that the
new electrical service will be underground by the MSF and new Public Works Service Center. It
is hoped that occupancy of the new building will be during the 3rd week of October as opposed to
October 1st.
2002 Motor Vehicle Highway-Street Division Budget (General Fund # 202)
2001 Budget: $ 3,571,479 Expenditure increase,excluding capital: 64.1 %
2002 Budget: $ 5,859,768 Total Expenditure increase: $ 2,288.289
Director of Bureau of Sewers and Streets Sam Hensley highlighted major changes on the
"Summary Sheet" for the proposed budget. The budget reflects the transfer of the Traffic and
Lighting Division to the Street Department as reflected in the $ 2,157,820 line item transfer..Mr.
Hensley stated that the transfer of traffic and lighting is"a natural".
The 2001 projected expenditures are $ 274,592 over budget; and the 2002 budget deficit is
projected at$676,606. In light of the MVH cash balance the projected MVH Fund cash balance as
of December 31, 2001 is to be $ 167,960.
The proposed thermal plastics should last 5-7 years. Mr. Hensley noted that the city is broken into
quadrants which may cost more in the short-run but will save the city monies in the long-run.
There is a projected $ 30,000 savings in overtime anticipated. Mr. Hensley stressed the need for
more monies for streets.
Council Member White noted that Mr. Gilot mentioned that the City of South Bend is striving for a
rating of"7"for its streets. She inquired what percent of our city streets are at this level.
Mr. Hensley noted that the city has five hundred (500) centerline miles and 2,200 lane miles which
equals 2,400 segments. The lowest rating of the City's streets would be a rating of 5.1; with at
least 30-40%o more needed in funds to rehab. Mr. Hensley stated that he would be able to give
more detailed information in the Spring of 2002. Mr. Hensley stressed that the lower the rating of
the City streets the more money it will take to improve them.
Mr. Gilot stated that guidelines with the use of video tapes are being used to remove human bias
during the evaluation process of the city street system.
Council Member Coleman inquired about seasonal activities. Mr. Hensley stated that
approximately 200 city blocks are addressed each summer. In September the leaf program gets
underway, with targeted dates being October 22nd to Thanksgiving. December 1st begins the
snow operations programs. There is ongoing alley work, crack sealing. He noted that there are
two (2) types of street sealing one which uses liquid in winter and emulsion in the Summer.
Grading takes place when weather permits. The City is also using an AMZ patcher which pulls
behind a trailer. It is being rented for a 2-month period.
Mr. Hensley noted that the City recently had a good media presentation on the new street
sweepers. There is one operating in each quadrant which should bring better accountability. Two
(2) sweepers are used at night, one on the east side and one on the west side addressing the
Personnel and Finance Committee
September 5, 2001
Page 3
downtown and all major thoroughfares. The decibel levels are low on the new sweepers therefore
allowing night-time operations. Prior to the new purchase, the city had ten (10) sweepers. The
old sweepers had a 2.5 hopper capacity; and the new sweepers have a 7.5 hopper capacity.
In response to a question from Council Member Coleman, crack sealing lasts between 2-3 years
and approximately eight hundred(800) blocks per year are crack sealed.
Dave Sypniewski questioned whether the City would use street sweepers in a similar manner as
snow route operations. Mr. Hensley stated that this concept is under consideration.
2002 Project Releaf Budget (Fund # 655)
2001 Revenue Budget: $ 160,500 Expenditure increase, excluding capital: 4,5 %
2002 Revenue Budget: $ 154,440 Total Expenditure increase: $4,522
Mr. Hensley noted that the City would hire twenty (20) part-time employees for the first week of
operation of Project Releaf, and then hire twenty (20) part-time employees at a later point of the
operation. The City of South Bend will be visiting the City of Elkhart to see a bailor-type
operation for leaf pick-up.
Mr. Gilot noted that the city needs staging areas for the more than 85,000 cubic feet of leaves. The
City is considering a quadrant deployment and other new ideas.
Dr. Varner inquired about mulching, and was advised that mulching takes place currently.
