Loading...
HomeMy WebLinkAboutChange Order No 1 - Northwest Elevated Tank Improvements Proj No. 122-018 - Viking Painting, LLC  ELIZABETH A. MARADIK JOSEPH R. MOLNAR GARY A. GILOT JORDAN V. GATHERS MURRAY L. MILLER 1316 COUNTY-CITY BUILDING 227 W. JEFFERSON BOULEVARD SOUTH BEND, INDIANA 46601-1830 PHONE 574/ 235-9251 FAX 574/ 235-9171 CITY OF SOUTH BEND JAMES MUELLER, MAYOR BOARD OF PUBLIC WORKS February 28, 2023 Mr. Luan Ha Viking Industrial Painting, LLC 10905 Harrison St. LaVista, NE 68128 luan@viptanks.com RE: Change Order No. 1 – Northwest Elevated Tank Improvements – Project No. 122-018 Dear Mr. Ha: At its February 28, 2023 meeting, the Board of Public Works approved the above referenced Change Order be decreased by $7,745 with an increase of ninety-seven (97) days, bringing the revised contract amount to $1,220,655 with a new completion date of March 31, 2023. Enclosed is a copy of the Change Order for your records. If you have any further questions, please call this office at (574) 235-9251. Sincerely, /s/ Theresa Heffner Theresa Heffner, Clerk Enclosures TH/lh DATE: PROJECT NO: PROJECT NAME: CONTRACT DATE: CITY OF SOUTH BEND DEPARTMENT OF PUBLIC WORKS PROJECT CHANGE ORDER February 6, 2022 122-018 Northwest Elevated Tank Rehabilitation Project August9,2022 1CHANGE ORDER NO. SUBJECT OF CHANGE ORDER: Deduct for the amount to rekey and master key locks in the City water facilities required to maintain security after the misplacement of the main key to the elevated tank. Time extension to spring for weather-dependent punch list items. The original contract sum Net change by previously authorized change orders The contract sum prior to this change order By this Change Order, the project amount is The new contract sum including this change order This Change Order represents a total change of Total change for entire project Original contracted completion date/time Extension of date/time by previous change orders Date/time extension by this change order New completion date/time CONTRACTOR �ffe Contractor Signature Luan Ha, Project Manager Printed Name and Title Viking Industrial Painting Company name 10905 Harrison Street Address La Vista, NE 68128 City, State, Zip $ 1,2282400.00 $ 0 $ 1,2282400.00 0 Increased � Decreased $ 7,745.00 $ 1,220,655.00 0.63 0.63 December 24, 2022 0 97 days March 31, 2023 RECOMMENDED FOR APPROVAL rflL;;/i� £ Elizabeth A. Maradik, President Joseph R. Molnar, Vice President Jordan V. Gathers, Member Gary A. Gilot, Member Murray L. Miller, Member % % February 28, 2023 INTER-OFFICE MEMORANDUM DEPARTMENT OF PUBLIC WORKS DIVISION OF ENGINEERING TO: Theresa Heffner, Clerk Board of Public Works FROM: Rebecca Plantz, Project Engineer SUBJECT: Change Order 1, Project No. 122-018 Northwest Elevated Tank Rehabilitation Project DATE: February 8, 2023 Change Order 1 to the Northwest Elevated Tank is to decrease the contract amount by $7,745.00. This deduct is to cover a quote from Michiana Lock & Key to rekey and master key locks at various locations within the City of South Bend Water Works Facilities to maintain security due to the misplacement of the main key to the elevated tank. Although the gates to the facility had a separate pad lock, a master key was needed to access the tower to the elevated tank. The master key that could not be found by the contractor could access many other Water Works facilities; therefore, the locks will be rekeyed. This change order also encompasses a seasonal time extension. The original contract had a substantial completion date of ninety (90) calendar days and a final completion date of one hundred and twenty (120) calendar days from the date of signed Notice to Proceed for all work. The Notice to Proceed was dated August 26, 2022, resulting in the completion date of December 24, 2022. The contract was originally bid on June 14, 2022, leaving time for this seasonal work to be complete. Due to the open market process of rejecting the first unresponsive bid and addressing missing information on an open market contract, the completion of the work was delayed into cold temperatures. There is a punch list of items for final completion that are to be completed when the temperatures allow, including exterior paint touch ups. Time has been extended by ninety-seven (97) days to March 31, 2023. Please call with your questions (5998). MICHIANA LOCK & KEY, INC. 621 E. Jefferson Blvd. South Bend, In 46617 Phone: 574-289-0095 E-mail:MLKUSA@sbcglobal.net Fax: 574-289-0900 www.michianalock.com January 27, 2022 South Bend Water Works Attn: Tony Email: tburnsid@southbendin.gov This is an estimate to rekey and master key locks at various locations. This estimate includes up to 50 keys. Any additional keys will cost $5.75 each. Any hardware repair or replacement will incur additional charges at our labor rate of $96.00 an hour plus parts. 105 Locks rekeyed and master keyed…..………........................20.00 ea...................... 2100.00 Service & Labor…………………………………………………………………………. 5645.00 Total………………………………………………………………………………………7745.00 This estimate is for the above work only. Any additional work requested will be billed out at our on-the-job rate plus materials. Upon receipt of a properly signed copy of this letter or a purchase order number, we will order parts (if needed) and contact you for an appointment. Payment terms are net due 30 days. This estimate is good for 30 days from above date. Thank you for giving us the opportunity to bid on this project. If you have any questions, please feel free to call. Sincerely, MICHIANA LOCK & KEY, INC. Mark Elliott Agent me:jws By signing below, I agree to the above terms and conditions and am authorized to have the above work performed by Michiana Lock & Key, Inc. ___________________________________________________ BOARD OF PUBLIC WORKS AGENDA ITEM REVIEW REQUEST FORM Date 02/10/2023 Name Becca Plantz Department Public Works BPW Date 02/28/2023 Phone Extension 5998 Review and Approval Required Prior to Submittal to Board Diversity Compliance and Inclusion Officer Officer Name BPW Attorney Attorney Name Michael Schmidt Dept. Attorney Attorney Name Purchasing Check the Appropriate Item Type – Required for All Submissions Professional Services Agreement Contract Proposal Open Market Contract Amendment/Addendum Special Purchase, QPA Bid Opening Bid Award Req. to Advertise Title Sheet Quote Opening Quote Award Reject Bids/Quotes Proposal Opening C/O & PCA No. PCA Chg. Order, No. 1 Traffic Control Resolution Other: Ease./Encroach Required Information Company or Vendor Name Viking Painting, LLC New Vendor Yes If Yes, Approved by Purchasing No MBE/WBE Contractor MBE WBE Completed E-Verify Form Attached Yes No Project Name Northwest Elevated Tank Improvements Project Number 122-018 Funding Source Water Works Capital – Distribution /Reservoirs Account No. PROJ 319 Amount $1,228,400.00 Terms of Contract Lump Sum Purpose/Description Install new coatings for the Northwest Elevated Storage Tank as well as several minor site and structure improvements. For Change Orders Only Amount of Increase Decrease $ ($ 7,745.00) Previous Amount $ 1,228,400.00 Current Percent of Change: Increase Decrease % (0.63%) New Amount $ 1,220,655.00 Total Percent of Change: Increase Decrease % (0.63%) Time Extension Amount: 97 days New Completion Date: March 31, 2023