HomeMy WebLinkAboutRatify Contracted Emergency Work - EPO Notre Dame Ave. & Howard St. Repair - Selge Construction Co., Inc.
ELIZABETH A. MARADIK JOSEPH R. MOLNAR GARY A. GILOT JORDAN V. GATHERS MURRAY L. MILLER
1316 COUNTY-CITY BUILDING
227 W. JEFFERSON BOULEVARD
SOUTH BEND, INDIANA 46601-1830
PHONE 574/ 235-9251
FAX 574/ 235-9171
CITY OF SOUTH BEND JAMES MUELLER, MAYOR
BOARD OF PUBLIC WORKS
November 8, 2022
Mr. Robert Kuhns
Selge Construction Co., Inc.
2833 South 11TH St.
Niles, MI 49120
aswinehart@selgeconstruction.com
RE: Ratify Contracted Emergency Work
Dear Mr. Kuhns:
At its November 8, 2022 meeting, the Board of Public Works approved the above
referenced ratified contract for a brick manhole structure at N. Notre Dame Ave. & Howard St.
due to an 18-inch vitrified clay sewer collapse in an increased amount of $23,261.47 with a
final total of $73,261.47.
Enclosed please find a copy of the ratified contract for your records.
If you have any further questions, please call this office at (574) 235-9251.
Sincerely,
/s/ Theresa Heffner
Theresa Heffner, Clerk
Enclosures
TH/lh
INTER-OFFICE MEMORANDUM
DEPARTMENT OF PUBLIC WORKS
DIVISION OF ENVIRONMENTAL SERVICES
TO: Members of the Board of Public Works
Michael Schmidt, Assistant City Attorney Public Works
Theresa Heffner, Clerk
FROM: Jacob M. Klosinski, P.E., Assistant City Engineer
SUBJECT: Emergency Repair – Notre Dame and Howard Street Sewer Repair
(PO-0018540)
Agenda Request – Ratify Emergency Repair Contract
DATE: October 18, 2022
The Department of Public Works Division of Engineering, Utility and Street/Sewer teams contacted
Selge Construction Company to assist with emergency repairs following observance of a cavity and
undermining at a manhole at the intersection of N. Notre Dame Avenue and Howard Street.
Description of Collapse and Repair
The break in the 18-inch vitrified clay sewer pipe (c.1914) was on the bottom of the pipe 8-feet
south of the brick manhole structure and 2-feet north of the water main on Howard Street. Once it
was identified that the repair could not be completed without removing a section of 6-inch water
main, relocating an overhead electrical wire, and adjusting the excavating to avoid an active gas
main, the excavation plan was modified plans to facilitate the repair.
To void the brick manhole being compromised during excavation work, City Engineering made the
decision to replace the structure, a broken section of clay pipe, and reconnect storm and sewer
leads. Sewer pipe reaches from the north and west as well as storm pipes at each quadrant of the
intersection were reconnected. A section of 6-inch water main was removed and reinstalled. Water
Works supplied a isolation valve to accommodate the work and avoid customer impact.
NIPSCO identified the active and abandoned gas lines along Notre Dame Avenue. AEP also
relocated a section of lighting cable that carried from the northeast corner of the intersection to the
southwest corner of the intersection to allow safe usage of excavation equipment.
During construction a section of abandoned railroad tracks and ties had to be removed to
accommodate trench box installation. The abandoned ties, containing creosote, were taken to a
landfill in accordance with required rules and regulations.
Asphalt pavement patching was completed by the contractor since City crews were not
available to assist with the patching and repair.
City’s repair estimate was $50,000. Final repair cost for the work was $73,261.47.
For questions, contact Jacob M. Klosinski (Ext. 9496) at the Division of Engineering.
2833 S. 11th St.Niles, MI 49120
(269) 684-0846Fax:
(269) 684-0842Phone:
227 W. Jefferson Blvd
South Bend, IN 46601-1830
City of South Bend
12Verbal ( ) - 10/30/2022
To tal Cost
9/30/2022 10650
Description
2022 INMISC
PO Number Due Date
Invoice
Invoice #Invoice Date
Bill To :
Reference
Te rms Customer #Phone #
Quantity
Net Due 30
Unit Unit Price
RE: CITY OF SOUTH BEND
73,261.47 Notre Dame and Howard Av enue Emergency Repair1.00 LS 73,261.47
73,261.47Total Due $
73,261.47Subtotal $1. Checks made payable to:
2. All invoices are to be paid within 30 days of receipt. A 1.5% monthly late fee
will be added to all overdue balances until paid. If additional means are
necessary to recover overdue funds, buyer agrees to pay Selge all costs of
collection. 3. All payments are non-refundable.
4. For questions regarding your invoice, please call Selge Construction at
269-684-0842
Selge Construction Co. Inc. 2833 S. 11th St, Niles, MI 49120
Thank you for your business!
0.00Sales Tax (if applicable) $
November 8, 2022
City of South Bend
Department of Administration & Finance
Change Order Request Form
Multiple PO lines:
PO Number PO-0018540
Line Number 1
Original Dollar Amount $50,000 (City's repair estimate)
New Dollar Amount
(For liquidation request, enter $0)$73,261.47 (Increase of $23,261.47 reflects final costs time and materials )
Reason Code (if changed)Service - Emergency Repair
Financial Dimensions (fund-dept-
division-subdivision-main account)641-06-602-509-439001
Project Code (if applicable)EPO - Emergency Service
Description of change (include
budget impact)
Adjustment of PO value reflects the final costs for time and materials to complete the
emergency repair work at Notre Dame Avenue and Howard Street.
PO Number
Line Number
Original Dollar Amount
New Dollar Amount
(For liquidation request, enter $0)
Reason Code (if changed)
Changing the line amount:
You can only change a line amount if it has NOT been invoiced against.
• If the line has NOT been invoiced – reduce the line amount to equal what it should be.
• If the line has been invoiced – cancel the delivery remainder and finalize the individual line, then add a new line for the
amount that should be remaining.
If you have changes to more than two lines on the same PO, fill out a separate section for each line affected by the change
order.
PO CHANGE FORM for PO-0018540 2022.10.18 1 of 5
BOARD OF PUBLIC WORKS
AGENDA ITEM REVIEW REQUEST FORM
Date: 10-18-2022
Name: Jacob M. Klosinski Department of Public Works – Engineering Division
BPW Date: 11-08-2022 Phone Extension:9496
Required Prior to Submittal to Board
BPW Attorney X Attorney Name Michael Schmidt
Dept. Attorney Attorney Name Michael Schmidt
Purchasing Michael Schmidt
Check the Appropriate Item Type –Required for All Submissions
Professional Services Agreement Contract Proposal
Open Market Contract Amendment/Addendum Special Purchase, QPA
Bid Opening Bid Award Req. to Advertise Title Sheet
Quote Opening Quote Award Reject Bids/Quotes
Proposal Opening C/O & PCA No. PCA
Chg. Order, No. Traffic Control Resolution
Other: Ratify Contracted
Emergency Work
Ease./Encroach
Required Information
Company or Vendor Name Selge Construction Company, Inc. (V-00001471)
New Vendor Yes If Yes, Approved by Purchasing
No
MBE/WBE Contractor MBE
WBE Completed E-Verify Form Attached Yes
No
Project Name Emergency Repair – Notre Dame Avenue and Howard Street San. Sewer
Project Number
Funding Source 641-06-602-509-439001
Account No. PO-0018540
Amount Original Estimate $50,000.00. Final Cost: $73,261.47
Terms of Contract Lump Sum (T&M)
Special Contract Provisions None
Purpose/Description City Engineering and Streets/Sewers, contracted Selge Construction to
provide emergency repairs at Notre Dame Avenue and Howard Street after
undermining and a sewer collapse were identified by City Sewer crews. See
Memorandum for description of services and repair work.
For Change Orders Only
Amount of
Increase
Decrease
$
($ )
Previous Amount $
Current Percent of Change:
Increase
Decrease
%
(%)
New Amount $
Total Percent of Change:
Increase
Decrease
%
(%)
Time Extension Amount:
New Completion Date: