Loading...
HomeMy WebLinkAboutPCA - CSO 18 Backwater Gate Replacement Proj No. 120-017 - Selge Contruction Co., Inc.  ELIZABETH A. MARADIK JOSEPH R. MOLNAR GARY A. GILOT JORDAN V. GATHERS MURRAY L. MILLER 1316 COUNTY-CITY BUILDING 227 W. JEFFERSON BOULEVARD SOUTH BEND, INDIANA 46601-1830 PHONE 574/ 235-9251 FAX 574/ 235-9171 CITY OF SOUTH BEND JAMES MUELLER, MAYOR BOARD OF PUBLIC WORKS December 13, 2022 Mr. Robert Kuhns Selge Construction Co., Inc. 2833 South 11TH St. Niles, MI 49120 aswinehart@selgeconstruction.com RE: Project Completion Affidavit – CSO 18 Backwater Gate Replacement Project No. 120-017 Dear Mr. Kuhns: At its December 13, 2022 meeting, the Board of Public Works approved the Project Completion Affidavit for this project in the amount of $124,980. A copy of the Project Completion Affidavit is enclosed for your records. If you have any further questions, please call this office at (574) 235-9251. Sincerely, /s/ Theresa Heffner Theresa Heffner, Clerk Enclosures TH/lh INTER-OFFICE MEMORANDUM DEPARTMENT OF PUBLIC WORKS DIVISION OF ENVIRONMENTAL SERVICES TO: Members of the Board of Public Works Michael Schmidt, Assistant City Attorney Public Works Theresa Heffner, Clerk FROM: Jacob M. Klosinski, P.E., Assistant City Engineer SUBJECT: 120-017 CSO 18 Backwater Gate Replacement Agenda Request – Final Completion Affidavit DATE: December 5, 2022 The Division of Engineering and Division of Utilities request the Board of Public Works approval of the Project Completion Affidavit for Project No. 120-017 CSO 18 Backwater Gate Replacement. Included are the following documents for closeout:  Project Completion Affidavit  Maintenance Bond  Final Waiver of Lien  Final Pay Application No. 3 – Release of Retainage Summary of Project – Final Costs: Original Contract Price $124,980.00 Change Orders (None) $ 0.00 Change Orders, Percentage Change 0.00% Final Contract Price: $124,980.00 On Budget This project was completed on budget. There was a change in the MWBE Utilization Plan that occurred during construction. City Engineering Team directed Selge Construction to remove the old concrete lid from CSO 18 for use at the CSO 27/28 collapse and repair project to save on costs for the CSO 27/28 manhole structure repairs. This allowed for re-use of the material for the repair project. Consequently, V&R Trucking had originally been scheduled to haul this item away from CSO 18 for demolition, but the lid was hauled by Selge Construction to the CSO 27/28 site due to scheduling needs for the CSO 27/28 project. This resulted in a minor change to the MBE Utilization Plan. This change is being recognized with the Final Completion documents. Refer to attached memorandum from Selge Construction Company explaining the adjustment to the MBE Utilization Plan. Closeout documents are submitted for approval at the 12/05/2022 Board of Public Works Meeting. For questions regarding the subject agenda request, contact Jacob M. Klosinski (Ext. 9496) at the Division of Engineering. 12-05-2022 December 13, 2022 Selge Construction Co., Inc. 2833 S. 11th Street - Niles, Michigan 49120 P: 269.684.0842 F: 269.684.0846 November 18, 2022 City of South South Bend Attn: Jacob Klosinski, PE 3113 Riverside Dr. South Bend, IN 46628 RE: CITY OF SOUTH BEND PROJECT #120-017 CSO 18 BACKWATER VALVE REPLACEMENT MWBE CHANGE IN SCOPE Dear Jacob, Selge Construction Company at the time of bidding for the above referenced project was planning to use V&R Trucking, Inc. to achieve our MWBE Utilization Goal. The total amount of this commitment was $210.00 and accounted for .16% of the total Bid/Proposal. The work that V&R was to perform was hauling the old concrete lid to a dump site to dispose of the lid. During the work of this contract an emergency repair for the City of South Bend occurred. Selge Construction Company was directed to take the lid to be used on this emergency repair. Therefore, we were unable to contract with V&R trucking to perform the work we had selected them to perform. Thank you for your understanding in this matter. Sincerely, Justin Butler Vice President Assistant City Engineer Date: 12-05-2022 Note: Process upon Board of Public Works approval of the Project Completion Affidavit on or after 12-13-2022. BOARD OF PUBLIC WORKS AGENDA ITEM REVIEW REQUEST FORM Date: 12-05-2022 Name: Jacob M. Klosinski Department of Public Works – Engineering Division BPW Date: 12-13-2022 Phone Extension: 9496 Required Prior to Submittal to Board BPW Attorney X Attorney Name Michael Schmidt Dept. Attorney Attorney Name Michael Schmidt Purchasing Mickey Lovy / Erich Haley Check the Appropriate Item Type –Required for All Submissions Professional Services Agreement Contract Proposal Open Market Contract Amendment/Addendum Special Purchase, QPA Bid Opening Bid Award Req. to Advertise Title Sheet Quote Opening Quote Award Reject Bids/Quotes Proposal Opening C/O & PCA No. PCA Chg. Order, No. Traffic Control Resolution Other: Ease./Encroach Required Information Company or Vendor Name Selge Construction Company, Inc. (V-00001471) New Vendor Yes If Yes, Approved by Purchasing No MBE/WBE Contractor MBE WBE Completed E-Verify Form Attached Yes No Project Name CSO 18 Backwater Valve Replacement Project Number 120-017 (PO-0012466) Funding Source Sewage Works Operations – Other Contractual Services Account No. 641-06-605-514-439001 Amount Terms of Contract Special Contract Provisions Purpose/Description The Division of Engineering and Division of Utilities (Wastewater) requests the approval of a Project Completion Affidavit for Selge Construction Company, Inc. for the subject project at the 12/13/2022 BPW Meeting. Work was completed in early November. All documentation is complete. For Change Orders Only Amount of Increase Decrease $ ($ ) Previous Amount $ Current Percent of Change: Increase Decrease % (%) New Amount $ Total Percent of Change: Increase Decrease % (%) Time Extension Amount: New Completion Date: