HomeMy WebLinkAboutOpening of Proposals - Coal Line Trail, Phase III Proj No. 123-007 - Abonmarche Consultants Inc. CITY OF SOUTH BEND
COAL LINE TRAIL PHASE 3
Des # 2201235
March 14, 2023
ENGINEERING • ARCHITECTURE • LAND SURVEYING
COVER LETTER
March 14, 2023
Rebecca Maenhout, Project Engineer
City of South Bend
227 W. Jefferson Blvd.
South Bend, IN 46601
RE: REQUEST FOR PROPOSALS – PE Services for Coal Line Trail Phase 3 (Des #2201235)
Dear Ms. Maenhout:
Trails, walkways, and greenways are important aspects of our communities and neighborhoods. They provide
safe, convenient access from their homes and schools between our parks, community centers, businesses,
and neighborhoods. Safe walkways and bikeways provide opportunities to promote a healthy lifestyle and
environmental awareness to everyone who calls South Bend their home.
Projects of this nature contain many pitfalls and challenges that must be managed through the development,
design and permitting process. This process seeks to minimize environmental impacts while creating an
amenity to serve the community for decades to come. Abonmarche will use our experience and local
understanding to anticipate the challenges of this project and work with the City to manage them
successfully.
You’ll find that our team is highly experienced in all aspects of development and design of multi -use trail
projects throughout northern Indiana and Michigan. Our experiences with the Next Level Trails program and
current design work for the Friends of the Pumpkin Vine will prove invaluable to this project. We appreciate
your consideration of our team and look forward to working with the City in making this project a reality.
Sincerely,
ABONMARCHE CONSULTANTS, INC.
Chad Knip, PE
Project Manager
cknip@abonmarche.com
574.314.1018
ENGINEERING • ARCHITECTURE • LAND SURVEYING
COMPANY INTRODUCTION
Civil Engineers
Architects
Land Surveyors
Marina/Coastal Engineers
Transportation Engineers
Landscape Architects
Structural Engineers
Planners
LOCATIONS
Abonmarche began shaping communities for the better 43 years ago in
the Midwest, providing clients with surveying, civil engineering, and
marina development services. As our services, client base, and
geographical service area expanded, Abonmarche continued to grow,
opening additional offices to better meet our clients’ needs and carry
on our tradition of client service.
Today, we work across 10 offices on some of the most transformative
projects in the region – in engineering, architecture, land surveying, site
development, landscape architecture, coastal & waterfront, planning,
financing strategies, and digital solutions.
Through our wide array of professional services, providing superior
customer value, and improving communities for a variety of private-
and public-sector clients. This often includes grant and loan applications
in coordination with state funding agencies.
Rather than telling our clients what to do, we work closely with them to
understand what they need to accomplish and what they hope to
achieve. Then, we put our expert technical and creative skills to work –
helping you create exceptional places. We harness the talents of our
principals and staff so that we're bringing our best to each project - no
matter the size. We are constantly honing our work processes and
advancing our teams' skillset, so that our clients are always getting the
best. Our strategy is to form a skilled project team that will add value to
your project by providing excellent communication, ingenuity, and
customer service paired with knowledge and experience.
We undertake every project with our client’s best interests in mind and
truly seek to become partners during the course of the project. Our
business strategy is centered upon building long-term client
relationships. During our proud history, we have attracted and retained
clients by providing superior customer value; in fact, the majority of our
work is repeat business from loyal clients.
1
South Bend, IN
Goshen, IN
Valparaiso, IN
Fort Wayne, IN
Hobart, IN
Lafayette, IN
Benton Harbor, MI
Kalamazoo/Portage, MI
Grand Haven, MI
Grand Rapids, MI
CHAD KNIP, PE
Project Manager
DARYL KNIP, PE
QA/Project Principal
FRANCISCO PEREZ
Staff Engineer
CONTACT
Chad Knip, PE, Project Manager
574.314.1018
cknip@abonmarche.com
RESPONSIBLE OFFICE
315 W. Jefferson Blvd.
South Bend, IN 46601
abonmarche.com
DB ENGINEERING
8.1 Non-Complex
Roadway Design
CITY OF SOUTH BEND
REBECCA MAENHOUT
Project Engineer
ROGER NAWROT, PE, PS
QA/QC
MICHAEL ROZYCKI, PS
Project Surveyor
ZACH HAUERSPERGER
Project Engineer/Utility Coordinator
ENGINEERING • ARCHITECTURE • LAND SURVEYING
KEY STAFF
Chad is responsible for the design of civil engineering projects and right of way
management for transportation and municipal projects. He has over 20 years of
experience in design and construction review. Chad has managed and designed
several Federal Aid LPA projects that have included roadway design, streetscape
improvements, water and sewer design, multi-use paths, and recreational
projects.
TRANSPORTATION AND MUNICIPAL
Chad specializes in the design and implementation of new road projects and the
reconstruction of existing roads, as well as streetscape beautification. His focus is on
understanding client needs and staying up-to-date on local and industry standards.
Chad is solution-oriented, figuring out how to complete a client’s vision for a project
within site constraints, on time, and on budget.
• Wilden Avenue Reconstruction, Goshen, LPA
• Edison Road Added Left Turn Lane, South Bend, LPA
• Heritage Iron Horse Trail, Portage, IN, LPA
• Cotter Street Reconstruction, South Bend, LPA
• East Shore Court Extension, La Porte, LPA
• Bremen Highway, Mishawaka, IN
• Douglas Road, South Bend, IN
• Main Street, Mishawaka, IN
• Jefferson Boulevard, South Bend, IN
• Division Street, DeMotte, IN, LPA
• Western Avenue, South Bend, IN
• 1st Street, Goshen, IN
• Supreme Court, Goshen, IN
• Maple City Greenway Phase IV
• Lake City Greenway
• SRTS Marshall Street and Walnut Street, Town of Argos, LPA
• Eddy and Howard Street, South Bend,
• 9th Street and Begonia Street Sidewalk, DeMotte, LPA
• Gumwood Road Multi-Use Path, Cass County, LAP
• Western Avenue Streetscape, South Bend
• Lincoln Way and Charles Martin Sr Drive, South Bend
• Pumpkinvine Trail, Middlebury
• Governor Kernan Trail, South Bend
• Ewing and Fellows Traffic Signal and Curb Ramp Replacement, South Bend
CHAD A. KNIP, PE
PROJECT MANAGER
EDUCATION
Purdue University
Bachelor of Science,
Civil Engineering
REGISTRATION
Professional Engineer
Licensed:
Indiana, Michigan
PROFESSIONAL AFFILIATIONS
American Society of
Civil Engineers (ASCE)
2
Daryl has over 26 years of experience in design and management of civil
engineering projects including roadways, sanitary sewer, lift stations, storm sewer,
water main, detention and retention analysis, and site design associated with
public works projects, federally funded projects and private developments. Daryl
understands his client’s vision and is able to conceptualize it, so that it’s their
vision guiding each project. He understands the area’s market and is able to
think beyond our client’s needs to their client’s needs, creating a design that’s
attractive to our client’s clients.
DARYL KNIP, PE
QA/PROJECT PRINCIPAL
ENGINEERING • ARCHITECTURE • LAND SURVEYING
Mike is a results-oriented land surveyor with over 23 years of experience in
topographic and boundary surveys, legal descriptions, and easement
preparation. Mike oversees the day to day operations and management of the
Indiana survey operations of Abonmarche. He has expertise in determining right
of way, route surveys, and parcel plats for right of way acquisition on federal
aided projects and locally funded projects.
MICHAEL ROZYCKI, PS
PROJECT SURVEYOR
KEY STAFF
Zach began working for Abonmarche in 2015 . He is an experienced engineer
who has designed several municipal and private projects that have included site
layouts, subdivision layouts, roadway designs, streetscape improvements, water
and sewer designs, and multi-use paths. He is also well versed in ADA
compliance standards for sidewalks and curb ramps as well as preparing permit
applications for IDEM. Zach takes pride in providing high quality designs and
plans to our clients.
• Safe Routes to School Near Monroe Primary Center and Studebaker
Elementary, City of South Bend
• Lincoln Way West and Charles Martin Sr. Drive Intersection Improvements,
City of South Bend
• State Street Reconstruction, Town of Middlebury
• Main Street Infrastructure Improvements, Town of Larwill
• Lincoln Way West and Olive Street Intersection Improvements, City of South
Bend
• DeMotte Community Crossing Matching Grant Projects (2017, 2019, and
2021), Town of DeMotte
• Campeau Street Streetscape Project, City of South Bend
ZACH HAUERSPERGER
PROJECT ENGINEER / UTILITY COORDINATOR
3
Frankie recently joined Abonmarche as a Staff Engineer in our South Bend office.
He has four years of experience working on various INDOT and other public
agency LPA projects. He has experience in preparing contract documents,
generating quantity calculations, preparing cost estimates, and working on
various tasks to complete a project. As his technical skills developed, Frankie
began to take on more responsibility by becoming the design lead for several
projects which involved assigning tasks to entry level engineers as well as finding
solutions to the challenges that came about during the design process. Frankie
has worked on a variety of INDOT and LPA related projects such as trails, sidewalk
improvements, and roadway projects. He has gained extensive experience in
collaborating with INDOT and local agency staff and managing outreach efforts
and meetings with stakeholders and clients.
• ADA Sidewalk Ramp Construction Along SR 10, SR 23, SR 49, US 24, and US
421, LaPorte District
• ADA Sidewalk Ramp Construction Along US 6 in Lake Station, IN and US 30,
Dyer, IN
• West Jefferson Streetscape (LPA), Culver, IN
• Lake Max Trail Phase II (LPA), Culver, IN
• Bike and Pedestrian Facilities Along SR 10 (INDOT LPA), in Culver, IN
FRANCISCO PEREZ
STAFF ENGINEER
ENGINEERING • ARCHITECTURE • LAND SURVEYING
KEY STAFF / PROJECT UNDERSTANDING
4
Founded in 2008, DB Engineering focuses on providing quality engineering, design, and inspection services
hallmarked by creativity, sustainability, and the celebration of the communities in which we work. DB Engineering
uses the collective strengths of our staff and project team members to create a holistic, multi -disciplined approach
to our work. Fostering a collaborative internal environment, coupled with strong collaborative relationships with our
clients, allows the DB Engineering team to address both simple and complex project elements with forward -thinking
solutions. DB Engineering fully invests in the communities we work in and believes that the best projects result from
consistent and meaningful client and stakeholder communication. We strive to complete projects that reflect
community values, promote livability, and create opportunity for growth and enrichment.
DB Engineering has a diverse staff with each member bringing a unique skill set, background, and approach to
planning, design, and construction. The cumulative experience of DB Engineering’s staff is impressive, each member
of the team brings with them the experiences gained throughout their careers working for small and large firms,
government entities, and construction companies. These collective experiences create a dynamic, multi -
disciplinary, and creative team of professionals. Our team has been involved in numerous private development,
transportation, stormwater, green infrastructure, site design, comprehensive planning, master planning,
redevelopment, urban design, historic preservation, zoning, and branding projects.
DB ENGINEERING
With over 47 years of Civil Engineering experience, Roger is responsible for quality
control of transportation and municipal infrastructure projects. As the lead
engineer, he directs the engineering design, land surveying and planning studies
to successfully complete civil engineering projects. Roger performs client
relations, quality control and quality assurance on infrastructure projects from
proposal development through construction. Areas of special interest include
the oversight of multidiscipline projects, traffic design, city revitalization, industrial
development of property and trenchless technology.
ROGER NAWROT, PE, PS
QA/QC
Mr. Matthew S. Larrabee is a registered professional engineer with over 26 years of
experience in the field of Civil Engineering. Matt is well versed as a senior manager
and design lead on various transportation projects. He is proficient in interstate and
highway design, rural and urban reconstruction and rehabilitations, intersection
improvement, roundabouts, signal and lighting design, storm drainage and culvert
design, trail and ADA design, and erosion and sediment control plans. He also has
experience as a construction project engineer. Matt is experienced in the
management of multidisciplinary projects as well. As with all DB Engineering
associates, Matt understands that constant communication with the client and key
stakeholders are the key to a successful project.
MATTHEW S. LARRABEE
DIRECTOR OF ENGINEERING
Ms. Candace Parker is an experienced project engineer with a background in civil
engineering, construction, and excavation. Her strong work ethic and attention to
detail make her a valuable team member. While she is knowledgeable in many areas
of the industry, she also looks for opportunities to learn and expand her skills.
CANDACE PARKER
PROJECT ENGINEER
ENGINEERING • ARCHITECTURE • LAND SURVEYING
PROJECT UNDERSTANDING
The City of South Bend is fortunate to have a robust and well connected trail system linking it to surrounding
communities. The St. Joseph River provides a natural path for trail routes linking neighborhoods throughout the
City with commercial corridors, community centers, and the downtown. This final link of the Coal Line Trail will
connect the Martin Luther King Jr. Center on the City’s west side with the existing trail network along the St.
Joseph River. Using a combination of the existing rail corridor, existing traffic signal location and the right of
way along Wilber Street no additional property acquisition is expected. We will design a multi -use trail that fits
the character of the neighborhood while considering pedestrian and traffic safety along the route. The
project will also provide an opportunity to add landscape amenities along the route exemplifying the Tree City
status South Bend has received. This connection will complete the link to the regional trail system and allow
people the opportunity to explore South Bend all the way from the state line to the eastern edge of the
county.
PROJECT APPROACH
We have tailored our scope of services per the Request for Proposals, our current experience with multiple
facets of the project that we’ve already completed, our current understanding of the project, our visits to the
site, and most importantly our history and experience working with City of South Bend. Our team is creative,
innovative, and focused on feasible ideas that will allow the development of the most viable and cost
effective project. Based on our understanding of the needs of the City will approach this project as follows:
Coal Line Trail Phase 3
The following tasks are anticipated to be completed for this project:
1. Boundary and Topographic Survey of the Project Route: This task involves collecting survey data along
the route to allow for the design of the project.
2. Utility Coordination: This task involves following the Indiana Department of Transportation’s utility
coordination for the design of the project. This task will include the necessary identification and
notification of existing utilities along the project route, necessary coordination meetings, a detailed
conflict analysis and review of the utility’s’ work plans. This will allow us to design a project that will be
delivered in the timeliest and cost effective way for all stakeholders.
3. Design: This portion of the project will include the bulk of the work. We will design the trail based on
the cross section developed from the geotechnical report to follow the route identified in the grant
application. We will provide the town with 30%, 60%, 90% and final design drawings for review and
comment throughout the duration of this task.
4. Permitting: This task will involve applying for all permits required for the construction of the trail. We
anticipate the necessity of a Rule 5 SWPPP (Erosion Control) following the new CSGP regulations. We
will reach out for early coordination with all agencies to determine what permits may be required and
the application process. We will monitor the submission and review during the permitting process.
5. Bidding and Construction Phase Services: This task will include administering the bidding of the project
with contractors in accordance with all applicable State laws. We will answer any contractor
questions and issue addendums as necessary. This task will also involve developing detailed cost
estimates based on our final design. During the construction we will also attend progress meetings and
address any RFI’s by the contractor.
5
PROJECT UNDERSTANDING &APPROACH
ENGINEERING • ARCHITECTURE • LAND SURVEYING
Kickoff Meeting
Upon receipt of the NTP we will meet with the City to confirm our methodology, our goals, and our objectives.
We will also discuss in detail our anticipated schedule and project approach. This will also give us an
opportunity to introduce the team and gather any other pertinent information that may help us develop the
project. We look forward to utilizing the City’s new web based Projectmates software to help manage and
keep the City aware of our progress and milestones during the design of the project.
QA/QC Effort and Methodology
The Quality Assurance and Quality Control (QA/QC) plan is important to establish and follow for any public
infrastructure project. Errors and Omissions in the documents have potential to lead to costly construction
change orders and even delays in the project completion. Our team includes experienced engineers who
are capable of both design and design review. For this project, we will assign Chad Knip, PE, to lead all daily
QA/QC efforts. To facilitate this process we will hold weekly internal progress meetings to evaluate team
member’s assignments and deadlines, discuss any major project issues, discuss the next week’s planned
work, and integrate any feedback from clients or coordination meetings. Along with these meetings Chad
will be responsible for the review of the preliminary and final reports, conceptual layout, and cost estimates.
Daryl S. Knip, PE will perform an executive level QA/QC review at major project milestones, including
presentations to the client and public. After all reviews a form will be completed for the review and will
define any changes needed, the timeline for completion, and a report back that the change was
implemented.
PROJECT APPROACH
6
ENGINEERING • ARCHITECTURE • LAND SURVEYING
QUALIFICATIONS
Abonmarche worked with the City’s
Engineering, Community Development, and
Venues Parks & Arts Departments. The
project had a number of funding sources
including a major parks bond and
emergency funds for repair of the historic
river wall. This was an important project to
the City since it provided linkage of
Downtown South Bend and Downtown
Mishawaka by a non-motorized trail, it
connected Governor Joe Kernan Park with
Howard Park, and provide safe bicycle and
pedestrian access to the Indiana University
at South Bend campus from the Downtown
area. The new trail replaces a narrow 5 foot
sidewalk on the edge of the river that was
not ADA compliant or safe for bicycles.
Abonmarche’s role in the project included field survey, design, permitting, river overlook nodes, and the
historic river wall restoration.
Governor Joe Kernan Trail serves as the completion of the City of South Bend’s long effort to redevelop the
adjacent former intercity industrial land into a vibrant residential neighborhood along the St. Joseph River front.
The investments made and the work Abonmarche performed have resulted in the finishing touches that will
complete the redevelopment of the southern portion of South Bend’s East Bank Neighborhood.
GOVERNOR JOE KERNAN TRAIL
SOUTH BEND, INDIANA
7
Imagination Glen Park and Woodland park provides residents and visitor
of the City of Portage with numerous recreational activities a
gymnasium, skate park, BMX race track, playgrounds, picnic areas, a
dog park. The city envisioned a trail to provide more access to the parks.
Iron Horse Trail, running over two miles between Max Mochal Road (SR
149) at the east end and Hamstrom Rd. at the west was designed to
improve access to the parks and create more recreational activities.
The design includes a 1,700 foot long, 12 foot wide asphalt multi-use trail
with painted cross walks at Portage Avenue and Hamstrom Road. ADA
ramps at the intersections of Portage Avenue and Crisman Road as well
as Iron Horse Trail and Hamstrom Road improved accessibility for people
for varying abilities.
Topographic surveys and right of way certification were conducted to
to prevent land disputes. And a comprehensive environmental field
investigation and analysis was performed to comply with requirements
of the Indiana Department of Transportation (INDOT).
The end result is a trail passing through a greenway corridor among
suburban back yards, though with a decidedly rural feel. Much of the
route is wooded, and the trail provides access to Imagination Glen Park
and Woodland Park.
IRON HORSE HERITAGE TRAIL
PORTAGE, INDIANA
ENGINEERING • ARCHITECTURE • LAND SURVEYING
QUALIFICATIONS
8
Abonmarche was hired by Friends of the Pumpkinvine Nature Trail, a trail
user non-profit, to add a section of multi-use path to extend the existing
Pumpkinvine Nature Trail. The project extended the trail to help close the
final gap in the 17 mile trail. The completed project provides a solid
surface biking and walking trail connecting the four towns in Indiana —
Elkhart, Goshen, Middlebury, and Shipshewana.
Abonmarche prepared the plans for the path, as well as survey
documents for property acquisition from the property owner,
administering the bid process and coordinating with the contractor
throughout the life of the project.
Our team communicated closely with the client, helping to direct them
through each phase of the design and construction process.
PUMPKINVINE TRAIL
GOSHEN, INDIANA
CLIENT
Friends of the Pumpkinvine Nature
Trail
CONSTRUCTION COST
$110,000
HIGHLIGHTS
• Multi-use Path
• Utility Coordination
ENGINEERING • ARCHITECTURE • LAND SURVEYING
QUALIFICATIONS
9
DB Engineering was responsible for all aspects of the design and development of the Franklin Street Trail Extension, from Greenfield Central Junior High School to Beckenholdt Park, including trail connection on New Road. The design
consists of three trail segments which will connect to existing portions of the Franklin Street Trail. Segment 1 Shall be
from the trail stub north of New Road to the entrance of Beckenholdt Park. This segment of the trail will connect to the newly constructed bridge over I-70. The trail is designed to be on the west side of Franklin Street and connect to
the newly constructed section across the bridge and is also designed to be on the south side of the park entrance
drive. Segment 2 shall be on the north side of New Road and shall connect to the existing trail on the west side of Franklin Street at the north end of the Greenfield Central Junior High School property and connect to the existing trail
stub along the south leg of New Road roundabout.
As the prime firm, we were responsible for the management of the subconsultants, who were responsible for the survey and right of way engineering. DB Engineering was responsible for the overall design of the trail segments,
surface drainage of the immediate trail area, maintenance of traffic, signage and pavement markings, temporary
erosion control, as well as miscellaneous tables and quantities. We coordinated with and obtained the necessary INDOT ROW permit for the construction of the project as well.
FRANKLIN STREET TRAIL EXTENSION
GREENFIELD, INDIANA
DB Engineering provided design and construction document services
for the development of the Pennsy Trail Phase 3B between Post Road
and German Church Road. The trail will connect to segments
previously completed or in design and will ultimately connect
Indianapolis to Cumberland and the City of Greenfield.
The project included a new multiuse path on a historic railroad
alignment, two bridge crossings, at-grade street crossings, identity
and trail traffic signs, lighting and pedestrian signalization, plantings,
trailheads, and coordination with adjacent property owners.
PENNSY TRAIL PHASE 3B
INDIANAPOLIS, INDIANA
The Brandywine Trail Project is in the City of Greenfield in Hancock
County, Indiana. The City of Greenfield and Department of Parks and
Recreation proposed a new trail to be constructed along the west
bank of Brandywine Creek between Davis Road and Pennsy Trail within
Brandywine Park.
DB Engineering assisted on this project and was tasked with trail design
and plan production, erosion control plans, application and obtaining
of the Rule 5 Permit all while conforming to Greenway Design
Standards. This is a 1.2-mile-long bicycle and pedestrian trail from east
Davis Road to a dual connection with Pennsy Trail. The trail runs
through Brandywine Park and includes a bridge over Little Brandywine
Creek.
BRANDYWINE TRAIL
GREENFIELD, INDIANA
Standard RFP Form Ver. 3-01-2021
7
(Rev. 06/27/18)
Des. #: 2201237
Affirmative Action Certification (AAC) for Disadvantaged Business Enterprises (DBE)
I hereby certify that my company intends to affirmatively seek out and consider Disadvantaged Business Enterprises (DBEs) certified
by the State of Indiana’s DBE Program and the Kentucky Transportation Cabinet (KYTC) DBE Program to participate as part of this
proposal. An Agreement between INDOT and KYTC established reciprocal acceptance of certification of DBE firms in their
respective states under the Unified Certification Program (UCP) pursuant to 49 CFR §26.81(e) and (f).
I acknowledge that this certification is to be made an integral part of this proposal. I understand and agree that the submission of a
blank certification may cause the proposal to be rejected. I certify that I have consulted the following DBE websites to confirm that
the firms listed below are currently certified DBEs:
INDOT: https://entapps.indot.in.gov/DBELocator/
KYTC: https://transportation.ky.gov/Civil-Rights-and-Small-Business-Development/Pages/Certified-DBE-Directory.aspx
I certify that I have contacted the certified DBE’s listed below, and if my company becomes the CONSULTANT, these DBEs have
tentatively agreed to perform the services as indicated. I understand that neither my company nor I will be penalized for DBE
utilization that exceeds the goal. After contract award, any change to the firms listed in this Affirmative Action Certification to be
applied toward the DBE goal must have prior approval by INDOT’s Economic Opportunity Division.
I. DBE Subconsultants to be applied toward DBE goal for the RFP item:
Certified DBE Name Service Planned Estimated Percentage to
be Paid*
%
%
%
%
II. DBE Subconsultants to be utilized beyond the advertised DBE goal for the RFP item:
Certified DBE Name Service Planned Estimated Percentage to
be Paid*
%
%
%
%
Estimated Total Percentage Credited toward DBE Goal:___________
Estimated Percentage of Voluntary DBE Work Anticipated over DBE Goal:__________
Company Name: ____________________________________________________________________
Signature: ___________________________________________ Date: ________________________
∗ It is understood that these individual firm percentages are estimates only and that percentages paid may be greater or less as a result
of negotiation of contract scope of work. My firm will use good faith efforts to meet the overall DBE goal through the use of these
or other certified and approved DBE firms.
DB Engineering 8.1 10
5%
3/14/2023
Abonmarche Consultants, Inc.
5%
2201235