HomeMy WebLinkAboutIndustrial Wastewater Discharge Permit Renewal - TK FinishingCITY OF SOUTH BEND JAMES MUELLER, MAYOR
DEPARTMENT OF PUBLIC WORKS
ERIC HORVATH, DIRECTOR
October 14, 2022
Board of Public Works
City of South Bend
1316 County City Building
227 West Jefferson Boulevard
South Bend IN 46601
RE: Renewal of Industrial Wastewater Discharge Permit
Dear Board Members:
The Division of Environmental Services recommends approving the renewal of the Industrial Discharge Permit for TK
Finishing at the October 25, 2022, Board of Public Works Meeting.
TK Finishing is a metal finisher under categorical standards 40 CFR 433.17. TK Finishing requirements were reviewed for
necessary changes to ensure the industrial permit remains legally substantiated. After review of requirements and
historical data, no pollutant limitations were adjusted. There have been no significant changes to the permit.
If you should have any questions, please do not hesitate to contact me (574) 235-5798 or at sshane@southbendin.gov.
Sincerely,
Serena Shane
Pretreatment Manager
City of South Bend
Division of Environmental Services, Department of Utilities
3113 Riverside Drive
South Bend, IN 46628
(574) 235-5798
sshane@southbendin.gov
Enclosure(s)
- Industrial Discharge Permit Board of Public Works Signature Page, Part I- Effluent Limitation, -Agenda Request Form
5
City of South Bend
Department of Public Works
Industrial Pretreatment Program
Significant Industrial User – Permit No. 14-1117.300
In accordance with all the terms of Chapter 17 of the City of South Bend’s Municipal Code, and with any applicable
provisions of federal or state law and regulations, permission is hereby granted to:
T K Finishing
3702 W. Sample St.- Suite 4045
South Bend IN 46619
for the contribution of wastewater into the City of South Bend Publicly Owned Treatment Works.
This permit is granted in accordance with the application filed on 10 May, 2022.
Effective on: 19 November, 2022
Expires on the: 18 November, 2027
Any violation of the terms and conditions of this permit shall be deemed a violation of the City of South Bend Municipal
Code and will subject the permittee to the sanctions set out in section 17-11 through 17-13 of the Municipal Code.
The permittee shall file an application for a renewal permit, a minimum of 90 days prior to the expiration date.
Approved By:
October 25, 2022
T K Finishing Industrial Wastewater Discharge Permit page 7 of 43
Facility Description
TK Finishing applies a Black Oxide coating to customer supplied parts. Black Oxide is a chemical solution
which converts the surface of ferrous metals to black iron oxide, Fe3O4 Magnetite. The black oxide penetrates
the surface and becomes an integral part of the surface and also provides protection. T K Finishing runs only one
line which consists of 5 tanks, a wash tank, a rinse tank, a black oxide process tank, another rinse tank, and an
oily rinse to protect the finished parts. Wastewater discharged from TK Finishing's process is subject to the Metal
Finishing Categorical Standards found at 40 CFR 433.17 (PSNS).
Part I – Effluent Limitations
A. Sample Port and Collection Location
1. The sampling location (site 4045) is located in the northwest corner of the suite. Tanks 2 and 4
discharge rinse waters from the black oxide line into a 55 gallon drum, where pH is adjusted as
needed. The effluent flows from the 55 gallon drum to the final discharge 55 gallon drum. A
sump pump moves the wastewater from the drum to the City of South Bend Sewer System.
Wastewater is sampled from the 55 gallon drum discharge pipe before it is pumped to the city
sewer. This site is considered end of process.
2. Any discharge of water or waste having a pH lower than 6.0 S.U. or a pH higher than 11.0 S.U.
is prohibited. In addition, the permittee’s wastewater discharge shall not exceed the following
effluent limitations:
Effluent limitations for Sample Site Outfall # 4045:
Parameter Daily Maximum Limit (mg/L) Monthly Average Limit (mg/L)
Arsenic (mg/L) *Report *Report
Cadmium (mg/L) *Report *Report
Chromium (mg/L) 2.77 1.71
Copper (mg/L) *Report *Report
Cyanide (mg/L) 1.20 0.65
Lead (mg/L) *Report *Report
Mercury (mg/L) 0.00019 -na-
Nickel (mg/L) 3.98 0.8
Oil and grease (mg/l) 300 -na-
Oil and Grease TPH (mg/l) 100 -na-
Silver (mg/L) *Report *Report
TTO (mg/l) 2.13 -na-
Zinc (mg/L) 2.61 1.48
3
PERMIT BRIEFING MEMO
1. Facility Description
TK Finishing is a job shop that engages in black oxide treatment and corrosion prevention of customer
supplied steel metal parts. Wastewater discharged from TK Finishing’s process is subject to the Metal
Finshing Categorical Standards found at 40 CFR 433.17. TK Finishing is generally open for business 4
days per week 7 am to 4. Process operations are conducted as jobs become available.
2. Discharge description:
Discharge is rinse water only. TK Finishing uses a series of 5 tanks for the treatment process of the metal
parts. Tank 1 contains Electro 100 which is a cleaner and tank 3 contains Black Oxide 110 which is the
Black Oxide treatment. Tanks 2 and 4 are rinse waters which discharge to the sewer system. Tank 5
contains oil which is applied to the metal parts to protect the finishing. Tanks 1, 3, and 5 are not
discharged to the sewer system.
From July 2021
through
July 2022
From November 2017
through
July 2022
Average Process Flow 34 gpd 42 gpd
Maximum Process Flow 92 gpd 2,169 gpd
3. Sample Site Description
Sample Site Outfall # 4045 is located at the northwest corner of the suite where the rinse tanks (2nd and 4th
tanks) discharge rinse water from the black oxide line into a 55-gallon drum, where pH is adjusted. A
sump pump pumps the wastewater to the City of South Bend Sewer System. Compliance samples are
collected from the discharge stream that flows from the pH adjustment 55-gallon drum to the final
discharge 55-gallon drum. This sampling location is deemed by the Industrial Pretreatment Group to be
end of pipe and end of process; sanitary waste excluded.
4. Wastewater Treatment
Wastewater treatment consists of pH neutralization using Hydrochloric Acid (Muriatic Acid) and Sodium
Hydroxide.
5. Classification
TK Finishing is classified as a Categorical Industrial User (CIU). Specifically, TK Finishing is classified
as a metal finisher covered by 40 CFR 433.17 (PSNS) due to the black oxide process of metal parts. TK
Finishing is categorized as a B industry in accordance with the City’s EPA approved Industrial
Pretreatment Program in which all Categorical Industries are classified as a Class B at minimum.
However, due to low daily discharge volumes, TK Finishing’s monitoring schedule is the same as a D
industry.
6. Calculation of Limits
Limits are applied from 40 CFR 433.17 (PSNS) without modification to the categorical process
wastewater flow unless local limitations are more stringent.
4
7. Monitoring Frequency
TK Finishing is categorized as a B industry per the City’s EPA approved Industrial Pretreatment Program
which requires that all categorical industries be categorized as B industries at a minimum. However, in
May of 2009, TK Finishing requested a reduction on the required monitoring frequencies to Semi-
Annual, due to lack of daily work process, and their low daily wastewater discharge flows which average
< 100 gpd. TK Finishing’s monthly sampling results have been within permit limits. Therefore, the City
of South Bend granted TK Finishing approval for the Semi-Annual reduced monitoring frequencies
request. Since no changes to TK Finishing’s work process and/or total wastewater discharge flow
volumes have changed since the issuance of their previous industrial discharge permit, and their sampling
results have been within permit limits since 2007, the City’s Pretreatment Group will continue to allow
the reduced monitoring frequency.
8. Industrial Operator Certification Requirement
Operator Certification Requirement: A-SO
Industrial operator certification requirements are based on the criteria listed in Indiana Administrative
Code, Title 327, 5-22-5.
Permit Drafted by:
City of South Bend
Industrial Pretreatment Group
September 8, 2022
BOARD OF PUBLIC WORKS
AGENDA ITEM REVIEW REQUEST FORM
Date 10/14/2022
Name Serena Lozano-Shane Department UTILITIES
BPW Date 10/25/2022 Phone Extension 5798
Review and Approval Required Prior to Submittal to Board Diversity Compliance
and Inclusion Officer Officer Name BPW Attorney Attorney Name
Dept. Attorney Attorney Name
Purchasing
Check the Appropriate Item Type – Required for All Submissions
Professional Services Agreement Contract Proposal
Open Market Contract Amendment/Addendum Special Purchase, QPA
Bid Opening Bid Award Req. to Advertise Title Sheet
Quote Opening Quote Award Reject Bids/Quotes
Proposal Opening C/O & PCA No. PCA
Chg. Order, No. Traffic Control Resolution
X Other: Industrial Permit Renewal TK Finishing Ease./Encroach
Required Information
Company or Vendor Name
New Vendor Yes If Yes, Approved by Purchasing
No
MBE/WBE Contractor MBE
WBE Completed E-Verify Form Attached Yes
No
Project Name
Project Number
Funding Source
Account No.
Amount
Terms of Contract
Purpose/Description _______________________________________________________________
_______________________________________________________________
___________________________________________________
For Change Orders Only
Amount of
Increase
Decrease
$
($ )
Previous Amount $
Current Percent of Change:
Increase
Decrease
%
( %)
New Amount $
Total Percent of Change:
Increase
Decrease
%
( %)
Time Extension Amount:
New Completion Date: