HomeMy WebLinkAboutResolution No 20-2023 - Adopting Policy for Community Wayfinding SignsPage 1 of 2
RESOLUTION NO. 20-2023
A RESOLUTION OF THE BOARD OF PUBLIC WORKS FOR THE
CITY OF SOUTH BEND, INDIANA, ADOPTING A
POLICY FOR COMMUNITY WAYFINDING SIGNS (CWS)
WHEREAS, the Board of Public Works ("BPW") is a contracting body of the City
of South Bend (the "City") and exists and operates under the provisions of I.C. 36-4-9-5, as
amended from time to time (the "Act"); and
WHEREAS, pursuant to I.C. §36-9-6-2 and I.C. §36-9-6-3, the City of South Bend,
Indiana Board of Public Works (“Board”) has authority over the use of public rights of way
and is responsible for the supervision of streets, alleys and other property of the City; and
WHEREAS, the BPW has received requests from local entities for the installation
of wayfinding signs, and
WHEREAS, the BPW has determined that in order to provide consistency in signs
located in the public right-of-way, a policy for wayfinding signs for local attractions be
developed; and
WHEREAS, signs located within the City’s right-of-way are to adhere to sound
traffic engineering principles, in compliance with the Indiana Manual on Uniform Traffic
Control Devices, and be limited in their locations; and
WHEREAS, the wayfinding signs should not be used for purposes of advertising a
location and are not intended to imply specific routing but rather a marker to indicate the
appropriate access from a major route; and
WHEREAS, the cost associated with signs made and installed for entities should not
be a burden on the citizens of South Bend; and
WHEREAS, BPW shall empower the City’s team of engineers, street, and public
safety professionals to establish the process for designing, locating, and installing wayfinding
signs for local entities.
WHEREAS, the foregoing resolution hereby repeals and replaces, it its entirety, any
prior existing BPW resolution, relating to wayfinding signs, which may or may not previously
exist with the exception of any plans or BPW action authorizing the installation of Tourist-
Oriented signage in the public right-of-way.
Page 2 of 2
NOW THEREFORE, BE IT RESOLVED BY THE BOARD OF
PUBLIC WORKS THAT:
The Board of Public Works for the City of South Bend, under the power vested by the
City of South Bend Municipal Code Section 20-3, shall do the following in regards to wayfinding
signs:
1.Adopt the Community Wayfinding Sign policy to guide the installation of signs for
local attractions in the public right-of-way.
2.Direct the City’s Engineering Division to manage the application process for
Community Wayfinding Signs per the procedures represented in Exhibit A.
ADOPTED this 25th d a y of April, 2023.
April 25, 2023
Page 1 of 3
EXHIBIT A
PROCEDURES FOR INSTALLATION OF
COMMUNITY WAYFINDING SIGNS (CWS) FOR ENTITIES
I.Definitions
a. Local attraction: Key civic, cultural and recreational attractions of local or regional
significance in the city. Typically, these attractions will have an annual attendance of
more than 10,000 but less than 150,000 people.
b.Traffic engineer: Authorized personnel in the City’s Engineering division who makes
decisions regarding traffic and signage in the public right-of-way.
II.In order to objectively and completely consider requests for CWS installation, for entities,
the Board of Public Works of the City of South Bend sets forth the following procedures:
a.An entity interested in having a wayfinding sign in the public right of way, shall fill out
the CWS application available online on the City’s website. The application shall
generally include:
•Name of entity requesting sign(s)
•Name of contact person
•Contact information (address, phone, e-mail)
•Data for previous year detailing annual attraction attendance for requesting entity.
•New attractions may provide projections for annual attendance numbers.
•Requested locations for signs (final determination to be made by City Traffic
Engineer)
•Any other details deemed pertinent to the sign request
b.The City Traffic Engineer shall evaluate the request and determine the sign design,
location(s) and costs. The sign design shall follow the City standard as shown below:
Page 1 of 3
c. The City Traffic Engineer shall evaluate the existing wayfinding signage near the
requesting entity location to inform the number of wayfinding signs. Generally, the
maximum number of community wayfinding signs for a local attraction shall be based
on the entity’s annual attendance, in accordance with the following schedule:
Annual Attendance Number of Signs
10,000 to 150,000 Up to 12
150,000 and above Discretion of the Traffic
Engineer
d. The number of signs will be dependent on the location of the attraction, and its
proximity to major roadways.
e. In the event that multiple entities request signage in close proximity, each case will be
evaluated to determine the appropriate sign configuration.
f. The wayfinding sign designs shall be in compliance with the current edition of the
Indiana Manual on Uniform Traffic Control Devices. The inclusion of logos or
pictographs will evaluated on a case by case basis.
g. Upon a request by the City Traffic Engineer, the Bureau of Traffic & Lighting, Streets
Division of the Department of Public Works, shall plan to make and install the proposed
signs.
h. Installation and maintenance of community wayfinding signs:
i. The Bureau of Traffic & Lighting shall fabricate and perform all required
installation, maintenance, removal and replacement of wayfinding signs that are
located within the right-of-way. Private entities may not install or remove any
signage in the public right-of-way.
ii. A wayfinding sign for an activity or site shall not be installed until the applicant
has paid the department the initial fee as set under this Resolution.
i. Wayfinding Sign Fees:
i. The initial service charge, payable once an application is approved, is $400 per
sign. This cost covers the fabrication, installation and maintenance of the sign
for a period of 4 years. If a change is made by the applicant that necessitates
changes to the sign that are beyond standard maintenance, it is the responsibility
of that entity to complete a new application and pay for the replacement.
ii. Every 4 years, the City shall assess the condition of the wayfinding sign. If it is
determined by the City Traffic Engineer that the sign needs to be replaced, or if
the owner’s information or logo has changed, the owner will be charged a full
replacement fee as determined by the City for the labor and material costs for
making and installing the new sign.
j. Wayfinding Sign Removal.
i. The City shall have the full right to remove a wayfinding sign if the activity or
site no longer qualifies for an attraction. Upon removal of the sign, the applicant
may request to keep the sign, or it can be recycled if they do not want it.
k. The City shall work with entities that currently have wayfinding signs in the public
right-of-way to bring their signs up to the new standard established in this policy. The
City may offer relief for such costs of bringing signage up to standard.
BOARD OF PUBLIC WORKS
AGENDA ITEM REVIEW REQUEST FORM
Date: 4/17/2022
Name: Charlie Brach Department of Public Works – Engineering Division
BPW Date: 4/25/2022 Phone Extension: 9246
Required Prior to Submittal to Board BPW Attorney X Attorney Name Michael Schmidt
Dept. Attorney Attorney Name
Purchasing
Check the Appropriate Item Type – Required for All Submissions
Professional Services Agreement Contract Proposal
Open Market Contract Amendment/Addendum Special Purchase, QPA
Bid Opening Bid Award Req. to Advertise Title Sheet
Quote Opening Quote Award Reject Bids/Quotes
Proposal Opening C/O & PCA No. PCA
Chg. Order, No. Traffic Control Resolution
Other: Ease./Encroach
Required Information
Company or Vendor Name N/A
New Vendor Yes If Yes, Approved by Purchasing
No
MBE/WBE Contractor MBE
WBE Completed E-Verify Form Attached Yes
No
Project Name Community Wayfinding Sign Policy
Project Number N/A
Funding Source N/A
Account No. N/A
Amount N/A
Terms of Contract N/A
Special Contract Provisions N/A
Purpose/Description A resolution establishing a policy for Community Wayfinding Signs for
Private Entities.
For Change Orders Only
Amount of
Increase
Decrease
$
($ )
Previous Amount $
Current Percent of Change:
Increase
Decrease
%
( %)
New Amount $
Total Percent of Change:
Increase
Decrease
%
( %)
Time Extension Amount:
New Completion Date: