HomeMy WebLinkAboutIndustrial Wastewater Discharge Permit Renewal - Imagineering CITY OF SOUTH BEND JAMES MUELLER, MAYOR
DEPARTMENT OF PUBLIC WORKS
ERIC HORVATH, DIRECTOR
October 14, 2022
Board of Public Works
City of South Bend
1316 County City Building
227 West Jefferson Boulevard
South Bend IN 46601
RE: Renewal of Industrial Wastewater Discharge Permit
Dear Board Members:
The Division of Environmental Services recommends approving the renewal of the Industrial Discharge Permit for
Imagineering Enterprises, Inc dba Imagineering Finishing Technologies (Foundation Court) at the October 25, 2022,
Board of Public Works Meeting.
Imagineering Finishing Technology Foundation Court is a metal finisher under categorical standards 40 CFR 433.17.
Imagineering Finishing Technologies Foundation Court requirements were reviewed for necessary changes to ensure the
industrial permit remains legally substantiated. After review of requirements and historical data, no pollutant limitations
were adjusted. There have been no significant changes to the permit.
If you should have any questions, please do not hesitate to contact me (574) 235-5798 or at sshane@southbendin.gov.
Sincerely,
Serena Shane
Pretreatment Manager
City of South Bend
Division of Environmental Services, Department of Utilities
3113 Riverside Drive
South Bend, IN 46628
(574) 235-5798
sshane@southbendin.gov
Enclosure(s)
- Industrial Discharge Permit Board of Public Works Signature Page, Part I- Effluent Limitation, -Agenda Request Form
5
City of South Bend
Department of Public Works
Industrial Pretreatment Program
Significant Industrial User – Permit No. 014-1035.301
In accordance with all the terms of Chapter 17 of the City of South Bend’s Municipal Code, and with any applicable
provisions of federal or state law and regulations, permission is hereby granted to:
Imagineering Finishing Technologies
3722 Foundation Court
South Bend IN 46628
for the contribution of wastewater into the City of South Bend Publicly Owned Treatment Works.
This permit is granted in accordance with the application filed on 16 August, 2022.
Effective on: 19 November, 2022
Expires on the: 18 November, 2027
Any violation of the terms and conditions of this permit shall be deemed a violation of the City of South Bend Municipal
Code and will subject the permittee to the sanctions set out in section 17-11 through 17-13 of the Municipal Code.
The permittee shall file an application for a renewal permit, a minimum of 90 days prior to the expiration date.
Approved By:
October 25, 2022
Imagineering Finishing Technologies
Industrial Wastewater Discharge Permit page 8 of 42
Facility Description
Imagineering Finishing Technologies is a Metal Finisher that performs Chemfilm (Alodine), zinc phosphate metal
finishing, zinc manganese metal finishing, and chromate passivation of panels, parts and pieces. Therefore,
Imagineering is subject to the discharge limitations found in 40 CFR 433.17.
PART I – EFFLUENT LIMITATION
A. Sample Port and Collection Location
1. Sample site 260 is located after the final pH tank in an open top weir box with V-notch overflow.
Composite samples are collected in the final discharge tank after the weir box, and grab samples
are collected from the overflow after the V-notch weir. The discharge at this point is strictly
process wastewater which has been treated
2. Any discharge of water or waste having a pH lower than 6.0 S.U. or a pH higher than 11.0 S.U. is
prohibited. In addition, the permittee’s wastewater discharge shall not exceed the following effluent
limitations:
Effluent limitations for Sample Site Outfall # 260:
Parameter Daily Maximum Limit (mg/L) Monthly Average Limit (mg/L)
Arsenic (mg/L) *Report *Report
Cadmium (mg/L) *Report *Report
Chromium (mg/L) 2.77 1.71
Copper (mg/L) 3.38 0.8
Cyanide (mg/L) 1.2 0.65
Lead (mg/L) *Report *Report
Mercury (mg/L) 0.00019 NA
Nickel (mg/L) 3.98 0.8
Oil & Grease (mg/L) 300 NA
Oil & Grease, TPH (mg/L) 100 NA
Silver (mg/L) *Report *Report
TTO (mg/L) 2.13 NA
Zinc (mg/L) 2.61 1.48
*Note: In accordance with the City of South Bend’s “What You Need Is What You Get” allocation method, local
Daily Maximum and Monthly Average limits have only been developed for those pollutants that have been
observed at or above certain concentrations in each Significant Industrial User’s wastewater discharge. If
“Report” appears on the table, it has been determined that an allocation of this pollutant is not necessary. The
permittee shall compare any monitoring data for these pollutants with the screening table in Part I (3) below. If
3
PERMIT BRIEFING MEMO
1. Facility Description
Imagineering Finishing Technologies engages in Chemfilm Line (Alodine), zinc phosphate metal
finishing, zinc manganese metal finishing, and chromate passivation of panels, parts, and pieces.
The finished parts are shipped off site. Imagineering operates between the hours of 9:00 PM to
5:00 PM. There are 86 employees who work in staggered shifts lasting 8.5 and 10 hours each
with no anticipated seasonal variation in production.
2. Discharge description
Imagineering discharge is split into wastewater that undergoes pretreatment and is discharged
through the sampling location, and wastewater that is not pretreated and is discharged directly to
the sewer. The only wastewater that is discharged at the sampling location is the wastewater that
undergoes pretreatment. Wastewater that is discharged directly to the sewer includes: boiler
blow down, water softener backwash, sanitary waste, and RO backwash brine water.
Wastewater that undergoes pretreatment before discharge includes Chromate Passivation line
rinse waters and concentrates, Zinc Phosphate line rinse waters and concentrates, Zinc
Manganese line rinse waters and concentrates, Chemfilm (Alodine) line rinse waters and
concentrates, and air scrubber pollution control wastewater.
Industrial process waters discharge to Outfall 260 via a weir box. For compliance sampling, 24
hour flow proportional composite samples are pulled from the weir box via a composite sampler.
Discharge totalizer numbers are documented daily. The boiler sump discharge line has a paddle
wheel totalizer that is used to determine blowdown and reverse osmosis brine flow. This water
flows to the sanitary line. RO softener backwash is metered and discharged to the sanitary line
as well.
Imagineering reports that chromium, copper, nickel, and zinc are present in its wastewater.
Imagineering suspects that lead and silver may be present as well.
From July 2021 to July 2022
Average Process Flow: 25, 242 gpd
Daily Maximum Process Flow: 46,919 gpd
3. Sample Site Description
Sample Site Outfall at Site #260 is located at the east end of the building. The sample site is
end-of-pipe; only process waters and pollution control wastewaters are discharged from the
sampling site. Therefore, there is no need for using the combined wastestream formula or any
other modification.
4. Wastewater Treatment
Wastewater treatment consists of chemical precipitation, flocculation, filtration, flow
equalization, neutralization and pH adjustment, sumps, and spill prevention.
4
5. Classification
Imagineering Finishing Technologies is classified as a Categorical Industrial User (CIU).
Specifically, Imagineering Finishing Technologies is classified as a metal finisher covered by 40
CFR 433.17 (PSNS) due to the electroplating and metal finishing operations. Imagineering
Finishing Technologies is categorized as a B industry per the City’s Industrial Pretreatment
Program based on the requirement that all categorical industries be considered Class B at a
minimum.
6. Calculation of Limits
Wastewater discharged at outfall 260 is subject to the Metal Finishing Categorical Standards at
40 CFR 433.17 (PSNS). The more stringent of limits provided in 40 CFR 433.17 or Chapter 17
of the City of South Bend Municipal Code have been applied without modification.
7. Monitoring Frequency
Monitoring frequencies are based on South Bend’s US EPA approved Industrial Pretreatment
Program monitoring plan.
8. Industrial Operator Certification Requirement
Operator Certification Requirement: B
Industrial operator certification requirements are based on the criteria listed in Indiana
Administrative Code, Title 327, 5-22-5. All industrial users subject to federal categorical
regulations are required to submit reports signed by an operator certified in the State of Indiana
with at least a B certification, regardless of existing treatment complexity.
Permit Drafted by:
City of South Bend
Industrial Pretreatment Group
September 12, 2022
BOARD OF PUBLIC WORKS
AGENDA ITEM REVIEW REQUEST FORM
Date 10/14/2022
Name Serena Lozano-Shane Department UTILITIES
BPW Date 10/25/2022 Phone Extension 5798
Review and Approval Required Prior to Submittal to Board Diversity Compliance
and Inclusion Officer Officer Name BPW Attorney Attorney Name
Dept. Attorney Attorney Name
Purchasing
Check the Appropriate Item Type – Required for All Submissions
Professional Services Agreement Contract Proposal
Open Market Contract Amendment/Addendum Special Purchase, QPA
Bid Opening Bid Award Req. to Advertise Title Sheet
Quote Opening Quote Award Reject Bids/Quotes
Proposal Opening C/O & PCA No. PCA
Chg. Order, No. Traffic Control Resolution
X Other: Industrial Permit Renewal Imagineering
Enterprises, Foundation Court
Ease./Encroach
Required Information
Company or Vendor Name
New Vendor Yes If Yes, Approved by Purchasing
No
MBE/WBE Contractor MBE
WBE Completed E-Verify Form Attached Yes
No
Project Name
Project Number
Funding Source
Account No.
Amount
Terms of Contract
Purpose/Description _______________________________________________________________
_______________________________________________________________
___________________________________________________
For Change Orders Only
Amount of
Increase
Decrease
$
($ )
Previous Amount $
Current Percent of Change:
Increase
Decrease
%
( %)
New Amount $
Total Percent of Change:
Increase
Decrease
%
( %)
Time Extension Amount:
New Completion Date: