City of South Bend
Kennedy School
February 14, 2023
Innovative
Ideas
Exceptional
Design
Unmatched
Client Service
Dear Selection Committee,
The City of South Bend is making impressive advancements in economic development and
revitalization of its neighborhoods. Whether its the progress made on the City’s 10-year
improvement plan to rebuild its streets, or following the State of Indiana’s guide to create safe
transportation options that promote more active lifestyles through its Safe Routes to School
(SRTS) program, the City of South Bend is taking proactive steps to help their communities!
Your DLZ Project Manager will be Anthony Glenn. Anthony, a South Bend native, understands the
needs and constraints of this project and has been directly responsible for the design of many
pedestrian projects in northern Indiana. Tony has worked with the City sucessfully before on
projects like Bendix Drive which included sidewalks and pedestrian access.
We have assembled an experienced transportation design team of engineers, surveyors and
environmental specialist who are dedicated to completing this project for the City. DLZ has a
strong local presence with over 100 employees located right here in the City of South Bend. We live
and work in your community. Our office is only 2 miles from the County-City Building and 3.5
from the project location. Being local, our designers are only 5 minutes from meeting with you at
your office or at the project site.
The DLZ team excels at seeing the whole picture and not just a curb ramp or sidewalk. We have
successfully delivered innovative solutions that have saved our clients time and money on similar
projects. We work diligently to anticipate issues, from funding to drainage, and present you with
cost effective solutions you can use immediately.
City of South Bend|Safe Routes to School
Safe Routes to School | 1
DLZ
2211 E. Jefferson Blvd
South Bend, IN 46615
574.236.4400 | www. dlz.com
Project Manager
Anthony Glenn, PE
574.236.4400 | aglenn@dlz.com
Authorized Negotiator
Laurie D. Johnson, PE | Vice President
574.904.7221 | ljohnson@dlz.com
Communicate with you, working towards successful completion of your project.
Understand your construction budget and strive to meet or beat your goals.
Work with you to determine the most beneficial project scope and areas of
reconstruction that will optimize development potential.
Successfully deliver this project on time. Additionally, we’re ready to accelerate
the schedule, if funding becomes available earlier.
ADDITIONALLY, OUR TEAM WILL:
$
DLZ is a multi-disciplinary State certified
minority-owned business enterprise (MBE),
with offices located in South Bend, Fort
Wayne, Indianapolis, Munster, Merrillville, and
Burns Harbor. Our fully-staffed South Bend
office is located 3.5 miles from Kennedy
School. Our ability to quickly access the project
sites will enhance our services by allowing
us to verify existing conditions, hold public
meetings, interview key stakeholders as well as
coordinate with City personnel.
Qualifications
DLZ has completed design and construction
of projects similar to yours which have
involved the planning and construction of
sidewalks, American Disabilities Act (ADA)
ramps, and trails. Your project requires
following INDOT/LPA standards and
procedures, of which DLZ is thoroughly
proficient. Our personnel have a full
understanding of INDOT’s federal aid design
criteria, standards and practice relating to
sidewalk and ADA ramp plan development.
YOUR VISION | OUR COMMITMENT AND EXPERIENCE
The City of South Bend has funding to improve the sidewalks and routes to school around Kennedy
School. This provides you with a fantastic opportunity to improve the surrounding neighborhood that
is lacking safe, ADA compliant sidewalk and curb ramps. We have the experience and commitment to
help bring this project through design and into construction. We will serve as an extension of the City’s
staff and deliver a quality project for the City.
Together, we will make a difference.
In addition to training our staff, DLZ wants our
clients to be informed on the requirements
of the ADA. As mentioned earlier, we have
utilized our expertise to assist numerous
clients with ADA compliance by providing a
variety of training opportunities at no cost.
DLZ sponsored full day informational seminars
entitled “The ADA and Your Community” in
Indianapolis, South Bend, and Fort Wayne,
that provided clients and public agencies with
a variety of information on the requirements
of the ADA on Title II entities.
As recognized authorities on the ADA, DLZ
staff are requested to present at conferences
on ADA topics. DLZ has presented at the
annual Accelerate Indiana Municipalities
conference, Purdue Road School, Indiana
Society of Professional Engineers,
Michigan Public Transit Association, Ohio
Transportation Engineering Conference,
County Commissioners Association of Ohio,
Ohio Townships Association, Kentucky
American Public Works Association, and
Transport Chicago.
DLZ has successfully completed the design
and construction of neighborhood ADA ramp
replacement projects, as well as over 100
miles of trails, greenways, and sidewalks
for numerous types of federal-aid projects.
ADA Compliance Specialists
DLZ has several staff that perform the
specialized services of ADA compliance
evaluation and design. This expertise has
been developed over many years by our
lead ADA specialists, and that experience
is passed on to others as new staff join our
team to meet the needs of our clients.
Recognized Leader
in ADA Requirements
Safe Routes to School | 2
Identification & Qualifications
DLZ’s ADA Specialist Stephen Metzer presenting at the
Ohio Transportation Engineering Conference (OTEC)
Team Participation
DLZ Indiana, LLC
96% | 5.2, 6.1, 8.1, 12.2
Metric Environmental, LLC (DBE)
3% | 5.2
Courtland Title & Escrow, Inc. (DBE)
1% | 12.2
Safe Routes to School | 3
Anthony
Glenn, PE
PROJECT MANAGER
Anthony’s history with
the City of South Bend
and direct experience
as lead designer of
several similar projects,
makes him the ideal
choice to make this a
successful project for
the City!
Representative experience includes, but not limited to, the following:
• Merrifield Park Connector Multi-Purpose Trail, Mishawaka, Indiana
• Potato Creek Trail, North Liberty, Indiana
• Trine State Recreation Area Roadway and Shared-Use Path, Steuben County, Indiana
• 103rd Street Homeplace ADA Project, Mishawaka, Indiana
• Memorial Hospital Streetscape Improvements, South Bend, Indiana
• Pinhook Park Pavilion Improvements, South Bend, Indiana
Anthony will be the point of contact between DLZ, INDOT, and the City of South Bend. He will work closely
with City representatives to keep you informed of progress, address challenges, and keep the project on track.
Anthony’s responsibilities will also include maintaining project budgets, ensuring that the project stays within
the specified scope, developing and administering the project schedule, timeline and delivery dates, ensuring
that staff working on the project have ample resources to perform the work, coordination and monitoring of
all subcontracts and ensuring that all quality control measure are followed. Anthony will track milestones using
the Critical Path Method for key deliverables. Anthony and his staff will be committed full time throughout the
duration of this contract for the successful completion of this sidewalk improvements project.
COMMUNICATION PLAN
Anthony, your one
point of contact!
Schedule and facilitate
meetings for all
stakeholders, including
progress meetings.
Work with the City
to develop a public
involvement plan.
Establish and confirm
expectations and goals
early in the planning
process.
Return phone calls and
emails the same business
day or within 24 hours.
CITY
PROJECT
MANAGER
Clearly communicate
through meeting
minutes/summaries and
time-critical action items.
Keep the City and INDOT
informed of the project progress.
Safe Routes to School | 4
Key Staff
PROJECT MANAGER
Anthony M. Glenn, PE
PROJECT PRINCIPAL
Laurie D. Johnson, PE
5.2 ENVIRONMENTAL DOCUMENT
PREPARATION - CE
Metric Environmental, LLC (DBE)
Jason Stone
Dan Stevens
6.1 TOPOGRAPHICAL SURVEY
Steven A. Jones, PS, CFEDS
Robert Hathaway, PS
8.1 NON-COMPLEX ROADWAY DESIGN
Mathieu Doyle, PE
Hannah Whisler
Brett Schneider, EI
Sara Huss, PLA, LEED AP
12.2 TITLE SEARCH
Courtland Title & Escrow, Inc. (DBE)
AS NEEDED
11.1 RIGHT OF WAY PLAN DEVELOPMENT
Steven A. Jones, PS
16.1 UTILITY COORDINATION
Hannah Whisler
QUALITY MANAGER
Ryan A. Carrington, PE
CITY OF SOUTH BEND
PROJECT ENGINEER
Gemma Stanton
Sara has developed a specialty in designing
for accessibility on both site/civil projects and
public right of way projects. She has furthered
her knowledge by attending continuing
education such as the National ADA Symposium
and INDOT’s Designing Pedestrian Facilities
for Accessibility. Her site layout experience,
combined with her knowledge with ADA
compliance, has enabled her to develop sensible
solutions for non-compliant situations. She
has authored numerous ADA Transition Plans
and performing Quality Assurance Reviews of
documents prepared by other DLZ staff.
• Town of North Liberty, Indiana
• Town of Topeka, Indiana
• Town of Shipshewana, Indiana
• Town of Markle, Indiana
Jason has 30 years of experience in the
preparation of NEPA compliance documents
including, Environmental Impact Statements
(EIS), Environmental Assessments / Findings of
No Significant Impact (EA/FONSI), Categorical
Exclusions (CE) and numerous Section 106/
Section 4(f) Analyses, primarily for Federal,
State and Municipal transportation and site
development projects. In addition, he has
managed interagency coordination and review
processes, performed resource inventories,
impact assessments, and prepared numerous
environmental permit documents, coordinating
these efforts with project development
milestones.
Ryan’s experience includes various highway and
roadway design projects. His experience also
includes feasibility studies, horizontal and vertical
alignment design, storm water management
systems, traffic analysis, erosion control plans,
signing plans, urban drainage design, basin
design, utility coordination, and right of way
engineering.
• Beiger Elementary School Sidewalk
Improvements, Mishawaka, Indiana
• Twin Branch Elementary School Sidewalk
Improvements, Mishawaka, Indiana
• Sidewalk and Pedestrian Improvements,
University of Notre Dame, Notre Dame,
Indiana
Quality
Manager
Ryan Carrington, PE
ADA
Specialist
Sara Huss, PLA, LEED AP
Environmental Document
Preparation
Jason Stone
A team built for success.
Safe Routes to School | 5
The City of South Bend has been awarded $1.875
Million in INDOT federal funds for the construction
of sidewalks and curb ramps in various locations.
The project includes the neighborhood
surrounding Kennedy Academy School bounded
by Bendix Drive to the west, Lincolnway West to
the north, Birdsell Street to the east, and Orange
Street to the south. We just partnered with the
City to submit a grant request for Kennedy Park.
If received, this grant could allow replacement of
the sidewalk around the park.
In order to begin the design process, DLZ would
propose a kick-off meeting with the City to review
the project’s scope of work, schedule and budget
parameters. This meeting will provide the details
to start the project in the right direction and put
everyone on the same page moving forward.
There are many times the length of existing
sidewalk in the project area is larger than what the
current budget can afford. We would propose
a field review of the current sidewalk conditions.
We could then work with the City to prioritize
corridors around Kennedy Academy School.
ADA compliance is extremely important on a
project like this. However, many of the sidewalks
are in such poor condition that they are a trip
hazard to anyone trying to use the sidewalk.
We have years of experience in ADA project
design and ADA transition plan development for
numerous communities throughout Indiana. Once
the areas of improvement are identified, DLZ will
develop plans to replace the sidewalk and curb
ramps. We will utilitze smart levels to determine
the segments of sidewalk and curb ramp that are
outside of ADA specifications. This will allow
us to define the topographic survey limits to
minimize the amount required. Ultimately, this will
expedite the design schedule, as well as allow the
City to maximize the amount of improvements
that can be done with the funding available.
We have the experience with INDOT LPA
projects to deliver this project to letting for
you. Throughout the design development, DLZ
will work closely with the City to review and
overcome any challenges that arise. We believe
that constant communication with project
partners is vital to project success.
We understand that the goal is to provide a safe
path for citizens and school children while giving
consideration to other important factors such as
construction costs, drainage, permitting, utilities
and aesthetics.
As required with the use of Federal Funding,
the design and construction will be done in
accordance with the Local Public Agency (LPA)
Guidance Document and related INDOT standard
specifications, design manual and standards.
Project
Understanding
and Approach
Sidewalk Focus
We recognize the City may have already
identified areas they would like to focus the
funding that is available. However, if there is still
some uncertainty, we propose the following
approach options for consideration:
• Establish a sidewalk and curb ramp
rating system based on visual inspection
to represent the existing conditions.
Assembling this information could help to
identify specific areas of focus.
• Focus on main roadways in the project area
around and leading to Kennedy School
for new or replacement sidewalk and curb
ramps, as appropriate.
• Begin at Kennedy School and work
outward to address sidewalk and curb ramp
deficiencies.
Safe Routes to School | 6
Project Area
The project area is contained by Bendix Drive on the west, Lincolnway
West on the north, Birdsell Street on the east and Orange Street on the
south. This covers a huge area that contains many times the amount of
sidewalk and curb ramps can be replaced with the current project budget.
Based on our site visit, we would estimate that approximately 25% or more
of the sidewalk is in disrepair and could be replaced. Since we cannot
repair all of the sidewalk within the project area and stay within budget, it
will be important to work with the City and identify priorities to maximize
the impact of this project. These projects will often also require limited
curb replacement along with asphalt patching of the roadway to properly
bring the curb ramps up to ADA standards. It will also be important to
coordinate with other City projects such as the potential Kennedy Park
improvements.
Drainage
One of the important aspects of any pedestrian improvements is properly
addressing drainage. Not only is it a safety issue to be walking through
ponding water, during the winter time it will also lead to freezing and
further deterioration of the sidewalk. The intent would be to perpetuate
existing drainage patterns as much as possible and try to promote the
runoff from the tree lawn area to be picked up by the roadway storm inlets.
11
22
33
Linc
o
l
n
w
a
y
W
e
s
t
Linc
o
l
n
w
a
y
W
e
s
t
North Bendix DriveNorth Bendix DriveN
Sidewalk with steeper than allowable slope
along N. Olive Street
Missing sidewalk along
North Elmer Street
Sidewalk with tree damage along Lincolnway West
1
2
PROJECT AREA
Orange StreetOrange Street Birdsell StreetBirdsell StreetKennedy School
3
Safe Routes to School | 7
Utility Coordination
Utility Coordination is an important
aspect of all projects, and we believe
it is a critical component of design
to maintain schedule, even on
curb ramp and sidewalk projects.
Our experience and preliminary
observation of the project area
indicates that utility conflicts will
likely be present. It is anticipated
that a majority of these conflicts can
be avoided through detailed and
creative design. We are prepared to
take a proactive approach to avoid
delays and issues during construction.
Utility coordination activities will
include:
• Initial notice to utilities and
verification of facilities
• Periodic status and plan updates
of the project to keep utilities
informed
• Correspondence and meetings
with utilities to discuss potential
conflicts and resolutions, if
necessary.
• Obtaining utility work plans,
including relocation plans, when
necessary.
Missing sidewalk
Environmental Documentation
The use of federal funding triggers compliance with National Environmental Policy Act (NEPA) documentation
requirements. DLZ has conducted a field visit and preliminary reviews of GIS data available on the IndianaMap website,
the IDEM Virtual File Cabinet, IDNR’s Indiana Buildings, Bridges, and Cemeteries Map website and other information
to identify potential “red flag” resources or issues that may need to be considered during design. Resources/issues
noted in and near the project area include public parks, schools, an active railroad, an abandoned railroad, a planned
trail and hazardous materials sites. Designs that minimize impacts to such resources and issues will be developed. The
identified features are not anticipated to impede project development.
The project will also require compliance with Section 106 of the National Historic Preservation Act, which sets forth
a review process for identifying historic properties (including archaeological sites) and assessing potential effects.
The project proposes work types which receive Section 106 approval under the MPPA. The services of Qualified
Professional cultural subconsultants would be required if the project were to impact historic character-defining features
or impact previously undisturbed soils.
If less than 0.5 acre of new right of way is to be acquired, a Level 1 Categorical Exclusion (CE) would be required. A
Level 2 CE would be required if more than 0.5 acre of new right of way is to be acquired. Section 4(f) involvement with
a public park would require preparation of a Level 4 CE.
ENVIRONMENTAL
CHALLENGES SOLUTIONS
Section 106
The project proposes work types which receive Section 106 approval under the Minor
Projects Programmatic Agreement (MPPA). MPPA applicability will expedite completion
of the NEPA documentation.
Section 4(f)
Section 4(f) properties, including public parks and historic properties, were noted in the
project area. No impacts are anticipated at this time. If it is determined that right of way
is required, the project intent will be to limit any impacts such that De minimis impact/
Section 4(f) MOU criteria are met. A De Minimis finding(s)/Section 4(f) MOU applicability
will expedite completion of the NEPA documentation.
Stream and Water
Quality Impacts
Implementation of INDOT Standard Specifications is anticipated to adequately address
water quality concerns. No streams were noted near the project area. Impacts are not
anticipated.
Wetlands No NWI-mapped wetlands were noted near the project area. Impacts are not anticipated.
Floodplains/
Floodways No floodplain areas were noted within the project area. No impacts are anticipated.
Threatened and
Endangered
Species
DLZ will conduct programmatic consultation for bat species of concern using the on-
line USFWS IPaC system, which streamlines the consultation process. “No Effect”
determinations, or “May Affect, Not Likely to Adversely Affect” determinations are
anticipated. If trees are removed/trimmed, a seasonal tree clearing restriction is expected
(trees may not be removed from April 1 through September 30).
Hazardous
Materials Sites
Hazardous materials sites were noted within the project area. Given the minor nature of
sidewalk construction activities, no impacts are anticipated.
Safe Routes to School | 8
Often a project like sidewalks, curb ramps,
and trails are viewed as “just a small project.”
At DLZ, we work diligently to ensure a high-
quality project, regardless of size, that will
serve your community for many years to
come. Our team has significant experience
with pedestrian centered projects that
have allowed us to navigate through many
different issues that commonly arise. When
designing a roadway, most projects are
focused on the roadway while peripheral
pieces and obstacles are moved to suit the
DLZ HAS THE EXPERIENCE YOU NEED
new corridor. With pedestrian projects, it’s
a very different approach. Sidewalks, curb
ramps, and trail construction must fit into
existing situations and avoid obstacles
while still meeting the required standards.
For example, on the Town of South Whitley
project there was one intersection where
there was very little space between the
roadway and house and a three-foot drop in
elevation. Our project engineer was able to
design a solution that worked for both the
homeowner and the town while still being
ADA compliant.
This is not just a sidewalk project. We
understand that there is much more involved
in order to truly be ADA compliant. It is
necessary to look at the entire intersection
when constructing curb ramps. In many
instances, we see curb ramps that end in a
low spot with the road surface which causes
water to pond, creating an undesirable
situation.
DLZ has ADA specialists on staff that truly
understand the ever-changing requirements
and standards. These specialists have often
developed creative solutions that are more
economical than traditional solutions. For
example, on the Mishawaka Safe Routes to
School project where an existing retaining
wall would have required the installation
of handrail and other costly modifications,
our ADA specialist worked directly with the
design engineer to adjust the design, creating
a more economically feasible solution to the
issue.
It’s this type of service that makes DLZ such
a great partner for the City of South Bend.
Sidewalk conidtion on Bertrand Street
Creative solutions in the
Town of South Whitley where
proximity between sidewalk
and roadway prevented a
traditional curb ramp design.
After
Before
Safe Routes to School | 8
Safe Routes to School | 9
APR
2023 NOTICE TO PROCEED
FIELD VERIFICATION
STAGE 3 PLANS (95%)
TOPOGRAPHIC SURVEY
FINAL TRACINGS
PRELIMINARY FIELD
CHECK PLANS
LETTING
ENVIRONMENTAL
DOCUMENT APPROVED
JUN
2023
NOV
2024
JUL
2023
MAR
2024
OCT
2023
JULY
2025
AUG
2024
Schedule
INDOT/LPA PROJECT DEVELOPMENT PROCESS
It is our understanding, this project is to have a 2026 fiscal year construction date, which is reflected in
the schedule to the right. DLZ is committed to exceeding the schedule expectations, and we are ready
to accelerate the schedule should funding become available for an earlier letting.
During the first 90 days after being given Notice to Proceed, the DLZ Team will get started with
the following tasks:
• Conduct a project kickoff meeting with the City to establish project goals, define more specific
areas of focus, and confirm our lines of communication.
• Once the project Area has been condensed, field verify sidewalks and curb ramps for ADA
compliance and determine topographic survey needs.
• Complete field visits for documenting environmental resources, if necessary.
• Perform topographic survey, verify existing right of way, and initiate any property surveys as
required.
• Initiate Early Coordination with State and Federal environmental resources.
• Initiate coordination with all utilities to verify locations of electrical, natural gas, water, and
sanitary sewer lines in the vicinity of the project.
ACTION PLAN FOR FIRST 90 DAYS
*Schedule assumes no right of way
acquisition is required.
Right of Way
Based upon our preliminary research of the GIS property lines, it generally appears that the
construction can be limited to stay within the existing right of way. However, DLZ’s experience
has shown that in some instances, areas around curb ramps may require additional right of way
to meet ADA requirements. Additionally, federal funding requires that appropriate documentation
of right of way be on record. As such, DLZ will perform title research to confirm the existing right
of way. If there are areas of insufficient documentation, or where additional right of way may be
needed to construct the desired improvements, our team will work diligently with INDOT and the
City of South Bend to find alternatives to reduce or eliminate the right of way impact. If permanent
or temporary right of way is required, the we will be ready to expedite Right of Way Engineering
and Acquisition services with your approval.
Safe Routes to School | 10
Similar
Project
Experience
Town-wide ADA Curb
Ramp Replacement
South Whitley, Indiana
DLZ provided professional consulting design
services for the development of engineering
plans and contract documents for ADA Curb
Ramp improvements in the Town of South
Whitley, Indiana.
The project consisted of construction of
ADA compliant curb ramps and sidewalks at
36 intersections around South Whitley. The
improvements includes sidewalk pavement
construction, ADA compliant curb ramps,
minor drainage grading improvements, yard
restoration, and pavement markings.
Additional services required for the design
included field survey, utility coordination,
NEPA document preparation (PCE),
construction inspection services, and
coordination with the various stakeholders
such as the Town of South Whitley and
adjacent property owners.
Mishawaka Safe
Routes to Emmons
Elementary School
Mishawaka, Indiana
The Emmons Safe Routes to School project
was an INDOT/federally funded project
consisting of sidewalk reconstruction along
Main Street and 16th Street. The project
also included design of curb ramps, advisory
signage, pavement markings and preparation
of Categorical Exclusion – Level 1 document.
The project limits were located along South
Main Street, between Sixth and Sixteenth
Street, for an approximate length of 3,200
feet, and along East Sixteenth Street,
between South Main Street and Union Street,
for an approximate length of 1,100 feet.
The total project length was approximately
4,300 feet. The concrete sidewalk varied
from four to six feet wide along Main Street,
and four to six feet wide along with a grass
buffer varying in width along 16th Street. The
improvements included sidewalk pavement
reconstruction, ADA compliant curb ramps,
roadway signing, and pavement markings.
Safe Routes to School | 11
Northview Safe Routes to
School
Valparaiso, Indiana
DLZ provided professional consulting
design services for a sidewalk project in the
Northview area of the City of Valparaiso.
The project included the design of sidewalk
gaps to the pedestrian facilities that had
challenging issues. Locations included a
mixture of curb and gutter or shoulder.
In many cases, gravel parking areas had
been created at the edge of the roadway,
prohibiting walking. The City coordinated
directly with property owners to provide
sidewalk in those areas. In other situations,
the carriage walk slopes from the homes to
the roadway, not within City right-of-way,
did not align with the sidewalk. DLZ was able
to design creative solutions that provided
the necessary profile grades. Ponding water
and limited right-of-way in many areas
were also challenges where the DLZ team
provided innovative solutions that kept the
construction limits at a minimum. DLZ staff
conducted additional field checks than is
customary to be certain these solutions would
be acceptable during construction.
Tamarack Multi-use Trail
North Liberty, Indiana
DLZ was retained by the Town of North Liberty
to provide design services for a multi-use trail
along the abandoned railroad from Wabash
Avenue to the north side of the VFW park.
Work included the installation of ADA compliant
infrastructure with the path being 10 feet
wide and hard-surfaced HMA pavement. The
approximate length of the trail was 4,600 feet
and connected the North Liberty Community
Center to the North Liberty Youth League
Ballpark along the abandoned railroad corridor
(formerly Indiana, Illinois and Iowa Railroad),
through approximately 2,200 feet of cleared
woods. The trail was designed in accordance
with the Indiana Department of Transportation
Standard Specifications.
Other elements of the project included
performing topographic survey, environmental
services, right of way engineering and
acquisition services, geotechnical investigation,
and construction phase office services.
Safe Routes to School
Project along Fox Road
Lawrence, Indiana
DLZ was retained by City of Lawrence to
prepare the design plans for a Safe Routes
to School Project along Fox Road in City of
Lawrence, Marion County, Indiana. Project will
construct sidewalk, boardwalks, curb ramps and
crosswalks along south side of Fox Road from
Pennycroft Drive to Amy Beverland Elementary
School. The typical section for the concrete
sidewalks will be 5 feet in width with 5 feet of
buffer. In some restricted areas, the typical
sidewalk will be 6 feet in width constructed at
the back of new curb and gutter. In large the
fill area and across Dry Branch Creek, six-foot-
wide elevated boardwalks will be constructed
with railings. The Total length of boardwalk
will be approximately 1,100. All other locations
will be concrete sidewalks. Utilizing the
boardwalk construction will reduce impacts to
wetland areas and reduce right-of-way. The
typical section for the concrete sidewalks and
boardwalks will be constructed with a designed
cross slope of 1.5%. Proposed improvements
include sidewalk construction, boardwalk
construction, ramps and drive approach
reconstruction conforming to the Americans
with Disabilities Act (ADA) standards.
(Rev. 06/27/2018)
Request for Proposal Number:
RFP Item Description:
Affirmative Action Certification (AAC) for Disadvantaged Business Enterprises (DBE)
I hereby certify that my company intends to affirmatively seek out and consider Disadvantaged Business Enterprises (DBEs)
certified by the State of Indiana’s DBE Program and the Kentucky Transportation Cabinet (KYTC) DBE Program to participate as
part of this proposal. An Agreement between INDOT and KYTC established reciprocal acceptance of certification of DBE firms in
their respective states under the Unified Certification Program (UCP) pursuant to 49 CFR §26.81(e) and (f).
I acknowledge that this certification is to be made an integral part of this proposal. I understand and agree that the submission
of a blank certification may cause the proposal to be rejected. I certify that I have consulted the following DBE websites to
confirm that the firms listed below are currently certified DBEs:
INDOT: https://entapps.indot.in.gov/DBELocator/
KYTC: https://transportation.ky.gov/Civil-Rights-and-Small-Business-Development/Pages/Certified-DBE-Directory.aspx
I certify that I have contacted the certified DBEs listed below, and if my company becomes the CONSULTANT, these DBEs have
tentatively agreed to perform the services as indicated. I understand that neither my company nor I will be penalized for DBE
utilization that exceeds the goal. After contract award, any change to the firms listed in this Affirmative Action Certification to
be applied toward the DBE goal must have prior approval by INDOT’s Economic Opportunity Division.
I.DBE Subconsultants to be applied toward DBE goal for the RFP item:
Certified DBE Name Service Planned Estimated Percentage to be
Paid*
%
%
%
%
II.DBE Subconsultants to be utilized beyond the advertised DBE goal for the RFP item:
Certified DBE Name Service Planned Estimated Percentage to be
Paid*
%
%
%
%
Estimated Total Percentage Credited toward DBE Goal:
Estimated Percentage of Voluntary DBE Work Anticipated over DBE Goal:
Company Name:
Signature: Date:
*It is understood that these individual firm percentages are estimates only and that percentages paid may be greater or less as a result of
negotiation of the contract scope of work. My company will use good faith efforts to meet the overall DBE goal through the use of these
or other certified and approved DBE firms.