2002 Water Works Operations (Fund # 620)
2001 Budget: $ 7,518,165 Expenditure increase •: 6.5 %
2002 Budget: $ 8,006,216 Total Expenditure increase: $ 488,051
2002 Water Works Capital (Fund # 622)
2001 Budget: $ 13,654,676 Expenditure increase : 10%
2002 Budget: $ 11,323,469 Total Expenditure increase: $ 1,031,653
2002 Water Works Sinking Fund (Fund # 625)
2001 Budget: $ 2,773,421 Expenditure increase : 19.6 %
2002 Budget: $ 3,317,253 Total Expenditure increase: $ 543,602
Director of the Bureau of Water Works John Stancati noted that the Water Works budgets were
prepared by Utilities Finance Director Rozanne Hayden. They noted that the proposed budget
reflects a proposed overall rate increase of eighteen percent (18 %) which should provide a net
fourteen percent (14 %) increase. Mr. Stancati noted that the City has begun using "radio reads",
however it will take 5-8 years for this program to be totally in place. They plan to reduce the
workforce by four(4)individuals with such reduction taking place by attrition.
Personnel and Finance Committee
September 5, 2001
Page 4
2002 Water Repair/Insurance Fund (Fund # 644)
2001 Budget: $ 779,929 Expenditure increase 22.2%
2002 Budget: $ 656,182 Total Expenditure increase: $ 119,253
Mr. Stancati stated that in 2000 an interfund transfer was needed to cover a cash short-fall, which
should be repaid in 2001. He noted however that due to continued cash flow problems, another
loan will be necessary at the end of this year to avoid a negative cash balance. A loan of$ 125,000
is anticipated to take place from the Water Works Capital Fund # 622 which would be repaid in
2002.
Mr. Stancati anticipates that the monthly rate charge for water repair/insurance will be increased
from $ 1.15 to $ 1.50.
Mr. Stancati noted that the number of breaks in service lines have increased. Mr. Stancati also
noted that Dr. Varner's concept of having varying deductible amounts is being considered.
Dr. Varner inquired whether the "opt out" option is being considered, and was advised that it was
not.
At this stage, Council Member Kelly joined the meeting.
2002 Sewer Repair/Insurance Fund (Fund # 640)
2001 Budget: $ 520,220 Expenditure increase 14.5%
2002 Budget: $ 595,393 Total Expenditure increase: $ 75,173
Director of the Division of Environmental Services John J. Dillon noted that the number and
average cost of sewer repairs have increased significantly during 2001. He noted the following
statistics:
1998 129 repairs @ $ 1,872 average
1999 170 repairs @ $ 1,841 average
2000 209 repairs @ $ 2,444 average
2001 240 repairs @ $ 2,473 projected
Mr. Dillon noted that the projected 2001 revenue shortfall is $ 191,858 and the 2002 projected
revenue shortfall is $ 114,673.00.
Dr. Varner inquired how many different contractors are being used for this program. Mr. Dillon
said"about 6", noting that bonding for contractors is a problem. He has periodic meetings with all
contractors and they review overall guidelines.
Council Member Kelly inquired if the age of the sewer system is a contributing factor,and inquired
about storm & sanitary systems vs. Combined systems. Council Member Kelly noted that
problems in his neighborhood and Councilmanic District continue.
Mr. Dillon stated that problems have occurred throughout the City, with the older houses being
more susceptible. He noted that lots with more trees typically have more problems unless the
Personnel and Finance Committee
September 5, 2001
Page 5
laterals are well maintained. New technology is being used in the Riverpark area on an
experimental basis.
2002 Sewage Operation Expenditures (Fund # 641-0621)
2001 Budget: $ 2,580,255 Expenditure increase 7.5%
2002 Budget: $ 2,773,833 Total Expenditure increase: $ 193,578
2002 Wastewater Operation Expenditures (Fund # 641-0630)
2001 Budget: $ 6,772,584 Expenditure increase
• 16.6%
2002 Budget: $ 7,895,755 Total Expenditure increase: $ 1,123,171
2002 Sewage Works Capital Fund (Fund # 642)
2001 Budget: $ 2,670,194
2002 Budget: $ 2,708,311
2002 Sewage Works Sinking Fund (Fund # 641-0621)
2001 Budget: $ 2,580,255 Expenditure increase 7.5%
2002 Budget: $ 2,773,833 Total Expenditure increase: $ 193,578
Mr. Dillon noted that these funds address two (2) basic operations: sewage operation and
wastewater operation. With the new upgrades, the City should save $ 100,000 in fuel per year.
By the end of this year, Mr. Dillon hopes to get a permit to look at CSO's and mitigate and
improve the water quality in the St. Joseph River. The cost is estimated at $ 80 to $ 100 million
over a twenty(20) year period.
Mr. Dillon noted that rate increases may be necessary next year in light of the costs and service
studies.
In response to a question from Council Member Coleman,Mr. Dillon stated that the City borrowed
from the State of Indiana $ 20 million at 0 % for the first two (2) years and three percent (3 %)
thereafter in interest which was used for the headworks building and other upgrades including
remote monitoring cameras, clarifiers,engine projects, air flow controls, etc.
2002 Solid Waste Operating Fund (Fund # 610)
2001 Budget: $ 3,863,468 Expenditure increase 0.9%
2002 Budget: $ 3,898,972 Total Expenditure increase: $ 35,504
2002 Solid Waste Depreciation Fund (Fund # 611)
2001 Budget: $ 4,131,194 Expenditure increase 0.3%
2002 Budget: $ 4,050,814 Total Expenditure increase: $ 11,420
•
Personnel and Finance Committee
September 5, 2001
Page 6
Mr. Dillon stated that Solid Waste has approximately 36,000 customers of which 7,200 are
seniors. Rates are $ 8.00 with seniors being charged $ 5.50. There are ten (10) residential routes
currently which will be reduced to nine (9) routes. Solid Waste utilizes an "incentive program"
which permits employees to go home as soon as they complete their route. A pilot program
utilizing nine (90) gallon containers with lids is underway in one (1) area of the city without a
strong neighborhood group and the other in an area with a strong neighborhood group in place.
They are considering going from a four(4) day work week to a five(5) day work week.
The projected Solid Waste Fund cash balance as of 12-31-01 is$ 588,358.
Mayor Luecke noted that special pick-ups continue. Code currently uses a five (5) day compliance
letter, then takes a picture and then sends out the clean-up crew.
Approximately one (1) month ago a new system was implemented with items to be picked up by
Jack Dillon's employees in at least five (5) working days.
Dr. Varner suggested that a two(2) working day period be the goal.
2002 Central Services-Equipment Services (Fund # 222-0605)
2001 Budget: $ 2,214,581 Expenditure increase • 4.6%
2002 Budget: $ 2,317,371 Total Expenditure increase: $ 102,790
Fiscal Officer Joe Kuzmits was then introduced by Director of Central Services Matt Chlebowski.
He reviewed the information contained in the footnotes on the "Summary" page. He noted that
labor rates were established in 1994 and new labor rates are proposed as follows:
From $44 to$46
From $42 to$ 44
From $32 to$34
Council Member Varner inquired about the preventive maintenance costs since it was his
understanding that the police vehicles were being sent to places like Insty Lube for at a cost of$ 25
to$30 and then being charged at the City rates. Mr. Chlebowski denied that such action had taken
place and stated that all police vehicles have been worked on in-house for such preventive
maintenance checks.
Tom Skarbek noted that savings are realized by the City since the Central Services operations
performs services in the middle of the night.
2002 Central Services-Central Stores (Fund # 222-0612)
2001 Budget: $ 109,947 Expenditure increase 4.3%
2002 Budget: $ 114,643 Total Expenditure increase: $ 4,696
Mr. Chlebowski noted that there has been a consolidation of Central Services postage cost which is
reflected in the proposed budget.
s `
Personnel and Finance Committee
September 5, 2001
Page 7
2002 Central Services-Print Shop (Fund # 222-0613)
•
2001 Budget: $ 159,133 Expenditure increase
2002 Budget: $ 164,585 Total Expenditure increase: $ 5,452
$ 5,452
Mr. Chlebowski noted that he anticipates an increase in the volume of printing and therefore the
budget should be in the black.
Dr. Varner inquired whether the Print Shop could receive information by disc and email, and he
was advised that it can. Approximately 45 % of the revenue comes from printing forms for the
South Bend Police Department.
2002 Central Services-Radio Shop (Fund # 222-0614)
2001 Budget: $ 229,455 Expenditure increase
2002 Budget: $ 239,839 Total Expenditure increase: $ 10,
$ 10,384
Mr. Chlebowski stated that the Radio Shop is now doing repairs for the Sheriff's Department, the
St. Joseph County Highway Department, as well as the North Liberty and Roseland police
departments.
Council Member Aranowski thanked everyone for their presentations, and then adjourned the
meeting at 4:50 p.m.
Respectfully submitted,
Council Member James Aranowski, Chairperson
Personnel and Finance Committee
KCF:kmf