Loading...
HomeMy WebLinkAboutRatify Contracted Emergency Work - Sewer Repair at Edison Rd. and Edgewater Rd. Collapse – HRP Construction, Inc.  ELIZABETH A. MARADIK JOSEPH R. MOLNAR GARY A. GILOT JORDAN V. GATHERS MURRAY L. MILLER 1316 COUNTY-CITY BUILDING 227 W. JEFFERSON BOULEVARD SOUTH BEND, INDIANA 46601-1830 PHONE 574/ 235-9251 FAX 574/ 235-9171 CITY OF SOUTH BEND JAMES MUELLER, MAYOR BOARD OF PUBLIC WORKS December 13, 2022 Mr. Matthew D. Cain HRP Construction Inc. 5777 Cleveland Rd., P.O. Box 266 South Bend, IN 46624-0266 johnk@hrpconstruction.com RE: Ratify Contracted Emergency Work Dear Mr. Cain: At its December 13, 2022 meeting, the Board of Public Works approved the above referenced emergency work for emergency sanitary sewer repair at Edison Rd. and Edgewater Rd. after a gravity sewer collapse in the amount of $19,066.25. Enclosed please find a copy of the emergency work for your records. If you have any further questions, please call this office at (574) 235-9251. Sincerely, /s/ Theresa Heffner Theresa Heffner, Clerk Enclosures TH/lh INTER-OFFICE MEMORANDUM DEPARTMENT OF PUBLIC WORKS DIVISION OF ENVIRONMENTAL SERVICES TO: Members of the Board of Public Works Michael Schmidt, Assistant City Attorney Public Works Theresa Heffner, Clerk FROM: Jacob M. Klosinski, P.E., Assistant City Engineer SUBJECT: Emergency Repair – Edison Road and Edgewater Sanitary Sewer Repair (PR-0020709) Agenda Request – Ratify Emergency Repair Contract DATE: December 2, 2022 The Department of Public Works Division of Engineering, Utilities, and Street/Sewer teams contacted HRP Construction to assist with emergency repairs following a sanitary gravity sewer main collapse west of the intersection of Edison Road and Edgewater Drive. This is a critical regional sanitary sewer main that is part of the I/N Tek Sanitary Trunk Sewer in St. Joseph County. Assessment The root cause of the sanitary sewer collapse appeared to be a combination of aging, deteriorated pipe and activities by Milestone Contractors. The Milestone Contractors vehicle’s tire sank into the ground at the intersection where the collapse occurred and had to be removed by a wrecker / tow truck prior to assessing the damage to the sewer. Emergency Repair Work City crews and HRP Construction assessed the situation and consulted about the repair work on- site. Crews were mobilized the following morning to remove the collapse section of pipe and couple a new section of pipe to restore flow to the sanitary sewer. This section of sanitary sewer should be considered for replacement in the future. The existing pipe is deteriorating to the point that the ductile iron pipe will not be a good substrate for a lining project. Full replacement of sections of gravity sewer along the I/N Tek Sanitary Trunk Sewer should be considered and budgeted to remedy the failing pipe section and continued problems along this trunk sewer. For questions regarding the subject agenda request and emergency repair, contact Jacob M. Klosinski (Ext. 9496) at the Division of Engineering. December 13, 2022 BOARD OF PUBLIC WORKS AGENDA ITEM REVIEW REQUEST FORM Date: 12-02-2022 Name: Jacob M. Klosinski Department of Public Works – Engineering Division BPW Date: 12-13-2022 Phone Extension: 9496 Required Prior to Submittal to Board BPW Attorney X Attorney Name Michael Schmidt Dept. Attorney Attorney Name Michael Schmidt Purchasing Michael Schmidt / Mickey Lovy Check the Appropriate Item Type – Required for All Submissions Professional Services Agreement Contract Proposal Open Market Contract Amendment/Addendum Special Purchase, QPA Bid Opening Bid Award Req. to Advertise Title Sheet Quote Opening Quote Award Reject Bids/Quotes Proposal Opening C/O & PCA No. PCA Chg. Order, No. Traffic Control Resolution Other: Ratify Contracted Emergency Work Ease./Encroach Required Information Company or Vendor Name HRP Construction, Inc. (V-00000775) New Vendor Yes If Yes, Approved by Purchasing No MBE/WBE Contractor MBE WBE Completed E-Verify Form Attached Yes No Project Name Emergency Repair –Edison Rd and Edgewater Rd Sanitary Sewer Repair Project Number PR-00020706 Funding Source Sewage Works Operations – Other Contractual Services Account No. 641-06-605-514-439001 Amount Final Cost: $19,066.25 Terms of Contract Lump Sum (T&M) Special Contract Provisions Purpose/Description City Engineering, Utilities (Wastewater) and Streets/Sewer, contracted HRP Construction to provide emergency repairs at Edison Road and Edgewater Road after a sanitary gravity sewer collapse. See Memorandum for description of services. For Change Orders Only Amount of Increase Decrease $ ($ ) Previous Amount $ Current Percent of Change: Increase Decrease % ( %) New Amount $ Total Percent of Change: Increase Decrease % ( %) Time Extension Amount: New Completion Date: