Loading...
HomeMy WebLinkAboutIndustrial Wastewater Discharge Permit Renewal - Imagineering CITY OF SOUTH BEND JAMES MUELLER, MAYOR DEPARTMENT OF PUBLIC WORKS ERIC HORVATH, DIRECTOR October 14, 2022 Board of Public Works City of South Bend 1316 County City Building 227 West Jefferson Boulevard South Bend IN 46601 RE: Renewal of Industrial Wastewater Discharge Permit Dear Board Members: The Division of Environmental Services recommends approving the renewal of the Industrial Discharge Permit for Imagineering Enterprises, Inc dba Imagineering Finishing Technologies (Foundation Court) at the October 25, 2022, Board of Public Works Meeting. Imagineering Finishing Technology Foundation Court is a metal finisher under categorical standards 40 CFR 433.17. Imagineering Finishing Technologies Foundation Court requirements were reviewed for necessary changes to ensure the industrial permit remains legally substantiated. After review of requirements and historical data, no pollutant limitations were adjusted. There have been no significant changes to the permit. If you should have any questions, please do not hesitate to contact me (574) 235-5798 or at sshane@southbendin.gov. Sincerely, Serena Shane Pretreatment Manager City of South Bend Division of Environmental Services, Department of Utilities 3113 Riverside Drive South Bend, IN 46628 (574) 235-5798 sshane@southbendin.gov Enclosure(s) - Industrial Discharge Permit Board of Public Works Signature Page, Part I- Effluent Limitation, -Agenda Request Form 5 City of South Bend Department of Public Works Industrial Pretreatment Program Significant Industrial User – Permit No. 014-1035.301 In accordance with all the terms of Chapter 17 of the City of South Bend’s Municipal Code, and with any applicable provisions of federal or state law and regulations, permission is hereby granted to: Imagineering Finishing Technologies 3722 Foundation Court South Bend IN 46628 for the contribution of wastewater into the City of South Bend Publicly Owned Treatment Works. This permit is granted in accordance with the application filed on 16 August, 2022. Effective on: 19 November, 2022 Expires on the: 18 November, 2027 Any violation of the terms and conditions of this permit shall be deemed a violation of the City of South Bend Municipal Code and will subject the permittee to the sanctions set out in section 17-11 through 17-13 of the Municipal Code. The permittee shall file an application for a renewal permit, a minimum of 90 days prior to the expiration date. Approved By: October 25, 2022 Imagineering Finishing Technologies Industrial Wastewater Discharge Permit page 8 of 42 Facility Description Imagineering Finishing Technologies is a Metal Finisher that performs Chemfilm (Alodine), zinc phosphate metal finishing, zinc manganese metal finishing, and chromate passivation of panels, parts and pieces. Therefore, Imagineering is subject to the discharge limitations found in 40 CFR 433.17. PART I – EFFLUENT LIMITATION A. Sample Port and Collection Location 1. Sample site 260 is located after the final pH tank in an open top weir box with V-notch overflow. Composite samples are collected in the final discharge tank after the weir box, and grab samples are collected from the overflow after the V-notch weir. The discharge at this point is strictly process wastewater which has been treated 2. Any discharge of water or waste having a pH lower than 6.0 S.U. or a pH higher than 11.0 S.U. is prohibited. In addition, the permittee’s wastewater discharge shall not exceed the following effluent limitations: Effluent limitations for Sample Site Outfall # 260: Parameter Daily Maximum Limit (mg/L) Monthly Average Limit (mg/L) Arsenic (mg/L) *Report *Report Cadmium (mg/L) *Report *Report Chromium (mg/L) 2.77 1.71 Copper (mg/L) 3.38 0.8 Cyanide (mg/L) 1.2 0.65 Lead (mg/L) *Report *Report Mercury (mg/L) 0.00019 NA Nickel (mg/L) 3.98 0.8 Oil & Grease (mg/L) 300 NA Oil & Grease, TPH (mg/L) 100 NA Silver (mg/L) *Report *Report TTO (mg/L) 2.13 NA Zinc (mg/L) 2.61 1.48 *Note: In accordance with the City of South Bend’s “What You Need Is What You Get” allocation method, local Daily Maximum and Monthly Average limits have only been developed for those pollutants that have been observed at or above certain concentrations in each Significant Industrial User’s wastewater discharge. If “Report” appears on the table, it has been determined that an allocation of this pollutant is not necessary. The permittee shall compare any monitoring data for these pollutants with the screening table in Part I (3) below. If 3 PERMIT BRIEFING MEMO 1. Facility Description Imagineering Finishing Technologies engages in Chemfilm Line (Alodine), zinc phosphate metal finishing, zinc manganese metal finishing, and chromate passivation of panels, parts, and pieces. The finished parts are shipped off site. Imagineering operates between the hours of 9:00 PM to 5:00 PM. There are 86 employees who work in staggered shifts lasting 8.5 and 10 hours each with no anticipated seasonal variation in production. 2. Discharge description Imagineering discharge is split into wastewater that undergoes pretreatment and is discharged through the sampling location, and wastewater that is not pretreated and is discharged directly to the sewer. The only wastewater that is discharged at the sampling location is the wastewater that undergoes pretreatment. Wastewater that is discharged directly to the sewer includes: boiler blow down, water softener backwash, sanitary waste, and RO backwash brine water. Wastewater that undergoes pretreatment before discharge includes Chromate Passivation line rinse waters and concentrates, Zinc Phosphate line rinse waters and concentrates, Zinc Manganese line rinse waters and concentrates, Chemfilm (Alodine) line rinse waters and concentrates, and air scrubber pollution control wastewater. Industrial process waters discharge to Outfall 260 via a weir box. For compliance sampling, 24 hour flow proportional composite samples are pulled from the weir box via a composite sampler. Discharge totalizer numbers are documented daily. The boiler sump discharge line has a paddle wheel totalizer that is used to determine blowdown and reverse osmosis brine flow. This water flows to the sanitary line. RO softener backwash is metered and discharged to the sanitary line as well. Imagineering reports that chromium, copper, nickel, and zinc are present in its wastewater. Imagineering suspects that lead and silver may be present as well. From July 2021 to July 2022 Average Process Flow: 25, 242 gpd Daily Maximum Process Flow: 46,919 gpd 3. Sample Site Description Sample Site Outfall at Site #260 is located at the east end of the building. The sample site is end-of-pipe; only process waters and pollution control wastewaters are discharged from the sampling site. Therefore, there is no need for using the combined wastestream formula or any other modification. 4. Wastewater Treatment Wastewater treatment consists of chemical precipitation, flocculation, filtration, flow equalization, neutralization and pH adjustment, sumps, and spill prevention. 4 5. Classification Imagineering Finishing Technologies is classified as a Categorical Industrial User (CIU). Specifically, Imagineering Finishing Technologies is classified as a metal finisher covered by 40 CFR 433.17 (PSNS) due to the electroplating and metal finishing operations. Imagineering Finishing Technologies is categorized as a B industry per the City’s Industrial Pretreatment Program based on the requirement that all categorical industries be considered Class B at a minimum. 6. Calculation of Limits Wastewater discharged at outfall 260 is subject to the Metal Finishing Categorical Standards at 40 CFR 433.17 (PSNS). The more stringent of limits provided in 40 CFR 433.17 or Chapter 17 of the City of South Bend Municipal Code have been applied without modification. 7. Monitoring Frequency Monitoring frequencies are based on South Bend’s US EPA approved Industrial Pretreatment Program monitoring plan. 8. Industrial Operator Certification Requirement Operator Certification Requirement: B Industrial operator certification requirements are based on the criteria listed in Indiana Administrative Code, Title 327, 5-22-5. All industrial users subject to federal categorical regulations are required to submit reports signed by an operator certified in the State of Indiana with at least a B certification, regardless of existing treatment complexity. Permit Drafted by: City of South Bend Industrial Pretreatment Group September 12, 2022 BOARD OF PUBLIC WORKS AGENDA ITEM REVIEW REQUEST FORM Date 10/14/2022 Name Serena Lozano-Shane Department UTILITIES BPW Date 10/25/2022 Phone Extension 5798 Review and Approval Required Prior to Submittal to Board Diversity Compliance and Inclusion Officer Officer Name BPW Attorney Attorney Name Dept. Attorney Attorney Name Purchasing Check the Appropriate Item Type – Required for All Submissions Professional Services Agreement Contract Proposal Open Market Contract Amendment/Addendum Special Purchase, QPA Bid Opening Bid Award Req. to Advertise Title Sheet Quote Opening Quote Award Reject Bids/Quotes Proposal Opening C/O & PCA No. PCA Chg. Order, No. Traffic Control Resolution X Other: Industrial Permit Renewal Imagineering Enterprises, Foundation Court Ease./Encroach Required Information Company or Vendor Name New Vendor Yes If Yes, Approved by Purchasing No MBE/WBE Contractor MBE WBE Completed E-Verify Form Attached Yes No Project Name Project Number Funding Source Account No. Amount Terms of Contract Purpose/Description _______________________________________________________________ _______________________________________________________________ ___________________________________________________ For Change Orders Only Amount of Increase Decrease $ ($ ) Previous Amount $ Current Percent of Change: Increase Decrease % ( %) New Amount $ Total Percent of Change: Increase Decrease % ( %) Time Extension Amount: New Completion Date: