HomeMy WebLinkAboutOpening of Proposals - Coal Line Trail, Phase III Proj No. 123-007 - Lochmueller GroupCOAL LINE TRAIL PHASE 3
CITY OF SOUTH BEND
Des. No. 2201235
RESPONSIBLE OFFICE
Lochmueller Group
112 W. Jefferson Blvd.
Suite 500
South Bend, IN 46601
AUTHORIZED NEGOTIATOR
Jessica J. Clark, PE
jclark@lochgroup.com
574.286.8074
PROJECT MANAGER
Barbie Swihart-Stutzman, PE
bstutzman@lochgroup.com
574.202.4491
URBAN TRAIL EXPERIENCE
We understand what cities want
when it comes to urban paths
and connector trails. We have
designed numerous multi-
modal transportation projects
including urban trails offering
vital connections to important resources for
citizens. Recently, we have contributed to regional
trail systems in the cities of Greenfleld, Goshen,
and La Porte.
CITY OF SOUTH BEND | Des. No. 2201235 | March 14, 2023
COAL LINE TRAIL
PHASE 3
A CREATIVE APPROACH
Lochmueller’s Senior Landscape
Architect, Laurel Harrington, PLA,
ASLA, LEED AP BD+C, Lead Trail
Design Engineer Ryan Clark, PE,
and our Historian / Cultural Resources Specialist,
Hannah Blad, will collaborate on a plan that
enhances the health of the community, infuses the
length of trail with historic and cultural context,
and offers a beautiful and calming streetscape for
the neighborhood to enjoy.
Lochmueller Group (Lochmueller) is pleased to present this
Letter of Intent to the City of South Bend for Phase 3 of the
Coal Line Trail. Our urban trail planning, design, and
engineering services are perfectly suited to meet every
expectation you have for this project. In fact, we know this
path provides more than just a healthy walk through the
neighborhood. Because Phase 3 culminates at the new
Martin Luther King, Jr. Dream Center at College Street and
Linden Avenue, it will provide a vital connection to important
resources the neighborhood desires. Our local offlce is ready
and excited to be a part of this transformation that will
improve urban trail access for all of South Bend ’s citizens.
Let’s get started!
LOCHMUELLER GROUP | CITY OF SOUTH BEND COAL LINE TRAIL PHASE 3 2
REBECCA MAENHOUT, PE
CITY OF SOUTH BEND
PROJECT ENGINEER
PROJECT TEAM
JESSICA CLARK, PE
NORTHERN INDIANA
REGIONAL LEADER
BARBIE SWIHART-STUTZMAN, PE
PROJECT MANAGER
DALE WILLS
CONSTRUCTABILITY REVIEW
DESIGN TEAM
Ryan Clark, Team Lead, PE
Howard Berberick, PE
Dan Mochen, EI
Marc Oakley, EI
UTILITY & RAILROAD
COORDINATION
Jeremy Ross
Jayson Earleywine, PE*
CULTURAL RESOURCES
Hannah Blad
PUBLIC
OUTREACH
Nicole Minton
Jessica Clark, PE
LIGHTING / SIGNALS
Nathan Nohren,
PE, PTOE
Jayson Earleywine, PE*
TITLE RESEARCH
TOPOGRAPHIC SURVEY
Kevin Johnson, PS
Ed Slaton, PS
Ron Cunningham*
Rodney Kelly, PS*
COAL LINE TRAIL PHASE 3
YOUR PROJECT MANAGER, BARBIE, WILL BE
LOCHMUELLER | 95%
5.2, 6.1, 8.1
ETICA | 5%
6.1, 12.2
Your First Point of Contact
Available 24 Hours via Email/Phone
Flexible to Schedule/Prioritize Changes
Lochmueller has the
✓ EXPERIENCE
✓ CREATIVITY
✓ CAPACITY
URBAN TRAIL DESIGN
Laurel Harrington
PLA, ASLA,
LEED AP BD+C
BICYCLE / PED PLANNING
Kevin Neill, AICP
ENVIRONMENTAL
DOC PREP—CE
C.J. Cunningham
*DBE = Etica
LOCHMUELLER GROUP | CITY OF SOUTH BEND COAL LINE TRAIL PHASE 3 3
PROJECT MANAGEMENT
BARBIE SWIHART-STUTZMAN, PE | PROJECT MANAGER
Barbie Swihart-Stutzman, PM, is one of Lochmueller’s most
versatile engineers, with over 17 years of experience spanning
the project development process from feasibility studies
through contract letting. She has developed specialized
expertise in designing urban thoroughfares, trails,
maintenance-of-traffic (MOT), sanitary and storm sewers,
erosion control, utility coordination, construction cost
estimation, plan preparation, and documentation.
Lochmueller has confidence in Barbie to manage the Coal
Line Trail Phase 3 project from design to completion.
+ CHESSIE TRAIL* | City of La Porte | Project Engineer
+ NINTH STREET TRAIL* | City of Goshen | Project Engineer
+ RILEY TRAIL* | City of Greenfleld | Project Manager
+ COLD SPRING TRAIL | City of Indianapolis | Project Engineer
+ RIVERSIDE TRAIL, PHASE II | City of South Bend | Project Engineer
+ LINCOLN WAY WEST ROAD REDESIGN | City of South Bend | Project Engineer
RELEVANT,VERSATILE, & LOCAL URBAN TRAIL, PARK, & ROADWAY PROJECT EXPERIENCE
*Please see page 11 for more details about these projects
+ BS, Civil Engineering,
Tri-State University, Angola, IN, 2005
+ Professional Engineer: IN
+ INDOT Certifled Site Manager
+ INDOT Certifled PE/PS Training
+ INDOT Certifled Technician Testing
+ INDOT Certifled Utility Coordinator
+ LPA Consultant Project Manager
Certiflcation NINTH STREET TRAIL | CITY OF GOSHEN
Lochmueller provided design services for the
historic renovation of Leeper Park, South
Bend’s oldest park. Careful attention was
made to restore the paths and landscaping to
George Kessler’s original design.
BARBIE SWIHART-STUTZMAN, PE
Project elements included:
+ Restoration and Installation of the Historic
Studebaker Fountain
+ Riverbank Overlook
+ Trafflc Calming
+ Pond Removal
+ Updated ADA Pathways
+ Formal Garden and Landscaping
+ Lighting Design
$2.2M | LET DATE APRIL 2019
+ Design Services
+ ADA Pathways
+ Trafflc Calming
+ Historic Elements
+ Public Outreach
PROJECT
RELEVANCY
LEEPER PARK | CITY OF SOUTH BEND
LOCHMUELLER GROUP | CITY OF SOUTH BEND COAL LINE TRAIL PHASE 3 4
Ryan Clark, PE | Lead Trail Design Engineer
BS Civil Engineering, Purdue University
Ryan has 25 years of transportation design, trafflc, safety, and project
management experience. He is proflcient in developing plans for state
and local projects. He has led multiple teams for urban trail design in St.
Joseph County and neighboring counties. Ryan will lead the roadway
team and be responsible for the Coal Line Trail path layout and design.
+ CHESSIE TRAIL* | City of La Porte, Project Manager
+ NINTH STREET TRAIL* | City of Goshen, Project Manager
C.J. Cunningham | Environmental Document Preparation—CE
BUPD, Urban Planning & Design, Ball State University
C.J. has16 years of experience in urban planning and environmental
services. He has authored over 100 approved NEPA documents for
INDOT and LPA projects. This experience enabled him to become an
expert on INDOT environmental policy and provide you with invaluable
insight on the best strategies to manage the NEPA delivery process and
schedule.
+ AUTEN TRAIL | St. Joseph County
+ ADAMS TRAIL, Phase I & II | St. Joseph County & Friends of
Granger Paths
KEY STAFF
*Please see page 11 for more details about these projects
Jessica Clark, PE | Northern Indiana Regional Leader
BS Civil Engineering, Purdue University
Jessica brings over 25 years of leadership to this project. She has
successfully managed 12 trail projects spanning over 10 miles with a
combined construction cost of $8.5M construction cost. She will assist with
the Public Outreach for Phase 3 of the Coal Line Trail project. Local
LPA-Federal Aid project experience includes:
+ ADAMS TRAIL, Phase I & II | St. Joseph County & Friends of
Granger Paths
+ LASALLE TRAIL, Phase I, II, & III | St. Joseph County Parks
Laurel Harrington,
PLA, ASLA, LEED AP
BD+C | Landscape
Architecture
BLA, Landscape
Architecture,
Michigan State
University School of
Architecture
Kevin Neill, AICP |
Bicycle / Ped Planner
Master of City & Regional
Planning, University of Memphis
Laurel’s expertise lies in developing designs to
help communities achieve their goals through
bicycle and pedestrian master planning, complete
streets, streetscapes, feasibility studies, landscape
architecture, and implementation of active
transportation projects. Laurel brings over 30
years of experience in trail design to this project.
Please see page 12 for Laurel’s project experience
Kevin is a transportation planner with a passion for
fostering healthy and active communities. From
statewide bicycle and pedestrian master plans to
regional trail plans to corridor studies, Kevin is
skilled at integrating active mobility into existing
transportation networks.
Laurel and Kevin bring added value
to you with their urban design,
bicycle / ped planning, and
implementation backgrounds
LOCHMUELLER GROUP | CITY OF SOUTH BEND COAL LINE TRAIL PHASE 3 5
COAL LINE TRAIL PHASE 3 TRAILHEAD
LINCOLN WAY WEST & WILBUR STREET
Crossing at existing signalized intersection
requires Accessible Pedestrian Signals
PROJECT MAP
A FIRST LOOK
COMMERCIAL NODE
Existing businesses and future redevelopment
incentives exist with enhanced visibility to trail users
and contribute to trail-user safety, plus compliments
the Near West Side Neighborhood Gateway.
BADUR HOUSE SIDE YARD
Probability of a Full Section 106 Review
is LOW if path is adjacent to side yard.
BADUR HOUSE
MATURE TREES
Run along west side of street
BRICK PAVED STREET
Brick street begins at
Werwinski. Full Section
106 probability trigger
is low.
ROUTE C: LWW TO COLLEGE
Full Section 106 probable by locating
path adjacent to Bottling House
ROUTE B: LWW TO RR ROW
Route avoids Full Section 106 Trigger
OVERHEAD ELECTRIC UTILITY POLES
Run along east side of street
CROSSING REQUIREMENTS
Curb ramps and crosswalks are necessary
at EACH PATH CROSSING, which may
require temporary or permanent
ROW to construct.
ROUTE A: WILBUR TO RUPEL
Narrow ROW is a distinct
challenge for this possible
path route.
EXISTING SIGNALIZED SECTION
CURB RAMPS & CROSSWALKS
STATE CLEAN-UP SITE
LEAKING UNDERGROUND TANK
HISTORIC PROPERTY
COAL LINE TRAIL
CONNECTION ROUTE A
CONNECTION ROUTE B
CONNECTION ROUTE C
RR ROW OPTION
COLLEGE STREET OPTION
COMMERCIAL NODE
THE DREAM CENTER
DEMOLISHED INDIANA GLASS
SITE & SOUTH BEND BREWING
ASSOCIATION BUILDINGS
+ Notable Property
+ Brownfleld Property
+ National Historic Register:
Full Section 106 Probable
Trigger BOTTLING HOUSE
5 MID-BLOCK CROSSINGS
Along Railroad ROW
LOCHMUELLER GROUP | CITY OF SOUTH BEND COAL LINE TRAIL PHASE 3 6
PROJECT APPROACH
The project involves the evaluation of the location
for and design of a 10’-12’ wide, 0.6 mile multi-use
path, from the existing Coal Line Trail trailhead at
Lincoln Highway (Lincoln Way West - LWW) and
Wilber Street to the proposed Dream Center at
Linden Avenue and College Street. South Bend
envisions this path to be accessible for people of all
ages and abilities who are walking, riding, and
rolling.
Phases 1 and 2 of the trail are located in the former
railroad right-of-way (ROW) where the land use
developed adjacent to and separate from the tracks.
Phase 3 integrates the trail into the Historic Near
West Side neighborhood where the design must
factor in safety and privacy concerns. This team
understands the importance of the public
involvement approach to educate, communicate,
listen, document, and act.
THE NEIGHBORHOOD CONTEXT
The Coal Line Trail is a linear park for extension into
the Near West Side neighborhood south of LWW.
This is the gateway connection to a new community
center, The Dream Center, that will anchor the south
end of the path. The neighborhood context of the
path introduces added challenges and constraints
as compared to the previous two phases. We
understand the City is considering the following
options:
OPTION 1
Alignment along College Street on the east side or
west side.
OPTION 2
Alignment within the railroad ROW mid-block
between North Brookfleld Street and College Street.
MATURE TREES & ELEVATED LAWN
Large mature trees in the lawn as well as an
elevated lawn pose design consideration
for the west side of the street trail path.
BRICK STREET MEETS ASPHALT
Brick street merges with asphalt at College
& Fassnacht. This south view shows the
existing road condition as well as on-street
parking considerations.
UTILITY POLES
Overhead electric lines are primarily
located on the east side and are barriers to
connectivity without ROW acquisition.
COLLEGE STREET
LOOKING SOUTH AT FASSNACHT COAL LINE TRAIL PHASE 3 APPROACH
Both options must address important
accessibility considerations around the
path’s adjacency to homes, safe crossings,
trafflc calming, and privacy. The College
Street alignment brings additional
considerations such as:
+ On-street Parking & Trash Pick-Up
+ Sidewalk Connections and Curb Ramps
+ Driveways, Steps, & Stoops
+ Utility poles & Underground Utilities
+ Businesses & Business Parking
Public involvement is critically important
for this project due to the neighborhood
context, signiflcance as a Crossway Trails
regional connection, and as the potential
for future path extensions to the south.
LOCHMUELLER GROUP | CITY OF SOUTH BEND COAL LINE TRAIL PHASE 3 7
EXISTING CONDITIONS ASSESSMENT
Lochmueller’s team will assess the existing
conditions of curbs, parallel sidewalks, and drainage
and provide recommendations with estimates for
replacement of damaged, or non-existent, curb,
sidewalk, and storm sewer construction.
TRAIL DESIGN CONSIDERATIONS
The design guidance in the NACTO
Urban Street Guide for multi-use paths
in low-speed urban settings
recommends a 5’ buffer between the
curb and the edge of the path. The preservation of
the on-street parking also provides a good buffer
for trail users and the 5’ buffer remains necessary to
allow space for car doors to swing open without
interfering with safe passage for trail users.
TRAIL AMENITIES
The team will incorporate trail-
user amenities such as benches,
wayflnding, branding, dog waste
stations and other amenities
compatible with the previous
phases and meeting the needs of
the neighborhood. With a tight, linear corridor, the
design team will look for creative ways to provide
amenities with multiple purposes such as a
wayflnding bench or signage as sculpture. There
are many inspirations for interpretive graphics such
as the historic Lincoln Highway, the Coal Line
Railroad, and the history of the Near West Side
neighborhood. The design of Phase 3 can help
reinforce the message of The Dream Center and
build a southern gateway to the City’s trail network.
PROJECT APPROACH
DESIGN CONSIDERATIONS BY SEGMENT
The RFP indicates the path will generally follow College Street south to the The Dream Center. MACOG ’s
GIS website shows rail ROW south of LWW, however a few adjacent property owners are “using” the area
and may oppose this route. While we considered this option and are open to discussing this with the City if
desired, our proposal focuses on the potential alignment options on College Street.
WILBER STREET at LINCOLN WAY WEST
Phase 3 begins at the northeast corner of Wilber and LWW where the
existing path terminates at this signalized intersection. From initial
impressions, it appears path-users will have the best visibility crossing
Wilbur, north of LWW, and then crossing LWW on its western approach.
Although pedestrian pushbuttons exist at the southeast corner,
pedestrian signal heads do not. With nearly 15,000 vehicles per day
here, we recommend new pedestrian countdown heads and other safe
crossing measures.
TRAIL DESIGN, REQUIREMENTS, & CONSIDERATIONS
LOOKING NORTH FROM
LINDEN AVENUE
LOCHMUELLER GROUP | CITY OF SOUTH BEND COAL LINE TRAIL PHASE 3 8
RUPEL STREET to WERWINSKI STREET
Challenges & Considerations (west side):
+ Room for shared-use path
+ Potential pedestrian/bike confiicts with
existing businesses & residential accesses &
alley
+ Valley Transmission appears to store
vehicles/equipment on the sidewalk
Challenges & Considerations (east side):
+ Recent removal of Indiana Glass/Classic Boutique building opens up site
for future trail-oriented design
+ Utility relocations are likely & require a curb barrier and buffer
for the path
+ Standing water
Just north of Werwinski, the brick pavers are exposed and drainage appears to
be limited or non-existent. Rehabilitating the brick paver segments will ease
path construction, promote positive drainage, and offer a higher quality
project for the neighborhood. Coordination with Valley Transmission may
encourage maintaining a clear path area.
PROJECT APPROACH
LINCOLN WAY WEST / WILBER STREET CONNECTIONS to COLLEGE
There are three connection routes from the LWW intersection to College Street.
Refer to the map on page 5 for an outline of the proposed routes.
ROUTE A
Wilbur to LWW to
Rupel to College
Existing buildings limit
the space available to
integrate a path.
ROUTE B
LWW to RR ROW to
Rupel to College
Additional space for
path elements, such as
benches and storm
water detention.
ROUTE C
LWW to College
Sufflcient space, but
highly probable the
route will trigger a
Full Section 106
Review due to
Bottling House site.
WERWINSKI STREET to LONGLEY AVENUE
Challenges & Considerations:
+ Brick pavers & patching with intermittent
curbing & a wide gutter pan
+ West side’s Temple Tree Service’s screen fence
extends the entire block. It leans toward the
street & is in poor condition
+ East side has an overhead electric utility, multiple drives, and an alley
The west side provides more available room with fewer confiicts.
LONGLEY AVENUE to FASSNACHT AVENUE
Similar considerations as the block between Werwinski and Longley. While
potential space exists behind the east pole line for the path, the clear offset from
the ROW and from the utility poles may be insufflcient.
The west side appears to be the better option for path placement.
FASSNACHT AVENUE to SIBLEY AVENUE
Challenges & Considerations:
+ Reduced curb height on both sides
+ Recent HMA overlay in good condition, does not require rehabilitation
+ Existing sidewalks in average to poor condition
+ East side utility poles remain a confiict
+ Locating path on east side will impact driveway and existing steps to home
+ Locating path on west side requires removal of mature trees
The west side alignment again has advantages over the east side in this
segment.
SIBLEY AVENUE to FLORENCE AVENUE
East Challenges & Considerations:
+ Buildings & yards are elevated from the
sidewalk grade
+ Likely require low retaining walls to avoid
grading impacts on private property
+ Coordination required for building frontages
with steps, walls, and drives
+ East side utility poles are located just behind the curb
COLLEGE STREET
LOCHMUELLER GROUP | CITY OF SOUTH BEND COAL LINE TRAIL PHASE 3 9
PROJECT APPROACH
Dale Wills has served
as Lochmueller’s
Resident Project
Representative on
flve LPA-Federal Aid
Trail projects and
three recent South
Bend projects. His
attention to detail,
ability to visualize the
effectiveness of a design and detect
constructability concerns from the plan
sheet have proven to save time and
minimize additional costs.
QA / QC
Lochmueller performs and
documents independent peer
reviews for both draft and flnal
project delivery
submissions. Reviewers provide
memorandums to the PM who ensure
completion of any noted corrections and
sign the memorandum to document
completion.
CONSTRUCTABILITY REVIEW
Using our in-house
construction inspection team
to review bid plans allows
our designers to include
details and speciflcations proven to be
successful while eliminating any
unsuccessful and costly ones. This
collaborative approach is one of the
beneflts Lochmueller brings to our
clients through a “down the hall” ability
to discuss project details with a wide
variety of professionals.
UTILITY COORDINATION
Coal Line Trail Phase 3 requires careful
utility coordination between agencies,
businesses, and residents. To prevent
delays and costly redesigns, it is
important to begin utility coordination
early in development and maintain
constant communication throughout
construction.
An 811 request for a list of area utilities
yielded:
+ AEP Electric
+ AT&T & Windstream
Communications
+ Choice Light, CenturyLink,
& Metro Fibernet Fiber Optic
+ Comcast North Cable
+ NIPSCO Gas
+ City of South Bend
Sewer & Water
Identifying challenges and confiicts upfront beneflts the
route alternative analysis and helps reduce possible
relocation costs, change orders, and schedule delays.
ROW
Existing parcel data indicates there is a consistent
66-foot ROW along College Street, inclusive of
the sidewalks on both sides.
Since ROW services are not a pre-qualiflcation in the
RFP, we deduce the City desires to limit the trail ’s
development impacts within existing street or former
railroad ROW. Typically, INDOT requires a temporary
easement to approximately 5’ beyond the limits of
construction for driveway reconstruction. There are also
a few step and stoop conditions adjacent to the ROW
that may also be impacted and require temporary
easements or minor modiflcations.
If necessary, our team is qualifled and ready to deliver
these services!
FLORENCE AVENUE to LINDEN AVENUE:
THE DREAM CENTER
The flnal segment of the alignment is the gateway to
The Dream Center.
East-Side Challenges & Considerations:
+ Residences with existing landscaping wall &
fencing adjacent to sidewalk
+ Street trees intersect the overhead electric lines
+ Commercial building on northeast side of Linden
is tight up against the ROW
The west side of the street has a fiatter grade, vacant
lots and fewer overhead electrical confiicts.
When completed, the entrance of The Dream Center
building will be located at the southeast corner of
College and Linden. A western path alignment would
cross Linden north-south and then cross east-west on
College. Safety countermeasures, such as raised
crosswalks, at this fully improved intersection will be
highly important to accommodate people of all ages
and abilities walking, riding, and rolling.
LOCHMUELLER GROUP | CITY OF SOUTH BEND COAL LINE TRAIL PHASE 3 10
DRIVING THE CRITICAL PATH
The most common challenges for LPA -Federal Aid projects are
ENVIRONMENTAL and potential ROW impacts.
As is the case on all federally funded LPA projects,
Phase 3 of the Coal Line Trail will require the
completion of an environmental document evaluating
the project’s impacts on the cultural and natural
environments. Lochmueller’s in-house environmental
and cultural resources team will work with our design
team to ensure the environmental document
encompasses all the necessary supporting studies to properly evaluate the
proposed path.
ENVIRONMENTAL DOCUMENTS SUMMARY
+ NEPA Document / Categorical Exclusion (CE) – Level 1
+ Alternatives Screening
+ Section 106, MPPA Documentation
+ Public Involvement: Key Stakeholder Engagement prior to design & Public
Information Meetings prior to flnal CE
Lochmueller will engage key stakeholders with an invested interest in
the outcome of this project to ensure their residential, business, and
community needs are met to the greatest extent.
PERMIT SUMMARY
Construction Stormwater General Permit (formerly known as a Rule 5 Permit)
PRIMARY CONSIDERATIONS
Lochmueller’s primary environmental approach goal is
to manage the project schedule in a manner ensuring
successful, timely project delivery. Two critical factors
affecting the overall project schedule include:
CULTURAL RESOURCES
Comprehensive cultural resource impact evaluations,
known as “Full Section 106” investigations, can take 12-15 months to complete,
and their approval must precede submission of the Draft CE. Lochmueller
believes a Full Section 106 Investigation will be required if the trail is located
immediately in front of the South Bend Brewing Association “Bottling House”
located on the west side of College Street, between Rupel and LWW. Other
routes will be eligible for review under the Minor Projects Programmatic
Agreement (MPPA), thereby saving 6-8 months on the project’s environmental
schedule.
ROW
Any acquisition necessary for the planned improvements typically requires up to
12 months to complete. The schedule below provides 7-10 months while
maintaining an August 2025 Letting Date.
OTHER CONSIDERATIONS
TREE REMOVAL
Tree removal must occur between October 1st and March 31st in order to comply
with USFWS policies aimed at reducing impacts to endangered bat species. This
should be a consideration for any necessary project schedule changes.
HAZARDOUS MATERIALS
Two Leaking Underground Storage Tanks (LUST) sites, and three State Cleanup
sites are located near the north end of the proposed project. Engagement with
INDOT Site Assessment and Management (SAM) will occur early during project
development. Additional hazardous material investigations may be necessary to
determine if contaminated soils will be encountered during construction.
PROPOSED PROJECT SCHEDULE
PROJECT APPROACH
8/6/25
Trail Design Environmental ROW* PI Mtg.
*Schedule offers up to 7-10 months for acquisition.
LOCHMUELLER GROUP | CITY OF SOUTH BEND COAL LINE TRAIL PHASE 3 11
LPA FEDERAL AID PROJECT EXPERIENCE
Chessie Trail is a 10-foot wide, 1.1-mile
concrete multi-use path through downtown
La Porte, which begins at a planned trailhead
at an urban intersection. Lochmueller
provided design, environmental, railroad
coordination, utility coordination, and ROW
services for Phase 2. Project elements
included:
+ Railroad crossing improvements
including approach, gate
reconstruction, pedestrian gates, &
“Z” gates or chicanes.
+ Staged pedestrian crossing with refuge
island
+ Path trailhead, signage, lookouts &
other trail amenities added for safety
concerns
CHESSIE TRAIL PHASE 2
CITY OF LA PORTE
NINTH STREET TRAIL
CITY OF GOSHEN
The Ninth Steet corridor resides in an urban
area and includes a railroad. After an EPA
Pilot-Brownfleld Area-Wide Plan identifled a
need for street redesign, the multi-use path
was identifled as the initial project for
improvement to be completed. Project
elements included:
+ Green initiatives for stormwater
treatment
+ Multi-use path design to avoid ROW
impacts
+ Raised intersection design for
pedestrian crossing & trafflc calming
+ Public involvement for presentation &
discussion of design elements.
+ Linkage to the Pumpkinvine and
Winona Railway Trails
RILEY TRAIL
CITY OF GREENFIELD
The Riley Trail is a 0.7 mile, concrete multi-use
trail through downtown Greenfleld which
starts and ends at the existing Pennsy Trail,
crossing several local and state routes.
Project elements included:
+ Unique design & engineering for each
block due to existing conditions,
drainage, utilities, & adjacent land
+ For pedestrian safety, curb lines were
pulled in to narrow the roadway
+ Bumpouts & new curb ramps were
placed at intersections
+ Flashing beacon & Hawk signal
+ Connectivity with Greenfleld’s heritage
sites created opportunity to work with
local museum to share the City’s
heritage with trail users
$1.7M | LET AUGUST 2022 $2.2M | LET NOVEMBER 2022 $1.25M | LET NOVEMBER 2019
+ Trail Design
+ Drainage Design
+ Utility Coordination
+ ROW
+ Public Outreach
PROJECT
RELEVANCY
+ Trail Design
+ Drainage Design
+ Utility Coordination
+ Public Outreach
PROJECT
RELEVANCY
+ Trail Design
+ Drainage Design
+ Utility Coordination
+ Public Outreach
PROJECT
RELEVANCY
LOCHMUELLER GROUP | CITY OF SOUTH BEND COAL LINE TRAIL PHASE 3 12
URBAN DESIGN LAUREL HARRINGTON PROJECT EXPERIENCE
LAUREL HARRINGTON
COMPLETE STREETS PLANNER
The Grant’s Trail project required extensive
coordination with the Steering Committee
and stakeholders to establish the best route
for a mutli-use path into Downtown Kirkwood
from the Gravois Greenway and the Great
Rivers Greenway regional network of trails
and greenways.
LAUREL HARRINGTON
PROJECT MANAGER & PLANNER
Project elements included:
+ Multi-use Path
+ Lighting
+ Native Plantings
+ Art Elements
+ Multiple Route
Evaluation
+ Regional Connectivity
+ Former Railroad ROW
+ Railroad Coordination
+ Public Involvement
+ Successful TAP Grant
PROJECT
RELEVANCY
GRANT’S TRAIL*
CITY OF KIRKWOOD, MO
LAUREL HARRINGTON
PROJECT MANAGER & PLANNER
Project elements included:
+ Multi-use Path
+ Roadway & Pedestrian Lighting
+ Native Prairie Plantings
+ Branding
*These projects were in-progress or completed at a previous firm.
OLD OLIVE*
CITY OF CREVE COEUR, MO
14TH TO DIAMOND*
CITY OF NORTH KANSAS, MO
+ Multi-use Path
+ Feasibility Study
+ Regional Connectivity
+ Railroad Coordination
+ DOT Coordination
+ Public Involvement
+ Successful TAP Grant
PROJECT
RELEVANCY
+ Flexible Section Planning
+ Regional Connectivity
+ DOT Coordination
+ Extensive Utility Coordination
+ Public Involvement
+ Successful STP Grant for
Intersection Improvements
PROJECT
RELEVANCY
112 West Jefferson Boulevard, Suite 500
South Bend, Indiana 46601
www.lochgroup.com
100 North Senate Avenue
Room N750
Indianapolis, Indiana 46204
PHONE: (317) 233-4664
FAX: (317) 233-0891
Eric Holcomb, Governor
Michael Smith, Commissioner
The Etica Group
7172 N Keystone Ave. Ste. G
Indianapolis IN 46240
08/19/2022
Dear Jessica Nickloy
Subject:No Change Affidavit
This letter confirms receipt of your annual No Change Affidavit and supporting documentation . The Indiana Department of
Transportation's Economic Opportunity Divison, in compliance with 49 CFR Parts 23 and 26, is pleased to inform you that your
firm's information has been reviewed and approved.
Your firm's DBE/ACDBE Certification will remain valid for another year.
The DBE Directory, located athttp://www.in.gov/2674.htm , will continue?to list your contact information and will include the NAICS
codes and description of services performed.
As a DBE/ACDBE, you have the responsibility to comply with all aspects of 49 CFR Parts 23 and 26, which include maintaining
an accurate mailing address, phone number and email address with INDOT EIS and promptly following up on all inquiries .
If you have any questions, please feel free to contact us at any time.
Derrick Casson
Certification Manager, Economic Opportunity Division
Indiana Department of Transportation
cc: file
Sincerely,
NAICS/DBE Codes Assigned:
DBE Code DBE Description NAICS Code DBE Speciality Code
DescriptionNAICS Description
0055.137P All Other Professional,
Scientific, and Technical
Services
541990 Construction Inspections, Permit
Reviews, Testing Administration ,
Testing
All Other
Professional,
Scientific, and
Technical Services
0055.32P Title Abstract and
Settlement Offices
541191 Title ResearchTitle Abstract and
Settlements
0052.28E Surveying and Mapping
(except Geophysical)
Services
541370 Land surveying services;
Topographic Survey Data
Collection, Boundry and
Investigation Surveys, Drone
Service, Land Title
Surveying and
Mapping (except
Geophysical)
Services
0053.67G Building Inspection
Services
541350 Building Inspections, Forensic
Engineering & Expert Witness
Services, Code Compliance
Building Inspection
Services
0052.11E Drafting Services 541340 Drafting ServicesDrafting Services
0055.161P Other Activities Related
to Real Estate
531390 Right of Way Plan DevelopmentOther Activities
Related to Real
Estate
0052.30E Engineering Services 541330 Hydrology, Hydraulics and
Drainage Design; Traffic Signal
Design; Non-Complex Roadway
Design;Traffic Safety
Analysis;Non-Complex Traffic
Capacity and Operations
Analysis;
Civil Engineering
Services
Highway, Street, and
Bridge Construction
237310
Engineering Services 541330