December 13, 2022
Mr. Robert Kuhns
Selge Construction Co., Inc.
2833 South 11TH St.
Niles, MI 49120
aswinehart@selgeconstruction.com
RE: Project Completion Affidavit – CSO 18 Backwater Gate Replacement
Project No. 120-017
Dear Mr. Kuhns:
At its December 13, 2022 meeting, the Board of Public Works approved the Project
Completion Affidavit for this project in the amount of $124,980.
A copy of the Project Completion Affidavit is enclosed for your records.
If you have any further questions, please call this office at (574) 235-9251.
Sincerely,
/s/ Theresa Heffner
Theresa Heffner, Clerk
Enclosures
TH/lh
INTER-OFFICE MEMORANDUM
DEPARTMENT OF PUBLIC WORKS
DIVISION OF ENVIRONMENTAL SERVICES
TO: Members of the Board of Public Works
Michael Schmidt, Assistant City Attorney Public Works
Theresa Heffner, Clerk
FROM: Jacob M. Klosinski, P.E., Assistant City Engineer
SUBJECT: 120-017 CSO 18 Backwater Gate Replacement
Agenda Request – Final Completion Affidavit
DATE: December 5, 2022
The Division of Engineering and Division of Utilities request the Board of Public Works approval of
the Project Completion Affidavit for Project No. 120-017 CSO 18 Backwater Gate Replacement.
Included are the following documents for closeout:
Project Completion Affidavit
Maintenance Bond
Final Waiver of Lien
Final Pay Application No. 3 – Release of Retainage
Summary of Project – Final Costs:
Original Contract Price $124,980.00
Change Orders (None) $ 0.00
Change Orders, Percentage Change 0.00%
Final Contract Price: $124,980.00 On Budget
This project was completed on budget.
There was a change in the MWBE Utilization Plan that occurred during construction. City
Engineering Team directed Selge Construction to remove the old concrete lid from CSO 18 for
use at the CSO 27/28 collapse and repair project to save on costs for the CSO 27/28 manhole
structure repairs. This allowed for re-use of the material for the repair project.
Consequently, V&R Trucking had originally been scheduled to haul this item away from CSO 18
for demolition, but the lid was hauled by Selge Construction to the CSO 27/28 site due to
scheduling needs for the CSO 27/28 project. This resulted in a minor change to the MBE
Utilization Plan. This change is being recognized with the Final Completion documents. Refer
to attached memorandum from Selge Construction Company explaining the adjustment to the
MBE Utilization Plan.
Closeout documents are submitted for approval at the 12/05/2022 Board of Public Works
Meeting. For questions regarding the subject agenda request, contact Jacob M. Klosinski (Ext.
9496) at the Division of Engineering.
12-05-2022
December 13, 2022
Selge Construction Co., Inc.
2833 S. 11th Street - Niles, Michigan 49120
P: 269.684.0842 F: 269.684.0846
November 18, 2022
City of South South Bend
Attn: Jacob Klosinski, PE
3113 Riverside Dr.
South Bend, IN 46628
RE: CITY OF SOUTH BEND PROJECT #120-017
CSO 18 BACKWATER VALVE REPLACEMENT
MWBE CHANGE IN SCOPE
Dear Jacob,
Selge Construction Company at the time of bidding for the above referenced project was planning to use
V&R Trucking, Inc. to achieve our MWBE Utilization Goal. The total amount of this commitment was
$210.00 and accounted for .16% of the total Bid/Proposal. The work that V&R was to perform was
hauling the old concrete lid to a dump site to dispose of the lid.
During the work of this contract an emergency repair for the City of South Bend occurred. Selge
Construction Company was directed to take the lid to be used on this emergency repair. Therefore, we
were unable to contract with V&R trucking to perform the work we had selected them to perform.
Thank you for your understanding in this matter.
Sincerely,
Justin Butler
Vice President
Assistant City Engineer Date: 12-05-2022 Note: Process upon Board of Public Works approval of the Project Completion Affidavit on or after 12-13-2022.
BOARD OF PUBLIC WORKS
AGENDA ITEM REVIEW REQUEST FORM
Date: 12-05-2022
Name: Jacob M. Klosinski Department of Public Works – Engineering Division
BPW Date: 12-13-2022 Phone Extension: 9496
Required Prior to Submittal to Board
BPW Attorney X Attorney Name Michael Schmidt
Dept. Attorney Attorney Name Michael Schmidt
Purchasing Mickey Lovy / Erich Haley
Check the Appropriate Item Type –Required for All Submissions
Professional Services Agreement Contract Proposal
Open Market Contract Amendment/Addendum Special Purchase, QPA
Bid Opening Bid Award Req. to Advertise Title Sheet
Quote Opening Quote Award Reject Bids/Quotes
Proposal Opening C/O & PCA No. PCA
Chg. Order, No. Traffic Control Resolution
Other: Ease./Encroach
Required Information
Company or Vendor Name Selge Construction Company, Inc. (V-00001471)
New Vendor Yes If Yes, Approved by Purchasing
No
MBE/WBE Contractor MBE
WBE Completed E-Verify Form Attached Yes
No
Project Name CSO 18 Backwater Valve Replacement
Project Number 120-017 (PO-0012466)
Funding Source Sewage Works Operations – Other Contractual Services
Account No. 641-06-605-514-439001
Amount
Terms of Contract
Special Contract Provisions
Purpose/Description The Division of Engineering and Division of Utilities (Wastewater) requests
the approval of a Project Completion Affidavit for Selge Construction
Company, Inc. for the subject project at the 12/13/2022 BPW Meeting. Work
was completed in early November. All documentation is complete.
For Change Orders Only
Amount of
Increase
Decrease
$
($ )
Previous Amount $
Current Percent of Change:
Increase
Decrease
%
(%)
New Amount $
Total Percent of Change:
Increase
Decrease
%
(%)
Time Extension Amount:
New Completion Date: