HomeMy WebLinkAboutOpening of Proposals - Coal Line Trail, Phase III Proj No. 123-007 - DLZ Indiana, LLC Project Manager
Mathieu Doyle, PE » Civil Engineer
574.245.1664 » mdoyle@dlz.com
Authorized Negotiator
Laurie D. Johnson, PE » Vice President
574.904.7221 » ljohnson@dlz.com
Responsible Office
DLZ Indiana, LLC
2211 East Jefferson Boulevard »
South Bend, IN 46615
574.236.4400 » www.dlz.com
Coal Line Trail Phase 3 »» City of South Bend
South Bend is making impressive progress on adding to its many pedestrian and bicycle trails by
constructing Coal Line Trail. The Coal Line Trail will provide a connection from the newly renovated
Martin Luther King Jr. Center north along College Avenue to Angela Boulevard and other trail
connections such as East Bank and SR 933 Trail. While DLZ was not involved in the first 2 phases, we
feel like our extensive trail experience would be able to contribute to the City’s efforts to complete this
phase 3 portion of the Coal Line Trail.
The DLZ team has experience in seeing the whole picture and not just concrete sidewalk and curb
ramps. We have successfully delivered innovative solutions that have saved our clients time and money
on similar projects. In addition, on Federal Aid projects you want a designer well versed in guiding
projects through the INDOT LPA process. Our proposed DLZ team has extensive Trail design experience
including SR 933 Trail, LaSalle Trail, IUSB Trail, and multiple other trail projects noted in our project
experience.
Your DLZ Project Manager will be Mathieu Doyle, PE. Matt has been directly responsible for pedestrian
projects and is currently working on the Kennedy Park Improvements. Matt understands the needs and
constraints that connect impact your project. We are confident that you will agree after reviewing our
team’s qualifications that the DLZ team is best suited to lead this project for the City.
Respectfully submitted,
DLZ Indiana, LLC
Mathieu Doyle, PE
Project Manager
Rendering of what Coal Line Trail along
College Street may look like
Coal Line Trail Phase 3 » City of South Bend Page 2
PROJECT APPROACH
It is our understanding that the City of South
Bend has been awarded just over $2 million
in CMAQ funds for construction of a trail for
Phase 3 of the Coal Line Trail. The project limits
would extend from the south end of Phase 1 at
Lincolnway West and Wilber Street, west along
Lincolnway West, then turning south along
College Street to the City’s Martin Luther King
Jr. Community Center at College Street and
Linden Avenue. Total length of trail is anticipated
to be 3,200 feet. DLZ is working on both the
streetscape project along Linden Avenue as well
as the site design for the Martin Luther King Jr.
Community Center reconstruction and thus have
a good knowledge of this area of South Bend.
With the federal project funding, the design
and construction of this project will need to be
performed in accordance with the Local Public
Agency (LPA) Guidance Document and related
INDOT design manual, standard specifications
and standard drawings. At the onset of design,
we would have a kickoff meeting with the City
and INDOT to review the project scope, schedule
and budget. This meeting will serve to make sure
everyone is working toward the same project
goals and put everyone on the same page. DLZ
will work closely with the City to review and
solve any challenges. We believe that consistent
communication with project partners is vital to
the success of this project.
Legend
Coal Line Trail - Phase 3
Coal Line Trail - Phase 1
Linc
o
l
n
W
a
y
W
e
s
t
College StreetOrange Street
Martin Luther King Jr.
Community Center and Park
We would coordinate with the
City which side of College Street
the trail would be located on.
The east side makes sense since
Phase 1 and Martin Luther King
Jr. Community Center are on the
east side of College Street
Connection at north end to
Coal Line Trail Phase 1
Coal Line Trail Phase 3 » City of South Bend Page 3
Potential location for trail along College Street
PROJECT APPROACH
Cottage Street is a 2 lane urban roadway with
curb, tree lawn and existing sidewalks generally
in poor condition. There are existing power lines
along the east side of the roadway as well as
street trees along both sides of Cottage Street.
There are residential homes, a few businesses as
well as vacant lots.
There are many utilities along the
College Street corridor
From the City GIS database, it appears there
is generally 16 to 18 feet from the back of the
roadway curb to the existing right of way line. In
most cases, this should accommodate the 10 to
12 foot trail with a tree lawn. There are multiple
locations where there are buildings or other
obstacles in the way of being able to construct
the trail and maintain a standard tree lawn. We
would work with the City to determine if the tree
lawn could be reduced or eliminated at these
pinch point locations or if additional right of
way be required. DLZ has complete right of way
services should this be needed.
Utility Coordination
Utility Coordination is an important aspect of
every project and we believe it is a critical to the
success of this project. It is anticipated that a
tree lawn will be maintained and some of the trail
widening would have to extend past the current
sidewalk edge. In many cases, the utility power
poles are right along the back of the current
sidewalk and will require relocation to widen
to a trail. We are prepared to take a proactive
approach to the utility coordination to avoid
construction delays and issues.
DLZ performs utility coordination by:• Obtaining existing location during the survey
of the project.
• Corresponding with utilities to verify existing
utilities and determine impacts, if any, and
potential solutions to accommodate the
construction of the trail.
• Coordinating with the utilities throughout the
project development process.
• Holding utility coordination meeting and
obtaining relocation plans from the utilities as
necessary.
Maintenance of Traffic
The majority of the trail construction will occur
outside of the roadway footprint. However,
construction activities may require lane
restrictions along the side of the street. During
the design process, we could evaluate options
depending on the existing roadway width. Either
2 way traffic with narrow lanes or maintaining
one way traffic would be the likely solutions. We
would coordinate the design with the City to get
their input and design a maintenance of traffic
plan that satisfies the City’s requirements.
Coal Line Trail Phase 3 » City of South Bend Page 4
PROJECT APPROACH
Environmental Documentation
The use of federal funding triggers compliance with National Environmental
Policy Act (NEPA) documentation requirements. DLZ has conducted a field
visit and preliminary reviews of GIS data available on the IndianaMap website,
the IDEM VFC, IDNR’s Indiana Buildings, Bridges, and Cemeteries Map website
and other information to identify potential “red flag” resources or issues
that may need to be considered during design. RFI resources/issues noted
in the project area include an abandoned railroad, a brownfields site, two
leaking underground storage tank (LUST) sites, two state cleanup sites and a
public park were noted within the project area. The identified items are not
anticipated to impede project development.
The project will also require compliance with Section 106 of the National
Historic Preservation Act, which sets forth a review process for identifying
historic properties (including archaeological sites) and assessing potential
effects. The project may be approved under the MPPA. Qualified professional
subconsultant services would be required if the project were to require new
permanent right of way or would impact historic character-defining features or
previously undisturbed soils.
A Level 1 Categorical Exclusion (CE) would be required if the project were to
acquire less than 0.5 acre of new right of way. A Level 2 CE would be required
if the project were to acquire more than 0.5 acre of new right of way. A Level 4
CE would be required for involvement with Kennedy Park.
CHALLENGES SOLUTIONS
Section 106 The project proposes work types for which Section 106 approval may be issued under the Minor Projects Programmatic Agreement
(MPPA). MPPA applicability will expedite completion of the NEPA documentation.
Section 4(f)Kennedy Park is located at the south project terminus and the site of the National Register-listed South Bend Brewing Company
(now demolished) is located near the north project terminus. No Section 4(f) uses are anticipated.
Stream and Water
Quality Impacts
Implementation of INDOT Standard Specifications is anticipated to adequately address water quality concerns. Impacts requiring
mitigation are not anticipated.
Wetlands No wetlands were noted in or near the project area. Impacts are not anticipated.
Floodplains/
Floodways No floodplains were noted in or near the project area. Impacts are not anticipated.
Threatened and
Endangered Species
DLZ will conduct programmatic consultation for bat species of concern using the on-line USFWS IPaC system, which streamlines
the consultation process. A “No Effect” determination, or “May Affect, Not Likely to Adversely Affect” determination is anticipated.
If trees are removed/trimmed, a seasonal tree clearing restriction is expected (trees may not be removed from April 1 through
September 30).
Hazardous
Materials Sites
Several hazardous materials sites were noted within the project area. Early in project development, DLZ will complete a Red Flag
Investigation (RFI) and will coordinate with the INDOT Site Assessment and Management Unit to determine the need for additional
investigations. The identified sites are not anticipated to impede project development given the minor nature of trail construction.
Coal Line Trail Phase 3 » City of South Bend Page 5
NTP Letting
Final
Tracings
Ready for
Contracts
Right of Way
Complete
Field Investigation
& Stage 1 Plans
Environmental
Document Approved
Stage 2
Plans
Preliminary
Field Check & Initiate
Geotechnical Investigation
Right of Way Acquisition - 9 months
DLZ understands that this project is scheduled for for a 2026 Fiscal Year, we would propose a July, 2025 letting date, early in the fiscal year which would
allow flexibility in the schedule.. DLZ is committed to meeting and beating schedule expectations, as we have recently performed on various projects.
Futhermore, DLZ is available to expedite this schedule should funding become available sooner.
Stage 3
Plans
MAY
2023 JAN
2024
FEB
2025
APR
2024
OCT
2023
APR
2025
FEB
2023
AUG
2023
JULY
2025
NOV
2024
Design Hearing
(If Required)
MAR
2024
SCHEDULE »» INDOT Project Development Process
PROJECT APPROACH
Indiana University South Bend Bicycle/Pedestrian Trail Missing ADA curb ramps at the intersection of
College Street/Sibley Avenue Little River Trail - Huntington, IN
Coal Line Trail Phase 3 » City of South Bend Page 6
MATHIEU DOYLE, PE, LEED AP
23 Years Experience
BS Civil Engineering » Trine University
Professional Engineer » Indiana
PROJECT MANAGERMANAGER
As Project Manager, I will lead the team to
provide you with a project you will be proud of.
I will listen to the City’s vision, and together we
will establish a plan to reach your goals.
Relevant Project Experience
»Kennedy Park Improvements, South Bend, IN
• Grant Funding
• Pedestrian and Athletic Field Improvements
• New Aquatic Center
»Jackson Road Park Bike/Pedestrian Facility, St.
Joseph County, Indiana
• Design of a bike/pedestrian facility
• Design of an engineered cap on the existing
landfill, site grading, site drainage and
signing
»North Liberty Potato Creek Trail, North Liberty,
Indiana
• Tra il Design
• Drainage Design
• Mantenance of Traffic
»Trine State Recreation Area Roadway and
Shared-Use Path, Phase II, Steuben County,
Indiana
• Roadway and Trail Design
• Drainage Design
• Mantenance of Traffic
• Quantity Calculations and Cost Estimates
Matt’s history with the City
of South Bend and direct
experience as lead designer
of several similar projects,
makes him the ideal choice
to make this a successful
project for the City!
• Pennsy Trail, Schererville, Indiana
• Jackson Road Park Bike/Pedestrian Facility, St.
Joseph County, Indiana
• Merrifield Park Connector Multi-Purpose Trail,
Mishawaka, Indiana
• Stellar Trail, North Liberty, Indiana
• Darden Road, South Bend, Indiana
• Beverly Crone Trail, St. Joseph County, Indiana
• IUSB Trail, South Bend, Indiana
Matt will be the point of contact between DLZ, INDOT, and the City of South Bend. He will work closely
with City representatives to keep you informed of progress, address challenges, and keep the project
on track. Matt’s responsibilities will also include maintaining project budgets, ensuring that the project
stays within the specified scope, developing and administering the project schedule, timeline and
delivery dates, ensuring that staff working on the project have ample resources to perform the work,
coordination and monitoring of all subcontracts and ensuring that all quality control measure are
followed. Matt will track milestones using the Critical Path Method for key deliverables. Matt and his staff
will be committed full time throughout the duration of this contract for the successful completion of this
sidewalk improvements project.
COMMUNICATION PLAN
Matt, your one
point of contact!
Schedule and facilitate
meetings for all
stakeholders, including
progress meetings.
Work with the City
to develop a public
involvement plan.
Establish and confirm
expectations and goals
early in the planning
process.
Return phone calls and
emails the same business
day or within 24 hours.
CITY
PROJECT
MANAGER
Clearly communicate
through meeting
minutes/summaries and
time-critical action items.
Keep the City and INDOT
informed of the project progress.
Representative experience includes, but not limited to, the following:
Coal Line Trail Phase 3 » City of South Bend Page 7
Indiana-Based
Transportation
Professionals
69
800+
Total Staff
Company Wide
PROJECT PRINCIPAL
Laurie D. Johnson, PE
QUALITY MANAGER
Brian Smith, PE
PROJECT MANAGER
Mathieu Doyle, PE
PROJECT TEAM Team
Percentage
INDOT Prequalifications
5.2 6.1 8.1 12.2
DLZ Indiana, LLC 93%✓✓✓✓
Metric Environmental, LLC (DBE)5%✓
Courtland Title & Escrow, Inc.
(DBE)
2%✓
PROJECT TEAM
5.2 Environmental
Metric Environmental, LLC
(DBE)
Jason Stone
Daniel Stevens
6.1 Topographic Survey
Steven Jones, PS, CFeds
Brian Kinney
8.1 Non-Complex
Roadway Design
Paul Foster
Michael Geiger, PE
12.2 Title Research
Courtland Title & Escrow, Inc.
(DBE)
Stakeholder Outreach and
ADA Expertise
Sara Huss PLA, LEED AP,
CPESC
Landscape Architecture and
Site Furnishing
Jonathan Mooney, PLA, LEED
AP
Indian Creek Trail
Coal Line Trail Phase 3 » City of South Bend Page 8
Brian Smith, PE
Quality Manager
25 Years Experience
Jason Stone
Environmental
29 Years Experience
Steve Jones, PS, CFEDS
Survey
27 Years Experience
KEY STAFFSTAFF
Jason Steve Sara Jonathan
»SR 933 Trail, South Bend, Indiana
»Stellar Trail, North Liberty, Indiana
»LaSalle Trail, St. Joseph County, Indiana
»Angela Boulevard, South Bend, Indiana
»Bendix Drive, South Bend, Indiana
»Stellar Trail, North Liberty, Indiana
»Frontage Road Trail, Huntington, Indiana
»LaSalle Trail Phase III, St. Joseph County,
Indiana
»Northwest Bike Trail, Goshen, Indiana
»North Liberty Safe Routes to School
Sidewalk, North Liberty, Indiana
»SR 933 Trail, South Bend, Indiana
»Stellar Trail, North Liberty, Indiana
»LaSalle Trail, St. Joseph County, Indiana
»Angela Boulevard, South Bend, Indiana
»Wrenwood Trail, North Liberty, Indiana
»Tamarack Trail, North Liberty, Indiana
Brian
Sara Huss, PLA, LEED AP,
CPESC
Stakeholder Outreach and ADA
Expertise
20 Years Experience
»Eberhart-Petro Golf Course Master Plan,
Mishawaka, Indiana
»Potato Creek Crossing Park Plan, North
Liberty, Indiana
»Goshen Sensory Trail Interpretive Feature,
Goshen, Indiana
»Riverwalk Extension - Race to Cedar,
Mishawaka, Indiana
»Crawford Park Master Plan, Mishawaka,
Indiana
»Pinhook Park, South Bend, Indiana
Jonathan Mooney, PLA,
LEED AP
Landscape Architecture and
Site Furnishing
28 Years Experience
»Dunes Kankakee Trail, Porter County, Indiana
»Geist Greenway, Fishers, Indiana
»White Lick Creek Trail, Phases II, IIB, and IV,
Avon, Indiana
»White Lick Creek Scoping Studies, North and
South Routes, Avon, Indiana
»High School Trail, Phases I and II, Blackford
County, Indiana
»Carmel Monon, Carmel, Indiana
Coal Line Trail Phase 3 » City of South Bend Page 9
Tamarack Multi-use Trail » North Liberty, IN
PROJECT ELEMENTS » Subgrade Treatment | Compacted Aggregate | HMA for
Sidewalk| HMA for Approaches
PROJECT EXPERIENCE
Wrenwood Trail » North Liberty, IN
PROJECT ELEMENTS » Pre-Engineered Bridge | Subgrade Treatment | Compacted
Aggregate | HMA for Sidewalk
Lasalle Trail » St. Joseph County
PROJECT ELEMENTS » Topographic Survey | Engineering
Assessment | Right of Way Documentation | Trail Design
SR 933 Trail » Notre Dame, IN
PROJECT ELEMENTS » Utility Analysis | Opinion of Probable
Cost Preparation | Traffic Analysis | Stormwater Basin Relocation
Analysis| Boundary Survey
Coal Line Trail Phase 3 » City of South Bend Page 10
Stellar Trail » North Liberty, IN
PROJECT ELEMENTS » Subgrade Treatment | Compacted Aggregate | HMA for Sidewalk| HMA for Approaches
Bendix Drive » South Bend, IN
PROJECT ELEMENTS » Roadway Design | Storm Sewer Design | Sidewalk Design |
Right-of-Way Engineering | Right-of-Way Acquisition Services | Hydraulic Analysis |
Topographic Survey
Angela Boulevard » South Bend, IN
PROJECT ELEMENTS » Road Design | Sidewalk and Trail Design |
Traffic Signal Design | Drone Survey |
(Rev. 06/27/2018)
Request for Proposal Number:
RFP Item Description:
Affirmative Action Certification (AAC) for Disadvantaged Business Enterprises (DBE)
I hereby certify that my company intends to affirmatively seek out and consider Disadvantaged Business Enterprises (DBEs)
certified by the State of Indiana’s DBE Program and the Kentucky Transportation Cabinet (KYTC) DBE Program to participate as
part of this proposal. An Agreement between INDOT and KYTC established reciprocal acceptance of certification of DBE firms in
their respective states under the Unified Certification Program (UCP) pursuant to 49 CFR §26.81(e) and (f).
I acknowledge that this certification is to be made an integral part of this proposal. I understand and agree that the submission
of a blank certification may cause the proposal to be rejected. I certify that I have consulted the following DBE websites to
confirm that the firms listed below are currently certified DBEs:
INDOT: https://entapps.indot.in.gov/DBELocator/
KYTC: https://transportation.ky.gov/Civil-Rights-and-Small-Business-Development/Pages/Certified-DBE-Directory.aspx
I certify that I have contacted the certified DBEs listed below, and if my company becomes the CONSULTANT, these DBEs have
tentatively agreed to perform the services as indicated. I understand that neither my company nor I will be penalized for DBE
utilization that exceeds the goal. After contract award, any change to the firms listed in this Affirmative Action Certification to
be applied toward the DBE goal must have prior approval by INDOT’s Economic Opportunity Division.
I.DBE Subconsultants to be applied toward DBE goal for the RFP item:
Certified DBE Name Service Planned Estimated Percentage to be
Paid*
%
%
%
%
II.DBE Subconsultants to be utilized beyond the advertised DBE goal for the RFP item:
Certified DBE Name Service Planned Estimated Percentage to be
Paid*
%
%
%
%
Estimated Total Percentage Credited toward DBE Goal:
Estimated Percentage of Voluntary DBE Work Anticipated over DBE Goal:
Company Name:
Signature: Date:
*It is understood that these individual firm percentages are estimates only and that percentages paid may be greater or less as a result of
negotiation of the contract scope of work. My company will use good faith efforts to meet the overall DBE goal through the use of these
or other certified and approved DBE firms.