HomeMy WebLinkAbout1602 East Wayne Street_AA 2023-0417Sarah Andrews,
President
HISTORIC
PRESERVATION
COMMISSION
OF
SOUTH BEND
AND
ST. JOSEPH
COUNTY
CERTIFICATE
OF
APPROPRIATENESS
The Historic Preservation Commission of South Bend and St.
Joseph County has approved the following work:
Remove shingles, install new ice and water, synthetic
underlayment, drip edge and new asphalt shingles.
No work to be done on soffit or fascia.
PEACHEY'S ROOFING & GENERAL CONSTRUCTION, LLC,
Contractor
for the following location:
1602 WAYNE ST
South Bend, IN, 46615
East Wayne Street
Application No. 2023-0417
in the County of St. Joseph; State of Indiana; which is:
Located in a Local Historic District
A Local Historic Landmark
and found this application to be appropriate according to the Standards
pertaining to Local Historic Landmarks and/or Local Historic Districts.
Regulations pertaining to the Historic Preservation Commission are
found in Chapter 21 (Zoning), South Bend Municipal Code and Chapter
26 of the St. Joseph County Code.
The issuance of this certificate does NOT in any manner, release
the recipient from the responsibility of complying with the requirements
of the zoning ordinances, building codes, safety codes, ADA or other
requirements of the City of South Bend, the County of St. Joseph, the
State of Indiana, or the United States Federal Government.
This certificate is good for one year from the date of issuance and
is effective from the date entered herein. Plans are on file and open for
public inspection at the office of the Historic Preservation Commission of
South Bend and St. Joseph County, 227 West Jefferson Blvd., Suite 1400
S, South Bend, Indiana, during normal business hours.
THIS CERTIFICATE IS NOT TRANSFERABLE
NAME OF APPLICANT:Lucas Stavole
CERTIFICATE ISSUED BY:
Ross Van Overberghe
Historic Preservation Specialist
POST IN A CONSPICUOUS PLACE ON THE STREET SIDE
OF THE PROJECT UNTIL COMPLETION OF ALL WORK.
Phone: (574) 235-9371
E-mail: SBSJCHPC@southbendin.gov
ADAM TOERING
Historic Preservation
Administrator
4/17/2023DATE CERTIFICATE
TAKES FORCE:4/17/2024DATE CERTIFICATE
EXPIRES:
Ord No. 7796-87
East Wayne Street
ADMINISTRATIVE APPROVAL
HISTORIC PRESERVATION COMMISSION
OF SOUTH BEND AND ST. JOSEPH COUNTY
County —City Building, South Bend, IN 46601
http://www. southbendin. gov/government/department/community-investment
Phone: 574/235.9371 Fax: 574/235.9021
Email: hpcsbsjc@southbendin.gov
Michele Gelfman, President
Adam Toering, Historic
Preservation Administrator
APPLICATION FOR A — CERTIFICATE OF APPROPRIATENESS
A Certified Local Government of the National Park Service
OFFICE USE ONLYS»»>DO NOT COMPLETE ANY ENTRIES CONTAINED IN THIS BOX<««OFFICE USE ONLY
Date Received:
Application Number:
Past Reviews: ❑ YES (Date of Last Review) ❑ NO
Staff Approval authorized by:
Historic Preservation Commission Review Date:
❑ Local Landmark
❑ National Landmark
Certificate Of Appr_oE,riateness:
I Denied ❑ Tabled
Title:
❑ Local Historic District (Name)
❑ National Register District (Name)
❑ Sent To Committee
❑ Approved and issued:
Address of Property for proposed work: [ e eV A' 4.1.,41, Street L th _geoid ga k / S�
(Scree Number —Street Name —City —Zip)
-
5-1Z ?ss�
Address of Contractor Company: 3k/j /0E p( .a 1 0-61'A Fet . 4' 116 4"; I
Current Use of Building:
Type of Building Construction:
Proposed Work: (more than one
box may be checked)
(Street Number —Street Name —City —Zip)
/Aht. be
(Single amity —Multi Family —Commercial —Government —Industrial —Vacant —etc.)
fCc` 1, r,,9 19-VA*LI t
Mood Frame—Brick—Stone-5'teel—Concrete—Uthei)
❑ Landscape
❑ New
❑ Replacement (not in -kind) ❑ Demolition
Description of Proposed Work: fhipVe 5 1►I5 /41 / /di 5k4// Pe4- 11I.$JCC 5A-et !d.
rr y t17r t. C veld r"► /npvte.: r hg .45Pri,Lit Sit 45
Owr;
signing this application I agree to abide by all local regulations related to project and to obtain a Building Department Permit, if applicable.
Peachey's Roofing and General Construction
57105 CR 21
Goshen, IN 46528
1-574-536-7554
Luke Stavole
1602 E. Wayne Street
South Bend, Indiana 46615
March 31, 2023
Dear; Luke
Peachey's Roofing and General Construction is pleased to provide labor,
material and equipment for the following:
SHINGLE RE -ROOF SERVICES FOR JOB
Provide means to remove shingle from house
Dispose of old materials
Provide and install new drip edge
Provide and install ice & water shield
Provide and install Synthetic underlayment on roof deck
Provide and install 33 Square Owens Corning Duration Shingle
Replace all vent boots and necessary flashing
Install Ridge vent andcapping
Drip edge, Ice&water shield Synthetic underlayment ... $1,720.00
Shingle starter, Owens Corning Duration Shingle 35 Year shingle,(33) Square on
house $6,828.80
Shingle tear off and new shingle installation, plus misc items.... $7,700.00
Note; If damaged or rotten decking is found, replacement will be charged at $75.00 per 4x8 sheet
Total cost to tear off shingle and re shingle
House Roof $16,248.80
Clean and Repair Gutter leak at chimney and above exterior
entry door $125.00
5-11
d
`E_
S