Loading...
HomeMy WebLinkAboutRatify Contracted Emergency Work - EPO McCartney Street Sewer Repair - G.E. Marshall, Inc.  ELIZABETH A. MARADIK JOSEPH R. MOLNAR GARY A. GILOT JORDAN V. GATHERS MURRAY L. MILLER 1316 COUNTY-CITY BUILDING 227 W. JEFFERSON BOULEVARD SOUTH BEND, INDIANA 46601-1830 PHONE 574/ 235-9251 FAX 574/ 235-9171 CITY OF SOUTH BEND JAMES MUELLER, MAYOR BOARD OF PUBLIC WORKS November 8, 2022 Mr. Frank A. Marshall G.E. Marshall, Inc. 1351 Joliet Rd. Valparaiso, IN 46385 frank.marshall@gemarshall.com RE: Ratify Contracted Emergency Work Dear Mr. Marshall: At its November 8, 2022 meeting, the Board of Public Works approved the above referenced ratified contract for the street collapse & cave-in at 1241 McCartney Street due to an 18-inch vitrified clay sewer collapse for an increased amount of $15,805.63 with a final total of $45,805.63. Enclosed please find a copy of the ratified contract for your records. If you have any further questions, please call this office at (574) 235-9251. Sincerely, /s/ Theresa Heffner Theresa Heffner, Clerk Enclosures TH/lh INTER-OFFICE MEMORANDUM DEPARTMENT OF PUBLIC WORKS DIVISION OF ENVIRONMENTAL SERVICES TO: Members of the Board of Public Works Michael Schmidt, Assistant City Attorney Public Works Theresa Heffner, Clerk FROM: Jacob M. Klosinski, P.E., Assistant City Engineer SUBJECT: Emergency Repair – McCartney Street Sanitary Sewer Repair (PO-0016785) Agenda Request – Ratify Emergency Repair Contract DATE: October 18, 2022 The Department of Public Works Division of Engineering and Street/Sewer teams contacted G.E. Marshall to assist with emergency repairs following the observance of a street collapse and cave-in in front of 1241 McCartney Street approximately 215 feet east of Portage Road. An 18-inch vitrified clay sewer collapse. Description of Collapse and Temporary Repair The 18-inch vitrified clay combined sewer pipe was observed to have longitudinal cracking along the length of the pipe at the 3-, 6-, 9- and 12-o’clock positions. In addition, groundwater seepage and calcium deposits (efflorescence) were also visible along the cracks, indicating groundwater. At the location of the collapse, a clay sewer lateral at the crown of the vitrified clay pipe collapsed causing the crown of the pipe to collapse. The condition of the pipe was very bad. The use compression sleeve couplings to connect an identical pipe section was not resulted in additional damage. Attempts were made but due to the longitudinal crack conditions, tightening the compression repair couplings resulted the pipe walls fracturing and crushing during tightening. As a result of the pipe conditions, the repair was completed with the use of a smaller, 15-inch SDR- 35 PVC pipe. The 15-inch pipe was inserted into the 18-inch pipe approximately 2 feet to 3-feet on either side of the section that was removed to re-establish the flow line in the combined sewer pipe. The new pipe was grouted in place using a concrete collar at each end of the repair section. The sanitary sewer lateral for 1241 McCartney Street was re-established during the repair work. During the repair, the G.E. Marshall had to address dewatering with in-situ pumps which required additional time and effort. In addition, a lead water lateral service line was also exposed and had to be replaced during the repair work. The roadway bedding was completed by G.E. Marshall. City Street crews assisted with the asphalt patching efforts after the repairs were complete. The section of 18-inch vitrified clay combined sewer pipe was added to the scope of work for the 2022/2023 Sewer and Manhole Rehabilitation work. City’s repair estimate was $30,000. Final repair cost for the work was $45,805.63. For questions, contact Jacob M. Klosinski (Ext. 9496) at the Division of Engineering. November 8, 2022 City of South Bend Department of Administration & Finance Change Order Request Form Multiple PO lines: PO Number PO-0016785 Line Number 1 Original Dollar Amount $30,000 (City's repair estimate) New Dollar Amount (For liquidation request, enter $0)$45,805.63 (Increase of $15,805.63 reflects final costs time and materials ) Reason Code (if changed)Service - Emergency Repair Financial Dimensions (fund-dept- division-subdivision-main account)641-06-602-509-439001 Project Code (if applicable)EPO - Emergency Service Description of change (include budget impact) Adjustment of PO value relfects the final costs for time and materials to complete the emergency repairs at McCartney Street. PO Number Line Number Original Dollar Amount New Dollar Amount (For liquidation request, enter $0) Reason Code (if changed) Changing the line amount: You can only change a line amount if it has NOT been invoiced against. • If the line has NOT been invoiced – reduce the line amount to equal what it should be. • If the line has been invoiced – cancel the delivery remainder and finalize the individual line, then add a new line for the amount that should be remaining. If you have changes to more than two lines on the same PO, fill out a separate section for each line affected by the change order. PO CHANGE FORM for PO-0016785 2022.10.18 1 of 5 BOARD OF PUBLIC WORKS AGENDA ITEM REVIEW REQUEST FORM Date: 10-18-2022 Name: Jacob M. Klosinski Department of Public Works – Engineering Division BPW Date: 11-08-2022 Phone Extension:9496 Required Prior to Submittal to Board BPW Attorney X Attorney Name Michael Schmidt Dept. Attorney Attorney Name Michael Schmidt Purchasing Michael Schmidt Check the Appropriate Item Type –Required for All Submissions Professional Services Agreement Contract Proposal Open Market Contract Amendment/Addendum Special Purchase, QPA Bid Opening Bid Award Req. to Advertise Title Sheet Quote Opening Quote Award Reject Bids/Quotes Proposal Opening C/O & PCA No. PCA Chg. Order, No. Traffic Control Resolution Other: Ratify Contracted Emergency Work Ease./Encroach Required Information Company or Vendor Name G.E. Marshall, Inc.(V-00000652) New Vendor Yes If Yes, Approved by Purchasing No MBE/WBE Contractor MBE WBE Completed E-Verify Form Attached Yes No Project Name Emergency Repair – McCartney Stret Sanitary Sewer Repair Project Number Funding Source 641-06-602-509-439001 Account No. PO-0016785 Amount Original Estimate $30,000.00. Final Cost: $45,805.63 Terms of Contract Lump Sum (T&M) Special Contract Provisions None Purpose/Description City Engineering and Streets/Sewers, contracted G.E. Marshall to provide emergency repairs at McCartney Street after a 18-inch vitrified clay sewer collapse were identified by City Sewer crews. See Memorandum for description of services and repair work. For Change Orders Only Amount of Increase Decrease $ ($ ) Previous Amount $ Current Percent of Change: Increase Decrease % (%) New Amount $ Total Percent of Change: Increase Decrease % (%) Time Extension Amount: New Completion Date: