Loading...
HomeMy WebLinkAboutOpening of Bids - 6000 More or Less, Universal Nestable Refuse and Yard Waste Containers - Pyramid Equipment, Inc.NOTICE TO BIDDERS Notice is hereby given that the City of South Bend, Indiana, Board of Public Works will receive sealed electronic bids at bpwbids@southbendin.gov until 9:00 a.m., Local Time, on January 10, 2023, for the following: Bid for Six Thousand (6,000) More or Less Universal/Nestable Refuse and Yard Waste Containers Specifications are available for download by visiting the City of South Bend's web page at www.southbendin.gov: X Click on "I'm Looking For" X Click on "Doing Business in South Bend" X Click on "City Contracts — Invitations to Bid" X Click on the "Required Link" to register your company. You must register to receive addenda and updates to the specific bid you are interested in. Failure to do so could render your bid non -responsive to the specifications. There is no charge for the specifications. The specifications are also available for review only during regular working hours in the Department of Public Works, Ste. 1316, County -City Building, 227 W. Jefferson Blvd., South Bend, Indiana 46601. Bids received after 9:00 a.m. Local Time, on January 10, 2023, will be deemed late. The Title of the Bid and Project Number (where applicable) as described above must be included in the subject line of the email to which you have attached your bid. The name of the company/vendor, address, contact email address and phone number must be included in the body of the email. Detailed instructions and information, including the link to the Reserved Mailbox for electronic bid submittals, is available at southbendin.gov/bids. Bids must be on the City of South Bend Bid/Proposal form provided, which includes a Non -Debarment Affidavit, Non -Discrimination Commitment form, and a Non -Collusion Affidavit Form. The Board reserves the right to reject any or all bids or to accept a full or partial award of the bid or bids which, in its judgment, will be to the best interests of the City of South Bend. If the Board elects to award the base bid plus an alternate(s), the Board will look at the totality of the cost when determining the lowest, most responsible bid. The Board may reject any bid that does not conform to these requirements as non -responsive. BOARD OF PUBLIC WORKS Theresa Heffner, Clerk Publish two (2) times: December 16. 2022 December 23. 2022 �F Sou TII ,&t U � C CITY OF SOUTH BEND, INDIANA W ":SCE , SELLER'S BID FOR SALE OR LEASE OF MATERIALS AND NON -COLLUSION AND NON -DEBARMENT AFFIDAVIT AND y 1865 NON-DISCRIMINATION COMMITMENT FOR SELLERS Bid for Six Thousand (6,000) More or Less Universal/Nestable Refuse and Yard BID NAME Waste Containers FOR BIDS DUE January 10, 2023 by 9:00 a.m. Local Time Bidder t n Date: ' . L -'1.0 - L L1 (Firm): �Y Address: �1� 0 � Jr 7 2 City/State/Zip: ,,,w�,-,-� Telephone Number. Agent of Bidder (if Appli able): `( b -S-) ( C n c When the prospective Contractor is unable to certify to any of the statements below, it shall attach an explanation to this Affidavit. CONTRACTOR'S NON -COLLUSION AND NON -DEBARMENT AFFIDAVIT, CERTIFICATION REGARDING INVESTMENT WITH IRAN, EMPLOYMENT ELIGIBILITY VERIFICATION, NON-DISCRIMINATION COMMITMENT AND CERTIFICATION OF USE OF UNITED STATES STEEL PRODUCTS OR FOUNDRY PRODUCTS (Must be completed for all quotes and bids. Please type or print) STATE OF ) SS: o -r4 e-- COUNTY ) The undersigned Contractor, being duly sworn upon his/her/its oath, affirms under the penalties of perjury that: 1. Contractor has not, nor has any other member, representative, or agent of the firm, company, corporation or partnership represented by him, entered into any combination, collusion or agreement with any person relative to the price to be bid by anyone at such letting nor to prevent any person from bidding nor to induce anyone to refrain from bidding, and that this bid is made without reference to any other bid and without any agreement, understanding or combination with any other person in reference to such bidding. Contractor further says that no person or persons, firms, or corporation has, have or will receive directly or indirectly, any rebate, fee, gift, commission or thing of value on account of such sale; and 2. Contractor certifies by submission of this proposal that neither contractor nor any of its principals are presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from participation in this transaction by any Federal department or agency; and 3. Contractor has not, nor has any successor to, nor an affiliate of, Contractor, engaged in investment activities in Iran. 2 a. For purposes of this Certification, "Iran" means the government of Iran and any agency or instrumentality of Iran, or as otherwise defined at Ind. Code § 5-22-16.5-5, as amended from time -to -time. b. As provided by Ind. Code § 5-22-16.5-8, as amended from time -to -time, a Contractor is engaged in investment activities in Iran if either: Contractor, its successor or its affiliate, provides goods or services of twenty million dollars ($20,000,000) or more in value in the energy sector of Iran; or ii. Contractor, its successor or its affiliate, is a financial institution that extends twenty million dollars ($20,000,000) or more in credit to another person for forty-five (45) days or more, if that person will (i) use the credit to provides goods and services in the energy sector in Iran; and (ii) at the time the financial institution extends credit, is a person identified on list published by the Indiana Department of Administration. 4. Contractor does not knowingly employ or contract with an unauthorized alien, nor retain any employee or contract with a person that the Contractor subsequently learns is an unauthorized alien. Contractor agrees that he/she/it shall enroll in and verify the work eligibility status of all of Contractor's newly hired employees through the E-Verify Program as defined by I.C. 22-5-1.7-3. Contractor's documentation of enrollment and participation in the E-Verify Program is included and attached as part of this bid/quote; and 5. Contractor shall require his/her/its subcontractors performing work under this public contract to certify that the subcontractors do not knowingly employ or contract with an unauthorized alien, nor retain any employee or contract with a person that the subcontractor subsequently learns is an unauthorized alien, and that the subcontractor has enrolled in and is participating in the E-Verify Program. The Contractor agrees to maintain this certification throughout the term of the contract with the City of South Bend and understands that the City may terminate the contract for default if the Contractor fails to cure a breach of this provision no later than thirty (30) days after being notified by the City. 6. Persons, partnerships, corporations, associations, or joint venturers awarded a contract by the City of South Bend through its agencies, boards, or commissions shall not discriminate against any employee or applicant for employment in the performance of a City contract with respect to hire, tenure, terms, conditions, or privileges of employment, or any matter directly or indirectly related to employment because of race, sex, religion, color, national origin, ancestry, age, gender expression, gender identity, sexual orientation or disability that does not affect that person's ability to perform the work. In awarding contracts for the purchase of work, labor, services, supplies, equipment, materials, or any combination of the foregoing including, but not limited to, public works contracts awarded under public bidding laws or other contracts in which public bids are not required by law, the City, its agencies, boards, or commissions may consider the 3 Contractor's good faith efforts to obtain participation by those Contractors certified by the State of Indiana as a Minority Business ("MBE") or as a Women's Business Enterprise ("WBE") as a factor in determining the lowest, responsible, responsive bidder. In no event shall persons or entities seeking the award of a City contract be required to award a subcontract to an MBE/WBE; however, it may not unlawfully discriminate against said WBE/MBE. A finding of a discriminatory practice by the City's MBE/WBE Utilization Board shall prohibit that person or entity from being awarded a City contract for a period of one (1) year from the date of such determination, and such determination may also be grounds for terminating the contact for which the discriminatory practice or noncompliance pertains. 7. The undersigned contractor agrees that the following nondiscrimination commitment shall be made a part of any contract which it may henceforth enter into with the City of South Bend, Indiana or any of its agencies, boards or commissions. Contractor agrees not to discriminate against or intimidate any employee or applicant for employment in the performance of this contract with privileges of employment, or any matter directly or indirectly related to employment, because of race, religion, color, sex, gender expression, gender identity, sexual orientation, handicap, national origin or ancestry. Breach of this provision may be regarded as material breach of contract. I, the undersigned bidder or agent as contractor on a public works project, understand my statutory obligations to the use of steel products or foundry products made in the United States (I.C. 5-16-8-1). I hereby certify that I and all subcontractors employed by me for this project will use steel products or foundry products made in the United States on this project if awarded. I understand I have an affirmative duty to notify the City in my bid that my proposal does not include the use of steel products or foundry products made in the United States. I understand it is my sole obligation and responsibility to provide a justification to the City, subject to review and approval, why the cost of United States made steel or foundry products is unreasonable. Prior to award and upon submission of bid which does not use steel products or foundry products made in the United States, the City, through its director of public works, shall make a determination if the price of United States made steel or foundry is unreasonable. I understand that violations hereunder may result in forfeiture of contractual payments. rd (To be completed only by ContractorslBidders claiming to be a "local Indiana business"pursuant to I.C. 36-1-12-22) INDIANA LOCAL BUSINESS PREFERENCE CLAIM A "local Indiana business" refers to any of the following (1) A business whose principal place of business is located in an affected county. (2) A business that pays a majority of its payroll (in dollar volume) to residents of affected counties. (3) A business that employs residents of affected counties as a majority of its employees. (4) A business that makes significant capital investments in the affected counties as defined in rules adopted by the political subdivision. (5) A business that has a substantial positive economic impact on the affected counties as defined by criteria in rules adopted by the political subdivision. An "affected county " refers to St. Joseph County, Indiana, or the following counties located adjacent to St Joseph County: Elkhart County, Marshall County, Starke County and LaPorte County There are the following price preferences for supplies purchased from a local Indiana business: - 5% for a purchase expected by the purchasing agency to be less than $50, 000 - 3% for a purchase expected by the purchasing agency to beat least $50,000 but less than $]00.000. - 1 %for a purchase expected by the purchasing agency to beat least $100, 000. Date: i 2= L id --I o-t - Pursuant to I.C. 5-22-15-20.9, •�� v�,� 1 claims a local Indiana business preference for Project 00 L44,j spc (Project # ) located within the City of South Bend, St. Joseph eounty, Indiana. The location of the principal place of business is 7 k1 S a (Address) d Q 6 ", ) ❑ St_ Joseph County, Indiana t ` The following county located adjacent to St. Joseph County, Indiana: �—G''t-cam 4- ❑ The majority of the business's payroll for the 12 months prior to the date of this Bid is to residents of St. Joseph County, Indiana or the adjacent county noted above. ❑ The majority of the business's employees for the 12 months prior to the date of this Bid are residents of St. Joseph County, Indiana, or the adjacent county noted above. If the business is deemed to be the apparent lowest, responsible, responsive bidder, then it shall provide supporting documentation for the 12 month period prior to the date of the Bid of (i) the total payroll amount paid to all employees of the business, and (ii) the total payroll amount paid to employees who are residents of St. Joseph County and the adjacent county noted above. WHEN SUPPLYING SUPPORTING PAYROLL RECORDS, BIDDER SHALL REDACT ALL SOCIAL SECURITYNUIIIBERS. Dated this 2 0 day of Sig a �e o�entractorBidder or Its Agent r:.,. N,,. c)1 (-) --i OL-5 wi Printed Name and Title 4 I hereby affirm under the penalties of perjury that the facts and information contained in the foregoing bid for public works are true and correct. Dated this 27 day of'Qe m 0022 Subscribed and sworn to before me this 27 My Commission Expires 08/12/2025 t fnlhn► �q .i�` , 1V — Corkractor/Bidder (Klrm) Signa of c(torBidder �Itsgent Printed Meme and Title 1-3 -day of December . 20 22 Notary Public County of Residence La PorteSSIOn rO If %, s • �0 BID NAME FOR BIDS DUE �S�uTxe� SPECIFICATIONS s MACE CITY OF SOUTH BEND 1865 Bid for Six Thousand (6,000) More or Less Universal/Nestable Refuse and Yard Waste Containers January 10, 2023 by 9:00 a.m. Local Time Pursuant to notices given, the undersigned offers bid(s) to the City of South Bend in accordance with the following attachment(s) which specify the class or item number or description, quantity, unit, unit price. It is the intent of these specifications to describe 96 and 45/48- gallon refuse and yard waste containers for the City of South Bend. All containers must be manufactured in the U.S.A. The City of South Bend reserves the right to reject any and all bids, which in its judgement, will be in the best interest of the City of South Bend. Vendor to complete bid proposal, and non- discrimination commitment contained in this bid specification and attach to the submitted bid. Vendor shall provide all information requested in specifications to qualify for the bid. Vendor shall indicate YES or NO for each area of the specification. Any variations to the following specifications must be noted on a separate sheet and attached to the bid in order for the bid to be valid. Vendor to complete bid proposal, and non-discrimination commitment contained in this bid specification and attach to the submitted bid. MANUFACTURING PROCESSES AND MATERIALS: Each rollout container shall consist of a body, lid, wheels, axle, and necessary accessories. The plastic resin material and the finished container must meet the minimum specifications herein. PLASTIC MATERIAL: Base plastic resin must be first quality linear low density polyethylene supplied by a national petrochemical producer. Please list supplier: r.AQ(_d LP Bidder must submit technical data sheet(s) from the resin producer, which verify that the resin to be used in the container body will meet the following minimum property levels: ESCR - > 1000 hrs Elongation - > 1000% Density - 0.937-0.940 .5 RESIN ADDITIVES: The plastic resin must be enhanced with color / NO pigment and ultraviolet inhibitor, which must be uniformly distributed throughout the finished container. To ensure thorough distribution of these additives, the resin and additives must be mixed in a molted state using a hot -melt compounding process. Bidder must submit a statement certifying that all of the plastic resin and additives will be hot -melt blended. CONTAINER REQUIREMENTS: The rollout containers must be YES / NO compatible with standard American semi -automated bar -locking lifters (ANSI type B) as well as automated arm lifters (ANSI type G) and function as follows: ANSI CONFORMANCE: Containers bid herein must meet the requirements of ANSI Z245.30-1999 and ANSI Z245.60-1999 standards for "Type B/G" containers. Bidder must submit independently certified copies of all ANSI test results with bid. Test results must state load (in pounds) under which tests were conducted. The load under which the tests were conducted must be the same as the load rating stated in all literature and specifications. The ANSI Appendix D test for "Loading and Unloading Test for Carts" must clearly state that the required 520 dump cycles under the cart's full rated load were performed on both a Semi -Automated Cart Lifter and a Fully Automated Grabber Arm. Containers must be made of material/texture or a gripping surface to prevent container from slipping out of the truck gripper arms. LOAD RATING: Containers must be designed to regularly receive / NO and dump the following pounds of waste materials, excluding the weight of the container, without permanent damage or deformation. The load rating must conform with ANSI Standard Z245.30. 96 Gallon — 335 pounds and 45/48 Gallon — 160 pounds Bidder must submit its normal printed color sales brochure which shows the exact product item bid and the corresponding load rating. Bidder must mark the location of the load rating on the brochure with a bold red arrow so as to aim directly at the load rating. Load rating stated on literature must exactly match all specifications, ANSI certification submitted with bidder's proposal, and the load rating permanently marked on the product. 96 Gallon: STATE LOAD RATING - pounds 04 ���oh 4548 Gaon: STATE LOAD RATING - pounds WEIGHT: The total weight of the fully assembled container shall be I �/ NO as follows: 96 Gallon — 3 pounds minimum li — =eem,, Z-'N nt)vvnr14 STATE FULLY ASSEMBLED WEIGHT OF EACH SIZE — 96 Gallon - 3`� 12), pounds GL g110� n - 2 pounds CAPACITY: The total capacity of the container body, excluding the / NO lid, must be 96 and 48 U.S. gallons (+/- 2%). The width of the 96- gallon container must be at a minimum 29.25 and 22.50 for the 45/48-gallon containers. Bidder must include an independent test result according to ANSI Z245.30, Appendix A (Volume Test), certified by an accredited professional engineer, showing the exact capacity of the cart body (to the nearest 0.1 U.S. gallon). 96 Gallon: STATE BODY CAPACITY - U.S. Gallons (0 Lt C'\\ OV\ !r w-� STATE BODY CAPACITY - � U.S. Gallons DIMENSIONS: The exterior dimensions of the completely YESCO assembled containers shall be as follows: 96 Gallon I Height: 41.25" — 46.0" STATE HEIGHT - 4 t " Length: 33.88" — 35.5" STATE LENGTH Width: 29.25" — 29.75" STATE WIDTH 4 SC\\ov\ Height: 37.5" — 39.20" STATE HEIGHT Length: 27.40" — 29.0" STATE LENGTH Width: 22.50" — 24.0" STATE WIDTH HANDLES: Each container must be equipped with two (2) handles, S NO each a minimum of 1" diameter. The handles and handle mounts must be an integrally molded part of the container body. The handles shall be designed to afford the user positive control of the loaded cart at all times. The handles must not have the ability to rotate on their own axis at any time. Handles which are molded as part of the lid are unacceptable. Bolted -on handle mounts or bolted -on handles are unacceptable. LID: The lid shall be configured to ensure that it will not warp, YE / NO bend, slump, or distort such an extent that it no longer fits the container properly or becomes otherwise unserviceable. The lid must be crowned in shape and designed to disallow entry of rain when in the closed position. The lid must open from a closed position through a full 270' arc. Living hinges and lid counter weights are unacceptable. Lid latches are unacceptable. The rim must also include a ledge on which the lid rests to create a tight seal between body and lid. BOTTOM: The bottom of the container must have a molded -in wear &�S / NO strip to protect against dragging. Container base must be impact resistant at all points (four comers and the center) of the base for durability. Screw -on, bolt -on, or pop -on wear guards are unacceptable. WHEELS: Wheels shall be 10" diameter and 1.75" wide with YE / NO knobby treads. Wheels must be extra high molecular weight polyethylene capable of supporting 200 pounds per wheel. AXLE: The axle must be 27/32" or greater for 96-gallon containers YES &0 and 45/48-gallon containers must be 3/4" or greater diameter zinc a 6 chromate plated solid high strength steel fully supported by cart S all body. Axle must slide through two molded -in plastic journals in the cart bottom and must not be exposed to contents inside of container. Each molded -in axle journal must be at least I" wide. Axles attached by means of bolts or rivets are unacceptable. STABILITY: Each container shall be stable and self -balancing when S / NO in the upright position, either loaded or empty. The container must be designed to withstand winds of up to 25 mph when empty. Containers must be easy for a citizen to tilt to the roll position when fully loaded while keeping both feet on the ground. Any container which is judged as too difficult to tilt when loaded with 335 pounds (96 Gallon) and 160 pounds (45/48 Gallon) of material will be disqualified. Containers that require a foot fulcrum to assist in tilting the container are unacceptable. LIFT SYSTEM: Each container shall be equipped with attachment S / NO points which make it compatible with standard American semi - automated bar -locking lifters and fully -automated arm lifters. The upper lift point must be integrally molded into the body of the container. The lower lift bar must be designed to withstand over ten (10) years of lifter attachment, and must be I" diameter galvanized steel. It must freely rotate a full 360' on its own axis. The lower bar must be mounted in molded -in plastic bearings so that it is not exposed to the contents inside the container. The lower bar must be factory installed and cannot be attached by means of rivets, screws, bolts, fasteners, etc. Containers with bolted on lower bars or plastic lower bars are NOT acceptable. COLOR — The container body color shall be a dark green or tan to / NO match our existing carts. Bidder must supply sample chips of the colors available with their bid. Surface treatments, spray -on finishes and materials that are not homogenous are not acceptable. Color will be determined at the time of order. C "vO t4v r ,U c, o,,t4, f� Damage to the container body, lid, or any component parts through YES NO opening or closing the lid. Failure of the lower lift bar from damage during interface with lifters. ES / NO Failure of the body and lid to maintain their original shape. / NO Damage or cracking of the container body through normal operating S NO conditions. Failure of the wheels to provide continuous, easy mobility, as �YES)NO originally designed. Failure of any part to conform to minimum standards as specified YES NO herein. If bidder is owned by another business entity, then the owning entity YES / NO must also accept full financial responsibility for the warranty of the ``' bidder. The bidder must submit with their bid a letter from the ► owning entity which clearly states its obligation and commitment to honor the warranty of the bidder, should the bidder ever be in a position to not do so. Such letter shall be signed by the owning entity's top officer and notarized. Warranty specimen of exact warranty offered must be included with 3E/ NO proposal. LEGAL OR ADMINISTRATIVE SETTLEMENTS: The YES / NO manufacturer of the cart must submit the name, contact name and/� telephone number for each government or agency with which it has had a legal or administrative settlement of warranty, cart failure claims or contract performance within the last five (5) years including ongoing negotiations of settlement. Include a brief summary of the settlement or indicate if a "gag order" was imposed, and by whom it was ordered. This information must be provided on a separate page entitled "Legal or Administrative Settlements." l QUANTITY PRICING: 6�4� YFC NO 6,000 more or less 96 gallon or�3f4t gallon in combination n _ I �� 0- containers over a 24 month period. Vendor to guarantee pricing for a 24 month period from date of bid award. A supply chain disruption x4c C � \M or other inflation related expenses will not be grounds for charging a higher price than bid. DELIVERY: Max 60 days. Vendor to state approximate delivery S NO time from bid award. MISCELLANEOUS: Must provide samples if requested by the City ��SXNO within two weeks. Delivered to: 3113 Riverside Drive, South Bend, IN 46628. Price UES/ NO to include all freight costs. 10 Les; v) C keW A ,. Required assembly limited to lids and wheels. YE / NO MARKINGS: Each container must be permanently marked with YES NO letters/numbers, as follows: SERIAL NUMBERS: Each container must have a serial number hot stamped in white on the front face of its body. The serial number shall be preceded by a letter or number code which designates the year of manufacture. Serial numbers shall be in sequence beginning with a number designated by the City. The bidder will maintain a file that will identify the date of manufacture by the serial number. LOGOS: The Seal of the City of South Bend along with other messaging shall be hot stamped onto both sides of the cart body. LID MESSAGING: The container lid will include messaging provided by the City also the street side of containers shall be marked NO PARKING. The messages for all containers will be provided by the City. RFID tags compatible with Desert Micro Software be included. YE NO USER INSTRUCTIONS: Instructions for the safe use of the YES NO container must be molded into each lid. LOAD RATING: The load rating of the container must be raised- E / NO relief molded into the lid. Load rating shall be stated in pounds. EXPERIENCE: YE / NO REFERENCES: Bidder must submit with its bid a reference list of municipalities currently using the bidder's products. The list must include at least ten (10) municipalities who currently have at least 20,000 carts in service. Include the name of the municipality, year of installation, contact person, phone number, and quantity for each reference. Failure to include these references will result in bid disqualification. WARRANTY: Bidder must submit with bid a document which E / NO clearly states the exact warranty of the bidder. The warranty must be for no less than ten (10) full years and must specifically provide for no -charge replacement of any component parts which fail in materials of workmanship for a period of ten (10) years after installation. The bidders warranty is understood to include, whether stated in bidder's warranty or not, the following coverage: Failure of the lid to prevent rain water from entering the container when in the closed position. BID NAME FOR BIDS DUE 4SpU T(i eFti O� p BID/PROPOSAL y """" a? CITY OF SOUTH BEND . gabs Bid for Six Thousand (6,000) More or Less Universal/Nestable Refuse and Yard Waste Containers January 10, 2023 by 9:00 a.m. Local Time - Description Make/Model Unit Price • e' $ tee✓ . toyas Item No. Est. Qty. Item Unit Price Total 1 TBD 96 - Gallon Universal/Nestable Refuse and Yard Waste Container Complete t�'�, , j I �3 0 Manufacturer: c, L In 2 TBD Fj 4 Gallon Universal/Nestable Refuse $ $ and Yard Waste Container Complete i�,�� 767 Manufacturer: e O, L �X Bidder (Firm): ij Address: Z 1� <;0 �r \v � _ - City/State/Zip: 3i1 Telephone Number: Z\ �► - �� $ Z St Fax Number: W� - -7 g _Z c� 2- By C—Ao (Signature) n��t� (Printed Name) (Title) BOARD OF PUBLIC WORKS Elizabeth A. Maradik, President Gary A. Gilot, Member Jordan Gathers, Member 11 Joseph Molnar, Vice President Murray L. Miller, Member Attest: Theresa Heffner, Clerk 3. 40U B BAD, �O CITY OF SOUTH BEND INSTRUCTIONS TO BIDDERS�� a .Fri-a.t' BID FORMS AND EXECUTION A. Bidders are expected to examine the Drawings, Specifications, Proposal and all Instructions. Failure to do so will be at the Bidder's risk. B. Each Bidder shall furnish all information required by the Notice, Instructions to Bidders and Specifications. Bids must be made on the form provided. The Bidder shall sign the Proposal and Non -Collusion Affidavit, which is a part of the provided form, where indicated, provide a notary signature and provide all other information required. C. The Bidder shall sign the Proposal in the following manner: If the Proposal is made by an individual, his/her name and post office address must be shown. If made by a partnership or joint venture, the name and post office address of each member of the partnership or joint venture must be shown. If made by a corporation, the Proposal must be signed by an officer of the corporation or by a representative duly authorized by the corporation to execute the Proposal in its behalf. ORDER OF PRECEDENCE A. Bid Form attached Proposal B. Amendments to Specifications C. Specifications D. Special Provision E. Instructions to Bidders F. Notice to Bidders DELIVERY OF BIDS A. Electronic bids/quotes/proposals shall be submitted to: bpwbids(d-)southbendin.gov. This is a confidential, reserved address for bid/quotes/proposal submittal only (Reserved Mailbox). All other communications should be addressed specific to the intended recipient. 1. The SUBJECT LINE of the transmittal must list the Title of the Project as described in the Notice to Bidders and Specifications, and the Project Number (where applicable). The message body shall contain the company/individuals name, address, point of contact email address and phone number. Submission of bid documents shall be in the form of an attachment using one or a combination of the formats listed in section IV of this page. B. Submitted bids/quotes/proposals shall be in accordance with the date and time set forth in the Notice to Bidders and Specifications. Any bids received after the listed closing date and time shall not be considered. The City of South Bend is not responsible for equipment or software failure that may cause delays or non -delivery. Samples will not be accepted except in the case if samples are requested to be provided in the bid/proposal/quote solicitation, colored scanned images may be submitted. Bids will be opened and read publicly at the time and place designated in the Notice to Bidders. Bidders, their authorized agents, and the public are invited to be present. C. Bidders may bid on one (1) or more items. D. The Board may reject any bid based on being non -responsiveness should such bid not conform to these requirements as listed herein or if a bid cannot be delivered in a manner consistent with the needs of the City. ADDENDA — NO VERBAL INTERPRETATIONS A. No inquiries by Bidders relative to interpretation of Plans, Specifications, Special Provisions, or other Bidding Documents will be answered verbally. If any prospective Bidder is unable or unwilling to comply with one or more requirements of the bidding document, such Bidder 12 should so inform the Board of Public Works in writing. Upon receipt of such information, consideration will be given to the advisability of issuing an Addendum which would thereupon become applicable to all Bidders. Any such inquiry must be submitted at least seven (7) days prior to the bid opening date in order to give the Board sufficient time to consider any necessary Addendum. All answers to such inquiries, in the form of Addenda, will be furnished to all prospective Bidders who have registered with the City. All Bidders are required to acknowledge receipt of any Addenda by inserting the Addendum number and the issuing date on executed Proposals. REJECTION OF PROPOSALS CONTAINING ALTERATION ERASURES INCOMPLETE BIDS AND ETC. A. Proposals shall be rejected if they show any alteration of form, additions not called for, conditional or alternate bids (except when and insofar as are invited), incomplete bids, erasures or irregularities of any kinds. B. All blank spaces for bid prices must be filled in, in ink, with the unit price and total price for each item (This does not apply to divisible bids). In case of incorrect totaling of amounts and where the unit price and the extension thereof do not agree, the unit price for each item shall govern, and the City is authorized to correct all erroneous extension and totals for the purpose of comparing bids. 6. TRADE DISCOUNTS A. Trade discounts shall not be shown separately, but shall be incorporated in the Bidder's unit price, unless otherwise specified. VEHICLE BIDS A. Bidders may bid on one (1) or more vehicles, provided however, that the bid submitted for each vehicle is delivered in a separate, sealed envelope, by vehicle, with the envelope clearly labeled on Bidders may bid on one (1) or more vehicles, provided however, that the bid submitted for each vehicle is delivered in a separate, sealed envelope, by vehicle, with the envelope clearly labeled on the outside as to the specific vehicle for which the bid is being submitted. Bidders may submit separate bid bonds for each vehicle being bid upon OR may submit one (1) bid bond equal to 10% of the combined total of all vehicle bids submitted. B. If an Option is included within these specifications, please be advised that, optional items placed in the specifications are to determine the best configuration of the item within a budgeted amount and may be included in the award criteria. If the Board elects to award one or more option(s), the base bid price and the option bid price(s) will be totaled and compared for all bidders offering the final configuration. Award will be made based on the lowest responsible/responsive bid prices submitted for the base bid with the selected option(s), if applicable. Failure to submit a bid on an option may result in the entire bid being non -responsive, depending on the final configuration of the product. S. The Board may reject any bid that does not conform to these requirements as non -responsive. TAX EXEMPTIONS A. The City of South Bend is exempt from the payment of federal excise and transportation taxes levied under the provision of the Internal Revenue Code. It is also exempt from the Indiana State Gross Retail Tax (sales tax). The City will furnish the successful Bidder with any certificate of exemption required. 10. WITHDRAWAL OF BIDS A. Withdrawal of bids will be allowed only in those cases in which a written request to withdraw a bid is received by the Board of Public Works prior to the date and hour for receiving and opening bids. In such cases, the same will be returned to Bidder unopened. 1 1. ESCALATOR OR CONTINGENT CLAUSES A. The use of escalator clauses or other contingent clauses by the Bidder is prohibited, unless requested or permitted by the Invitation to Bid. No Proposal shall contain nor be accompanied by any writing purporting to limit or qualify the City's right to accept such 13 Proposal or purporting to alter such Proposal or any Contract which may be executed pursuant thereto. 12. PRICES MUST BE DELIVERED PRICES A. The bid price shall be a delivered price. All materials shall be shipped F.O.B. destination as specified in the Invitation to Bid. No fuel surcharges accepted. 13. AWARD — WAIVER OF TECHNICALITIES A. The Award of Bid, if any award be made, will be made within sixty (60) calendar days after the opening of Proposals to the lowest responsible and responsive Bidder who's Proposal complies with all the requirements prescribed, exclusive of technicalities waived. Until the final award of the Bid, however, the right is reserved by the City to reject any and all Proposals and to waive technical errors. 14. SPLITTING OF AWARDS/DIVISIBLE BIDS A. Bids will be awarded on the basis of the total dollar amount for all items in the Proposal unless the bid is described by the City as a Divisible Bid. The City may award a Divisible Bid to the lowest responsible and responsive Bidder for each item or class of items as indicated in the bid documents. 15. BIDDER QUALIFICATION A. The City may require any Bidder to submit evidence of qualifications, and may consider any evidence of the financial, technical, and other qualifications and abilities of the Bidder. The City will not award a Contract to a Bidder who, in its opinion, is not fully qualified on the basis of financial resources and responsibility, possession of adequate equipment, personnel, experience, and past record of performance to perform the obligations to be undertaken competently and without delay. 16. PURCHASE ORDERS A. A Purchase Order will be issued to the successful Bidder after formal acceptance of the bid is made by the City. 17. NEW MANUFACTURE A. Unless otherwise specified in the Invitation to Bid, the items offered shall all be new and the latest model of manufacture. 18. SOURCE OF SUPPLY A. If the Bidder is not a manufacturer, the source of supply must be shown and all sub- contractors must be identified. 19. PACKAGING A. All items shall be delivered strongly packed and marked according to accepted commercial practice unless otherwise directed in the Specifications. No charge shall be made for containers and the City shall have no obligation to return containers unless otherwise provided by the Specifications or Special Provisions. Any items not received in good condition will be rejected. 20. INSPECTION OF GOODS A. The City of South Bend reserves the right to inspect and have any goods tested after delivery for compliance with the specifications. Notice of latent defects, which would make the item unfit for the purposes for which they are required, may be given at any time within one year after discovery of the defects. B. All items rejected must be removed immediately by the Contractor at the expense of the Contractor. If the Contractor fails or refuses to remove the rejected items, they may be sold by the City of South Bend. C. In some cases, at the discretion of the City, inspection of the commodities or equipment will be made at the factory, plant, or other establishment where they are produced before shipment. D. The above provision shall not be construed in limitations of any rights the City may have under any laws including the Uniform Commercial Code. 21. ASSIGNMENTS A. No person to whom a Contract has been awarded may assign his interest in the Contract without the consent, in writing, of the City. 22. CANCELLATION A. The City of South Bend reserves the right to cancel any Contract for failure or refusal of performance, fraud, deceit, misrepresentation, collusion, conspiracy, or any other misconduct on the part of the Contractor. 23. DEDUCTION OF DAMAGES A. If the City cancels the contract for any cause, it shall deduct from whatever is owed the Contractor on the Contract or any other Contract, any amount sufficient to compensate the City for any damages suffered by it because of the Contractor's wrongdoing. 24. METHOD OF INVOICING FOR PAYMENT A. Contractor shall bill the City of South Bend 1. On regular invoice form giving a complete and detailed description of the goods delivered, including purchase order number. 2. If the Contractor allows a discount, the period of time in which the City must make payment to qualify for the discounts shall be computed from the date the City received the invoice (completely filled out), or the date the goods are delivered and accepted, whichever may be later, and shall not be less than twenty (20) days. 3. If more than one shipment is made under the Contract and on the same purchase order, the City will make partial payments on a basis that is agreeable to both parties. 25. OWNERSHIP OF GOODS A. The goods which are the subject of the Contract shall remain property of the Contractor until delivered to and accepted by the City of South Bend. 26. ESTIMATED QUANTITIES A. If the quantity set forth in the Notice to Bidders and Proposal is approximate and represents the estimated requirements of the City for a specified period of time, the unit price and the extended total price thereof shall be used only as a basis for the evaluation of bids. The actual quantities necessary may be more or less than the estimate, but the City shall neither be obligated nor limited to any specific amount. The City will, if at all possible, restrict increases to twenty percent (20%) of the estimated quantity and will, if at all possible, restrict decreases to twenty percent (20%) of the estimated quantity. 27. TERM "OR EQUAL" A. Where the term "OR EQUAL" is used in these Specifications, the Bidder deviating from specified item shall file with his/her bid a letter fully explaining and justifying his/her proposed article or equal. The City of South Bend shall be the sole judge in determining if the "OR EQUAL" offered meets the Specifications. 28. INDEMNIFICATION CLAUSE A. The Contractor agrees to indemnify, defend, and hold harmless the City of South Bend, its agents, officers, and employees from all costs, losses, claims and suits, including court costs, attorney fees, and other expenses, arising from or out of the negligent performance of this Contract by the Bidder or because or arising out of any defect in the goods, materials or equipment supplied by the Bidder. NOTE: Electronic bids must be on the City of South Bend Contractor's Bid for Public Work Form. The Board of Public Works will receive sealed electronic bids at bpwbids@southbendin.gov until 9:00 a.m., Local Time, on January 10, 2023. 15 CASCADE ENGINEERING Date: July 17, 2009 P.O. No.: ISE15448 ' .1 - Ja es Jan Pro ct Manager 4700 Broadmoor SE, Suite 200 Kentwood, MI 49512 Telephone: 616-656-7401 Facsimile: 616-656-2022 www.intertek-etlsemko.com Report No.:3182829GRR-001 B Reference No.: 09-0603-202466 Page 1 of 11 Test Report For: CASCADE ENGINEERING ANSI Z 245.30-2008CONTAINERS STANDARD DIMENSIONS 64 Gallon Cart Brya Stratton Reviewer/cm This report is for the exclusive use of Intertek's Client and is provided pursuant to the agreement between Intertek and its Client. Intertek's responsibility and liability are limited to the terms and conditions of the agreement. Intertek assumes no liability to any party, other than to the Client in accordance with the agreement, for any loss, expense or damage occasioned by the use of this report. Only the Client is authorized to permit copying or distribution of this report and then only in its entirety. Any use of the Intertek name or one of its marks for the sale or advertisement of the tested material, product or service must first be approved in writing by Intertek. The observations and test results in this report are relevant only to the sample tested. This report by itself does not imply that the material, product, or service is or has ever been under an Intertek certification program. dtEwt � C�T4� O sEAB Approved CASCADE ENGINEERING Date: July 17, 2009 P.O. No.: ISE15448 Attention: Container Group CASCADE ENGINEERING 4950 37th Street SE Grand Rapids, MI 49512 Phone: 616-975-4820 Fax: 616-956-9492 Email: barrettm(a)cascade.com DATE RECEIVED: DATES TESTED: DESCRIPTION OF SAMPLES: Part Description: Sample Condition: 06/22/09 06/22/09 - 07/13/09 64 Gallon Cart Production Report No.:3182829GRR-001 B Reference No.: 09-0603-202466 Page 2 of 11 WORK REQUESTED APPLICABLE DOCUMENTS: To test the submitted samples per ANSI Z 245.30-2008CONTAINERS STANDARD DIMENSIONS for the following tests: Test Description: A: Volumetric Loading Capacity (7.2.4.2.1) B: Slope Stability (7.2.4.2.3) C: Durability During Pulling (7.2.4.2.4.) D: Loading and Unloading (7.2.4.2.5) E: Center of Balance Position (7.2.4.2.6) F: Force to Tip (7.2.4.2.7) G: Lid Test (7.2.4.2.8) CONCLUSION: The submitted samples meet the acceptance level criteria. TEST EQUIPMENT: Pennsylvania 5600 Scale: Lift and Dump Machine: DFE - 100: Digi-Sense Digital Thermometer Pennsylvania Disc Weight 51.80lbs Disc Weight 5.08lbs Disc Weight 25.15lbs Combination Square Asset No. 94-215397 Asset No. 40000 Asset No. 138-914 Asset No. 30943 Asset No. 2975 Asset No. 2931 Asset No. 2937 Asset No. PR001 CASCADE ENGINEERING Date: July 17, 2009 P.O. No.: ISE15448 VOLUMETRIC LOADING CAPACITY TEST A: Date Tested: 06/22/09 Description of Samples: Part Description: 64 Cart Sample Condition: Production Test Procedure: Report No.:3182829GRR-001 B Reference No.: 09-0603-202466 Page 3 of 11 Test Method: Place the empty container on a scale and record the weight. Place the empty container in a tank full of water with a temperature of 59'F ± 9 `F. Fill the container up to the rim and then place the container on a scale. Record the difference from the full container and the empty container. Water Temp: 66.40 Number of Specimens Tested: Two (2) Carts Acceptance Criteria: Accuracy of measurement must be ± 2 % of the measured capacity of the container. Results: Sample Description Actual Capacity % Difference 64 1 63.62 1 -.57 The submitted sample meets the acceptance level criteria. CASCADE ENGINEERING Date: July 17, 2009 P.O. No.: ISE15448 SLOPE STABILITY TEST B: Dates Tested: Description of Samples: Part Description: Sample Condition: Test Procedure: Test Method: Report No.:3182829GRR-001 B Reference No.: 09-0603-202466 Page 4 of 11 07/07/09 - 07/13/09 64 Gallon Cart Production Place the empty and loaded container on a defined normal slope of 5°to the horizontal. The container must be placed and stand in any direction (a minimum of 3 orientations). Container Size: 64 Gallon Cart Actual Loading Amount: 224 lbs. (Standard Load 224 lbs.) Number of Specimens Tested: One (1) Cart Acceptance Criteria: There shall be no tipping or moving of the container. Results: Cart Orientation Emp-ty Loaded Wheels Facing Up Pass Pass Wheels Facing Down Pass Pass Wheels Facing Sideways Pass Pass The submitted sample meets the acceptance level criteria. CASCADE ENGINEERING Date: July 17, 2009 P.O. No.: ISE15448 Report No.:3182829GRR-001 B Reference No.: 09-0603-202466 Page 5 of 11 DURABILITY DURING PULLING TEST C: Dates Tested: 06/23/09 - 06/24/09 Description of Samples: Part Description: Sample Condition: Test Procedure: Test Method: Curb Height: Curb Radii: Temperature in Test Area: Number of Cycles: Actual Container Load Number of Specimens Tested 64 Gallon Cart Production Pull cart by handles off of curb fully loaded. Pull cart by handles up curb unloaded. 14 cm (5 1 /2") 26 mm (1 ") 73F ± 9F 520 224 lbs. (Standard load 224lbs) One (1) Acceptance Criteria: Handles, wheels, axles, their attachments to the container, and the container itself must remain functional. Results: Number of Cycles Descri tion 0 Start of Test 520 Test Complete - Pass The submitted sample meets the acceptance level criteria. CASCADE ENGINEERING Date: July 17, 2009 P.O. No.: ISE15448 Report No.:3182829GRR-001 B Reference No.: 09-0603-202466 Page 6 of 11 LOADING AND UNLOADING TEST D: Dates Tested: 06/24/09 - 06/25/09 Description of Samples: Part Description: Sample Condition: Test Procedure: Test Method: Number of Cycles: Number of Specimens Tested 64 Gallon Cart Production The test was performed at room temperature with a cycle time that simulates lift, dump and return in not less than 8 seconds. The cart was loaded to 226 lbs. (+15-0 lbs.) Note: ANSI standards require a load specified on cart that is 224 lbs. 520 Cycles One (1) 64 Gallon Cart Acceptance Criteria: Carts shall remain water tight and functional through 520 cycles. Results: Number of Cycles Description 0 Start of Test 520 Test Completed - Pass The submitted sample meets the acceptance level criteria. CASCADE ENGINEERING Date: July 17, 2009 P.O. No.: ISE15448 CENTER OF BALANCE POSITION TEST E: Date Tested: 07/07/09 Description of Samples: Part Description: 64 Gallon Cart Sample Condition: Production Test Procedure: Report No.:3182829GRR-001 B Reference No.: 09-0603-202466 Page 7 of 11 Test Method: Place container on a hard level surface and block wheels from movement. Tip container until the center of balance position is obtained. Block the container at this position and measure the distance vertically from the ground plane to the centerline of the handle of the base of the container. Number of Specimens Tested: One (1) Cart Acceptance Criteria: The height of the handle shall be equal to or greater than 29 inches and equal to or less than 40 inches from the ground. Results: Center of Balance Position Measurement: (In Inches) Sample Description 1 2 3 64 32 9/16 32.5 32 9/16 The submitted sample meets the acceptance level criteria. CASCADE ENGINEERING Date: July 17, 2009 P.O. No.: ISE15448 FORCE TO TIP TEST F: Date Tested: Description of Samples: Part Description: Sample Condition: Test Procedure: Test Method: Standard load: Report No.:3182829GRR-001 B Reference No.: 09-0603-202466 Page 8 of 11 07/07/09 64 Gallon Carts Production Place loaded container on a hard level surface and block container wheels to prevent forward motion. Attach force gauge to the handle and pull in line with the handle's movement to obtain the maximum force to tip. 224lbs Actual Container Load: 227.5 lbs. Number of Measurements: 3 Number of Specimens Tested: One (1) Acceptance Criteria: Tipping force shall not exceed 120 lbs. force. Results: (Ibf) Number of Tests Sample Description 1 2 3 Av Ibf 64 48.0 48.3 48.3 48.2 The submitted sample meets the acceptance level criteria. CASCADE ENGINEERING Date: July 17, 2009 P.O. No.: ISE15448 LID TEST G: Date Tested: Description of Samples: Part Description: Sample Condition: Test Procedure: Test Method: Load Fixture Dimensions: Test Load: Duration of Load: Number of Specimens Tested Report No.:3182829GRR-001 B Reference No.: 09-0603-202466 Page 9 of 11 07/07/09 64 Gallon Cart Lid Production Place partially loaded or empty container on a hard level surface and place a load in the center of lid. 8" Diameter 80 lbs. 15 Minutes One (1) Cart Acceptance Criteria: The container lid shall remain intact. Unit may deflect or distort but must not collapse and fall into the container. Results: Sample Description Description of Results 64 Gal Cart Lid Pass The submitted sample meets the acceptance level criteria. CASCADE ENGINEERING Report No.:3182829GRR-001 B Date: July 17, 2009 Reference No.: 09-0603-202466 P.O. No.: ISE15448 Page 10 of 11 TERMS AND CONDITIONS 1.0 INTRODUCTION These Terms and Conditions are incorporated into the Intertek proposal made and submitted to you. The party executing this document ("Client") indicates acceptance of this proposal as a contract between Client and Intertek which governs the performance of the stated services and the rights and obligations of the parties and that Intertek may proceed with the work. 2.0 PROPOSAL TERM Unless otherwise stated in the proposal, this offer shall remain valid until accepted, but in no event for a period longer than thirty days from the date of the proposal. 3.0 CLIENT INFORMATION Client represents that the information supplied by it or its agents to Intertek is accurate and complete and samples are representative, and Client has informed Intertek concerning any dangerous or potentially dangerous characteristics of such samples which could cause injury during the performance of the work or in the transporting of such samples and Client also acknowledges that Intertek is relying upon such information and samples or data in the preparation of this proposal without further verification by Intertek as to its accuracy or completeness. The Client agrees to hold Intertek harmless and indemnify Intertek from any liability of whatever kind or nature, including but not limited to court costs and reasonable attorneys fees if information provided by the Client is inaccurate or incomplete or samples are not representative. Intertek agrees that information received from the Client shall remain the property of the Client and will be returned to the Client upon demand, except for that which is necessary as a basis for the Intertek Reports. Client may designate in writing any information provided by Client to Intertek as confidential and proprietary. If Client has done so, Intertek will not release to third parties any such information without the prior written consent of the Client or only in response to a proper court order or process. As to that information, Intertek may make and retain copies. Client shall designate in writing to Intertek if it does not wish to have Intertek transmit any information, including test data and Reports, via electronic means. 4.0 PROPOSAL, PRICE AND SCHEDULE Intertek will work diligently to provide the services according to the costs and schedule stated in the referenced proposal. Client recognizes and agrees that the proposal is a good faith estimate of the costs for the services to be provided and times of completion, but such estimate is not a guarantee of the total costs or time that may be involved in completing the proposal. Intertek will not exceed the authorized estimate of costs without written authorization of Client. Samples will be shipped by Client to Intertek prepaid and will be returned collect or disposed of at Client's expense within thirty (30) days after testing is completed, unless alternative arrangements are made by Client. Additional fees will be charged for unanticipated assembly or preparation of samples. Test services will not be initiated until satisfactory credit has been established with Intertek's accounting department. 5.0 INVOICING Invoices will generally be issued upon project completion. In certain instances, interim invoices may be issued. Invoices are due and payable to Intertek at its offices, within thirty (30) calendar days after receipt of invoice, and Client agrees to pay reasonable collection costs if necessary in the event of non-payment. 6.0 INSURANCE Intertek declares that it maintains workers' compensation and employer's liability insurance on Intertek employees in a form and amount as required by applicable laws. This insurance does not cover any employees of Client or third parties who may be involved with the work to be performed, whether on property of Intertek, Client or third parties. 7.0 REPORTS The Client agrees to waive any claim against Intertek and defend, indemnify, and hold Intertek harmless from any and all causes of action, lawsuit, proceedings or claims, including legal fees and expenses incurred by Intertek, allegedly arising as a result of unauthorized use of Intertek's Reports. The term Reports includes all reports, laboratory test data, calculations, estimates, notes and other documents prepared by Intertek in the course of providing services to the Client. All technical determinations of compliance arising from product, material or system evaluation shall not be considered final until issuance of a written report, reviewed and signed by an Intertek qualified Reviewer. All final decisions on product certification are made by the Certification Manager. Intertek retains any and all rights of ownership of Intertek's concepts, ideas, inventions, patents or copyrights used by Intertek in preparing Intertek's Reports and the provision of services to the Client. Only the Client is authorized to copy or distribute Intertek's Reports and then only in their entirety, and the Client shall not use the Reports in a misleading manner. Client further agrees and understands that reliance upon the Reports is limited to the representations made therein. Any use of the Intertek SD 3.1.2 (10/19/07) Mandatory CASCADE ENGINEERING Report No.:3182829GRR-001 B Date: July 17, 2009 Reference No.: 09-0603-202466 P.O. No.: ISE15448 Page 11 of 11 name or one of its marks for the sale or advertisement of the tested material, product or service must first be approved in writing by Intertek. If Intertek becomes directly or indirectly involved in litigation as a result of misuse of its Reports, the Client agrees to compensate Intertek for its fees and expenses, including legal costs, in accordance with Intertek's prevailing fee schedule and expense reimbursement policy. 8.0 LIMITED WARRANTY Intertek warrants that if any of its completed services fail to conform to professional standard, Intertek will, at its own expense, perform corrective services of the type originally performed as may be reasonably required to correct such defects, of which Intertek is notified in writing within six months of the completion of services. No other representation, express or implied, and no warranty or guarantee is included or intended in this Agreement, or in any report, opinion, document or otherwise. 9.0 LIMITS OF LIABILITY Intertek's liability is limited as follows: 9.1 The Client agrees to limit Intertek's liability arising from Intertek's professional activity, errors, or omissions, such that the total aggregate liability of Intertek shall not exceed Intertek's total fee for the services rendered on the project in question, except in the case of a finding of gross negligence or willful misconduct on the part of Intertek by a court of competent jurisdiction. 9.2 Intertek shall be discharged from all liability to the Client for all claims for loss, damage or expense unless a claim is made within three (3) months of the date at which the damage, defect or alleged non-performance became apparent to the Client, and the process of law served no later than two (2) years from the provision of services by Intertek. - 9.3 Intertek shall not be liable to the Client for any consequential damages incurred by Client due to the fault of Intertek, regardless of the nature of this fault, whether it was committed by Intertek, its employees, agents or subcontractors. Consequential damages include, but are not limited to, loss of use and loss of profit. 9.4 The Client agrees to extend any and all limitations, indemnifications, and waivers provided by the Client to Intertek to those individuals and organizations Intertek retains for proper execution of the work. These shall be deemed to include but are not necessarily limited to Intertek's officers and employees and their heirs and assigns, as well as Intertek's agents, subcontractors and their officers, employees, heirs and assigns. 9.5 Client acknowledges that testing, including sample preparation and transportation, may damage or destroy Client's product. Client agrees to hold Intertek harmless from any and all responsibility for such alteration. 9.6 The Client agrees Intertek shall not be responsible for any injuries to the Client's representatives while attending to or observing testing at Intertek's facility. If testing takes place at the Client's facility, Client agrees that Intertek will not operate and shall not be responsible for any of Client's equipment and that although Intertek agrees to abide by Client's safety procedures, Intertek shall not be responsible for injury to any of Client's personnel. 10.0 GOVERNING LAW This proposal, and any work performed pursuant to this proposal, shall be governed by the laws of the jurisdiction within which the Intertek facility making the proposal is located. Any action brought hereon shall be venued in said jurisdiction. 11.0 SEVERABILITY Any provision of this proposal that may be held invalid, void or unenforceable for any reason, shall not affect any other term or condition of this proposal, and such term or condition shall be replaced or interpreted to accomplish the intent of the parties. 