HomeMy WebLinkAbout10252022 Board of Public Works MeetingAGENDA REVIEW SESSION OCTOBER 20, 2022 231
The Agenda Review Session of the Board of Public Works was convened at 10:32 a.m. on October 20, 2022, by Board President Elizabeth A. Maradik, Vice President Joseph Molnar (absent), and Board Members Gary Gilot, Jordan Gathers (absent), Murray Miller was present.
Corporate Counsel Sandra Kennedy was present in Board Attorney Michael Schmidt (absent) absence. Board of Public Works Clerk, Theresa Heffner, presented the Board with a proposed agenda of items presented by the public and by City Staff.
OPENING OF QUOTATIONS – APPROVE CONTRACT – SHERIDAN & RIVERSIDE
PARKING LANE RESURFACING – PROJECT NO. 122-056 (PR-00019271) President Maradik advised that this was the date set for the receiving and opening of sealed quotations for the above referenced project. The following quotations were opened and read:
DAYS CONSTRUCTION & ASPHALT 855 Taft St. Gary, IN 46404 s.d.shine@sbcglobal.net
Quotation was submitted by Mr. Robert DayNo Non-Collusion, Non-Discrimination Affidavit Form was completed.None of Three (3) MWBE Forms were completed.
QUOTATION: $106,500
Upon a motion made by Murray Miller, seconded by Gary Gilot and carried by roll call, the above quotes were referred to Engineering for review and recommendation.
PRIVILEGE OF THE FLOOR
Tim Corcoran Director of Planning and Community Resources gave a brief introduction of
the alley vacation process and how the process can be very confusing for the petitioner and City
staff. He noted that the presentation that Senior Planner Chris Dressel was giving today would address some of the issues related to alley vacations and some recommendations on how to improve the process for the petitioner and City staff. Mr. Corcoran noted that nothing needed to be voted on today, but there would be ordinance change recommendations coming to a future
Board meeting.
Chris Dressel, Senior Planner with Community Investment provided a presentation to the Board with suggested changes to the street/alley vacation process. An overview of the presentation provided the following:
Why Alleys Are Important
•Alleys allow for uses to be accessed from the back of the lot by automobiles
•Removes front facing garages, eliminates driveways at the front of properties, and limitscurb cuts on the main road which allows for more of the lot to be take up but the home
•Provides a more consistent residential streetscape
•Allows for more spaces for street trees by providing a continuous tree lawn throughout
the block
•Allows for a finer grain development, resulting in the following:
o City’s investment in utilities yields a higher rate of returnoThere is a larger tax base per acreoAllows for greater variety of housing and as such a greater variety of housingaffordability
Discussion of the Current Alley Vacation Process and Issues
•No proper recommendation criteria
•Applicants lack guidance about value of alleys and challenged by the process
o Errant referrals suggesting vacation is solutionoDifficulty preparing petition, particularly the legal description
•Requests do not expire and can change following BPW recommendation
•Lack of staff monitoring through public meeting/hearing process
Current Ordinance Issues
•No proper recommendation criteria
AGENDA REVIEW SESSION OCTOBER 20, 2022 232
o Current state ordinance criteria applies to “reason for objection”
•No advance notification to appropriate city departments and agencies in advance ofpetition filing
•Request do not expire and can change following BPW recommendation
•Notifications to property owners may fail to cover the full block beyond the 150-footradius
Proposed Criteria
If answers to any of the following questions is YES, a request to vacate should be denied:
•Do any property owners currently access the alley
•Do less than fifty percent (50%) of the properties on the full block face have direct accessto the street?
•Is this the only midblock connection?
•Is the block length greater than 600 feet?Will the vacation result in a dead-end alley?
•Will vacating the alley allow for direct street access and interfere with a designated bikeroute?
•Will vacating the alley allow for direct access to the street in a manner that will not meetminimum engineering standards for traffic safety?
•Are there public or private utilities in the alley?
Proposed Alley Vacation Process
•To add a step to the process where there is an intake of the application to improveconsultation with applicants/petitioners and quality of requests
•Notes that Engineering will provide the legal description
•Add 180-day limit between BPW result and petitions filing
•Ensure there is no change to the petition
•Mailed notifications to all property owners within 150 feet also to include entire block
with signatures
•City staff attends council hearings where petitions are taking place
Potential Ordinance Changes
•Department of Community Investments and Department of Engineering initiates reviewof application request using recommendation criteria as determined by Board of PublicWorks (BPW) and engages with applicant
•Engineering conducts review of any utilities in the area and the preparation of amap/drawing and legal description
•Engineering shares request with appropriate departments and other public agencies
determined by the BPW prior to BPW review and filing of petition
•Add “file by” date of 180 days following BPW recommendation
•Amend notification radius to include all properties within block containing alley
Summary of Proposal
•Introduce proper evaluation criteria
•Use of pre-application form/engagement process
•Provide additional guidance to applicants/petitioners
•Update ordinance language to reflect changes to criteria, process, and responsibilities
•Set an expiration date for requests
•Follow requests through the public hearing process
Next Steps
•Meeting with Public Works & Property Vacation Committee Chair
•Present to Council Public Works & Property Vacation Committee
•Revisit with Board of Public Works
•Present to Common Council for ordinance adoption
•Conclude with Board of Public Works for policy consideration
AGENDA REVIEW SESSION OCTOBER 20, 2022 233
Mr. Gilot asked if there should be a link to existence of alleys as being related to zoning ordinances for residential. R1 zones have wider lots which are designed for driveways in the front. Mr. Gilot stated that he may be incorrect on the zone names.
Mr. Corcoran explained that S1 is a suburban lot which is designed for frontloading garages on bigger lots. When you get into Urban 1 and 2, they can be subdivided down to fifteen (15) feet wide .
Mr. Gilot asked if that is a buildable lot. Mr. Corcoran answered absolutely, a townhouse.
Mr. Corcoran stated that the city is very flexible about the different types of housing products that can be built. The zoning ordinance tries to address the changes in demographics that are
happening in the nation, not just in South Bend, and being able to deliver the types of housing
that the Ordinance is set up to help us deliver on those and require if there is an alley present, the owner use that alley.
Mr. Corcoran noted that the street department is putting together a GIS map of where all the
alleys are and the condition of the alley. The street department may also be included in the alley
vacation recommendation process.
Mr. Miller asked if that means maintenance of the alley.
Mr. Corcoran stated that the maintenance of the alley is a two (2) step issue. Overgrowth of trees
and grass is to be maintained by the property owner just as the tree lawn is. The surface itself, we are trying to figure out ways to do better at grading, etc.
Mr. Gilot noted that the city used to use to send trash trucks down the alleys that would allow two (2) routes to go through, even though it would cost us some mirrors.
Mr. Corcoran advised that we are all trying to find a solution for that would work that the City can pay for.
Mr. Gilot noted that there is no funding for alley maintenance where there is for streets.
President Maradik thanked Mr. Corcoran and Mr. Dressel for presenting to the Board.
ADJOURNMENT
There being no further business to come before the Board, President Maradik adjourned the meeting at 11:08 a.m.
November 8, 2022
REGULAR MEETING OCTOBER 25, 2022 234
REGULAR MEETING OCTOBER 25, 2022
The Regular Meeting of the Board of Public Works was convened at 9:30 a.m. on Tuesday,
October 25, 2022, by Board President Elizabeth A. Maradik in the 13th Floor Conference Room of the County-City Building, 227 W. Jefferson Blvd., South Bend, Indiana. The meeting was also streamed live to the public via Microsoft Teams. Board Clerk Theresa Heffner confirmed the presence of Board President Elizabeth A. Maradik, Vice President Joseph Molnar, and Board Members Gary Gilot, Jordan Gathers (arrived at 9:39 a.m.), Murray Miller (absent), and Board
Attorney Michael Schmidt (virtual), with a roll call. President Maradik reminded virtual attendees to mute their microphones and turn off their cameras when not speaking, and to save their questions and comments for the Privilege of the Floor.
APPROVE MINUTES OF PREVIOUS MEETING
Upon a motion made by VP Joseph Molnar, seconded by Gary Gilot and carried by roll call, the minutes for the Agenda Review Session and Regular Meeting of the Board held on October 6, and October 11, 2022, were approved. Jordan Gathers was not present for roll call.
OPENING OF BIDS – 2022 CONTRACTOR PAVING, ROUND III – PROJECT NO. 122-048
(PR-00017693) This was the date set for receiving and opening of sealed bids for the above referenced project. The Clerk tendered proof of publication of Notice in the South Bend Tribune, which was found to be sufficient. The following bids were opened and publicly read:
MILESTONE CONTRACTORS NORTH, INC. 24358 State Road 23 South Bend, IN 46614 akrueger@milestonelp.com
Bid was signed by Mr. Dustin Hilary
Non-Collusion, Non-Discrimination Affidavit Form was completed.
Five percent (5%) Bid Bond was submitted. Three (3) Forms MWBE-1.0, 2.0, 2.1 were completed. Four of Four Addendum(s) Acknowledgement received.
BID: $2,951,000.00
RIETH-RILEY CONSTRUCTION CO., INC. 25200 State Road 23
South Bend, IN 46614
ralvarado@rieth-riley.com; hgritton@rieth-riley.com
Bid was signed by Mr. Ruben Alvarado
Non-Collusion, Non-Discrimination Affidavit Form was completed. Five percent (5%) Bid Bond was submitted. Three (3) Forms MWBE-1.0, 2.0, 2.1 were completed. Four of Four Addendum(s) Acknowledgement received.
BID: $2,267,500.00
Upon a motion made by VP Joseph Molnar, seconded by Gary Gilot and carried by roll call, the above bids were referred to Public Works for review and recommendation. Jordan Gathers was not present for roll call.
OPENING OF BIDS – CAMPEAU STREET STREETSCAPE – PROJECT NO. 121-073 (PR-
00019420) This was the date set for receiving and opening of sealed bids for the above referenced project. The Clerk tendered proof of publication of Notice in the South Bend Tribune, which was found to be sufficient. The following Bids were opened and publicly read:
HRP CONSTRUCTION, INC. 5777 Cleveland Rd., P.O. Box 266 South Bend, IN 46624-0266 cindyv@hrpconstruction.com
Bid was signed by Mr. Matthew D. Cain Non-Collusion, Non-Discrimination Affidavit Form was completed.
REGULAR MEETING OCTOBER 25, 2022 235
Five percent (5%) Bid Bond was submitted.
Three (3) Forms MWBE-1.0, 2.0, 2.1 were completed.
One of One Addendum(s) Acknowledgement received.
BASE BID TOTAL: $2,539,900.00
MILESTONE CONTRACTORS NORTH, INC. 24358 State Road 23 South Bend, IN 46614 akrueger@milestonelp.com Bid was signed by Mr. Dustin Hilary Non-Collusion, Non-Discrimination Affidavit Form was completed. Five percent (5%) Bid Bond was submitted. Three (3) Forms MWBE-1.0, 2.0, 2.1 were completed. One of One Addendum(s) Acknowledgement received.
BASE BID TOTAL: $2,836,000.00
RIETH-RILEY CONSTRUCTION CO., INC.
25200 State Road 23
South Bend, IN 46614
ralvarado@rieth-riley.com; hgritton@rieth-riley.com Bid was signed by Mr. Ruben Alvarado Non-Collusion, Non-Discrimination Affidavit Form was completed. Five percent (5%) Bid Bond was submitted. Three (3) Forms MWBE-1.0, 2.0, 2.1 were completed. One of One Addendum(s) Acknowledgement received.
BASE BID TOTAL: $2,315,275.24
Upon a motion made by VP Joseph Molnar, seconded by Gary Gilot and carried by roll call, the above bids were referred to Public Works and Community Investment for review and
recommendation. Jordan Gathers arrived during the bid reading and was present for roll call.
OPENING OF QUOTATIONS – DREWRY’S BREWERY FENCE REPLACEMENT – PROJECT NO. 119-031B (PR-00020167) President Maradik advised that this was the date set for the receiving and opening of sealed quotations for the above referenced project. The following quotation was opened and read:
RITSCHARD BROS., INC. 1204 W. Sample St.
South Bend, IN 46619
rit1204@datacruz.com Quotation was submitted by Mr. Donald Ritschard, Jr. Non-Collusion, Non-Discrimination Affidavit Form was completed. Three (3) Forms MWBE-1.0, 2.0, 2.1 were completed.
QUOTATION: $118,260.00
Upon a motion made by VP Joseph Molnar, seconded by Jordan Gathers and carried by roll call, the above quotations were referred to Public Works and Community Investment for review and recommendation.
APPROVAL OF REQUEST TO REJECT BIDS/QUOTATIONS – WASTEWATER TREATMENT PLANT COMPRESSOR BUILDING MASONRY IMPROVEMENTS – PROJECT NO. 121-046 (PR-00018587)
In a memorandum to the Board, Mr. Jacob Klosinski, Engineering, requested permission to reject
all bids for the above referenced project due to the bids exceeded the available budget for the project and will be re-advertised. Therefore, upon a motion made by VP Joseph Molnar, seconded by Jordan Gathers and carried by roll call, the above request was approved.
REGULAR MEETING OCTOBER 25, 2022 236
APPROVAL OF REQUEST TO REJECT BIDS/QUOTATIONS – SHERIDAN & RIVERSIDE PARKING LANE RESURFACING – PROJECT NO. 122-056 (PR-00019271)
In a memorandum to the Board, Mr. Scott Kreeger, Engineering, requested permission to reject all quotations for the above referenced project due to the quote documentation was not sufficient and Engineering is evaluating how to proceed. Therefore, upon a motion made by VP Joseph Molnar, seconded by Jordan Gathers and carried by roll call, the above request was approved.
APPROVE CHANGE ORDER NO. 1 (FINAL) – POTAWATOMI ZOO PARKING LOT EXPANSION – PROJECT NO. 120-014 (PO-0013320) President Maradik advised that Ms. Rebecca Plantz, Engineering, has submitted change order number 1 on behalf of Milestone Contractors North, Inc., 24358 State Road 23, South Bend, IN 46614, indicating the contract amount be increased by $19,206 for a new contract sum, including this change order, in the amount of $457,471.82. Upon a motion made by VP Joseph Molnar,
seconded by Jordan Gathers and carried by roll call, the change order was approved.
APPROVE CHANGE ORDER NO. 1 (FINAL) – AIRPORT ANNEXATION AREA WATER
MAIN EXTENSION – PROJECT NO. 120-026 (PO-0013841)
President Maradik advised that Mr. Jacob Klosinski, Engineering, has submitted change order number 1 on behalf of G.E. Marshall, Inc, 1351 Joliet Rd., Valparaiso, IN 46385, indicating the contract amount be decreased by $75,740.30 with an additional sixty-five (65) days for a new contract sum, including this change order, in the amount of $237,456.10 with a new completion date of July 31, 2022. Upon a motion made by VP Joseph Molnar, seconded by Jordan Gathers
and carried by roll call, the change order was approved.
APPROVAL OF REQUEST TO ADVERTISE FOR THE RECEIPT OF BIDS AND TITLE SHEET – NEIGHBORHOOD INFRASTRUCTURE - LONGFELLOW AVE. & SOUTH ST.
INTERSECTION – PROJECT NO. 121-048B (PR-00019884)
In a memorandum to the Board, Ms. Leslie Biek, Engineering, requested permission to advertise for the receipt of bids for the above referenced project. Also presented at this time for approval and execution was the title sheet. Upon a motion made by VP Joseph Molnar, seconded by Jordan Gathers and carried by roll call, the above request to advertise was approved, and the title
sheet was approved and signed.
APPROVAL OF REQUEST TO ADVERTISE FOR THE RECEIPT OF BIDS AND TITLE SHEET – NEIGHBORHOOD INFRASTRUCTURE - FORD ST. & WALNUT ST. INTERSECTION – PROJECT NO. 121-048C (PR-00019886)
In a memorandum to the Board, Ms. Leslie Biek, Engineering, requested permission to advertise
for the receipt of bids for the above referenced project. Also presented at this time for approval and execution was the title sheet. Upon a motion made by VP Joseph Molnar, seconded by Jordan Gathers and carried by roll call, the above request to advertise was approved, and the title sheet was approved and signed.
APPROVAL OF AGREEMENTS/CONTRACTS/PROPOSALS/ADDENDA The following agreements/contracts/proposals/addenda were submitted to the Board for approval: Type Business Description Amount/ Funding Motion/ Second
Temporary
Access Agreement
Rescue
Incorporated d/b/a Hope Ministries
Access Property to
Conduct Weather Amnesty Services at 510 S. Main St. from October
25, 2022 to April 30, 2023
N/A VP Molnar/
Mr. Gathers
Professional Services Agreement
VS
Engineering,
Inc.
Design and Inspection Services for Linden Avenue Streetscape at
College St. to Birdsell St. Project No. 122-050
$191,000 (PR-00019888) VP Molnar/ Mr. Gathers
Professional Services Agreement
DLZ Indiana, LLC Design Services for Angela Boulevard Pedestrian Safety Improvements SR 933 and Twyckenham Dr.
NTE $159,900 (Hourly) (PR-00020234)
VP Molnar/ Mr. Gathers
REGULAR MEETING OCTOBER 25, 2022 237
Amendment
No. 2 to Professional Service
Agreement
Donohue &
Associates, Inc.
Additional Engineering
Services for South Well Field Improvements Project No. 117-059C
NTE $181,995
(Hourly) (PR-0000038
VP Molnar/
Mr. Gathers
Professional Services Agreement
Jones Petrie Rafinski Corporation
Design Services for New Automatic Entrance Gates and Parking Lot
Improvements at Century
Center Project No. 122- 060
NTE $12,200
(Hourly)
(7304.42010.0 00.0099)
VP Molnar/ Mr. Gathers
ADOPT RESOLUTION NO. 49-2022 – A RESOLUTION OF THE CITY OF SOUTH BEND, INDIANA BOARD OF PUBLIC WORKS AUTHORIZING THE TRANSFER OF REAL
PROPERTY TO THE CITY OF SOUTH BEND REDEVELOPMENT COMMISSION
Upon a motion made by VP Joseph Molnar, seconded by Jordan Gathers and carried by roll call, the following resolution was adopted by the Board of Public Works:
RESOLUTION NO. 49-2022
A RESOLUTION OF THE CITY OF SOUTH BEND, INDIANA, BOARD OF PUBLIC WORKS AUTHORIZING THE TRANSFER OF REAL PROPERTY TO THE CITY OF SOUTH BEND REDEVELOPMENT COMMISSION
WHEREAS, the City of South Bend, Indiana, Board of Public Works (the “Board”) exists pursuant to Indiana Code Section 36-4-9-5, holds real property owned by the City of South Bend, Indiana (the “City”) pursuant to Indiana Code Section 36-9-6-3, and is authorized to transfer such property to another governmental entity pursuant to Indiana Code Section 36-
1-11-8; and
WHEREAS, the South Bend Redevelopment Commission, the governing body of the City of South Bend, Indiana, Department of Redevelopment (the “Commission”), exists and operates pursuant to Indiana Code Section 36-7-14 (the “Act”); and
WHEREAS, the Board owns one (1) parcel of real property in the City, 510 S. Main St., more particularly described on Exhibit A (the "Property"); and
WHEREAS, the Board desires to convey the Property to the Commission pursuant to
Ind. Code 36-1-11-8 for the purpose of making the Property available for re-use and
redevelopment in accordance with the Commission's purposes and powers under the Act; and
WHEREAS, it is anticipated that the Commission will adopt a resolution accepting the Board's conveyance of the Property to the Commission and appointing a representative to
accept and record the deed received from the Board.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY OF SOUTH BEND, INDIANA, BOARD OF PUBLIC WORKS AS FOLLOWS:
1.The Board hereby approves the conveyance of the Property to the Commissionin accordance with Indiana Code Section 36-1-11-8.
2.The President and Clerk of the Board are authorized and instructed to executeand attest, respectively, a quit claim deed in substantially the form attached hereto as Exhibit B, conveying all of the Board's right, title, and interest in the Property to the Commission.
3.The Board authorizes Joseph Molnar of the City’s Department of CommunityInvestment to present for recordation in the Office of the Recorder of St. Joseph County, Indiana, the deed conveying the Property to the Commission, as well as to execute any other document necessary to affect the Board’s conveyance to the Commission.
4.This Resolution will be in full force and effect upon its adoption by the Board.
ADOPTED at a meeting of the City of South Bend, Indiana, Board of Public Works held
REGULAR MEETING OCTOBER 25, 2022 238
on October 25, 2022, at 1308 County-City Building, 227 West Jefferson Boulevard, South Bend, Indiana 46601.
CITY OF SOUTH BEND BOARD OF PUBLIC WORKS s/ Elizabeth A. Maradik s/ Joseph R. Molnar s/ Gary A. Gilot
s/ Jordan V. Gathers
ATTEST:
s/ Theresa Heffner, Clerk
APPROVAL OF LICENSE AND PERMIT APPLICATIONS The following license and permit applications were presented for approval: Applicant Description Date/Time Location Motion Carried
Linden Grill Sidewalk Café Permits - Pending Minimum ADA
Clearances
Monday –
Saturday 11:00 a.m. to 9:00 p.m.
119 S. Michigan St. VP Molnar/ Mr. Gathers
FAVORABLE RECOMMENDATION - PETITION TO VACATE THE EAST/WEST ALLEY
FROM N. HILL ST. TO NORTH/SOUTH ALLEY BETWEEN E. CORBY BLVD. AND E.
KALORAMA ST. AT 824 N. HILL STREET
President Maradik indicated that the Board approve the revised description of the East/West alley from N. Hill St. to the North/South alley between E. Corby Blvd. and E. Kalorama St. President Maradik advised the Board is in receipt of favorable recommendations concerning this vacation petition from the Fire Department, Police Department. Community Investment and
Public Works Department recommend approval pending the applicant hiring a bonded and
permitted contractor to remove the existing alley entrance apron between sidewalk and N. Hill Street and installing a new six (6) inch curb across the opening within thirty (30) days. Based on the recommendations, the request does meet the criteria of I.C. 36-7-3-13. Therefore, VP Joseph Molnar made a motion to approve sending City Council a favorable recommendation subject to
removing the alley approach and installing a curb and sidewalk. Jordan Gathers seconded the
motion which carried by roll call.
APPROVE RENEWAL OF WASTEWATER DISCHARGE PERMIT(S)
In a Memorandum to the Board, Ms. Serena Lozano-Shane, Division of Wastewater, submitted
the following wastewater discharge permit(s) for renewal and recommended approval:
Imagineering Finishing Technologies, 3722 Foundation Court TK Finishing, 3702 W. Sample St.
There being no further discussion, upon a motion made by VP Joseph Molnar, seconded by Jordan Gathers and carried by roll call, the wastewater discharge permit(s) was approved.
RATIFY APPROVAL AND/OR RELEASE CONTRACTOR, EXCAVATION, AND
OCCUPANCY BONDS
The Division of Engineering Permit Department recommended that the following bonds be ratified pursuant to Resolution 100-2000 and/or released as follows:
Business Bond Type Approved/ Released Effective Date
Martinez Sons Construction LLC Contractor Released 10/20/2022
Coder Home Services, LLC Occupancy Approved 10/06/2022
Delta III Inc. Occupancy Approved 10/06/2022 KRG Eddy Street Land III, LLC Occupancy Approved 10/04/2022
Inland Water Pollution Control Inc. Occupancy Released 11/12/2022
VP Joseph Molnar made a motion that the bond’s approval and/or release as outlined above be ratified. Jordan Gathers seconded the motion, which carried by roll call.
REGULAR MEETING OCTOBER 25, 2022 239
RATIFY PREAPPROVED CLAIMS PAYMENTS
VP Joseph Molnar stated the Board received notices of the following preapproved claim
payments from the City’s Department of Administration and Finance:
Name Date Amount of Claim
City of South Bend Claims GBLN-45121, GBLN- 45122 10/07/2022 $705,733.89
City of South Bend Claims GBLN-45351 10/11/2022 $2,804,342.12
City of South Bend Claims GBLN-45347 10/11/2022 $5,297,412.02
City of South Bend Claims GBLN-45524, GBLN- 45567 10/17/2022 $3,774.64
City of South Bend Claims GBLN-45932 10/18/2022 $3,268,967.71
Each claim is fully supported by an invoice; the person receiving the goods or services has
approved the claims, and the claims have been filed with the City Fiscal Officer and certified for
accuracy. Therefore, upon a motion by VP Joseph Molnar, seconded by Jordan Gathers, and carried by roll call, the Board ratified the preapproved claims payments.
PRIVILEGE OF THE FLOOR
ADJOURNMENT There being no further business to come before the Board, President Maradik adjourned the meeting at 9:50 a.m.
November 8, 2022