HomeMy WebLinkAboutChange Order No 2 - North Water Treatment Plant Improvements Proj No. 119-011 - Bowen Engineering Corp.  ELIZABETH A. MARADIK JOSEPH R. MOLNAR GARY A. GILOT JORDAN V. GATHERS MURRAY L. MILLER 1316 COUNTY-CITY BUILDING 227 W. JEFFERSON BOULEVARD SOUTH BEND, INDIANA 46601-1830 PHONE 574/ 235-9251 FAX 574/ 235-9171 CITY OF SOUTH BEND JAMES MUELLER, MAYOR BOARD OF PUBLIC WORKS April 11, 2023 Mr. John Dettman Bowen Engineering Corporation 8802 N. Meridian St. Indianapolis, IN 46260 rlee@bowenengineering.com RE: Change Order No. 2 – North Water Treatment Plant Improvements Project No. 119-011 Dear Mr. Dettman: At its April 11, 2023 meeting, the Board of Public Works approved the above referenced Change Order be decreased by $45,673, bringing the revised contract amount to $3,551,640. Enclosed is a copy of the Change Order for your records. If you have any further questions, please call this office at (574) 235-9251. Sincerely, /s/ Theresa Heffner Theresa Heffner, Clerk Enclosures TH/lh CITY OF SOUTH BEND DEPARTMENT OF PUBLIC WORKS PROJECT CHANGE ORDER DATE: PROJECT NO: PROJECT NAME: CONTRACT DATE: CHANGE ORDER NO. SUBJECT OF CHANGE ORDER: Decrease the contract for less work required than contracted on the raw water header replacements. Note: CO1 had an incorrect original contract sum which has been corrected here. The original contract sum $ Net change by previously authorized change orders $ The contract sum prior to this change order $ By this Change Order, the project amount is Increased Decreased $ The new contract sum including this change order $ This Change Order represents a total change of % Total change for entire project % Original contracted completion date/time Extension of date/time by previous change orders Date/time extension by this change order New completion date/time RECOMMENDED FOR APPROVAL CONTRACTOR PROJECT MANAGER CITY OF SOUTH BEND BOARD OF PUBLIC WORKS Approved Date: Contractor Signature Printed Name and Title Elizabeth A. Maradik, President Company name Gary A. Gilot, Member Address Jordan V. Gathers, Member City, State, Zip Joseph R. Molnar, Vice President Murray L. Miller, Member 03/17/2023 North Water Treatment Plant Improvements 4/26/2022 119-011 2 3,582,800.00 14,513.00 3,597,313.00 45,673.00 3,551,640.00 (1.27) (1.23) Substantial: 8/15/22, Final 9/15/2022 Substantial: 5/4/22, Final 6/2/2022 260 days X Mitchell Stull, Sr. Project Engineer Bowen Engineering 8802 N. Meridian St Indianapolis, IN, 46260 April 11, 2023 8802 North Meridian St. • Indianapolis, IN 46260 317.842.2616 phone • 317.841.4257 fax • BowenEngineering.com PAGE 1 OF 1 February 21, 2023 City of South Bend Attn: Rebecca Plantz 227 West Jefferson Boulevard South Bend, IN 46601-1830 RE: South Bend North Treatment Plant Improvements Bowen Project Number: 15 – 22 – 042 PCO-04 Filter Vessel 3, 4, and 5 Water Header Replacement Credit Rebecca: Bowen Engineering (BEC) is submitting a credit for the work associated with Bid Alternates 1, 2 and 3. The filter header piping as shown on the contract documents did not need full replacement and therefore the credit below reflects a partial replacement. Lump Sum Credit: $45,673.00 Please review, and if you have any questions, please do not hesitate to contact me. Sincerely, Mitchell Stull Senior Project Engineer Mobile: 317-650-8313 | Email: mstull@bowenengineering.com BOARD OF PUBLIC WORKS AGENDA ITEM REVIEW REQUEST FORM Date 03/17/2023 Name Becca Plantz Department Public Works BPW Date 04/11/2023 Phone Extension 5998 Review and Approval Required Prior to Submittal to Board Diversity Compliance and Inclusion Officer Officer Name BPW Attorney Attorney Name Michael Schmidt Dept. Attorney Attorney Name Purchasing Check the Appropriate Item Type – Required for All Submissions Professional Services Agreement Contract Proposal Open Market Contract Amendment/Addendum Special Purchase, QPA Bid Opening Bid Award Req. to Advertise Title Sheet Quote Opening Quote Award Reject Bids/Quotes Proposal Opening C/O & PCA No. PCA Chg. Order, No. 2 Traffic Control Resolution Other: Ease./Encroach Required Information Company or Vendor Name Bowen Engineering Corporation New Vendor Yes If Yes, Approved by Purchasing No MBE/WBE Contractor MBE WBE Completed E-Verify Form Attached Yes No Project Name North Water Treatment Plant Improvements Project Number 119-011 Funding Source River West TIF & Water Works Capital Account No. PO-16353 Amount Terms of Contract Purpose/Description Decrease in the contract for less work required than contracted on the raw water header replacements. For Change Orders Only Amount of Increase Decrease $ ($45,673.00) Previous Amount $ 3,597,313.00 Current Percent of Change: Increase Decrease % (1.27%) New Amount $ 3,551,640.00 Total Percent of Change: Increase Decrease % (1.23%) Time Extension Amount: New Completion Date: