HomeMy WebLinkAboutOpening of Bids - WWTP Masonry Improvements at Building 5 Proj No. 121-046R - Ziolkowski Construction, Inc.Version 02/23/2022 General Conditions - 10 CITY OF SOUTH BEND, INDIANA CONTRACTOR’S BID FOR PUBLIC WORK RESPONSIBLE BIDDER CHECKLIST Project Name Wastewater Treatment Plant Masonry Improvements at Building 5 Project No. 121-046-R For Bids Due November 22, 2022 Contractor Name: The City seeks to enhance its ability to identify responsive and responsible bidders on all City public works projects by institution of comprehensive submission requirements in compliance with State law. Quality workmanship, efficient operation, safety, and timely completion of projects requires that all bidders meet certain minimum requirements to be responsive and responsible bidders. THIS FORM MUST BE SUBMITTED WITH YOUR BID. INSTRUCTIONS: If you are a pre-qualified bidder, complete Section I only. If you are not a pre-qualified bidder, complete Section II only. Section II acts as an application for pre-qualification. Submission of Section II will allow the bidder to be considered for pre-qualification for bids with the City of South Bend Department of Public Works. Pre- qualified bidders will then be exempt from a portion of the submission requirements outlined in Section 6- 63 of The Responsible Bidding Ordinance No. 10594-18 (hereinafter, “Responsible Bidding Ordinance”) for a period of twelve (12) months. Thereafter, contractors who are pre-qualified must submit a complete application for continuation of “pre- qualified” standing, on a form provided by the City (“Responsible Bidder Checklist (1) Pre-Qualified Bidders”) by December 31st for the upcoming calendar year, or within twelve (12) months of obtaining pre- qualified standing. If the status of any item changes within the twelve (12) months, it is the responsibility of the contractor to notify the City. Failure by any pre-qualified contractor to submit its complete application for continuation of “pre-qualified” standing within the time prescribed above shall result in automatic removal of the designation, effective January 1 of the following year, or immediately following the twelve (12) months of pre-qualified standing. However, the “removed” contractor or subcontractor shall still be permitted to bid on City public works projects, though the contractor must submit all required documents under 6-63 until “pre-qualified” status is re-established. Please Note: The City reserves the right to request supplemental information from the bidder, additional verification of any information provided by the bidder, and may also conduct random inquiries of the bidder’s current and previous customers regardless of pre-qualified standing. It is the sole responsibility of the potential bidder to comply with all submission requirements applicable to the bidder in Section 6-63 of the Responsible Bidding Ordinance no later than the date of the public bid opening. Ziolkowski Construction, Inc. Version 02/23/2022 General Conditions - 11 POST BID SUBMISSIONS: Post-bid submissions must be submitted in accordance with Section 6-64 of the Responsible Bidding Ordinance. The post-bid submission requirements are as follows: 1.All bidders shall collect, maintain, and provide upon request, a current written list that discloses the name, address, licensing status, and type of work for any subcontractor from whom the bidder has accepted a bid and/or intends to hire on any part of the public work project, including individuals performing work as independent contractors. 2.Each subcontractor, whose portion of the project is estimated to be at least one-hundred fifty thousand dollars ($150,000.00), shall be required to adhere to the requirements of Section I of the Responsible Bidder Ordinance as though it were bidding directly to the City, except that the subcontractor shall submit the required information (including the name, address, and type of work) to the successful bidder prior to the commencement of work. 3.Failure of a subcontractor to submit the required information shall not disqualify the successful bidder from performing work on the project and shall not constitute a contractual default and/or breach by the successful bidder. However, the City may withhold all payment otherwise due for work performed by a subcontractor, until the subcontractor submits the required information and the City approves such information. 4.The disclosure of a subcontractor list (“Disclosed Subcontractor(s)”) to the City by a bidder shall not create any rights in the Disclosed Subcontractor(s). Thus, a bidder may substitute another subcontractor for a Disclosed Subcontractor by giving the City, upon request, written notice of the name, address, licensing status, and type of work of the substitute subcontractor. 5.The successful bidder and all subcontractors on a public works project are required to submit certified payroll utilizing the federal form known as WH-347 or a similar form on a bi-weekly basis, submitted within 10 days after the end of each bi-weekly payroll period. Certified payrolls shall identify the job title and craft for each employee. Certified payrolls shall be submitted electronically. Please Note: Submissions deemed inadequate, incomplete, or untimely by the City may result in the automatic disqualification of the bid. The City, after review of complete and timely submissions, shall, in its sole discretion, after taking into account all information in the submission requirements, determine whether a bidder is responsive and responsible, and provide a Pre-Qualification Verification Letter. The City specifically reserves the right to utilize all information provided in the contractor’s submission and any information obtained by the City through its own independent verification of the information provided by the contractor. Version 02/23/2022 General Conditions - 12 I.PRE-QUALIFIED BIDDER CHECKLIST (a) Acknowledgements: (i)___By checking this box, I hereby acknowledge that I am a pre-qualified bidder with the City of South Bend and that I have met the pre-qualification requirements within the last twelve (12) months. A copy of my Pre-Qualification verification letter is attached. (ii)___By checking this box, I hereby acknowledge that the City reserves the right to request supplemental information, additional verification of any information provided by me, and may also conduct random inquiries of my current and prior customers. (b) Attachments: (i)___Indiana Secretary of State’s on-line records (ie. Business verification) dated within sixty (60) days of the submission of said document showing that business is in existence, current with the Indiana Secretary of State’s Business Entity Report, and eligible for a certificate of good standing. (Not applicable to individuals, sole proprietors or partnerships). (ii)___Statement on staffing capabilities, including labor sources. This statement indicates and ensures I have sufficient employees on staff to complete the work. It outlines how I intend to meet the staffing needs of the work. (iii)___List of projects of similar size and scope of work performed in all areas, including the State of Indiana, within the last three (3) years. (iv)___For every project, submit evidence of participation in apprenticeship and training programs, applicable to the work to be performed on the project, which are approved by and registered with the United States Department of Labor’s Office of Apprenticeship, or its successor organization. X X X X X X Version 02/23/2022 General Conditions - 13 II.PRE-QUALIFICATION CHECKLIST (FOR BIDDERS THAT ARE NOT PRE-QUALIFIED) (a) Acknowledgements: (i)___By checking this box, I hereby acknowledge that I am not a pre-qualified bidder with the City of South Bend. (ii)___By checking this box, I hereby acknowledge that the City reserves the right to request supplemental information, additional verification of any information provided, and may also conduct random inquiries of my current and prior customers. The City reserved the right to utilize all information provided in this submission and all information obtained in inquiries or requests to determine if a bidder is responsive and responsible. Additionally, I acknowledge that all information provided to the City shall be regarded as public records. (iii)___By checking this box, I hereby acknowledge that copies of all Applicable apprenticeship certificates or standards for training programs applicable to the work performed on the project may be requested at any time and shall be furnished upon request. (iv)___By checking this box, I hereby acknowledge and ensure that I and all sub- contractors, from whom I have accepted a bid and/or intend to hire to perform work on the public work project, are properly licensed. Furthermore, I acknowledge my understanding that it is my responsibility to ensure that all sub-contractors have the necessary licenses to undertake the work called for in this bid. If a sub- contractor loses their license at any point, it is the responsibility of that sub- contractor to notify the City. (b) Attachments: (i)___Indiana Secretary of State’s on-line records (ie. Business verification) dated within sixty (60) days of the submission of said document showing that business is in existence, current with the Indiana Secretary of State’s Business Entity Report, and eligible for a certificate of good standing. (Not applicable to individuals, sole proprietors or partnerships). (ii)___List identifying all former business names. (iii)___Any determinations by a court or governmental agency any violations of federal state, or local laws including, but not limited to, violations of contracting or antitrust laws, tax or licensing laws, environmental laws, Occupational Safety and Health Act (OSHA), or federal Davis-Bacon and related Acts, within the preceding five (5) years. (iv)___Statement about staffing capabilities, including labor sources. This statement indicates and ensures I have sufficient employees on staff to complete the work I am bidding on OR outlines how I intend to meet the staffing needs of the work. (v)___Statement that individuals who will perform work on the public work project on my behalf will be properly classified as an employee or as an independent contractor under all applicable state and federal laws and local ordinances. (vi)___For every project, submit evidence of participation in apprenticeship and training programs, applicable to the work to be performed on the project, which are approved by and registered with the United States Department of Labor’s Office of Apprenticeship, or its successor organization. (vii)___Copy of a written plan for employee drug testing that covers all of my employees who will perform work on the public work project and meets or exceeds the requirements set forth in IC 4-13-18-5 or IC 4-13-18-6. (viii)___Evidence that I am utilizing a surety company which is on the Bureau of Fiscal Service “Department of Treasury’s Listing of Approved Sureties” as required in the bid specifications or contract. CITY OF SOUTH BEND JAMES MUELLER, MAYOR DEPARTMENT OF PUBLIC WORKS ERIC HORVATH, DIRECTOR October 7, 2022 Meghan Hughes Ziolkowski Construction, Inc. mhughes@zbuild.com RE: Pre-Qualification Verification – WWTP Compressor Building Masonry Improvements – Project No. 121-046 Dear Ms. Hughes: This letter serves as verification of Pre-Qualification status of your company for bidding with the City of South Bend. This Pre-Qualification status is effective for twelve (12) months from the date of this letter. Thereafter you are required to re-submit a complete application for continuation of pre-qualification status prior to December 31 for the upcoming calendar year. A copy of this Verification Letter must be included with every bid exceeding $150,000 submitted to the City of South Bend Board of Public Works, along with your Pre-Qualified Bidder Checklist and attachments. If you have any further questions regarding this matter, please call this office at (574) 235- 9251. Sincerely, Liz Horvath, Permit Manager ZIOLKOWSKI construction, Inc. General construction & Design/Bull<! Building Strong Relationships Since 1974 November 22, 2022 Subject: Operations Letter Dear Sirs: Ziolkowski Construction, Inc. has been in business since 1974 and operated during that period of time under that name only. Ziolkowski Construction has not violated any federal, state or local laws, including violations of contracting or antitrust laws, tax or licensing laws, environmental laws, Occupational Safety and Health Act (OSHA) laws, federal Davis-Bacon Act laws, within the past five years. Ziolkowski Construction, Inc. is proud to employ the industry's top skilled craftsmen. We have a core group of union craftsmen working on our projects and supplement that group with trained skilled workers from the local union halls. We currently have sufficient workers t o perform the work that we are bidding for the above project. Ziolkowski Construction, Inc. uses local union manpower. If residents who reside within the district are members of such union, when feasible, Ziolkowski Construction, Inc. will offer an employment opportunity. All individuals performing work for Ziolkowski Construction, Inc. will be properly classified as employees under the federal Fair Labor Standards Act and in line with all Indiana State and local ordinances. Ziolkowski Construction, Inc. had no federal, state or local tax liens or tax delinquencies in any of the preceding three tax years. Respectfully, ZI�WSKI CONSTRUCTION, INC. ason Watts President 4050 Ralph .J.an.es...D..1:... Sallth...Bend, IN 46628 Pbaae .{fil1l 267-1811 Fax� ,e.,,?3,.,.4.,,...0u..1S.u.1 __ _ Committed to professionalism and excellence for the benefit of our clients, employees, and shareholders. Version 09/29/2021 Contractor’s Bid for Public Works - 3 PART II (For projects of $100,000 or more – IC 36-1-12-4) These statements to be submitted under oath by each bidder with and as part of his/her/its bid. Attach additional pages for each section as needed. SECTION I EXPERIENCE QUESTIONNAIRE 1.Attach information regarding projects your organization has completed for the period of one (1) year prior to the date of the current bid. 2.Attach a listing of public works projects currently in process of construction by your organization. 3.Attach information regarding any failure to complete any work awarded to you and the location thereof. 4.Attach references from private firms for which you have performed work. SECTION II PLAN AND EQUIPMENT QUESTIONNAIRE 1.Attach an explanation of your plan or layout for performing proposed work. (Examples could include a narrative of when you could begin work, complete the project, number of workers, etc. and any other information which you believe would enable the City of South Bend to consider your bid.) 2.Attach a listing of the names and addresses of all subcontractors (i.e. persons or firms outside your own firm who have performed part of the work) that you have used on public works projects during the past five (5) years along with a brief description of the work done by each subcontractor. 3.If you intend to sublet any portion of the work, attach the name and address of each subcontractor, equipment to be used by the subcontractor, and whether you will require a bond. However, if you are unable to currently provide a listing, please understand a listing must be provided prior to contract approval. Until the completion of the proposed project, you are under a continuing obligation to immediately notify the City of South Bend in the event that you subsequently determine that you will use a subcontractor on the proposed project. 4.Attach a listing of equipment you have available to use for the proposed project. 5.Have you entered into contracts or received offers for all materials which substantiate the prices used in preparing your proposal? If not, attach an explanation for the rationale used which would corroborate the prices listed. SECTION III CONTRACTOR’S FINANCIAL STATEMENT Attachment of bidder’s financial statement is mandatory. Any bid submitted without said financial statement as required by statute shall thereby be rendered invalid. The financial statement provided hereunder to the City of South Bend awarding the contract must be specific enough in detail so that said City of South Bend can make a proper determination of the bidder’s capability for completing the project if awarded. See Attached See Attached N/A See Attached -To use the available manpower and work with other trades to maintain schedule. -If the contract is awarded, a list of subcontractors will be provided. -If the contract is awarded, a list of subcontractors will be provided. -We will use whatever is required to complete the project properly and on time. -Yes, we receive pricing the day of the bid. Version 09/29/2021 Contractor’s Bid for Public Works - 4 When the prospective Contractor is unable to certify to any of the statements below, it shall attach an explanation to this Affidavit. CONTRACTOR’S NON-COLLUSION AND NON-DEBARMENT AFFIDAVIT, CERTIFICATION REGARDING INVESTMENT WITH IRAN, EMPLOYMENT ELIGIBILITY VERIFICATION, NON- DISCRIMINATION COMMITMENT AND CERTIFICATION OF USE OF UNITED STATES STEEL PRODUCTS OR FOUNDRY PRODUCTS (Must be completed for all quotes and bids. Please type or print) STATE OF ___________ ) ) SS: COUNTY ) The undersigned Contractor, being duly sworn upon his/her/its oath, affirms under the penalties of perjury that: 1. Contractor has not, nor has any other member, representative, or agent of the firm, company, corporation or partnership represented by him, entered into any combination, collusion or agreement with any person relative to the price to be bid by anyone at such letting nor to prevent any person from bidding nor to induce anyone to refrain from bidding, and that this bid is made without reference to any other bid and without any agreement, understanding or combination with any other person in reference to such bidding. Contractor further says that no person or persons, firms, or corporation has, have or will receive directly or indirectly, any rebate, fee, gift, commission or thing of value on account of such sale; and 2. Contractor certifies by submission of this proposal that neither contractor nor any of its principals are presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from participation in this transaction by any Federal department or agency; and 3.Contractor has not, nor has any successor to, nor an affiliate of, Contractor, engaged in investment activities in Iran. a.For purposes of this Certification, “Iran” means the government of Iran and any agency or instrumentality of Iran, or as otherwise defined at Ind. Code § 5-22-16.5-5, as amended from time-to-time. b. As provided by Ind. Code § 5-22-16.5-8, as amended from time-to-time, a Contractor is engaged in investment activities in Iran if either: i.Contractor, its successor or its affiliate, provides goods or services of twenty million dollars ($20,000,000) or more in value in the energy sector of Iran; or ii. Contractor, its successor or its affiliate, is a financial institution that extends twenty million dollars ($20,000,000) or more in credit to another person for forty-five (45) days or more, if that person will (i) use the credit to provides goods and services in the energy sector in Iran; and (ii) at the time the financial institution extends credit, is a person identified on list published by the Indiana Department of Administration. 4. Contractor does not knowingly employ or contract with an unauthorized alien, nor retain any employee or contract with a person that the Contractor subsequently learns is an unauthorized alien. Indiana St. Joseph Version 09/29/2021 Contractor’s Bid for Public Works - 5 Contractor agrees that he/she/it shall enroll in and verify the work eligibility status of all of Contractor’s newly hired employees through the E-Verify Program as defined by I.C. 22-5-1.7-3. Contractor’s documentation of enrollment and participation in the E-Verify Program is included and attached as part of this bid/quote; and 5.Contractor shall require his/her/its subcontractors performing work under this public contract to certify that the subcontractors do not knowingly employ or contract with an unauthorized alien, nor retain any employee or contract with a person that the subcontractor subsequently learns is an unauthorized alien, and that the subcontractor has enrolled in and is participating in the E-Verify Program. The Contractor agrees to maintain this certification throughout the term of the contract with the City of South Bend, and understands that the City may terminate the contract for default if the Contractor fails to cure a breach of this provision no later than thirty (30) days after being notified by the City. 6.Persons, firms, partnerships, corporations, associations, or joint venturers awarded a contract by the City of South Bend through its agencies, boards, or commissions shall not discriminate against any employee or applicant for employment in the performance of a City contract with respect to hire, tenure, terms, conditions, or privileges of contract or employment, or any matter directly or indirectly related to contracting or employment because of race, sex, religion, color, national origin, ancestry, gender expression, gender identity, sexual orientation, or due to age or disability that does not affect that person's ability to perform the work. In awarding contracts for the purchase of work, labor, services, supplies, equipment, materials, or any combination of the foregoing including, but not limited to, public works contracts awarded under public bidding laws or other contracts in which public bids are not required by law, the City, its agencies, boards, or commissions will consider the Contractor’s good faith efforts to obtain participation by those subcontractors certified by the State of Indiana as a Minority Business (“MBE”) or as a Women’s Business Enterprise (“WBE”) as a factor in determining the lowest, responsible, responsive bidder. Contractors seeking the award of a City contract cannot be required to award a subcontract to an MWBE; however, they may not unlawfully discriminate against said MBE/WBE. On goal-eligible contracts, Contractors are required to either meet both MBE and WBE utilization goals or demonstrate that the Contractor has made good faith efforts to obtain participation from MBE and WBE subcontractors. A finding of noncompliance or a discriminatory practice shall prohibit that Contractor from being awarded a City contract for a period of one (1) year from the date of such determination, and such determination may also be grounds for terminating the contact to which the discriminatory practice or noncompliance pertains. 7.The undersigned Contractor agrees that the following nondiscrimination commitment shall be made a part of any contract which it may henceforth enter into with the City of South Bend, Indiana or any of its agencies, boards or commissions. Contractor agrees not to discriminate against or intimidate any employee or applicant for employment in the performance of this contract with privileges of employment, or any matter directly or indirectly related to employment, because of race, religion, color, sex, gender expression, gender identity, sexual orientation, handicap, national origin or ancestry. Breach of this provision may be regarded as material breach of contract. I, the undersigned bidder or agent as contractor on a public works project, understand my statutory obligations to the use of steel products or foundry products made in the United States (I.C. 5-16-8-1). I hereby certify that I and all subcontractors employed by me for this project will use steel products or foundry products made in the United States on this project if awarded. I understand I have an affirmative duty to notify the City in my bid that my proposal does not include the use of steel products or foundry products made in the United States. I understand it is my sole obligation and responsibility to provide a justification to the City, subject to review and approval, why the cost of United States made steel or foundry products is unreasonable. Prior to award and upon submission of bid which does not use steel products or foundry products made in the United States, the City, through its director of public works, shall make a determination if the price of United States made steel or foundry is unreasonable. I understand that violations hereunder Completed Projects 2021-2022 Contract Amount Class of Work Completion Date Project Name Name and Address of Owner $2,131,927 City Park February 2021 Ironworks Phase II Biergarten South Bend Board of Public Works | 227 W. Jefferson Blvd., South Bend, IN 46601 $6,185,921 School February 2021 Lincoln Jr. High School Plymouth Community School Corporation | 611 Berkley St., Plymouth, IN 46563 $4,712,852 Commerical February 2021 The Foundry Phase II The Foundry | 1145 N. Eddy St., South Bend, IN 46617 $1,184,325 School March 2021 Kokomo High School Kokomo School Corporation | S. Courtland Ave., Kokomo, IN 46902 Current Projects 2021-2022 Contract Amount Class of Work Estimated Completion Date Project Name Name and Address of Owner $3,254,933 Library March 2022 St. Joseph County Public Library St. Joseph County Public Library | 304 S. Main St., South Bend, IN 46601 $7,456,273 City Park July 2022 Seitz Park South Bend Board of Public Works | 227 W. Jefferson Blvd., South Bend, IN 46601 $5,550,625 Commercial May 2022 United Way of St. Joseph County United Way of St. Joseph County | 3517 E. Jefferson Blvd., South Bend, IN 46615 $4,259,306 Hospital October 2022 Goshen Health Tower Goshen Health Systems | 200 High Park Ave., Goshen, IN 46526 References Company Name / Address Contact Name Phone No. University of Notre Dame 200 Facilities Building Notre Dame, IN 46556 Tony Polotto LEED, AP 574-631-4200 City of Mishawaka 600 East Third Street Mishawaka, IN Ken Prince 574-258-1625 Fetters Construction, Inc. 5417 County Road 427 Auburn, IN 46706 Steven A. Fetters 260-927-8516 Memorial Hospital & Health System 615 N. Michigan Street South Bend, IN46601 Don Gee 574-532-5650 CITY OF SOUTH BEND MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN FORM MBE-2.0 EVIDENCE OF GOOD FAITH EFFORTS Version 09/29/2021 Contractor’s Bid for Public Works - 11 This completed form should be included as part of the Bids documents related to City of South Bend Public Works Projects requiring Good Faith Efforts to obtain MBE participation. Project Number: 121-046-R Date: Project Name: Wastewater Treatment Plant Masonry Improvements at Building 5 Bidder: Contact Person: Telephone: Address: City: State: Zip: Email: To determine whether a bidder has demonstrated good faith efforts to reach the MBE utilization goals set forth in the City of South Bend Public Works Project Specifications, the City and its agencies, boards, or commissions, REQUIRE ALL of the following Good Faith Efforts as listed in the table below*: EVIDENCE OF GOOD FAITH EFFORTS MBE LIST(S): The bidder reviewed 1) the City of South Bend’s Minority and Women Business Enterprise Inclusion Program Plan; 2) the list of certified MWBEs provided by the City; and 3) the Indiana Department of Administration list of Minority and Women Owned Businesses (both certified and non-certified) found at: http://www.in.gov/idoa/. GOOD FAITH EFFORTS TO OBTAIN MBE PARTICIPATION The bidder shall initial each item below, as evidence of its good faith efforts to obtain MBE participation in the awarded contract. I affirm that I reviewed the City of South Bend’s Minority and Women Business Enterprise Inclusion Program Plan and the Indiana Department of Administration’s certified list of Indiana Minority and Women Business Enterprises, found on their website (http://www.in.gov/idoa). I affirm that I have made good faith efforts to select portions of the contract work to be performed by MWBEs, including, where appropriate, breaking out contract work items into economically feasible units to facilitate MBE participation. I affirm that I have made good faith efforts to solicit through all reasonable and available means the interest of all MBEs in the scopes of work of the contract. I affirm that I attended all pre-bid meetings scheduled by the City of South Bend to inform MBEs of contracting and subcontracting opportunities. I affirm that I advertised in general circulation and/or trade association publications concerning subcontract opportunities and allowed MBEs reasonable time to respond to such advertisements. I affirm that I performed any and all necessary steps to provide written notices in a manner reasonably calculated to inform MBEs of subcontracting opportunities and allowed sufficient time for MBEs to participate effectively. I affirm that I followed up on initial solicitations with interested MBEs. I affirm that I negotiated with interested MBEs in good faith, including providing such MBEs with adequate information about the plans, specifications and other requirements of the subcontract. I affirm that I have made good faith efforts to assist interested MBEs in obtaining bonding, lines of credit, or insurance as required by the City or the bidder, where appropriate. 11/22/2022 Ziolkowski Construction, Inc. Brad Dennis 574-287-1811 Ext. 240 4050 Ralph Jones Drive South Bend IN 46628 bdennis@zbuild.com BD BD BD BD BD BD BD BD BD CITY OF SOUTH BEND MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN FORM MBE-2.0 EVIDENCE OF GOOD FAITH EFFORTS Version 09/29/2021 Contractor’s Bid for Public Works - 12 I affirm that I have made good faith efforts to assist interested MBEs in obtaining necessary equipment, supplies, materials, or related assistances or services, where appropriate. I affirm that I did not reject any MBEs as unqualified without sound business reasons based on a thorough investigation of their capabilities. CONTRACT RECORDS: The bidder has maintained the following records for each MBE that has bid on the subcontracting opportunity: 1. Name, address, and telephone number; 2. A description of information provided by the bidder or subcontractor; and 3. A statement of whether an agreement was reached, and if not, why not, including any reasons for concluding that the MBE was unqualified to perform the job. *Proper demonstration of Good Faith Efforts requires your initials next to all of the above boxes. Any omissions shall be considered grounds for rejection of the bid by the Board of Public Works. The City of South Bend reserves the right to request additional information. BD BD CITY OF SOUTH BEND MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN FORM WBE-2.0 EVIDENCE OF GOOD FAITH EFFORTS Version 09/29/2021 Contractor’s Bid for Public Works - 13 This completed form should be included as part of the Bids documents related to City of South Bend Public Works Projects requiring Good Faith Efforts to obtain MWBE participation. Project Number: 121-046-R Date: Project Name: Wastewater Treatment Plant Masonry Improvements at Building 5 Bidder: Contact Person: Telephone: Address: City: State: Zip: Email: To determine whether a bidder has demonstrated good faith efforts to reach the WBE utilization goals set forth in the City of South Bend Public Works Project Specifications, the City and its agencies, boards, or commissions, REQUIRE ALL of the following Good Faith Efforts as listed in the table below*: EVIDENCE OF GOOD FAITH EFFORTS WBE LIST(S): The bidder reviewed 1) the City of South Bend’s Minority and Women Business Enterprise Inclusion Program Plan; 2) the list of certified MWBEs provided by the City; and 3) the Indiana Department of Administration list of Minority and Women Owned Businesses (both certified and non-certified) found at: http://www.in.gov/idoa/. GOOD FAITH EFFORTS TO OBTAIN WBE PARTICIPATION The bidder shall initial each item below, as evidence of its good faith efforts to obtain WBE participation in the awarded contract. I affirm that I reviewed the City of South Bend’s Minority and Women Business Enterprise Inclusion Program Plan and the Indiana Department of Administration’s certified list of Indiana Minority and Women Business Enterprises, found on their website (http://www.in.gov/idoa). I affirm that I have made good faith efforts to select portions of the contract work to be performed by WBEs, including, where appropriate, breaking out contract work items into economically feasible units to facilitate WBE participation. I affirm that I have made good faith efforts to solicit through all reasonable and available means the interest of all WBEs in the scopes of work of the contract. I affirm that I attended all pre-bid meetings scheduled by the City of South Bend to inform WBEs of contracting and subcontracting opportunities. I affirm that I advertised in general circulation and/or trade association publications concerning subcontract opportunities and allowed WBEs reasonable time to respond to such advertisements. I affirm that I performed any and all necessary steps to provide written notices in a manner reasonably calculated to inform WBEs of subcontracting opportunities and allowed sufficient time for WBEs to participate effectively. I affirm that I followed up on initial solicitations with interested WBEs. I affirm that I negotiated with interested WBEs in good faith, including providing such WBEs with adequate information about the plans, specifications and other requirements of the subcontract. I affirm that I have made good faith efforts to assist interested WBEs in obtaining bonding, lines of credit, or insurance as required by the City or the bidder, where appropriate. BD BD BD BD BD BD BD BD BD Ziolkowski Construction, Inc. Brad Dennis 4050 Ralph Jones Drive South Bend IN 46628 574-287-1811 Ext. 240 bdennis@zbuild.com CITY OF SOUTH BEND MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN FORM WBE-2.0 EVIDENCE OF GOOD FAITH EFFORTS Version 09/29/2021 Contractor’s Bid for Public Works - 14 I affirm that I have made good faith efforts to assist interested WBEs in obtaining necessary equipment, supplies, materials, or related assistances or services, where appropriate. I affirm that I did not reject any WBEs as unqualified without sound business reasons based on a thorough investigation of their capabilities. CONTRACT RECORDS: The bidder has maintained the following records for each WBE that has bid on the subcontracting opportunity: 1. Name, address, and telephone number; 2. A description of information provided by the bidder or subcontractor; and 3. A statement of whether an agreement was reached, and if not, why not, including any reasons for concluding that the MWBE was unqualified to perform the job. *Proper demonstration of Good Faith Efforts requires your initials next to all of the above boxes. Any omissions shall be considered grounds for rejection of the bid by the Board of Public Works. The City of South Bend reserves the right to request additional information. BD BD Order Confirmation Not an Invoice Account Number:570014 Customer Name:Ziolkowski Construction Inc Customer Address: Ziolkowski Construction Inc 4050 Ralph Jones DR South Bend IN 46628-9408 Contact Name:Kristin Kromer Contact Phone: Contact Email:kkromer@zbuild.com PO Number: Date:11/15/2022 Order Number:8072362 Prepayment Amount: $ 0.00 Column Count:1.0000 Line Count:25.0000 Height in Inches:0.0000 Print Product #Insertions Start - End Category SBN South Bend Tribune 3 11/17/2022 - 11/20/2022 Bids & Proposals SBN southbendtribune.com 3 11/17/2022 - 11/20/2022 Bids & Proposals Total Order Confirmation $138.50 1/2 Ad Preview 2/2