Loading...
HomeMy WebLinkAboutSewer & Water Service Agreement & Title Sheet - 2240 Prairie Ave. – S&J Real Estate Holdings LLC  ELIZABETH A. MARADIK JOSEPH R. MOLNAR GARY A. GILOT JORDAN V. GATHERS MURRAY L. MILLER 1316 COUNTY-CITY BUILDING 227 W. JEFFERSON BOULEVARD SOUTH BEND, INDIANA 46601-1830 PHONE 574/ 235-9251 FAX 574/ 235-9171 CITY OF SOUTH BEND JAMES MUELLER, MAYOR BOARD OF PUBLIC WORKS October 11, 2022 Mr. Pete Burns S&J Real Estate Holdings LLC pdburns@burnsdistributing.com RE: Sewer and Water Service Agreement Dear Mr. Burns: At its October 11, 2022 meeting, the Board of Public Works approved the above referenced agreement for the utility extension at 2240 Prairie Ave., Project No. DP22-018. Enclosed please find the original of the agreement for your signature. Please sign and return the original agreement to lhensley@southbendin.gov. Please retain a copy for your records. If you have any further questions, please call this office at (574) 235-9251. Sincerely, /s/ Theresa Heffner Theresa Heffner, Clerk Enclosures TH/lh SEWER AND WATER SERVICE AGREEMENT This Sewer and Water Service Agreement (“Agreement”) is made on the 11th. day of October, 2022 by and between S&J Real Estate Holdings LLC, an Indiana limited liability company, (“Owner”) and the City of South Bend, a municipal corporation existing under the laws of Indiana, acting by and through its Board of Public Works (“City”) in accordance with 170 I.A.C. 6-1.5-40. WHEREAS, Owner intends to develop 1.55 acres located at 2240 Prairie Avenue; and WHEREAS, Owner plans to extend and make additions to existing water and sanitary sewer systems to serve said development as shown on the Exhibit A, attached and incorporated hereto (the "Dedicated Improvements"), and desires certain commitments from City; and WHEREAS, the engineering design for said Dedicated Improvements has been, or will be, accomplished by competent professional engineers registered and licensed in the State of Indiana; and NOW, THEREFORE, in consideration of the obligations, terms and conditions contained herein, the adequacy of which the parties expressly acknowledge, Owner and the City agree as follows: 1.Recitals The parties hereto acknowledge and agree that the foregoing recitals are incorporated herein as a part of this Agreement. 2.Design The Owner shall consult the City and allow the City Engineer or her designee input prior to designating the project engineer who shall be responsible for the engineering design and inspection in connection with the installation of the Dedicated Improvements (the "Project Engineer"). The Owner shall inspect the site during construction to ensure the Project Engineer’s conformance to zoning requirements, adequacy of design, and conformance to the City's specifications and standards regarding location, size and depth of line, and quality of construction of the Dedicated Improvements. The Owner shall provide the plans with a City of South Bend cover sheet and specifications for the Dedicated Improvements along with a cost estimate to the City. The Owner shall also provide to the City a statement from the Project Engineer certifying that the materials and workmanship including pipes, bedding, manholes, and other related materials and work meet the City’s specifications and standards. Upon request of the City, the certification shall be substantiated by material affidavits from suppliers and by applicable test results for inflow/infiltration, exfiltration, deflection, pressure, leaks, bacteria, compaction and other tests required by the City. All construction, engineering, and inspection costs in connection with the Dedicated Improvements shall be borne by the Owner. 3.Construction Inspection The Owner has provided the City with Exhibit A, which depicts drawings of the Dedicated Improvements, which the City acknowledges conforms to the City’s standards. The Owner shall allow the City to inspect the Dedicated Improvements during construction to ensure conformance to the agreed standards set forth in Exhibit A, in particular with regard to zoning requirements, adequacy of design, and quality of construction. The Owner shall contact the City’s Engineering Department at least two (2) business days in advance to arrange for the attendance of a City inspector at key milestones throughout work. Key milestones shall include but not limited to: mandrel deflection testing, sanitary sewer taps, and water main taps. The Owner agrees to perform any necessary adjustments as reasonably requested by the City to ensure the Dedicated Improvements are constructed in accordance with Exhibit A. 4.Permits It shall be Owner’s sole responsibility and expense to obtain any and all permits associated with the construction and installation of the Dedicated Improvements and to comply with all applicable laws. 5.Engineer’s Estimate The Owner has provided an Engineer’s Estimate (See Exhibit B, incorporated herein by reference and attachment) for the cost to construct the Dedicated Improvements, including but not limited to, excavation, pipe materials, valves, hydrants, and all other appurtenant materials, supplies and equipment, permit fees, backfill and bedding, pavement, curbs, sidewalks, signs, and restoration of the areas within the proposed R.O.W. 6.Performance Bond Owner shall provide the City with a performance bond for an amount equal to one hundred twenty–five percent (125%) of the construction cost covering all work performed or to be performed pursuant to this Agreement. Owner’s failure to provide the performance bond as prescribed herein shall cause this Agreement to be immediately terminated and of no effect, without the requirement of notice. The performance bond shall be provided concurrently with the execution of this Agreement and attached as Exhibit C. 7.Maintenance Bond Within ten (10) days of City’s acceptance of the Dedicated Improvements, Owner shall provide the City with a maintenance bond equal to ten percent (10%) of the construction cost covering all work performed or to be performed pursuant to this Agreement, and such bond shall remain in effect for three (3) years after dedication as described in Section 9 below. 8.Term Except as otherwise provided herein, this Agreement shall continue for a period of sixteen (16) months from the Effective Date of this Agreement, or upon the issuance of the relevant occupancy permit(s), whichever occurs last. 9.Dedication Upon completion of the construction of the Dedicated Improvements substantially as depicted in Exhibit A, the Owner shall also convey an easement and dedicate to the City within such easement the Dedicated Improvements as public infrastructure. It is understood by the Owner that no dedication shall be accepted by the City until all required easements have been conveyed, accepted, and recorded by the City. It is also understood by Owner and the City that water main and sanitary sewer constructed in previous phases shall be dedicated to the City. The Owner shall use its best efforts to work with the City to ensure that the Dedicated Improvements are dedicated to the City in a timely manner. Additionally, prior to dedication, the following must be satisfied: a.All parts and labor must meet the standards and requirements stated in the design specifications as presented to and accepted by the City's Engineering Department. b.Lien waivers must be received with regard to all workmanship and materials used in connection with these improvements. c.The Completion Affidavit must be furnished to Owner by the South Bend, Indiana Board of Public Works. d.Owner must provide copies of test reports or cut sheets on all materials supplied. e.Owner must provide televising DVDs of the Sewer per the City of South Bend Construction Standards and Specifications 4-4.2. f.Owner must provide As-Built drawings in accordance with the City of South Bend Prevailing Specifications for Public Works, which may be found at https://southbendin.gov/wp-content/uploads/2020/05/Prevailing-Supplemental- Specifications.pdf Owner’s failure to comply with this Section 9 shall be a material breach of this Agreement. 10.System Development Charges Simultaneously with the execution of this Agreement, the Owner shall pay the City a sum of $5,832.00 (five thousand, eight hundred thirty two dollars and 00/100) for access to the City’s water and sewer sanitary systems set forth as Exhibit D. For purposes of this Section 10 of the Agreement, an equivalent residential unit (“ERU”) shall mean a single-family residence. For purposes of customers that are not single-family residences, one ERU shall equal estimated wastewater and water flows of 310 gallons per day, respectively. No customer will be less than one ERU. For every new connection to the South Bend Municipal Sewer Works, a capital contribution of $1,145 shall be collected per ERU. For every new connection to the South Bend Municipal Water Works, a system development charge of four hundred seventy-five dollars ($475.00) shall be collected per ERU and additional portion thereof to be connected. All charges shall be paid to the City at the time the application for connection is filed. For all other types of structures, the ERU calculation shall be based upon the ratio of Average Daily Flow as computed pursuant to 327 IAC 3-6-11 in relationship to 310 gallons per day. For structures not listed in 327 IAC 3-6-11, the ERU shall be calculated as the relationship between the Average Daily Flow reported in the sewer capacity certification for the structure and 310 gallons per day. 11.Indemnification Owner agrees and undertakes to indemnify and hold the City, and its respective agents, employees, successors, and assigns, harmless from any liability, loss, costs, damages or expenses, including attorneys’ fees, which the City may suffer or incur as a result o f any claims or actions which may be brought by any person or entity arising out of this Agreement . If any action is brought against the City or its respective agents, employees, successors, or assigns, in connection with this Agreement, Owner agrees to defend such action or proceedings at its own expense and to pay any judgment rendered therein. 12.Insurance Owner, or Owner’s contractor, at Owner’s sole expense, shall maintain during the term of this Agreement, commercial general liability insurance covering the Owner and the Dedicated Improvements in an amount not less than Five Million Dollars ($5,000,000.00) per occurrence. Owner understands and agrees the amount of insurance does not in any way limit liability under this agreement to $5,000,000. The Certificate of Insurance shall be provided concurrently with the execution of this Agreement and attached as Exhibit E. 13.Assignment This Agreement may not be assigned by the Owner without the express written consent of the City which such consent may be withheld for any reason. Any violation of this limitation shall terminate the City’s obligation and forfeit the Owner’s rights under this Agreement. 14.Material Breach In the event either party breaches any of the provisions set forth herein, the non-breaching party shall provide written notice of the breach to the breaching party. Upon receipt of the notice, the breaching party shall use its good faith efforts to cure the breach as soon as practical. In the event the breach is not cured within a reasonable amount of time, the non -breaching party may terminate this Agreement and pursue its legal and equitable remedies. 15.Governing Law and Jurisdiction This Agreement shall be construed and interpreted according to the laws of the State of Indiana, including, but not limited to, I.C. § 8-1-2-101.5 and 170 I.A.C. 6-1.5 et seq. and/or 170 I.A.C. 8.5-4 et seq. regarding the dispute resolution process of customer complaints, and shall be enforced in any court of competent jurisdiction in St. Joseph County, Indiana. It is further agreed that all provisions of law now or hereafter in effect relating to water and sewer service by the City shall be applicable to this Agreement. 16.Severability Wherever possible, each provision of this Agreement shall be interpreted in such a manner as to be effective and valid under applicable law, but if any provision of this Agreement shall be prohibited by or invalid under applicable law, such provision shall be ineffective only to the extent of such prohibition or invalidity, without invalidating the remainder of such provision or the remaining provisions of this Agreement. 17.Waiver No provision of this Agreement will be deemed waived, unless such waiver will be in writing and signed by the party against which the waiver is sought to be enforced. The waiver will not be construed to be a waiver of any succeeding breach of any such provision, a waiver of the provision itself, or a waiver of any other provisions of this Agreement. No delay or omission on the part of either party to exercise or avail itself of any right, power, or privilege that it has or may have under this Agreement will operate as a waiver of any breach or default. 18.Time Time is of the essence of this Agreement. 19.Entire Agreement This Agreement sets forth the entire agreement and understanding between the Owner and the City as to the subject matter hereof, and merges and supersedes all prior discussions, agreements, and understanding of any and every nature between them. 20.Corporate Authority The person signing on behalf of the Owner represents that he/she has been duly authorized to execute this Agreement on behalf of said Owner. IN WITNESS WHEREOF, the Owner and the City, through their duly authorized representatives, have caused this Agreement to be executed as of the day and year first written above. The parties have read and understand the foregoing terms of this Agreement and do, by their respective signatures hereby agree to its terms. IN WITNESS WHEREOF, the Owner and the City, through their duly authorized representatives, have caused this Agreement to be executed as of the date first written above. The parties have read and understand the foregoing terms of this Agreement and do, by their respective signatures, hereby agree to its terms. "OWNER" By: Printed: Title: October 11, 2022 EXHIBIT A DEDICATED IMPROVEMENTS DEBRA S M I TH H U GHESPROF E SSIONA L E N G INEERINDIA N AREGISTER E DNo. PE880266 STATE OF NOTE SEE CONSTRUCTION PLAN SET FOR 2240 PRAIRIE AVENUE FOR THE STORM WATER POLLUTION PREVENTION PLAN FOR THIS PROJECT. CITY OF SOUTH BEND, INDIANA DEPARTMENT OF PUBLIC WORKS PROJECT SITE X X SANITARY SEWER AND WATER MAIN EXTENSION 2240 PRAIRIE AVENUE BETWEEN EWING AVENUE AND OLIVE STREET EXTENSION OF EXISTING 8 IN. DIAM. SANITARY SEWER 113' NORTHEAST ALONG PRAIRIE AVENUE TOWARD EWING AVENUE. EXTENSION OF EXISTING 10 IN. DIAM. WATER MAIN 510' SOUTHWEST ALONG PRAIRIE AVENUE TOWARD OLIVE STREET. 08/31/2022 CITY PROJECT NUMBER DP22-0018 10/7/2022 10/07/2022 10/7/2022 10/07/2022 10/11/2022 October 11, 2022 3" TREE M H T MH 3" TREE Concrete Concrete B M 0 4 7 6 - 2 0 2 1 - 1 Asphalt Lawn Conc Sidewalk Prairie Avenue (SR 23) (70' R/W) 33 4 1 M H Concrete Sidewalk Concrete Sidewalk E w i n g A v e n u e As p h a l t P a v e m e n t Co n c r e t e Asphalt Parking Asphalt Parking 12" Wide Shrubs 12" Wide Shrubs 12" WideShrubs12" SAN 12" SAN35 5 8 IN L E T 12" STORM 2" T R E E 2" T R E E 2" T R E E 2" T R E E 2" T R E EHYD MH 758.0 E E E E E E E E E E E E T T T W W W WWWWWW 15+13 10+0010+00 11+00 12+00 13+00 14+00 15+00 21+13 20+0020+00 21+00 SAN MH #1 STA: 21+12.89 RIM: 748.37 8" INV. SW. 740.39 99'- 4" SAN. SERVICE @ 4.10%36'- 4" SAN. SERVICE @ 1.74%HY D 23+43 WATER VALVE STA: 15+08.15 RIM ELEV.: 758.43 10" TOP SW. 751.93 10" TOP NE. 751.93 WATER VALVE STA: 23+39.72 RIM ELEV.: 752.56 1" TOP SE. 746.99 1" TOP NW. 746.99 WATER VALVE STA: 10+00.00 RIM ELEV.: 747.29 10" TOP NE. 741.38 FIRE HYD. STA: 12+20.91 221' - 10" WATER MAIN31+76 87'- 4" SAN. SERVICE @ 4.00%87'- 4" SAN. SERVICE @ 3.75%6'- 4" SAN. SERVICE @ 94.14% SAN SEWER #7 - 113' - 8" @ 2.47% 45° BEND STA: 12+81.33 45° BEND STA: 12+65.53 45° BEND STA: 14+55.39 45° BEND STA: 14+71.80 WATER VALVE RIM ELEV.: 752.43 PIPE TOP EL: 746.95 WATER VALVE RIM ELEV.: 752.36 PIPE TOP EL: 746.87 WATER VALVE RIM ELEV.: 752.28 PIPE TOP EL: 746.72 234' - 10" WATER MAIN 6'- 4" SAN. SERVICE @ 99.42% 5'- 4" SAN. SERVICE @ 110.22% 9'- 4" SAN. SERVICE @ 69.78% EXIST SAN MH #3341 RIM: 745.42 8" INV. NE. 737.60 12" INV. SW. 736.10 STRUCTURE DETAILS 3341 MANHOLE RIM 745.42 GRAVEL IN 12" CLAY SW 736.1 INV 12" CLAY S 736.1 (CEMENTED SHUT) SHELF 736.2 NO OTHER PIPES FOUND DEBRA S M I TH H U GHESPROF E SSIONA L E N G INEERINDIA N AREGISTER E DNo. PE880266 STATE OF SITE BENCHMARK BM 0476-2021-1 CHISELED SQUARE ON SOUTHERN TOP OF CONCRETE LAMP BASE ON WESTERN SIDE OF DRIVEWAY OF GAS STATION. ELEVATION 746.90' 736 738 740 742 744 746 748 750 752 754 756 758 760 762 736 738 740 742 744 746 748 750 752 754 756 758 760 762 9+75 10+00747.3747.45747.5748.1410+50748.1748.83748.7749.4111+00749.2749.63749.8750.3211+50750.6751.42751.1751.5712+00751.8751.94752.7752.8812+50753.6753.82754.3754.5413+00754.6755.113+50756.1756.514+00756.8757.314+50757.6757.815+00758.315+255' MIN. COVER5' MIN. COVEREXISTING PROFILE WATER TAPPING VALVE STA: 15+08.15 VALVE RIM: 758.43 EXIST. 10" WATER MAIN FIRE HYD. #1 STA: 12+20.91WATER VALVE STA: 10+00.00 RIM ELEV.: 747.29 10" TOP NE. 741.38 4" SAN. SEWER SVC INV. 745.65 4" SAN. SEWER SVC INV. 746.57 PROPOSED PROFILE 221' - 10" WATER MAIN 45° BEND 45° BEND 45° BEND 45° BEND 4" SAN. SEWER SVC INV. 745.86 4" SAN. SEWER SVC INV. 745.97 31"29"34" 35"1" WATER SERVICE CONNECTON 234' - 10" WATER MAIN 732 734 736 738 740 742 744 746 748 750 752 754 732 734 736 738 740 742 744 746 748 750 752 754 19+75 20+00745.4746.020+50746.7747.321+00748.021+25 SAN SEWER #7 - 1 1 3 ' - 8 " @ 2 . 4 7 % SAN MH #1 STA: 21+12.89 RIM: 748.37 8" INV. SW. 740.39 EXIST SAN MH #3341 RIM: 745.42 8" INV. NE. 737.60 12" INV. SW. 736.10 EXISTING PROFILE 4" SAN. SEWER SVC INV. 739.40 INV. 737.60 HIGH PERFORMANCE FLEXIBLE CONNECTORS MEETING ASTM C-923 EXISTING MANHOLE NEW SANITARY SEWER SANITARY MANHOLE CONNECTION DETAIL NO SCALE24 IN. MAX.EXISTING SAN. SEWER DRAWING NO. JOB NO:SHEET OF DATE OF CERTIFICATION: SCALE: HORIZONTAL VERTICAL CAD FILE: C info@sam.biz (574) 266-1010 Fax: (574) 262-3040 3220 Southview Drive Elkhart, Indiana 46514 www.sam.biz REVISION: REVISION: REVISION: REVISION: REVISION: REVISION:DRAWN BY:Wednesday, August 31, 2022 11:24 AMPrinted:\\saminc\ELK\PROJECTS\1021067463\100\Survey\11Design\Dwg\1021067463-DESIGN.dwgFile Name:Last Saved: Wednesday, August 31, 2022 11:23 AM 1021067463-DESIGN.dwg ENGINEER: 2022 Surveying & Mapping, LLC 1" = 20'1" = 5' 1021067463 476-21 A-46426BLS Debra S. Hughes, PE E S W GRAPHIC SCALE 0 ( IN FEET ) 1 inch = ft. 20 10 4020 80 20 2 3 08/31/20228.6'5.8'6.3'7.1'6.3'14.4'WATER MAIN LOCATION SHOWN IS APPROXIMATE BASED ON CITY RECORDS. CONTRACTOR TO FIELD VERIFY EXISTING WATER MAIN LOCATION AND ELEVATION. CONNECT WITH TAPPING SLEEVE AND VALVE 4.0'PAVEMENT REMOVAL AND REPLACEMENT FOR WATER MAIN CONSTRUCTION 41.1' 12.0'7.0'8.1'5.8'55.7' PAVEMENT REMOVAL AND REPLACEMENT FOR SANITARY SEWER CONSTRUCTION. DRIVEWAY TO REMAIN OPEN AT ALL TIMES.4.0'6.2' CONCRETE CURB REMOVAL AND REPLACEMENT FOR SANITARY SEWER CONSTRUCTION 5 FT. CONC. WALK 5 FT. CONC. WALK PAVEMENT REMOVAL AND REPLACEMENT FOR WATER MAIN CONSTRUCTION. DRIVEWAY TO REMAIN OPEN AT ALL TIMES. 68.7'4.0'SANITARY SEWER EXTENSION NOTES: DESIGN SANITARY FLOW RATE REQUIREMENTS FOR COLLECTION SYSTEMS AND WATER POLLUTION TREATMENT/CONTROL FACILITIES (TITLE 327 OF INDIANA ADMINISTRATIVE CODE ARTICLE 3 RULE 6 SEC. 11) 1. AVERAGE DESIGN FLOW FOR SHOPPING CENTER IS 0.1 GPD/SQ.FT. OF FLOOR SPACE, PLUS 20 GPD/EMPLOYEE. 2. AVERAGE DESIGN FLOW = 0.1 GPD/SQ.FT. X 9,463 SQ.FT. + 20 GPD/EMPLOYEE X 16 EMPLOYEES = 1,266 GALLONS/DAY 3. PEAK DESIGN FLOW = PEAK FACTOR X AVERAGE DESIGN FLOW 4. PEAK FACTOR = 4 5. PEAK DESIGN FLOW = 1,266 GPD X 4 = 5,064 GALLONS/DAY WATER MAIN EXTENSION NOTES: CALCULATION OF PUBLIC WATER SYSTEM QUANTITY REQUIREMENT STANDARDS FOR AVERAGE AND PEAK DEMAND CONDITIONS (TITLE 327 OF INDIANA ADMINISTRATIVE CODE ARTICLE 8 RULE 3.3 SEC. 2) 1. AVERAGE DAILY CONSUMER DEMAND FOR SHOPPING CENTER IS 0.1 GPD/SQ.FT. OF FLOOR SPACE, PLUS 20 GPD/EMPLOYEE. 2. AVERAGE DAILY CONSUMER DEMAND = 0.1 DPD/SQ.FT. X 9,463 SQ.FT. = 20 GPD/EMPLOYEE X 16 EMPLOYEES = 1,266 GPD 3. PEAK DESIGN FLOW = PEAK FACTOR X AVERAGE DAILY CONSUMER DEMAND + FIRE FLOW 4. PEAK FACTOR = 2.5 5. FIRE FLOW = 0 GPD 6. PEAK DAILY CONSUMER DEMAND = 1,266 GPD X 2.5 = 3,165 GPD20.7'SANITARY SEWER AND WATER MAIN PLAN, PROFILE AND DETAIL SANITARY SEWER AND WATER MAIN EXTENSION 2240 PRAIRIE AVENUE (SR 23), SOUTH BEND, PT. NE 1 4, SEC. 22, T37N, R2E, PORTAGE TWP., ST JOSEPH CO., INDIANA CONNECT TO EXISTING SAN. SEWER MH CONNECT TO EXISTING SAN. SEWER MH CONNECT WITH TAPPING SLEEVE AND VALVE DEBRA S M I TH H U GHESPROF E SSIONA L E N G INEERINDIA N AREGISTER E DNo. PE880266 STATE OF DRAWING NO. JOB NO:SHEET OF DATE OF CERTIFICATION: SCALE: HORIZONTAL VERTICAL CAD FILE: C info@sam.biz (574) 266-1010 Fax: (574) 262-3040 3220 Southview Drive Elkhart, Indiana 46514 www.sam.biz REVISION: REVISION: REVISION: REVISION: REVISION: REVISION:DRAWN BY:Wednesday, August 31, 2022 11:24 AMPrinted:\\saminc\ELK\PROJECTS\1021067463\100\Survey\11Design\Dwg\1021067463-DESIGN.dwgFile Name:Last Saved:Wednesday, August 31, 2022 11:23 AM1021067463-DESIGN.dwg ENGINEER: 2022 Surveying & Mapping, LLC NONE NONE 1021067463 476-21 A-46426BLS Debra S. Hughes, PE 3 3 08/31/2022 CITY STANDARD DETAILS SANITARY SEWER AND WATER MAIN EXTENSION 2240 PRAIRIE AVENUE (SR 23), SOUTH BEND, PT. NE 1 4, SEC. 22, T37N, R2E, PORTAGE TWP., ST JOSEPH CO., INDIANA 3" TREE M H T MH 3" TREE Concrete Concrete B M 0 4 7 6 - 2 0 2 1 - 1 Asphalt Lawn Conc Sidewalk Prairie Avenue (SR 23) (70' R/W) 33 4 1 M H Concrete Sidewalk Concrete Sidewalk E w i n g A v e n u e As p h a l t P a v e m e n t Co n c r e t e Asphalt Parking Asphalt Parking 12" Wide Shrubs 12" Wide Shrubs 12" WideShrubs12" SAN 12" SAN35 5 8 IN L E T 12" STORM 2" T R E E 2" T R E E 2" T R E E 2" T R E E 2" T R E EHYD MH 758.0 E E E E E E E E E E E E T T T W W W WWWWWW 15+13 10+0010+00 11+00 12+00 13+00 14+00 15+00 21+13 20+0020+00 21+00 SAN MH #1 STA: 21+12.89 RIM: 748.37 8" INV. SW. 740.39 99'- 4" SAN. SERVICE @ 4.10%36'- 4" SAN. SERVICE @ 1.74%HY D 23+43 WATER VALVE STA: 15+08.15 RIM ELEV.: 758.43 10" TOP SW. 751.93 10" TOP NE. 751.93 WATER VALVE STA: 23+39.72 RIM ELEV.: 752.56 1" TOP SE. 746.99 1" TOP NW. 746.99 WATER VALVE STA: 10+00.00 RIM ELEV.: 747.29 10" TOP NE. 741.38 FIRE HYD. STA: 12+20.91 221' - 10" WATER MAIN31+76 87'- 4" SAN. SERVICE @ 4.00%87'- 4" SAN. SERVICE @ 3.75%6'- 4" SAN. SERVICE @ 94.14% SAN SEWER #7 - 113' - 8" @ 2.47% 45° BEND STA: 12+81.33 45° BEND STA: 12+65.53 45° BEND STA: 14+55.39 45° BEND STA: 14+71.80 WATER VALVE RIM ELEV.: 752.43 PIPE TOP EL: 746.95 WATER VALVE RIM ELEV.: 752.36 PIPE TOP EL: 746.87 WATER VALVE RIM ELEV.: 752.28 PIPE TOP EL: 746.72 234' - 10" WATER MAIN 6'- 4" SAN. SERVICE @ 99.42% 5'- 4" SAN. SERVICE @ 110.22% 9'- 4" SAN. SERVICE @ 69.78% EXIST SAN MH #3341 RIM: 745.42 8" INV. NE. 737.60 12" INV. SW. 736.10 STRUCTURE DETAILS 3341 MANHOLE RIM 745.42 GRAVEL IN 12" CLAY SW 736.1 INV 12" CLAY S 736.1 (CEMENTED SHUT) SHELF 736.2 NO OTHER PIPES FOUND DEBRA S M I TH H U GHESPROF E SSIONA L E N G INEERINDIA N AREGISTER E DNo. PE880266 STATE OF SITE BENCHMARK BM 0476-2021-1 CHISELED SQUARE ON SOUTHERN TOP OF CONCRETE LAMP BASE ON WESTERN SIDE OF DRIVEWAY OF GAS STATION. ELEVATION 746.90' 736 738 740 742 744 746 748 750 752 754 756 758 760 762 736 738 740 742 744 746 748 750 752 754 756 758 760 762 9+75 10+00747.3747.45747.5748.1410+50748.1748.83748.7749.4111+00749.2749.63749.8750.3211+50750.6751.42751.1751.5712+00751.8751.94752.7752.8812+50753.6753.82754.3754.5413+00754.6755.113+50756.1756.514+00756.8757.314+50757.6757.815+00758.315+255' MIN. COVER5' MIN. COVEREXISTING PROFILE WATER TAPPING VALVE STA: 15+08.15 VALVE RIM: 758.43 EXIST. 10" WATER MAIN FIRE HYD. #1 STA: 12+20.91WATER VALVE STA: 10+00.00 RIM ELEV.: 747.29 10" TOP NE. 741.38 4" SAN. SEWER SVC INV. 745.65 4" SAN. SEWER SVC INV. 746.57 PROPOSED PROFILE 221' - 10" WATER MAIN 45° BEND 45° BEND 45° BEND 45° BEND 4" SAN. SEWER SVC INV. 745.86 4" SAN. SEWER SVC INV. 745.97 31"29"34" 35"1" WATER SERVICE CONNECTON 234' - 10" WATER MAIN 732 734 736 738 740 742 744 746 748 750 752 754 732 734 736 738 740 742 744 746 748 750 752 754 19+75 20+00745.4746.020+50746.7747.321+00748.021+25 SAN SEWER #7 - 1 1 3 ' - 8 " @ 2 . 4 7 % SAN MH #1 STA: 21+12.89 RIM: 748.37 8" INV. SW. 740.39 EXIST SAN MH #3341 RIM: 745.42 8" INV. NE. 737.60 12" INV. SW. 736.10 EXISTING PROFILE 4" SAN. SEWER SVC INV. 739.40 INV. 737.60 HIGH PERFORMANCE FLEXIBLE CONNECTORS MEETING ASTM C-923 EXISTING MANHOLE NEW SANITARY SEWER SANITARY MANHOLE CONNECTION DETAIL NO SCALE24 IN. MAX.EXISTING SAN. SEWER DRAWING NO. JOB NO:SHEET OF DATE OF CERTIFICATION: SCALE: HORIZONTAL VERTICAL CAD FILE: C info@sam.biz (574) 266-1010 Fax: (574) 262-3040 3220 Southview Drive Elkhart, Indiana 46514 www.sam.biz REVISION: REVISION: REVISION: REVISION: REVISION: REVISION:DRAWN BY:Wednesday, August 31, 2022 11:24 AMPrinted:\\saminc\ELK\PROJECTS\1021067463\100\Survey\11Design\Dwg\1021067463-DESIGN.dwgFile Name:Last Saved: Wednesday, August 31, 2022 11:23 AM 1021067463-DESIGN.dwg ENGINEER: 2022 Surveying & Mapping, LLC 1" = 20'1" = 5' 1021067463 476-21 A-46426BLS Debra S. Hughes, PE E S W GRAPHIC SCALE 0 ( IN FEET ) 1 inch = ft. 20 10 4020 80 20 2 3 08/31/20228.6'5.8'6.3'7.1'6.3'14.4'WATER MAIN LOCATION SHOWN IS APPROXIMATE BASED ON CITY RECORDS. CONTRACTOR TO FIELD VERIFY EXISTING WATER MAIN LOCATION AND ELEVATION. CONNECT WITH TAPPING SLEEVE AND VALVE 4.0'PAVEMENT REMOVAL AND REPLACEMENT FOR WATER MAIN CONSTRUCTION 41.1' 12.0'7.0'8.1'5.8'55.7' PAVEMENT REMOVAL AND REPLACEMENT FOR SANITARY SEWER CONSTRUCTION. DRIVEWAY TO REMAIN OPEN AT ALL TIMES.4.0'6.2' CONCRETE CURB REMOVAL AND REPLACEMENT FOR SANITARY SEWER CONSTRUCTION 5 FT. CONC. WALK 5 FT. CONC. WALK PAVEMENT REMOVAL AND REPLACEMENT FOR WATER MAIN CONSTRUCTION. DRIVEWAY TO REMAIN OPEN AT ALL TIMES. 68.7'4.0'SANITARY SEWER EXTENSION NOTES: DESIGN SANITARY FLOW RATE REQUIREMENTS FOR COLLECTION SYSTEMS AND WATER POLLUTION TREATMENT/CONTROL FACILITIES (TITLE 327 OF INDIANA ADMINISTRATIVE CODE ARTICLE 3 RULE 6 SEC. 11) 1. AVERAGE DESIGN FLOW FOR SHOPPING CENTER IS 0.1 GPD/SQ.FT. OF FLOOR SPACE, PLUS 20 GPD/EMPLOYEE. 2. AVERAGE DESIGN FLOW = 0.1 GPD/SQ.FT. X 9,463 SQ.FT. + 20 GPD/EMPLOYEE X 16 EMPLOYEES = 1,266 GALLONS/DAY 3. PEAK DESIGN FLOW = PEAK FACTOR X AVERAGE DESIGN FLOW 4. PEAK FACTOR = 4 5. PEAK DESIGN FLOW = 1,266 GPD X 4 = 5,064 GALLONS/DAY WATER MAIN EXTENSION NOTES: CALCULATION OF PUBLIC WATER SYSTEM QUANTITY REQUIREMENT STANDARDS FOR AVERAGE AND PEAK DEMAND CONDITIONS (TITLE 327 OF INDIANA ADMINISTRATIVE CODE ARTICLE 8 RULE 3.3 SEC. 2) 1. AVERAGE DAILY CONSUMER DEMAND FOR SHOPPING CENTER IS 0.1 GPD/SQ.FT. OF FLOOR SPACE, PLUS 20 GPD/EMPLOYEE. 2. AVERAGE DAILY CONSUMER DEMAND = 0.1 DPD/SQ.FT. X 9,463 SQ.FT. = 20 GPD/EMPLOYEE X 16 EMPLOYEES = 1,266 GPD 3. PEAK DESIGN FLOW = PEAK FACTOR X AVERAGE DAILY CONSUMER DEMAND + FIRE FLOW 4. PEAK FACTOR = 2.5 5. FIRE FLOW = 0 GPD 6. PEAK DAILY CONSUMER DEMAND = 1,266 GPD X 2.5 = 3,165 GPD20.7'SANITARY SEWER AND WATER MAIN PLAN, PROFILE AND DETAIL SANITARY SEWER AND WATER MAIN EXTENSION 2240 PRAIRIE AVENUE (SR 23), SOUTH BEND, PT. NE 1 4, SEC. 22, T37N, R2E, PORTAGE TWP., ST JOSEPH CO., INDIANA CONNECT TO EXISTING SAN. SEWER MH CONNECT TO EXISTING SAN. SEWER MH CONNECT WITH TAPPING SLEEVE AND VALVE DEBRA S M I TH H U GHESPROF E SSIONA L E N G INEERINDIA N AREGISTER E DNo. PE880266 STATE OF DRAWING NO. JOB NO:SHEET OF DATE OF CERTIFICATION: SCALE: HORIZONTAL VERTICAL CAD FILE: C info@sam.biz (574) 266-1010 Fax: (574) 262-3040 3220 Southview Drive Elkhart, Indiana 46514 www.sam.biz REVISION: REVISION: REVISION: REVISION: REVISION: REVISION:DRAWN BY:Wednesday, August 31, 2022 11:24 AMPrinted:\\saminc\ELK\PROJECTS\1021067463\100\Survey\11Design\Dwg\1021067463-DESIGN.dwgFile Name:Last Saved: Wednesday, August 31, 2022 11:23 AM 1021067463-DESIGN.dwg ENGINEER: 2022 Surveying & Mapping, LLC NONE NONE 1021067463 476-21 A-46426BLS Debra S. Hughes, PE 3 3 08/31/2022 CITY STANDARD DETAILS SANITARY SEWER AND WATER MAIN EXTENSION 2240 PRAIRIE AVENUE (SR 23), SOUTH BEND, PT. NE 1 4, SEC. 22, T37N, R2E, PORTAGE TWP., ST JOSEPH CO., INDIANA BOARD OF PUBLIC WORKS AGENDA ITEM REVIEW REQUEST FORM Date: 10/4/2022 Name: Charlie Brach Department of Public Works – Engineering Division BPW Date: 10/11/2022 Phone Extension: 9246 Required Prior to Submittal to Board BPW Attorney X Attorney Name Michael Schmidt Dept. Attorney Attorney Name Purchasing Check the Appropriate Item Type – Required for All Submissions Professional Services Agreement Contract Proposal Open Market Contract Amendment/Addendum Special Purchase, QPA Bid Opening Bid Award Req. to Advertise Title Sheet Quote Opening Quote Award Reject Bids/Quotes Proposal Opening C/O & PCA No. PCA Chg. Order, No. Traffic Control Resolution Other: Utility Extension Agreement Ease./Encroach Required Information Company or Vendor Name S&J Real Estate Holdings LLC New Vendor Yes If Yes, Approved by Purchasing No MBE/WBE Contractor MBE WBE Completed E-Verify Form Attached Yes No Project Name 2240 Prairie Project Number DP22-018 Funding Source N/A Account No. PR/PO # N/A Amount N/A Terms of Contract N/A Special Contract Provisions N/A Purpose/Description Sewer and Water Extension Agreement for 2240 Prairie For Change Orders Only Amount of Increase Decrease $ ($ ) Previous Amount $ Current Percent of Change: Increase Decrease % ( %) New Amount $ Total Percent of Change: Increase Decrease % ( %) Time Extension Amount: New Completion Date: 3" TREE M H T MH 3" TREE Concrete Concrete B M 0 4 7 6 - 2 0 2 1 - 1 Asphalt Lawn Conc Sidewalk Prairie Avenue (SR 23) (70' R/W) 33 4 1 M H Concrete Sidewalk Concrete Sidewalk E w i n g A v e n u e As p h a l t P a v e m e n t Co n c r e t e Asphalt Parking Asphalt Parking 12" Wide Shrubs 12" Wide Shrubs 12" Wide Shrubs12" SAN 12" SAN35 5 8 IN L E T 12" STORM 2" T R E E 2" T R E E 2" T R E E 2" T R E E 2" T R E EHYD MH 758.0 E E E E E E E E E E E E T T T W W W WWWWWW 15+13 10+0010+00 11+00 12+00 13+00 14+00 15+00 21+13 20+0020+00 21+00 SAN MH #1 STA: 21+12.89 RIM: 748.37 8" INV. SW. 740.39 99'- 4" SAN. SERVICE @ 4.10%36'- 4" SAN. SERVICE @ 1.74%HY D 23+43 WATER VALVE STA: 15+08.15 RIM ELEV.: 758.43 10" TOP SW. 751.93 10" TOP NE. 751.93 WATER VALVE STA: 23+39.72 RIM ELEV.: 752.56 1" TOP SE. 746.99 1" TOP NW. 746.99 WATER VALVE STA: 10+00.00 RIM ELEV.: 747.29 10" TOP NE. 741.38 FIRE HYD. STA: 12+20.91 221' - 10" WATER MAIN31+76 87'- 4" SAN. SERVICE @ 4.00%87'- 4" SAN. SERVICE @ 3.75%6'- 4" SAN. SERVICE @ 94.14% SAN SEWER #7 - 113' - 8" @ 2.47% 45° BEND STA: 12+81.33 45° BEND STA: 12+65.53 45° BEND STA: 14+55.39 45° BEND STA: 14+71.80 WATER VALVE RIM ELEV.: 752.43 PIPE TOP EL: 746.95 WATER VALVE RIM ELEV.: 752.36 PIPE TOP EL: 746.87 WATER VALVE RIM ELEV.: 752.28 PIPE TOP EL: 746.72 234' - 10" WATER MAIN 6'- 4" SAN. SERVICE @ 99.42% 5'- 4" SAN. SERVICE @ 110.22% 9'- 4" SAN. SERVICE @ 69.78% EXIST SAN MH #3341 RIM: 745.42 8" INV. NE. 737.60 12" INV. SW. 736.10 STRUCTURE DETAILS 3341 MANHOLE RIM 745.42 GRAVEL IN 12" CLAY SW 736.1 INV 12" CLAY S 736.1 (CEMENTED SHUT) SHELF 736.2 NO OTHER PIPES FOUND DEBRA S M I TH H U GHESPROF E SSIONA L E N G INEERINDIA N AREGISTER E DNo. PE880266 STATE OF SITE BENCHMARK BM 0476-2021-1 CHISELED SQUARE ON SOUTHERN TOP OF CONCRETE LAMP BASE ON WESTERN SIDE OF DRIVEWAY OF GAS STATION. ELEVATION 746.90' 736 738 740 742 744 746 748 750 752 754 756 758 760 762 736 738 740 742 744 746 748 750 752 754 756 758 760 762 9+75 10+00747.3747.45747.5748.1410+50748.1748.83748.7749.4111+00749.2749.63749.8750.3211+50750.6751.42751.1751.5712+00751.8751.94752.7752.8812+50753.6753.82754.3754.5413+00754.6755.113+50756.1756.514+00756.8757.314+50757.6757.815+00758.315+255' MIN. COVER5' MIN. COVEREXISTING PROFILE WATER TAPPING VALVE STA: 15+08.15 VALVE RIM: 758.43 EXIST. 10" WATER MAIN FIRE HYD. #1 STA: 12+20.91WATER VALVE STA: 10+00.00 RIM ELEV.: 747.29 10" TOP NE. 741.38 4" SAN. SEWER SVC INV. 745.65 4" SAN. SEWER SVC INV. 746.57 PROPOSED PROFILE 221' - 10" WATER MAIN 45° BEND 45° BEND 45° BEND 45° BEND 4" SAN. SEWER SVC INV. 745.86 4" SAN. SEWER SVC INV. 745.97 31"29"34" 35"1" WATER SERVICE CONNECTON 234' - 10" WATER MAIN 732 734 736 738 740 742 744 746 748 750 752 754 732 734 736 738 740 742 744 746 748 750 752 754 19+75 20+00745.4746.020+50746.7747.321+00748.021+25 SAN SEWER #7 - 1 1 3 ' - 8 " @ 2 . 4 7 % SAN MH #1 STA: 21+12.89 RIM: 748.37 8" INV. SW. 740.39 EXIST SAN MH #3341 RIM: 745.42 8" INV. NE. 737.60 12" INV. SW. 736.10 EXISTING PROFILE 4" SAN. SEWER SVC INV. 739.40 INV. 737.60 HIGH PERFORMANCE FLEXIBLE CONNECTORS MEETING ASTM C-923 EXISTING MANHOLE NEW SANITARY SEWER SANITARY MANHOLE CONNECTION DETAIL NO SCALE24 IN. MAX.EXISTING SAN. SEWER DRAWING NO. JOB NO:SHEET OF DATE OF CERTIFICATION: SCALE: HORIZONTAL VERTICAL CAD FILE: C info@sam.biz (574) 266-1010 Fax: (574) 262-3040 3220 Southview Drive Elkhart, Indiana 46514 www.sam.biz REVISION: REVISION: REVISION: REVISION: REVISION: REVISION:DRAWN BY:Wednesday, August 31, 2022 11:24 AMPrinted:\\saminc\ELK\PROJECTS\1021067463\100\Survey\11Design\Dwg\1021067463-DESIGN.dwgFile Name:Last Saved:Wednesday, August 31, 2022 11:23 AM1021067463-DESIGN.dwg ENGINEER: 2022 Surveying & Mapping, LLC 1" = 20'1" = 5' 1021067463 476-21 A-46426BLS Debra S. Hughes, PE E S W GRAPHIC SCALE 0 ( IN FEET ) 1 inch = ft. 20 10 4020 80 20 2 3 08/31/20228.6'5.8'6.3'7.1'6.3'14.4'WATER MAIN LOCATION SHOWN IS APPROXIMATE BASED ON CITY RECORDS. CONTRACTOR TO FIELD VERIFY EXISTING WATER MAIN LOCATION AND ELEVATION. CONNECT WITH TAPPING SLEEVE AND VALVE 4.0'PAVEMENT REMOVAL AND REPLACEMENT FOR WATER MAIN CONSTRUCTION 41.1' 12.0'7.0'8.1'5.8'55.7' PAVEMENT REMOVAL AND REPLACEMENT FOR SANITARY SEWER CONSTRUCTION. DRIVEWAY TO REMAIN OPEN AT ALL TIMES.4.0'6.2' CONCRETE CURB REMOVAL AND REPLACEMENT FOR SANITARY SEWER CONSTRUCTION 5 FT. CONC. WALK 5 FT. CONC. WALK PAVEMENT REMOVAL AND REPLACEMENT FOR WATER MAIN CONSTRUCTION. DRIVEWAY TO REMAIN OPEN AT ALL TIMES. 68.7'4.0'SANITARY SEWER EXTENSION NOTES: DESIGN SANITARY FLOW RATE REQUIREMENTS FOR COLLECTION SYSTEMS AND WATER POLLUTION TREATMENT/CONTROL FACILITIES (TITLE 327 OF INDIANA ADMINISTRATIVE CODE ARTICLE 3 RULE 6 SEC. 11) 1.AVERAGE DESIGN FLOW FOR SHOPPING CENTER IS 0.1 GPD/SQ.FT. OF FLOOR SPACE, PLUS 20 GPD/EMPLOYEE. 2.AVERAGE DESIGN FLOW = 0.1 GPD/SQ.FT. X 9,463 SQ.FT. + 20 GPD/EMPLOYEE X 16 EMPLOYEES = 1,266 GALLONS/DAY 3.PEAK DESIGN FLOW = PEAK FACTOR X AVERAGE DESIGN FLOW 4.PEAK FACTOR = 4 5.PEAK DESIGN FLOW = 1,266 GPD X 4 = 5,064 GALLONS/DAY WATER MAIN EXTENSION NOTES: CALCULATION OF PUBLIC WATER SYSTEM QUANTITY REQUIREMENT STANDARDS FOR AVERAGE AND PEAK DEMAND CONDITIONS (TITLE 327 OF INDIANA ADMINISTRATIVE CODE ARTICLE 8 RULE 3.3 SEC. 2) 1.AVERAGE DAILY CONSUMER DEMAND FOR SHOPPING CENTER IS 0.1 GPD/SQ.FT. OF FLOOR SPACE, PLUS 20 GPD/EMPLOYEE. 2.AVERAGE DAILY CONSUMER DEMAND = 0.1 DPD/SQ.FT. X 9,463 SQ.FT. = 20 GPD/EMPLOYEE X 16 EMPLOYEES = 1,266 GPD 3.PEAK DESIGN FLOW = PEAK FACTOR X AVERAGE DAILY CONSUMER DEMAND + FIRE FLOW 4.PEAK FACTOR = 2.5 5.FIRE FLOW = 0 GPD 6.PEAK DAILY CONSUMER DEMAND = 1,266 GPD X 2.5 = 3,165 GPD20.7'SANITARY SEWER AND WATER MAIN PLAN, PROFILE AND DETAIL SANITARY SEWER AND WATER MAIN EXTENSION 2240 PRAIRIE AVENUE (SR 23), SOUTH BEND, PT. NE 1 4, SEC. 22, T37N, R2E, PORTAGE TWP., ST JOSEPH CO., INDIANA CONNECT TO EXISTING SAN. SEWER MH CONNECT TO EXISTING SAN. SEWER MH CONNECT WITH TAPPING SLEEVE AND VALVE DEBRA S M I TH H U GHESPROF E SSIONA L E N G INEERINDIA N AREGISTER E DNo. PE880266 STATE OF DRAWING NO. JOB NO:SHEET OF DATE OF CERTIFICATION: SCALE: HORIZONTAL VERTICAL CAD FILE: C info@sam.biz (574) 266-1010 Fax: (574) 262-3040 3220 Southview Drive Elkhart, Indiana 46514 www.sam.biz REVISION: REVISION: REVISION: REVISION: REVISION: REVISION:DRAWN BY:Wednesday, August 31, 2022 11:24 AMPrinted:\\saminc\ELK\PROJECTS\1021067463\100\Survey\11Design\Dwg\1021067463-DESIGN.dwgFile Name:Last Saved:Wednesday, August 31, 2022 11:23 AM1021067463-DESIGN.dwg ENGINEER: 2022 Surveying & Mapping, LLC NONE NONE 1021067463 476-21 A-46426BLS Debra S. Hughes, PE 3 3 08/31/2022 CITY STANDARD DETAILS SANITARY SEWER AND WATER MAIN EXTENSION 2240 PRAIRIE AVENUE (SR 23), SOUTH BEND, PT. NE 1 4, SEC. 22, T37N, R2E, PORTAGE TWP., ST JOSEPH CO., INDIANA EXHIBIT B ENGINEER’S ESTIMATE NO ITEM QTY UNIT UNIT PRICE AMOUNT 1 Construction Engineering 1 LUMP $ 4,000.00 $ 4,000.00 2 CPM Schedule 1 LUMP $ 1,000.00 $ 1,000.00 3 Mobilization and Demobilization 1 LUMP $ 5,000.00 $ 5,000.00 4 Sanitary Sewer, 8 inch SDR35 PVC 113 L.F. $ 17.34 $ 1,959.03 5 Sanitary Sewer, Manhole 1 EACH $ 2,372.47 $ 2,372.47 6 Sanitary Sewer, Frame and Cover 1 EACH $ 554.06 $ 554.06 7 INDOT #8 Stone 80 CYS $ 53.90 $ 4,312.27 8 Flowable Fill 1 LUMP $ 600.93 $ 600.93 9 Sanitary Sewer, Core and Boot Existing Manhole 1 EACH $ 961.49 $ 961.49 10 Sanitary Sewer, Video Inspection 1 LUMP $ 4,807.44 $ 4,807.44 11 Water Main, 10 inch Ductile Iron 525 L.F. $ 62.50 $ 32,812.29 12 Water Main, Valve Box 2 EACH $ 632.51 $ 1,265.02 13 Water Main, Gate Valve 2 EACH $ 1,932.74 $ 3,865.48 14 INDOT #8 Stone 12 CYS $ 53.71 $ 644.47 15 Water Main, Fittings 76 LB $ 54.36 $ 4,131.24 16 Water Main, Hydrant 1 EACH $ 6,682.54 $ 6,682.54 17 P.C. Concrete 5 CYS $ 372.06 $ 1,860.32 18 Water Main, Pressure Tap Existing Water Main 1 EACH $ 5,580.96 $ 5,580.96 19 Hot Mix Asphalt, Removal and Replacement 78.89 SYS $ 54.38 $ 4,290.00 TOTAL 86,700.00$ 2240 Prairie Avenue Public Right of Way Work Engineer's Estimate 10/3/2022 EXHIBIT C PERFORMANCE BOND EXHIBIT D SYSTEM DEVELOPMENT CHARGE Estimate Provided On:8/30/2022 Estimate Provided By:C. Brach Values Unit Type Retail # of Unit Types 8982 sf Estimated Flow (gpd) for Retail 0.1 per sf Estimated Total Flow for Retail 898.2 gpd Retail # of Unit Types 20 employees Estimated Flow (gpd) for Retail 20 per employee Estimated Total Flow for Retail 400 gpd Estimated Total Flow for 2240 Prairie 1298 gpd ERU calculation 4.188 ERU ERU rounddown 4 ERU Sewer SDC Calculation ($1145 per ERU) Water SDC Calculation ($475 per ERU) Estimated Amount Due for 2240 Prairie Estimated 10% Discounted Total (Payment in full) Estimate for System Development Charges 2240 Prairie South Bend, IN Per the Ordinance of the Common Council of the City of South Bend, System Development Charges are summarized below from Sections 17-79 and 17-80: 6,480.00$ 5,832.00$ **Estimate is based on projected uses and calculations provided by owner/consultant** 4,580.00$ 1,900.00$ EXHIBIT E CERTIFICATE OF INSURANCE