Loading...
HomeMy WebLinkAbout08-30-00 Personnel & Finance Committee pot: etoannei an /inane ( ommcttee The August 30, 2000 meeting of the Personnel and Finance Committee was called to order by its Chairperson,Council Member James Aranowski at 3:05 pm in the Council Informal Meeting room. Persons in attendance included Council Members Aranowski, Varner, and Kirsits; Citizen Member Isabelle Gonzalez, Building Commissioner Don Fozo, Fiscal Officer Rebecca Neese,City Controller Cathy Roemer and Kathleen Cekanski-Farrand, Council Attorney. Council Member Aranowski welcomed members of the Building Department to the budget meetings for a review of their proposed 2001 budget. BUILDING DEPARTMENT IEUND it 600) 2000 Total Revenue Projection: $1,027,440 2001 Total Revenue Projection: $1,079,490 $ 52,050 reflecting a 5.1 %increase 2000 Total Expense Projection: $1,099,120 2001 Total Expense Projection: $ 1,040,142 $34,506 reflecting a 3.4%increase Don Fozo, Building Commissioner made the presentation. He noted that the anticipated changes in revenue would be directly related to the rate changes. An ordinance is pending before the County Council which will be acted upon in October which is similar to the ordinance passed by the Common Council. Mr. Fozo noted that they may have to dip into reserves. He then reviewed the footnoted material on the"Summary of Major Changes"page. Mr. Fozo added that his department is looking at rolling over the vehicle fleet every four years as opposed to every three years which is the current policy. The fleet covers 440 square miles. In response to a question from Dr. Varner it was noted that the vehicles average between 80-90,00 miles. The vehicles are obtained as demos with approximately 12,000 to 20,000 on them. All employees have the option to take the vehicles home or park them in the city garage. In response to a question from Dr. Varner, Mr. Fozo noted that at the beginning of this year he had$271,000 in cash reserves which is now down $ 50,000. Mr. Fozo noted that his staff is stretched to the limit. One person goes to AM General daily to check concrete work and there is additional time needed to review prints before checking. By state law, the Building Department is a public safety department and therefore the inspection phase is critical to safety. Permits are becoming more complicated in light of DNR, asbestos checks, Design Review, historical reviews, etc. As a result, it is impossible to train personnel in light of the load. In response to a question form Dr. Varner, Mr. Fozo noted that permits are not longer seasonal. The commercial side is strong throughout the year thanks to the warm winters. Jim Markle is certified and can get a state stamp for prints. They are considering reviewing local plan review which would not be mandatory. The State Building Commissioner's stamp however would still need to be obtained. , rte Personnel and Finance Committee August 30,2000 Page 2 Mr. Fozo noted that more staff is necessary in order to properly do plan and design reviews. They hope to have a one-week turn around whereas the state has a ten-week turn around process. The state is currently doing a very generic review addressing building type and occupancy. The City's Board of Zoning Appeals typically reviewed four (4) requests at each meeting which has now grown to ten (10); and the County Board of Zoning Appeals has gone from ten (10) to twenty(20) per meeting. It is becoming more time-consuming and the Board members are not paid for their services. Mr. Fozo noted that he gives educational talks to professional groups as an education outreach and keeps in touch with title companies. Council Member Aranowski inquired whether licenses were being sold noting that a lot of that had happened in 1998-1999. Mr. Fozo stated that it does but not as much, with only one incident this year. He noted that all testing is now national and most problems are related to contractors who are not locally licensed. Council Member Coleman joined the meeting at this time. Mr. Fozo noted that AM General needs 600 pipefitters, as a result they will be seeking persons nationally. Isabelle Gonzalez noted that housing skilled trades are in short supply also. Mr. Fozo noted that he has entered into a contract with the County Commissioners to move into the Law Building 1st floor. Remodeling will cost $ 45,000 per year for three years which reflects a$ 1,000 savings on their current lease per year. After the three year period they will pay $ 10,000 per year for the space. Council Member Kirsits inquired about joining the inspections efforts with those in the fire department. Mr. Fozo noted that they have worked with the fire department but have not had discussions, but he would be open to it. He noted that the fire inspectors are brought in for final inspections since they are used in the area of maintenance and building use, whereas the building inspectors are used for construction codes. The Council Attorney noted that fees for fire inspections are a topic which the Fire Administration would like to pursue since most cities the size of South Bend have been charging for such services for years. There being no further business to come before the Committee, the meeting was adjourned at 3:50 p.m. Respectfully submitted, Council Member James Aranowski, Chairperson Personnel and Finance Committee KCF:kmf