12.0 MODIFICATIONS No modification, waiver or amendment of any of these terms and conditions, including any assignment of Client's rights and responsibilities hereunder, shall be binding upon Intertek unless agreed to in a writing signed by an agent of Intertek. SD 3.1.2 (10/19/07) Mandatory CASCADE ENGINEERING Date: July 17, 2009 P.O. No.: ISE15448 ' .1 - Ja es Jan Pro ct Manager 4700 Broadmoor SE, Suite 200 Kentwood, MI 49512 Telephone: 616-656-7401 Facsimile: 616-656-2022 www.intertek-etlsemko.com Report No.:3182829GRR-001 C Reference No.: 09-0603-202466 Page 1 of 11 Test Report For: CASCADE ENGINEERING ANSI Z 245.30-2008CONTAINERS STANDARD DIMENSIONS 96 Gallon Cart Brya Stratton Reviewer/cm This report is for the exclusive use of Intertek's Client and is provided pursuant to the agreement between Intertek and its Client. Intertek's responsibility and liability are limited to the terms and conditions of the agreement. Intertek assumes no liability to any party, other than to the Client in accordance with the agreement, for any loss, expense or damage occasioned by the use of this report. Only the Client is authorized to permit copying or distribution of this report and then only in its entirety. Any use of the Intertek name or one of its marks for the sale or advertisement of the tested material, product or service must first be approved in writing by Intertek. The observations and test results in this report are relevant only to the sample tested. This report by itself does not imply that the material, product, or service is or has ever been under an Intertek certification program. dtEwt � C�T4� O sEAB Approved CASCADE ENGINEERING Date: July 17, 2009 P.O. No.: ISE15448 Attention: Container Group CASCADE ENGINEERING 4950 37th Street SE Grand Rapids, MI 49512 Phone: 616-975-4820 Fax: 616-956-9492 Email: barrettm(a)cascade.com DATE RECEIVED: DATES TESTED: DESCRIPTION OF SAMPLES: Part Description: Sample Condition: 06/22/09 06/22/09 - 07/13/09 96 Gallon Cart Production Report No.:3182829GRR-001 C Reference No.: 09-0603-202466 Page 2 of 11 WORK REQUESTED APPLICABLE DOCUMENTS: To test the submitted samples per ANSI Z 245.30-2008CONTAINERS STANDARD DIMENSIONS for the following tests: Test Description: A: Volumetric Loading Capacity (7.2.4.2.1) B: Slope Stability (7.2.4.2.3) C: Durability During Pulling (7.2.4.2.4) D: Loading and Unloading (7.2.4.2.5) E: Center of Balance Position (7.2.4.2.6) F: Force to Tip (7.2.4.2.7) G: Lid Test (7.2.4.2.8) CONCLUSION: The submitted samples meet the acceptance level criteria. TEST EQUIPMENT: Pennsylvania 5600 Scale: Lift and Dump Machine: DFE - 100: Digi-Sense Digital Thermometer Pennsylvania Disc Weight 51.80lbs Disc Weight 5.08lbs Disc Weight 25.15lbs Combination Square Asset No. 94-215397 Asset No. 40000 Asset No. 138-914 Asset No. 30943 Asset No. 2975 Asset No. 2931 Asset No. 2937 Asset No. PR001 CASCADE ENGINEERING Date: July 17, 2009 P.O. No.: ISE15448 VOLUMETRIC LOADING CAPACITY TEST A: Date Tested: 06/22/09 Description of Samples: Part Description: 96 Cart Sample Condition: Production Test Procedure: Report No.:3182829GRR-001 C Reference No.: 09-0603-202466 Page 3 of 11 Test Method: Place the empty container on a scale and record the weight. Place the empty container in a tank full of water with a temperature of 59'F ± 9 `F. Fill the container up to the rim and then place the container on a scale. Record the difference from the full container and the empty container. Water Temp: 62 ° Number of Specimens Tested: Two (2) Carts Acceptance Criteria: Accuracy of measurement must be ± 2 % of the measured capacity of the container. Results: Sample Description Actual Capacity % Difference 96 Universal 95.76 -.25 96 Automatic 95.75 -.26 The submitted samples meet the acceptance level criteria. CASCADE ENGINEERING Date: July 17, 2009 P.O. No.: ISE15448 SLOPE STABILITY TEST B: Dates Tested: Description of Samples: Part Description: Sample Condition: Test Procedure: Test Method: Report No.:3182829GRR-001 C Reference No.: 09-0603-202466 Page 4 of 11 07/07/09 - 07/13/09 96 Universal and 96 Automatic Gallon Carts Production Place the empty and loaded container on a defined normal slope of 5°to the horizontal. The container must be placed and stand in any direction (a minimum of 3 orientations). Container Size: 96 Gallon Cart Actual Loading Amount: 338 lbs. Standard Load 336 lbs. Number of Specimens Tested: Two (2) Cart Acceptance Criteria: There shall be no tipping or moving of the container Results: Loaded Sample Description Wheels Facing Up Wheels Facing Down Wheels Facing Sideways 96 Universal Cart Pass Pass Pass 96 Automatic Cart Pass Pass Pass Unloaded Sample Description Wheels Facing Up Wheels Facing Down Wheels Facing Sideways 96 Universal Cart Pass Pass Pass 96 Automatic Cart Pass Pass Pass The submitted samples meet the acceptance level criteria. CASCADE ENGINEERING Date: July 17, 2009 P.O. No.: ISE15448 Report No.:3182829GRR-001 C Reference No.: 09-0603-202466 Page 5 of 11 DURABILITY DURING PULLING TEST C: Dates Tested: 06/26/09 - 07/07/09 Description of Samples: Part Description: Sample Condition: Test Procedure: Test Method: Curb Height: Curb Radii: Temperature in Test Area: Number of Cycles: Actual Container Load: Number of Specimens Tested 96 Universal and 96 Automatic Gallon Carts Production Pull cart by handles off of curb fully loaded. Pull cart by handles up curb unloaded. 14 cm (5 1 /2") 26 mm (1 ") 73F ± 9F 520 336 lbs. Standard Load 336 lbs. Two (2) Acceptance Criteria: Handles, wheels, axles, their attachments to the container, and the container itself must remain functional. Results: Sample Description Number of Cycles Description of Results 96 Gal Universal Cart 520 Pass 96 Gal Automatic Cart 520 Pass The submitted samples meet the acceptance level criteria. CASCADE ENGINEERING Date: July 17, 2009 P.O. No.: ISE15448 LOADING AND UNLOADING TEST D: Dates Tested: 07/06/09 - 07/07/09 Description of Samples: Part Description: Sample Condition: Test Procedure: Test Method: Number of Cycles: Number of Specimens Tested Report No.:3182829GRR-001 C Reference No.: 09-0603-202466 Page 6 of 11 96 Universal Gallon Cart Production The test was performed at room temperature with a cycle time that simulates lift, dump and return in not less than 8 seconds. The cart was loaded to 336 lbs. (+15-0 lbs.) Note: ANSI standards require a load specified on cart that is 336 lbs. 520 Cycles One (1) 96 Gallon Cart Acceptance Criteria: Carts shall remain water tight and functional through 520 cycles. Results: Number of Cycles Description 0 Start of Test 520 Test Completed - Pass The submitted sample meets the acceptance level criteria. CASCADE ENGINEERING Date: July 17, 2009 P.O. No.: ISE15448 CENTER OF BALANCE POSITION TEST E: Date Tested: 07/07/09 Description of Samples: Part Description: 96 Gallon Cart Sample Condition: Production Test Procedure: Report No.:3182829GRR-001 C Reference No.: 09-0603-202466 Page 7 of 11 Test Method: Place container on a hard level surface and block wheels from movement. Tip container until the center of balance position is obtained. Block the container at this position and measure the distance vertically from the ground plane to the centerline of the handle of the base of the container. Number of Specimens Tested: Two (2) Carts Acceptance Criteria: The height of the handle shall be equal to or greater than 29 inches and equal to or less than 40 inches from the ground. Results: Center of Balance Position Measurement: (In Inches) Sample Number Sample Description 1 2 3 96 Universal 37 37 1/8 37 1/8 96 Automatic 35.25 35 1/8 35.25 The submitted samples meet the acceptance level criteria. CASCADE ENGINEERING Date: July 17, 2009 P.O. No.: ISE15448 FORCE TO TIP TEST F: Date Tested: Description of Samples: Part Description: Sample Condition: Test Procedure: Test Method: Standard Load : Report No.:3182829GRR-001 C Reference No.: 09-0603-202466 Page 8 of 11 07/07/09 96 Gallon Carts Production Place loaded container on a hard level surface and block container wheels to prevent forward motion. Attach force gauge to the handle and pull in line with the handle's movement to obtain the maximum force to tip. 336 lbs. Actual Container Load: 338 lbs. Number of Measurements: 3 Number of Specimens Tested: Two (2) Acceptance Criteria: Tipping force shall not exceed 120 lbs. force. Results: (Ibf) Number of Tests Sample Description 1 2 3 Avg Ibf 96 Automatic 76 78 80 78 96 Universal 76 77 76 76 The submitted samples meet the acceptance level criteria. CASCADE ENGINEERING Date: July 17, 2009 P.O. No.: ISE15448 LID TEST G: Date Tested: Description of Samples: Part Description: Sample Condition: Test Procedure: Test Method: Load Fixture Dimensions: Test Load: Duration of Load: Number of Specimens Tested Report No.:3182829GRR-001 C Reference No.: 09-0603-202466 Page 9 of 11 07/07/09 96 Gallon Cart Lid Production Place partially loaded or empty container on a hard level surface and place a load in the center of lid. 8" Diameter 80 lbs. 15 Minutes Two (2) Cart Lids Acceptance Criteria: The container lid shall remain intact. Unit may deflect or distort but must not collapse and fall into the container. Results: Sample Description Test Load Ibs Description of Results 96 Universal 80 Pass 96 Automatic 80 Pass The submitted samples meet the acceptance level criteria. CASCADE ENGINEERING Report No.:3182829GRR-001C Date: July 17, 2009 Reference No.: 09-0603-202466 P.O. No.: ISE15448 Page 10 of 11 TERMS AND CONDITIONS 1.0 INTRODUCTION These Terms and Conditions are incorporated into the Intertek proposal made and submitted to you. The party executing this document ("Client") indicates acceptance of this proposal as a contract between Client and Intertek which governs the performance of the stated services and the rights and obligations of the parties and that Intertek may proceed with the work. 2.0 PROPOSAL TERM Unless otherwise stated in the proposal, this offer shall remain valid until accepted, but in no event for a period longer than thirty days from the date of the proposal. 3.0 CLIENT INFORMATION Client represents that the information supplied by it or its agents to Intertek is accurate and complete and samples are representative, and Client has informed Intertek concerning any dangerous or potentially dangerous characteristics of such samples which could cause injury during the performance of the work or in the transporting of such samples and Client also acknowledges that Intertek is relying upon such information and samples or data in the preparation of this proposal without further verification by Intertek as to its accuracy or completeness. The Client agrees to hold Intertek harmless and indemnify Intertek from any liability of whatever kind or nature, including but not limited to court costs and reasonable attorneys fees if information provided by the Client is inaccurate or incomplete or samples are not representative. Intertek agrees that information received from the Client shall remain the property of the Client and will be returned to the Client upon demand, except for that which is necessary as a basis for the Intertek Reports. Client may designate in writing any information provided by Client to Intertek as confidential and proprietary. If Client has done so, Intertek will not release to third parties any such information without the prior written consent of the Client or only in response to a proper court order or process. As to that information, Intertek may make and retain copies. Client shall designate in writing to Intertek if it does not wish to have Intertek transmit any information, including test data and Reports, via electronic means. 4.0 PROPOSAL, PRICE AND SCHEDULE Intertek will work diligently to provide the services according to the costs and schedule stated in the referenced proposal. Client recognizes and agrees that the proposal is a good faith estimate of the costs for the services to be provided and times of completion, but such estimate is not a guarantee of the total costs or time that may be involved in completing the proposal. Intertek will not exceed the authorized estimate of costs without written authorization of Client. Samples will be shipped by Client to Intertek prepaid and will be returned collect or disposed of at Client's expense within thirty (30) days after testing is completed, unless alternative arrangements are made by Client. Additional fees will be charged for unanticipated assembly or preparation of samples. Test services will not be initiated until satisfactory credit has been established with Intertek's accounting department. 5.0 INVOICING Invoices will generally be issued upon project completion. In certain instances, interim invoices may be issued. Invoices are due and payable to Intertek at its offices, within thirty (30) calendar days after receipt of invoice, and Client agrees to pay reasonable collection costs if necessary in the event of non-payment. 6.0 INSURANCE Intertek declares that it maintains workers' compensation and employer's liability insurance on Intertek employees in a form and amount as required by applicable laws. This insurance does not cover any employees of Client or third parties who may be involved with the work to be performed, whether on property of Intertek, Client or third parties. 7.0 REPORTS The Client agrees to waive any claim against Intertek and defend, indemnify, and hold Intertek harmless from any and all causes of action, lawsuit, proceedings or claims, including legal fees and expenses incurred by Intertek, allegedly arising as a result of unauthorized use of Intertek's Reports. The term Reports includes all reports, laboratory test data, calculations, estimates, notes and other documents prepared by Intertek in the course of providing services to the Client. All technical determinations of compliance arising from product, material or system evaluation shall not be considered final until issuance of a written report, reviewed and signed by an Intertek qualified Reviewer. All final decisions on product certification are made by the Certification Manager. Intertek retains any and all rights of ownership of Intertek's concepts, ideas, inventions, patents or copyrights used by Intertek in preparing Intertek's Reports and the provision of services to the Client. Only the Client is authorized to copy or SD 3.1.2 (10/19/07) Mandatory CASCADE ENGINEERING Report No.:3182829GRR-001 C Date: July 17, 2009 Reference No.: 09-0603-202466 P.O. No.: ISE15448 Page 11 of 11 distribute Intertek's Reports and then only in their entirety, and the Client shall not use the Reports in a misleading manner. Client further agrees and understands that reliance upon the Reports is limited to the representations made therein. Any use of the Intertek name or one of its marks for the sale or advertisement of the tested material, product or service must first be approved in writing by Intertek. If Intertek becomes directly or indirectly involved in litigation as a result of misuse of its Reports, the Client agrees to compensate Intertek for its fees and expenses, including legal costs, in accordance with Intertek's prevailing fee schedule and expense reimbursement policy. 8.0 LIMITED WARRANTY Intertek warrants that if any of its completed services fail to conform to professional standard, Intertek will, at its own expense, perform corrective services of the type originally performed as may be reasonably required to correct such defects, of which Intertek is notified in writing within six months of the completion of services. No other representation, express or implied, and no warranty or guarantee is included or intended in this Agreement, or in any report, opinion, document or otherwise. 9.0 LIMITS OF LIABILITY Intertek's liability is limited as follows: 9.1 The Client agrees to limit Intertek's liability arising from Intertek's professional activity, errors, or omissions, such that the total aggregate liability of Intertek shall not exceed Intertek's total fee for the services rendered on the project in question, except in the case of a finding of gross negligence or willful misconduct on the part of Intertek by a court of competent jurisdiction. 9.2 Intertek shall be discharged from all liability to the Client for all claims for loss, damage or expense unless a claim is made within three (3) months of the date at which the damage, defect or alleged non-performance became apparent to the Client, and the process of law served no later than two (2) years from the provision of services by Intertek. - 9.3 Intertek shall not be liable to the Client for any consequential damages incurred by Client due to the fault of Intertek, regardless of the nature of this fault, whether it was committed by Intertek, its employees, agents or subcontractors. Consequential damages include, but are not limited to, loss of use and loss of profit. 9.4 The Client agrees to extend any and all limitations, indemnifications, and waivers provided by the Client to Intertek to those individuals and organizations Intertek retains for proper execution of the work. These shall be deemed to include but are not necessarily limited to Intertek's officers and employees and their heirs and assigns, as well as Intertek's agents, subcontractors and their officers, employees, heirs and assigns. 9.5 Client acknowledges that testing, including sample preparation and transportation, may damage or destroy Client's product. Client agrees to hold Intertek harmless from any and all responsibility for such alteration. 9.6 The Client agrees Intertek shall not be responsible for any injuries to the Client's representatives while attending to or observing testing at Intertek's facility. If testing takes place at the Client's facility, Client agrees that Intertek will not operate and shall not be responsible for any of Client's equipment and that although Intertek agrees to abide by Client's safety procedures, Intertek shall not be responsible for injury to any of Client's personnel. 10.0 GOVERNING LAW This proposal, and any work performed pursuant to this proposal, shall be governed by the laws of the jurisdiction within which the Intertek facility making the proposal is located. Any action brought hereon shall be venued in said jurisdiction. 11.0 SEVERABILITY Any provision of this proposal that may be held invalid, void or unenforceable for any reason, shall not affect any other term or condition of this proposal, and such term or condition shall be replaced or interpreted to accomplish the intent of the parties. 12.0 MODIFICATIONS No modification, waiver or amendment of any of these terms and conditions, including any assignment of Client's rights and responsibilities hereunder, shall be binding upon Intertek unless agreed to in a writing signed by an agent of Intertek. SD 3.1.2 (10/19/07) Mandatory CASCADE engineering CASCADE AUTHORIZED DISTRIBUTOR / RESELLER Cascade Engineering certifies that Pyramid Equipment, Inc., located in Rolling Prairie, IN is an authorized distributors/resellers of Cascade Cart Solutions products in all fifty United States. Cascade manufactures all container bodies and lids in its Grand Rapids, Michigan manufacturing facilities. Please contact Brian Miller at 616-975-4750 if you have questions or need additional information. Regards Brian Miller Cascade Cart Solutions Regional Sales Manager 4950 Thirty Seventh Street S.E., Grand Rapids, Michigan 49512 CASCADE engineering CASCADE CART SOLUTIONS PRODUCT WARRANTY Cascade Cart Solutions, a division of Cascade Engineering, Inc. ("Cascade") warrants that the products listed below shall be free from defects in materials and workmanship for the applicable period. This warranty does not cover negligence, abuse or normal wear and tear, which include but are not limited to the examples provided below. This warranty shall be voided by any alterations, modifications, or unauthorized repairs to the product(s); or, as a result of any abuse, neglect, misuse or the resale of the products. Purchaser must make all warranty claims within the applicable period. Cascade shall, at its option, repair or replace such defective product(s) or part(s) thereof, or refund the purchase price of the product(s). Repairedor replaced product(s) or part(s) are warranted for the balance of the original warranty period of the original product(s) or part(s). Purchaser shall be responsible for any labor costs incurred to install replacement parts and reassembly, if required. Replacement products and/or parts provided under this warranty are guaranteed only for the remaining period of the original warranty. Cascade reserves the right to inspect in person, or request photos, to verify the existence of a covered defect. Purchaser shall promptly notify Cascade of any failures under this warranty by completing a warranty request form, which is available at www.cascadecartsolutions.com. THIS LIMITED WARRANTY IS GIVEN ONLY TO THE ORIGINAL PURCHASER; IT MAY NOT BE TRANSFERRED OR ASSIGNED AND DOES NOT EXTEND TO ANY SUBSEQUENT PURCHASER OR TRANSFEREE OF THE PRODUCT(S). THIS WARRANTY IS IN LIEU OF ANY OTHER WARRANTY, EXPRESSED OR IMPLIED, INCLUDING BUT NOT LIMITED TO ANY IMPLIED WARRANTIES OF MERCHANTABILITY AND FITNESS FOR A PARTICULAR PURPOSE. WITHOUT LIMITATION TO THE FOREGOING, CASCADE SHALL NOT UNDER ANY CIRCUMSTANCES BE LIABLE TO PURCHASER OR ANY THIRD PARTY FOR ANY SPECIAL, INCIDENTAL, OR CONSEQUENTIAL DAMAGES BASED UPON BREACH OF WARRANTY, BREACH OF CONTRACT, NEGLIGENCE, STRICT TORT, OR ANY OTHER LEGAL THEORY. EXAMPLES OF NORMAL WEAR AND TEAR (including but not limited to): • Scratches, cuts or scores from any source. • Accumulation of dirt or any other similar substance. • Normal deterioration of metal parts during services. • Normal discoloration due to atmospheric exposure or water conditions. • Appearance of rust on steel parts. • Damage caused by rodents, squirrels or other wildlife/animals. EXAMPLES OF NEGLIGENT OR ABUSIVE USE (including but not limited to): • Exposure to heat which may result in burns, scorches, melting. • Exposure to chemicals such as solvents, petrochemicals, paints, or acids. • Major impacts such as being hit by a vehicle. www.cascadecartsolutions.com C CASCADE engineering Improper storage such as storage in stacks, on lids, near heat or chemicals, outside uncovered withoutlid on, or in any area where damage may occur. • Improper handling such as dropping cart stacks off delivery trucks, dragging over rough surfaces, stacking with wheels on, forcing through narrow openings, allowing packer mechanism to hit cartduring dumping cycle. • Improper handling by automated arms such as any scratches, cuts, creases, scores, cracks or breaks from a maladjusted automated lift arm or semi -automated dumper, including squeezing lid with armand dropping cart into packer or possible wheel/axle damage and including excessive lift speed including any lift speed faster than six seconds for full lift -dump -down cycle. • Failure to properly open or secure lids when emptying, handling or moving carts. • Improper use such as any use other than for storage, transport, and dumping normal single unit residential solid wastes and curbside recyclables collection, including such improper use as: construction, industrial, landscaping, liquid storage/transport, bulk solids storage/transport, recreational, commercial, food service and institutional applications. WARRANTY PERIODS AND OTHER PRODUCT -SPECIFIC DETAILS STANDARD CARTS: Ten (10) years from the date of shipment to Purchaser. Specifically excluded are carts: used as crew carts; dumped manually or with mechanical lifting/dumping devices that do not meet ANSI requirements; or used for any purpose other than residential solid waste and curbside recyclables collection. BASIC BLACK CARTS: Three (3) years from the date of shipment to Purchaser. Basic Black Carts are also warranted against insufficient resistance to weathering while in normal use. For purposes of this warranty, "normal use" is considered to be the collection of residential solid waste in conjunction with an approved semi -automated or fully automated mechanical lifting device. If a dumping device other than one approved by Cascade is to be used for semi - automated or fully automated dumping, written approval of that brand andspecific model of dumping device must be obtained from Cascade prior to use. Adjustments or modifications may be required for approval. POLY DURA KAN REFUSE CONTAINERS: Three (3) years from the date of shipment to Purchaser. Specifically excluded are any attached hardware, lids or casters. At temperatures reaching -20F or below, precautions andrestrictions should be taken on containers during lifting and/or dumping because the material becomes brittle, which could create breakage and possible voiding of warranty. CURBSIDE RECYCLING CONTAINERS: Five (5) years from the date of manufacture. GRAVITY LOCKS: Five (5) years from the date of shipment. If Cascade chooses to replace the gravity lock andthe original type is no longer available, a comparable gravity lock will be provided instead. www.cascadecartsolutions.com 4 CASCADE cart solutions a cascade engineering company 64 GALLON UNIVERSAL CART STERLING SERIES CART MANUFACTURING PROCESS • Injection molded with High Density Polyethylene (HDPE) • UV stabilized against long term effects of the sun ANSI PERFORMANCE STANDARDS • Meets or exceeds all performance standards CONTAINER SHIPMENT • Truckload capacity is 800 carts with lids assembled INTEGRATED RFID TECHNOLOGY RECYCLABILITY • Carts are 100% recyclable DIMENSIONS • Height:44" Width: 25" Depth: 27.5" WHEELS • 10"injection molded snap -lock wheels • Plastic tread for a quieter roll WEIGHT • 28 pounds LOAD RATING • 224 pounds AXLE • Manufactured from 1010 steel • Coated with zinc dichromate plating to prevent rust • Diameter / Length: 5/8" diameter — 20" length LIFT AREAS • Rust proof, high strength composite lower lift bar -The lift bar is stronger than standard steel, has 3600 rotation, and is easily replaceable BOTTOM ABRASION PROTECTION • Molded in wear strips STANDARD COLORS • Carts are available in a large variety of standard color options • Custom colors available upon request IMPRINTING • Custom hot -stamp on lid and body • Custom in -mold graphics on lid WARRANTY • 10 Year Non -Prorated 4 CASCADE cart solutions a cascade engineering company 96 GALLON UNIVERSAL CART STERLING SERIES CART MANUFACTURING PROCESS • Injection molded with High Density Polyethylene (HDPE) • UV stabilized against long term effects of the sun ANSI PERFORMANCE STANDARDS • Meets or exceeds all performance standards CONTAINER SHIPMENT • Truckload capacity is 580 carts with lids assembled INTEGRATED RFID TECHNOLOGY RECYCLABILITY • Carts are 100% recyclable DIMENSIONS • Height:46" Width: 26" Depth: 34" WHEELS • 10"injection molded or 12"blow molded snap -lock wheels • Plastic tread for a quieter roll WEIGHT • 37.25 pounds LOAD RATING • 336 pounds AXLE • Manufactured from 1010 steel • Coated with zinc dichromate plating to prevent rust • Diameter / Length:.844" diameter - 23" length LIFT AREAS • Rust proof, high strength composite lower lift bar -The lift bar is stronger than standard steel, has 3600 rotation, and is easily replaceable BOTTOM ABRASION PROTECTION • Molded in wear strips STANDARD COLORS • Carts are available in a large variety of standard color options • Custom colors available upon request IMPRINTING • Custom hot -stamp on lid and body • Custom in -mold graphics on lid WARRANTY • 10 Year Non -Prorated For more information and technical assistance contact: Chevron Phillips Chemical Company LP P.O. Box 4910 AUNEXv The Woodlands, TX 77387-4910 800.231.1212 POIYFTNYI f Nf PREMIUM EXTRUSION AND RIGID PACKAGING RESINS Marlex° 9005 Polyethylene HIGH DENSITY POLYETHYLENE (HDPE) This high density polyethylene is an ethylene-hexene This resin meets these specifications: copolymer that is tailored for injection molded applications • ASTM D4976 - PE 233 that: • FDA 21 CFR 177.1520(c) 3.2a, use conditions B through H • Require moderate flow per 21 CFR 176.170(c) • Require excellent impact strength • UL94HB yellow card per UL file EE349283 • Require excellent ESCR • Require good warpage resistance • Are durable and recyclable for sustainability Typical injection molded applications for 9005 include: • Industrial parts • Seats • Food and household containers • Agricultural parts Density Melt Index, 190 °C/2.16 kg Tensile Strength at Yield, 2 in/min, Type IV bar Elongation at Break, 2 in/min, Type IV bar Flexural Modulus, Tangent - 16:1 span:depth, 0.5 in/min ESCR, Condition B (100 % Igepal), Fao Durometer Hardness, Type D (Shore D) Vicat Softening Temperature, Loading 1, Rate A Brittleness Temperature, Type A, Type I specimen --- 0.945 g/cm3 ASTM D1505 --- 6.0 g/10 min ASTM D1238 3,400 psi 23 MPa ASTM D638 1,000 % 1,000 % ASTM D638 155,000 psi 1,070 MPa ASTM D790 90 h 90 h ASTM D1693 62 62 ASTM D2240 250 °F 121 °C ASTM D1525 < -103 °F < -75 °C ASTM D746 1. The nominal properties reported herein are typical of the product, but do not reflect normal testing variance and therefore should not be used for specification purposes. Values are rounded. The physical properties were determined on compression molded specimens that were prepared in accordance with Procedure C of ASTM D4703, Annex Al. Revision Date: August, 2016 Anot6erquufiryprodudfrom Before using this product, the user is advised and cautioned to make its own determination and assessment of the safety and suitability of the product for the specific use in question and is further advised against relying on the information contained Ch@YIwh herein as it may relate to any specific use or application. It is the ultimate responsibility of the user to ensure that the product is suited and the information is applicable to the user's specific application. Chevron Phillips Chemical Company LP does not make, and expressly disclaims, all warranties, including warranties of merchantability or fitness for a particular purpose, phi��o regardless of whether oral or written, express or implied, or allegedly arising from any usage of any trade or from any course of dealing in connection with the use of the information contained herein or the product itself. The user expressly assumes all risk Cbsmkal Company LP and liability, whether based in contract, tort or otherwise, in connection with the use of the information contained herein or the TheWoodlonds, Texos product itself. Further, information contained herein is given without reference to any intellectual property issues, as well as federal, state or local laws which may be encountered in the use thereof. Such questions should be investigated by the user. Page 1 of 1 C CASCADE engineering EXCEPTIONS City of South Bend Title: Rollout Refuse & Yard Waste Containers Container Specifications • Dimensions: o Cascade's carts meet ANSI specifications with the dimensions listed in the bid response. • Axle: o Cascade's 64G axle meets spec with a 5/8" diameter. Our 96G axle has a 0.844" diameter for added strength due to the size of the cart. www.cascadecartsolutions.com C 4% CASCADE engineering Hot Melt Blending Cascade Engineering certifies that all resin and additives used to manufacture its containers and components are hot -melt blended throughout and are 100% recyclable. Cascade uses a Conair weigh blender, Serial Number WSB 460T, for this process. The blender is located at Cascade's headquarters at 4950 37th Street SE, Grand Rapids, Michigan 49512. Cascade carts are manufactured with high density polyethylene provided by major polyethylene suppliers (Chevron, Exxon, etc.). Carts are also stabilized against ultraviolet degradation with not less than of 1% of UV additive. An additional anti -oxidant package is included to ensure the integrity and longevity of the container. The stabilization package ensures a 10-year life. 146A� Scott Downer Director of Sales www.cascadecartsolutions.com CASCADE engineering Municipal References City Contact Address Phone Size & # of Carts Date in Person Application Service City of Laredo John Orfila 6912 Highway 359 (956) 337-7770 96 10,000 1995 Laredo, TX 78044 Universal Carts Bernalillo County Kim P.O. Box 15700 (505) 224-1611 96 29,000 1996 McKibben Albuquerque, NM 87174 Fully Automated City of Ft. Lauderdale Greg Slagle 1401 SE 21 st Street (954) 828-5341 64 & 96 56,000 1998 Ft. Lauderdale, FL 33316 Fully Automated City of Chicago Chris Sauve 121 N. LaSalle (312) 744-4616 96 400,000 1998 Chicago, IL 60602 Semi Automated City of Elgin Tish Powell 150 Dexter Court (847) 931-5980 35, 64, 96 54,000 2002 Elgin, IL 60120 Semi Automated City of Durham Christina 1833 Camden Ave (919) 560-4186 96 46,000 2002 Tookes Durham, NC 27704 Universal Carts City of Southaven Ray 8710 Northwest Drive (901) 461-4784 96 7,000 2003 Tarrance Southaven, MS 38671 Semi Automated Plainfield Municipal David Ervin 127 Roosevelt Avenue (908) 226-4921 64 & 96 24,000 2003 Utilities Authority Plainfield, NJ 07060 Semi Automated City of Rochester Karen 210 Colfax Street (585) 428-6512 96 90,000 2003 Simoni Rochester, NY14606 Semi Automated City of Chesapeake Dave 912 Hollowell Lane (757) 615-9218 96 97,000 2003 Thompson Chesapeaks, VA 23320 Universal Carts City of Lake Dallas Mike 1601 Railroad Drive (972) 316-2218 96 5,200 2003 Holbrock Lewisville, TX 75067 Universal Carts City of Oakland Bob Angell 172 98th Avenue (510) 613-2833 35, 64, 96 60,000 2004 Oakland, CA 94603 Universal Carts Town of Manchester Joe Lentini 263 Olcott Street (860) 647-3234 64 & 96 19,000 2004 Manchester, CT 06040 Semi & Fully Automated City of Ocala John Zobler 2100 NE 30th Ave. (352) 351-6757 64 & 96 8,000 2004 Ocala, FL 34470 Fully Automated Collier County Teresa 2685 South Horseshoe Dr. (239) 403-2350 64 285,000 2004 Riesen Naples, FL 34104 Fully Automated Miami -Dade County Robert Purchasing Deparatment (305) 375-1291 96 120,000 2004 Menge Miami -Dade County, FL Fully Automated Village of Oak Park Karen 131 S. Boulevard (708) 445-3373 64 & 96 28,000 2004 Rozmus Oak Park, IL 60302 Semi Automated City of Indianapolis John 1725 S. West Street (317) 327-2372 96 60,000 2004 Workman Indianapolis, IN 46225 Semi & Fully Automated City of Riverside David 3900 Main Street (951) 826-5561 96 11,000 2005 Dewey Riverside, CA 92522 Fully Automated City of Big Springs Kenny 1380 Airpark Drive (432) 264-2503 96 Universal 4,000 2005 Davis Big Springs, TX 79720 Carts City of Pomona Howard 636 West Monterey Ave. (909) 620-2362 96 3,000 2006 Morris Pomona, CA 91768 Universal Carts City of Augusta Mark 4330 Deans Bridge Road (706) 592-9634 64 & 96 36,000 2006 Johnson Blythe, GA 30805 Semi & Fully Automated County of Henrico Steve Yob 10401 Woodman Road (804) 261-8217 96 36,000 2006 Glen Allen, VA 23060 Fully Automated City of Boston Susan Room 714 - City Hall (617) 635-4959 64,96 6,000 2006 Cascino Boston, MA 02201 Universal Carts References -Municipal 0410.x1s 1 of 2 0:4%� CASCADE Municipal References engineering City Contact Person Address Phone Size & Application # of Carts Date in Service City of New Orleans Veronica 1340 Poydras Street (504) 658-3800 96 Universal 148,000 2006 White New Orleans, LA 70112 Carts City of Waterbury Louis Spina 236 Grand Street (203) 574-8261 64,96 20,000 2006 Waterbury, CT 06702 Universal Carts City of Tulare Frank 3981 South K Street (559) 805-9075 96 2,000 2007 Rodriguez Tulare, CA 93274 Fully Automated City of Scarborough Mike Shaw 20 Washington Avenue (207) 730-4400 64 14,000 2007 Scarborough, ME 04706 (207) 883-5159 Semi & Fully Automated City of Woonsocket Michael 169 Main Street (401) 767-9216 64 32,000 2007 Debroisse Woonsocket, RI 02895 (401) 641-8205 Fully Automated City of Memphis Keith 125 North Main Street (901) 576-6866 96 30,000 2007 Richardson Memphis, TN 38112 Semi -Automated City of Tacoma Rick Boyne 3510 South Mullen Street (253) 591-5543 35, 64, 96 25,000 2007 Tacoma, WA 98409 Universal Carts City of Newton Elaine 1000 Commonwealth Ave. (617) 796-1000 64 5,000 2007 Gentile Newton Centre, MA 02459 Universal Carts City of Hartford Marilynn 525 Main Street (860) 757-9900 64 RFID 27,000 2007 Cruz -Aponte Hartford, CT 06103 Universal Carts City of Lufkin Steve Floyd P.O. Box 190 (936) 630-0536 96 Universal 12,000 2008 Lufkin, TX 75902-0190 Carts City of Coppel Mike 1601 Railroad Drive (972) 316-2218 64 Universal 12,000 2008 Holbrock Lewisville, TX 75067 Carts City of Murphy Mike 1601 Railroad Drive (972) 316-2218 96 Universal 5,000 2008 Holbrock Lewisville, TX 75067 Carts City of Highland Mike 1601 Railroad Drive (972) 316-2218 96 Universal 5,500 2008 Village Holbrock Lewisville, TX 75067 Carts City of Tampa Douglas 4010 West Spruce Street (813) 348-1135 96 Universal 27,000 2009 Raikes Tampa, FL 33607 Carts City of Garner Paul Cox 610 Rand Mill Road (919) 772-7600 64 8,000 2009 Garner, NC 27529 Universal Carts City of Naugatuck Sheila 246 Rubber Avenue (203) 720-7071 96 Universal 8,500 2010 Baummer Naugatuck, CT 06770 Carts City of Revere Thomas 281 Broadway (781) 589-3056 35,64 17,500 2010 Ambrosino Revere, MA 02151 Universal Carts References -Municipal 0410.xls 2 of 2 C CASCADE engineering MATERIAL ADJUSTMENT CLAUSE The resin cost will be adjusted quarterly (up or down) in accordance with changes in the IHS index for general purpose injection mold HDPE or similar resin index (such as the CDI index). The index for December, 2022 will be used as the baseline and the pursuant quarterly adjustments will be based on the average index for the previous quarter. www.cascadecartsolutions.com