Loading...
HomeMy WebLinkAboutChange Order No 1 - MPAC Guaranteed Energy Savings Contract Proj No. 121-030 - Ameresco, Inc.  ELIZABETH A. MARADIK JOSEPH R. MOLNAR GARY A. GILOT JORDAN V. GATHERS MURRAY L. MILLER 1316 COUNTY-CITY BUILDING 227 W. JEFFERSON BOULEVARD SOUTH BEND, INDIANA 46601-1830 PHONE 574/ 235-9251 FAX 574/ 235-9171 CITY OF SOUTH BEND JAMES MUELLER, MAYOR BOARD OF PUBLIC WORKS April 11, 2023 Mr. Jay Fleishman Ameresco, Inc. 10 S. LaSalle St., Suite 3450 Chicago, IL 60603 jfleishman@ameresco.com; zmafraji@ameresco.com RE: Change Order No. 1 – Morris Performing Arts Center Guaranteed Energy Savings Contract – Project No. 121-030 Dear Mr. Fleishman: At its April 11, 2023 meeting, the Board of Public Works approved the above referenced Change Order be increased by $25,410, bringing the revised contract amount to $5,386,410. Enclosed is a copy of the Change Order for your records. If you have any further questions, please call this office at (574) 235-9251. Sincerely, /s/ Theresa Heffner Theresa Heffner, Clerk Enclosures TH/lh Confidential & Proprietary Information of Ameresco, Inc. Page 1 of 7 CHANGE ORDER #1 (Agreement for change in Scope of Services) CUSTOMER: City of South Bend Ameresco Project No. 33433 I. REQUEST Date: January ____, 2023 (a) Requested by City of South Bend pursuant to Section 8 of the Energy Services Agreement dated October 26, 2021 (b) Description of change MAU connect to existing hot water loop II. AMERESCO’S AGREEMENT For all costs involved in this change including extensions of time herein requested, Ameresco proposes to perform the additional work described in the Attachments listed below (which are hereby incorporated herein by reference into the Agreement resulting from this Change Order #1), accordance with the provisions of the Agreement entered into October, 26 2021, (excluding the original Attachments, except where indicated, but including the Attachments listed below) for the Contract Cost as follows. Payment shall be made on the basis of: (x) Predetermined lump sum total of (add) TWENTY FIVE THOUSAND FOUR HUNDRED TEN AND 00/100 DOLLARS ($25,410.00). ATTACHMENTS ATTACHMENT A-1 PROPERTY DESCRIPTION ATTACHMENT B-1 SCOPE OF SERVICES ATTACHMENT E-1 NOTICE TO PROCEED ATTACHMENT K-1 CONTRACT SUMMARY Capitalized terms not defined herein shall have the same meaning as those set forth in the Agreement. All references in the Agreement to Attachments shall also mean and refer to Attachments A-1, B-1, etc., included in this Change Order as a separate Scope of Services. All other provisions of the Agreement not expressly modified by this Change Order #1 shall remain in full force and effect including but not limited to, Section 25 of the Agreement, Representations and Warranties, which representations and warranties are incorporated herein by reference with respect to this Change Order #1. Confidential & Proprietary Information of Ameresco, Inc. Page 2 of 7 IN WITNESS WHEREOF, the Parties hereto have caused this Change Order #1 to be duly executed and delivered by their proper and duly authorized officers as of the date first written above. Contract Award $5,361,000.00 Previous Additions $0.00 Previous Deductions $0.00 Net Total $5,361,000.00 This Change $25,410.00 Total $5,386,410.00 AMERESCO, INC. _____________________________ Authorized and Required Signature Name: Louis P. Maltezos Title: Executive Vice President Date: ________________________ CITY OF SOUTH BEND _____________________________ Authorized and Required Signature Name: ________________________ Title: _________________________ April 11, 2023 Confidential & Proprietary Information of Ameresco, Inc. Page 3 of 7 ATTACHMENTS TO ENERGY SERVICES AGREEMENT BETWEEN AMERESCO, INC. AND CITY OF SOUTH BEND ATTACHMENT A-1 PROPERTY DESCRIPTION The following buildings, facilities, and areas, which are owned and operated by CUSTOMER, are included in the Scope of Services set forth in Attachment B-1: Building Name Address City, State, Zip Code Morris Performing Arts Center 211 N. Michigan St. South Bend, IN 46601 Confidential & Proprietary Information of Ameresco, Inc. Page 4 of 7 ATTACHMENT B-1 SCOPE OF SERVICES This Attachment sets forth a description of the Energy Conservation Measures (ECM) and related equipment to be installed by Ameresco at the buildings, facilities, and areas set forth in Attachment A within the Property. Installation of the ECM(s) and the included equipment is subject to change if Ameresco discovers unforeseen conditions at the Property that render its preliminary analysis of the Property inaccurate, or significantly affect achievement of the Guaranteed Savings. Any changes to the installation of the ECM(s) and the included equipment are subject to approval of Customer and issuance of a Change Order, which approval shall not be unreasonably withheld, conditioned or delayed. The ECMs described below are included in the Scope of Services: ECM 1: MAU connection to hot water loop Ameresco will remove the existing non-functional hot water heater and associated piping to the makeup air unit and connect the makeup air unit heating hot water coil to the existing main hot water loop of the building via new piping and a plate and frame heat exchanger. This scope includes: 1. Demolish existing heating hot water heater 2. Demolish existing piping and valving to MAU 3. Demolish the existing hot water circulation pump 4. Existing gas supply to be capped at the location of the existing water heater. Gas piping to this location will remain. 5. Existing gas flue to be capped in place 6. Furnish and install one (1) new plate and frame B&G BP410-30 heat exchanger with maximum capacity of 500,000 BTU and two (2) new associated circulation pump to tie into the existing hot water of the building in the nearby corridor. MAU side pump to be NBF-22, 1/25 HP. Source side pump to be NRF-36, 1/6 HP 7. Connect new valving and new pump to nearest existing building automation system (BAS) controller and provide programming and graphics 8. Heating loop will contain a 35% glycol solution to prevent freezing 9. Valving will only open and pump will only energize when MAU calls for heat. Valving will modulate to maintain a set temperature loop in the MAU 10. No changes to MAU operation or controls as installed under base contract Confidential & Proprietary Information of Ameresco, Inc. Page 5 of 7 General Scope of Services Comments: • Unless specifically noted in the Scope of Services – abatement of ACM and other hazardous materials is excluded. • As final engineering is not started and equipment is not ordered until Ameresco has a signed contract / notice to proceed - Ameresco cannot guarantee delivery dates / system start-up and is not responsible for costs associated with additional mobilizations, temporary equipment, etc. if long lead times affect construction schedule. • Material ordering and final scheduling will not occur until a signed agreement is received. • Ameresco pricing assumes 100% availability of rooms to do the work. Unless noted otherwise, pricing based on first shift only (Monday through Friday). • Unless specifically noted in the Scope of Services – paint / patch is excluded. If noted in the Scope of Services – only the affected areas will be addressed (not the entire area / wall). Paint will match existing adjacent as close as possible but an exact match cannot be guaranteed. • Piping / conduit / wire mold may be run exposed in occupied spaces (as applicable). • Unless specifically noted in the Scope of Services – conduit / wire mold is un-painted. • Some existing equipment may be left abandoned in place. • Unless specifically noted in the Scope of Services – no piping covers have been included. • If applicable - tile and carpet in-fill strips will match adjacent existing as close as possible but an exact match cannot be guaranteed. • If applicable - existing ceiling tiles will be removed and reinstalled. New ceiling / grid is not included in the Scope of Services unless specifically noted. Confidential & Proprietary Information of Ameresco, Inc. Page 6 of 7 ATTACHMENT E-1 NOTICE TO PROCEED MONTH DAY YEAR Jay Fleishman Vice President - Operations Ameresco, Inc. 10 S. LaSalle Street, Suite 3450 Chicago, IL 60603 SUBJECT: NOTICE TO PROCEED Mr. Fleishman: In accordance with the terms of the Energy Services Agreement dated July 1, 2021 , Customer hereby issues this Notice to Proceed to Ameresco in relation to the Scope of Services for this Phase set forth in Change Order #1 to such Agreement. Sincerely, CITY OF SOUTH BEND _____________________ Signature _____________________ Name _____________________ Title Confidential & Proprietary Information of Ameresco, Inc. Page 7 of 7 ATTACHMENT K-1 CONTRACT SUMMARY Item Contract Amount ($) Energy Savings ($) Operating Cost Savings ($) Total Guaranteed Savings ($) ESA $5,361,000 $47,448 $199,866 $247,314 Change Order 1 $25,410 $0 $0 $0 Total $5,386,410 $47,448 $499,866 $247,314 City of South Bend Department of Administration & Finance Change Order Request Form Multiple PO lines: Project POs: PO Number 14130 Line Number 3 Original Dollar Amount $0.00 New Dollar Amount (For liquidation request, enter $0)$25,410.00 Reason Code (if changed) Financial Dimensions (fund-dept- division-subdivision-main account)101-04-040-040-443001-ARP019 Project Code (if applicable)PROJ-297 Description of change (include budget impact)MAU connect to existing hot water loop APPROVED BY PROJECT ACCOUNTING TEAM (if applicable)(PAT member's name and date to be completed by PAT member) PO Number Line Number Original Dollar Amount New Dollar Amount (For liquidation request, enter $0) Reason Code (if changed) Financial Dimensions (fund-dept- division-subdivision-main account) Project Code (if applicable) Description of change (include budget impact) APPROVED BY PROJECT ACCOUNTING TEAM (if applicable)(PAT member's name and date to be completed by PAT member) PO Number Line Number Original Dollar Amount Changing the line amount: You can only change a line amount if it has NOT been invoiced against. • If the line has NOT been invoiced – reduce the line amount to equal what it should be. • If the line has been invoiced – cancel the delivery remainder and finalize the individual line, then add a new line for the amount that should be remaining. If you have changes to more than one line on the same PO, fill out a separate section for each line affected by the change order. For change orders on project-related POs, this form must be approved by the Project Accounting Team as described in Supplement 508. Change Order Request Form - MPAC GESC PO 14130 1 of 3 BOARD OF PUBLIC WORKS AGENDA ITEM REVIEW REQUEST FORM Date 04/03/2023 Name Becca Plantz Department Public Works BPW Date 04/11/2023 Phone Extension 5998 Review and Approval Required Prior to Submittal to Board Diversity Compliance and Inclusion Officer Officer Name Michael Patton BPW Attorney Attorney Name Michael Schmidt Dept. Attorney Attorney Name Purchasing Check the Appropriate Item Type – Required for All Submissions Professional Services Agreement Contract Proposal Open Market Contract Amendment/Addendum Special Purchase, QPA Bid Opening Bid Award Req. to Advertise Title Sheet Quote Opening Quote Award Reject Bids/Quotes Proposal Opening C/O & PCA No. PCA Chg. Order, No. 1 Traffic Control Resolution Other: Ease./Encroach Required Information Company or Vendor Name Ameresco, Inc. New Vendor Yes If Yes, Approved by Purchasing No MBE/WBE Contractor MBE WBE Completed E-Verify Form Attached Yes No Project Name Morris Performing Arts Center Guaranteed Energy Savings Contract Project Number 121-030 Funding Source American Rescue Plan, Morris Capital Account No. PROJ-297 Amount Terms of Contract Guaranteed Maximum Purpose/Description _Increase for connecting out of scope makeup air unit to existing hot water loop. For Change Orders Only Amount of X Increase Decrease $ 25,410.00 ($ ) Previous Amount $ 5,361,000.00 Current Percent of Change: Increase Decrease 0.47% ( %) New Amount $ 5,386,410.00 Total Percent of Change: Increase Decrease 0.47% ( %) Time Extension Amount: New Completion Date: