HomeMy WebLinkAboutChange Order No 4 - WWTP Final Clarifiers 4-5, Aeration Tanks 1-4, & Disinf. Imprvmts. Proj No. 119-069A - Bowen Engieering Corp.  ELIZABETH A. MARADIK JOSEPH R. MOLNAR GARY A. GILOT JORDAN V. GATHERS MURRAY L. MILLER 1316 COUNTY-CITY BUILDING 227 W. JEFFERSON BOULEVARD SOUTH BEND, INDIANA 46601-1830 PHONE 574/ 235-9251 FAX 574/ 235-9171 CITY OF SOUTH BEND JAMES MUELLER, MAYOR BOARD OF PUBLIC WORKS November 22, 2022 Mr. John Dettman Bowen Engineering Corporation 8802 N. Meridian St. Indianapolis, IN 46260 Johnd@BowenEngineering.com RE: Change Order No. 4 – Wastewater Treatment Plant Final Clarifiers 4-5, Aeration Tanks 1-4, & Disinfection Improvements – Project No. 119-069A Dear Mr. Dettman: At its November 22, 2022 meeting, the Board of Public Works approved the above referenced Change Order be increased by $10,320 with an additional seventy (70) days, bringing the revised contract amount to $4,485,905.23 with a new completion date of November 3, 2022. Enclosed is a copy of the Change Order for your records. If you have any further questions, please call this office at (574) 235-9251. Sincerely, /s/ Theresa Heffner Theresa Heffner, Clerk Enclosures TH/lh CITY OF SOUTH BEND DEPARTMENT OF PUBLIC WORKS PROJECT CHANGE ORDER DATE: 11-14-2022 PROJECT NO: 119-069A PROJECT NAME: WWTP Final Clarifiers 4-5, Aeration Tanks 1-4, and Disinfection Improvements CONTRACT DATE: 11/13/2020 Notice to Proceed CHANGE ORDER NO. 004 SUBJECT OF CHANGE ORDER: Scope of Work Changes including temporary bulkheading of gates in Aeration Channel (Unforeseen Condition), additional electrical work (Owner Directed), and time adjustment for Stop Log Frame manufacturer delays. All items completed substantially as planned. See attached Comparison of Estimate for overruns and underruns. The original contract sum $ 4,272,999.00 Net change by previously authorized change orders $ 202,586.23 The contract sum prior to this change order $ 4,475,585.23 By this Change Order, the project amount is Increased Decreased $ 10,320.00 The new contract sum including this change order $ 4,485,905.23 This Change Order represents a total change of 0.24 % Total change for entire project 4.98 % Original contracted completion date/time 05/17/2022 Extension of date/time by previous change orders 100 days Date/time extension by this change order 70 days (due to manufacturer delays) New completion date/time 11/03/2022 RECOMMENDED FOR APPROVAL CONTRACTOR Construction Manager CITY OF SOUTH BEND BOARD OF PUBLIC WORKS Approved Date: Contractor Signature Printed Name and Title Bowen Engineering Corporation President Company name 8802 North Meridian Street Member Address Indianapolis, IN 46260 Member City, State, Zip Member Member Pat Stanford, Project Manager 11-14-2022 November 22, 2022 Page 1 of 1 8802 North Meridian Street • Indianapolis, IN 46260 • 317.842.2616 phone • www.BowenEngineering.com October 31,2022 (E-Mail) Benjamin Burroughs Water Resource Engineer Arcadis U.S., Inc. 150 West Market Street Suite 278 Indianapolis, IN 46204 RE: South Bend WWTP Upgrades Bowen Project #15-21-008 RE: RFQ-020 – Aeration Gate Bulkheads Dear Mr. Burroughs: The Aeration gates were leaking into the backside channel bulks heads were required to isolate the aeration tanks. Work was tracked on a T&M basis. See associated costs below. Labor/Equipment: $7,080.00 Material: 0.00 Markup: $1,062.00 Bonds/Insurance: $81.00 Total Price: $8,223.00 We look forward to the opportunity to review this proposal with you. If you have any questions regarding this proposal, feel free to contact me at 219-746-7165. Sincerely, BOWEN ENGINEERING CORPORATION Patrick Stanford Project Manager City of South Bend Department of Administration & Finance Change Order Request Form Multiple PO lines: PO Number PO-0005021 -- Bowen Engineering Line Number Add Line 5 - Increase Total Amount by $10,320.00 "Change Order No. 4" Original Dollar Amount $4,475,585.23 New Dollar Amount (For liquidation request, enter $0)4,485,905,23 (Includes Change Order No. 4, Increase of $10,320.00) Reason Code (if changed)N/A Financial Dimensions (fund-dept- division-subdivision-main account)641-06-605-515-439001 Project Code (if applicable)N/A Description of change (include budget impact) Change Order No. 4 reflects additional scope of work required to bulkhead leaking Aeration Gates at Aeration Tanks 1-4 during construction to keep water off of the contractor during new gate installations. This change order also included Owner directed electrical work to add a receptacle for the disinfection processes for a reserve sulfur dioxide mixer. Changing the line amount: You can only change a line amount if it has NOT been invoiced against. • If the line has NOT been invoiced – reduce the line amount to equal what it should be. • If the line has been invoiced – cancel the delivery remainder and finalize the individual line, then add a new line for the amount that should be remaining. If you have changes to more than two lines on the same PO, fill out a separate section for each line affected by the change order. PO CHANGE FORM for PO-0005021 2022.11.14 1 of 5 BOARD OF PUBLIC WORKS AGENDA ITEM REVIEW REQUEST FORM Date: 11-14-2022 Name: Jacob M. Klosinski Department of Public Works – Engineering Division BPW Date: 11-22-2022 Phone Extension: 9496 Required Prior to Submittal to Board BPW Attorney X Attorney Name Michael Schmidt Dept. Attorney Attorney Name Michael Schmidt Purchasing Mickey Lovy / Ron O'Connor Check the Appropriate Item Type –Required for All Submissions Professional Services Agreement Contract Proposal Open Market Contract Amendment/Addendum Special Purchase, QPA Bid Opening Bid Award Req. to Advertise Title Sheet Quote Opening Quote Award Reject Bids/Quotes Proposal Opening C/O & PCA No. PCA Chg. Order, No. 004 Traffic Control Resolution Other: Ease./Encroach Required Information Company or Vendor Name Bowen Engineering Corporation (V-00000243) New Vendor Yes If Yes, Approved by Purchasing No MBE/WBE Contractor MBE WBE Completed E-Verify Form Attached Yes No Project Name WWTP Final Clarifiers 4-5, Aeration Tanks 1-4, and Disinfection Improvements Project Number 119-069A (PROJ00000078) Funding Source Venues, Parks and Arts - Services & Charges-Other-Misc Charges & Svcs Account No. PO # PO-0005021 (642-06-605-514-442005; Sewage Works Capital) Amount $10,320.00 Terms of Contract Special Contract Provisions Purpose/Description The Division of Engineering and Division of Utilities requests the Board of Public Works approval of Change Order No. 4 for the subject project. Refer to attached detail regarding changes in scope (increase) and adjustment of time for manufacturer delays material and fabrication delays. Net Increase. For Change Orders Only Amount of Increase Decrease $ 10,320.00 ($ ) Previous Amount $ 4,475.585.23 Current Percent of Change: Increase Decrease 0.24% (%) New Amount $ 4,485,905.23 Total Percent of Change: Increase Decrease 4.98% (%) Time Extension Amount: 70 days (Due to Manufacturing and Materials Delays) New Completion Date: 11-03-2022