HomeMy WebLinkAboutOpening of Bids - 2022 Curb and Sidewalk Construction, Round II Proj No. 122-044 - Selge Construction Co., Inc.CITY OF SOUTH BEND, INDIANA
CONTRACTOR'S BID FOR PUBLIC WORK
CHECKLIST FOR BIDDERS
Project Name 2022 Curb and Sidewalk Construction — Round 2
Project No.
For Bids Due
122-044
December 13th 2022
From time to time the South Bend Board of Public Works finds it necessary to reject a bid because
it does not comply with statutory requirements. In preparing your bid, please use the following
checklist in order to make sure that your bid is done in the proper manner.
Proper bid security included. The bidder has the option of providing either a Certified Check
X or Bid Bond.
Bid prepared on the City of South Bend Contractor's Bid for Public Work Form, completely
X executed.
Contractor's Non -Collusion and Non -Debarment Affidavit, Certification Regarding Investments
with Iran, Employment Eligibility Verification, Non -Discrimination Commitment, and
X Certification of use of United States Steel Products or Foundry Products.
Proof of M/WBE Utilization Plans [MBE -1.0 and WBE-1.0]. Also provide Evidence of Good
Faith Efforts Forms [MBE -2.0 and WBE-2.0] and M/WBE Contacted Forms [MBE -2.1 and
X WBE-2.1].
X Acknowledge Receipt of Addendum(s) included with the bid.
X All required additional information is included with the bid.
Proposal statements and other affidavits all signed by the proper party with name either
X printed or typed underneath signature.
x This checklist submitted with the Bid.
This checklist is provided for bidder's use in assuring compliance with required
documentation; however, it does not include all specifications requirements and does not
relieve the bidder of the need to read and comply with the specifications.
Bidder: Selge Construction Co., Inc. Date: December 13, 2022
By Authorized Representative, _
Signature:
Print Name & Title: �u/in Butler, Vice President
Version 09/29/2021 Contractor's Bid for Public Works - 1
CITY OF SOUTH BEND, INDIANA
CONTRACTOR'S BID FOR PUBLIC WORK
Project Name 2022 Curb and Sidewalk Construction — Round 2
Date:
Address:
Project No.
For Bids Due
122-044
December 13th 2022
PART I
(Must be completed for all bids. Please type or print)
12/13/2022 Bidder (Firm): Selge Construction Co., Inc.
2833 S. 11 th St.
City/State/Zip: Niles, MI 49120 Telephone Number: ( 269 ) 684-0842
Agent of Bidder (if Applicable):
Pursuant to notices given, the undersigned offers to furnish labor and/or material necessary to complete the
public works project of:
2022 Curb and Sidewalk Construction — Round 2
the City of South Bend, Indiana, in accordance with plans and specifications prepared by:
City of South Bend Department of Public Works Division of En ineerin
and dated 12.08.22
for the sum of (enter the Total Bid as shown on the Proposal)
Eight Hundred Eighty Eight Thousand Four Hundred Seventy One Dollars and Seventy Five Cents A$888.471 .75
(Enter sum of Total Base Bid plus Alternates shown on Proposal) (Numerical)
The undersigned further agrees to furnish a bond or certified check with this bid for an amount specified in
the notice of the letting. If alternative bids apply, the undersigned submits a proposal for each in accordance
with the notice. Any addendums attached will be specifically referenced at the applicable page.
If additional units of material included in the contract are needed, the cost of units must be the same as that
shown in the original contract if accepted by the City of South Bend. If the bid is to be awarded on a unit
basis, the itemization of the units shall be shown on a sepa�rateatatt'achment
By obi
The above bid is accepted this
Subject to the following conditions:
BOARD OF PUBLIC WORKS
Elizabeth A. Maradik, President
Gary A. Gilot, Member
(Signature)
us ' Butler, Vice President
(Printed Name of Person Signing)
ACCEPTANCE
day of
20
Joseph R. Molnar, Vice President
Jordan V. Gathers, Member
Murray L. Miller, Member Attest: Theresa Heffner, Clerk
Version 09/29/2021 Contractor's Bid for Public Works - 2
PART II
(For projects of $100,000 or more — IC 36-1-12-4)
These statements to be submitted under oath by each bidder with and as part of his/her/its bid.
Attach additional pages for each section as needed.
SECTION I EXPERIENCE QUESTIONNAIRE
1. Attach information regarding projects your organization has completed for the period of one
(1) year prior to the date of the current bid. See Attached
2. Attach a listing of public works projects currently in process of construction by your
organization. See Attached
3. Attach information regarding any failure to complete any work awarded to you and the
location thereof. None
4. Attach references from private firms for which you have performed work. See Attached
SECTION II PLAN AND EQUIPMENT QUESTIONNAIRE
1. Attach an explanation of your plan or layout for performing proposed work. (Examples could
include a narrative of when you could begin work, complete the project, number of workers,
etc. and any other information which you believe would enable the City of South Bend to
consider your bid.) Work will be completed in an orderly manner, according to specifications and as best
suits the Owner & its Engineer.
2. Attach a listing, of the names and addresses of all subcontractors (i.e. persons or firms outside
your own firm who have performed part of the work) that you have used on public works
projects during the past five (5) years along with a brief description of the work done by each
subcontractor. See attached
3. If you intend to sublet any portion of the work, attach the name and address of each
subcontractor, equipment to be used by the subcontractor, and whether you will require a
bond. However, if you are unable to currently provide a listing, please understand a listing
must be provided prior to contract approval. Until the completion of the proposed project, you
are under a continuing obligation to immediately notify the City of South Bend in the event that
you subsequently determine that you will use a subcontractor on the proposed project.
Subcontracts list to be determined. Bond not required
4. Attach a listing of equipment you have available to use for the proposed project. See attached
Have you entered into contracts or received offers for all materials which substantiate the
prices used in preparing your proposal? If not, attach an explanation for the rationale used
which would corroborate the prices listed. Yes
SECTION III CONTRACTOR'S FINANCIAL STATEMENT
Attachment of bidder's financial statement is mandatory. Any bid submitted without said
financial statement as required by statute shall thereby be rendered invalid. The financial
statement provided hereunder to the City of South Bend awarding the contract must be specific
enough in detail so that said City of South Bend can make a proper determination of the bidder's
capability for completing the project if awarded.
See attached.
Version 09/29/2021 Contractor's Bid for Public Works - 3
When the prospective Contractor is unable to certify to any of the statements below, it shall attach an explanation to this Affidavit.
CONTRACTOR'S NON -COLLUSION AND NON -DEBARMENT AFFIDAVIT, CERTIFICATION
REGARDING INVESTMENT WITH IRAN, EMPLOYMENT ELIGIBILITY VERIFICATION, NON-
DISCRIMINATION COMMITMENT AND CERTIFICATION OF USE OF UNITED STATES STEEL
PRODUCTS OR FOUNDRY PRODUCTS
(Must be completed for all quotes and bids. Please type or print)
STATE OF Michigan )
) SS.
Berrien COUNTY )
The undersigned Contractor, being duly sworn upon his/her/its oath, affirms under the penalties of perjury
that:
1. Contractor has not, nor has any other member, representative, or agent of the firm, company,
corporation or partnership represented by him, entered into any combination, collusion or agreement with
any person relative to the price to be bid by anyone at such letting nor to prevent any person from bidding
nor to induce anyone to refrain from bidding, and that this bid is made without reference to any other bid and
without any agreement, understanding or combination with any other person in reference to such bidding.
Contractor further says that no person or persons, firms, or corporation has, have or will receive directly or
indirectly, any rebate, fee, gift, commission or thing of value on account of such sale; and
2. Contractor certifies by submission of this proposal that neither contractor nor any of its principals
are presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from
participation in this transaction by any Federal department or agency; and
3. Contractor has not, nor has any successor to, nor an affiliate of, Contractor, engaged in
investment activities in Iran.
a. For purposes of this Certification, "Iran" means the government of Iran and any agency
or instrumentality of Iran, or as otherwise defined at Ind. Code § 5-22-16.5-5, as
amended from time -to -time.
b. As provided by Ind. Code § 5-22-16.5-8, as amended from time -to -time, a Contractor
is engaged in investment activities in Iran if either:
i. Contractor, its successor or its affiliate, provides goods or services of twenty
million dollars ($20,000,000) or more in value in the energy sector of Iran;
or
ii. Contractor, its successor or its affiliate, is a financial institution that extends
twenty million dollars ($20,000,000) or more in credit to another person for
forty-five (45) days or more, if that person will (i) use the credit to provides
goods and services in the energy sector in Iran; and (ii) at the time the
financial institution extends credit, is a person identified on list published by
the Indiana Department of Administration.
4. Contractor does not knowingly employ or contract with an unauthorized alien, nor retain any
employee or contract with a person that the Contractor subsequently learns is an unauthorized alien.
Version 09/29/2021 Contractor's Bid for Public Works - 4
Contractor agrees that he/she/it shall enroll in and verify the work eligibility status of all of Contractor's
newly hired employees through the E -Verify Program as defined by I.C. 22-5-1.7-3. Contractor's
documentation of enrollment and participation in the E -Verify Program is included and attached as part of
this bid/quote; and
5. Contractor shall require his/her/its subcontractors performing work under this public contract to
certify that the subcontractors do not knowingly employ or contract with an unauthorized alien, nor retain
any employee or contract with a person that the subcontractor subsequently learns is an unauthorized alien,
and that the subcontractor has enrolled in and is participating in the E -Verify Program. The Contractor agrees
to maintain this certification throughout the term of the contract with the City of South Bend, and understands
that the City may terminate the contract for default if the Contractor fails to cure a breach of this provision
no later than thirty (30) days after being notified by the City.
6. Persons, firms, partnerships, corporations, associations, or joint venturers awarded a contract by the
City of South Bend through its agencies, boards, or commissions shall not discriminate against any employee
or applicant for employment in the performance of a City contract with respect to hire, tenure, terms,
conditions, or privileges of contract or employment, or any matter directly or indirectly related to contracting
or employment because of race, sex, religion, color, national origin, ancestry, gender expression, gender
identity, sexual orientation, or due to age or disability that does not affect that person's ability to perform the
work.
In awarding contracts for the purchase of work, labor, services, supplies, equipment, materials, or any
combination of the foregoing including, but not limited to, public works contracts awarded under public
bidding laws or other contracts in which public bids are not required by law, the City, its agencies, boards,
or commissions will consider the Contractor's good faith efforts to obtain participation by those
subcontractors certified by the State of Indiana as a Minority Business ("MBE") or as a Women's Business
Enterprise ("WBE") as a factor in determining the lowest, responsible, responsive bidder.
Contractors seeking the award of a City contract cannot be required to award a subcontract to an MWBE;
however, they may not unlawfully discriminate against said MBE/WBE. On goal -eligible contracts,
Contractors are required to either meet both MBE and WBE utilization goals or demonstrate that the
Contractor has made good faith efforts to obtain participation from MBE and WBE subcontractors. A finding
of noncompliance or a discriminatory practice shall prohibit that Contractor from being awarded a City
contract for a period of one (1) year from the date of such determination, and such determination may also
be grounds for terminating the contact to which the discriminatory practice or noncompliance pertains.
7. The undersigned Contractor agrees that the following nondiscrimination commitment shall be made
a part of any contract which it may henceforth enter into with the City of South Bend, Indiana or any of its
agencies, boards or commissions.
Contractor agrees not to discriminate against or intimidate any employee or applicant for employment in the
performance of this contract with privileges of employment, or any matter directly or indirectly related to
employment, because of race, religion, color, sex, gender expression, gender identity, sexual orientation,
handicap, national origin or ancestry. Breach of this provision may be regarded as material breach of
contract.
I, the undersigned bidder or agent as contractor on a public works project, understand my statutory
obligations to the use of steel products or foundry products made in the United States (I.C. 5-16-8-1). I hereby
certify that I and all subcontractors employed by me for this project will use steel products or foundry
products made in the United States on this project if awarded. I understand I have an affirmative duty to
notify the City in my bid that my proposal does not include the use of steel products or foundry products
made in the United States. I understand it is my sole obligation and responsibility to provide a justification
to the City, subject to review and approval, why the cost of United States made steel or foundry products is
unreasonable. Prior to award and upon submission of bid which does not use steel products or foundry
products made in the United States, the City, through its director of public works, shall make a determination
if the price of United States made steel or foundry is unreasonable. I understand that violations hereunder
Version 09/29/2021 Contractor's Bid for Public Works - 5
may result in forfeiture of contractual payments.
I hereby affirm under the penalties of perjury that the facts and information contained in the foregoing bid
for public works are true and correct.
Dated this 13th day of Decembe20 22
Subscribed and swornto before me this 13th
My Commission Expires 10/27/2027
County of Residence
Sel a Construction Co., Inc.
Contractor/Bidder (Firm)
oia2tvre of Contractor/Bidder or Its Agent
Justin Butler, Vice President
Printed Name and Title
2022
A.
Notary Public Allison Swinehart ■`'`'swilvp `may
Berrien
Version 09/29/2021 Contractor's Bid for Public Works - 6
,•`Qts. -----.!5f ''•,,
%C i Ky yn F
MY t "20V ;
of '
Ci
� �yginlhe��
OF
1t1��'Lt
BID/PROPOSAL
u' r ♦rr .�i T
CITY OF SOUTH BEND
Project Name: 2022 Curb and Sidewalk Construction — Round 2 "
Project Number: 122-044
For Bids Due: December 13t'', 2022
Contractor Name: Selge Construction Co., Inc.
DIVISION 1
Item
No.
f
Description
Qty
Unit
Unit Price
Total
Amount
1
{ CONCRETE SIDEWALK, REMOVE
495
SY
$ 73.50
$ 36,382.50
2
CONCRETE SIDEWALK, 4 -IN
500
SY
$ 100.75
$ 50,375.00
3
CONCRETE CURB, REMOVE
855
LF
$ 32.75
$ 28,001.25
4
CONCRETE CURB, MODIFIED
1130
LF
$ 52.25
$ 59,042.50
5
CONCRETE APPROACH, REMOVE
80
SY
$ 65.00
$ 5,200.00
6
PCCP FOR APPROACHES, 6 -IN
55
SY
$ 151.00
$ 8,305.00
7
CURB RAMP, REMOVE
30
SY
$ 65.00
$ 1,950.00
8
ONE-WAY PERPENDICULAR CURB RAMP
20
SY
$ 247.00
$ 4,940.00
9
PAIRED PERPENDICULAR CURB RAMP
15
SY
$ 262.00
$ 3,930.00
10
TOPSOIL AND SEEDING
645
SY
$ 29.45
$ 18,995.25
11
TREE, REMOVE, 18 -IN
1
EA
$ 625.00
$ 625.00
12
TREE, REMOVE, 30 -IN
2
EA
$ 1,850.00
$ 3,700-00
13
PLANT, DECIDUOUS TREE, SINGLE STEM,
2 -IN TO 2.5 -IN
2
EA
$ 1,525.00
$ 3,050.00
DIVISION 1 TOTAL $ 224,496.50
DIVISION 2
Item
No.
Description
Qty
Unit
Unit Price
Total
Amount
1
CONCRETE SIDEWALK, REMOVE
125
SY
$ 96.40
$ 12.050-00
2
CONCRETE SIDEWALK, 4 -IN
100
SY
$ 142.25
$ 14.225.00
3
CONCRETE CURB, REMOVE
200
LF
$ 57.00
$ 11.400.00
4
CONCRETE CURB, MODIFIED
200
LF
$ 64.75
$ 12,950.00
5
CURB RAMP, REMOVE
50
SY
$ 80.00
$ 4,000.00
6
PAIRED PERPENDICULAR CURB RAMP
50
SY
$ 298.00
$ 14,900.00
7
TOPSOIL AND SEEDING
135
SY
$ 45.45
$ 6,135.75
8
PLANT, DECIDUOUS TREE, SINGLE STEM,
2 -IN TO 2.5 -IN 1
1
EA
$ 2,055.00
$ 2,055.00
DIVISION 2 TOTAL $ 77,715.75
Version 09/29/2021 Contractor's Bid for Public Works - 7
BID/PROPOSAL ,�x j_
CITY OF SOUTH BEND r
Project Name: 2022 Curb and Sidewalk Construction - Round 2 ;
Project Number:
For Bids Due:
122-044
December 13th, 2022
Contractor Name: Selge Construction Co., Inc.
"90[�-l[97k,[c?
Item
No.
Description
Q
Unit
Unit Price
Total
Amount
1
CONCRETE SIDEWALK, REMOVE
680
SY
$ 70.35
$
47 838.00
2
CONCRETE SIDEWALK, 4 -IN
685
SY
$64.25
$ 44 011.25
3
CONCRETE CURB, REMOVE
1270
LF
$ 38.00
$
48 260.00
4
CONCRETE CURB. MODIFIED
1270
LF
$ 38.10
$
48 387.00
5
CONCRETE APPROACH, REMOVE
70
SY
$ 60M
$
4.200.00
6
GRAVEL APPROACH, REMOVE
40
SY
$ 15.00
$
600.00
7
PCCP FOR APPROACHES, 6 -IN
85
SY
$ 140.00
$
11,900.00
8
TOPSOIL AND SEEDING
925
SY
$ 21.7
$
20 8.75
9
TREE, REMOVE, 30 -IN
6
EA
$ 1,800.00 $
10,800-00
10
11
STUMP, REMOVE
PLANT, DECIDUOUS TREE, SINGLE STEM,
2 -IN TO 2.5 -IN
2
13
EA
EA
$ 350.00
$ 970.00
$
$
700.00
12,610.00
DIVISION 3 TOTAL $ 249,425.00
DIVISION 4
Item
No.
Description
Qty
Unit
Unit Price
Total
Amount
1
CONCRETE SIDEWALK, REMOVE
575
SY
$ 52.60
$
30,245.00
2
CONCRETE SIDEWALK, 4 -IN
570
SY
$ 86.00
$
49,020.00
3
CONCRETE CURB, REMOVE
630
LF
$ 44.00
$
27.720.00
4
CONCRETE CURB, MODIFIED
630
LF
$ 49.00
$ 30,870.00
5
CONCRETE APPROACH, REMOVE
70
SY
$ 47.00
$
3,290.00
6
GRAVEL APPROACH, REMOVE
10
SY
$ 10.00
$
100.00
7
ASPHALT APPROACH, REMOVE
10
SY
$ 35.00
$
350.00
8
PCCP FOR APPROACHES, 6 -IN
90
SY
$ 115.00
$
10,350.00
9
CURB RAMP, REMOVE
25
SY
$ 47.00
$
1,175.00
10
PAIRED PERPENDICULAR CURB RAMP
25
SY
$ 234.00
$
5,850.00
11
TOPSOIL AND SEEDING
480
SY
$ 24.65
$
11 832.00
12
TREE, REMOVE, 18 -IN
1
EA
$ 1.225.00
$
1,225.00
13
TREE, REMOVE 30 -IN
4
EA
$ 2,050.00
$
8,200.00
14
TREE, REMOVE, 48 -IN
5
EA
$ 3,075.00
$
15,375.00
15
STUMP, REMOVE
1
EA
$ 350.00
$
350.00
16
PLANT, DECIDUOUS TREE, SINGLE STEM, .
2 -IN TO 2.5 -IN
19
EA
$ 805.00
$
15,295.00
DIVISION 4 TOTAL $ 211,247.00
Version 09/29/2021 Contractor's Bid for Public Works - 8
Project Name:
Project Number:
For Bids Due:
Contractor Name:
MIMMI G
BID/PROPOSAL
CITY OF SOUTH BEND
2022 Curb and Sidewalk Construction — Round 2 '
122-044
December 13th, 2022
Selge Construction Co., Inc.
Item
No.
, Description
Q
Unit
Unit Price
Total
Amount
1
CONCRETE SIDEWALK, REMOVE
230
SY
$ 111.50
$ 25,645.00
2
CONCRETE SIDEWALK, 4 -IN
230
SY
$ 138.00
$ 31,740.00
3
CONCRETE CURB, REMOVE
225
LF
$ 72.00
$ 16,200.00
4
CONCRETE CURB, MODIFIED
225
LF
$ 91.75
$ 20 643.75
5
CONCRETE APPROACH, REMOVE
10
SY
$ 100.00
$ 1,000.00
6
GRAVEL APPROACH, REMOVE
20
SY
$ 15.00
$ 300.00
9
PCCP FOR APPROACHES, 6 -IN
30
SY
$ 179.00
$ 5,370.00
10
CURB RAMP, REMOVE
15
SY
$ 100.00
$ 1,500.00
11
PAIRED PERPENDICULAR CURB RAMP
15
SY
$ 306.00
$ 4,590.00
12
TOPSOIL AND SEEDING
385
SY
$ 31.75
$ 12 223.75
13
TREE, REMOVE, 48 -IN
1
EA
$ 3,325.00
$ 3,325.00
14
PLANT, DECIDUOUS TREE, SINGLE STEM,
2 -IN TO 2.5 -IN
2
EA
$ 1,525.00
$ 3,050.00
Bidder (Firm):
Address:
City/State/Zip:
DIVISION 5 TOTAL $ 125,587.50
Construction Co., Inc.
2833 S. 11th St
Niles, MI 49120 Telephone Number: ( 269 ) 684-0842
Byt
(Signature)
Justin Butler, Vice President
(Printed Name of Person Signing)
Version 09/29/2021 Contractor's Bid for Public Works - 9
CITY OF SOUTH BEND
MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN:.;, "_ x
FORM MBE -1.0 ,,, •.
MBE UTILIZATION PLAN
This completed form should be supplied with Bids that pertain to City of South Bend Public Works Projects involving MBE participation. It is
the bidder's sole responsibility to verify whether any listed minority-owned business meets the MBE qualifications.
Selge Construction Co., Inc.
Project Number: 122-044 Project Name:
Bidder: Selge Construction Co., Inc.
2022 Curb and Sidewalk Construction — Round 2
Total Bid Amount: 888,471.75
Division 1 — MBE Goal: 3.0% Division 1 Bid Amount: $224,496.50
Name & Address of MBE Primary Contact Person Scope of Work to be Performed
(Name/Telephone) (Attach scope/schedule if you need additional space)
1st Class Logistics Bernard Coutee
2213 St. Charles Ave 574-993-0071 Trucking
Division 2 — MBE Goal: 3.1 %
Division 2 Bid Amount: —$77.715.75
Dollar Amount of MBE
Component
6,855.00
2 pages
Percentage
of Total
Bid/Proposal
3.05%
Name & Address of MBE
Primary Contact Person
Scope of Work to be Performed
Dollar Amount of MBE
Percentage
of Total
(Name/Telephone)
(Attach scope/schedule if you need additional space)
Component
Bid/Proposal
1st Class Logistics
Bernard Coutee
Trucking
$2,525.00
o
3.25/o
2213 St. Charles Ave
574-993-0071
d IN 4Sfi14
1
Version 09/29/2021 Contractor's Bid for Public Works -10
Division 3 — MBE Goal: 2.7%
Tx
CITY OF SOUTH BEND n
a
MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN
FORM MBE -1.0
ras5
MBE UTILIZATION PLAN
Division 3 Bid Amount: $249,425.00
Division 4 — MBE Goal: 2.6%
Division 4 Bid Amount: $211,247.00
Name & Address of MBE
Primary Contact Person
Scope of Work to be Performed
Dollar Amount of MBE
Percentage
Name & Address of MBE
Primary Contact Person
Scope of Work to be Performed
Dollar Amount of MBE
of Total
1st Logistics
(Namefrelephone)
(Attach scope/schedule if you need additional space)
Component
Bid/Proposal
1st Logistics
Bernard Coutee
Trucking
$6,800.00
2.7%
2213 St. Charles Ave
South Bend, IN 46614
574-993-0071
1
Division 4 — MBE Goal: 2.6%
Division 4 Bid Amount: $211,247.00
Name & Address of MBE
Primary Contact Person
Scope of Work to be Performed
Dollar Amount of MBE
Percentage
of Total
(NamefTelephone)
(Attach scope/schedule if you need additional space)
Component
Bid/Proposal
1st Logistics
Bernard Coutee
Trucking
$5,700.00
2.7%
2213 St. Charles Ave
574-993-0071
South Bend. IN 46614
Division 5 — MBE Goal: 2.7%
Division 5 Bid Amount: $125,587.50
Name & Address of MBE
Primary Contact Person
Scope of Work to be Performed
Dollar Amount of MBE
Percentage
of Total
(Name/Telephone)
(Attach scope/schedule if you need additional space)
Component
Bid/Proposal
ist Class Logistics
2213 St. Charles Ave
Bernard Couteeo
Trucking
$3,535.00
2.81/o
South Bend, IN 46614
574-993-0071
Submitted by:
Justin Butler, Vice President
Print Name
December 13, 2022
��ature Date
s
Version 09/29/2021 Contractor's Bid for Public Works -11
CITY OF SOUTH BEND
MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN
FORM WBE-1.0
WBE UTILIZATION PLAN
This completed form should be supplied with Bids that pertain to City of South Bend Public Works Projects involving WBE participation. It is
the bidder's sole responsibility to verify whether any listed woman -owned business meets the WBE qualifications.
Selge Construction Co., Inc.
Project Number: 122-044 Project Name
Bidder: Selge Construction Co., Inc.
Division 1 — WBE Goal: 5.2%
2022 Curb and Sidewalk Construction — Round 2
Total Bid Amount: $888,471.75 2 pages
Division 1 Bid Amount: $224,496.50
Name & Address of WBE
Primary Contact Person
Scope of Work to be Performed
Dollar Amount of WBE
Percentage
of Total
(Name/Telephone)
(Attach scope/schedule if you need additional space)
L
Component
Bid/Proposal
Traffic Control Specialists, Inc.
Tracey Teske
Traffic Control
$600.00
2.05%
1810 W Pacific Ave Knox, In 46534
574-772-7001
$4,600.00
Slusser's Green Thumb, Inc.
John Williams Landscaping
$6,242.75
°
2.78 /o
125 Montgomery Street
574-722-3102
John Williams
574-722-3102
Landscaping
Logansport, IN 46947
4.63%
125 Montgomery Street Logansport, IN 46947
t3D(; construction Supply Teresa Butler ADA Tiles $1,050.00 0.47%
Division 2 — WBE Goal: 5.3% 765-412-3484 Division 2 Bid Amount: $77,715.75
Name & Address of WBE
Primary Contact Person
Scope of Work to be Performed
Dollar Amount of WBE
Percentage
of Total
(NamefTelephone)
(Attach scope/schedule if you need additional space)
Component
Bid/Proposal
Traffic Control Specialists, Inc.
Tracey Teske
Traffic Control
$600.00
0.77%
574-7 7 2-7001
1810 W Pacific Ave Knox, In 46534
Slusser's Green Thumb, Inc.
John Williams
574-722-3102
Landscaping
$3,600.75
4.63%
125 Montgomery Street Logansport, IN 46947
Version 09/29/2021 Contractor's Bid for Public Works - 12
Division 3 — MBE Goal: 4.9%
CITY OF SOUTH BEND
MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN
FORM WBE-1.0
WBE UTILIZATION PLAN
Division 3 Bid Amount: $249,425.00
Name & Address of WBE
Primary Contact Person
(NamerTelephone)
Scope of Work to be Performed
(Attach scope/schedule if you need additional space)
Dollar Amount of WBE
Component
Percentage
of Total
Bid/Proposal
5lusser's Green I Numb, Inc.
John Williams
Landscaping
$17,003.75
of Total
125 Montgomery Street Logansport, IN 46947
574-722-3102
(Attach scope/schedule if you need additional space)
Component
6.8%
Slusser's Green Thumb, Inc.
John Williams
Landscapingo
$18,007.00
5
8./o
Division 4 — WBE Goal: 4.7%
Division 4 Bid Amount: $211,247.00
Division 5 — MBE Goal: 4.9%
Division 5 Bid Amount: $125,587.50
Name & Address of WBE
Primary Contact Person
Scope of Work to be Performed
Dollar Amount of WBE
Percentage
Name & Address of WBE
Primary Contact Person
Scope of Work to be Performed
Dollar Amount of WBE
of Total
Traffic Control Specialists, Inc.
(Name/Telephone)
(Attach scope/schedule if you need additional space)
Component
Bid/Proposal
Slusser's Green Thumb, Inc.
John Williams
Landscapingo
$18,007.00
5
8./o
125 Montgomery Street
574-722-3102
Landscaping
$5,648.75
125 Montgomery Street
Logansport IN 46947
I IN AAQd7
Division 5 — MBE Goal: 4.9%
Division 5 Bid Amount: $125,587.50
Name & Address of WBE
Primary Contact Person
Scope of Work to be Performed
Dollar Amount of WBE
Percentage
of Total
(Name/Telephone)
(Attach scope/schedule if you need additional space)
Component
Bid/Proposal
Traffic Control Specialists, Inc.
Tracey Teske
Traffic Control
$675.00
o
0.54/o
1810 W Pacific Ave Knox, In 46534
574-772-7001
5.4%
Slusser's Green Thumb, Inc.
John Williams
Landscaping
$5,648.75
125 Montgomery Street
574-722-3102
I IN AAQd7
Submitted by: Justin Butler, Vice President December 13, 2022
Print Name gnature Date
Version 09/29/2021 Contractor's Bid for Public Works -13
CITY OF SOUTH BEND
MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN
FORM MBE -2.0
EVIDENCE OF GOOD FAITH EFFORTS
This completed form should be included as part of the Bids documents related to City of South Bend Public
Works Projects requiring Good Faith Efforts to obtain MBE participation.
Project Number: 122-044 Date: 12/13/2022
Project Name: 2022 Curb and Sidewalk Construction — Round 2
Bidder: Selge Construction Co., Inc.
Contact Person: Justin Butler, Vice President Telephone: 269-684-0842
Address: 2833 S. 11th St.
City: Niles State: Michigan zip: 49120
Email: jbutier@selgeconstruction.com
To determine whether a bidder has demonstrated good faith efforts to reach the MBE utilization goals set forth in
the City of South Bend Public Works Project Specifications, the City and its agencies, boards, or commissions,
REQUIRE ALL of the following Good Faith Efforts as listed in the table below':
Version 09/29/2021 Contractor's Bid for Public Works - 14
EVIDENCE OF GOOD FAITH EFFORTS
MBE LIST(S): The bidder reviewed 1) the City of South Bend's Minority and Women Business Enterprise
Inclusion Program Plan; 2) the list of certified MWBEs provided by the City; and 3) the Indiana Department
of Administration list of Minority and Women Owned Businesses (both certified and non -certified) found
at: htt :/Iwww. in. ov/idoa1.
GOOD FAITH EFFORTS TO OBTAIN MBE PARTICIPATION
The bidder shall initial each item below, as evidence of its good faith efforts to obtain MBE participation
in the awarded contract.
I affirm that I reviewed the City of South Bend's Minority and Women Business Enterprise
Inclusion Program Plan and the Indiana Department of Administration's certified list of
Indiana Minority and Women Business Enterprises, found on their website
(httr)://www.in.gov/idoa)
V /
I affirm that I have made good faith efforts to select portions of the contract work to be
6
performed by MWBEs, including, where appropriate, breaking out contract work items into
economically feasible units to facilitate MBE participation.
V
I affirm that I have made good faith efforts to solicit through all reasonable and available
means the interest of all MBEs in the scopes of work of the contract.
I affirm that I attended all pre-bid meetings scheduled by the City of South Bend to inform
MBEs of contracting and subcontracting opportunities.
I affirm that I advertised in general circulation and/or trade association publications
concerning subcontract opportunities and allowed MBEs reasonable time to respond to
such advertisements.
I affirm that I performed any and all necessary steps to provide written notices in a manner
reasonably calculated to inform MBEs of subcontracting opportunities and allowed
sufficient time for MBEs to participate effectively.
I affirm that I followed up on initial solicitations with interested MBEs.
I affirm that I negotiated with interested MBEs in good faith, including providing such MBEs
with adequate information about the plans, specifications and other requirements of the
subcontract.
I affirm that I have made good faith efforts to assist interested MBEs in obtaining bonding,
lines of credit, or insurance as required by the City or the bidder, where appropriate.
Version 09/29/2021 Contractor's Bid for Public Works - 14
CITY OF SOUTH BEND
MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN
FORM MBE -2.0
EVIDENCE OF GOOD FAITH EFFORTS
*Proper demonstration of Good Faith Efforts requires your initials next to all of the above boxes. Any
omissions shall be considered grounds for rejection of the bid by the Board of Public Works. The City of
South Bend reserves the right to request additional information.
Version 09/29/2021 Contractor's Bid for Public Works - 15
I affirm that I have made good faith efforts to assist interested MBEs in obtaining necessary
equipment, supplies, materials, or related assistances or services, where appropriate.
I affirm that I did not reject any MBEs as unqualified without sound business reasons based
on a thorough investigation of their capabilities.
CONTRACT RECORDS: The bidder has maintained the following records for each MBE that has bid on
the subcontracting opportunity:
1. Name, address, and telephone number;
2. A description of information provided by the bidder or subcontractor; and
3. A statement of whether an agreement was reached, and if not, why not, including any reasons for
concluding that the MBE was unqualified to perform the job.
*Proper demonstration of Good Faith Efforts requires your initials next to all of the above boxes. Any
omissions shall be considered grounds for rejection of the bid by the Board of Public Works. The City of
South Bend reserves the right to request additional information.
Version 09/29/2021 Contractor's Bid for Public Works - 15
TH
CITY OF SOUTH BEND
MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN
FORM WBE-2.0
EVIDENCE OF GOOD FAITH EFFORTS
This completed form should be included as part of the Bids documents related to City of South Bend Public
Works Projects requiring Good Faith Efforts to obtain MWBE participation.
Project Number: 122-044 Date: 12/13/2022
Project Name: 2022 Curb and Sidewalk Construction — Round 2
Bidder: Selge Construction Co., Inc.
Contact Person: Justin Butler, Vice President Telephone: 269-684-0842
Address: 2833 S. 11th St.
City: Niles State: Michigan Zip: 49120
Email: jbutler@selgeconstruction.com
To determine whether a bidder has demonstrated good faith efforts to reach the WBE utilization goals set forth in
the City of South Bend Public Works Project Specifications, the City and its agencies, boards, or commissions,
REQUIRE ALL of the following Good Faith Efforts as listed in the table below":
Version 09/291421 Contractor's Bid for Public Works - 16
EVIDENCE OF GOOD FAITH EFFORTS
WBE LIST(S): The bidder reviewed 1) the City of South Bend's Minority and Women Business Enterprise
Inclusion Program Plan; 2) the list of certified MWBEs provided by the City; and 3) the Indiana Department
of Administration list of Minority and Women Owned Businesses (both certified and non -certified) found
at: htl-Ilwww-in- ov/idoal.
GOOD FAITH EFFORTS TO OBTAIN WBE PARTICIPATION
The bidder shall initial each item below, as evidence of its good faith efforts to obtain WBE participation
in the awarded contract.
I affirm that I reviewed the City of South Bend's Minority and Women Business Enterprise
inclusion Program Plan and the Indiana Department of Administration's certified list of
Indiana Minority and Women Business Enterprises, found on their website
(http:l/www.in.gov/idoa).
I affirm that I have made good faith efforts to select portions of the contract work to be
performed by WBEs, including, where appropriate, breaking out contract work items into
economically feasible units to facilitate WBE participation.
I affirm that I have made good faith efforts to solicit through all reasonable and available
means the interest of all WBEs in the scopes of work of the contract.
I affirm that I attended all pre-bid meetings scheduled by the City of South Bend to inform
WBEs of contracting and subcontracting opportunities.
I affirm that I advertised in general circulation and/or trade association publications
concerning subcontract opportunities and allowed WBEs reasonable time to respond to
such advertisements.
Vg
I affirm that I performed any and all necessary steps to provide written notices in a manner
reasonably calculated to inform WBEs of subcontracting opportunities and allowed
sufficient time for WBEs to participate effectively.
1
I affirm that I followed up on initial solicitations with interested WBEs.
I affirm that I negotiated with interested WBEs in good faith, including providing such WBEs
with adequate information about the plans, specifications and other requirements of the
subcontract.
1+
I affirm that I have made good faith efforts to assist interested WBEs in obtaining bonding,
{j
lines of credit, or insurance as required by the City or the bidder, where appropriate.
Version 09/291421 Contractor's Bid for Public Works - 16
CITY OF SOUTH BEND
MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN
FORM WBE-2.0
EVIDENCE OF GOOD FAITH EFFORTS
*Proper demonstration of Good Faith Efforts requires your initials next to all of the above boxes. Any
omissions shall be considered grounds for rejection of the bid by the Board of Public Works. The City of
South Bend reserves the right to request additional information.
Version 09/29/2021 Contractor's Bid for Public Works - 17
rs6s
I affirm that I have made good faith efforts to assist interested WBEs in obtaining
necessary equipment, supplies, materials, or related assistances or services, where
appropriate.
I affirm that I did not reject any WBEs as unqualified without sound business reasons
based on a thorough investigation of their capabilities.
CONTRACT RECORDS: The bidder has maintained the following records for each WBE that has bid on
the subcontracting opportunity:
1. Name, address, and telephone number;
2. A description of information provided by the bidder or subcontractor; and
3. A statement of whether an agreement was reached, and if not, why not, including any reasons for
concluding that the MWBE was unqualified to perform the job.
*Proper demonstration of Good Faith Efforts requires your initials next to all of the above boxes. Any
omissions shall be considered grounds for rejection of the bid by the Board of Public Works. The City of
South Bend reserves the right to request additional information.
Version 09/29/2021 Contractor's Bid for Public Works - 17
rs6s
CITY OF SOUTH BEND U
MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN
FORM MBE -2.1
MBE CONTACTED
This completed form should be supplied with Bids that pertain to City of South Bend Public Works Projects
requiring Good Faith Efforts to contact MBEs. It is the bidder's sole responsibility to verify whether any listed
minority-owned business meets the MBE qualifications. Attach additional pages if necessary.
PAGE 1 OF 1
Project Number: 122-044 MBE Participation Goal Varies
Project Name: 2022 Curb and Sidewalk Construction — Round 2
Bidder: S I e Co struction Co., Inc.
By: Justin Butler, Vice President December 13, 2022
ignature) (Title) (Date)
MBE Firm
Owner or Contact at MBE Firm
Telephone: Fax: Email:
TYPE OF WORK SOLICITED FOR THIS PROJECT:
**See attached listing with results
RESULTS OF CONTACT WITH THE MBE FIRM:
MBE Firm
Owner or Contact at MBE Firm
Telephone: Fax: Email
TYPE OF WORK SOLICITED FOR THIS PROJECT:
RESULTS OF CONTACT WITH THE MBE FIRM.
Version 09/29/2021 Contractor's Bid for Public Works - 18
CITY OF SOUTH BEND
MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN
FORM MBE -2.1 r
WBE CONTACTED
This completed form should be supplied with Bids that pertain to City of South Bend Public Works Projects
requiring Good Faith Efforts to contact WBEs. It is the bidder's sole responsibility to verify whether any listed
woman -owned business meets the WBE qualifications. Attach additional pages if necessary.
PAGE 1 OF 1
Project Number: 122-044 WBE Participation Goal Varies
Project Name: 2022 Curb and Sidewalk Construction — Round 2
Bidder: Sel a Cd structlon Co., Inc.
By: Justin Butler, Vice President December 13, 2022
nature} (Title) (Date)
WBE Firm
Owner or Contact at WBE Firm
Telephone: Fax: Email:
TYPE OF WORK SOLICITED FOR THIS PROJECT:
**See attached listing with results
RESULTS OF CONTACT WITH THE WBE FIRM:
WBE Firm
Owner or Contact at WBE Firm
Telephone: Fax: Email:
TYPE OF WORK SOLICITED FOR THIS PROJECT:
RESULTS OF CONTACT WITH THE WBE FIRM -
Version 09/29/2021 Contractor's Bid for Public Works - 19
Document A310 TM -2010
Conforms with The American institute of Architects AIA Document 310
Bid Bond
CONTRACTOR: SURETY:
(Name, legal status and addma) (Name, legal swus and princfjxd place ofbrctirre.�►)
The Cincinnati Insurance Company
Selge Construction Co., Inc. P.O. Box 145496 This document has important
2833 South 11th Street Cincinnati, OH 45250-5496 legal consequences. Consultabon
Niles, MI 49120 Mailing Address for Notices with an attorney is encouraged
same as above with respect to its completion or
OWNER: modification.
(Name. legal status and address)
Any singular reference to
Contractor, Surety, Owner or
Ci of South Bend, Indiana- Board of Public Works
ry
other party shat[ be considered
125 West Colfax Avenue
plural where applicable.
South Bend, IN 46601
BOND AMOUNT: 5% Five Percent of Amount Bid
PROJECT:
(.4'rmre, location or address' and Project number, [/'any)
2022 Curb and Sidewalk Construction - Round 2 Project No. 122-044
The Contractor and Surety are bound to the Owner in the amount set forth above, for talc paynteltt of which the Contractor and Surcty bind
themselves. their heirs, oxccutors, administrators, successors and assigns, jointly and severally, as providcd herein. Mile conditions of this
Bond are such that if the Owner accepts the bid of the Contractor within the time specified in the bid documents, or %within such tittle period
as may be agreed to by the O} Filer and C:ontmetor, and the Contractoreither(I) a eters info a contract With the Owner in accordance with
the terms of such bid, and gives such boil d or bonds as may be specified in the bidding orContract Documelits, n•itli a surety admitted iii
the jurisdiction of the Project and othe nviso acceptable to the Owner, for Ilse tait] iful performative of such Contract and Car the pro tilpt
payment of labor and material furnished in the prosecution thereof: or (2) pays to tale Owner the difference, not to exceed Ilie all louut of
this Bond, between tete amount specified in said bid and such [artier anlouut for nllic11 the ()wirer may iu rood faith contract %virh another
party to perli)rm lite ►York covered by said bid, then Ihis ahligation ~hall he null and void, oil temvi%e to remain in Bill lorce and eliecl. The
Surety liereh_v Iva ives ally notice of an agrvinnenI between the 0%viler and Contractor to extend the Bine is ►vllit; h the 0mitr ntay accept the
bid, Waivernf,not icc try tilt Surely shall rloi apply til ally exlsitsicm exceeding sixty (60) clays in 111e aegregate beyond the lime lilr
acceptance ol'bids specilied in the hid documents, and Ilse 0wiser and Contractor shall obtain the Survlys consent lilr an extcnsilin beyond
Axly (60) days.
If this Bond is issued in connection with a subcontractors bid to a Contractor, the tcmt Contractor in this Bond shall be deemed to be
Subcontractor and the tern Ouster shall be deemed to be Contractor.
When Illi~ hand 11 as been rumis,hed to 4xinill y ►villi a slatntory or other legal reyuiretnent iin the trx:ution nCllie Praj cci any provision in
this Rond con IIicIing pith aid titatutory or legal requirement shall be deeined deleted lie rcImnl and provisions cc;nfiorininu to such
statutory or either legal requirement shall be deemed in cor;xlmled Herein. WIien w hiniis, lit: d, the intent is Ilia[ tliis Bond snail be toilstrued
as a statutory bond and not as a conminn law bond.
Signed and scaled this 13th day of December, 2022.
I � 1
(ii'irrizss) Allison Swinehart
60,*
(fPlinesc) Da id J. Roth
S-00541AS 8110
Selqe Construction Co., Inc.
(Principal) (seal)
B f a L
kJ Justin Butler, Vice President
The Cincinnati Insurance Company
1Suretyj
By: /k►�ea c
(1701e) Tracie House, Attorney -in -Fact
as �Rsur�
CORPORATE
S E A L
Business Name
Ethnicity
Gender
Cert
Type
Owner
First
Owner
Last
Business Certified Description
City
cal
cal Date
1st Class Logistics LLC
Black
MBE
Name
Bernard
Name
Coutee
Dump trucks; Regional or national trucking
Sstclassloeistics2013(l¢mail.com
(574) 993-0071
2213 Saint Charles South Bend
State
IN
Zip
4fifi14
;*MX
services
Avenue
Received/Acc
12/6/2022
epted
BUC Construction Supply
Caucasian
Female
WBE
Teresa
Butler
Pipe & Fittings
TCOBUCCONSTRUCTIONSUPPLY.COM
(765) 412-3484
PO Box 4153 LaFayette
IN
47903
Received/Acc
12/6/2022
epted
Kennedy Expressline Inc
Black
MBE
Marcus
Northern
Dump trucks; Subsea dredging trenching and
kennedvexnressline(a)vahoo.com
(574) 876-8881
4324 Ashard DriveSouth Bend
IN
46628
excavation services; Demolition services; Local
Did not rec
12/6/2022
quote
Slusser's Green Thumb
landscaping
idw(aslussers.com
(574) 722-3102
PO Box 33 Logansport
IN
46947
Quote
Received/Acc
12/6/2022
epted
State Barricading, Inc.
Caucasian
Female
WBE
Esther
Michalski
Traffic control
statebarricadel0aol.com
(574) 287-2078
24963 US 20 West South Bend
IN
46628
Quote
Received/To
12/6/2022
o High
Traffic Control Specialists
WBE
Tracey
Traffic Control, striping
estimatine(altcsoeciatists.net
(574) 772-7001
1810 W. Pacific Ave. Knox
IN
46534
Quote
Received/Acc
12/6/2022
epted
V & R Trucking, Inc.
DBE
Veda L.
Godette
Hauler
RFiehtinelrishPaol.com
(574) 234-1268
1845 N. Elmer Street South Bend
IN
46628Did
not rec
12/6/2022
quote
Generated from 826now on 9/16/2011
Page 1
Crissy Frickson
From: Crissy Frickson
Sent: Tuesday, December 6, 2022 4:06 PM
To: lstclasslogistics20l3@gmaii.com; Teresa Butler; John Williamson; James Michalski
Subject: RFQ: South Bend 2022 Curb & Sidewalk Construction
Good Afternoon,
We are bidding the City of South Bend 2022 Curb & Sidewalk Construction — Round 2 #122-044 project. We would like to
know if you would be interested in quoting this project. Please provide your quote by noon, Monday December 12, 2022
to estimating@selgeconstruction.com. Please see the links below for the plans & specs.
T
Plans: M htt s: sel econstruction-m .share oint.com :b: cloud Eesod2TChddGkKSHErkCxKkBb-
lepeoQLJ iTvm USbJ ReCiw?e=DAd LTh
m
Specs: P°F https:llselgeconst
my.sharer)oint.com/:b:Zp/cloud/EVBo7967Z8dH]RQJUuSlzKEBzg6h4 RCEbvhDD8wOTlbww?e=44hfce
Thank you,
Crissy Frickson
LG%1.
Office Manager
Project Management Administrator
Selge Construction
2833 S. 11th St. Niles, MI 49120
(w)269-684-0842
www.selgeconstruction.com
Crissy Frickson
From: Crissy Frickson
Sent: Tuesday, December 6, 2022 4:07 PM
To: RFightinglrish@aol.com; estimating
Subject: RFQ: South Bend 2022 Curb & Sidewalk Construction
Good Afternoon,
We are bidding the City of South Bend 2022 Curb & Sidewalk Construction — Round 2 #122-044 project. We would like to
know if you would be interested in quoting this project. Please provide your quote by noon, Monday December 12, 2022
to estimating@selgeconstruction.com. Please see the links below for the plans & specs.
T
Plans: P°r httos://selgeconstruction-my.sharepoint.com/:b:/P/cloud/Eesod2TChddOkKSHErkCxKkBb-
lepeoQU iTvm USbJ ReCiw?e=DAd L.Th
Specs: PaF https:lLselgeconstruction-
my.sharepoint.com/: b:Lgcloud/EVBo796728dHIRQJUuSlzKEBzg6h4 RCEbvhDD8wOTlbww?e=44hfcg
Thank you,
Crissy Frickson
SE Office Manager
L Project Management Administrator
a
Selge Construction
_ 2833 S. 11th St. Niles, MI 49120
(w)269-684-0842
www.selgeconstruction.com
Crissy Frickson
From: Crissy Frickson
Sent: Tuesday, December 6, 2022 4:09 PM
To: kennedyexpressline@yahoo.com
Subject: RFQ: South Bend 2022 Curb & Sidewalk Construction
Good Afternoon,
We are bidding the City of South Bend 2022 Curb & Sidewalk Construction — Round 2 #122-044 project. We would like to
know if you would be interested in quoting this project. Please provide your quote by noon, Monday December 12, 2022
to estimatingPselgecon struction.com. Please see the links below for the plans & specs.
T
Plans: P°F htt s: sel econstruction-m .share oint.com :b: cloud Eesod2TChdd0kKSHErkCxKkBb-
1e ea U7fvmUSbJReCiw?e=DAdLTh
m
Specs: P°F httgs:llselgeconstruction-
m .share oint.com :b: cloud EVBo7967Z8dHIR UuS1zKEB2 6h4 RCEbvhDD8wOTlbww?e=44hfc
Thank you,
4No
Crissy Frickson
EOfficer G
Manager
L
Project Management Administrator
--
Selge Construction
2833 S. 11th St. Niles, MI 49120
(w)269-684-0842
www.selgeconstruction.com
Bo�
to
N
N
^n
Wu
C q
C�
J 0
%-�-
V t
cq
e
0
u
c
0
4-
u
0
A
W
w
cl)
`
^n
Wu
70
C,�-
%-�-
V t
o
0
D
.-
0
m
�Q
cl 0i
w
0
Cf)
v
70
r�
%-�-
V t
o
0
D
.-
0
m
�Q
cl 0i
= Z
%
cn
F�
r n`
v
70
I
o
u
�
V)
M
�Q
u
4--
ON
4—
cn
Cy
C:
(L)
0
F-
u
a
0.0
�..
V)
= Z
%
cn
F�
0
v
::)
C�5
o
u
�
V)
C
C
E 0
0
llqT
0
1
CN
r
� O �
L.
D
0
u
0
0
u
N
CN
C)z
rw�
■
CN
00
C)
1
lqlqT
00
11440
OD
x
CN
NvO..
v
�J
�
OX
�Q
ON
N
N
Crissy Frickson
From: Gannett Legals Public Notices 7 <ganlegpubnotices7@gannett.com>
Sent: Tuesday, December 6, 2022 4:15 PM
To: Crissy Frickson
Subject: DO NOT REPLY- Auto Message
CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you
recognize the sender and know the content is safe.
This is an auto generated email, please do not reply.
The legal department has received your email and will be processing your notice as soon as possible.
We will provide a proof as well as publication dates, cost and payment requirements prior to the notice
running.
All Legal/Public Notices will be processed for the desired publication if received by deadline.
Office Hours: Monday — Friday 8:00 am -5:00 pm CST/EST
Thank you for your business.
Gannett Legal/Public Notice Department
Crissy Frickson
From: Crissy Frickson
Sent: Tuesday, December 6, 2022 4:15 PM
To: legals@sbtinfo.net
Cc: Gannett Legals Public Notices 7
Subject: LEGAL AD - South Bend Tribune
Good Afternoon,
Please run the following legal ad, (2) times on December 81h & 9th 2022 in the South Bend Tribune.
Selge Construction Co., Inc is requesting subcontractor bids from qualified MBE/WBE/VBE subcontractors, suppliers,
manufacturers, and truckers for the SOUTH BEND 2022 CURB & SIDEWALK CONSTRUCTION — ROUND 2 #122-
044. Interested businesses please contact our main office at (269) 684-0842. Proposals will be accepted until noon,
Monday, December 12, 2022.
Thank you,
Crissy Frickson
Office Manager
y�
Project Management Administrator
LEI -
Selge Construction
2833 S. 11th St. Niles, MI 49120
(w) 269-684-0842
www.selgeconstruction.com
F- Back
Govt Bids & Proposals
12/08/2022
Tct
@Ysi
finally
O fished
ROM
Kuthbendtril
Sgnt
Selge Construction Co., Inc is requesting subcontractor bids from qualified MBE/*K?,E2
subcontractors, suppliers, manufacturers, and truckers for the SOUTH BEND 2022RB
& SIDEWALK CONSTRUCTION - ROUND 2 #122-044. Interested businesses pope
contact our main office at (269) 684-0842. Proposals will be accepted until noon, We day,
December 12, 2022.
HSPAXLP 2x 12/8,12/9
44
AD,
< Share this
7a. -Y.,
P.
M9
t
Print
�t
F-- Back
Govt Bids & Proposals
12/09/2022
30��b�
1
Tct
Gla
Qxl�linally
KIiShed
fo
Vuthbendtrit
SAnt
Selge Construction Co., Inc is requesting subcontractor bids from qualified MBE/I#?(?,9?2
subcontractors, suppliers, manufacturers, and truckers for the SOUTH BEND 202 jWB
& SIDEWALK CONSTRUCTION — ROUND 2 #122-044. Interested businesses pulse
contact our main office at (269) 684-0842. Proposals will be accepted until noon, ftnday,
December 12, 2022. @QR
HSPAXLP 2x 12/8,12/9 Rbu
Ku -
0
2/8,12/9
o
094
RD
{ Share this Print
Bid Memo
*State of Indiana Certified MBE -DBE*
FIN 46-3085979
Date: 12/12/2022
Project: 2022 Curb and Sidewalk Round 2
Project location: South Bend, IN
Project No..122-044
Quote prepared for: Selge Construction
2022-23 Tri -axle hourly rates
Regular rate $115.00
Overtime rate $129.00
2022-23 Quad -axle hourly rates
Regular rate $119.00
Overtime rate $133.00
2022-23 Flatbed hourly rates
Regular rate $140.00
i Overtime consists of anything over 8 hrs daily and all day Saturday
2, 4 and 8 hour rule applies for daily hourly minimums
• 4, and 8 hour daily minimums for flatbed hauling, local hauling, legal loads only
Sunday rates add $36.00 per hour, per truck. 8 hr. Minimum
i Trucks will be upon availability, list Class does not have control of scheduling
■ To avoid 2 hour show up time please call our office 2 hours before start times for
any job cancellations or delays
* 1 st Class shall be compensated for all time spent on the jobsite
s Truck orders requires 48 to 72 hour notice if possible
4 Signatory to Teamster Local 364 Union
9 Any questions contact Bernard Coutee... 574-993-0071
Siusser's Green Thumb, Inc
® 125 Montgomery Street
Post Office Box 33
!iT#BE
WW Logansport, Indiana 46947-0033
Phone: (574) 722-3102
Prequalified - Certified Indiana "DBE" & "WBE" Contractor Toll Free: (800) 762-7442
Pre
q Fax: (574) 722-2993
�� � Seeding -Sodding, Erosion Control, Landscaping Estimating Fax: .slu sers.c 28
Website: www.slussers.com
C�?IJ,D TAT
,O Email: info@siussers.com
2
Customer: Quoted: December 12, 2022 Quote No. SScrubrd
DIVISION 1
1 10 Mulched Seeding w/ 30 Day Watering - Partial 645.000 SY $ 4.95 $ 3,192.75
(Topsoil or erosion blanket not included)
2 13 Plant, Deciduous Tree, 2" - 2.5" Cal. 2.000 EA $ 1,525.00 $ 3,050.00
Total: $ 6,242.75
DIVISION 2
1 7 Mulched Seeding w/ 30 Day Watering - Partial 135.000 SY $ 11.45 $ 1,545.75
(Topsoil or erosion blanket not Included)
2 8 Plant, Deciduous Tree, 2" - 2.5" Cal. 1.000 EA $ 2,055.00 $ 2,055.00
Total: $ 3,600.75
DIVISION 3
1 8 Mulched Seeding w/ 30 Day Watering - Partial 925.000 SY $ 4.75 $ 4,393.75
(Topsoil or erosion blanket not included)
2 11 Plant, Deciduous Tree, 2" - 2.5" Cal. 13.000 EA $ 970.00 $ 12,610.00
Total: $ 17,003.75
DIVISION 4
? 11 Mulched Seeding w/ 30 Day Watering - Partial 480.000 SY $ 5.65 $ 2,712.00
(Topsoil or erosion blanket not included)
2 16 Plant, Deciduous Tree, 2" - 2.5" Cal, 19.000 EA $ 805.00 $ 15,295.00
Total: $ 18,007.00
*****SPECIAL NOTATIONS*****
***Pagel of 3***
Accepted by:
Selge Construction, Inc. Date
Subtotal:
SPECIFIC CONDITIONS ARE LISTED ON THE NEXT PAGE Sales Tax:
Equal Opportunity Employer Total:
Selge Construction, Inc.
Bids:
December 13, 2022
Project:
2022 Curb & Sidewalk Construction Round #2
2833 S. 11th Street
Location:
St. Joseph County, Indiana, USA
Niles Mi 49120
Estimated by: John Williamson, Extension 3210
Phone: (269) 684-0842
Revised:
Fax: (269) 684-0846
Revisions:
Attn: Estimating
LINE
ITEM BID ITEM DESCRIPTION
QUANTITY UNIT UNIT PRICE AMOUNT
DIVISION 1
1 10 Mulched Seeding w/ 30 Day Watering - Partial 645.000 SY $ 4.95 $ 3,192.75
(Topsoil or erosion blanket not included)
2 13 Plant, Deciduous Tree, 2" - 2.5" Cal. 2.000 EA $ 1,525.00 $ 3,050.00
Total: $ 6,242.75
DIVISION 2
1 7 Mulched Seeding w/ 30 Day Watering - Partial 135.000 SY $ 11.45 $ 1,545.75
(Topsoil or erosion blanket not Included)
2 8 Plant, Deciduous Tree, 2" - 2.5" Cal. 1.000 EA $ 2,055.00 $ 2,055.00
Total: $ 3,600.75
DIVISION 3
1 8 Mulched Seeding w/ 30 Day Watering - Partial 925.000 SY $ 4.75 $ 4,393.75
(Topsoil or erosion blanket not included)
2 11 Plant, Deciduous Tree, 2" - 2.5" Cal. 13.000 EA $ 970.00 $ 12,610.00
Total: $ 17,003.75
DIVISION 4
? 11 Mulched Seeding w/ 30 Day Watering - Partial 480.000 SY $ 5.65 $ 2,712.00
(Topsoil or erosion blanket not included)
2 16 Plant, Deciduous Tree, 2" - 2.5" Cal, 19.000 EA $ 805.00 $ 15,295.00
Total: $ 18,007.00
*****SPECIAL NOTATIONS*****
***Pagel of 3***
Accepted by:
Selge Construction, Inc. Date
Subtotal:
SPECIFIC CONDITIONS ARE LISTED ON THE NEXT PAGE Sales Tax:
Equal Opportunity Employer Total:
SLUSSERS
Customer:
Phone:
Fax:
Attn:
Slusser's Green Thumb, Inc
125 Montgomery Street
g Post Office Box 33
WE Logansport, Indiana 46947-0033
Phone: (574) 722-3102
Prequalifled - Certified Indiana "DBE" 8 "WBE" Contractor Tall Free: (800) 762-7442
Fax: (574) 722-2993
Seeding - Sodding, Erosion Control, Landscaping Estlmating Fax: (574) 722-1628
Website: www.stussers.com
QUO TA TION Email: info@slussers.com
Quoted: December 12, 2022 Quote No. SBcrubrd2
Bids: December 13, 2022
Project: 2022 Curb & Sidewalk Construction Round #2
Location: St. Joseph County, Indiana, USA
Estimated by: John Williamson, Extension 3210
Revised:
Revisions:
LINE
ITEM BID ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE AMOUNT
DIVISION 5
1 10 Mulched Seeding -Partial
(Topsoil or erosion blanket not included)
2 14 Plant, Deciduous Tree, 2" - 2.5" Cal.
"**"*SPECIAL NOTATIONS''""***
'Page 2 of 3***
385.000 SY
2.000 EA
Accepted by:
Date
SPECIFIC CONDITIONS ARE LISTED ON THE NEXT PAGE
Equal Opportunity Employer
$ 6.75 $ 2,598.75
$ 1,525.00 $ 3,050.00
Total: $ 5,648.75
Subtotal:
Sales Tax:
Total:
SLUSSERS
SPECIAL CONDITIONS
Concerning the Attached Quotation
Quote Number: SBcrubrd2
STANDARD NOTATIONS:
1. Special note concerning seeding: Slusser's will install seed year-round. However, we will not guarantee
seeding performed May 15th through August 15th, and October 1 through March 1. Seeding during this
period is very risky due to extreme climatic conditions (heat/drought/cold/etc.) This note does not apply
to prairie or wetland seeding unless specified otherwise.
2. This quote is valid for a period of 60 days.
3. Lawn maintenance to include mowing or spraying is not included in this quotation.
4. Topsoil, topsoil placement and any necessary amendments are not included in this quotation.
5. Quantities on this quotation are approximate. Areas will be measured and invoiced per unit prices.
6, Performance & Payment bonds are available but not included in this quotation.
7. Clearing, grubbing, removal of rocks, debris and existing vegetation is not included in this quotation.
S. Inorganic and Organic soil amendments are not included in this quotation.
9. Supplying or Installing topsoil, planting soil, or engineering soil is not included in this quotation.
10. Seeding price includes 100% Kentucky Bluegrass lawn mix, fertilizer, straw mulch, and watering for 30 days
per specification only. Topsoil, topsoil placement, or erosion blanket is not included in this price.
11. Tree price includes supplying and installing 2" - 2.5" Caliper size tree from the pre -approved tree list,
staking, hardwood mulch, watering for 30 days, and 7 year warranty.
12. Maintenance or warranty bond for seeding or trees is not included in this quotation.
13. Steel edging or weed barrier is not included in this quotation.
14. Indiana State Sales Tax has not been included in pricing.
15. Traffic control Is the responsibility of the contractorlowner.
T. Traffic Bid Proposal
GENERAL NOTES:
1. Above quote is based on plans and specifications at the time of bid. Calendar days may be adjusted upon request.
2. Quote valid for 30 calendar days ONLY, contracts awarded after 30 days may require a requote.
3. Contact TCS, LLC if the proposal is NOT ACCEPTED IN WHOLE.
4. Items not paid by owner will be invoiced to the contractor at a daily rate, based on adjusted item unit price.
5. Changes by Engineer/Contractor require approved and signed change order, PRIOR to commencing work.
6. Retention will only be agreed to if Owner requires retention from Contractor.
7. All quantities are estimates only and actual installed quantities will be billed.
S. Proposal is subject to applicable state sales tax if a valid sales tax exemption certificate is not provided by the customer.
9. TCS, LLC must have at least 7 -days notice prior to scheduled work.
10. Move -ins will be billed as quoted. All additional mobilizations will be billed.
11. Any Mobilization performed outside the hours of 7:00 am to 5:00 pm, Monday through Thursday, will incur additional costs.
Contacts:
For questions regarding the quote:
Estimating Manager: Rik Ritzler, Office 574-772-7001 Ext. 122 Cell: 574-806.7139
Esti matino(o tcspecialists-net
To accept the quote, please contact Contract Administration:
Traffic Control Specialists, LLC
1810 W. Pacific Ave, Knox, IN 46534
contractadm i nCdtcs oecial ists. net
574-772-7001 Office Ext. 129 Approved 8y: Brian A. Triska
574-772-7002 Fax
Date:
Accepted By: Customer Signature Required Date:
Members of Laborers International Union of North America, ATSSA and BBB Page 1 of 1
cs Control
%$peciallstauc
Knox - Fort Woyna - Crawforanvlta
Lettis Date
Contract Number
12/12/2022
Project Location
Attn: Estimating
City of South Bendr Various Streets and Roads St Joseph Co
REP
Quote Valid
Start Date Completion Date
Intermediate Completion Date
Closure/Restriction Days Calendar Days
SDR
30 Days
1311512023
Line Item Number Description
Quantity Unit Price Total
1
801-06775
Maintaining Traffic
Daily Rental As Needed
1A
801-06775
Maintaining Traffic - Non -Fixed Construction Sin
$2,36 EA, per Calendar Da
18 B01-06775
Maintaining Traffic - Barrel
$0.50 EA, per Calendar Da
10
801-06775
Maintaining Traffic - Barrel w/Light
$0.68 EA, per Calendar Da
1D
801-06775
Maintaining Traffic- Sand Bas
50.05 EA, per Calendar Da
1 E
B01-06775
Maintaining Traffic - Delivery Charge (Drop off Only)
$86.00 EA
1 F
B01-06775
Maintaining Traffic - Pick-up Charge
$86.00 EA
1G
801-06775
Maintaining Traffic- Delivery Charge (Setup)
$96.00 EA, Laborer per Hr.
1 H
801-06775
Maintaining Traffic - Pick-up Charge (Setu)
$96.00 EA, Laborer per Hr.
11
601-06775
Maintaining Traffic - Truck
$31.00 EA, perHr.
1 J
B01-06775
Maintaining Traffic - Type 111 Barricade
$3.58 EA, per Calendar Da
1 K -601-06775
Maintaini ng Traffic - Type 111 Barricade w/ 2 Flash HDs
$4.23 EA, per Calendar Da
1 L
801-06775
Maintaining Traffic - Type III Barricade w! 1 Sin
$4.58 EA, per Calendar Da
1M
801-06775
I intalnin Traffic - Type III Barricade 2 Flash HDs and 1 Sign
$5.25 EA, per Calendar Da
1N
801-06775
Maintaining Traffic - Arrowboard (Flashing Arrow Sign)
$24.00 Ea, Per Calendar Day
$150.00 Ea, Per Week
'$310.00 Ea, Per Month
10
801-06775
1
Maintaining Traffic - Flagging Operation (Up to 10hrs.)
(Includes: 2 Flaggers, Truck & Equipment)
$165.00 Per Hr. Include Travel
1 P
801-06775
Maintaining Traffic - Flagging Operation (Over 10hrs. & Weekends)
(Includes: 2 Flaggers, Truck & Equipment)
$209.00 Per Hr. Include Travel
TOTAL
GENERAL NOTES:
1. Above quote is based on plans and specifications at the time of bid. Calendar days may be adjusted upon request.
2. Quote valid for 30 calendar days ONLY, contracts awarded after 30 days may require a requote.
3. Contact TCS, LLC if the proposal is NOT ACCEPTED IN WHOLE.
4. Items not paid by owner will be invoiced to the contractor at a daily rate, based on adjusted item unit price.
5. Changes by Engineer/Contractor require approved and signed change order, PRIOR to commencing work.
6. Retention will only be agreed to if Owner requires retention from Contractor.
7. All quantities are estimates only and actual installed quantities will be billed.
S. Proposal is subject to applicable state sales tax if a valid sales tax exemption certificate is not provided by the customer.
9. TCS, LLC must have at least 7 -days notice prior to scheduled work.
10. Move -ins will be billed as quoted. All additional mobilizations will be billed.
11. Any Mobilization performed outside the hours of 7:00 am to 5:00 pm, Monday through Thursday, will incur additional costs.
Contacts:
For questions regarding the quote:
Estimating Manager: Rik Ritzler, Office 574-772-7001 Ext. 122 Cell: 574-806.7139
Esti matino(o tcspecialists-net
To accept the quote, please contact Contract Administration:
Traffic Control Specialists, LLC
1810 W. Pacific Ave, Knox, IN 46534
contractadm i nCdtcs oecial ists. net
574-772-7001 Office Ext. 129 Approved 8y: Brian A. Triska
574-772-7002 Fax
Date:
Accepted By: Customer Signature Required Date:
Members of Laborers International Union of North America, ATSSA and BBB Page 1 of 1
BUC Construction Supply DBE Supplier
PO Box 4153
IN 47903
+1 7654123484
tcCa bucconstructionsupply.com
Quote
ADDRESS SHIP TO
Selge Construction Selge Construction
11111
Conmruaion Supply, INC.
QUOTE # 12-22-COSB-121-
044-1
DATE 12/12/2022
EXPIRATION DATE 02/10/2023
WBE 60% Goal:$3,510.00 TOTAL $5p850-00
'BUC Terms & Conditions:
1. Due to the instability of raw materials, each material in this quote is
subject to a 10% increase if purchased after the expired quote date of
2/10/23. Freight included. Full Truck Loads -materials ordered by
2/10/23 will ship by 5/1/23. Quote is based on BUC's interpretation of
plans/specs-contractor to determine final materials and/or quantities.
2. If materials are used for WBE goal, contact BUC ASAP. Any
materials purchased after 5/1/23 are at market price.
3. BUC shall not be held liable or responsible to the other party nor be
PRODUCT
DESCRIPTION
QTY
PRICE
AMOUNT
12/12/2022
COSB Project 121-044
Curb and Sidewalk 2022
Round 2
BUC Terms and Conditions -
See last page
12/12/2022
Divison 1
12/12/2022
Armor -Tile - 2x5 -
Line Item: 8
5
210.00
1,050.00
Brick Red
2'x5' Armor -Tile
12/12/2022
Division 2
12/12/2022
Armor -Tile - 2x2 -
Line Item: 9A
8
85.00
680.00
Brick Red
2'x2' Armor -Tile
12/12/2022
Armor -Tile - 2x4 -
Line Item: 9B
2
170.00
340.00
Brick Red
2'x4' Armor -Tile
12/12/2022
Armor -Tile - 2x5 -
Line Item: 9C
10
210.00
2,100.00
Brick Red
2'x5' Armor -Tile
12/12/2022
Divison 4
12/12/2022
Armor -Tile - 2x5 -
Line Item: 10
6
210.00
1,260.00
Brick Red
2'x5' Armor -Tile
12/12/2022
Divison 5
12/12/2022
Armor -Tile - 2x5 -
Line Item: 11
2
210.00
420.00
Brick Red
2'x5' Armor -Tile
WBE 60% Goal:$3,510.00 TOTAL $5p850-00
'BUC Terms & Conditions:
1. Due to the instability of raw materials, each material in this quote is
subject to a 10% increase if purchased after the expired quote date of
2/10/23. Freight included. Full Truck Loads -materials ordered by
2/10/23 will ship by 5/1/23. Quote is based on BUC's interpretation of
plans/specs-contractor to determine final materials and/or quantities.
2. If materials are used for WBE goal, contact BUC ASAP. Any
materials purchased after 5/1/23 are at market price.
3. BUC shall not be held liable or responsible to the other party nor be
deemed to have defaulted under or breached this quote for failure or
delay in fulfilling or performing any term of this quote to the extent and
for so long as, such failure or delays caused by or results from causes
beyond the reasonable control of BUC, including supply chain delays,
pandemics, quarantines & weather.
Accepted By Accepted Date
STATE OF INDIANA DEPARTMENT OF ADMINISTRATION
Division of Supplier Diversity
Eric J. Holcomb, Governor Indiana Government Center South
402 West Washington Street, Room W462
Indianapolis, IN 46204
(317) 232 - 3061
October 15, 2021
Ms. Teresa Butler
BUC Construction Supply, Inc.
P.O. Box 4153
Lafayette, IN 47901
Subject: Application for WBE Certification
Dear Ms. Butler,
Congratulations! The Indiana Department of Administration, Division of Supplier Diversity is pleased to
inform you that BUC Construction Supply, Inc. is hereby certified as a Women's Business Enterprise
(WBE).
Your company provides a commercially useful function in the areas listed below. Only work performed in
these areas will be counted towards Women's Business Enterprise participation:
UNSPSC COMS]
Code
Description
25172706
Silt protector
30103619
Precast concrete element
30121700
Road and railroad construction materials
30121702
Geotextile
30121802
Tree Protection Rod
30130000
Structural building products
30131703
Concrete tiles or flagstones
31100000
Castings and casting assemblies
31101700
Permanent mold castings and casting assemblies
31400000
Gaskets
31401501
Rubber molded gasket
39121409
Wire connectors
40141600
Valves
40141613
Gate valves
40141726
Hydrants
40171503
Commercial ductile iron pipe
40171517
Commercial PVC pipe
40172203
Ductile iron pipe blind flange
40172504
Ductile iron pipe connector
40172508
PVC plastic pipe connector
40174600
Pipe tees
Page 1 of 2
Referencing: BUC Construction Supply, Inc.
On September 13, 2010, the Governor's Commission on Supplier Diversity approved the department's
effort to streamline its recertification process. Instead of conducting an onsite visit to each company seeking
recertification, the department now has the discretion to waive the visit after a thorough review of the
company's file and recertification documents. We have approved your recertification and it is valid through
October 31, 2024. Please note that IDOA continues to reserve the right to conduct a site visit or phone
interview at any time to certified companies.
Although your certification is valid for a three-year period, you are required to submit an annual Affidavit
of Continued Eligibility (ACE) form, located at https:llwww.in.gov/idoa/wbt/DSDCert ACElijidex.html.
Please remember you must notify us immediately if any changes occur. Failure to notify us of changes or
to provide the ACE form annually will result in revocation of your certification. Changes include, but are
not limited to, changes in location, contact information, ownership or control.
We encourage you to visit IDOA's procurement website, www.in.gov/idoa/2464.litm, and update your
Business Registration Profile. It is important that you review and update your profile regularly, because
state purchasing agents and prime contractors may use this information to contact you for business
opportunities.
While this letter serves as notification of certification, it does not serve to prove continued eligibility. Please
visit https:llwww.in.goyridoalmwbe/2743.htm to verify certification status. Please contact our office at
(317) 232-3061 or mwbe cr7pr idoa.in.gov if you have any other questions or concerns about your letter.
Sincerely,
Kesha Rich, Director of Certification
Indiana Department of Administration
Division of Supplier Diversity
Page 2 of 2
THE CINCINNATI INSURANCE COMPANY
THE CINCINNATI CASUALTY COMPANY
Fairfield, Ohio
POWER OF ATTORNEY
KNOW ALL MEN BY THESE PRESENTS: That THE CINCINNATI INSURANCE COMPANY and THE CINCINNATI CASUALTY
COMPANY, corporations organized under the laws of the State of Ohio, and having their principal offices in the City of Fairfield,
Ohio (herein collectively called the "Companies"), do hereby constitute and appoint Tracie House
its true and legal Attomey-in-Fact to sign and deliver on behalf of the Companies as Surety, at any place within the United States,
the following surety bond:
Surety Bond Number. Bid Bond
Principal: Selge Construction Co., Inc.
Obligee: City of South Bend, Indiana- Board of Public Works
This appointment is made under and by authority of the following resolutions adopted by the Boards of Directors of The Cincinnati
Insurance Company and The Cincinnati Casualty Company, which resolutions are now in full force and effect, reading as follows:
RESOLVED, that the President or any Senior Vice President be hereby authorized, and empowered to appoint Attorneys -in -Fact
of the Company to execute any and all bonds, policies, undertakings, or other like instruments on behalf of the Corporation, and
may authorize any officer or any such Attomey-in-Fact to affix the corporate seat; and may with or without cause modify or
revoke any such appointment or authority. Any such writings so executed by such Attorneys -in -Fact shall be binding upon the
Company as if they had been duly executed and acknowledged by the regularly elected officers of the Company.
RESOLVED, that the signature of the President or any Senior Vice President and the seal of the Company may be affixed by
facsimile on any power of attorney granted, and the signature of the Secretary or Assistant Vice -President and the Seal of the
Company may be affixed by facsimile to any certificate of any such power and any such power of certificate bearing such
facsimile signature and seal shall be valid and binding on the Company. Any such power so executed and sealed and certified
by certificate so executed and sealed shall, with respect to any bond or undertaking to which it is attached, continue to be valid
and binding on the Company.
IN WITNESS WHEREOF, the Companies have caused these presents to be sealed with their corporate seals, duly attested by their
President or any Senior Vice President this 16th day of March, 2021.
STATE OF OHIO )SS:
COUNTY OF BUTLER )
THE CINCINNATI INSURANCE COMPANY
THE CINCINNATI CASUALTY COMPANY
On this 16th day of March, 2021 before me came the above-named President or Senior Vice President of The Cincinnati Insurance
Company and The Cincinnati Casualty Company, to me personally known to be the officer described herein, and acknowledged that the
seals affixed to the preceding instrument are the corporate seals of said Companies and the corporate seals and the signature of the
officer were duly affixed and subscribed to said instrument by the authority and direction of said corporations.
qTE
Keith CgKtt, Attorney at Law
Notary Public —State of Ohio
My commission has no expiration date.
Section 147.03 O.R.C.
I, the undersigned Secretary or Assistant Vice -President of The Cincinnati Insurance Company and The Cincinnati Casualty Company,
hereby certify that the above is the Original Power of Attorney issued by said Companies, and do hereby further certify that the said
Power of Attorney is still in full force and effect.
Given under my hand and seal of said Companies at Fairfield, Ohio, this 13th day of December , 2022 .
duw,yry inr,yy
. corao�urr i � S E A L�
�SEAI.°
ON10 ORl6
BN -1457-S (3/21)
1
Part II, Section I Experience Questionnaire
1. What public works projects has your organization completed for the period of one (1) year prior to the date of the current bid?
CONTRACT
WHEN
NAME AND ADDRESS
AMOUNT
CLASS OF WORK COMPLETED
OF OWNER
$669,623.00
CLARK & HANNAH COURT IMPROVEMENTS
2020
CITY OF ELKHART / 229 S. 2ND ST., ELKHART, IN 46516 574-294-5471
$2,188,635.01
CARRIAGE HILLS SS EXTENSION
2020
SJ CNTY REG WATER & SEWER / 227 W. JEFFERSON BLVD., SOUTH BEND, IN 46601 -574-236
$1,987,254.40
JA DRIVE & LEXINGTON STREETSCAPES
2020
CITY OF ELKHART 1229 S 2ND ST., ELKHART, IN 46516 574-2945471
$2,254,710.00
WAWASEE CONKLIN BAY TRAIL
2020
SYRACUSE-WAWASEE PARK FDN 1801 N HUNTINGTON ST, SYRACUSE, IN 46567 -574-675643;
$248,928.65
CR 46 RR CROSSING SS REPAIR
2020
NEW PARIS CONSERVANCY DIST / 18121 CR 29, NEW PARIS, IN 46553 -574831-6100
$120,35275
LAUREL ROAD TRAIL CONSTRUCTION
2020
CITY OF SOUTH BEND / 227 W. JEFFERSON BLVD., SOUTH BEND, IN 46601 -5742369216
$905,050.20
2020 CONCRETE REPAIR
2020
CITY OF GOSHEN, 204 E. JEFFERSON ST., GOSHEN, IN 46528
$12,50000
MAIN STREET CULVERT REPAIR
2020
CITY OF SOUTH BEND / 227 W. JEFFERSON BLVD., SOUTH BEND, IN 46601 -5742369216
$500,000.00
BRANDYWINE HS TENNIS COURTS
2020
BRANDYWINE COMM SCHOOLS 11830 S. THIRD ST, NILES, MI 49120
$223,000.00
PRESS GANEY CONCRETE REPLACEMENT
2020
PAI PROPERTIES, LLC 13601 LATHROP ST., SOUTH BEND, IN 46628
$62,72680
HYDRANT REPLACEMENT
2020
CITY OF SOUTH BEND 1227 W. JEFFERSON BLVD., SOUTH BEND, IN 46601 -574235-9216
$173,678.20
PRAIRIE CREEK RUN PH II WATER SERVICES
2020
ELKHART HWY DEPT./ 610 STEURY AVE, GOSHEN, IN 46528 - 5745349394
$185,550.00
STEUBEN LAKES PUMP 1
2020
STEUBEN LAKES REG WASTE DISTRICT 18119 W CR 150 N, ANGOLA, IN 46703
$753,81104
ZIGLER/FILBERT STREET IMPROVEMENTS
2020
TOWN OF NEW CARLISLE 1124 MICHIGAN ST, NEW CARLISLE, IN 46552
$38,174.00
117 JACKSON AVENUE
2020
CITY OF ELKHART/229 S. 2ND ST., ELKHART. IN 46516 5742945471
$536,041.05
IRONWORKS DEV UTILITIES PHASE 2
2021
CITY OF MISHAWAKA / 600 E 3RD ST., MISHAWAKA, IN 46545 - 574258-1618
$319,951.66
HOME STREET LIFT STATION
2021
CITY OF MISHAWAKA 1600 E 3RD ST, MISHAWAKA, IN 46545 - 574258-1618
$4,847,000.00
NILES - AEP SERVICE CENTER
2021
E & L CONSTRUCTION, 3040 AIRPARK DR, FLINT, MI 48507 810-744-4300
$1,987,254.40
JA DRIVE & LEXINGTON AVE STREETSCAPE;
2021
CITY OF ELKHART 1229 S. 2ND ST., ELKHART, IN 46516 5742945471
$548,625.75
BURNS BUILDING UTILITY EXTENSION
2021
CITY OF SOUTH BEND / 227 W. JEFFERSON BLVD., SOUTH BEND, IN 46601 -5742369216
$105,063.00
ST JOE RIVER BACKWATER VALVES
2021
CITY OF SOUTH BEND 1227 W. JEFFERSON BLVD„ SOUTH BEND, IN 46601 -5742369216
$2,129,833 19
BUFFALO STREET PLAZA
2021
CITY OF WARSAW / PO BOX 817, WARSAW, IN 46581 - 574372-9545
$1,230,212.00
LCRUD CONTRACT C REG B W WTP IMPROVE
2021
LaGRANGE COUNTY REGIONAL UTILITY DISTRICT, LAGRANGE, IN
$1,746,289 80
ROCK RUN SEWER IMPROVEMENT C
2021
CITY OF GOSHEN, 220 S. MAIN ST., GOSHEN, IN 574533-8621
$109,925.00
CSO3 BACKWATER VALVE REPAIR
2021
CITY OF SOUTH BEND / 227 W. JEFFERSON BLVD., SOUTH BEND, IN 46601 -5742369216
$4,115,879 34
CASS - DOWNTOWN STREETSCAPES
2021
VILLAGE OF CASSOPOLIS, 117 S. BROADWAY, MI 49031
$2,487,844.22
CASS - STONE BEACH IMPROVEMENTS
2021
VILLAGE OF CASSOPOLIS, 117 S. BROADWAY, MI 49031
$288,491.20
DAWN ESTATES LIFT STATION REPLACEMEP
2021
TOWN OF MIDDLEBURY / 416 N MAIN ST, MIDDLEBURY, IN 46540
$1,148,483 84
FAST GOSHEN WM REPLACEMENT
2021
CITY OF GOSHEN, 220 S. MAIN ST., GOSHEN, IN 574533-8621
$219,471.00
LIFT STATION 12 REPLACEMENT
2021
CITY OF ELKHART / 229 S. 2ND ST., ELKHART, IN 46516 5742945471
$253,390.00
G1 LIFT STATION
2021
ONTWA TOWNSHIP / 26225 US HWY 12, EDWARDSBURG, MI 49112
$113,78640
WATER SERVICE REPLACEMENT
2021
CITY OF ST JOSEPH / 700 BROAD STREET, ST JOSEPH, MI 49065
$855,000.00
HILLS AT ST. JOE FARM & CURB
2021
THE VILLAGE DEVELOPMENT LLC / 52127 FALL CREEK DR, GRANGER, IN 46530-5743169666
$398,008.00
LS & MANHOLE IMPROVEMENTS
2021
VILLAGE OF MARTIN / 1609 N MAIN ST., MARTIN, MI 49070
$758,650.00
HILLS RESIDENTIAL DEVELOPMENT LIFT STF
2021
THE VILLAGE DEVELOPMENT LLC / 52127 FALL CREEK DR, GRANGER, IN 46530-5743169668
$486,924.45
WATER SYSTEM IMPR COLFAX & MESSNER 1
2021
BENTON CHARTER TAP / 1725 TERRITORIAL ROAD, BENTON HARBOR, MI 49022
$162,750.00
GOSHEN POND DAM IMPROVEMENTS
2021
ELKHART COUNTY PARK & RECREATION BOARD / 211 W LINCOLN AVE., GOSHEN IN 46526
$125,142.00
LAUREL WOODS DRAINAGE IMPR
2021
CITY OF SOUTH BEND 1227 W. JEFFERSON BLVD., SOUTH BEND, IN 46601 -5742369216
$24,630.00
2010 SUPERIOR ST SEWER REPAIR
2021
CITY OF ELKHART / 229 S. 2ND ST., ELKHART, IN 46516 5742945471
$449,064.51
COLFAX LIFT STATION
2022
CITY OF SOUTH BEND /227 W. JEFFERSON BLVD., SOUTH BEND, IN 46601 -574235-9216
$731,154.29
PARK SHORE DR & EAST ST ROAD IMPR
2022
THE VILLAGE DEVELOPMENT LLC / 52127 FALL CREEK DR, GRANGER, IN 46530-5743169668
$4,554,745 21
CONTRACT 3 NE SECTION SS IMPR
2022
CITY OF BENTON HARBOR / 200 E WALL ST, BENTON HARBOR, MI 49022
$4,031,520.04
CRAWFORD PARK CONNECTOR SEWER
2022
CITY OF MISHAWAKA / 600 E 3RD ST., MISHAWAKA, IN 46545 - 574258-1618
$1,637,111,40
LAKESIDE SEWER RELOCATION
2022
CITY OF LAPORTE 1801 MICHIGAN AVE, LAPORTE, IN 46350
Attach a listing of public works projects currently in process of construction by your organization.
Contract Amount
$2,213,565
Class of Work
Concrete Pavement
Expected Name and Address of Owner
Completion Date
Summer 2022 INDOT R41066 672
$2,820,177
WW Treatment
Summer 2022 LaGrange CRUD IN 682
$1,461,885
Lift Station
Summer 2022 LaGrange CRUD IN 683
$3,696,528
SW Quad Road Sewer Water
Summer 2022 Town of Middleb IN 687
$1,855,455
Coloma Lift Station Rel2lacem
Fall 2022 Colonia Charter Township 688
$1,623,701
INDOT Bike & Ped. Facilities
Fall 2022 MOT 838064 689
$2,564,409
South Main St. Streetsca es
S rin 2022 City of ElkhartIN 694
$939,000
Lift Station Improvements
Summer 2022 Town of White Pigeon. MI 697
$1,242,475
WWTP Im movements
Summer 2022 Town of White Pi eon MI 698
$943,310.00
Lift Station Improvements
Summer 2022 New Buffalo Tw12, MI 699
$2,693,838
Front Main Church Sts. Improv Fall 2022 City of Mishawaka IN 703
$399,549
3rd Street Utilitig Replacement Fall 2022 Buchanan MI 704
$253,004
2021 Drainage Improvements
S ring 2022 Ci1y of South Bend IN 706
124.980
CSO 18 Backwater Valve Repl
Spring 2022 Citv of South Bend, IN (707
_
$4.593,517
Northshore-Eastshore Collect
Summer 2022 Turkey Creek RSD IN 708
$290,120
Elkhart CM Courthouse Pro'
Summer 2022 Elkhart Coun IN 710
$83M56
PI DOT Bike & Ped Facilities
Fall 2022 INDOT 837502 (7L4).
$159,850
ADA Compliant Trail
Spring 2022 Elkh IN 717
$2,907,973
Ci Wide Water Service Rel2l
S rin 2023 Benton Charter T MI 718
$159,880
JA Drive Node Re air
SpriKkg Spring2022 Ci of Elkh IN 719
$5,797,216
Conrail LS & Interceptor Im r
Summer 2423 Benton Charter Twp,MI 720
$1,325,294
Sewer Extension
Summer 2022 Cily of Elkh IN 721
$158,441
Fountain Water Improvements
Summer 2022 Cily of South Bend IN 722
$5,455,896,75
$1,667,547
Sewer Improvements
Lift Station
Summer 2023 City of Mishawaka, IN 723
S rina 2023 Ci of Mishawaka IN 725
$15,448,283.22
WW Collection Systems - A
Winter 2024 TCRSD—N.Webster IN 731
$11,253 814.09
WW Collection S tems—C
Winter 2024 TCRSD—N.Webster. IN 732
GOVERNMENTAL REFERENCES
Selge Construction
Eric Horvath, Director of Public Works
574-235-9251
City of South Bend
227 W. Jefferson Blvd., Ste 1300
South Bend, IN 46601
Toy Villa, Construction Manager
574-235-9251
City of South Bend
227 W. Jefferson Blvd.
1316 County -City Building
South Bend, IN 46601
Sky Medors, Engineer
574-235-9626
St. Joseph County
227 W. Jefferson Blvd.
South Bend, IN 46601
Tim Woodward
260-856-4341
Turkey Creek Regional Sewer District
4852 N. 1200 W
Cromwell, IN 46732
Steve Haversperger, Area Engineer
219-362-6125
INDOT, LaPorte District
PO Box 429
LaPorte, IN 46352
Brigid Forlenza
269-663-2347
Ontwa Township
PO Box 209
Edwardsburg, MI 49112
Mike Koch, Area Engineer
260-484-9541
INDOT, Fort Wayne District
5333 Hatfield Road
Fort Wayne, IN 46805
OVER
Chris Jamrose, Director of Engineering
574-258-1619
City of Mishawaka
600 East Third Street
Mishawaka, IN 46546-0363
Tory Irwin, Engineering Service Mgr.
574-293-2572
City of Elkhart
Municipal Building
229 S. Second Street
Elkhart, IN 46516
Dustin Sailor, Engineer
574-534-2201
City of Goshen
204 E. Jefferson St., Suite 1
Goshen, IN 46526
Mary Cripe, Town Manager
574-825-1499
Town of Middlebury
418 N. Main Street
Middlebury, IN 46540
Joe Ray, Director Public Works
269-683-4100
City of Niles
333 N. Second Street
Niles, MI 49120
Paul Warnke, Board President
574-586-7249
Koontz Lake Regional Sewer District
10870 Cherokee Rd.
PO Box 204
Walkerton, IN 46574
James Emans, P.E.
574-267-6885
City of Warsaw
102 S. Buffalo Street
Warsaw, IN 46580
ENGINEERING REFERENCES
Selge Construction
Rich Zielinski
317-547-5580
American Structurepoint
7260 Shadeland Station, Suite 100
Indianapolis, IN 46256
Jeremy Roschyk
574-288-4580
Donahue & Associates
100 N. Michigan, Ste 510
South Bend, IN 46601
Andy Lemberis
574-236-4400
DLZ Indiana, LLC
2211 East Jefferson Blvd.
South Bend, IN 46615
Paul Hummel
574-234-3167
Lawson Fisher Associates, P.C.
525 West Washington Avenue
South Bend, IN 46601
David Harvey
Fleis & Vanderbrink Engineering, Inc.
2960 Lucerne Drive, S.E.
Grand Rapids, MI 49546
Kenneth Jones
574-293-7762
Jones, Petrie, Rafinski, Inc.
200 Nibco Parkway Dr
Elkhart, IN 46516
Matt Davis
269-927-0100
Wightman and Associates, Inc.
2303 Pipestone Road
Benton Harbor, MI 49022
Jason Durr
574-282-8001
Christopher B. Burke Engineering, LLC
220 West Colfax Avenue, Suite 500
South Bend, IN 46601
Daryl Knip
574-232-8700
Abonmarche Consultants of IN, Inc.
750 Lincolnway East
South Bend, IN 46601
"Attachment
Section 1 No. 4 List references of private firms for which you have performed work.
South Bend Orthopedics Pokagon Gaming Authority
Elm Road Medical Campus 1111 Wilson Road
53880 Carmichael Drive New Buffalo, MI 49117
South Bend, IN 46635
AM General Precision Wall Systems
Rolland Miller Jim Mroz
13200 McKinley Highway 3801 S. Main St
Mishawaka, IN 46545 South Bend, IN 46601
South Bend Ethanol
M.A.A.C.
3201 W. Calvert Street
PO Box 262
South Bend, IN 46613
Niles, MI 49120
Notre Dame Federal Credit Union AEP Niles Service Center
Bob Green 2603 Walton Rd
PO Box 7818 Niles, MI 49120
Notre Dame, IN 46556
Flaherty & Collins Gospel City Church
Art Smith 52277 Hickory Road
One Indiana Square, Suite 3000 Granger, IN 46530
Indianapolis, IN 46204
Aeroplex Syracuse & Wawasee Park Foundation
FM Stone Real Estate Jerry Wright
421 S. Second St. 1013 N. Long Drive
Elkhart, IN 46516 Syracuse, IN 46567
DJ Landscaping C&S Machine
4436 Broadmoor Ave 2929 Sarratore Dr
Grand Rapids, MI 49512 Niles, MI 49120
Altera
David Kline
600-888 Dunsmuir Street
Vancouver, BC 6C3K4
SECTION II - PLAN AND EQUIPMENT QUESTIONNAIRE
2. SUBCONTRACTORS LIST WORK PERFORMED:
Bailey Aggregates Aggregate Trucking
12609 Indianapolis Rd
Yoder, IN 46798-9733
Brusky Construction Aggregate Trucking
70569 Elizabeth St
Niles, MI 49120
V & R Trucking Aggregate Trucking
1845 Elmer St
South Bend, IN46628
Niblock Excavating, Inc. Asphalt Construction
PO Box 211
Bristol, IN 46507
Rieth-Riley Construction Co., Inc. Asphalt Construction
PO Box 477
Goshen, IN 46527-0477
Milestone Contractors North Asphalt Construction
1700 E. Main St.
Griffith, IN 46319-2999
Michigan Paving & Materials Co. Asphalt Construction
2300 Gendenning
Kalamazoo, MI 49003
Abonmarche Consultants, LLC. Construction Engineering
750 Lincolnway East
South Bend, IN 46601
Jones Petrie Rafinski, Inc. Construction Engineering
412 S. Lafayette Blvd
South Bend, IN 46601
1
SUBCONTRACTOR LIST continued WORK PERFORMED
Wightman & Associates Construction Engineering
2303 Pipestone Rd
Benton Harbor, MI 49022
Deversified Dewatering Dewatering
9150 96th Ave.
Zeeland, MI 49464
Bender Electric Electrical Wiring
PO Box 143
Cassopolis, MI 49031
Hawk Enterprises, Inc. Electrical/Signal/Signage
1850 E. North Street
Crown Point, IN 46307
Custom Fence Co Fencing
PO Box 526
Niles, MI 49120
Mike's Fencing Fencing
68021 SR 19 North
Nappanee, IN 46550
Milestone Fence Fencing
13399 McKinley Hwy
Mishawaka, IN 46545
C -Tech Corporation Guard Rails
5300 W. 100 N.
Boggstown, IN 46110-9706
Lowe Construction Jack and Bore
2535 Bader Road
Horton, MI 49246
Weaver Consultants, LLC Laboratory Testing
7121 Grape Rd
Granger, IN 46530
2
SUBCONTRACTOR LIST (continued) WORK PERFORMED
Acorn Landscaping, LLC Landscape/Restoration
24930 Kern Rd.
South Bend, IN 46614-9787
Fuerbringer Landscaping & Design, Inc. Landscape/Restoration
25530 Brick Road
South Bend, IN 46628
Slussers Green Thumb, Inc. Landscape/Restoration
PO Box 33
Logansport, IN 46947-0033
Turf Services Landscape/Restoration
57780 Sink Road
Dowagiac, MI 49047
Ferguson Waterworks #1934 Lift Station Installation
1077 Oliver Plow Ct
South Bend, IN 46601
Best Sweeping Specialists, Inc. Road Sweeping/Dust Control
632 S. Sixth Street
Goshen, IN 46526
A-1 Striping Service, Inc. Road Striping
56825 Spirea Rd.
New Carlisle, IN 46552
The Airmarking Co., Inc. Road Striping
1544 North State Road 25
Rochester, IN 46975
Michiana Contracting, Inc. Traffic Signal Work
PO Box 929
Plymouth, IN 46563
Rathco Traffic Control
6742 Lovers Lane
Portage, MI 49002
el
SUBCONTRACTOR LIST continued WORK PERFORMED
Give `Em A Brake Traffic Control
2610 Sanford Ave
Grandville, MI 49418
State Barricading, Inc. Traffic Control
24963 U.S. 20 West
South Bend, IN 46628
KC Tree Tree Removal
1320 Third Street
Osceola, IN 46561
Payne's Services Tree Removal
30296 Redfield St
Niles, MI 49120
Construction Video Media Video Taping
111 E. Newberry St.
Romeo, MI 48065
Watson Tree Service, Inc. Tree Removal
2953 E. Detroit Road
Niles, MI 49120
S/T Bancroft Electric Electrical
25020 SR 2
South Bend, IN 46619
2022
M
Selge Construction Co., Inc.
Equipment List
QUANTITY
DESCRIPTION AND CAPACITY OF ITEMS
YEAR
2
JOHN DEERE 544L WHEEL LOADER
2021
1
VOLVO EWR170E WHEELED EXCAVATOR
2021
1
TRAIL KING TKT16 TILT
2021
1
TOWMASTER Tl 6T DECKOVER TRAILER
2021
1
JOHN DEERE 245G LC EXCAVATOR
2020
1
VOLVO ECR355E EXCAVATOR
2020
1
IMPACT CONSTRUCTION TRAILER
2020
1
JOHN DEERE 345G LC EXCAVATOR
2020
1
2020 JOHN DEERE 650K II CRAWLER DOZER W/GPS
2020
1
VOLVO ECR145E EXCAVATOR
2020
1
DUAL SOCK TRACKER FOR JD EXCAVATOR
2019
1
YANMAR V1035 MINI EXCAVATOR
2019
2
JOHN DEERE 544K II 4WD LOADERS
2018
2
JOHN DEERE 624K II 4WD LOADERS
2018
1
2"-8" DIP BUTT FUSION MACHINE
2018
1
DCI FS FALCON LOATING SYSTEM
2018
1
VERMEER D40X55 S3 DIRECTIONAL DRILL
2018
2
HAMM H101 SMOOTH DRUM COMPACTOR/ ROLLER
2018
1
2018 BOMAD BW 120 COMPACTOR / ROLLER
2018
1
GODWIN CD150M TRASH/BY-PASS PUMP
2018
1
YANMAR V1055 MINI EXCAVATOR
2018
1
ROFHDR ROADWIDENER
2017
1
JOHN DEERE 344K LOADER
2017
1
MULTIQUIP CONCRETE MIXER
2017
5
ARTIC HD 17 SNOW PLOWS
2017
1
ARTIC HD14 SNOW BOX
2017
1
ROAD WIDENER W/DUAL REMOVE
2017
1
VS 63-20-D Grout Machine
2016
1
YANMAR V1080 MINI EXCAVATOR
2016
1
KENWORTH T-800 CUMMINS TRACTOR
2016
1
DITCH WITCH TRACKER WITH BEACON/DISPLAY
2016
9
CATERPILLAR COMPACT TRACK LOADERS
2016
1
McLAUGHLIN VX30-500 VACUUM EXCAVATOR
2016
1
PERCUSSION DRILL
2016
2
YANMAR Vio35-6 MINI EXCAVATORS
2016
1
YANMAR Vio45 MINI EXCAVATOR
2016
1
MACK DUMP TRUCK MODEL GU813
2015
1
ETNYRE TRAILER WITH 4TH FLIP AXLE
2015
1
JOHN DEERE 245 LC EXCAVATOR
2015
3
ARTIC SNOW PUSHER PLOWS W/QUICK COUPLERS
2015
2
YANMAR V1055 MINI EXCAVATOR
2015
3
WESTERN PLOWS
2015
1
ISCO FUSION MACHINE
2014
2
JOHN DEERE 245 LC EXCAVATOR
2014
1
JOHN DEERE 544K 4WD LOADER
2014
2
MOVAX-SP60 HAMMERS
2013
1
KOMATSU PC490LC-10 EXCAVATOR
2012
1
KOMATSU PC390LC-10 EXCAVATOR
2012
1
JOHN DEERE 700K DOZER
2012
1
1 JOHN DEERE 650K DOZER
2012
QUANTITY
DESCRIPTION AND CAPACITY OF ITEMS
YEAR
3
JOHN DEERE 544K LOADERS
2012
1
CATERPILLAR CH 85E TRACTOR
2010
2
ROME SCRAPER PANS
2010
1
12" - 36" BUTT FUSION MACHINE
2009
1
VERMEER D100 X 120 NAVIGATOR W. ATTACHMENTS
2009
1
YAN MAR V1075 EXCAVATOR
2008
1
MR MANHOLE CUTTER EXTRACTOR & AUGER
2008
1
CATERPILLAR 328D EXCAVATOR
2007
1
CATERPILLAR 321CLCR EXCAVATOR
2007
1
CATERPILLAR 314 CLCR EXCAVATOR
2007
1
D36X50 NAVIGATOR
2006
1
DUAL ELECTRIC MAST SYSTEM (LAZER FOR DOZER
2006
2
DITCH WITCH VAC SYSTEM W/TRAILER
2006
1
ROADTEC RX700-4 MILLING MACHINE
2006
1
IHI IC30-2 CRAWLER CARRIER
2006
1
JOHN DEERE 450D EXCAVATOR
2006
1
KENWORTH DUMP TRUCK
2006
1
DITCH WITCH JT27T2 WITH ATTACH./PIPE
2005
1
DITCH WITCH JT2020 WITH ATTACH./PIPE
2005
3
JOHN DEERE LOADERS MODEL 544J
2005
1
FELCO MINI CONVEYOR
2005
1
DITCH WITCH SK500 UNIT W/AUGER & TRENCHER
2004
2
FELCO COMPACTION BUCKETS
2004
1
SCISSOR LIFT
2004
1
CATERPILLAR CH85 CHALLENGER TRACTOR
2003
2
MISKIN SP-C17 SCRAPERS
2003
1
DYNA-PACK MODEL CC122 VIBRATORY ROLLER
2003
1
AMERICAN AUGER BORING MACHINE
2003
1
KUBOTA L3010HST TRACTOR
2002
1
TRAILER EXPESS 18' FLATBED TANDEM AXLE TRAILER
2002
1
TC-600 TEXTURE/CURE MACHINE & ACCESSORIES
2002
1
CURB FORM C55629
2002
1
FELCO 30 X 60 COMPACTOR BUCKET
2002
1
KOMATSU WA120-3 WHEEL LOADER
2001
1
EASI-POUR COMPACT 880 SLIPFORM TRIMMER/PAVER
2001
1
KOMATSU PC128US -2 006487 EXCAVATOR
2001
1
KOMATSU PC228US LC-3 020533 EXCAVATOR
2001
1
BOBCAT SKID STEER LOADER, MODEL 773K
2001
1
TREMIX COMPACTOR MODEL MV80
2001
3
JOHN DEERE 1-650H, 2-550H CRAWLER DOZERS
2001
1
KENWORTH DUMP TRUCK
2001
1
FREIGHTLINER FL80 DUMP TRUCK
2000
1
FREIGHTLINER FL112 DUMP TRUCK
2000
1
PMD 800 VAC-TRON VACUUM
2000
1
VERMEER T-555 TRACK TRENCHER
2000
1
DITCH WITCH JT7020 BORING UNIT
2000
1
MCS-325 PORTABLE BENTONITE MIXING & RECYCLING SYSTEM
2000
1
VOLVO L70D WHEEL LOADER
2000
1
CATERPILLAR 930 WHEEL LOADER
2000
1
DITCH WITCH JET TRAC MODEL 920L W/ MUD MIXER, SUBSITE ATT.
1999
1
ROSCO RB48 SWEEPER, WITH SNOW PLOW
1999
1
STERLING L8513 DUMP TRUCK
1999
1
920L DITCH WITCH DIRECTION BORA- SYSTEM
1999
QUANTITY
DESCRIPTION AND CAPACITY OF ITEMS
YEAR
1
CHAMPION 730A VHP MOTOR GRADER
1999
1
CMI SF3002 SLIPFORM PAVER
1999
1
FORD F800 DUMP TRUCK
1998
1
CLEAN EARTH SFE -JET -VAC
1998
1
MCELROY #412 HYDRAULIC FUSION UNIT
1998
1
BELSHE T9 TRAILER
1998
2
928G CATERPILLAR WHEEL LOADERS
1998
1
NPK 8XA HYDRAULIC HAMMER
1998
1
EX750 - HITACHI EXCAVATOR
1998
1
FELCO VIBRATORY COMPACTOR BUCKET
1998
1
JCB 411 TOOL CARRIER, WITH FORKS
1998
1
INTERNATIONAL 4900 6 X 6 WATER TRUCK
1998
1
MACK CL713 TRACTOR
1997
1
VERMEER D-2440 NAVIGATOR DIRECTIONAL BORE SYSTEM
1997
1
FINN HYDROSEEDER W/ ATTACH., GROUNDHOG
1997
1
MACK CL713 DUMP TRUCK
1996
1
MACK RD68 TRACTOR
1996
1
MACK TRACTOR MODEL CL713
1996
1
CATERPILLAR MODEL CS433 COMPACTOR
1996
1
PEMBERTON 72" DITCH CL. BUCKET FOR CAT 300LE
1996
1
PC200-6 KOMATSU EXCAVATOR
1996
1
MACK TRACTOR, MODEL CL713
1995
1
VERMEER 4" LW HAMMERHEAD MOLE
1995
1
VERMEER 3" HAMMERHEAD MOLE
1995
1
DITCH WITCH DIRECTIONAL BORE SYSTEM
1995
1
MELROE 853C BOBCAT
1995
1
CATERPILLAR HYD. EXCAVATOR MODEL 325L
1994
1
CATERPILLAR HYD EXCAVATOR MODEL 330L 3CY
1994
1
JOHN DEERE 624G LOADER 3 1/2 YD_
1994
1
JOHN DEERE 955 4WD TRACTOR W/TILLER AND BROOM
1994
1
FELCO BEDDING CONVEYOR, STAND. SLIDER, W/2' EXTENSION
1994
1
FORD TRACTOR MODEL LN 8000
1993
1
GMC WHITE TRACTOR TRUCK
1993
1
CATERPILLAR D5C DOZER
1992
1
JOHN DEERE 955 TRACTOR W/TILLER, BOX SCRAPER, BROOM
1991
1
FELCO ROLLER BEDDING CONVEYOR W/6 CY HOPPER
1991
1
JOHN DEERE 544 RUBBER TIRE LOADERS
1990
1
JOHN DEERE 455G CRAWLER LOADER
1989
1
KOEHRING 6644 HYD. EXCAVATOR 3 1/2 YD.
1988
1
FORD F800 UTILITY TRAILER WITH HI RANGER
1985
1
JOHN DEERE 570A ROAD GRADER
1980
1
KOEHRING 866 HYD. BACK HOE 4 YD.
1979
1
CATERPILLAR D4C DOZER SERIES 3
1979
1
FERGUSON TANDEM DRUM VIBRATOR ROLLER
1979
1
HARTMAN FABCO CONVEYOR
1979
1
1 EARTH BORING MACHINE 48" AND ACCESSORIES
1975
QUANTITY
DESCRIPTION AND CAPACITY OF ITEMS
YEAR
1
INTERNATIONAL T.D. DOZER
1972
1
BLAW-KNOX RW 195 ROAD WIDNER
1970
2
KOEHRING 505 HYD. BACK HOE 2 1/2 YD.
1969 & 70
WITH 6 CYLINDER HOPPER
150 KW CAT. GENERATOR, ELECTRIC PUMPS, DEEP WELLS,
HYDRAULIC CLAM, ETC., COMPLETE
ONAN 30 KW STANDBY POWER ENGINE GENERATOR, TRAILER
MOUNTED, W/CABLE & DIESEL FUEL TANKS, SUBMERSIBLE
SEWER PUMP
CEMENT SAWS, AIR COMPRESSORS, WELL POINT PUMPS, WELL
POINTING EQUIPMENT, 4000 GAL. WATER TANKER & JET PUMP,
BROOMS, SHOP TRAILERS, 3 FIELD OFFICE TRAILERS,
COMPACTORS, POWER MORTAR MIXERS, TAMPERS, LASER
BEAMS, SMALL TOOLS, 3 TANDEM DUMP TRUCKS, 1 SEMI -
DUMP TRAILER, 4 LOWBOY TRAILERS, 3 TRUCK TRACTORS,
PORTABLE TRAFFIC LIGHTS, PORTABLE FLASHING SIGN, STEEL
SHEETS, GENERATORS, PAVING BREAKERS, ROCK DRILLS,
TRENCH BOXES, WELLS CARGO PUMP TRAILER, 3 WELLS
CARGO TOOL TRAILERS, WELLS CARGO CYCLE WAGON,
1 FRUEHAUF TRAILER, HENDERSON BLADE RAKE, PROSSER PUMPS,
VIBRATORY ASPHALT PLATE, 1255HP DIALGRADE LASERS,
INGERSOLL-RAND LIGHT TOWER, TAG TRAILER, ROSCO SWEEPER,
FORKLIFT, CURB FORMS, DITCH WITCH SUB SITES, GENERATORS,
VARIOUS BUCKETS, DUAL ELECTRIC MAST SYSTEM (LAZER FOR
DOZER), VARIOUS TRAILERS, TEREX PAVING KIT, REROUND TOOL,
SCRAPER TOOL, ELECTRIC PROCESSOR, 24" DIPS INSERT SET,
HEATER ASSEMBLY FOR FUSION MACHINE, AUGER
VERMEER DIRECTIONAL DRILL, LOCATORS
4
Selge Construction Company, Inc.
Financial Report
February 28, 2022
Contents
Independent auditor's report 1-2
Financial statements
Balance sheets 3
Statements of income 4
Statements of stockholders' equity 5
Statements of cash flows 6
Notes to financial statements 7-15
Supplementary information
Schedules of construction and general and administrative expenses 16
Independent Auditor's Report
Board of Directors
Selge Construction Company, Inc.
:'J =
RSM
RSM US LLP
Opinion
We have audited the financial statements of Selge Construction Company, Inc. (the Company), which
comprise the balance sheets as of February 28, 2022 and 2021, the related statements of income,
stockholders' equity, and cash flows for the years then ended, and the related notes to the financial
statements.
In our opinion, the accompanying financial statements present fairly, in all material respects, the financial
position of the Company as of February 28, 2022 and 2021, and the results of its operations and its cash
flows for the years then ended in accordance with accounting principles generally accepted in the United
States of America.
Basis for Opinion
We conducted our audits in accordance with auditing standards generally accepted in the United States
of America (GARS). Our responsibilities under those standards are further described in the Auditor's
Responsibilities for the Audit of the Financial Statements section of our report. We are required to be
independent of the Company and to meet our other ethical responsibilities, in accordance with the
relevant ethical requirements relating to our audits. We believe that the audit evidence we have obtained
is sufficient and appropriate to provide a basis for our audit opinion.
Responsibilities of Management for the Financial Statements
Management is responsible for the preparation and fair presentation of the financial statements in
accordance with accounting principles generally accepted in the United States of America, and for the
design, implementation, and maintenance of internal control relevant to the preparation and fair
presentation of financial statements that are free from material misstatement, whether due to fraud or
error.
In preparing the financial statements, management is required to evaluate whether there are conditions or
events, considered in the aggregate, that raise substantial doubt about the Company's ability to continue
as a going concern within one year after the date that the financial statements are issued (or within one
year after the date that the financial statements are available to be issued when applicable).
Auditor's Responsibilities for the Audit of the Financial Statements
Our objectives are to obtain reasonable assurance about whether the financial statements as a whole are
free from material misstatement, whether due to fraud or error, and to issue an auditor's report that
includes our opinion. Reasonable assurance is a high level of assurance but is not absolute assurance
and therefore is not a guarantee that an audit conducted in accordance with GAAS will always detect a
material misstatement when it exists. The risk of not detecting a material misstatement resulting from
fraud is higher than for one resulting from error, as fraud may involve collusion, forgery, intentional
omissions, misrepresentations, or the override of internal control. Misstatements are considered material
if there is a substantial likelihood that, individually or in the aggregate, they would influence the judgment
made by a reasonable user based on the financial statements.
THE POWER OF BEING UNDERSTOOD
AUDIT I TAX I CONSULTING
RSM VS LLP Is the US n semberfu nnof RSWM—Iotlenal aglehalnetwork of independent audit,l —. an d cansulturg fir ms V<_il rsnruscc,n:ot:outusfor rnorei�fcr—tion regaidin,g RSM JS LLP and
RSM tntel national
In performing an audit in accordance with GAAS, we:
• Exercise professional judgment and maintain professional skepticism throughout the audit.
• Identify and assess the risks of material misstatement of the financial statements, whether due to
fraud or error, and design and perform audit procedures responsive to those risks. Such procedures
include examining, on a test basis, evidence regarding the amounts and disclosures in the financial
statements.
• Obtain an understanding of internal control relevant to the audit in order to design audit procedures
that are appropriate in the circumstances, but not for the purpose of expressing an opinion on the
effectiveness of the Company's internal control. Accordingly, no such opinion is expressed.
• Evaluate the appropriateness of accounting policies used and the reasonableness of significant
accounting estimates made by management, as well as evaluate the overall presentation of the
financial statements.
• Conclude whether, in ourjudgment, there are conditions or events, considered in the aggregate, that
raise substantial doubt about the Company's ability to continue as a going concern for a reasonable
period of time.
We are required to communicate with those charged with governance regarding, among other matters,
the planned scope and timing of the audit, significant audit findings, and certain internal control—related
matters that we identified during the audit.
Other Matters
Our audit was conducted for the purpose of forming an opinion on the financial statements as a whole.
The accompanying supplementary schedule of construction and general and administrative expenses is
presented for purposes of additional analysis is not a required part of the financial statements. Such
information is the responsibility of management and was derived from and relates directly to the
underlying accounting and other records used to prepare the financial statements. The information has
been subjected to the auditing procedures applied in the audit of the financial statements and certain
additional procedures, including comparing and reconciling such information directly to the underlying
accounting and other records used to prepare the financial statements or to the financial statements
themselves, and other additional procedures in accordance with auditing standards generally accepted in
the United States of America. In our opinion, the information is fairly stated in all material respects in
relation to the financial statements as a whole.
�?s.q U5
South Bend, Indiana
May 20, 2022
2
Selge Construction Company, Inc.
Notes to Financial Statements
Note 1. Nature of Business and Significant Accounting Policies
Nature of business: Selge Construction Company, Inc. (the Company) is a commercial contractor
specializing in the construction of underground sewer and water mains. The Company's contracts are
typically with businesses and municipalities in northern Indiana and southern Michigan.
Significant accounting policies:
Use of estimates: The preparation of financial statements in conformity with accounting principles
generally accepted in the United States of America requires management to make estimates and
assumptions that affect the reported amounts of assets and liabilities and disclosure of contingent assets
and liabilities at the date of the financial statements and the reported amounts of revenues and expenses
during the reporting period. Accordingly, actual results could differ from those estimates.
Variable interest entity: The Company has elected an accounting alternative as provided for in
Accounting Standards Update (ASU) No. 2014-07, Consolidation (Topic 810): Applying Variable Interest
Entity Guidance to Common Control Leasing Arrangements, issued by the Financial Accounting
Standards Board (FASB). Pursuant to this election, the Company did not apply the variable interest entity
(VIE) guidance in Accounting Standards Codification (ASC) 810 to assess certain lessor entities under
common control for consolidation for the years ended February 28, 2022 and 2021. See Note 12 for
additional information.
Cash: The Company has cash on deposit in financial institutions which, at times, may be in excess of
Federal Deposit Insurance Corporation limits.
Contract receivables: Contract receivables are carried at original invoice amount less an estimate made
for doubtful receivables based on a review of all outstanding amounts on a monthly basis. Contract
receivables in the accompanying balance sheets at February 28, 2022 and 2021, are stated net of an
allowance for doubtful accounts of $15,000. Management determines the allowance for doubtful accounts
by identifying troubled accounts and by using historical experience applied to an aging of accounts.
Contract receivables are written off when deemed uncollectible. Recoveries of contract receivables
previously written off are recorded when received. A contract receivable is considered past due if any
portion of the receivable balance is outstanding for more than 30 days. The Company generally does not
charge interest on past due receivables.
Contract receivables represent amounts billed to customers under customary industry credit terms. In
accordance with construction industry practice, retainage is a portion of the final payment of a contract
that is withheld until the project is complete in accordance with the terms of the contract. The Company
records retainage receivables on long-term contracts as a component of receivables. Retainage amounts
outstanding at February 28, 2022 and 2021, are approximately $457,000 and $1,220,000, respectively.
Property and equipment: Improvements and betterments are capitalized; routine maintenance and
repairs are charged to expense as incurred. When equipment is retired or otherwise disposed of, the cost
and related accumulated depreciation are removed from the respective accounts and any gains or losses
arising from the disposition are reflected in income.
7
Selge Construction Company, Inc.
Notes to Financial Statements
Note 1. Nature of Business and Significant Accounting Policies (Continued)
Depreciation of property and equipment is computed principally by the straight-line method over the
estimated useful lives of the related assets as follows:
Years
Buildings and improvements 5-39
Construction equipment 5-15
Automotive and trucks 5-7
Office equipment 3-10
Long-lived assets: In accordance with accounting standards, the Company reviews its long-lived assets
periodically to determine potential impairment by comparing the value of the long-lived assets with the
estimated future net undiscounted cash flows expected to result from the use of the assets, including
cash flows from disposition. Should the sum of the expected future net cash flows be less than the
carrying value of the related asset, the Company would recognize an impairment loss at that date. An
impairment loss would be measured by comparing the amount by which the carrying value exceeds the
fair value of the long-lived assets. During the years ended February 28, 2022 and 2021, the Company
determined that no impairment loss was necessary.
Revenue recognition: The Company utilizes the percentage of completion method for reporting revenue
on the majority of its construction contracts. Under this method, a portion of the total contract revenue is
recognized as revenue based on the Company's estimate of job completion. See Note 2 for further
information on the Company's revenue recognition.
Income taxes: The Company, with the consent of its stockholders, has elected to have its income taxed
under Section 1362 of the Internal Revenue Code and a similar section of the state tax laws which
provide that, in lieu of corporation income taxes, the stockholders account for their proportionate share of
the Company's items of income, deduction, losses and credits. It is the Company's intent to make
distributions to stockholders for their individual income tax liabilities relating from the Company's income.
Management has evaluated the Company's tax positions and concluded that the Company has taken no
uncertain tax positions that require adjustment to the financial statements to comply with the provisions of
accounting guidance for uncertainty in income taxes.
The Company files income tax returns in the U.S. federal, Indiana and Michigan jurisdictions. With few
exceptions, the Company is no longer subject to tax examinations by the U.S. federal, state, or local tax
authorities for years before the Company's fiscal and tax year end of February 28, 2019.
The Company is required at times to make federal tax deposits in order to retain its fiscal year end. The
federal tax deposit of approximately $571,000 and $313,000 at February 28, 2022 and 2021, respectively,
is reflected as a long-term asset in the Company's accompanying balance sheets.
Selge Construction Company, Inc.
Notes to Financial Statements
Note 1. Nature of Business and Significant Accounting Policies (Continued)
Pending accounting pronouncement: In February 2016, the FASB issued ASU 2016-02, Leases
(Topic 842). The guidance in this ASU supersedes the leasing guidance in Topic 840, Leases. Under the
new guidance, lessees are required to recognize lease assets and lease liabilities on the balance sheet
for all leases with terms longer than 12 months. Leases will be classified as either finance or operating,
with classification affecting the pattern of expense recognition in the statement of income. The new
standard is effective for fiscal years beginning after December 15, 2021, including interim periods within
those fiscal years. The Company is currently evaluating the impact the new standard will have on its
financial statements.
Subsequent events: The Company has evaluated subsequent events for recognition and disclosure
through May 20, 2022, which is the date the Company's financial statements were available to be issued.
Note 2. Revenue Recognition
The Company primarily generates revenue from fixed-price contracts in the construction of underground
sewer and water mains. The Company recognizes revenue over time using the percentage -of -completion
method. The Company's contracts are generally considered to be a single performance obligation
because the Company provides a significant service of integrating a complex set of tasks and
components. Management has concluded performance obligations related to construction contracts are
satisfied over time because the Company's performance typically creates or enhances an asset that the
customer controls as the asset is created or enhanced. The Company recognizes revenue as
performance obligations are satisfied and control of the promised good and/or service is transferred to the
customer.
The Company's performance obligations are satisfied with the transfer of control utilizing the cost -to -cost
measure of progress. The cost of revenue include all direct material, subcontracts, labor, and other
miscellaneous direct costs. General and administrative costs and those indirect costs related to contract
performance, such as indirect labor, supplies, tools, repairs and depreciation costs are charged to
expense as incurred. Pre -contract costs are generally expensed as incurred.
Changes in job performance and revisions in cost and profit estimates are reflected in the accounting
period in which the facts requiring the revisions become known. At the time a loss on a contract becomes
foreseeable, the entire amount of the estimated loss is accrued. Under the cost -to -cost approach, use of
estimated costs to complete each performance obligation is a significant variable in the progress of
determining and recognizing revenue and is a significant factor in the accounting for such performance
obligations.
The Company also performs work under cost -plus -fee contracts that are small short-term projects, and
uses point in time revenue recognition, which is based upon completion and billing for the project. These
projects are based on cost plus margin.
The Company's remaining performance obligations (hereafter referred to as backlog) represent the
unrecognized revenue on the open fixed-price contracts as of February 28, 2022. The Company's
backlog as of February 28, 2022, is approximately $24,424,000.
The transaction price for the Company's contracts may include variable consideration, which includes
increases in transaction price for approved or unapproved change orders and incentives. Change orders
and incentives are generally not distinct from the existing contract due to the significant integration
provided in the context of the contract and are accounted for as a modification of the existing contract and
performance obligation. The Company estimates variable consideration for a performance obligation at
the most likely amount that the Company expects to be entitled.
0
Selge Construction Company, Inc.
Notes to Financial Statements
Note 6. Pledged Assets, Notes Payable, Long -Term Debt and Subsequent Event (Continued)
The Company has elected to apply the guidance under ASC 470, Debt. Under the provisions of ASC 470,
the amounts received under the loan are recognized as debt, until it is either paid off or the debtor is
legally released as the primary obligor. Under the PPP program, the debtor is released at the point the
application for forgiveness is approved. The gain from the release of the liability, including accrued
interest, will be presented in the statements of income as a gain on the forgiveness of debt.
Under the program, the Company submitted the PPP loan forgiveness application and received approval
from the SBA during the year ended February 28, 2022. The entire balance of the forgiven loan was
recognized into income and included in other nonoperating income on the accompanying statement of
income for the year ending February 28, 2022.
Aggregate maturities of long-term debt, for the years ending February 2024 through 2027 are as follows:
2024
$ 139,000
2025
28,500
2026
26,000
2027
8,567
$ 202,067
Subsequent to February 28, 2022, the Company financed the purchase of equipment that was previously
leased under operating leases. The total amount financed with a note payable was $486,615. The note is
due in monthly installments of $14,488 including interest at 4.56%. The maturity date is March 2025.
Note 7. Accrued Expenses
Accrued expenses are composed of the following at February 28, 2022 and 2021:
Profit sharing
Accrued payroll, payroll taxes and other withholdings
Other expenses
Note 8. Operating Lease Commitments
2022 2021
$ 14,555 $ 134,818
99,824 108,626
8,395 19,638
$ 122,774 $ 263,082
The Company leases equipment from unrelated parties under operating lease agreements which expire
in March 2022. The lease agreements require monthly payments of approximately $11,000. Rent
expense under these agreements for the years ended February 28, 2022 and 2021, was approximately
$131,100 and $112,900, respectively. Upon the final monthly payment in March 2022, the lease was not
renewed.
13
Selge Construction Company, Inc.
Notes to Financial Statements
Note 9. Related Party Transactions
The Company has entered into various month-to-month equipment lease agreements with Selge Leasing,
Inc., a company related through common ownership. The leases have been accounted for as operating
leases. The Company is responsible for all insurance, taxes and maintenance related to the operation of
the equipment. Total rent paid by the Company for these leases to the related party for the years ended
February 28, 2022 and 2021, was $780,000 and $1,080,000, respectively.
The Company has advanced funds to Selge Properties, LLC, a company related through common
ownership, to purchase land near the Company's corporate office. The balance due from Selge
Properties, LLC is $169,945 at February 28, 2022 and 2021, and has no stated date of repayment. The
Company has also advanced $7,242 and $77,214 at February 28, 2022 and 2021, respectively, to a
stockholder that will be paid through future dividends. As a result of these terms and the nature of the
relationship, these amounts due are reflected as a reduction of stockholders' equity in the accompanying
balance sheets at February 28, 2022 and 2021.
In addition, the Company has an unsecured note payable due to a stockholder at February 28, 2022 and
2021, in the amount of approximately $877,000 and $523,000, respectively, bearing interest at 5%. The
payable is reflected as a long-term liability as the stockholder has waived the right to demand payment
prior to March 1, 2023.
Note 10. Stockholders' Equity
The Company has 92,366 shares of common stock outstanding at February 28, 2022 and 2021.
Note 11. Employee Benefit Plans
The Company has adopted a profit sharing plan, more commonly known as a 401(k) plan, for the benefit
of all eligible nonunion employees. The plan allows for discretionary contributions by the Company to be
determined on an annual basis. For the years ended February 28, 2022 and 2021, total Company
contributions associated with the plan were approximately $135,000 and $151,000, respectively.
The Company has also adopted a 401(k) plan, for the benefit of all eligible union and nonunion
employees. The plan does not require Company contributions but allows for salary deferrals on the part of
the eligible participants. The Company did not make any contributions to the plan for the years ended
February 28, 2022 and 2021.
Note 12. Variable Interest Entity
Selge Leasing, Inc. owns and leases machinery and equipment to the Company as described in Note 9.
Selge Leasing, Inc. is related to the Company through common ownership. The Company is Selge
Leasing, Inc.'s only customer. The Company and Selge Leasing, Inc. entered into a cross collateralization
agreement with a local bank. The Company can be required to perform on the guarantee in the event of
nonpayment of a bank debt by Selge Leasing, Inc. During the year ended February 28, 2021, Selge
Leasing, Inc. paid off all outstanding debt that was guaranteed by Selge Construction, Inc.
Pursuant to the policy to apply the accounting alternative to certain lessor entities under common control,
Selge Construction Company, Inc. did not apply the VIE guidance to ASC 810 to consolidate this certain
lessor entity under common control into the Company's financial statements for the years ended
February 28, 2022 and 2021.
14
Selge Construction Company, Inc.
Notes to Financial Statements
Note 13. Cash Flows Information
Supplemental information relative to the statements of cash flows for the years ended February 28, 2022
and 2021, is as follows:
Supplemental schedule of noncash investing
and financing activities:
Purchase of equipment in exchange for financing contract
Supplemental disclosures of cash flow information:
Cash payments for interest
15
2022 2021
$ 122,835 $ 695.430
$ 34,600 $ 38.300
CITY OF SOUTH BEND, INDIANA
CONTRACTOR'S BID FOR PUBLIC WORK
RESPONSIBLE BIDDER CHECKLIST
Project Name 2022 Curb and Sidewalk Construction — Round 2
Project No.
For Bids Due
122-044
December 13t'', 2022
Contractor Name: Selae Construction Co. Inc.
The City seeks to enhance its ability to identify responsive and responsible bidders on all City public works
projects by institution of comprehensive submission requirements in compliance with State law. Quality
workmanship, efficient operation, safety, and timely completion of projects requires that all bidders meet
certain minimum requirements to be responsive and responsible bidders.
THIS FORM MUST BE SUBMITTED WITH YOUR BID.
INSTRUCTIONS:
If you are a pre -qualified bidder, complete Section I only.
If you are not a pre -qualified bidder, complete Section II only.
Section II acts as an application for pre -qualification. Submission of Section II will allow the bidder to be
considered for pre -qualification for bids with the City of South Bend Department of Public Works. Pre-
qualified bidders will then be exempt from a portion of the submission requirements outlined in Section 6-
63 of The Responsible Bidding Ordinance No. 10594-18 (hereinafter, "Responsible Bidding Ordinance")
for a period of twelve (12) months.
Thereafter, contractors who are pre -qualified must submit a complete application for continuation of "pre-
qualified" standing, on a form provided by the City ("Responsible Bidder Checklist (1) Pre -Qualified
Bidders") by December 31 st for the upcoming calendar year, or within twelve (12) months of obtaining pre-
qualified standing. If the status of any item changes within the twelve (12) months, it is the responsibility of
the contractor to notify the City. Failure by any pre -qualified contractor to submit its complete application
for continuation of "pre -qualified" standing within the time prescribed above shall result in automatic removal
of the designation, effective January 1 of the following year, or immediately following the twelve (12) months
of pre -qualified standing.
However, the "removed" contractor or subcontractor shall still be permitted to bid on City public works
projects, though the contractor must submit all required documents under 6-63 until "pre -qualified" status
is re-established.
Please Note: The City reserves the right to request supplemental information from the bidder,
additional verification of any information provided by the bidder, and may also conduct random
inquiries of the bidder's current and previous customers regardless of pre -qualified standing.
It is the sole responsibility of the potential bidder to comply with all submission requirements applicable to
the bidder in Section 6-63 of the Responsible Bidding Ordinance no later than the date of the public bid
opening.
Version 02/23/2022 General Conditions -10
POST BID SUBMISSIONS:
Post -bid submissions must be submitted in accordance with Section 6-64 of the Responsible Bidding
Ordinance. The post -bid submission requirements are as follows:
1. All bidders shall collect, maintain, and provide upon request, a current written list that discloses the
name, address, licensing status, and type of work for any subcontractor from whom the bidder has
accepted a bid and/or intends to hire on any part of the public work project, including individuals
performing work as independent contractors.
2. Each subcontractor, whose portion of the project is estimated to be at least one -hundred fifty
thousand dollars ($150,000.00), shall be required to adhere to the requirements of Section I of the
Responsible Bidder Ordinance as though it were bidding directly to the City, except that the
subcontractor shall submit the required information (including the name, address, and type of work)
to the successful bidder prior to the commencement of work.
3. Failure of a subcontractor to submit the required information shall not disqualify the successful
bidder from performing work on the project and shall not constitute a contractual default and/or
breach by the successful bidder. However, the City may withhold all payment otherwise due for
work performed by a subcontractor, until the subcontractor submits the required information and
the City approves such information.
4. The disclosure of a subcontractor list ("Disclosed Subcontractor(s)") to the City by a bidder shall
not create any rights in the Disclosed Subcontractor(s). Thus, a bidder may substitute another
subcontractor for a Disclosed Subcontractor by giving the City, upon request, written notice of the
name, address, licensing status, and type of work of the substitute subcontractor.
5. The successful bidder and all subcontractors on a public works project are required to submit
certified payroll utilizing the federal form known as WH -347 or a similar form on a bi-weekly basis,
submitted within 10 days after the end of each bi-weekly payroll period. Certified payrolls shall
identify the job title and craft for each employee. Certified payrolls shall be submitted
electronically.
Please Note: Submissions deemed inadequate, incomplete, or untimely by the City may result in
the automatic disqualification of the bid.
The City, after review of complete and timely submissions, shall, in its sole discretion, after taking into
account all information in the submission requirements, determine whether a bidder is responsive and
responsible, and provide a Pre -Qualification Verification Letter. The City specifically reserves the right to
utilize' all information provided in the contractor's submission and any information obtained by the City
through its own independent verification of the information provided by the contractor.
Version 02/23/2022 General Conditions - 11
PRE -QUALIFIED BIDDER CHECKLIST
(a) Acknowledgements:
(i) X By checking this box, I hereby acknowledge that I am a pre -qualified bidder with
the City of South Bend and that I have met the pre -qualification requirements within
the last twelve (12) months. A copy of my Pre -Qualification verification letter
is attached.
(ii) x By checking this box, I hereby acknowledge that the City reserves the right to
request supplemental information, additional verification of any information
provided by me, and may also conduct random inquiries of my current and prior
customers.
(b) Attachments:
(i) x Indiana Secretary of State's on-line records (ie. Business verification) dated within
sixty (60) days of the submission of said document showing that business is in
existence, current with the Indiana Secretary of State's Business Entity Report,
and eligible for a certificate of good standing. (Not applicable to individuals, sole
proprietors or partnerships).
(ii) X Statement on staffing capabilities, including labor sources. This statement
indicates and ensures I have sufficient employees on staff to complete the work. It
outlines how I intend to meet the staffing needs of the work.
(iii) X List of projects of similar size and scope of work performed in all areas, including
the State of Indiana, within the last three (3) years.
(iv) x For every project, submit evidence of participation in apprenticeship and training
programs, applicable to the work to be performed on the project, which are
approved by and registered with the United States Department of Labors Office of
Apprenticeship, or its successor organization.
Version 02/23/2022 General Conditions - 12
PRE -QUALIFICATION CHECKLIST (FOR BIDDERS THAT ARE NOT PRE -QUALIFIED)
(a) Acknowledgements:
(i) _ By checking this box, I hereby acknowledge that I am not a pre -qualified bidder
with the City of South Bend.
(ii) _ By checking this box, I hereby acknowledge that the City reserves the right to
request supplemental information, additional verification of any information
provided, and may also conduct random inquiries of my current and prior
customers. The City reserved the right to utilize all information provided in this
submission and all information obtained in inquiries or requests to determine if a
bidder is responsive and responsible. Additionally, I acknowledge that all
information provided to the City shall be regarded as public records.
By checking this box, I hereby acknowledge that copies of all Applicable
apprenticeship certificates or standards for training programs applicable to the
work performed on the project may be requested at any time and shall be furnished
upon request.
(iv) _ By checking this box, I hereby acknowledge and ensure that I and all sub-
contractors, from whom I have accepted a bid and/or intend to hire to perform work
on the public work project, are properly licensed. Furthermore, I acknowledge my
understanding that it is my responsibility to ensure that all sub -contractors have
the necessary licenses to undertake the work called for in this bid. If a sub-
contractor loses their license at any point, it is the responsibility of that sub-
contractor to notify the City.
(b) Attachments
(i)
(ii)
(iv)
(v)
(vi)
(vii)
(viii)
Indiana Secretary of State's on-line records (ie. Business verification) dated within
sixty (60) days of the submission of said document showing that business is in
existence, current with the Indiana Secretary of State's Business Entity Report,
and eligible for a certificate of good standing. (Not applicable to individuals, sole
proprietors or partnerships).
List identifying all former business names.
Any determinations by a court or governmental agency any violations of federal
state, or local laws including, but not limited to, violations of contracting or antitrust
laws, tax or licensing laws, environmental laws, Occupational Safety and Health
Act (OSHA), or federal Davis -Bacon and related Acts, within the preceding five (5)
years.
Statement about staffing capabilities, including labor sources. This statement
indicates and ensures I have sufficient employees on staff to complete the work I
am bidding on OR outlines how I intend to meet the staffing needs of the work.
Statement that individuals who will perform work on the public work project on my
behalf will be properly classified as an employee or as an independent contractor
under all applicable state and federal laws and local ordinances.
For every project, submit evidence of participation in apprenticeship and training
programs, applicable to the work to be performed on the project, which are
approved by and registered with the United States Department of Labor's Office of
Apprenticeship, or its successor organization.
Copy of a written plan for employee drug testing that covers all of my employees
who will perform work on the public work project and meets or exceeds the
requirements set forth in IC 4-13-18-5 or IC 4-13-18-6.
Evidence that I am utilizing a surety company which is on the Bureau of Fiscal
Service "Department of Treasury's Listing of Approved Sureties" as required in the
bid specifications or contract.
Version 02/23/2022 General Conditions - 13
(ix) Written statement of any federal, state or local tax liens or tax delinquencies owed
to any federal, state or local taxing body in the preceding three years.
(i) _ List of projects of similar size and scope of work performed in all areas, including
the State of Indiana, within three (3) years prior to the date on which the bid is due.
Date: December 13, 2022
ere)
Justin Butler, Vice President
(Print Name Here)
Selge Construction Co., Inc.
(Name of Company)
2833 South 11th Street
(Address of Company)
Niles
(City)
Michigan
(State)
269-684-0842
(Telephone Number)
Version 02/23/2022 General Conditions - 14
CITY OF SOUTH BEND JAMES MUELLER, MAYOR
DEPARTMENT OF PUBLIC WORKS
ERIC HORVATH, DIRECTOR
December 15, 2021
Allison Swinehart
Selge Construction
aswinehart@selgeconstruction.com
RE: Pre -Qualification Verification
Dear Ms. Swinehart:
This letter serves as verification of Pre -Qualification status of your company for bidding
with the City of South Bend. This Pre -Qualification status is effective for twelve (12)
months from the date of this letter. Thereafter you are required to re -submit a complete
application for continuation of pre -qualification status prior to December 31 for the
upcoming calendar year.
A copy of this Verification Letter must be included with every bid exceeding $150,000
submitted to the City of South Bend Board of Public Works, along with your Pre -Qualified
Bidder Checklist and attachments.
If you have any further questions regarding this matter, please call this office at (574) 235-
9251.
Sincerely,
W a•y11r.�h ¢
Liz Horvath
Liz Horvath, Permit Manager
Page 1 Of 3 CertificatelD:15236195
State of Indiana
Office of the Secretary of State
Certified Copies
To Whom These Presents Come, Greeting:
I, HOLLI SULLIVAN, Secretary of State of Indiana, do hereby certify that I am, by virtue of the laws
of the State of Indiana, the custodian of the corporate records and the proper official to execute
this certificate.
I further certify that this is a true and complete copy of this 2 page document consisting of the
following records filed in this office:
Certification Date- December 08, 2022
Business Name: SELGE CONSTRUCTION CO INC
Business ID: 197203-307
Transaction Date Filed No. of pages
Business Entity Report 01/11/2022
2
Total No. of pages
2
�TAT�e
••... In Witness Whereof, I have caused to be affixed my
:. � signature and the seal of the State of Indiana, at the
City of Indianapolis, December 08, 2022
glob
}� k
i
•�
•�••''•• •�•• �• HOLLI SULLIVAN
isle
SECRETARY OF STATE
197203-307 / 15236195
All certificates should be validated here: https://bsd.sos.in.gov/ValidateCertificate
Expires on January 07, 2023.
Page 1 Of 3 CertificatelD:15236195
BUSINESS ENTITY REPORT —
?HANE AND PRINCIPAL OFFICE ADDRESS -
BUSINESS ID
BUSINESS TYPE
BUSINESS NAME
ENTITY CREATION DATE
JURISDICTION OF FORMATION
PRINCIPAL OFFICE ADDRESS
YEARS FILET)
YEARS
EFFECTIVE DATE
EFFECTIVE DATE
EFFECTIVE TIME
REGISTERED OFFICE AND ADDRESS
APPROVED AND FILED
HOLLI SULLIVAN
INDIANA SECRETARY OF STATE
01/11/2022 03:32 PM
197203-307
Foreign For -Profit Corporation
SELGE CONSTRUCTION CO INC
03/15/1972
Michigan
2833 S. 11th Street, NILES, MI, 49120, USA
2022/2023
01/11/2022
3:32 PM
REGISTERED AGENT TYPE Individual
NAME BRENT E. INABNIT
ADDRESS 210 S. MICHIGAN AVE, SOUTH BEND, IN, 46624, USA
Page 2 Of 3 CertificateID:15236195
-Page 1 of 2 -
APPROVED AND FILED
HOLLI SULLIVAN
INDIANA SECRETARY OF STATE
01/11/2022 03:32 PM
GOVEIR ING PERSON INFORMATION '
TITLE President
NAME Jim Boyles
ADDRESS 2833 S 11TH ST., NILES, MI, 49120, USA
TITLE Secretary
NAME Allison Swinehart
ADDRESS 2833 S. 11th Street, Niles, MI, 49120, USA
TITLE CEO
NAME Marvin L Selge JR.
ADDRESS 2833 S. 11th Street, Niles, MI, 49120, USA
TITLE
Vice President
NAME
Justin Butler
ADDRESS
2833 S. 11th Street, Niles, MI, 49120, USA
SIGNATU
IN WITNESS WHEREOF, THE UNDERSIGNED HEREBY VERIFIES, SUBJECT TO THE PENALTIES OF PERJURY, THAT THE
STATEMENTS CONTAINED HEREIN ARE TRUE, THIS DAY January 11, 2022.
THE UNDERSIGNED ACKNOWLEDGES THAT A PERSON COMMITS A CLASS A MISDEMEANOR BY SIGNING A
DOCUMENT THAT THE PERSON KNOWS IS FALSE IN A MATERIAL RESPECT WITH THE INTENT THAT THE DOCUMENT
BE DELIVERED TO THE SECRETARY OF STATE FOR FILING.
SIGNATURE
TITLE
Page 3 Of 3
ALLISON SWINEHART
Secretary
Business ID : 197203-307
Filing No.: 9281142
CertificateID:15236195
- Page 2 of 2 -
STATE OF INDIANA
OFFICE OF THE SECRETARY OF STATE
CERTIFICATE OF AUTHORIZATION
To Whom These Presents Come, Greetings:
I, TODD ROKITA, Secretary of State of Indiana, do hereby certify that I am, by virtue of the laws of the State of Indiana,
the custodian of the corporate records, and proper official to execute this certificate.
I further certify that records of this office disclose that
SELGE CONSTRUCTION CO INC
duly filed the requisite documents to commence business activities under the laws of State of Indiana on March 15, 1972, and
was in existence or authorized to transact business in the State of Indiana on February 10, 2010.
I further certify this For -Profit Foreign Corporation has filed its most recent report required by Indiana law with the Secretary
of State, or is not yet required to file such report, and that no notice of withdrawal, dissolution or expiration has been filed or
taken place.
In Witness Whereof, I have hereunto set my hand
and affixed the seal of the State of Indiana, at the
city of Indianapolis, this Tenth Day of February, 2010.
TODD ROKITA, Secretary of State
197203-307/2010021072953
CONSENT RESOLUTIONS OF THE SHAREHOLDERS AND DIRECTORS
OF SELGE CONSTRUCTION CO., INC.
The Shareholders and Board of Directors of Selge Construction Co., Inc., a Michigan
corporation, take the following actions pursuant to Section 407 and Section 525 of the
Michigan Business Corporation Act:
1: Financial Statement
The financial statements have been reviewed by all shareholders and officers and
approved as presented.
2. Board of Directors
The following persons were elected to serve as directors of the Corporation until
the next annual shareholders meeting or until their successors are elected and take
office:
Marvin L. Selge, Jr.
Officers
The following person shall hold the offices set forth opposite their names until
their successors are elected and shall qualify:
Name
Office
James Boyles
President
Justin E. Butler
Vice President
Allison Swinehart
Secretary
Marvin L. Selge, Jr.
Treasurer
4. Authorization to Sign Construction Documents
The President, James Boyles, the Vice President, Justin E. Butler, the Treasurer,
Marvin L. Selge, Jr., the Secretary, Allison Swinehart, and the Project
Managers, Robert P. Kuhns, Robert S. Riley, Christian Baybutt, Ronald J.
White, Jr., Thomas A. Lentz, Mathew Huss, Andrew Boyles and Kyle Silveus
are all authorized to sign construction documents on behalf of the Corporation.
The signature of the President, the Vice President, the Treasurer, the Secretary, or
the Project Manager shall be sufficient to bind the Corporation as to any
construction documents submitted.
5. Ratification of Past Acts
The Shareholders and Directors hereby ratify and reaffirm all corporate actions of
the officers and directors of the Corporation taken between the date of the last
meeting and the date of this Resolution.
6. Authorization
The officers of the Corporation are authorized and empowered for and on behalf
of the Corporation to do any and all acts and things and execute any and all
additional instruments, papers or documents that may be or become necessary,
desirable, or appropriate to carry out, put into effect, and make operative any
portion of portions of these Resolutions.
DATED: September 1. 2021
MA IN L. SEWGE, JR.
P IE ANN BUTLER
�rteto.."i
r -
"Shareholders"
"Director"
2
�J 9
BARBARA S. 9ELGE
STIN E. BUTLER
CERTIFIED RESOLUTION
I, ALLISON SWINEHART, hereby certify that I am the duly elected and acting
Secretary of SELGE CONSTRUCTION CO., INC., a Michigan corporation, and that
the following resolution was duly adopted by unanimous consent of the Shareholders and
Directors of said Corporation, on September 1, 2021, and that said resolution is in full
force and effect:
Board of Directors. The following person was elected to serve as director of the
Corporation until the next annual shareholders meeting or until their successors
are elected and take office:
Marvin L. Selge, Jr.
2. Officers. The following persons shall hold the offices set forth opposite their
names until their successors are elected and shall qualify:
Name
James Boyles
Justin E. Butler
Allison Swinehart
Marvin L. Selge, Jr.
Office
President
Vice President
Secretary
Treasurer
IN WITNESS WHEREOF, I have signed this Certified Resolution this 1 st day of
September, 2021.
ALLISON SWINEHART
3
rsE Gt .
FAdamems
2833 S. 11'" Street
Niles, Michigan 49120
P: 269.684.0842 F: 269.684.0846
www. selgecanstruction. cc
Selge Construction Staffing Capabilities and Employee
Statement
Selge Construction Co., Inc. is proud to be part of the Christian Labor
Association (CLA), Local Union 10. Being part of the CLA provides an organized
workforce that has gone through rigorous training and provides premium pay and
benefits to everyone on staff. Our team is comprised of 75 individuals (19 office
members and 56 field personnel). The team is made up of male, female, and
minority members. The average employee has been with Selge Construction for
16 years.
Each person on your project will be properly classified as an employee under all
applicable state and federal laws and local ordinances. Selge has never
defaulted on a contract and we do not bid any work that we cannot complete.
Based on our current schedule and capabilities, we will utilize 100% Selge
employees and equipment for your project. We do not foresee any issues being
able to complete the project within the designated schedule. Let there be no
doubt that Selge Construction has sufficient employees and resources to
complete any work that is bid on.
SELGE CONSTRUCTION CO., INC.
COMPLETED PROJECT DESCRIPTIONS
Description:
Steuben Lakes — NED Phase 1 WW Collection System (610) — LaGrange County Regional
Utility District. Installation of 120,000 LF of low-pressure sewer, 290 grinder pump units, 3 new
lift stations and one upgrade to existing lift station. $10,144,631.00. Completed: 2021
Description:
Buffalo Street Plaza (643) — Owner: City of Warsaw. Installation of helical piles to support
deck, retaining walls, decorative concrete, site lighting, pavilion, and an interactive fountain.
$2,129,833.00 Completed: 2021
Description:
AEP Service Center (628) — Owner: E&L Construction. All site work, underground utilities,
site concrete and asphalt pavement for new 35 -acre AEP facility. $4,847,000.00 Completed 2021
Description:
C-1 Lift Station (670) — Owner: Ontwa Township. Equipment upgrade & to existing lift station.
$253,390.00 Completed: 2021
Description:
Hills at St. Joe Farm & Curb (676) — Owner: The Village Development LLC. Complete
construction of 2,000 LF of new roadway including sanitary sewer, storm sewer and water main.
$855,000.00 Completed: 2021
Description:
Lift Station & Manhole Improvements (677) — Owner: Village of Martin. Rehabilitation of 2
existing sanitary lift stations. $398,008.00 Completed: 2021
Description:
Hills Residential Development Lift Station (681) — Owner: The Village Development LLC.
Installation of new sanitary lift station and 9,200 LF of forcemain. $758,650.00 Completed: 2021
Description:
Goshen Pond Dam Improvements (701) — Owner: Elkhart County Park & Recreation Board.
Removal and replacement of existing toe drain at the base of dam. $162,750.00 Completed: 2021
Description:
Ironworks Dev Utilities Phase II (589) — Owner: City of Mishawaka. New sanitary sewer,
water main and storm sewer for development at the Ironworks site. $536,041.00 Completed:
2021
Description:
Home Street Lift Station (617) — Owner: City of Mishawaka. Removal and replacement of
sanitary lift station. $319,952.00 Completed: 2021
Description:
Burns Building Utility Extension (632) — Owner: City of South Bend. Extension of sanitary
sewer and water main to a new convenience store. $548,626.00 Completed: 2021
Description:
St. Joe River Backwater Valve Replacement (642) — Owner: City of South Bend. Installation
of 2 new 36" backwater valve and 1 new 42" backwater valve. $105,063.00 Completed: 2021
Description:
LCRUD Contract C Regional B Wastewater Treatment Plant Improvements (645) —
Owner: LaGrange County Regional Utility District. Construction of two new buildings,
installation of new blowers and all associated yard piping to connect to existing equipment.
$1,230,212.00 Completed: 2021
Description:
CS03 Backwater Valve Repair (652) — Owner: City of South Bend. Removal and replacement
of existing sanitary lift station. $109,925.00 Completed: 2021
Description:
Dawn Estates Lift Station Replacement (662) — Owner: Town of Middlebury. Removal and
replacement of existing sanitary lift station. $288,491.00 Completed: 2021
Description:
Lift Station 12 Replacement (667) — Owner: City of Elkhart. Removal and replacement of
existing sanitary lift station. $219,474.00 Completed: 2021
Description:
Water System Improvements Colfax & Messner (693) — Owner: Benton Charter Township.
Installation of 1,600 LF of water main and restoration including concrete pavement. $486,924.00
Completed: 2021
Description:
Rock Run Sewer Improvement C (649) — Owner: City of Goshen. Installation of 2,500 LF of
24" & 42" sanitary sewer, concrete siphon chambers and associated restoration. $1,746,290.00
Completed: 2021
Description:
East Goshen Water Main Replacement (664) — Owner: City of Goshen. Installation of 4,000
LF of water main, 50 water services and associated street repairs. $1,148,484.00 Completed:
2021
Description:
JA Drive & Lexington Streetscapes (629) — Owner: City of Elkhart. Complete reconstruction
of the streets including new underground utilities, decorative sidewalk and new streetlights.
$1,987,254.00 Completed: 2020
Description:
Wawasee Conklin Bay Trail (633) — Owner: Syracuse-Wawasee Park Foundation. Installation
of 1,700 LF of boardwalk and 2,500 LF of 10 concrete pathways. $2,254,710.00 Completed:
2020
Description:
CR 46 RR Crossing SS Repair (638) — Owner: New Paris Conservancy District. Installation of
sanitary sewer beneath the railroad crossing. $248,929.00 Completed: 2020
Description:
Laurel Road Trail Construction (639) — Owner: City of South Bend. Installation of concrete
pathway. $120,352.75 Completed: 2020
Description:
2020 Concrete Repair (640) — Owner: City of Goshen. Removal and replacement of concrete
pavement patches at various locations in Goshen. $905,050.00 Completed: 2020
Description:
Brandywine High School Tennis Courts (646) — Owner: Brandywine Community Schools.
Installation of new tennis courts including all site work. $500,000.00 Completed: 2020
Description:
Press Ganey Concrete Replacement (647) — Owner: PAI Properties, LLC. Removal of existing
parking lot and replacement with concrete pavement. $223,000.00 Completed: 2020
Description:
Hydrant Replacement (648) — Owner: City of South Bend. Removal and relocation of 6 fire
hydrants. $62,727.00 Completed: 2020
Description:
Prairie Creek Run Phase II Water Services (656) — Owner: Elkhart Highway Dept.
Installation of 13 new water services. $173,678.00 Completed: 2020
Description:
Steuben Lakes Pump 1 (660) — Owner: Steuben Lakes Regional Waste District. Installation of
new lift station and associated bypass pumping. $185,550.00 Completed: 2020
Description:
Zigler/Filbert Street Improvements (663) — Owner: Town of New Carlisle. Installation of new
water main, storm sewers and road reconstruction. $753,811.00 Completed: 2020
Description:
117 Jackson Avenue (671) — Owner: City of Elkhart. Remove and replace existing manhole.
$38,174.00 Completed: 2020
Description:
Jackson Boulevard Streetscapes (587) — Owner: City of Elkhart. Remove and reconstruct the
entire area including sewers, concrete, curbs, brick work. $5,237,724.00 Completed: 2020
Description:
Region C — Wastewater Project — Contract A -Wastewater Treatment Plant (598) — Owner:
LaGrange County Regional Utility District.
Erection of 1800 square foot maintenance building and 1800 square foot blower/headworks
building. Installation of 0.200 MGD extended aeration activated sludge process with aerobic
sludge digestion. Main pump station, cast in place concrete tankage, UV disinfection, post
aeration and effluent meter. $4,644,845.00 Completed: 2020
Description:
Carriage Hills Sanitary Sewer Extension (625) — Owner: St. Joseph County Regional Water
and Sewer District. Installation of 15,500 LF of sanitary sewer main and laterals for the Carriage
Hills Subdivision. $2,188,635 Completed: 2020
Description:
The Mill At Ironworks, Mishawaka, IN (571) — Owner: F&H Mishawaka Development, LLC.
Subcontracted by Flaherty & Collins to complete demolition and removal of paving, site clearing
and rough grading. Installation of Water, Sanitary Sewer and Storm Drainage. $1,413,067.00
Completed: 2019
Description:
Ironworks Development Area Utility Design — Phase II (589) — Owner: City of Mishawaka.
Installation of approximately 700 feet of storm sewer and structures, 825 feet of sanitary sewer
and structures. Electrical and utility conduit, lighting foundations and appurtenances.
$549,451.30 Completed: 2019
Description:
Lincolnway West & Charles Martin Drive Improvements (592) — Owner: City of South
Bend, IN Installation of storm sewer, structures, drains, curb, sidewalk and brickwork.
$1,175,078.00 Completed: 2019
Description:
2018 Lift Station Improvements (597) — Owner: Town of Bremen, IN
Removal and installation of lift stations, lift station pumps, electrical system and back-up
generator and sanitary sewer and forcemain installation. $638,196.00 Completed: 2019
4
Description:
Buffalo Street Plaza (572) — Owner: City of Warsaw, IN. Installation of boardwalk plaza and
greenspace located at Buffalo and East Canal Street. $2,347,947.00 Completed: 2019
Description:
Niles PO Apartments (636) — Owner: Bedrock Construction (Sub) Installation of the sanitary
sewer for the Niles -Post Office Apartment project. Relocate Sanitary Main, Asphalt & curb
replacement. $78,400.00 Completed: 2019
Description:
Temporary Traffic Calming (635) — Owner: City of South Bend. Install temporary speed
humps along miscellaneous streets in South Bend. 300 ft temp rubber speed hump, 400 ft rubber
curbing. $67,350.00 Completed: 2019
Description:
Riverbank Repairs (634) — Owner: City of Elkhart. Riverbank repairs for the City of Elkhart.
Restack existing stone, 140 -ton natural stone boulders, 50 -ton rip -rap. $59,930.00 Completed:
2019
Description:
East Race Boat Launch (631) — Owner: City of South Bend. Reconstruction of the boat ramp
launch on the East Race. 250 sy turf reinforcement mat, 75 if coir roll, 29 sy riprap, 821f fencing.
$49,384:00 Completed: 2019
Description:
2019 CDBG Sidewalk (626) — Owner: City of Elkhart. Remove non-compliant curb ramps, curb
& gutter, and portions of sidewalk in order to install 3,400 sf ADA compliant curb ramps, 250 sf
sidewalk, 7251f concrete curb. $139,284.00 Completed: 2019
Description:
5th Street Sewer Lateral (624) — Owner: City of Goshen. Sewer lateral replacement, 6 sewer
laterals & tie to a 24" clay sewer main approximately 16' deep. $175,675.00 Completed: 2019
Description:
JPR Solar Covered Patio (623) — Owner: Jones Petrie Rafinski. Create a solar panel covered
patio. $95,000.00 Completed: 2019
Description:
Candy Lane Sanitary Sewer Improvements (621) — City of Plymouth. $
Description:
Home Street Lift Station (617) — Owner: City of Mishawaka. Rehabilitation of the Home St.
lift station including wet well modifications, valve vault, pumps, piping, controls, and all
associated appurtenances. $285,791.00 Completed: 2019
Description:
Small Drainage & Repair Division B (616) — Owner: City of South Bend. Storm sewer repairs
at different locations around South Bend. 7,187 if pipe, 590 cy excavation, 223 if fencing
replacement, 15,76 sy sodding. $100,620.00 Completed: 2019
Description:
Hidden Hills Estates (615) — Owner: Hidden Hills Estates. Created 2 cul-de-sacs for the
development of Hidden Hills Estates in Cass County Michigan. Earthwork & excavation, 2,175
If of Storm Sewer, 10 manholes, 7401f Curb & gutter $350,878.00 Completed: 2019
Description:
Lakeland Riverfront Trail Expansion (614) — Owner: City of Niles & MDNR. Create trailhead
on Lakeland Health property along St. Joseph River including ADA accessible observation,
fishing platform, boardwalk, and foot vending plaza. $435,237.00 Completed: 2019
Description:
Goshen Hospital Loading Dock (599) — Owner: Goshen Health (Sub for DJ Construction).
Water main, sanitary sewer, storm sewer, excavation of basement, sheet piling, earthwork.
$736,512.00 Completed: 2019
Description:
Rodgers Lake Water System Improvements (600) — Owner: Pokagon Band of Potowatomi
Indians. 11,445 ft of water main, 10 water main taps, 7 hydrants, 2,220 ft of directional drilling.
$1,477,016.00 Completed: 2019
Description:
Warsaw W. Center St. Watermain Improvements (604) — Owner: Indiana American Water.
Replace 2,795 linear feet of water main with appurtances, 76 linear feet of concrete
sidewalk/driveway/curb, 25 square yards of concrete sidewalk/driveway, 3 ADA ramps.
Restoration, Landscaping $ 662,154.00 Completed: 2019
Description:
Sewer Rehabilitation — Sewer Replacement (574) — Owner: City of Warsaw, Indiana. Sewer
replacement, small diameter rehabilitation and large diameter rehabilitation. Funded through
SRF. $1,205,769.00 Completed: 2019
Description:
Region B Lift Station #2 & #6 Piping Replacement (607) — Owner: LaGrange County
Regional Utility District. Replace piping and force main air release valves on 2 lift stations
$158,500.00 Completed: 2018
Description:
Jackson Landscape (603) — Owner: City of Elkhart. Landscape improvements around various
locations on the Jackson Blvd project. $ 219,100.00 Complete: 2018
U. S. Department of Labor
Office of Appr+enticaship
Date: December 13, 2021
From: Tiffanie L. Clawson, Michigan ATR
Offioe of Apprenticeship
Subject: Program Verification
To: Bruce Dickie
Selge Construction Company, Inc.
2833 South 11th Street
Niles, MI 49120
Thank you for participating in the National Apprenticeship Program. You have been
registered with the US Department of Labor, Office of Apprenticeship since 2009. Your
program has two occupations registered, Construction Craft Laborer and Heavy
Construction Equipment Operator. Both occupations have active apprentices registered
with the US DOL and utilize NCCER as the RTI Provider.
Thank you again for your participation in Registered Apprenticeship with the US
Department of Labor, Office of Apprenticeship. If I can provide additional information or
service, please feel free to contact me.
Appr6rkl6ship & Training Representative
U.S. Department of Labor
Office of Apprenticeship
269-961-7337 — Office
269-601-2820 — Cell
clawson.tftnie.l@dol.gov
Phone: (269) 961-7337
US DOL/OA DISCOVER Cell: (269) 601.2820
74 North Washington Ave., RM 2-1-56 APPRENTICESHIP Clawson,ftnial®dol.gov
Battle creek MI 49037
J.��;d.�Nu�..r�ldf/ �-�.�•7rI//� '.iran.�l:.rv:yyr
MiA
JOQDCJ lO )I�IDla.Ioag3 a5rj kiJ Pa✓ SvDlsa
dr sa�r�uaaddD�o sp.rDJouD�s �rsD9 a5rj ylrfw a.OuDp.roaaD ui
zuajsli� dit�sa�?rjua.rdd JDuor�D ar�j�o �rDd sD paza�sr6a
MOPP 00 UmPnW,9 P uMw6#ssOl3 tJnu.L AP Jof
un4yxry 1 mac
-oul `iCuvdwoo ummvuoo a8jaS
r,V un:/n-garh<</
69TZ60800DS
,,In(/
6002 IT kW
ucvibox�� �ilC��a�i��iaa��� �a �toi;�a�$i�a� �o a��a�;;1aa7
dlq5jjljujaddlo 10
J,
jo,��Jo tuaugauda@� �a1B1� Qaa���'
A99
On-The-job Training
I:a tr m
�
�.uktE _.
Homo 1 Partner.&&-Agreemonis
Partnership Agreements
Firm Name: Selge Construction Co., Inc.
Year. 2022
Training Program: 9JT Program d aannershi0 Aareeh+ento�
Step 1: Determine Total Number of Hours worked in High way construction trades on INDOT federal -aid
contrects(either as prime contractor
or sub contractor during the past three years. Do not include hours worked an state -funded and private
work.)
Hours Worked During 2018 Hours 2020 Hours 2021 Hours
Total 4 0 403
Step 2:
Step 3:
Add the total number of hours from each year and divide it by three (3);
4 0 403
2019 2020 2021
Multiply the "Average Hours" by five percent (5%):
135 " 5%
Average Hours
407 13 135
Average Hours
6
2022 Training Goal
Approved Training Program: CLA L rjgrtQrncnt2021.2024.odf
BS r i1f
yyo4 L W
RGf
I here by agree all the terms and conditions contained herein and affirm under penalty and the pre)ury
that the information stated above is true and accurate.
Prepared on 1127/2022 3:10:32 PM by SWINEHART, ALLISON
Approved on 2/15/2022 11:34:15 AM by Daniels, Kathryn
Fields with this color background are required
Indiana Department of Transportation
Version. 1.0.0
1l1