Loading...
HomeMy WebLinkAbout2023-02-06 Council Traffic Calming Presentation Public Works & Property Vacation Committee Update (2)CITY OF SOUTH BEND, IN South Bend Traffic Calming Project PROJECT PRIORITIZATION AND SELECTION OVERVIEW COUNCIL UPDATE 2/6/23 Kara Boyles, Ph.D., P.E., City Engineer Charlie Brach, P.E., Senior Engineer Leslie Biek, P.E., Assistant City Engineer Daniel Sexton, Project Engineer CITY OF SOUTH BEND, IN •Traffic request backlog •236 traffic requests through 2021 with more requests weekly •Budget has continually increased since 2016 with a significant jump for 2022/23 Traffic Calming in South Bend 2 CITY OF SOUTH BEND, IN Process Overview Traffic Calming Request Summary Traffic Calming Requests by Council District 3 46 39 30 39 25 21 0 10 20 30 40 50 1 2 3 4 5 6 CITY OF SOUTH BEND, IN Process Overview 4 Traffic Calming Requests Summary 0 2 4 6 8 10 12 14 16 Belleville GardensBercliff EstatesBeverly HeightsChippewa HeightsCODHCopperfield EstatesCoquillard WoodsCouncil OakCreekswood VillasEastgate EstatesEdison ParkErskine ParkFar NorthwestFar West SideHarter HeightsHoward ParkKeller ParkKennedy ParkLafayette FallsLNCLasalle ParkLincoln BendixLWW GatewayMcKinley TerraceMiami HillsMiami VillageMonroe ParkNear West SideNNNNortheastNorthshore TrianglePinhookRiver ParkRiverside ManorRum VillageScottsdale CommunitySMHASOARSoutheast PondSt CasimirSunnymedeSwanson ParkTopsfieldTwyckenham HillsVillas at Lake BlackthornWalnut GroveWest SideWooded EstatesWoodlawnUnique Requests per Neighborhood CITY OF SOUTH BEND, IN Rubber Speed Hump Pilot 5 •12 Rubber Speed Humps (6 tables + 6 cushions) installed in November 2022 •Speed cushions have suffered damage (surface and raised lips) •Speed tables with snowplow lip attachment have not been damaged •Better feedback from Streets Dept on Speed tables •Current Pricing for Supply and Install: $15,801.82 CITY OF SOUTH BEND, IN Process Overview Data Review and Processing Preliminary Review Priority Scoring Project Selection 6 CITY OF SOUTH BEND, IN Process Overview Data Review and Processing •236 Traffic Calming Requests (2018-2021)* •37 requests removed •Arterial roadways •Over 5,000 vehicles per day •Speed data below speed limit •Non-residential/non-neighborhood corridors 7 * Does not include more than 80 new requests in 2022 CITY OF SOUTH BEND, IN Process Overview 8 Lane Width 5 pts/ft if over 9 ft Bike Lanes None: 10 pts Bike Lanes: 5 pts Protected Bike Lanes: 0 pts Sidewalks None: 10 pts One-side: 5 pts Both sides: 0 pts Traffic Control Devices None: 5 pts Stop Sign or Traffic Signal: 0 pts Speed Humps or other Traffic Calming: -10 pts School Zone Yes: 10 pts No: 0 pts Crashes 5 pts/crash Pedestrian Generators 5 pts/pedestrian generator Daily Traffic Local Street: 1 pt/100 vehicles Collector Street: 1 pt/300 vehicles Preliminary Review: Data Review and Processing CITY OF SOUTH BEND, IN Data Review and Processing 9 Preliminary Score Top 25 Scores: 20 pts Top 50 Scores: 15 pts Top 75 Scores: 10 pts Top 100 Scores: 5 pts Rest: 0 pts Daily Traffic Local: 1 pt for every 100 vehicles over 500 vpd Collector: 1 pt for every 500 vehicles over 1,000 vpd Speed Data Local: 5 pts for every 1 MPH over 30 MPH Collector: 5 pts for every 1 MPH over speed limit Crashes 1 crash/mile: 3 pts Adjusted with length of segment, rate of fatalities and injuries Sidewalk No sidewalk: 20 pts Sidewalk (not continuous): 15 pts Sidewalk (one-side): 10 pts Sidewalk (both sides): 0 pts Shared use path: 0 pts Pedestrian Generators Pedestrian Generator: 5 pts Adjusted with length of segment Number of Requests Multiplier of Total Score 1 request: Total Score x1 2-5 request: Total Score x1.25 6-10 request: Total Score x1.5 11+ request: Total Score x2 Process Overview Priority Scoring: CITY OF SOUTH BEND, IN Priority Scoring (DRAFT) Prioritization Scoring Results •Priority Rank Overview: 10 Priority Scoring Distribution Mean : 41.68 Normal Dist. 0 15 29.9 44.8 59.8 74.8 89.7 104.6 119.6 134.5 149.5 164.5 179.4 194.4 209.3 224.3 239.2 254.1 269.1 284.1 299 PRI1 Total Score 0 5 10 15 20 25 30 35 40 45 50 55 60 65 Count CITY OF SOUTH BEND, IN 2023 Project Selection (DRAFT) •42 projects total •21% of all 200 qualifying traffic calming requests •$1.9M estimated construction costs •19 linear miles of project corridors Three Project Types/Categories: •Group 1 –High Priority Projects (~60%) •Highest-scoring projects in each District •Group 2 -Supporting Projects (~20%) •Projects that support high priority projects and mitigate potential negative effects like traffic diversion to adjacent residential streets •Group 3 -Flex Projects (~20%) •High scoring projects that did not fit in Group 1 or 2 selected by staff to address geographic distribution and other project goals 11 CITY OF SOUTH BEND, IN 2023 Project Selection (DRAFT) 2023 Project Costs by Type and District Group 1 - High Priority Projects Group 2 - Suppor�ng Projects Group 3 - Flex Projects 1 2 3 4 5 6 Council District 0 20,000 40,000 60,000 80,000 100,000 120,000 140,000 160,000 180,000 200,000 220,000 240,000 260,000 280,000 300,000 320,000 340,000 Sum of Project Costs180,000 180,000 220,000 160,000 220,000 220,000 60,000 80,000 60,000 60,000 40,000 40,000 80,000 60,000 40,000 100,000 60,000 60,000 CITY OF SOUTH BEND, IN District 3Projects(DRAFT) Project Locations: Wall Street Greenlawn Avenue High Street Calvert Street Broadway Street 36th Street Indiana Avenue CITY OF SOUTH BEND, IN Next Steps •Traffic Calming Open Houses •February 16, 2023, 5:30-7pm, TBD •February 21, 2023, 5:30-7pm, Howard Park •February 23, 2023, 5:30-7pm, NNN •Review Phase in Project Selection Process •Prep of Project Bid Packages •Contact: trafficrequest@southbendin.gov 14 CITY OF SOUTH BEND, IN Feedback •Do you think this process has captured your Council District’s needs? •What can we consider going forward? 15 CITY OF SOUTH BEND, IN District 1Projects(DRAFT) Project Locations: Johnson Street Huey Street Olive Street Lathrop Street Elwood Avenue LaSalle Avenue Wilber Street CITY OF SOUTH BEND, IN District 2Projects(DRAFT) Project Locations: Grandview Avenue Vassar Avenue Wilber Street Walnut Street Brookfield Street Prast Boulevard Kaley Street CITY OF SOUTH BEND, IN District 4Projects(DRAFT) Project Locations: Northshore Drive Corby Boulevard LaSalle Avenue Sunnyside Avenue Rockne Drive Bissell Street Madison Street Manchester Drive CITY OF SOUTH BEND, IN District 5Projects(DRAFT) Project Locations: Walter Street Fellows Street Altgeld Street Ridgedale Road Inwood Road Altgeld Street Topsfield Road Erskine Boulevard CITY OF SOUTH BEND, IN District 6Projects(DRAFT) Project Locations: Ford Street Edison Avenue Indiana Avenue Donald Street Brookfield Street Huron Street Kosciuszko Street Walnut Street