HomeMy WebLinkAboutOpening of Bids - Neighborhood Infrastructure - Riverside Dr. & Leland Ave. Proj No. 121-048A-R - Rieth-Riley Construction Co., Inc.CITY OF SOUTH BEND, INDIANA CONTRACTOR'S BID FOR PUBLIC WORK Project Name South Bend Neighborhood Infrastructure Project — Riverside Drive and Leland Avenue Intersection Project No. 121 -048A -R For Bids Due October 11, 2022 PART I (Must be completed for all bids. Please type or print) Date: October 11, 2022 Address: 25200 State Road 23 Bidder (Firm): Rieth-Riley Construction Co., Inc. City/State/Zip: South Bend, In. 46614 Telephone Number: ( 574 ) 288-8321 Agent of Bidder (if Applicable): Ruben Alvarado Pursuant to notices given, the undersigned offers to furnish labor and/or material necessary to complete the public works project of: South Bend Neighborhood Infrastructure Project -Riverside Drive and Leland Avenue Intersection the City of South Bend, Indiana, in accordance with plans and specifications prepared by: KnID. Abonmarche Consultants and dated n/a for the sum of (enter the Total Bid as shown on the Proposal) Vint. rcd Th►< Foyr `T*huusc cl ballar5 A►z;/ no cmfs (s 93Y� ox. oo ) (Enter sum of Total Bas9 Bid plus Alternates shown on Proposal) (Numerical) The undersigned further agrees to furnish a bond or certified check with this bid for an amount specified in the notice of the letting. If alternative bids apply, the undersigned submits a proposal for each in accordance with the notice. Any addendums attached will be specifically referenced at the applicable page. If additional units of material included in the contract are needed, the cost of units must be the same as that shown in the original contract if accepted by the Cit of South Bend. If the bid is to be awarded on a unit basis, the itemization of the units shall be shown a separat a chme t. By (Signature) Ruben Alvarado, Sales Manager (Printed Name of Person Signing) The above bid is accepted this Subject to the following conditions: BOARD OF PUBLIC WORKS Elizabeth A. Maradik, President Gary A. Gilot, Member ACCEPTANCE day of 20 Joseph R. Molnar, Vice President Jordan V. Gathers, Member Murray L. Miller, Member Attest: Theresa Heffner, Clerk Version 09/29/2021 Contractor's Bid for Public Works - 2 ' ; CITY OF SOUTH BEND, INDIANA CONTRACTOR'S BID FOR PUBLIC WORK CHECKLIST FOR BIDDERS Project Name South Bend Neighborhood Infrastructure Project — Riverside Drive and Leland Avenue Intersection Project No. 121 -048A -R For Bids Due October 11, 2022 From time to time the South Bend Board of Public Works finds it necessary to reject a bid because it does not comply with statutory requirements. In preparing your bid, please use the following checklist in order to.make sure that your bid is done in the proper manner. Proper bid security included. The bidder has the option of providing either a Certified Check X or Bid Bond. Bid prepared on the City of South Bend Contractor's Bid for Public Work Form, completely X executed. Contractor's Non -Collusion and Non -Debarment Affidavit, Certification Regarding Investments with Iran, Employment Eligibility Verification, Non -Discrimination Commitment, and X Certification of use of United States Steel Products or Foundry Products. Proof of M/WBE Utilization Plans [MBE -1.0 and WBE-1.0]. Also provide Evidence of Good Faith Efforts Forms [MBE -2.0 and WBE-2.0] and M/WBE Contacted Forms [MBE -2.1 and X WBE-2.1]. X Acknowledge Receipt of 1 Addendum(s) included with the bid. X All required additional information is included with the bid. Proposal statements and other affidavits all signed by the proper party with name either X printed or typed underneath signature. X This checklist submitted with the Bid. This checklist is provided for bidder's use in assuring compliance with required documentation; however, it does not include all specifications requirements and does not relieve the bidder of the need to read and comply with the specifications. Bidder: Rieth-Riley Construction Co., Inc. Date: October 11, 2022 By Authorized Represent Signature: Print Name & Title: Ruben Alvarado, Sales Manager Version 09/29/2021 Contractor's Bid for Public Works - 1 PART II (For projects of $100,000 or more — IC 36-1-12-4) These statements to be submitted under oath by each bidder with and as part of his/her/its bid. Attach additional pages for each section as needed. SECTION I EXPERIENCE QUESTIONNAIRE 1. Attach information regarding projects your organization has completed for the period of one (1) year prior to the date of the current bid. 2. Attach a listing of public works projects currently in process of construction by your organization. 3. Attach information regarding any failure to complete any work awarded to you and the location thereof. n/a 4. Attach references from private firms for which you have performed work. SECTION II PLAN AND EQUIPMENT QUESTIONNAIRE 1. Attach an explanation of your plan or layout for performing proposed work. (Examples could include a narrative of when you could begin work, complete the project, number of workers, etc. and any other information which you believe would enable the City of South Bend to consider your bid.) According to plans and specifications 2. Attach a listing of the names and addresses of all subcontractors (i.e. persons or firms outside your own firm who have performed part of the work) that you have used on public works projects during the past five (5) years along with a brief description of the work done by each subcontractor. see attached 3. If you intend to sublet any portion of the work, attach the name and address of each subcontractor, equipment to be used by the subcontractor, and whether you will require a bond. However, if you are unable to currently provide a listing, please understand a listing must be provided prior to contract approval. Until the completion of the proposed project, you are under a continuing obligation to immediately notify the City of South Bend in the event that you subsequently determine that you will use a subcontractor on the proposed project. subcontractor list will be provided upon award 4. Attach a listing of equipment you have available to use for the proposed project. see attached 5. Have you entered into contracts or received offers for all materials which substantiate the prices used in preparing your proposal? If not, attach an explanation for the rationale used which would corroborate the prices listed. As needed SECTION III CONTRACTOR'S FINANCIAL STATEMENT Attachment of bidder's financial statement is mandatory. Any bid submitted without said financial statement as required by statute shall thereby, be rendered invalid. The financial statement provided hereunder to the City of South Bend awarding the contract must be specific enough in detail so that said City of South Bend can make a proper determination of the bidder's capability for completing the project if awarded. Version 09/29/2021 Contractor's Bid for Public Works - 3 When the prospective Contractor is unable to certify to any of the statements below, it shall attach an explanation to this Affidavit. CONTRACTOR'S NON -COLLUSION AND NON -DEBARMENT AFFIDAVIT, CERTIFICATION REGARDING INVESTMENT WITH IRAN, EMPLOYMENT ELIGIBILITY VERIFICATION, NON- DISCRIMINATION COMMITMENT AND CERTIFICATION OF USE OF UNITED STATES STEEL PRODUCTS OR FOUNDRY PRODUCTS (Must be completed for all quotes and bids. Please type or print) STATE OF Indiana ) ) SS: St. Joseph COUNTY ) The undersigned Contractor, being duly sworn upon his/her/its oath, affirms under the penalties of perjury that: 1. Contractor has not, nor has any other member, representative, or agent of the firm, company, corporation or partnership represented by him, entered into any combination, collusion or agreement with any person relative to the price to be bid by anyone at such letting nor to prevent any person from bidding nor to induce anyone to refrain from bidding, and that this bid is made without reference to any other bid and without any agreement, understanding or combination with any other person in reference to such bidding. Contractor further says that no person or persons, firms, or corporation has, have or will receive directly or indirectly, any rebate, fee, gift, commission or thing of value on account of such sale; and 2. Contractor certifies by submission of this proposal that neither contractor nor any of its principals are presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from participation in this transaction by any Federal department or agency; and 3. Contractor has not, nor has any successor to, nor an affiliate of, Contractor, engaged in investment activities in Iran. a. For purposes of this Certification, "Iran" means the government of Iran and any agency or instrumentality of Iran, or as otherwise defined at Ind. Code § 5-22-16.5-5, as amended from time -to -time. b. As provided by Ind. Code § 5-22-16.5-8, as amended from time -to -time, a Contractor is engaged in investment activities in Iran if either: i. Contractor, its successor or its affiliate, provides goods or services of twenty million dollars ($20,000,000) or more in value in the energy sector of Iran; or ii. Contractor, its successor or its affiliate, is a financial institution that extends twenty million dollars ($20,000,000) or more in credit to another person for forty-five (45) days or more, if that person will (i) use the credit to provides goods and services in the energy sector in Iran; and (ii) at the time the financial institution extends credit, is a person identified on list published by the Indiana Department of Administration. 4. Contractor does not knowingly employ or contract with an unauthorized alien, nor retain any employee or contract with a person that the Contractor subsequently learns is an unauthorized alien. Version 09/29/2021 Contractor's Bid for Public Works - 4 Contractor agrees that he/she/it shall enroll in and verify the work eligibility status of all of Contractor's newly hired employees through the E -Verify Program as defined by I.C. 22-5-1.7-3. Contractor's documentation of enrollment and participation in the E -Verify Program is included and attached as part of this bid/quote; and 5. Contractor shall require his/her/its subcontractors performing work under this public contract to certify that the subcontractors do not knowingly employ or contract with an unauthorized alien, nor retain any employee or contract with a person that the subcontractor subsequently learns is an unauthorized alien, and that the subcontractor has enrolled in and is participating in the E -Verify Program. The Contractor agrees to maintain this certification throughout the term of the contract with the City of South Bend, and understands that the City may terminate the. contract for default if the Contractor fails to cure a breach of this provision no later than thirty (30) days after being notified by the City. 6. Persons, firms, partnerships, corporations, associations, or joint venturers awarded a contract by the City of South Bend through its agencies, boards, or commissions shall not discriminate against any employee or applicant for employment in the performance of a City contract with respect to hire, tenure, terms, conditions, or privileges of contract or employment, or any matter directly or indirectly related to contracting or employment because of race, sex, religion, color, national origin, ancestry, gender expression, gender identity, sexual orientation, or due to age or disability that does not affect that person's ability to perform the work. In awarding contracts for the purchase of work, labor, services, supplies, equipment, materials, or any combination of the foregoing including, but not limited to, public works contracts awarded under public bidding laws or other contracts in which public bids are not required by law, the City, its agencies, boards, or commissions will consider the Contractor's good faith efforts to obtain participation by those subcontractors certified by the State of Indiana as a Minority Business ("MBE") or as a Women's Business Enterprise ("WBE") as a factor in determining the lowest, responsible, responsive bidder. Contractors seeking the award of a City contract cannot be required to award a subcontract to an MWBE; however, they may not unlawfully discriminate against said MBE/WBE. On goal -eligible contracts, Contractors are required to either meet both MBE and WBE utilization goals or demonstrate that the Contractor has made good faith efforts to obtain participation from MBE and WBE subcontractors. A finding of noncompliance or a discriminatory practice shall prohibit that Contractor from being awarded a City contract for a period of one (1) year from the date of such determination, and such determination may also be grounds for terminating the contact to which the discriminatory practice or noncompliance pertains. 7. The undersigned Contractor agrees that the following nondiscrimination commitment shall be made a part of any contract which it may henceforth enter into with the City of South Bend, Indiana or any of its agencies, boards or commissions. Contractor agrees not to discriminate against or intimidate any employee or applicant for employment in the performance of this contract with privileges of employment, or any matter directly or indirectly related to employment, because of race, religion, color, sex, gender expression, gender identity, sexual orientation, handicap, national origin or ancestry. Breach of this provision may be regarded as material breach of contract. I, the undersigned bidder or agent as contractor on a public works project, understand my statutory obligations to the use of steel products or foundry products made in the United States (I.C. 5-16-8-1). I hereby certify that I and all subcontractors employed by me for this project will use steel products or foundry products made in the United States on this project if awarded. I understand I have an affirmative duty to notify the City in my bid that my proposal does not include the use of steel products or foundry products made in the United States. I understand it is my sole obligation and responsibility to provide a justification to the City, subject to review and approval, why the cost of United States made steel or foundry products is unreasonable. Prior to award and upon submission of bid which does not use steel products or foundry products made in the United States, the City, through its director of public works, shall make a determination if the price of United States made steel or foundry is unreasonable. I understand that violations hereunder Version 09/29/2021 Contractor's Bid for Public Works - 5 may result in forfeiture of contractual payments. I hereby affirm under the penalties of perjury that the facts and information contained in the foregoing bid for public works are true and correct. Dated this 11th day of October, 2022 Rieth-Riley Construction Co., Inc. Co=2zea� Signature of ContractorBidder or Its Agent Ruben Alvarado, Sales Manager Printed Name and Title Subscribed and sworn to before me this 11th d October 20 22 My Commission Expires 07/14/2029 4 Notary Public Dawn E. Armstrong County of Residence Kosciusko Count DAWN E.ARMSTRONG Notary Public, State of Indiana o • Kosciusko County =z Commission Number NP0734858 My Commission Expires ��i �HDIANP� Julyl4,2029 Version 09/29/2021 Contractor's Bid for Public Works - 6 BID/PROPOSAL Addendum No. 1 CITY OF SOUTH BEND Project Name: South Bend Neighborhood Infrastructure Project - Riverside Drive and Leland Avenue Intersection Project Number: 121 -048A -R For Bids Due: October 11, 2022 Contractor Name: Base Bid Item No. Description Quantity Unit Unit Price Total Amount 1. Construction Engineering 1 LS $10,035.00 $10,035.00 2. Mobilization/Demobilization 1 LS $46,000.00 $46,000.00 3. Maintenance of Traffic 1 LS $52,220.02 $52,220.02 4. Temporary Erosion Control 1 LS $65,180.00 $65,180.00 5. Clearing Right of Way 1 LS $135,022.00 $135,022.00 6. Pavement Milling 4,600 SYD $5.78 $26,588.00 7. Curb, Concrete, Remove 820 LFT $20.77 $17,031.40 8. Omitted 9. Remove Structure 9 EA $1,558.51 $14,026.59 10. Remove Pipe 155 LFT $56.24 $8,717.20 11. Brick Pavement, Remove and Salvage 200 SYD $35.00 $7,000.00 12. Common Excavation 1,435 CYD $0.01 $14.35 13. B Borrow 400 CYD $91.12 $36,448.00 14. Structure Backfill 110 CYD $36.68 $4,034.80 15. Compacted Aggregate, No. 53 560 TON $50.88 $28,492.80 16. HMA Surface, 9.5 mm, Type B 535 TON 51-45.81 578.008.35 17. HMA Intermediate, 12.5 mm, Type B 395 TON $117.71 $46,495.45 18. HMA Intermediate, 19.0 mm, Type B 235 TON $126.00 $29,610.00 19. HMA Base, 25.0 mm, Type B 375 TON $111.04 $41,640.00 20. Asphalt for Tack Coat 4 TON $704.85 $2,819.40 21. Joint Adhesive 4,000 LFT $1.22 $4,880.00 22. Liquid Asphalt Sealant 2,000 LFT $0.57 $1,140.00 23. Concrete Curb, 6" 825 LFT $37.61 $31,028.25 24. Concrete Header 35 LFT $141.22 $4,942.70 25. Concrete Approach, 6" 210 SYD $131.19 $27,549.90 26. Concrete Sidewalk, 4" 380 SYD $83.96 $31,904.80 27. Concrete Curb Ramp 130 SYD $238.11 $30,954.30 28. Sodding 1,030 1 SYD $20.40 $21,012.00 Version 09/29/2021 Contractor's Bid for Public Works - 7 BID/PROPOSAL Addendum No. 1 CITY OF SOUTH BEND Project Name: South Bend Neighborhood Infrastructure Project - Riverside Drive and Leland Avenue Intersection Project Number: 121 -048A -R For Bids Due: October 11, 2022 Contractor Name: ko;10-fh RA4 CUnSfrVL do CD.. 144 - Base Bid 29. 1 Tree, 2.5" 11 EA $646.00 $7,106.00 30. Casting, Adjust to Grade 26 EA $661.39 $17,196.14 31. Storm Sewer Manhole 4 EA $5,492.57 $21,970.28 32. Storm Sewer Inlet 3 EA $4,649.35 $13,948.05 33. Storm Sewer Pipe, 12" 96 LFT $99.86 $9,586.56 34. Storm Sewer Pipe, Water Main Grade Pipe, 12" 131 LFT $148.01 $19,389.31 35. Sign, Sheet, Remove 5 EA $85.00 $425.00 36. Sign, Sheet, Remove and Relocate 6 EA $210.00 $1,260.00 37. Signal Detector Housing 2 EA $850.00 $1,700.00 38. Sawcut for Roadway Loop Detector and Sealant 300 LFT $9.00 $2,700.00 39. Signal Cable, Roadway Loop, Copper, 1 c/14 GA 920 LFT $0.60 $552.00 40. Light Pole, Furnish 2 EA $7,500.00 $15,000.00 41. Light Pole Assembly, Furnish and Install 1 EA $10,800.00 $10,800.00 42. Existing Light Pole, Remove and Relocate 1 EA $5,200.00 $5,200.00 43. Line, Thermoplastic, Solid, White, 4" 335 LFT $1.65 $552.75 44. Line, Thermoplastic, Solid, White, 6" 215 LFT $2.34 $503.10 45. Line, Thermoplastic, Solid, Yellow, 4" 460 LFT $1.65 $759.00 v ;Transverse, _",%;t.om ')�A" ..N mina.::: ! C:T,oplasti $iY.65 �73L.5J 47. Pavement Message Marking, Preformed Plastic, Chevron 4 EA $456.00 $1,824.00 Base Bid Total $934,000.00 Bidder (Firm): ie;0-4h kq ItA (-nnS�-Vcbn L, /nL - Address: �J�a�66 22S /Q o23 City/State/Zip: SG /J / Telephone ber: (1y By (L-- 6�& (Signature) (Printed Nam6 of Person Submitting) Version 09/29/2021 Contractor's Bid for Public Works - 8 CITY OF SOUTH BEND MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN' FORM MBE -1.0 :± MBE UTILIZATION PLAN�,:,G;,'T„- This completed form should be supplied with Bids that pertain to City of South Bend Public Works Projects involving MBE participation. It is the bidder's sole responsibility to verify whether any listed minority-owned business meets the MBE qualifications. Project Number: Bidder: 121 -048A -R South Bend Neighborhood Infrastructure Project — Riverside Drive and Leland Project Name: Avenue Intersection Rieth-Riley Construction Co., Inc. Total Bid Amount: J� ?3Z 000.00 MBE Goal: 3.2% Page 1 of 1 Name & Address of MBE Primary Contact Person (Name/Telephone) Scope of Work to be Performed (Attach scope/schedule if you need additional space) Dollar Amount of MBE Component Percentage of Total Bid/Proposal 1s¢ Cloiss Lojas-hC Ss LU. .2a13 Sf• ck&45 /4vc• Sb,,fl, 6w IN yGGjy btenaeal Covk� 57q.99'3. 0071 nick,,,- �� 9,0D 3.g% Submitted by: UAAAAk /'e On Print Name 8ibnature Version 09/29/2021 Contractor's Bid for Public Works - 9 10/11/22 Date This completed form should be supplied with Bids that pertain to City of South Bend Public Works Projects involving WBE participation. It is the bidder's sole responsibility to verify whether any listed woman -owned business meets the WBE qualifications. Project Number: Bidder: 121 -048A -R Project Name: Rieth-Riley Construction Co., Inc. South Bend Neighborhood Infrastructure Project — Riverside Drive and Leland Avenue Intersection Total Bid Amount: , f,�y ®®Q• WBE Goal: 5.5% Page 1 of 1 Name & Address of WBE �ypL1II g�,i CITY OF SOUTH BEND Iu� MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN c��iv�l�s/ylolli�t� toc. FORM WBE-1.0 �cAraBin$ WBE UTILIZATION PLAN 9G% This completed form should be supplied with Bids that pertain to City of South Bend Public Works Projects involving WBE participation. It is the bidder's sole responsibility to verify whether any listed woman -owned business meets the WBE qualifications. Project Number: Bidder: 121 -048A -R Project Name: Rieth-Riley Construction Co., Inc. South Bend Neighborhood Infrastructure Project — Riverside Drive and Leland Avenue Intersection Total Bid Amount: , f,�y ®®Q• WBE Goal: 5.5% Page 1 of 1 Name & Address of WBE Primary Contact Person (Name/Telephone) Scope of Work to be Performed (Attach scope/schedule if you need additional space) Dollar Amount of WBE Component Percentage of Total Bid/Proposal c��iv�l�s/ylolli�t� toc. N.M � �cAraBin$ 0 9G% 3113 Z-17. gr 2.7.15' S/o J41-,eson vel lco %Ie+ q1)30 f{awk Er,kqr►ses, Inc .&'ee AX I � �1 �,�a c � y�, � �7. 00 y.37 5y- �6a.?09'0 sN y1307 .219. .211. M0d9oerw� 7r_Lt E. n6 Int• Kar" OVjvr 60%r�' ✓vcln� 2�oa w. ��� Rd. aB4a.3gg. B4Gi F044 Wou4m, i Al q4l (I Submitted by:/° An AAM_� Nri QaamAek ignature Version 09/29/2021 Contractor's Bid for Public Works - 10 10/11/22 Date y, scv rx jsr �-. CITY OF SOUTH BEND �l MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN FORM MBE -2.0 EVIDENCE OF GOOD FAITH EFFORTS IN'" This completed form should be included as part of the Bids documents related to City of South Bend Public Works Projects requiring Good Faith Efforts to obtain MBE participation. Project Number: 121 -048A -R Date: October 11, 2022 South Bend Neighborhood Infrastructure Project — Riverside Drive and Leland Project Name: Avenue Intersection Bidder: Rieth-Riley Construction Co., Inc. Contact Person: Hannah Gritton Telephone: 574-288-8321 Address: 25200 State Road 23 City: South Bend State: Indiana zip: 46614 Email: hgritton@rieth-riley.com To determine whether a bidder has demonstrated good faith efforts to reach the MBE utilization goals set forth in the City of South Bend Public Works Project Specifications, the City and its agencies, boards, or commissions, REQUIRE ALL of the following Good Faith Efforts as listed in the table below*: Version 09/29/2021 Contractor's Bid for Public Works - 11 EVIDENCE OF GOOD FAITH EFFORTS MBE LIST(S): The bidder reviewed 1) the City of South Bend's Minority and Women Business Enterprise Inclusion Program Plan; 2) the list of certified MWBEs provided by the City; and 3) the Indiana Department of Administration list of Minority and Women Owned Businesses (both certified and non -certified) found at: http://www.in.gov/idoa/. GOOD FAITH EFFORTS TO OBTAIN MBE PARTICIPATION The bidder shall initial each item below, as evidence of its good faith efforts to obtain MBE participation in the awarded contract. I affirm that I reviewed the City of South Bend's Minority and Women Business Enterprise Inclusion Program Plan and the Indiana Department of Administration's certified list of Indiana Minority and Women Business Enterprises, found on their website (http://www.in.gov/idoa). I affirm that I have made good faith efforts to select portions of the contract work to be performed by MWBEs, including, where appropriate, breaking out contract work items into ai-onorr,.irnlly faacihla iinitc to fnrilitatc NADP nnrfirinntinn It ri I affirm that I have made good faith efforts to solicit through all reasonable and available means the interest of all MBEs in the scopes of work of the contract. I affirm that I attended all pre-bid meetings scheduled by the City of South Bend to inform MBEs of contracting and subcontracting opportunities. I affirm that I advertised in general circulation and/or trade association publications concerning subcontract opportunities and allowed MBEs reasonable time to respond to such advertisements. I affirm that I performed any and all necessary steps to provide written notices in a manner reasonably calculated to inform MBEs of subcontracting opportunities and allowed �1 sufficient time for MBEs to participate effectively. y 1 affirm that I followed up on initial solicitations with interested MBEs. (, I affirm that I negotiated with interested MBEs in good faith, including providing such MBEs with adequate information about the plans, specifications and other requirements of the �7 subcontract. I affirm that I have made good faith efforts to assist interested MBEs in obtaining bonding, lines of credit, or insurance as required by the City or the bidder, where appropriate. Version 09/29/2021 Contractor's Bid for Public Works - 11 CITY OF SOUTH BEND MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN FORM MBE -2.0 EVIDENCE OF GOOD FAITH EFFORTS *Proper demonstration of Good Faith Efforts requires your initials next to all of the above boxes. Any omissions shall be considered grounds for rejection of the bid by the Board of Public Works. The City of South Bend reserves the right to request additional information. Version 09/29/2021 Contractor's Bid for Public Works -12 t L� I affirm that I have made good faith efforts to assist interested MBEs in obtaining necessary f� equipment, supplies, materials, or related assistances or services, where appropriate. I affirm that I did not reject any MBEs as unqualified without sound business reasons based `i on a thorough investigation of their capabilities. CONTRACT RECORDS: The bidder has maintained the following records for each MBE that has bid on the subcontracting opportunity: 1. Name, address, and telephone number; 2. A description of information provided by the bidder or subcontractor; and 3. A statement of whether an agreement was reached, and if not, why not, including any reasons for concluding that the MBE was unqualified to perform the job. *Proper demonstration of Good Faith Efforts requires your initials next to all of the above boxes. Any omissions shall be considered grounds for rejection of the bid by the Board of Public Works. The City of South Bend reserves the right to request additional information. Version 09/29/2021 Contractor's Bid for Public Works -12 This completed form should be included as part of the Bids documents related to City of South Bend Public Works Projects requiring Good Faith Efforts to obtain MWBE participation. Project Number: 121 -048A -R Date: October 11, 2022 South Bend Neighborhood Infrastructure Project— Riverside Drive and Leland Project Name: Avenue Intersection Bidder: Rieth-Riley Construction Co., Inc. Contact Person: Hannah Gritton Address: 25200 State Road 23 Telephone: 574-288-8321 City: South Bend State: Indiana zip: 46614 Email: hgritton@rieth-riley.com To determine whether a bidder has demonstrated good faith efforts to reach the WBE utilization goals set forth in the City of South Bend Public Works Project Specifications, the City and its agencies, boards, or commissions, REQUIRE ALL of the following Good Faith Efforts as listed in the table below": EVIDENCE OF GOOD FAITH EFFORTS CITY OF SOUTH BEND %1 sir MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN HI tA� E L FORM WBE-2.0 EVIDENCE OF GOOD FAITH EFFORTS at: http://www.in.gov/idoa/. This completed form should be included as part of the Bids documents related to City of South Bend Public Works Projects requiring Good Faith Efforts to obtain MWBE participation. Project Number: 121 -048A -R Date: October 11, 2022 South Bend Neighborhood Infrastructure Project— Riverside Drive and Leland Project Name: Avenue Intersection Bidder: Rieth-Riley Construction Co., Inc. Contact Person: Hannah Gritton Address: 25200 State Road 23 Telephone: 574-288-8321 City: South Bend State: Indiana zip: 46614 Email: hgritton@rieth-riley.com To determine whether a bidder has demonstrated good faith efforts to reach the WBE utilization goals set forth in the City of South Bend Public Works Project Specifications, the City and its agencies, boards, or commissions, REQUIRE ALL of the following Good Faith Efforts as listed in the table below": Version 09/29/2021 Contractor's Bid for Public Works -13 EVIDENCE OF GOOD FAITH EFFORTS WBE LIST(S): The bidder reviewed 1) the City of South Bend's Minority and Women Business Enterprise Inclusion Program Plan; 2) the list of certified MWBEs provided by the City; and 3) the Indiana Department of Administration list of Minority and Women Owned Businesses (both certified and non -certified) found at: http://www.in.gov/idoa/. GOOD FAITH EFFORTS TO OBTAIN WBE PARTICIPATION The bidder shall initial each item below, as evidence of its good faith efforts to obtain WBE participation in the awarded contract. I affirm that I reviewed the City of South Bend's Minority and Women Business Enterprise Inclusion Program Plan and the Indiana Department of Administration's certified list of HIndiana Minority and Women Business Enterprises, found on their website (httr)://www.in.nnv/icin:;). I affirm that I have made good faith efforts to select portions of the contract work to be ' 1 /' t, 1fnr __ by 1/ __ i�,rltiuJing � 11—e appropriate, breaking out contract work items .nto economically feasible units to facilitate WBE participation. I affirm that I have made good faith efforts to solicit through all reasonable and available the interest WBEs in the the means of all scopes of work of contract. I affirm that I attended all pre-bid meetings scheduled by the City of South Bend to inform WBEs of contracting and subcontracting opportunities. I affirm that I advertised in general circulation and/or trade association publications ! t� concerning subcontract opportunities and allowed WBEs reasonable time to respond to C� such advertisements. I affirm that I performed any and all necessary steps to provide written notices in a manner reasonably calculated to inform WBEs of subcontracting opportunities and allowed sufficient time for WBEs to participate effectively. 1 affirm that I followed up on initial solicitations with interested WBEs. I affirm that I negotiated with interested WBEs in good faith, including providing such WBEs with adequate information about the plans, specifications and other requirements of the subcontract. C1 I affirm that I have made good faith efforts to assist interested WBEs in obtaining bonding, lines of credit, or insurance as required by the City or the bidder, where appropriate. Version 09/29/2021 Contractor's Bid for Public Works -13 CITY OF SOUTH BEND MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN FORM WBE-2.0 EVIDENCE OF GOOD FAITH EFFORTS *Proper demonstration of Good Faith Efforts requires your initials next to all of the above boxes. Any omissions shall be considered grounds for rejection of the bid by the Board of Public Works. The City of South Bend reserves the right to request additional information. Version 09/29/2021 Contractor's Bid for Public Works -14 I affirm that I have made good faith efforts to assist interested WBEs in obtaining 61 necessary equipment, supplies, materials, or related assistances or services, where appropriate. f1 I affirm that I did not reject any WBEs as unqualified without sound business reasons n� based on a thorough investigation of their capabilities. CONTRACT RECORDS: The bidder has maintained the following records for each WBE that has bid on the subcontracting opportunity: 1. Name, address, and telephone number; 2. A description of information provided by the bidder or subcontractor; and 3. A statement of whether an agreement was reached, and if not, why not, including any reasons for concluding that the MWBE was unqualified to perform the job. *Proper demonstration of Good Faith Efforts requires your initials next to all of the above boxes. Any omissions shall be considered grounds for rejection of the bid by the Board of Public Works. The City of South Bend reserves the right to request additional information. Version 09/29/2021 Contractor's Bid for Public Works -14 CITY OF SOUTH BEND �pUTH gf MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN FORM MBE -2.1 MBE CONTACTED This completed form should be supplied with Bids that pertain to City of South Bend Public Works Projects requiring Good Faith Efforts to contact MBEs. It is the bidder's sole responsibility to verify whether any listed minority-owned business meets the MBE qualifications. Attach additional pages if necessary. PAGE 1 OF 1 Project Number: Project Name Bidder: By: 121 -048A -R MBE Participation Goal 3.2% South Bend Neighborhood Infrastructure Project – Riverside Drive and Leland Avenue Intersection Rieth-Riley Construction Co., Inc. 10/11/22 (Signature) ' (Title) (Date) MBE Firm '�S� SSh e.S� LLC, Owner or Contact at MBE Firm d COU1 I�Ekd�� Telephone: Sly, ",3.007! Fax: Email: y5�CtptSS I0�1S�i(Se2®J�i����I. Com TYPE OF WORK SOLICITED FOR THIS PROJECT: -1 Irvcki A 91 RESULTS OF CONTACT WITH THE MBE FIRM: Will U5# 1_0 Clam LeJiS�k Ls, i4 MBE Firm Owner or Contact at MBE Firm Telephone: Fax: Email: TYPE OF WORK SOLICITED FOR THIS PROJECT: RESULTS OF CONTACT WITH THE MBE FIRM: Version 09/29/2021 Contractor's Bid for Public Works - 15 CITY OF SOUTH BEND MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN FORM MBE -2.1 15- . WBE CONTACTED This completed form should be supplied with Bids that pertain to City of South Bend Public Works Projects requiring Good Faith Efforts to contact WBEs. It is the bidder's sole responsibility to verify whether any listed woman -owned business meets the WBE qualifications. Attach additional pages if necessary. PAGE 1 OF 1 Project Number: 121 -048A -R WBE Participation Goal 5.5% South Bend Neighborhood Infrastructure Project — Riverside Drive and Leland Project Name: Avenue Intersection Bidder: Rieth-Riley Construction Co., Inc. By: (Signature) 10/11/22 (Date) WBE Firm (r 811 4L1.!_5 N[I I I �1�1 • d AC . Owner or Contact at WBE Firm J j JOE H-*h-tS Telephone: $�a.7,Zj O�tii� Fax: &X.7a5Email 0Q(0P;nQ('�� 5 TYPE OF WORK SOLICITED FOR THIS PROJECT: Int RESULTS OF CONTACT WITH THE WBE FIRM: W, Ilse 4w^ -q1e0 WBE Firm ail �VI+LrL)r;5'25, Inc. Owner or Contact at WBE Firm " �PIJ l 1 Lb Telephone: �)q. Yo Fax: dq�11,� '093 Email:hawk- //1 G Um TYPE OF WORK SOLICITED FOR THIS PROJECT: RESULTS OF CONTACT WITH THE WBE FIRM: W` Version 09/29/2021 Contractor's Bid for Public Works - 16 No. 0070 BID BOND TRAVELERS CASUALTY AND SURETY COMPANY OF AMERICA Hartford, Connecticut 06183 KNOW ALL MEN BY THESE PRESENTS, That we, RIETH-RILEY CONSTRUCTION CO.. INC. as Principal, hereinafter called the Principal, and TRAVELERS CASUALTY AND SURETY COMPANY OF AMERICA, of Hartford, Connecticut, a corporation duly organized under the laws of the State of Connecticut, as Surety, hereinafter called the Surety, are held and firmly bound unto City of South Bend, Indiana , as Obligee, hereinafter called the Obligee, in the sum of Five Percent (5%) of total bid Dollars ($ 5% of bid ), for the payment of which sum well and truly to be made, the said Principal and the said Surety, bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents. WHEREAS, the Principal has submitted a bid for Neighborhood Infrastructure Riverside Dr and Leland Ave Project No. 121 -048A -R NOW, THEREFORE, if the Obligee shall accept the bid of the Principal and the Principal shall enter into a Contract with the Obligee in accordance with the terms of such bid, and give such bond or bonds as may be specified in the bidding or Contract Documents with good and sufficient surety for the faithful performance of such, or in the event of the failure of the Principal to enter such Contract and give such bond or bonds, if the Principal shall pay to the Obligee the difference not to exceed the penalty hereof between the amount specified in said bid and such larger amount for which the Obligee may in good faith contract with another party to perform the Work covered by said bid, then this obligation shall be null and void, otherwise to remain in full force and effect. Signed and sealed this 1 1 th day of October 2022 Witness D wn . Arm tro g Witness Lori Patronite RIETH-fiMEY CONSTaUCTION CO., INC I /f /[ L (Principal) (Seal) (Name & Title) Ruben Alvarado, Sales Manager TRAVELERS CASUALTY AND SURETY COMPANY OF AMERICA 6-9�-Z'Pok� Geri Patronite Attorney -in -Fact Travelers Casualty and Surety Company of America Travelers Casualty and Surety Company TRAVELERS J St. Paul` Fire and Marine Insurance Company POWER OF ATTORNEY KNOW ALL MEN BY THESE PRESENTS: That Travelers Casualty and Surety Company of America, Travelers Casualty and Surety Company, and St. Paul Fire and Marine Insurance Company are corporations duly organized under the laws of the State of Connecticut (herein collectively called the "Companies"), and that the Companies do hereby make, constitute and appoint Geri Patronite of CLEVELAND , Ohio , their true and lawful Attorney(s)-in-Fact to sign, execute, seal and acknowledge any and all bonds, recognizances, conditional undertakings and other writings obligatory in the nature thereof on behalf of the Companies in their business of guaranteeing the fidelity of persons, guaranteeing the performance of contracts and executing or guaranteeing bonds and undertakings required or permitted in any actions or proceedings allowed by law. IN WITNESS WHEREOF, the Companies have caused this instrument to be signed, and their corporate seals to be hereto affixed, this 21st day of April, 2021. COMM State of Connecticut By: City of Hartford ss. Robert L. Rane enior vice President On this the 21st day of April, 2021, before me personally appeared Robert L. Raney, who acknowledged himself to be the Senior Vice President of each of the Companies, and that he, as such, being authorized so to do, executed the foregoing instrument for the purposes therein contained by signing on behalf of said Companies by himself as a duly authorized officer. IN WITNESS WHEREOF, I hereunto set my hand and official seal. MAY My Commission expires the 30th day of June, 2026 Anna P. Nowik, Notary Public This Power of Attorney is granted under and by the authority of the following resolutions adopted by the Boards of Directors of each of the Companies, which resolutions are now in full force and effect, reading as follows: RESOLVED, that the Chairman, the President, any Vice Chairman, any Executive Vice President, any Senior Vice President, any Vice President, any Second Vice President, the Treasurer, any Assistant Treasurer, the Corporate Secretary or any Assistant Secretary may appoint Attorneys -in -Fact and Agents to act for and on behalf of the Company and may give such appointee such authority as his or her certificate of authority may prescribe to sign with the Company's name and seal with the Company's seal bonds, recognizances, contracts of indemnity, and other writings obligatory in the nature of a bond, recognizance, or conditional undertaking, and any of said officers or the Board of Directors at any time may remove any such appointee and revoke the power given him or her; and it is FURTHER RESOLVED, that the Chairman, the President, any Vice Chairman, any Executive Vice President, any Senior Vice President or any Vice President may delegate all or any part of the foregoing authority to one or more officers or employees of this Company, provided that each such delegation is in writing and a copy thereof is filed in the office of the Secretary; and it is FURTHER RESOLVED, that any bond, recognizance, contract of indemnity, or writing obligatory in the nature of a bond, recognizance, or conditional undertaking shall be valid and binding upon the Company when (a) signed by the President, any Vice Chairman, any Executive Vice President, any Senior Vice President or any Vice President, any Second Vice President, the Treasurer, any Assistant Treasurer, the Corporate Secretary or any Assistant Secretary and duly attested and sealed with the Company's seal by a Secretary or Assistant Secretary; or (b) duly executed (under seal, if required) by one or more Attorneys -in -Fact and Agents pursuant to the power prescribed in his or her certificate or their certificates of authority or by one or more Company officers pursuant to a written delegation of authority; and it is FURTHER RESOLVED, that the signature of each of the following officers: President, any Executive Vice President, any Senior Vice President, any Vice President, any Assistant Vice President, any Secretary, any Assistant Secretary, and the seal of the Company may be affixed by facsimile to any Power of Attorney or to any certificate relating thereto appointing Resident Vice Presidents, Resident Assistant Secretaries or Attorneys -in - Fact for purposes only of executing and attesting bonds and undertakings and other writings obligatory in the nature thereof, and any such Power of Attorney or certificate bearing such facsimile signature or facsimile seal shall be valid and binding upon the Company and any such power so executed and certified by such facsimile signature and facsimile seal shall be valid and binding on the Company in the future with respect to any bond or understanding to which it is attached. I, Kevin E. Hughes, the undersigned, Assistant Secretary of each of the Companies, do hereby certify that the above and foregoing is a true and correct copy of the Power of Attorney executed by said Companies, which remains in full force and effect. Dated this day of CONKn Kevin E. Hughes, Assi tant Secretary To verify the authenticity of this Power ofAttorney, Please call us at 1-800-421-3880. Please refer to the above-named Attorney(s)-in-Fact and the details of the bond to which this Power ofAttorney is attached, WZ Fq.I' 1316 COUNTY -CITY BUILDING 227 W. JEFFERSON BOULEVARD SOUTH BEND, INDIANA 46601-1830 Date: To: From Subject PHONE 574!235-9251 FAX 574/ 235-9171 TDD 574/ 235-5567 CITY OF SOUTH BEND JAMES MUELLER, MAYOR BOARD OF PUBLIC WORKS October 5th, 2022 All Bidders Theresa Heffner, Clerk, Board of Public Works Addendum Number: 1 Project Name: Project Number: South Bend Neighborhood Infrastructure Project — Riverside Drive and Leland Avenue Intersection 121 -048A -R ACKNOWLEDGEMENT OF RECEIPT OF ADDENDUM Date Received: This addendum is being forwarded to you for the above referenced project. Please sign below and acknowledge receipt of this Addendum by faxing this sheet to the Board of Public Works at (574) 235-9171. A copy MUST also be included with your bid package upon submittal. T141S ADDENDUM All AV AFFECT YOUR -RID- Note: The attached documents are hereby Add to the Specifications and Contract Documents and become a part of herein. Company: kle+k Authorized Signature: Date: 100% Qualify o 100% Employee Owned • Over 100 Years CERTIFICATE OF AUTHORITY KNOW ALL MEN BY THESE PRESENTS, that the undersigned President of Riefh-Riley Construction Co., Inc., a corporation duly organized and existing under the laws of the State. of Indiana, hereby represents and -confirms that Ruben Alvarado, Sates Manager, has full power and authority to make, execute, seal, if required by law, and deliver for and on its behalf, and as its act and deed any and al.l bids, proposals or contracts; said bids; proposals or contracts not to exceed $2,000,000.00 which bids; proposals or contracts call for work, services, or materials to be furnished by Rieth-Riley Construction Co., Inc., whether such bids, proposals or contracts are being submitted to an individual or entity, public or private, and to bind Rieth-Riley Construction Co., Inc. thereby as fully and to the same extent as if such bids, proposals or contracts were signed by an Executive. Officer of Rieth-Riley Construction Co., Inc., and sealed, if required by law; and attested by one of such officers, and hereby rates and confirms all that the above named designee may do in pursuance hereof. The authority granted to the above named designee is pursuant to Section 6.03 of the Restated. By -Laws of Rieth-Riley Construction Co., Inc., as amended, which Restated By -Laws were effective February 9, 2010, and which Restated fay -Laws, as amended, and the authority granted to the above named designee continue in full force and effect. This Certificate of Authority is issued, signed and sealed, if required by law, by facsimile under and by authority of the following standing resolutions adopted by the :Board of Directors of Rieth-Riley Construction Co., Inc., ata meeting held on the 16th day of February, 1996, at which a quorum was present, and which resolutions have not been amended or repealed and continue in full force and effect: Resolved that for purposes of clarification and in furtherance of the intent of Section 6.03 of the By -Laws of the Company the authority granted in Section 6.03 shall extend to the making, execution, sealing, if required by law; and delivery on, behalf of the Company of all documents required as part of any bid, proposal or contract; which is for work, services or materials to be furnished by Company and which is being submitted to an individual or entity, public or private." "Resolved that in carrying out the provisions of Section 6.0.3 of the By -Laws of the Company.the signatures of such directors and officers and, if required by law, the seal of the Company may be affixed to any such Cerff icate of Authority or any certificate relating thereto by facsimile, .and any such Certificate of Authority or certificate bearing such facsimile signatures or facsimile seal shall be valid and binding upon the Company and any such Certificate of Authority so executed and certified by facsimile signature and facsimile sealshall be valid and binding upon the Company, with respect to any bid, proposal orcontract to which it is attached." IN WITNESS WHEREOF, Rieth-Riley Construction Co., Inc., has caused these presents to be signed by its President and its corporate seal to be hereto affixed, this 10th day of September, 2020. „ RIETH-RILEY CONSTRUCTION CO., INC. SEAL A. Keith Rose, President STATE OF INDIANA ) )SS: COUNTY T OF ELKHAR T ) On this 10th day of September, 2020, before me personally came A. Keith Rose, to me known, who, being by me sworn, did depose and say: that he is President of Rieth-Riley Construction Co., Inc., the corporation described in and which executed the above instrument that he knows the seal of said corporation; that the seal affixed to the said instrument is such corporate seal; and that he executed the said instrument on behalf of the corporation by authority of his office pursuant to. corporation's Restated By -Laws and standing resolutions. My Commission Expires: .March 16, 2024 SEAL n o� ✓� r ! y.�, IAS Ronya Phillips, Notary Public Residing in Elkhart County, Indiana I, Robert L. Konopinski, do hereby certify that I am the duly appointed and acting Secretary of Rieth-Riley Construction Co., Inc., a corporation duty organized, validly existing and in good standing under the laws of the State of Indiana; that the foregoing Certificate of Authority has neither been amended or rescinded and remains in full force and effect; and furthermore, that the Restated By -Laws and standing resolutions of the corporation, as referred to and set forth in this Certificate of Authority, continue in full force and effect. 11 ig d eal d at th orate Office of Rieth-Riley Construction Co., Inc., in the City of Goshen, State of Indiana. Dated this l day of 20 -z- < SEAL f Robert L. Konopinski, Secretary 0 CERTIFICATE OF QUALIFICATION to provide CONSTRUCTION SERVICES for PUBLIC WORKS PROJECTS to the STATE OF INDIANA This Certification Board, having duly considered application for qualification in terms of apparent experience and financial resources; and under the applicable Indiana Code 4-13.6-4 and adopted rules of this Board, hereby issues a Certificate of Qualification to provide construction services to the State of Indiana for Public Works Projects to: RIETH RILEY CONSTRUCTION CO INC 3626 ELKHART RD PO BOX 477 GOSHEN IN 46527-0477 Phone 574-875-5183 Fax 574-875-8405 Company Official KEITH ROSE for the twenty-seven month period stated herein, unless revoked by this Board for cause, and in the classifications of services stated below. This certificate supercedes any previous certificate. 1611.01 Concrete Construction of Roads & Curbing 1611.02 Asphalt Construction of Roads and Parking Lots 1622.01 Gen Contr-brdgs,vdcts,elvd hw ys,rlwy,tnis 1623.03 Sewers and/or Water Lines 1771.01 Concrete Construction 1794.01 Earthmoving and Land Clearing 1794.02 Excavation 1795.02 Demolition of Pavements and Roads CERTIFICATION DATE 6/20/2022 EXPIRATION DATE 9/20/2024 THIS CERTIFICATE ISSUED BY THE STATE OF INDIANA, PUBLIC WORKS DIVISION CERTIFICATION BOARD, 402 WEST WASHINGTON STREET, ROOM W467, INDIANAPOLIS, INDIANA 46204, ALSO ACTS AS THE OFFICIAL NOTICE OF EXPIRATION. STA Tracy L. Cross, Ex tive Secretary Certification Board DAPW PQ2 State Form 3983R Rev. 07/06 I 1-1- R4-,-W,4A .l INDIANAPOLIS, IN we] RIETH-RILEY CONSTRUCTION CO., INC. November 05. 2021 GOSHEN, IN who has filed With the Department a Contractor`s 'Statement of lExperiencee and r lniandai Condition a required mer Indiana e - 3-1< , tsherebyqualifed tobidat any Department offransportation letting in Classes of Work and within the amount and oft lk-nitation of each classification as listed below, for such period a3 the trmmpleled work on hand from al I scum does not exceed the Aggregate amount: Clasitf ation references by nam or symbol. are in accordance Wkh the definitions in the Cortrado(a Statement of Experier a and Finandal Condition. This certificate supersedes any certificate prevbusly issued, but is submit to r v Ston or revocation according to the taw, If and when changes in the financtal condition of the contracting firm or other facts justify srrch revision or revocation. � Valid November 06, 2021 Thru July 31, 2022 P(0�In ,,;; nn C ^&Q'J ` Aggregate Bidding Capacity: 1,164,594,000.00 0103 3 -SIDED BOX STRUCTURE(S) W/SPA N > 20 FT ........................................................... A(A) CONCRETE PAVEMENT: GENERAL................................................................................ B(A) ASPHALT PAVEMENT: W/INDOT CERTIFIED HMA PLANT ............................................. C(A) HEAVY GRADING.............................................................................................................. D(A) HIGHWAY OR RAILROAD BRIDGE OVER WATER.......................................................... D(B) HIGHWAY OR RAILROAD BRIDGE OVER HIGHWAY ..................................................... D(C) HWY/RR BRIDGE REQ RR TRACK PROTECTION......................................................... E(C) BRIDGE DECK OVERLAY AND MINOR BRIDGE REPAIR ............................................... E(E) SMALL STRUCTURES AND DRAINAGE ITEMS.............................................................. E(F) SURFACE MASONRY AND MISCELLANEOUS CONCRETE ........................................... E(H) DEEP SEWER AND/OR EXCAVATION.............................................................................. E(R } ASPHALT PAY EM I IVIILLING....................................................................................... E(T) DEMOLITION...................................................................................................................... 'z-- PREQUALIFICA'I'I€ N ENGINEER $99,999,999.00 $99,999,999.00 $99,999,999.00 $99,999,999.00 $99,999,999.00 $99,999,999.00 $99,999,999.00 $10,000,000.00 $10,000,000.00 $99,999,999.00 $99,999,999.00 $99,995,9979.00 $99,999,999.00 COMMISSIONER July 27, 2022 CERTIFIED AGGREGATE PRODUCERS Specification Reference: 917 & ITM 211 ..SM Producer/Supplier Material List Type: Aggregate SM Material Codes: 904M00010 to 904MO6950 A certified aggregate producer is one who has complied with the requirements set out in the above referenced specification. A producer. accepted into this program may supply aggregates for all projects beginning with the date approved as a certified aggregate producer. Source Producer Name Q Code Location Number 2408 AMERICAN AGGREGATE, INC NILES, MI ---------------------------------------------Q032207 2410 AGGREGATE INDUSTRIES EDWARDSBURG, MI ---------------------------------------Q012184 AGG0151 AUDUBON SAND & GRAVEL HENDERSON, KY -----------------------------=-----------Q222300 2334 BARRETT PAVING MATERIALS, INC RICHMOND, IN ------------------------------------------Q982111 2381 BEAVER MATERIALS NOBLESVILLE, IN ---------------------------------------Q982116 2578 BEAVER MATERIALS WAVERLY, IN ------------------------------------- 012195 2781 BEEMSTERBOER AGGREGATES - SOURTH SHORE PLANT 2 GARY, IN ----------------------------------------------Q112262 2473 BEEMSTERBOER AGGREGATES - SOUTH SHORE PLANT HAMMOMD, IN -------------------------------------------Q082244 2772 BUTLER MILL SERVICE BUTLER, IN --------------------------------------------Q992158 2329 CALDWELL GRAVEL SALES, INC MORRISTOWN, IN ----------------------------------------Q992164 2643 CAVE/CALCAR QUARRIES, INC 2641 CAVE QUARRIES, INC PAOLI, IN ---------------------------------------------Q982066 2763 CLIFFORD AGGREGRATE, INC. - ANGOLA PIT ANGOLA, IN --------------------------------------------Q992165 2283 CLIFFORD AGGREGRATE, INC. - HENSHEN PIT SOUTH MILFORD, IN -------------------------------------Q002169 2743 CLIFFORD AGGREGRATE, INC. - LIGONIER PIT LIGONIER, IN ------------------------------------------Q982099 2247 CLIFFORD AGGREGRATE, INC. - MARTIN PIT AUBURN, IN --------------------------------------------Q972024 2248 CLIFFORD AGGREGRATE, INC. KENDALLVILLE, IN --------------------------------------Q062227 2206 ELKHART COUNTY GRAVEL, INC MILFORD, IN -------------------------------------------Q982068 2700 ELKHART COUNTY GRAVEL, INC - PLANT #2 MIDDLEBURY, IN -------------------------=--------------Q982112 1 of 9 July 27, 2022 CERTIFIED AGGREGATE PRODUCERS Specification Reference: 917 & ITM 211 SM Producer/Supplier Material List Type: Aggregate SM Material Codes: 904M00010 to 904MO6950 2718 ELKHART COUNTY GRAVEL, INC - WARSAW, IN --- =--------------------------------------=-Q982071 2789 ELKHART COUNTY GRAVEL, INC - PLANT #1 MIDDLEBURY, IN ------------------------------------ Q042219 2423 ENGINEERING AGGREGATES CORP - PLANT #1 LOGANSPORT, IN ----------------------------------- ---Q972063 AGG0136 ENGINEERING AGGREGATES CORP - PLANT #3 LOGANSPORT, IN ----------------------------------------Q192290 2758 ESHELMAN SAND & GRAVEL KENDALLVILLE, IN -------------------------------------- Q142271 2632 EVANSVILLE MATERIALS, INC (MULZER) EVANSVILLE, IN -------------=---------------=--=---=---Q972021 2488 FRITZ ENTERPRISES INC EAST CHICAGO, IN. -------------------------------------Q202293 2688 GIBBSON COUNTY SAND & GRAVEL, INC OWENSVILLE, IN ----------------------------------------Q042218 2783 HANSON AGGREGATES MIDWEST - AGGROCK QUARRY SELLERSBURG,. IN ------------ =------------`------=--=---Q032208 2706 HANSON AGGREGATES MIDWEST - ARDMORE SAND AND GRAVEL' FT. WAYNE, IN -----------------`---- ---- --=--==--Q992153 2240 HANSON AGGREGATES MIDWEST - ANGOLA PLANT ANGOLA, IN --------------------------------------------Q982145 2232 HANSON AGGREGATES MIDWEST - ARDMORE QUARRY FORT WAYNE, IN -----------------------------------------Q972023 2573 HANSON AGGREGATES MIDWEST - ATKINS PLANT JEFFERSONVILLE, IN ------------------------------------Q982143 2512 HANSON AGGREGATES MIDWEST - DRY FORK CLEVES, OH --------------------------------------------Q112260 2312 HANSON AGGREGATES MIDWEST - HARDING ST INDIANAPOLIS, IN -------------------------------------- Q962011 2556 HANSON AGGREGATES MIDWEST.- HAYDEN HAYDEN, IN --------------------------------------------Q972017 2764 HANSON AGGREGARES MIDWEST - MILNER BUNKER HILL, IN ---------------------------------------Q992157 2135 HANSON AGGREGATES MIDWEST - PUTNAMVILLE QUARRY PUTNAMVILLE, IN ---------------------------------------Q972038 2563 HANSON AGGREGATES MIDWEST - SCOTT COUNTY BLOCHER, IN -------------------------------------------Q982074 2552 HANSON AGGREGARES MIDWEST - VERSAILLES VERSAILLES, IN -------------------------------------- Q982079 2237 HANSON AGGREGATES MIDWEST - WOODBURN #2 EDGERTON, IN ------------------------------------------Q002179 2 of 9 July 27, 2022 CERTIFIED AGGREGATE PRODUCERS Specification Reference: 917 & ITM 211 SM Producer/Supplier Material List Type: Aggregate SM Material Codes: 904M00010 to 904MO6950 2575 HANSON AGGREGATES MIDWEST JEFFERSONVILLE, IN ------------------------------------ Q972022 2472 HANSON-MATERIAL SERVICE THORNTON, IL ------------------------------------------Q982104 2409 HANSON-MATERIAL SERVICE - MONON MONON, IN ---------------------------------------------Q022197 2440 HANSON-MATERIAL SERVICE FRANCESVILLE, IN --------------------------------------Q022198 2509 HARRISON SAND & GRAVEL CO - METAMORA PLANT METAMORA, IN ------------------------------------------Q072240 2514 HARRISON SAND & GRAVEL CO NEW TRENTON, IN ---------------------------------------Q982123 2797 HAYNES SAND AND GRAVEL FT, WAYNE, IN -----------------------------------------Q052224 AGG0125 INDIANA GRAVEL LLC. GOSHEN, IN --------------------------------------------Q182287 2164 INTERSTATE SAND & GRAVEL CO (ROGERS GROUP) WILLIAMSPORT, IN --------------------------------------Q982134 2306 IRVING MATERIALS, INC ANDERSON, IN ------------------------------------------Q972065 2262 IRVING MATERIALS, INC BLUFFTON, IN ------------------------------------------Q952008 2561 IRVING MATERIALS, INC BROWNSTOWN, IN ----------------------------------------Q982115 2333 IRVING MATERIALS, INC CAMBRIDGE CITY, IN ------------------------------------Q982130 2570 IRVING MATERIALS, INC COLUMBUS, IN ------------------------------------------Q982117 2338 IRVING MATERIALS, INC CONNERSVILLE, IN --------------------------------------Q982132 2572 IRVING MATERIALS, INC - CORYDON CORYDON, IN -------------------------------------------Q982127 AGG0063 IRVING MATERIALS, INC - FALL CREEK PLANT FORTVILLE, IN -----------------------------------------Q112256 2792 IRVING MATERIALS, INC GREENWOOD, IN -----------------------------------------Q052221 2211 IRVING MATERIALS, INC HUNTINGTON, IN ----------------------------------------Q952001 2367 IRVING MATERIALS, INC MONTPELIER, IN ----------------------------------------Q952005 2362 IRVING MATERIALS, INC MUNCIE, IN --------------------------------------------Q982067 3 of 9 July 27, 2022 CERTIFIED AGGREGATE PRODUCERS Specification Reference: 917 & ITM 211 SM Producer/Supplier Material List Type: Aggregate SM Material Codes: 904M00010 to 904MO6950 2348 IRVING MATERIALS, INC PENDLETON, IN -----------------------------------------Q982075 2254 IRVING MATERIALS, INC PERU IN --Q972027 2431 IRVING MATERIALS, INC PLYMOUTH,IN--------------------------------=---------9982107 2542 IRVING MATERIALS, INC - SELLERSBURG SELLERSBURG, IN ----------------------------------------0972040 2347 IRVING MATERIALS, INC SPRINGPORT,''IN---------------------------------------- Q982089 2355 IRVING MATERIALS, INC - PIPECREEK JR SWAYZEE, IN -------------------------------------------Q962009 AGG0124 IRVING MATERIALS, INC UPLAND, IN ----,-------------------------------------- Q202292 2359 IRVING MATERIALS, INC - STONEY CREEK NOBLESVILLE, IN ---------------------------------------Q952004 2686 JONES & SONS, INC - STAR POINT MINE VINCENNES,` IN ----------------------------------------- Q002175. 2973 KLINK TRUCKING, INC SOUTH BEND IN Q982128 2651 KNOX COUNTY SAND &..GRAVEL (ROGERS GROUP) " VINCENNES IN 972056 AGG0106 LANDMARK MATERIALS WALKERTON, IN ----------------------------------------- Q152276 2217 LEESBURG SAND & GRAVEL LEESBURG, IN ------------------------------------------ 0972041 2793 LINCOLN PARK STONE GOSPORT, IN -------------------------------------------Q052222 2180 LINCOLN PARK STONE PUTNAMVILLE, IN ---------------------------------------Q982147 AGG0128 M & H PRODUCTS GHENT, KY ---------------------------------------------Q182286 2353 MARTIN MARIETTA KOKOMO, IN --------------------------------------------Q972064 2389 MARTIN MARIETTA NOBLESVILLE, IN ---------------------------------------Q982072 2762 MARTIN MARIETTA RUSSIAVILLE, IN ---------------------------------------Q992152 2522 MARTIN MARIETTA WAVERLY, IN -------------------------------------------Q972049 2311 MARTIN MARIETTA -96TH ST INDIANAPOLIS, IN --------------------------------------Q962010 4 of 9 July 27, 2022 CERTIFIED AGGREGATE PRODUCERS Specification Reference: 917 & ITM 211 SM Producer/Supplier Material List Type: Aggregate SM Material Codes: 904M00010 to 904MO6950 2310 MARTIN MARIETTA - BELMONT INDIANAPOLIS, IN ---------------------=----------------Q972044 2157 MARTIN MARIETTA - CLOVERDALE PLANT CLOVERDALE, IN ----------------------------------------Q982078 2314 MARTIN MARIETTA - KENTUCKY AVE INDIANAPOLIS, IN --------------------------------------Q962012 2303 MARTIN MARIETTA - HAZEL DELL PKWY CARMEL, IN --------------------------------------------Q982083 2519 MARTIN MARIETTA - ROSS PLANT ROSS, OH ----------------------------------------------Q022200 2506 MARTIN MARIETTA - E -TOWN S&G HARRISON, OH ------------------------------------------Q982139 AGG0142 MELVIN STONE CO - KILBY RAILYARD HARRISON, OH ---------------------------------------- Q202291 AGG2989 MILESTONE CONTRACTORS NORTH, INC. LAPORTE, IN -------------------------------------------Q182288 AGG0045 MILESTONE CONTRACTORS NORTH, INC. SOUTH BEND, IN ----------------------------------------Q092248 AGG0056 MILESTONE RECYCLED PRODUCTS LAFAYETTE, IN --------------------------------------- Q092250 2771 MOOSE LAKE AGGREGATE NILES, MI ---------------------------------------------Q992167 2540 MULZER CRUSHED STONE CHARLESTOWN, IN ---------------------------------------Q972052 2646 MULZER CRUSHED STONE ENGLISH, IN -------------------------------------------Q982084 2624 MULZER CRUSHED STONE LEAVENWORTH, IN ---------------------------------------Q982110 2969 MULZER CRUSHED STONE MT VERNON, IN -----------------------------------------Q972031 2970 MULZER CRUSHED STONE NEWBURGH, IN ------------------------------------------Q972032 2971 MULZER CRUSHED STONE ROCKPORT, IN ------------------------------------------Q972028 2972 MULZER CRUSHED STONE. TELL CITY, IN -----------------------------------------Q972029 2974 MULZER CRUSHED STONE - GREENRIVER ROAD PIT EVANSVILLE, IN ----------------------------------------Q982098 2631 MULZER CRUSHED STONE - GRIFFIN PLANT GRIFFIN, IN -------------------------------------------Q972020 2668 MULZER CRUSHED STONE - I-164 PIT EVANSVILLE, IN ----------------------------------------Q972058 5 of 9 July 27, 2022 CERTIFIED AGGREGATE PRODUCERS Specification Reference: 917 & ITM 211 SM Producer/Supplier Material List Type: Aggregate. SM Material Codes: 904M00010 to 904MO6950 2510 NEW POINT STONE CO - DERBYSHIRE QUARRY LAUREL, IN --------------------------------------------Q972033 2533 NEW POINT STONE CO - HARRIS CITY GREENSBURG, IN ----------------------------------------Q982126 2537 NEW POINT STONE CO - NAPOLEON QUARRY BATESVILLE,`IN--------------------------------------Q992162 2536 NEW POINT STONE CO - NEW POINT QUARRY GREENSBURG, IN -----------------------------------__'___Q952002 2538 NEW POINT STONE CO - ST. PAUL QUARRY ST. PAUL, IN ------------------------------------------Q982121 2207 NIBLOCK EXCAVATING & ASPHALT KIMMEL, IN -.-------------------------------------------Q072237 2273 NIBLOCK EXCAVATING INC --BRISTOL PIT BRISTOL, IN -------------------------------------------Q982101 2590 NUGENT SAND CO COLUMBUS, IN -------------------------------=---=------Q972043 2576 NUGENT SAND CO LOUISVILLE, KY --------------------------------------- 982070 _Q 2553 NUGENT SAND CO MILTON, KY -=-=-----------=------------------------ Q982138 0145 OLD PRAIRIE PRODUCTS, INC ANGOLA IN -------------------------------------------- Q212297 AGG0118 OZINGO MATERIALS & LOGISTICS ----------------------------- Q HANNA, IN -------------- 212298 2478 PHOENIX SERVICES LLC EAST CHICAGO, IN --------------------------------------Q982106 2791 PHOENIX SERVICES LLC EAST CHICAGO, IN --------------------------------------Q102253 2451 PHOENIX SERVICES, LLC PORTAGE, IN ------------------ ---------------------.----Q952003 AGG2165 PRO -AGR. INC. CAYUGA, IN --------------------------------------------Q172283 2109 PURDY MATERIALS, INC LAFAYETTE, IN -----------------------------------------Q072238 AGG0144 RIETH RILEY CONSTRUCTION CO ELKHART, IN -------------------------------------------Q202294 2498 RIETH RILEY CONSTRUCTION CO SOUTH BEND, IN ---------------------------- ------------Q982095 AGG2987 RIETH RILEY CONSTRUCTION CO GARY, IN --=------------------------ ----------------Q142272 AGG0127 RIETH RILEY CONSTRUCTION CO LAPORTE, IN -------------------------------------------Q192289 6 of 9 July 27, 2022 CERTIFIED AGGREGATE PRODUCERS Specification Reference: 917 & ITM 211 SM Producer/Supplier Material List Type: Aggregate SM Material Codes: 904M00010 to 904MO6950 AGG2543 ROBERTSON CRUSHED STONE MILLTOWN, IN ------------------------------------------Q122264 AGG0021 ROCK CREEK STONE QUARRY, INC. BLUFFTON, IN ------------------------------------------ Q142273 2645 ROGERS GROUP MITCHELL, IN --------------------------------------.----Q972016 2521 ROGERS GROUP - BLOOMINGTON QUARRY BLOOMINGTON, IN ---------------------------------------Q972050 AGG2580 ROGERS GROUP - JEFFERSON COUNTY STONE LOUISVILLE, KY ----------------------------------------Q132269 2523 ROGERS GROUP - MORGAN CO. SAND AND GRAVEL CO. MARTINSVILLE IN ---------------------------------------Q972060 2445 ROGERS GROUP - NEWTON COUNTY KENTLAND, IN ------------------------------------------Q972062 2503 ROGERS GROUP - OLDHAM COUNTY CRESTWOOD, KY -----------------------------------------Q022204 2111 ROSKOVENSKY CONCRETE & GRAVEL CLINTON, IN -------------------------------------------Q992161 2322 RUSH COUNTY STONE, CO MILROY, IN --------------------------------------------Q062230 2163 S & G EXCAVATING MONTEZUMA, IN -----------------------------------------Q992159 AGG0086S & G EXCAVATING - KERNS PIT TERRE HAUTE, IN ---------------------------------------Q132266 2113 S & G EXCCAVATING - MORRIS/LOMBARDI TERRE HAUTE, IN ---------------------------------------Q012192 2534 SHELBY MATERIALS EDINBURG, IN ------------------------------------------Q982122 2399 SHELBY MATERIALS SHELBYVILLE, IN ---------------------------------------Q982114 AGG0057 SOUTH LAKE STONE HEBRON, IN --------------------------=-----------------Q162278 2295 SPEEDWAY SAND AND GRAVEL DISKO, IN ---------------------------------------------Q972046 AGG0112 SPEEDWAY SAND & GRAVEL GARRETT, IN -------------------------------------------Q162279 2591 SPRAY SAND & GRAVEL SEYMOUR, IN -------------------------------------------Q972015 2777 SMYRNA READY MIX DALEVILLE, IN -----------------------------------------Q012186 2749 STAFFORD GRAVEL INC BUTLER IN ------------------------------------Q012183 7of9 July 27, 2022 CERTIFIED AGGREGATE PRODUCERS Specification Reference: 917 & ITM 211 SM Producer/Supplier Material List Type: Aggregate - SM Material Codes: 904M00010 to 904MO6950 2439 STOCKBERGER TRUCKING, INC PLYMOUTH, IN -------------------------------------------9982091 2238 STONE STREET QUARRIES INC POE IN _ Q982085 AGG2294 STONECO of ANGOLA SAND & GRAVEL ANGOLA, IN---='--- ----------- ----------- - ---------------- Q132267 AGG0091 STONECO OF STURGIS S & G Michigan Material & Aggregate STURGIS, MI-==-'--=----=---------=-==--- -------- ----=-=`'Q172285 AGG0147 TRAP ROCK & GRANITE QUARRIES E ST. LOUIS, MO -------------- -------------------------- - Q222299 AGG0041 U.S. AGGREGATES, INC CLOVERDALE, IN -------------- =---------=-------=-------Q092246 2535 U.S. AGGREGATES, INC COLUMBUS, IN ---------------------------------------=--Q972045 2136 U.S. AGGREGATES, INC CRAWFORDSVILLE, IN ------------------------------------Q972042 2461 U.S. AGGREGATES INC FRANCESVILLE, IN --------------------------------------Q9720513 2266 U.S. AGGREGATES, INC LINN GROVE,..IN------------------------ ----------------Q022201 2449 U.S. AGGREGATES INC LOWELL, IN -=------------------------------------------Q002168 AGG0097 U.S. AGGREGATES INC LOWELL, IN --------------------------------------------Q142274 2428 U.S. AGGREGATES INC ren%rn%' T%T ----------------- - n01`�nc R 2361 U.S. AGGREGATES, INC PORTLAND, IN ------------------------------------------Q962013 2331 U.S. AGGREGATES, INC RICHMOND, IN ------------------------------------------Q982109 2363 U.S. AGGREGATES, INC RIDGEVILLE, IN ------------------------------------- -- Q982124 2642 U.S. AGGREGATES INC SPRINGVILLE, IN ---------------------------------------Q112258 2143 U.S. AGGREGATES, INC - THORNTOWN PLANT THORNTOWN, IN -----------------------------------------Q162281 2531 U.S. AGGREGATES, INC - CAVE PLANT FLAT ROCK, IN --------------=--------------------------Q972018 2421 U.S. AGGREGATES, INC - DELPHI LIMESTONE, INC DELPHI, IN ---------------------------------------------Q972034 2267 U.S. AGGREGATES, INC - PLEASANT MILLS DECATUR, IN -------------------------------------------Q982131 8 of 9 July 27, 2022 CERTIFIED AGGREGATE PRODUCERS Specification Reference: 917 & ITM 211 SM Producer/Supplier Material List Type: Aggregate SM Material Codes: 904M00010 to 904MO6950 2183 U.S. AGGREGATES INC - SWISHER ROAD BATTLEGROUND, IN --------------------------------------Q002181 2687 VCNA PRAIRIE AGGREGATES, IN, INC. BLOOMFIELD, IN ----------------------------------------Q022199 AGG0085 VCNA PRAIRIE AGGREGATES, IN, INC. MANTENO, IL -------------------------------------------Q152275 2788 VCNA PRAIRIE AGGREGATES, IN, INC. WAVERLY, IN -------------------------------------------Q032206 2477 VULCAN MATERIALS CO. KANKAKEE, IL -----------------------------------------Q982136 2798 WARD STONE, LLC FLATROCK, IN ------------------------------------------Q062235 2786 WATSON GRAVEL INC - PLANT #2 HARRISON, OH ------------------------------------------Q032211 AGG0077 WEST PLAINS MINING / KENTNER CREEKSTONE WASBASH, IN -------------------------------------------Q122263 2110 WHITESVILLE MILL SERVICE CRAWFORDSVILLE, IN ------------------------------------Q982119 9 of 9 CITY OF SOUTH BEND, INDIANA CONTRACTOR'S BID FOR PUBLIC WORK RESPONSIBLE BIDDER CHECKLIST Project Name South Bend Neighborhood Infrastructure Project — Riverside Drive and Leland Avenue Intersection Project No. For Bids Due 121 -048A -R October 11, 2022 Contractor Name: Rieth-Rilev Construction Co.. Inc. The City seeks to enhance its ability to identify responsive and responsible bidders on all City public works projects by institution of comprehensive submission requirements in compliance with State law. Quality workmanship, efficient operation, safety, and timely completion of projects requires that all bidders meet certain minimum requirements to be responsive and responsible bidders. THIS FORM MUST BE SUBMITTED WITH YOUR BID. INSTRUCTIONS: If you are a pre -qualified bidder, complete Section I only. If you are not a pre -qualified bidder, complete Section II only. Section II acts as an application for pre -qualification. Submission of Section II will allow the bidder to be considered for pre -qualification for bids with the City of South Bend Department of Public Works. Pre- qualified bidders will then be exempt from a portion of the submission requirements outlined in Section 6- 63 of The Responsible Bidding Ordinance No. 10594-18 (hereinafter, "Responsible Bidding Ordinance") for a period of twelve (12) months. Thereafter, contractors who are pre -qualified must submit a complete application for continuation of "pre- qualified" standing, on a form provided by the City ("Responsible Bidder Checklist (1) Pre -Qualified Bidders") by December 31 st for the upcoming calendar year, or within twelve (12) months of obtaining pre- qualified standing. If the status of any item changes within the twelve (12) months, it is the responsibility of the contractor to notify the City. Failure by any pre -qualified contractor to submit its complete application for continuation of "pre -qualified" standing within the time prescribed above shall result in automatic removal of the designation, effective January 1 of the following year, or immediately following the twelve (12) months of pre -qualified standing. However, the "removed" contractor or subcontractor shall still be permitted to bid on City public works projects, though the contractor must submit all required documents under 6-63 until "pre -qualified" status is re-established. Please Note: The City reserves the right to request supplemental information from the bidder, additional verification of any information provided by the bidder, and may also conduct random inquiries of the bidder's current and previous customers regardless of pre -qualified standing. It is the sole responsibility of the potential bidder to comply with all submission requirements applicable to the bidder in Section 6-63 of the Responsible Bidding Ordinance no later than the date of the public bid opening. Version 02/23/2022 General Conditions - 10 POST BID SUBMISSIONS: Post -bid submissions must be submitted in accordance with Section 6-64 of the Responsible Bidding Ordinance. The post -bid submission requirements are as follows: 1. All bidders shall collect, maintain, and provide upon request, a current written list that discloses the name, address, licensing status, and type of work for any subcontractor from whom the bidder has accepted a bid and/or intends to hire on any part of the public work project, including individuals performing work as independent contractors. 2. Each subcontractor, whose portion of the project is estimated to be at least one -hundred fifty thousand dollars ($150,000.00), shall be required to adhere to the requirements of Section I of the Responsible Bidder Ordinance as though it were bidding directly to the City, except that the subcontractor shall submit the required information (including the name, address, and type of work) to the successful bidder prior to the commencement of work. 3. Failure of a subcontractor to submit the required information shall not disqualify the successful bidder from performing work on the project and shall not constitute a contractual default and/or breach by the successful bidder. However, the City may withhold all payment otherwise due for work performed by a subcontractor, until the subcontractor submits the required information and the City approves such information. 4. The disclosure of a subcontractor list ("Disclosed Subcontractor(s)") to the City by a bidder shall not create any rights in the Disclosed Subcontractor(s). Thus, a bidder may substitute another subcontractor for a Disclosed Subcontractor by giving the City, upon request, written notice of the name, address, licensing status, and type of work of the substitute subcontractor. 5. The successful bidder and all subcontractors on a public works project are required to submit certified payroll utilizing the federal form known as WH -347 or a similar form on a bi-weekly basis, submitted within 10 days after the end of each bi-weekly payroll period. Certified payrolls shall identify the job title and craft for each employee. Certified payrolls shall be submitted electronically. Please Note: Submissions deemed inadequate, incomplete, or untimely by the City may result in the automatic disqualification of the bid. The City, after review of complete and timely submissions, shall, in its sole discretion, after taking into account all information in the submission requirements, determine whether a bidder is responsive and responsible, and provide a Pre -Qualification Verification Letter. The City specifically reserves the right to utilize all information provided in the contractor's submission and any information obtained by the City through its own independent verification of the information provided by the contractor. Version 02/23/2022 General Conditions - 11 PRE -QUALIFIED BIDDER CHECKLIST (a) Acknowledgements: (i) X By checking this box, I hereby acknowledge that I am a pre -qualified bidder with the City of South Bend and that I have met the pre -qualification requirements within the last twelve (12) months. A copy of my Pre -Qualification verification letter is attached. (ii) X By checking this box, I hereby acknowledge that the City reserves the right to request supplemental information, additional verification of any information provided by me, and may also conduct random inquiries of my current and prior customers. (b) Attachments: (i) X Indiana Secretary of State's on-line records (ie. Business verification) dated within sixty (60) days of the submission of said document showing that business is in existence, current with the Indiana Secretary of State's Business Entity Report, and eligible for a certificate of good standing. (Not applicable to individuals, sole proprietors or partnerships). (ii) X Statement on staffing capabilities, including labor sources. This statement indicates and ensures I have sufficient employees on staff to complete the work. It outlines how I intend to meet the staffing needs of the work. (iii) X List of projects of similar size and scope of work performed in all areas, including the State of Indiana, within the last three (3) years. (iv) X For every project, submit evidence of participation in apprenticeship and training programs, applicable to the work to be performed on the project, which are approved by and registered with the United States Department of Labor's Office of Apprenticeship, or its successor organization. Version 02/23/2022 General Conditions - 12 II. PRE -QUALIFICATION CHECKLIST (FOR BIDDERS THAT ARE NOT PRE -QUALIFIED) (a) Acknowledgements: (i) By checking this box, I hereby acknowledge that I am not a pre -qualified bidder with the City of South Bend. (ii) By checking this box, I hereby acknowledge that the City reserves the right to request supplemental information, additional verification of any information provided, and may also conduct random inquiries of my current and prior customers. The City reserved the right to utilize all information provided in this submission and all information obtained in inquiries or requests to determine if a bidder is responsive and responsible. Additionally, I acknowledge that all information provided to the City shall be regarded as public records. (iii) By checking this box, I hereby acknowledge that copies of all Applicable apprenticeship certificates or standards for training programs applicable to the work performed on the project may be requested at any time and shall be furnished upon request. (iv) By checking this box, I hereby acknowledge and ensure that I and all sub- contractors, from whom I have accepted a bid and/or intend to hire to perform work on the public work project, are properly licensed. Furthermore, I acknowledge my understanding that it is my responsibility to ensure that all sub -contractors have the necessary licenses to undertake the work called for in this bid. If a sub- contractor loses their license at any point, it is the responsibility of that sub- contractor to notify the City. (b) Attachments: (i) Indiana Secretary of State's on-line records (ie. Business verification) dated within sixty (60) days of the submission of said document showing that business is in existence, current with the Indiana Secretary of State's Business Entity Report, and eligible for a certificate of good standing. (Not applicable to individuals, sole proprietors or partnerships). List identifying all former business names. Any determinations by a court or governmental agency any violations of federal state, or local laws including, but not limited to, violations of contracting or antitrust laws, tax or licensing laws, environmental laws, Occupational Safety and Health Act (OSHA), or federal Davis -Bacon and related Acts, within the preceding five (5) years. (iv) Statement about staffing capabilities, including labor sources. This statement indicates and ensures I have sufficient employees on staff to complete the work am bidding on OR outlines how I intend to meet the staffing needs of the work. (v) Statement that individuals who will perform work on the public work project on my behalf will be properly classified as an employee or as an independent contractor under all applicable state and federal laws and local ordinances. (vi) For every project, submit evidence of participation in apprenticeship and training programs, applicable to the work to be performed on the project, which are approved by and registered with the United States Department of Labor's Office of Apprenticeship, or its successor organization. (vii) Copy of a written plan for employee drug testing that covers all of my employees who will perform work on the public work project and meets or exceeds the requirements set forth in IC 4-13-18-5 or IC 4-13-18-6. (viii) Evidence that I am utilizing a surety company which is on the Bureau of Fiscal Service "Department of Treasury's Listing of Approved Sureties" as required in the bid specifications or contract. Version 02/23/2022 General Conditions - 13 (ix) Written statement of any federal, state or local tax liens or tax delinquencies owed to any federal, state or local taxing body in the preceding three years. (i) List of projects of similar size and scope of work performed in all areas, including the State of Indiana, within three (3) years prior to the date on which the bid is due. Date: Oc er 11, 2022 (Sign Here) Ruben Alvarado (Print Name Here) Rieth-Riley Construction Co., Inc. (Name of Company) 25200 State Road 23 (Address of Company) South Bend (City) Indiana (State) 574-288-8321 (Telephone Number) Version 02/23/2022 General Conditions - 14 CITY OF SOUTH BEND JAMES MUELLER, MAYOR DEPARTMENT OF PUBLIC WORKS ERIC HORVATH, DIRECTOR December 9, 2021 Dawn An-nstrong Rieth-Riley Construction darmstrong@rietll-rila.com RE: Pre -Qualification Verification Dear Ms. Armstrong: This letter serves as verification of Pre -Qualification status of your company for bidding with the City of South Bend. This Pre -Qualification status is effective for twelve (12) months from the date of this letter. Thereafter you are required to re -submit a complete application for continuation of pre -qualification status prior to December 31 for the upcoming calendar year. A. copy of this Verification Leiter must be included with every bid exceeding $150,000 submitted to the City of South Bend Board of Public Works, along with your Pre -Qualified Bidder Checklist and attachments. If you have any further questions regarding this matter, please call this office at (574) 235- 9251. Sincerely, {� ,7i3Olgllallysignedby Ux Horvath Liz Horvath OH: cn=Llx Harvalh,1hbndhgy,dng, kina`I=Iharvath@sou lhhendin.gov, c -US f" Oate:1021.12.100937304S00' .l` Liz Horvath, Permit Manager RIETH-RILEY CONSTRUCTION CO., Business Name: INC. Entity Type: Domestic For -Profit Corporation Creation Date: 08/08/1952 Principal Office Address: 3626 Elkhart Road, P.O. Box 477, Goshen, IN, 46527 - 0477, USA Jurisdiction of Formation: Indiana Title Name Vice President Brian A. Inniger Director Ronald G. Pope Director A. Keith Rose Secretary Robert L. Konopinski CFO Michael J. Weber Vice President Chad Loney Vice President Eric Engleking Vice President Todd Colberg Vice President Scott R. Stine CEO A. Keith Rose Director Brian A. Inniger BUSINESS INFORMATION E HOLLI SULLIVAN INDIANA SECRETARY OF STATE 09/12/2022 03:04 PM Business ID: 192874AO67 Business Status: Active Inactive Date: Expiration Date: Perpetual Business Entity Report Due 08/31/2024 Date: Years Due: Address 3626 ELKHART ROAD, P. 0. BOX 477, GOSHEN, IN, 46527 - 0477, USA 3626 ELKHART ROAD, P. 0. BOX 477, Goshen, IN, 46527, USA 3626 ELKHART ROAD, P. 0. BOX 477, GOSHEN, IN, 46527 - 0477, USA 3626 ELKHART ROAD, P. 0. BOX 477, GOSHEN, IN, 46527 - 0477, USA 3626 ELKHART ROAD, P. 0. BOX 477, Goshen, IN, 46527 - 0477, USA 3626 Elkhart Road, P. 0. Box 477, Goshen, IN, 46527, USA 3626 ELKHART ROAD, P. 0. BOX 477, Goshen, IN, 46527, USA 3626 ELKHART ROAD, P. 0. BOX 477, Goshen, IN, 46527, USA 3626 ELKHART ROAD, P. 0. BOX 477, Goshen, IN, 46527, USA 3626 ELKHART ROAD, P. 0. BOX 477, Goshen, IN, 46527, USA 3626 ELKHART ROAD, P. 0. BOX 477, Goshen, IN, 46527, USA Type: Individual Name: ROBERT L. KONOPINSKI Address: 3626 ELKHART RD., Goshen, IN, 46527, USA 11."nmqrR►rr.Trnn► �� 100/ Quality O 100/ Employee Owned o Over 100 Years November 18, 2021 RE: City of South Bend, IN Contractor's Bid for Public Work: Pre -qualification Checklist Prequalification Checklist b) Attachments iii. Rieth-Riley Construction Co., Inc. is a 100% union contractor, and recruits through union halls as necessary to complete the work required. iv. All individuals working for Rieth-Riley Construction Co., Inc. are subject to our policies and procedures. Rieth-Riley Construction Co., Inc. participates in E -Verify, and requires all employees to present proper identification. V. Rieth-Riley Construction Co., Inc. is a 100% union contractor, and recruits through union hall apprenticeship programs which are registered through the United States Department of Labor Office of Apprenticeship. Respectfully, Riath_Rilav ('nnctri irtinn f n Inr Dawn Armstrong, Payroll Administrator 25200 S.R. 23 • South Bend, IN 46614 Phone. (574) 288-8321 • www.rfeth-riley.com 04/1/19 n i 03/31/24 !k -n 04/1119 ........ ............ .. . . 03/31/24: n. .. . .. .. ..... .. ............ .. . . 0611/18-* 5131/23 1"0 06/1/18 .......... ........ . . ...... ...... .... 0611/18 .. .... . .................. .. 05/31/23 06/1118 mmg WI. 06/1/18 .. .. ............. ... ...... . ....... ...... ... ..... ........ .... ....... ...... ... ..... ........ .... 05/31/23 "T 04/1/17 n n' ."1'5103131/22 .............. 04/1/17 04/1/18 03/31/23 0411/18 J: 03/31/23 V! 05/1 /18 0430/23 ..... . ...... 04/30122 ........... 05/1/17 ........... . ........ . 04/1/17 03131/22 . .......... .... 04/1/17 2 03131/2 1":, . . ... ..... . . I U, . . . ......... 03131/22 .. . ... .. .... ..... . ..... ... ... . 0 ..._, ... e.. .... �,>*C.,:...:04/30/22 511/17 Ri ... ... .... . .. .............. "I -%n 11. .......... ... .. .. .. .... ...... ...-Tur . ........... . .... . .. ... . .... ...... . .. ....... . . .. . .. ...... . 04/1/18 A 03/31/23 n .i`lztt - . ... ... ........ V.U. .. ........ .... RIETH-RILEY CONSTRUCTION CO., INC. 2013 20ZO SAMPLE WORK COMPLETED RIETH-RILEY CONSTRUCTION CO., INC. 2021 SAMPLE WORK -IN -PROGRESS Project Name RR Job R HIDE Owner Construction Manager Title Phone Email SCOPE OF WORK ContractAmount %Cpmpl Proi Compl Date SURETY R -41542-A 3208340, INDOT Kirk Stafford Project Engineer 317-650-1890 kstafford@corradino.com Asphalt Pavement $181,601,73.1 6% July 2025 TRAVELER'S CASUALTY 1-69 Section 4 3208342-48 & Bridges AND SURETY Toll Road Push 111 3681014 ITR Concession Company, LLC Brian Cherry Infrastructure Manager 574651-2464 bcherry@indianatollroad.org Asphalt Overlay $61,168,876 451 December 2028 TRAVELER'S CASUALTY Construction AND SURETY Toll Road Push II 3681010 ITR Concession Company, LLC Brian Cherry Infrastructure Manager 574-651-2464' bcherry@indianatollroad.org Asphalt Overlay $61,112,626 88% December2026 TRAVELER'S CASUALTY Construction AND SURETY 16 -ENG -05 3200713 City of Carmel Timothy Conarroe, PE Project Engineer 317-547-5580 tconarroe@structurepoint.com - Interchange $31,685,314 99% May 2021 TRAVELER'S CASUALTY 96thStreet and Keystone Construction AND SURETY Const Inspection Section R -39504-A 3208296 INDOT Cory Mahe n, P.E. Manager 317-780-7262 cmahan@chacompanies.com Asphalt Pavement $30,090,075 26% October2021 TRAVELER'S CASUALTY 146th Street Over SR 37 N AND SURETY R-37797 3408086 INDOT Clayton Pergal Inspector 765-376-0471 cpergal@indat.in.gov Road $27,227,764 1% September2024 TRAVELER'S CASUALTY SR 26 Clinton County Reconstruct AND SURETY 11016-130008 7118264 MDOT Kenton McAndrew Project Engineer 269-270-7313 MandrewKl@Michigan.gov Asphalt Nivement $23,784,327 7% 1une2023 TRAVELER'S CASUALTY 1-94 Design/Build AND SURETY R -39500-A 3208283 INDOT GregPererson Project Supervisor 765-570-8003 gpeterson@indot.in.gov Asphalt Pavement $22,251,736 97% June2021 TRAVELER'S CASUALTY 126th Street & SR 37 AND SURETY R -31319-B 3408078 INDOT Gannon Carnes Inspector 765-307-8434 games@indot.in.gov Road $15,640,800 251. September2024 TRAVELER'S CASUALTY Teal Road Reconstruct AND SURETY 210004 7508232 MDOT Shaun Bates Project Engineer 989-773-7756 batess2@michigan.gov Hot Mix Asphalt $13,247,055 0% October2021 TRAVELER'S CASUALTY US 127 Clare Cold Milling & Resurfacing AND SURETY �...., .....:.:......:..... n ihi z A. ::.`Erie:H,alcom��.G:ouern :.:..::............ ......_....:. .....:..................... James. Brown:, :Director ' ...:.::.......... 2 019 .............. Seel `ts - .............q.......... - ............................... .:.Plt . :. Phane.(317);234-.6062 ToIIR6e.(80.0)=400-4520:Fax:(31-7.)454=8744 3f!' . ..... .... .. 13 .. ........ . . ex I m O.. M .. . James'MBrown�D.rec Or .. . Wage........ ...... Esk, 11H 10. WM o Mr.. . ......... . .. ......... . ......... . 'O. ....... .... W ... :J -M 0 Sit 11 0. iQr .... ........ . ... .. .. .. ............ . .... ........... .... .... ....... .... .. . .. T71 0.0 .............. . . .. . ... ::r:axn�ng Trust Fund Appxe ....... .. ...... . .......... ..... !4-3 .. . ..... . ... .. . ....... .. . . ........ ............. .... .. .. ... ..... .. ........... P ::B' it ...... ................... ... .. . Do .. .. .............. ....... ... ITOC or .............. i -TO .. .. .. ....... ... .. .... . ...... .... ...... .... ... .... i-ons.1 . ..... ..... .. ... ... . .. .. . ... ... 4 r-O.YT4 Til: ........... .. . ...... ... ---- ------ . .... .... ..... . ... ......... . ........ . ....... .. ... .... ........... ....... ::81 52 . . ...... .. 6. .;!h:a::C:Me -7---'7;l '9*. 1.6.. Ti. 'State ........ gp Fr:--P0)40450Ta)J(317)=234�8744 na.(-*3T-7)-2a4-,7..6062 Ulf- ...: ... - .. m <ai; ,!n. »..; ..ALLaif�'Y::. ., f.:::::f ,• �i., .,t.x/....>........ti. ,.!f. ,.5.»:<..........• ..k jb f,..: ,tt ... � .: �., .. 1`i... �Snr:}:. ..,.,s,:..#i„';?,,.,1:zss.,,»..:»:x.,»,ski»,,.,,...,»:,s:>S...Fssa...,.,.,,�.,,..:s..t,.sr_ ._ .._:an. f:.. r..,,: ,,.#<.:n s: L)af}s.. ^•t ao£b£:3 .r.:,,.r..s.,::} •.-:>t�rt».?t:,:rts2s#::> ri.,Z.,: � �Y7;.;' s..:..r,...n.....x......R..«...£.....X ... Js<..d.74tE..k,_.....£r..P,...r..:�»...c..s_<ostxv t.::r..a.'..._t.:.<bt..,•. »..4..�<,,./�:6tfL7r�u:5'S'i»F.,..it:�i� ................................... •ss:r;.stfsrssk:».a.:a»tr3�3?.95"c,?;f .:f,.:'t�n#�,s2a �.. <.a„x ....<.�'SYc,>vrwSh'hSl ::S.t ..y y ..' »i %? 55£<tr .ry,.p<• �-y::5: ,<.....3.,..:^..» X",.<..' a»Sa.�s.� �.:..�szY:n ' : ;?£",r:.;;»ri ..w�ifi> i„ -y'. -t:. •;.ii..�;;t3Yr.�� .' lit AMU x' Y ss (- z��y` a �^z £S Y-::FiY7 "F ;.,�E��iFF}n:y» S3 h x1r, F i 3,F�e.:ss ��Sf�Yn s - 3'� j Fs g slszF�,r, w �r. tty ,.FFr_� s£a}#Ss dz SF'F',.rr`<G.:,:'#'ifk%�tss»�;;?z:#mss'.::,.k,:>rati, %r¢k`s,.'>'�as�b „rt Fi �,. �', 1£ i�f` £ ,f- +:sryi �� rri„ ff.�� v'hsr :»»,.:, ,.. ...o:,. . . -.,s7 as-rt_.,>:.r, .;:.., ..»zE,xo. .., ... x.S.fa. ............................................................._ _..... :a::::::::::.F:::r:::::c::::c::.:: ::c::::r::r::.a: ::Eii:?iiic::.ii:titi7ec�_.p-:;�:'?............2 ��:;: APPLICANT _.._....__..... ::-::-:::--:::i:- :Q..15_°�� ...... s' 3Y`A %i�Yt 't1 .st..,':�;ry• e�F�rriE�ga'8�<A-fr9nan�v;f.�HIMs y�. :.✓sln%? ,� _ ��r � r ,�'!♦<>�� 'R kjTF�7k n'#£•}�ZIY :i{nfs: na....... :. . ...#t».... Y >�,ia-:.n2,Sb FF r5<in4 i> :..:..:... . .....:::...:::: .......... .... :'--:w'i.•.-i::i:':':•.::::.':':::-.-::'::::::'::::'::::'3 •' ' .--...::: ': mo ......... -:: ::::::: i :::::•....::::::. ...^.......__::::::::� ::::::::::: :::::::.........:. �: :Not-Re9istered t. r •: , ” -ham'•-'so - '^.""�f M ✓s” "Yi� >:.... .....: ..b -.F .?f?L#.t..}w5v.; 9:?».A;"a2` »Y�t»�<a'T'�iks•�<".iH ink t' <btr xL..F>z<fi i.»2:4..£<v .s ur„a3 «iq..>'#�FJ iw":..':(%`if:��n}:t3'D'NS"v:'i"ri; �bti.`>u •�:.••wk>1 a�. #� ,#:.:#AN MEN �Iss� :iii F;;s�;� }"'r��? st#� ?y!Iarb.��•:F: ,t (is; t:r .:�3: .0 �,a4;sc. � T i £rY�» : 5°�3 Sr$,YH ,F4y�v'E igt(�k� f �r A�P? �£'x ���yLrs„2 ,S £�"n�"#»,�?r�''SF'ismi�s��F `t�a"«•�s,�'�£3� �. „i i�<.�;:�i�l;?fis�'3£'.�'��FS m• h� � �� bL^t t? ..„a•o%ifi �.:. Y� � i b.. sy €1 r isa� �,•: •;, <Y�F�r#»>°" 3 "(, # x` s :3y rF.:� .s-r...:MUM r ... tt}.:>.loo:;ro'i` - r : 3. XS>.Y4Y.#i ,< }5{Ff x:'. ... 3a' rbi>S':?F- <� ,. s.»..,,,irF4. <»<T 5. .. .>,-.. v,.vv.-...... - ..... .. .. :Suspended :.r........ _......,. _ ::.... Q`59 %. tk....-r ._.... _....._.::::r urv,33a`:':.::'y_ ...4:$:Y`:»vyr-.. _ ;»n <$( rr�,k _tt�:L .. 1 nsa+U /,iir..rF&ii7u •.:YS.:'Y.:.:"QY:::: ;a <e#",iffy''' }5 Y'�Pk}i. v(�' � '��° y.F•'N':`?Fv, x�z.' ..��. ..x-.>`���.E��rm£in,�ss�t.-.rr�{t} i `<" i��s.� ��> �.��' _..r, ,}'t:%1� ��` ;,. wq•'.y��;:5 � � �€#�#.7,'•t- .t"q... nr'.:Xs r «� •-' .ik> ...:'. �z orSf`.:aF-?M-"'<o. f.^P�aS".� ��:xb:, �&3 <k'tf:,.� � ;,>�,£e><:f s:�'K::: i i r�T. »: #Hid':- 'c�E�L`:'� ,ti-{... .r '.riY .. ->:>�.g"tif �a"fs�'u4s`a.,.?.xT is�..,3» Sfs�<' . u.`'�#� . n �r�,r. kaF� »?�',"•�>:H:�'xo#.:.xn-zr<'�S��.N�s„�.<x'.'''i,.i5.1�.,bF>ms iF�£�>'�F>.:E:,� :',�:�.u`,.ar<�,,:. fi�Y:-'�»',.,>,.,:.,<�.,Yyass b,3r, t<•withdraw: ::........ o.: .........................._......_ :....... .............. :.. __......::,,:.:::.:.........:..........:_>..........T..._:.,,.::i...a:..:::,:: . :.. :A.....::.:re`r:.fi:ce:tatu R:::art B:3 ndfie:i. lDate: p.._..........................................._..............................._.._......p_:...::.._..:..:..:....:y...<..:....::..._::...::..:_.:::........._....:..._::._.................. . :Appre;nfice.s.an:enturedBetvieen�h/.2Q20:And *2/.3:112020: �ApPr�nt(ce P�ogram�lN2� Year A reniice'S •�A .............. . . ........................... .�:0.�.. :.... :.. .......... ...> r.>»-„- v: <:. :. i-irt �xs •.: i"''r >k9i»:> rsn i:3:"b•Y2?:>:;v,»ax,<.....e' Y £>' $ �' -t•:. �5� Y Y �» SY:••a,.. >, ..s'>: ..:at'. u:'v>>nu Y k S A £ i -: iK # t� k£ w' 6 sem; <Sk •':f'� � 'ro Gt {� {} J 1��( �Y?� � f � � F xf � }f5Y '£„r55� 'f �3 ,�y FF 37s . I 5b�#£: x9 # F�� , s��f Lk��•t�' s Y ��y�v <ai; ,!n. »..; ..ALLaif�'Y::. ., f.:::::f ,• �i., .,t.x/....>........ti. ,.!f. ,.5.»:<..........• ..k jb f,..: ,tt ... � .: �., .. 1`i... �Snr:}:. ..,.,s,:..#i„';?,,.,1:zss.,,»..:»:x.,»,ski»,,.,,...,»:,s:>S...Fssa...,.,.,,�.,,..:s..t,.sr_ ._ .._:an. f:.. r..,,: ,,.#<.:n s: L)af}s.. ^•t ao£b£:3 .r.:,,.r..s.,::} •.-:>t�rt».?t:,:rts2s#::> ri.,Z.,: � �Y7;.;' s..:..r,...n.....x......R..«...£.....X ... Js<..d.74tE..k,_.....£r..P,...r..:�»...c..s_<ostxv t.::r..a.'..._t.:.<bt..,•. »..4..�<,,./�:6tfL7r�u:5'S'i»F.,..it:�i� ................................... •ss:r;.stfsrssk:».a.:a»tr3�3?.95"c,?;f .:f,.:'t�n#�,s2a �.. <.a„x ....<.�'SYc,>vrwSh'hSl ::S.t ..y y ..' »i %? 55£<tr .ry,.p<• �-y::5: ,<.....3.,..:^..» X",.<..' a»Sa.�s.� �.:..�szY:n ' : ;?£",r:.;;»ri ..w�ifi> i„ -y'. -t:. •;.ii..�;;t3Yr.�� .' lit AMU x' Y ss (- z��y` a �^z £S Y-::FiY7 "F ;.,�E��iFF}n:y» S3 h x1r, F i 3,F�e.:ss ��Sf�Yn s - 3'� j Fs g slszF�,r, w �r. tty ,.FFr_� s£a}#Ss dz SF'F',.rr`<G.:,:'#'ifk%�tss»�;;?z:#mss'.::,.k,:>rati, %r¢k`s,.'>'�as�b „rt Fi �,. �', 1£ i�f` £ ,f- +:sryi �� rri„ ff.�� v'hsr :»»,.:, ,.. ...o:,. . . -.,s7 as-rt_.,>:.r, .;:.., ..»zE,xo. .., ... x.S.fa. ............................................................._ _..... :a::::::::::.F:::r:::::c::::c::.:: ::c::::r::r::.a: ::Eii:?iiic::.ii:titi7ec�_.p-:;�:'?............2 ��:;: APPLICANT _.._....__..... ::-::-:::--:::i:- :Q..15_°�� ...... s' 3Y`A %i�Yt 't1 .st..,':�;ry• e�F�rriE�ga'8�<A-fr9nan�v;f.�HIMs y�. :.✓sln%? ,� _ ��r � r ,�'!♦<>�� 'R kjTF�7k n'#£•}�ZIY :i{nfs: na....... :. . ...#t».... Y >�,ia-:.n2,Sb FF r5<in4 i> :..:..:... . .....:::...:::: .......... .... :'--:w'i.•.-i::i:':':•.::::.':':::-.-::'::::::'::::'::::'3 •' ' .--...::: ': mo ......... -:: ::::::: i :::::•....::::::. ...^.......__::::::::� ::::::::::: :::::::.........:. �: :Not-Re9istered t. r •: , ” -ham'•-'so - '^.""�f M ✓s” "Yi� >:.... .....: ..b -.F .?f?L#.t..}w5v.; 9:?».A;"a2` »Y�t»�<a'T'�iks•�<".iH ink t' <btr xL..F>z<fi i.»2:4..£<v .s ur„a3 «iq..>'#�FJ iw":..':(%`if:��n}:t3'D'NS"v:'i"ri; �bti.`>u •�:.••wk>1 a�. #� ,#:.:#AN MEN �Iss� :iii F;;s�;� }"'r��? st#� ?y!Iarb.��•:F: ,t (is; t:r .:�3: .0 �,a4;sc. � T i £rY�» : 5°�3 Sr$,YH ,F4y�v'E igt(�k� f �r A�P? �£'x ���yLrs„2 ,S £�"n�"#»,�?r�''SF'ismi�s��F `t�a"«•�s,�'�£3� �. „i i�<.�;:�i�l;?fis�'3£'.�'��FS m• h� � �� bL^t t? ..„a•o%ifi �.:. Y� � i b.. sy €1 r isa� �,•: •;, <Y�F�r#»>°" 3 "(, # x` s :3y rF.:� .s-r...:MUM r ... tt}.:>.loo:;ro'i` - r : 3. XS>.Y4Y.#i ,< }5{Ff x:'. ... 3a' rbi>S':?F- <� ,. s.»..,,,irF4. <»<T 5. .. .>,-.. v,.vv.-...... - ..... .. .. :Suspended :.r........ _......,. _ ::.... Q`59 %. tk....-r ._.... _....._.::::r urv,33a`:':.::'y_ ...4:$:Y`:»vyr-.. _ ;»n <$( rr�,k _tt�:L .. 1 nsa+U /,iir..rF&ii7u •.:YS.:'Y.:.:"QY:::: ;a <e#",iffy''' }5 Y'�Pk}i. v(�' � '��° y.F•'N':`?Fv, x�z.' ..��. ..x-.>`���.E��rm£in,�ss�t.-.rr�{t} i `<" i��s.� ��> �.��' _..r, ,}'t:%1� ��` ;,. wq•'.y��;:5 � � �€#�#.7,'•t- .t"q... nr'.:Xs r «� •-' .ik> ...:'. �z orSf`.:aF-?M-"'<o. f.^P�aS".� ��:xb:, �&3 <k'tf:,.� � ;,>�,£e><:f s:�'K::: i i r�T. »: #Hid':- 'c�E�L`:'� ,ti-{... .r '.riY .. ->:>�.g"tif �a"fs�'u4s`a.,.?.xT is�..,3» Sfs�<' . u.`'�#� . n �r�,r. kaF� »?�',"•�>:H:�'xo#.:.xn-zr<'�S��.N�s„�.<x'.'''i,.i5.1�.,bF>ms iF�£�>'�F>.:E:,� :',�:�.u`,.ar<�,,:. fi�Y:-'�»',.,>,.,:.,<�.,Yyass b,3r, t<•withdraw: ::........ o.: .........................._......_ :....... .............. :.. __......::,,:.:::.:.........:..........:_>..........T..._:.,,.::i...a:..:::,:: . :.. pp:re:ra c:; ::; atu ep:± fy a.nd r u�- : D..a e.- ::: :..:.,:. _................... Apprentices Iri e:flfuretl; Befiiveen 1is 20�� 7� Arid:'S%13%2020. Appr�rtiGeProg,�am�1N2� `Year` renticeStafu: rent'cs: r,ppa ,.....,:.:. Ism. ' f5�' k ✓ Yar � f£X � X£t't?:3.� .•iYY Y £ 3 a � x{7J,� k !f'4�YTsb% ��sZ 5,��,Y���-: q� tb:/�G�x-J's'���k 54 ��"v'�`<�Fstr �i�,�1/Z!��3"�5��"f �t =' %,Y�SSQ�ih� f n,�3£(l�(��rl sr f�nr'cY 3f fs Y.(s#i`& .t t# :..:t ,,., ,.,,✓ (brY,,. ., S, :,.,::.,. a.� ,(31k .b'>.N,at s�•����"4ia n���.:1"�s k"�:J :'.:k'�aeni:..ssk ia::s`£. .ie-7^Y.Ym<.o,'s:"•nVs v ,.............. ..... ...sr:.µ. :,__. —nr ,..-:.,.....,..v:.r.Y.:ti�, «.s:....--............ • - .. :.� - .. lis dr:i:°ru:rce'8w�o - -w: .. !� sg"`Y q b ^k'�y�,� � �a.^kr,Y's-➢ h ryni. 3 'q � ks _.t£�,t'Z<.i�r7��(� £% ... ...., . l" F .....,x...,,.t 3,�.�i; .: v......... _..... ._.............. ..... .. ................ .......... ..:::. - .7 •f .Y''tirfa fS9ik! r- xL-^�:<. riJ ,h$ ra. � ,.J. i nij; ..f, n. ...< ...�!•�{��F .{.�„�teyr£,r..� ..__ .... .:....�..:. ................. :• :::• ....._ 'Y i - ; V .: kr sxcL o. •> : s.fsr$£ap .[�[�,a<�f��.�. . «.stn. a ..:-,.£ ..�-.�.�.��.��.ax.Y,<.w.,. ol.-s:�'-i4�wsas% >.�b � i��t� �.'1 L -i#� :G�E� Y•�'i S13'7lt_ ;i'� G c�>r'�” � .. a :.:t,.<:,.;.,:.. ..:......... x,:ftg , 7.:<a :�}f• ,..Cxt.:r 1 L�y<�4'Yf��'t';'{X �x•.!<ri - 3.. , -J ��;.: ::,>�a~•'%l�^s F •s<r.<d� � � { `�-A:�t ; .;SZy t z�5;r,3. i E { ,fes.. :.l:ff:��/U: x53:xrx,;rt"i ' ...........,....,.:: �f fy;: i' ....._..,.._...__.._..___._.f_...._..,.......: ..-¢..:.,.:..C.;..,,f..,,,. <�r...,..,>..::.....,.t.�....ix ...............%-..,...,...,.....,,.... .... v:::;<z.:.,Y<.;r,x::;.s.-..:".;�•.:..;=:::;:a^3%,a' ........ '//♦♦ A y�-F ,i •.te4 >YEr,TtA'S�3i4F)t"R..s n5# f' �� 'E> 3•,.st�igF Y ��'' ice'S C3QS'$�%<e.(<E,ye! i FS£1 E tii..-.'-f 3 �.N 4 [ p S`:s'<,G� P"i'S✓�<>.�s rykr T r'i Rr�:,9 >.. Y _.f J :>< .. E�E'` f�,l[y5.i�>- :rza3,x<.j> <. w.%>.. 4`,.Rn4>':llA . ...xfx 3::., .. iY.s:�, �3,<-.£-<✓.�:t ...cJ'SS' .............. :'easy::e:-�xs•....o,•,:._:..-_,.a. •:..... _..,._._...__...:.>s::c:::::-_:::was::::,:::::.._.._....; yzRM< ;7//.,..ic .< x1La " ,,.,... n n T .r�a,"5 . .y< .3£:..:,3,-1 J:, : A. 1<RAf..Sfv.'i.{' ' ,,Pv i�i tae` r2 is is SyrZw-rFx:Y.<�n�5�'SYft �4.k '.G•'Gb'>xFs '�q e%' ���0���..1 {.'Y' at`� V�b?"gy�i.�i iry/� . m`'h�iE:s3�.'�iENB'b?`kv%j >k WMn 'YdJSua, RENio is :, ..J.:,.:i `.t,:y.•:t• was....:. �..., ...... iY R ,t s YF- s5 J 1 b" fMFM i'i Es -Y; -....:via...:�:_.<,.��:r•.:;;......;_..�; .....:.__ ...... -.. ......... ,.Y:r:=::::��`_:::::^rn:^�=:: "':" 'is is is „ii " s:' gY S f� - L F "a'°'%� is s<�< Yz res ;�, ,'E<' is.! 5}�;� '.SIf"+•�'�.a; .>�I'!'i"i�a �'�y.� .2- _ Ktr'�L'f�"'""y� �7'.iy�'r` fi x5 8 e' 7Esn g s�41k `' C,,•fkj, f%����tt>y # ......_ _ ffs SxJ ; llI 'c.:?it- :Ai0,01 7K xs. li �- ktEAaJS.6a�yiRa�<nSa�.:i i.s>?»;TSSS±.TS'S<o':�tib� .,CN .�.vyx. SSC' --.'3< �.' .f' Y[Yt 1�.��'S k ........... . ...x............. ,,::..:ya:,xas) ,.. :,:: ' -:.ase.:.-•::F.. ......:::�.... . it::.: :.....:.::...... ......._........... .. f •ti ..: 1:.:. . .. _ •A 1::- •t2'£ <�+ Urz`R.iiGW'<�>t`a�urY;:R.�ya<w�STgaik,y..t.2.dfi:'k`C�=k ''m-'kJ.v�_C3<w,394'?.,:.tYi;':�sf:<ie�"'xay3.i.><t�.&�y",�:..�ee.t��l:(d %mo- i'Yjr�,:<�ss.:...:.5:C�.:£S:L,- >2y.3i<'t �,,aS:<x<.<9 �" Wy3N�o3rwIM uf`:X• � �� � ����� S% �4utI �<',%{f'f •fx,�,`.Y,<lf`3�f x < ..... -- wF< 3,s .. J _ ' :n,? ..ro"T ,Es :°3'>� ,. .ac. •S;Xz"Ri n:.3�. t+iAf :1 bi.,. 4sfZ`.kt A t .13i;< .... . z<- l_ij'� . ik'. '4 it ... ,. a.:..: ;:� ...�.._...................�?,. a 7. -us .0 B""n" d*`­"lnf"n "i. A" "'In': !%t.:!!! vilb, en. up't.......Pt-U. pf Re`:. .ort: . ... .. . ....... . .......... ........... .. ... .. ......... . ... . ..... .n... Year Ace Status poentice :c:en n .2. 202,14. . ...... .. .... . . .. ... .... 2,04:8": ii, n ­nn wg� 'n .gpong, �gg o g % � . .. . . ..... ..... ... ............. 43 ;.:n . ....... in .. n:nn-n: m.nro, -nn in n.... ...... .. . ..... .. . gm map- 011.11 g 'm oto IS IS ......................... . . . . . ............ mi-. to E "t. ;Ade, .... ...... _... , E M :.rl:.:::-.:::.;:-:::�!:....:::. 7-." -.n i n ::nn DE�C- (�8`56-M.M. n=.:. in .......... n=.. .... ... ........ ... Vn. ninn .. .... — tn% n.t-, A : ! 4;1:_.:::::....-::..::.::::: .... ........... . . ... ...... . . .. ... .... .. .......... .... . ........ .!inn Unn:= n.%n.n;n.;i:; ... . ....... ........... . "n . ................. ...... .. ...... .... . . . .... . ...... .. gingm—M? m NO, M M., , " i. NNE �ol WIN im lit na, MEN I ;�grg. Mg ME Womp. Nei L n .... ........... ...... - . .... . . . ......... Fin 'iilff MITE ffin. "go ......... . i�M r M -n Nl fj, . ....... ....... ...... . . ..... ... ......... ........ ...... ... ......... ... n ;n* n: in ii 09� g -.0 m IS MEN" 01 .,gg g 1,71 W . . . . . . . . . . . . . . . . . . S n. ..... . .. .. ...... ... i -K -A-11, Wti in ... . ..U92. :;:nn==M in Me ....... ... .............. ....... . . . . ..... .. EM ,gga MIT ......... ..nnn,nn . . . ..... ..... . - M , —M. --- .... ... .............. .......... ..... . .. . . ..... . . ...... ... .... .. Wo ......... . .... .. ffl ........ n :1-nnn=n nn.T.T.InilMill ........ .......... nt ................. ............ ......... Nng 'd, raw--- .. . ......... .1 ... . .. ........... .. n .............. .... . . . ..... . . .... . ..... . n=n. :.L wm ..... .... . .. ......... n= InI.-6. ....... ...... ... ...... ...... . .. ..... I ...... ..... Valenta t raw nnnn. ... ...... ...............................25 . ....- ....... ........ nM -a in in ..M.. . . . ..... .....-.. n Total Indenter red. 68' ..................... H m a ej -, .1 - 1 111— ry mm ---h .gpong, �gg o � 0.0 tOL Y.::: : : ... ::: 43 ;.:n . ....... in .. n:nn-n: m.nro, -nn .................. ...... .. . ................ ...... .......... ............. it .. .. .. .. ........ .... ....... . gm map- 011.11 g 'm oto IS IS 4 W ;Ade, , E M m �l nn:=:;=nnnn.:....... .H .... ........................d. .......... .. .. . ......... ..Mr ................................... ... .. .... ..... .. ..... AM g �g�g.igg,""r M.M.0011M®R "m IN MOM ............. .... I VE ME Womp. Nei L MOM ..nn: : .n. ­.n.... -1hRuve'i Ml ;. i­A;-,nn....n........=.. .............. ........ . m gog i�M ... .... ......... ....... WAR I W.: ol . ....... ....... ...... . . ..... ... ......... ........ ...... ... ........... .... n U=nn.= Med n n -n .. ..... ... ......... ........... ....... . ......... .. . . . ...... .... ........ .. .. .. ............. ..... . . ....... ... . ..... .. ......... .... ...... ........... . M:'i, =-CO., n. rt . ..... . in R 1_11P nn. -I. lan. MEN" ......... . nn� S n. ..... . .. .. ...... ... i -K -A-11, Wti in ... . ..U92. a�Y...... EM ,gga MIT -.0 a wg - -00. g - Q!g gf� g I • 1 . .. ........ .... ................ M OR` I ........ n :1-nnn=n nn.T.T.InilMill ........ .......... nt ................. ............ ......... Nng 'd, raw--- .. . ......... .1 ... . .. ........... .. n .............. .... . . . ..... . . .... . ..... . n=n. :.L wm ..... .... . .. ......... n= InI.-6. ....... ...... ... ...... ...... . .. ..... I ...... ..... .......... . . .. ... .......... . ;--i z, 2 in . . . ... ..... .. T �. za. z n t: U-n t' * e" 2'd ... .. ....... ... ..... ....... ..... . ....... ... n- -.: ...... .... . . .... . ...... V.. . ... .... ... .......... .... .... .... . —;n --- Mun. 'Ra T-Tf_hte:.VVednbs'd��.J'*.*.Mqy-..I'3,;..-2Q2Q' :1.0 - Nx, 21 . . .... ...... .4 T ...... .... . .... ....... 8T Pit 000"0. -0`-07 W -5-7 -ho 4) ---.-W PMM4 477- 3.6.2. U. Elk, -R'�:* I G ''h'.P-' RT...6 27' .52 oy, . .. .. ... . .. ..... wn. . ....... ... 4t ..... . . .. ... . .......... it. . .. .. ... ..... .. ..... ....... t: Lt.: . . ........ -q ' ....... ... ... ............i . ..... . .. ........ . .... .. ... . .... .. .... .. ...... ... .. .... . .. .... ... .. .. ......... .. .. . . ... ... . ... .... .. .... .. . .. ..... . 11cesl .. ...... ...... Ott, gr ... . ........ .. t nin ;-Q.,.. Dafllne .. .... .... ....... .. 7: t". Cl . .. .. . . ... .... . .... .. .... ... .... .... ...... ........... .... . ........... . . ..... .. .... . ........ ... . . ....... . . ... i' 1 j/. �..v � ' I• :E� �41 n,i—eii tin, :�.;�... �li.g� �. E .:v` `'• � : :+fel 'i � it.' .c' .y¢ t.%� r'r•�: • � �tf: •':.'1.511.. I i t i � .,"+:., • iF ,.a t f f. I S IM MI. ,n w r 0 r ti �,�,:Lt'.�'.a daix•. y::yyi�•:'4;•t:%�'.Fv:�-:'��::�.�i�...�•:�:_.,k,:il:.4:::�;.7`.� _ Y, :.o2!;'.."..Uc"�}Y: ,�3:',s.c.�.:r..v;o:.:::z.<�..:f+.r;..� .`I�5Lp�� E;<..i:c:�.`tr•: •. ..D....13y :..Y:2":E.�I`�..`�.••L.::G:ta'�.s:ii?i1�:t�,::£'YL�i'L�. '��c�:'y�,.�^3.i.E:cX's,.l'v�h.,•_'t:�T �... '•.tW �"�,',T�.. �''.i.'��. ... :: :..i:.r•r : `i+•a:-.'ai;�A�"f�;.�,i��i�;•y;:.:"S�;t''.•`;-�;tErsi'si�:-�. ... ;/,.., f•. :: .4* C'•'... . rc-.C<•`•3:-t ."`s t•>.•� 4'' d.1�t .,i:� '_':.:��.• .E�••�",.�•�L::...5'. �:`s:.:.. . v`� �s:i�;,.++;•.5"...'";4,ai{,•%t '�'s3,:`Si'; . is:i�"l:.i F'.' ..ter..... .y a�,.1 �• >� s�. y - .SEi FiF1i..... KY OF IJEBOFt'......... .. ..:::..... AIMA ii x •AS${STP!?ET€ScGRE.iAFCY F�• iHXyNP??�ECdi�, m ::�•-:.: �....: -::::� ::. �:::. Tom.. U _ :-' ::, •� � MArtP4WER ....Vli.b „+ , s• '4:^ y: £: :d 3 � 't.: :y;i;,, ::,BUREAU,;4i2f.Ii:Z�STP.A?C!R;;i:i ?::>'?;. •:. .::6URERU;aFAcN`i��3F?1�A`y�P.;Tl�41kE'FiG >:'<^•:• 50. Ft . . ..... ...... .... .... . .... ..... 'S ftft. .... ....... IS 0 0 lio . MR. hl' I :fro to:" . ....... . L I 15-a A": n Lies. I o. 'r.- Ar Ar Tfi ......... .... ...... ...... .. Y., IRto r A . . ... . .. ......... ..... ... .. ... ... " J% 094 .481 P66 Rieth-Riley Construction Co,, Inc. Equi ment List _ 3/31/2020 • Acquired New or Asset Description Acquisition Date Used Cast Accum De r P Ci8500a006 2a195ULLAIR 1B5-KUB-DPQAIR COMPR9550R 3/28/2019. N 19 581,Otl 4,895,28 NBV C1B500a007 20195ULLAIJI i85=KU8-DPQAIR COMPRESSOR 3/20/2019 N 15,58100 4,895,28 14,685,72 CiS500a008 2019-SULLAIR 185-KUB-DPQAIR COMPRE55OR 3/28/2019 N 19,581.00 4 895,28 14,685,72 C1850o'7009 20195ULLAIR185-KUB-DPCLAIRCOMPRESSOR 3123/2aig N 19,581.00 ' 14,685.72 C18500o010 20i9SULLAIR 185-KUB-DPQAIR COMPRESSOR 19'581.00 4,895,28 4,895,28 14,685,72 C1850a001i 2019 SULLAIR 185-KUB-DPQAIR COMPRESSOR 3/28/Ztl19 N 19,581.00 14,685,72 =5000=2019SULLAIRiB5-KUB-DPQAIRCOMPR55SOR 3/28/2019 N 19,581::00 4,895,28 14,685,72 C185000013 2019SULLAIR185-KUB-DPQAIRCOMPRE55CIR 3/28 f 2019 N 19 581.00 4,895.26 14,685,72 D035000= 2019 WACKER R512A-90 35" VIBRATORY COMPACTOR 4/18/2019 N , 17,914.00 4,895,28 4,4'18,52 14,685,72 JT3000000i TRUCKITON 2/1/2005 N 9,667.206,627,20 13,435.48 JT3aaaauo2 TRUCK ITON 2/1/2007 N 10 27815 3,040,00 JT30000003 TRUCK ITON 12/11/2008. N •8.743,20 6334.20 3+232,00 JT30000004 TRUCKITON 12/1112008 N a,743.2a 6,334 JT30000005 TRUCKIT.ON 12/11/2008 N 11,398,90 $,287.40 • 2+409,00 JTB0000006 TRUCK MN 12/ii./200a N 11390 90 4a E,287 3,111,50 JT30000007 TRUCK I TON 12/11/2008 N 11398;90 8'287 40 3,iii.5a JT30000aa8 TRUCKITON JT309a00�9 12'11%2008 N 11,''292.37 8,180,87 3+111,50 3+111.50 TRUCKITON 1 2111/2 0 0 8 N 11,292,37 11,292,37 JT3aaaa010 TRUCK I TON 12 f i f 29Q9 N 10,409,73 7,135.73 JT300000ii TRUCKiTON 1211/2009 N 10,409,73 7,135.73 3,27400 IT3000a012 TRUCKITON - 12/1/2409 N 10,409.73 7,135,73 3'274.00 JT30004013 TRUCK 1TaN 1211/2009 N 14 409.73 7135.73 3,274.00 JT3aaaoai4 TRUCKITON 1211/2009 N io,4a9.73 7,135.73 3+274.00 JT30oaca15 TRUCKITON 12/1/2009 N 10,507.94 7,233.94 , 3+274.00 JT300a0ai6 TRUCKiTON 1211/2009 • N 10,507.94 7,233,94 3+274,00 JT3aaaaal7 TRUCKITON 12/1/2009 N 10,507,94 7,233,94 3,274.00 JT300xaalS 'TRUCKITON 1211/2909 N I0,409.73 7,135.73 3+274,00 JT3aaaa919 TRUCK i TON 12/1/2009 N 10,507.94 7,203.94 3,274.00 JT3aaa.0oma TRUCKiTON UTILITY 6'3'2012 N 12,733.75 11,460,38 B,274.00 JTeoa&Qi TRUCKITON UTILITY 613/2012 N 12,73375 11,460,38 ,273.a7' 1T3a490022 . TRUCK I TDN 613/2012 N 12,135,08 10,921,57 1,273,37 JT30d00023 TRUCKITON 613/2012 N 12,021.67 10,819,50 3,213,51 1T30000UZ4 TRUCKiTON 6/312012 N 12,021.67 10,819,50 1,202,37 JT36000025 TRUCKITON 613/2012 N 12,295,58 11,066,92 1,2x2,17 J'r30000026 TRUcKiTaN 6/15/2911 N 16,760,50 16,76Q,5a 1+229.56 JT30600027 TRUCK iToN UTILITY 6113/2011 N 14,193.77 14.,193,77 JT3aa.0a029 TRUCK iTON UTILITY. - 6113/zaii N 14,193.77 14,193,77 ]T3aaaa.029 TRUcKITaN sfi3fzail N 14,327.67 14,327,67 JT3aaaaa39 TRUCKiTON UTILITY 6'13'2011 N 14,327.67 1.4,327,67 JT3aaaamj TRUCKITON UTILITY 6/13/2011 N 14,327.67 14,327,67 JT3040.0032 TRUCKITON UTILITY 6/1312011 N 14,327.67 1.4,327,67 7T3aaaaa33 TRUCK iTaN UTILITY 6113/2011 N 14,327.67 14,327.67 R JT30000034 TRUCKITON 6/1512011 N 13,390,03 13,390,03 JTBb=035 TRUCKITON 6/15/2011 N JT30000036 TRUCKiTON 6/15/2011 N 13,390.03 13,390,03 1173000037 TRUCKiTON 6'15/2911 N 13,390.03 13,391,'73 ` JT3aaa0039 TRUCKiTON 8/25/2017 •�N 17,536.43 15.782 '7a _ .. ,e :•:v, _�,v__ s.: to _._ JT40Qa0002 TRUCK 1.5 TON iltil G;.ili 7/17/2017 .0 N SS,524,47 15,878,80 �4,'ueL.u6 14,29x,92 JT4aaaa003 TRUCK 1,5ToN UTILITY �TRUCKI.5TON 12/28/2013 N 44,g10.02 44,91a,x2 1,597.s8 JT400000 UTILITY 7117/2017 N 17,759,33 15,983.40 JT4x900005 TRUCK 1.5 TON UTILITY 7/17/2017 N 19,039.15 17,135,23 1775.93 JT49aa0a06 TRUCK 1.5 TON UTILITY 7/17'2917 N 19,083,13 17,174.82 3,903,92 IT40000007 TRUCK 1,5 TON UTILITY 7/18/2017 N 19,083,13 37,174,92 1,908,31 JT900006a's TRUCK 1.5 TON iITILITY 12/15/2017 N 24,575;25 2.4,575,25 1,9x0,31 JT40000a9 TRUCK I,STON UTILITY 12115/2017 N 25,351,90 25,351,90 JT40000010 TRUCKI.5TON UTILITY 12115/2017 N 24,204,43 24,2x4.49 JT4aaaaQii TRUCKi.5TON UTILITY 12'15/2017 N 25,351.89 25,351,89 JT40000012 TRUCK 1.3 TON UTILITY ' 12'35/2017 N 23,868,76 23,868,76 JT4000d013 TRUCK 1,5 TON UTILITY JT4xaaaai4 7RUCKI.5TON UTILITY 12/15/2017 N 23,868,76 23,868.76 12/15/2017N 24,204,49 A; Q4.49 JT40000015 TRUCK 1.5 TON UTILITY 12115/2017 N 24,204,4.9 24,204,49 _ JT40000015 TRUCKI,STON UTILITY 12/1512017 N 23,978,28 23,978,28 JT40000017 TRUCK 1.5 TON UTILITY 12/1512017 N '25,174,45 25,174,45 JT4a000012 TRUCK1.5TON UTILITY 12/1512017 N 25,174,45 25,174,45 IT40000019 TRUCK 1.5 TON UTILITY 12/1512017 N 24,204.49 24,204,49 JT40000020 TRUCKi,5TaN 4/8/2016 N 60,230,30 47,431,44 i2,79s,a6 ]T40000021 TRUCK 1,5 TON . 4/8/2016 _ N 60,230,30 47,431,44 1T4000022 TRUCKi.STON 41812016 N 60,230,30 47,431,44 i2,798.a6 JT40000023 TRUCKI,5TON 4/8/2016 N 60,230,30 47,431,44]T4aaaao24 12,79ams TRUCK1,5ToN N 60,230,30 47,431,44 12,798,8641817,015 ]T4009025 TRUCKI,5TON 4/8/2016 N 59667.40 .469a8,04 12,798.as ]T40a00026 TRUCK1,5TON 4/8f201fi N 60,230,30 47,431,44 126 73,36 1T4000a027 TRUCK1.5TON 4/8/2016 N 59,667.40 46,988,04 127988fi JT40000028 TRUCKI,5TON 3J28f201fi N 59,667,40 46,988,04 12,679,3fi JT4aQ0a029 TRUCK1,5TON 3/28/2016 N 59,667,40 46,988,04 12,679,36 JT40000030 TRUCKI,STON 4/8/2016 N 60,230.30 47,431,44 12,679,36 i2,798,86 Rieth-Riley Construction Co., Inc. Equipment List 3/ss/0000 Acquired New or ' Asset il Description Acquisitlon pate Used Cost Accum Depr JT40000031 TRUCK 1.5 TON UTILITY 6/1/2017 N JT401100032 TRUCK 1,5 TON UTILITY 4120/2ai7 N 60,071.94 28,901,83NBV 21,170,11 JT40a00033 TRUCK 1,5 TON UTILITY 514/2917 N 60,D71.94 ' 40,548.60 19,523,34 JT4p000034 TRbCK 1.5 TON UTILITY 4/20/2017 N fi0,071,94 39,422,25 20 JT40000035 TRUCK 1.5 TON UTILrJY 4/20/2017 N 60,071,94 40,548,60 19,649,69 19,503,34 JT4000036 TRUCK 1.5 TON UTILITY 6/1/2017N 60,071,94 40,548,sa 19,523,34 JT4000a037 TRUCK 1.5 TON UTILITY 4./2012017 N 60,071,94 38,902.41 21,169,53 JT40000038 TRUCK 15 TON UTILITY 61112017 N 60,071,9Q 40,548,60 19,503,34 JT40000039 TRUCK 1,5 TOM UTILITY 5/4/2017 f4 60,071,94 38,902,41 21,169,53 JT4000004o TRUCKI,5TONUTILITY 611/2017 N 60,071,94 39,402,45 20,649,69 JT40000041 TRUCK 1,5 TON UTILITY . 412012017• N 60,071,94 50,071,94 38,902,41 40,548,sa 21,169,53 JT4900a642 TRUCK 1.5 TON UTILITY 6/1/2017 N 19,523,34 .IT4p000043 TRUCK 1.5 TON' UTILITY 4/20/2017 N 60,071,94 38,902,41 21,169,53' JT400aa044 TRUCK i,5.T.ON UTILITY 5/1/2017 N19,523,34 60,071,94 40,548,60 JT40000045 TRUCK 15 TON UTILITY 6/i/2017 N 60,071,94 38,902,41 JT400oa046 TRUCK 1.5iON UTILITY 4/20/2017 N 60,071,94 38,902,41 21,169,53 1740x00047 TRUCK 1.5 TON UTILITY 6/1/2017 N • 60 °71,94 40 598,60 19,523,34 JT4000.0,048 TRUCK 1,5T`ON UTILI-TY 4/20/2017 N 60,071,94 38,902.41 21,169,53 IT4000U049 TRUCK 1,5 TON 12/-9/2018 N 59,510,52 ,8 616444 40,169,52 20 536,52 19,341,00 JT4000xx50 TRUCK I.5 TON TRUCK 1215/2018 N 61,644,84 20,536,32 41'1°8,52 IT40000051 1.5 TON '1215/2019 N 61644,84 20174,64 41,108,52 1740000052 TRUCKI,5TON 121512018 N 61,644,84 20,536,32 41,47°,20 JT40000053 TRUCK i,5 TON 12/5/2018 N 611644,84 20 536,32 41'1x8,52 JT4000a054 TRUCK 1.5 TON 12/5/2x18 N 61,644.84 20,53fi,32 41,108,52 7T4d00a055 TRUCK 1,5 TON 121512018 N 61,644,84 41,iae,52 /742000056 TRUCK 1,STON 1215/2018 N 61644.84 ' .20,536,32 20 536,32 41,1°8,52 JT40000057 TRUCK 1,5 TON ,12/1912018 N fii,644.84 20,53Q32 41,im,52 JT40000058 2019 CHEVROLET45110 UTILITYTRUCK B/2B/Mi9 N 61,746,58 ' 10,291,12 41,108,52 JTOOM059 2019 CHEVROLET4500 UTILITYTRUCK 1bf3/Z919 N 51,455,46 IT40000060 2019 CHEVROLET4500 LMLITYTRUCK B/28/2019 N 61,746,58 61,746,58 7,718,34 iO,291,1z • 5¢ 078,24 1740000061 2di9 CHEVROLET45a0 UTILITYTRUCK 8/281 2x19 • N 61,746,58 10,291,12 51,455,46 JT4aag0062 2019 CHEVROLET 450aUTILITYTRUCK 10/4/2019 N 61,746,58 7,718,34 MAMAS ,4 1T40a00x63 20i9CHEVROLET4500UTILITYTRUCK 101212019. N 61,746,58 54,028,24 Md000064 2x19 CHEVROLET 4500 UTILITY TRUCK •2019 10f4JZ019 N 7,718,34 54,028,24 /747000065 CHEVROLET45ax UTILITYTRUCK 1013/2019 N fi1,746,58 61,746,58 7,718,34 7,718,34 54 ,028.24 JT40000096 •2019 CHEVROLET4500 UTILITYTRUCK 10/712019 N 61,746,58 7,718,34 54,02a,24 P1200oa09i TftUCKPICItUPif2TON 212/2011 N 54,028,24 P120000002 TRUCK PICKUP 1/2 TON 7/3/2011 N 5,350,°3 4,915,03 535.00 P120900003 TRUCK PICKUP 1fZTON 1211512017 N 5,350,03 3,56743 1,783,00 P12000aa74 TRUCK PICKUP iJZ'TON 12/15/0017 N 14,714,45 14,714.45 _ p12aa0aa05. TRUCK PICKUP iJZ TON 12/1512017 N 14,714.45 14,714,45 _ P120000006 TRUCK PICKUP 112 TON 12/1512017 N 14,714.45 14,714,45 14,714,45 14,714,45 P120000007 TRUCK PICKUP 1/2 TON 1211512(317 N 14,714,45 14,714,45 P120000008 TRUCK PICKUP iJZ TON 1211512017 N 14 714.45 14,714.45 ni20090909 TRUCK PICKi 0 11112 rOnl Pi20000010 TRUCK PICKUP S12 TON 12%1512017 12/15/2017 N N 14,621,52 14,621,52 P1200xaa11 TRUCK PICKUP iJZ TON 12/1512017 N 15,199.37 15,199,37 p1200a0012 TRUCK PICKUP J.J2 TON t y!;�;; ;• ; li 15 i99,37 ' I1,3 XA gn '15199,37 i3,�9;,Ya - P12000OO13 TRUCK PICKUP 112 TON 12115/2017 N 13,304.80 13,304,ea P12000=4 TRUCK PICKUP I/2 TON 12115/2017 N 13,753,85 13,753,85 P120000015 TRUCK PICKUP 112 TON W/PRO M0090916 TRUCK PICKUP 112. TON 5fia/2016 N 41,304.67 32,527,44 a P120009017 TRUCK PICKUP if 2 TON 4/117006 4/1/2006 U U 6,360,90 5,724,00 ,777.23 636,00 PizaaOoaiB TRUCK PICKUP 112 TON • 4Ji/taa6 u 1,060:90 954,00 Pi200000i9 TRUCK PICKUP i/2 TON 1/2 912 0 0 8 U 1o,600,00 1,855,00 9,540,°0 1,669,50 1109,90 ,Ofi0,90 p120000a20 2019 DODGE 1500 PICKUP TRUCK QA 4122/Zai9 N 36,842,61 9,219,fi0 1a5,5o P140000001 TRUCK PICKUP 112 TON 6/312016 N 19,057,46 9,°47,21 27 ,900,01 W0000002 TRUCK PICKUP I2TON J 6/312°116. N 9,907,71 8,919,94 1,005,29 P140000003 TRUCK PICKUP 1/2 TON 4X4 6f 312016 N 17,917,90 16,126,94 990-77 P14900=4 TRUCK PICKUP iJ2 TON 4X4 17,7°7,°5 15 936,14 1,791,79 P14a90ao05 TRUCK PICKUP 11Z TON 4X4 6/a/2016 N 14,877.67 13,389,90 1 1777,97 PW000006 -TRUCK PICKUP i12 TON 4X4 1211512017 N 16,395,38 16,105,38 ,487 77 Pi46000007 TRUCK PICKUP ij2TON4X4 Pi4a0000a8 TRUCK PICKUP 112 TON 4X4 12/15/2017 N 16,1a5,38 19,165,39 P220000091 TRUCK PICKUP 314 TON 5118 jzai6 2/310093 N N 38,839,98 3x,586,50 2,253.48 Pzzaaaa0az TRUCK PICKUP 3/4 TON 2/19/2008 N 21,233,80 19,110,42 2,173,38 P220000003 TRUCK PICKUP314TON 4/2912008 N 6,632.75 ,341,59 2,986,00 P220600004 TRUCK PICKUP 314 TON 1211112GOR N 7,791.59 5 5 341,59 1,450,°0 P220006x05 TRUCK PICKUP 314 TON 12112008 / / N 6,735,30. 4,896,8❑ ,838,50 P220000006 TRUCK PICKUP 314 TON i2lli/20oa N 6,fi72,35 4,833,85 1,838,50 'P220000007 TRUCK PICKUP 3 4TON 12f11f2068 N 6,699.21 4,853,01 11a0m P220000aa8 TRUCK PICKUP 314 TON iz1111zaaa N 6,699,21 4,853,21 i,846.°0 P220000009 TRUCK PICKUP 314TON 12/11/2008 N 6,699,21 4,853,21 i,fi46,60 P220000010 TRUCK PICKUP314-TON 12111/z°aa N 6,699,21 4,853,21 1,04fi,x0 P220000011 TRUCK PICKUP 314 TON 1 12/1112068 N 6,699,21 4,853;21 1,846,60 MONO= TRUCK PICKUP 314 TON 2/1/26ia N 6,699.21 4,853,2i 1,846,00 13220000013 TRUCK PICKUP S14TON 2/1/2610 N 6,227,40 4287,4o i 6,227,40 4,287,40 1mua Rieth-Riley Construction Cd., Inc. ' Equipment List 3/31/2020 Acquired New or Asset p [Description Acquisition [late Used Cost Accum De r p P220aaaal4 TRUCK PICKUP 314 TON 2/1J2(10 N 6,227,4° 4,287.40 NaV P2200x0015 TRUCK PICKUp3/4 TON 212010 J 1 N 1,940,00 1322(0013036 TRUCK PICKUP 3/4 TON 2f 1/2x10 N 622792 1,940,00 P220200a17 TRUCK PICKUP 314 TON 2/1/2010 N 6.227,40 41287.40 287,40 1,940,x2 P22000008. TRUCK PICKUP 3/4 TON 2/1/201a N 6,227,40 4,287,40 1,940,°° P220000019 TRUCK PICKUP 3/4 TON 2/1/2010 N 6,169,20 4,229.20 11940,04 P220°a0a20 TRUCK PICKUP 3/4 TON 3/15/2010 N 6,159,20 4,229,20 1,940,a0 P122000002i TRUCK PICKUP 3/4 TON 7/3/2011 N 7,235,33 4 981,33 1 2,254,0° P220000k22 TRUCK PICKUP 3/4ToN 7/312011 N 7,036,32 4,844,32 219200 P2200a0023 TRUCK PICKUP 314 TON 2/2/201,1 N 7,036,32 4,344.32 2,19222 P220000024 TRUCK PICKUP 314 TOM 7/3/2011 N 7,034,16 6330,74 703,42 P220000025 TRUCK'PICKUPa/4TON 7/3/2011 N 7,036,32 4,844.32 2,192,00 P229000026 TRUCK PICKUP 314TON 7/312011 N 7,036,32 •4,844.32 2,192.00 /3220000027 TRUCK PICKUP314TCIN 212/7011 N 7,036,32 4,844,32 2,192,00 P220000028 TRUCK PICKUP314TON 7/3/2011 N 7,03446 7,314,00 6330,74• 51014.00 703,42 P22ad(0029 TRUCK PICKUP 31471N 7/3/za11 N 7,383,00 51083,00 2,300,00 P220da0030 TRUCK PICKUP 314TON 7/3/2011 N 7,314,00 2,322,21] P220aaaa3l TRUCK PICKUP 3f4TaN � 7/3/2011 N 51014,00 2'300,00 P220000032 TRUCK PICKUP 3%4TON 7/3/2011 N 7,383,0° 5x83,00 ' 2,332,00 P2200d0033 TRUCK PICKUP 314TON 7/3/2011 N fi,996,20 4,664.20 2,00 P220a00234 TRUCK PICKUP 314TON 7/3/2(11 N 7,073,24 4,716,24 21357,00 13220000035 TRUCK PICKUP 314TON 2/412012 N 6,788,19 4,673,19 2,115,°° P220000036 TRUCK PICKUP 3/4ToN 2/412012 N ,3, 6,240,24 693,36 P222001]037 TRUCK PICKUP314TON 2/4/2012 N 7,00883,4455 7 6,375,10 708'35 P220000038 TRUCK PICKUP 3/4 TON 2/412012 N708,35 7,083,45 6,375.10 P2200a2a39 TRUCK PICKUP 314 TON 2/4/2012 N 7,063,45 6,375,10 708,35 P220000040 TRUCK PICKUP 314 TON 214/2012 N 7,083,45 5 6 375.10 708,35 P220000a4i TRUCKPIcKUPaj4TON 7,093,45 375,10 708,35 P22600042 TRUCK PICKUP 314TON 6/3/2012 N 7,150,28 6,435,25 715,03 1`220000043 TRUCK PICkUP3/4TON• 6/3/2012 N 7,083,45 6,375,10 700,35 P220600044 TRUCK PICKUP 3/4TON 6/3/2012 N 7,083,45 6,375,10 708,35 P220000045 TRUCK PICKUP 314TON 613/2012 N 7,083,45 6,375,10 P220000046 . TRUCK PICKUP 3/4 TON 7,083,45 6,375,10 708 35 P220000a47 TRUdKPICKUP314TON 6/3/2012N 7,083,45 6,375.10 708,35 P220000648 TRUCK PICKUP 314 TON S/312012 N 7,083,45 6,682,50 400.95 P22Q000049 TRUCK PICKUP 3/4 TON 6/312012 N 7,083,45 7,089,45 6375.10 61 708,35 P22a000050 TRUCIC PICKUP 314 TON 613/2012 N 375.10 708,35 13221]00°051 TRUCK PICKUP 3/4 TON 61312012 N 7,083,45 6 375,10 708,35 P.220000052 TRUCK PICKUP 314 TON 6/312012 N 7,083,45 61375,10 7°8,35 P220000053 TRUCK PICKUP 314TON 6/3/2212N 7,150,28 6,435,25 715,03 P220000054 TRUCK PICKUP 314TON 6/1312011 N .: 7,150,28 9,311,76 6,435.2s 9,311,76 735,03 ' P220000055 TRUCK PICKUP 314 TON 6/13/2011 N 9,3ii,7fi 9,311.76 P220000056 TRUCK PICKUP 314 TON 6/1312011 N 9,224.73 9,224.73 P220000057 TRUCK PICKUP 314TON 6/13/2011 N ' P222000058 TRUCK PICKUP 314TON 6/1312011 N 9,224,73 9,224,73 9,224,73 9,224.73 P220000059 TRUcKPICKUP 314TON 6/1312011. N 9,311,76 9,311,76 " P220000060 TRUCK PICKUP 314TON 6/22/2011 N 9,331.76 5.311,76 " P^< on<<;1 T=D.rri rtrttt;pa!?rn;= 4, � - P220000062 TRUCK PICKUP 3/4 TON 6/2212011 ' N 9,311,76 9,311.76 P220a02063 TRUCK PICKUP 314 TON 6/2212011 N 9,860,67 9,860,67 " P220000064 TRUCK PICKUP 314TON 6/22/2011 N 9,860,67 9,860,67 " P22000aQ65 TRUCK PICKUP 314 TON 6122/2011 N .9,860.57 9,860,67 " P220000066 TRUCK PICKUP 314 TON 6/22/2011 N 6,860,67 9,860.67 " 13220000067' TRUCK PICKUP 314TON 6/22/2011 N 9,860,57 9,1160,67 P•220060068 TRUcK.PICK6314TON 5/2212017 N 11,832,15 10,648,94. P220200069 TRUCK PICKUP 314 TON 3/22/2217 N 33,358,54 12,022,72 i ,183,21 /3220002070 TRUCK PICKUP 3/4 TON 12115/1,335,82 2017 N 15,662.49 1s,6a2,09 P229000071 TRUCK PICKUP 314 TON 12/15/2017 • N" 15,682,09 15,682,09 P220000072 TRUCK PICKUP 314 TON 12/15/2017 N 16,923,e6 16,923,86 /3220000073 TRUCK PICKUP 314TON P220600074 TRUCK PICKUP 314 TON i2f15f2017 N 16,157,91 :.16,157,91 P220000�75 TRUCK PICKUP 3/4TON 12/15/2017 12/15%2017 N N 16,870,19 16,170,19 P22a(20076 TRUCK PICKUP 314ToN 12/i5/2017 N 16,870,19 17,676,87 16,870,i9 17,676.87 _ P220000077 TRUCK PICKUP 314 TON 12/1512017 N 17,066,06 17,096,06 P220000078 TRUCK PICKUP 314 TON 12115/2017 N 17,215,37 17,215,37 " P220000079 TRUCK PICKUP 314 TON 418/2016 N39,355.95 30,992,76 P220000080 TRUCK PICKUP 314 TON 4/8/2016 N 39,355,95 80,992,76 8,363,i9 P220000081 TRUCK PICKUP 314TON 4/8/2016 N 38 988,13 35 089,32 6,363 i9 P22A°a0082 TRUCK PICKUP 314TON 41812ai6 N 38,988,13 303703,14 g gg P220000083 TRUCk PICKUP 314TON 4/8/2016 N 39 355,95 30 992,76 8128181 P22aa00084 TRUCK PICKUP 3/4TON 4/8/2016 N 3811988,14 81364/99 P220000085 TRUCK PICKUP 314 TON 4/8/2016 N 30703,14 8,28506 P22ax00086 TRUCK PICKUP 314TON 4/8/2016 N 36988,14 60703,14 s P220000087 TRUCK PICKUP 314TON 4/8/2016 N 38,988113 30,703,14 8,284 99 P220000088 TRUCK PICKUP314TON 4/812016 N 98,908,13 30703,14 g +284,99 P220000089 TRUCK PICKUP 314 TON 3128/2016 N 39,355,95 30,99X76 8,363,19 P220000090 TRUCK PICKUP 314 TON 4/8120i6 N 39,355,95 39,355,95 99,355.95 30,992.76 0 3fi3,19 Rieth-Riley Constructian Co,, Inc. Equipment Ust: 3/31/2020 AssetN Oescriptlon 'TRUCK Acquisition Date Acquired New or Used Cast AccumDe r P220000091 PICKUP 314 TON 4/1/2017 N P220000092 TRUCK PICKUP 314TON 4/1/2017 N 39,846,01 26,896,OaNBV 12,949.93 P2200a0099 TRUCK PICKUP 314TON 4/1/2017 N 39,846,01 26,896,08 12'949,93 P220000094 TRUCK PICKUP 3%4 TON 4/1/2017 N 39,846,01 26,896,08 12,949,93 ' 1`220000095 TRUCK PICKUP 314TON 4/1/2017 N 39 846,01 26 $96,08 12,949,93 P220000096 TRUCK PICKUP 3/4TON W/LIF 4/1/2017 N 39,846,01 2E,896,08 12'949.93 /`220000097 TRUCK PICKUP 314TON 4/1/2017 N 39 846,01 39,846,01 26 896.03 2fi,a96,08 12,949,93 P226000098 TRUCK PICKUP 314 TON 411/2017N 12,949,93 P220000099 TRUCK PICKUP a/4TaN 4/1/2017 N 39,844,01 26,e96,08 12,949,93 P22dhaaiOa TRUCK PICKUP 314TON 411/2017 N 39,H46.0i 26,896,08 12,949.93 P220000101 TRUCK PICKUP 314TPN 4/1/zo17 N 39 846,01 26 896,08 12'949,93 P22aa0o1a2 TRUCK PICKUP 314TON 4/1/2017 N 39,846,01 26,896.09 12,646,93 P220130003 TRUCK PICKUP 314TON 4/1/2017 N 39,846.01 26,896,08 12,949,93 1`2200130104. TRUCK PICKUP 314TON 4/112017 N 39,846,01 26,896,08 12,949.93 P220006105 TRUCK PICKUP 314 TON 411/ZC17 N 39,846,01 26,896.08 12,949.93 P220000106 TRUCK PICKUP 314TCN 411121317 N 39,846,131 26,896,08 12,949,93 P221300a107 TRUCK PICKUP 314TON 411/2017 N39846131 , 39,$46,01 26,896,08 12,949,53 1`220000109 TRUCK PICKUP 3%4TON 411/2a17 39,H46,01 26,896,08 12,949.93 •P220000109 TRUCK PICKUP 3j4TON 4/1/2017 N 39,846.01 26,896.08 12,949.83 P220aaaiia TRUCKPICKUP 314TON 4/1/2017 N 39,846.01 26,896.aa 12,949.93 •P220a00111 TRUCK PICKUP 314TON 4/112017 N 39 84s•0i 26 096 08 12+949,53 P220000112 TRUCK PICKUP 314 TON 4/112017 N B9,246.01 26 696.08 12+949.93 P2213aa0119 TRUCK PICKUP 314 TON 4/1/2017 N 39 846.01 26 896.0a 12,949,93 P220000114 TRUCK PICKUP 3/4TON 411/2m N 39+846,01 26896,08 12,949,53 P220000115 TRUCK PICKUP 314 TON 411/2(117 N 89846,01 26 896,08 12'949.93 PZZa000ii6 TRUCK PICKUP 314 TON 4/1/2017 N 39,846,01 39 846.0i 26,896,08 12,949,93 1`220000117 TRUCK PICKUP 314TON W/LIF 41112017 N12,949,93 26,196.0a P220Od011$ TRUCK PICKUP 314TON 4/ifZtl17 N 42,272.01 28,533.60 13,738,41 P2213130=9 TRUCK PICKUP 314TON 4/1/2017 N 39,473,62 26,64¢,fi8 12,828,54 P40000120 TRUCK PICKUP 314TON 411/2(117 N 3926,1344.6s , 26 644.,68 1z,HZS,54 1`220000125 TRUCK PICKUP 314TaN '4/112017 N 3s�473,62 26 644.6$ 12,a2a,94 P220000122 TRUCK PICKUP 314 TOM 411/2017 N 39,473,62. 26 644.68 12,828,94 P220000123 TRUCK PI,CKUP314TON 4/112(117 N 394739 ,62 2 644,68 12,828,94 P2213a00124 TRUCK PICKUP 314TON 4/i/2017 N 39,473.52 26,fig4, 12,$78,94 /`22/3000125 TRUCK PICKUP 3 j4•TON 4/112017 N 39,473.62 26,6g4.ea68 sa 12,828,94 P221]O130128 TRUCK PICKUP 314 TON 411/2017 N 39,473.62 26,644,68 12,828,94 P220da01z7 TRUCK PICKUP 314TON 41112a17 N 39,473.52 26,644.,8E 12'828.94 P22130a0151 TRUCK PICKUP 314 TON 8/2912018N 39,473.62 26,644,58 12,828,94 P2213(1001S2 TRUCK PICKUP 314 TON 8/15/2018 N 40,1326,93 40,1326,93 16,2113,92 16,21(1,92 23,Sis,ai P22aaaa153 TRUCK PICKUP 314 TON Sf15120is Ni 23,816,01 1`220000154 TRUCK PICKUP 314 TON Bf14fZ(118 N 40,026,93 40,026,93 16,210,92 16,210,92 23,816,41 P270000155 TRUCK PICKUP 314 TON 91612018 N 29 P22Oatl0155 TRUCK PICKUP 314 TON 8/23/2018 N 40,026,93 15,431,13 24,595,80 1`2213000157, TRUCK PICKUP 314 TON 8/1512019 N 40,026,93 16,210,92 23,816.01 P22.O0.,i5a ,, ,. r, ., PICKUP 3�•rt�m 40 026,93 16;210,92 23 ,,., ",n-o,u1 tRUCK P220000159 TRUCK PICKUP 314TON 9/6/2018 8/2312018 1`l N 40026,94 15;431,13 24,595.81 Pz200130is(1 TRUCK PICKUP 314TON 1 s/1412016 N 40'026,94 40,026,93 1s 498,84 24,576,10 1`220000161 TRUCK PICKUP 3/4TOD! 55,498,84 24,528,G+9 Pz2acaaifiz TRUCK PICKUP 314 1 � � 8/2112018 , � N 4 ,02�.°•'s 40,404,56 1y 416,74 15,645,00 25 s1a,z0 P22(113=63 TRUCKPICKUP314TON • 811412018 N 40,404,56 35,645,00 z4759,5s P22000ai64 TRUCK PICKUP 314 TON 8/2i/2018 N 40,404,55 15,64-9•00 24,759,56 P220000165 TRUCK PICKUP 314 TON 8fi412018 N 40,404,5615,645,0(1 24,759,55 1`220000166 TRUCK PICKUP 314TOR 8/2312618 N 40 404,56 ' 15 845,00 24,759.58 P220000187 TRUCK PICKUP 314 TON 9 f fi/2aia N 40,404,56 ' 15,098,$5 24,759,56 1`Z200001fig TRUCK PICKUP 314TON 8/29/2018 N 40,404,56 15,645,00 25.305.71 P22000Qifi9 TRUCK PICKUP 314 1 9/6f20iH N 40,404.56 55,098;85 24,759.56 1`22(1000170 TRUCK PICKUP 314 TON s/1512010 N 40,444,56 • 15,645.00 25 ,345.71 P2200130i7i TRUCK PICKUP 3l4TON UFTG 8/2312018 N 40,026.93 15,498,84 24 ,759,56 1`2200/30172 TRUCK PICKUP'314TON .. 8 29 2018 1 / N 15,4,45,00 24,528,04 P220000i73 TRUCK PICKUP 314TON 3 /1 612 0 0 9 U 19,404.56 19,335,89 17,402.30 24,759,56 P22tla00174 TRUCK PICKUP 3/4 TON 3116120(19 U 15,668,53 14 101.60 1933.59 ' /3220000175 2019 RAM 25130 TROCK PICKUP 614120i9 N 47760,41 8,017,50 P22(1Oa0176 2019 RAM 2500 TRUCK PICKUP 6/27/2019 N 42,760.41 $,017,40 34565,85 P2200=77' 2019 RAM 2500 TRUCK PICKUP 6/412019 N 42,760.41 S,a17,60 34!742,81 ,742.81 PZ20a0017a 2019 RAM 2500 TRUCK PICKUP 6f 2712019 N 42,760,41 a 017,60 34,742,61 P2200a0179 2019 RAM 25(10 TRUCK PICKUP 6f i4%2a19 N 42,760.41 8017,60 34 P220000i8a 2019 RAM 2500 TRUCK PICKUP 5/31/2019 N 42,760.41 8,819,36 34742.81 P220000i81 2019 RAM 2500 TRUCK PICKUP 61412018 N 42,760.41 ' 8,017,60 33,742,81 ,041.05 1`22(1000182 2019 RAM 25aa TRUCK PICKUP 6/27/2019 N 42,760,41 8,017.160 34,742.81 1`2200001832019 RAM 2500 TRUCK PICKUP WILIFiGATE 6127/2019 N 45,949,01 8,1315.4a 34 ,742.81 P22aaaaia4 2019 RAM 2500 TRUCK PICKUP 5/31/2019 N 42,760.41 37,333,61 P220aaa185 2019 RAM 2500 TRUCK PICKUP 5/3112019 N 42,760.41 8,619,36 33,941,(1s /`220000186 2019 RANI 2500 TRUCK PICKUP 614/2019 N 42,760,41 8,819,34 33,941.05 P220130=7 2019 RAM 2500 TRUCK PICKUP 6/412010 N 51017,60 34,742.51 P220000188 2019 RAM 2500 TRUCK PICKUP 614/2019 N 42,760,41 4Z 760,41 8,017,60 34,742,81 P220000189 2019 RAM 2500 TRUCK PICKUP 5131 f 2019 N 42,760,41 8,017.60 34 11220000190 2019 RAM 2500 TRUCK PICKUP 5/31 f 2019 N 42,760,41 5 gi9 36 33'742,81 8,819,36 39'941'•05 41,05 Rietb-Riley Construction Co,, Inc. ' Equipment List ' 3/31/2020 Asset QesertpEion nDaEe Acqutred New or Used P220000191 2019 RAM 2500 TRUCK PICKUP 6/4/20195/31/2019 Cast Accum Depr P220000192 2019 RAM 2500 TRUCK PICKUP N 42,760,41 e,017.60 P220000193 2019 RAM 2500 TRUCK PICKUP ' 6/14/2019 N 42,760,41 8,819,36' P2200aa194 2019 RAM 2500 TRUCK PICKUP s/4Jztl19 42,760.41 8,017,60 P220000195 2019 RAM 4500 TRUCK PICKUP 6/1422019 N N 42,760,41 13,a17,60 P220000196 2019. RAM 2500 TRUCK PICKUP 6/14/2019 N 42,760,41 &,017,6° P220000197 2019 RAM 25TRUCK PICKUP 6/4/2015 N 42,76°,.41 g00 ,017,60 P220000198 ' 2019 RAM2500 TRUCK PICKUP s/4Jzai9 N 42,760,41 8,017.60 P240900001 TRUCK PICKUP 314TON 4X4 2/3/2003 42,760,41 81819,36 P24aa90003 TRUCK PICKUP 314TON 4X4 2/2/2011 N 24,165,80 21,749,22 P240000OQ4 TRUCK PICKUP 324taN 4X4 7/3/2011 N 10,243,30 91218,97 P24000aa9.9 • TRUCKTICKUP 314TON 4X4 6/22/2011 N 7+869,00 5,41a,aa P240000006 TRUCK PICKUP 3/4 TON 4X4 612212°11 N 10,5!3,61 10,513,61 _ P240000007 TRUCK PICKUP 3/4TON 4X4 6/22/2021 N 1°,859,37 10,859,37 • P240000008 TRUCK PICKUP 314TON 4X4 5/22/2017 N 10,859,37 10,859,37 P240000009 TRUCK PICKUP 314TON 4X4 12/15/2017 N 13,392,57 8,788,85 P24000OCIa TRUCK PICKUP 314TON 04 12/15/2017 N 76 18,268,76 P240=01i TRUCK PfCICUP 314 TON 4X4 12/1512017 N 18,269 61 VAN0000001 VAN PA55ENGER 4/2/2019 N 18,846,61 18,846,61 ,H46,61 WRKTistlatl2 2ol9RoADWIDENER FHDRDUAL SIDE ATPACHMENT 4/2422019 N 36+0x0,73 20,421,52 WRRT190003 2.019 CATERPILLAR BKT320-48 GRAPTOR ATTACHMENT 7/10/201.9N 63,880,83 13,308,50 WRKT19b004 2019 CATERPILLAR GM20-48 GRAPTOR ATTACHMENT 7/1012019 25,773,63 4,932,55 DT1000o001 'TRUCK FLATBED 511/2°01 N4,832.55 N 25,773.62 ,773,fi2 DT1aaaaa02 TRUCK FLATBED DUMP 5J1120tl1 N 16,735,33 12,751,33 DTS°0°OP03 TRUCK FLATBED DUMP 5/1/2001 N 16,735,33 g2 ,751,33 DTicaaad24 TRUCK FLATSED DUMP 16 ,735,33 12,75133 DT1000a0o5 TRUCK FLATBED 6UMP 7/1521996 N 16,01182 14 ,027,82 DTi0099a26 TRUCK FLATBED DUMP 8/2/1999 N 8,963.49 8,°67,14 DTiaaaaaa7 TRUCK FLAT6ED DUMP 21912(104 N 31,823,66 20,223,69 ' DT10000008 TRUCK FLATBED DUMP + 2/9/2004 N 15,90a,aa S,929.10 DTia000009 TRUCK FLATBED DOMP 6/21 20x4 N 17,911.80 . 1140,90 DTIOOOOOia TRUCK•FLATHED DUMP 3131/2010 59,855,02 53,,9869,52 DTloaaa°ii TRUCK FLATBED DUMP 5/3122010 N N 21,76238 13,775,18 DT1tl0oOa13 TRUCK FLATBED DUMP 61312012 N 20,571.77 13 ,025,04 DT1tl000o14 TRUCK FLATBED DUMP 613/2012 N 24,164.56 21,748,10 DTiatlaaal5 TRUCK FLATBED DUMP 62312012'. N 24,164,56 21 DTiaadaw TRUCK FI.ATRED DUMP 9/30/2013 .N 23,938,72 21,748,!0 DT1000tl017 TRUCK FLATBED DUMP 3/25/2010 N 34,153,14 30,544,85 ,737.83 FBi000601 TRUCK FLATS ED SIA 6/911997 N 3!,722'83 31,722.83 F=000062 TRUtR FLATBED 41111°96 U 42,s94,54 38,425,09 F851a00001 'TRUCK FLATBED SERVICE 521/2001 N 8+4a°,o0 7,632,00 FBSiaaaaa2 TRUCK FLATBED SERVICE 1222/2092 N ,17,902,41 13,942,41 FBSW200001 TRUCK FLATBED SERVICE WATE 313!/2010 N 20,840,42 15,303,42 FBSW2OOa02 TRUCK FLATHED SERVICE WATE 2/522013 N 24,146,07 . 15,204,81 FRMiatl99ai TRUCK FORM 3/15/2010 N 23,015,57 20,714.01 FRMi290902 TRUCK FORM 6/3/20!7 h� 1H 187,71 11 JT30000038 TRUCK MECHANIC ITON 122!5/20!7 N B1,996.96 1,996 96 , 28732.71 ,797'26 JT39a90a4a TRUCK MECHANIC 1TON 12/1512017 N MSTOaa0001 TRUCK MECHANIC 2TON 3/22/ze06 22,844 97 __.�.. 20 15,9 23° 0 ' ::iS:L:.':C:'c";� i'`-•�'�ni�'''�� Rieth-Riley Construction Co,, Inc. Equipment List 3/31/2020 Assett! Description Acquisition Date Acquired New or Used AP08000002 PAVER BFTTRACK AP655D 12115/2017 N Cast Accum Depr NBV AP08000010 PAVER 8 FTTRACK P385B 8/312017 N 140,394,96 140,394,97 AP08000015 PAVER aFTTRACK PF4410 3/27/2009. U 52,404.15 17,468,16 34,935,99 AP10a0a002 PAVER iaFTTRAcK RP195 313112010 N 120,880,00 120,000,00 AP20020003' PAVER 1aFTRUBBER TIRED RP 3131/2010 N 97,iB9,B3 97 ,189,93 APiaga4004 PAVER 10FTTRACK PF5510 RE 90,280,00 90,280,00 AP10a00005 PAVER IOFTTRACK RP195 4/162/213 N5 332,018,99 332,018,99 APidamoo6 PAVER 10FTTRACKAP1055D 4115[2809 N 69,309,80 69,308,80 APIOOQU007 PAVER 1aFrTRACK AP1055D 4[1512009 N 80,273,65 80,273,65 AP10a00008 PAVER 1aFI'TRACKAP1655D 3f22[2010 N 72,381,82 72,381,82 AP.10adaa09 PAVER iOFTTRACK APiO55D 3122/2010 97,463.40 97,463,40 AP1a0000il PAVER 1aFT'TRAcK AP 17-/1812817 N N •113,281.63 113Sa55E ,281,63 AP10006012 PAVER 1aFTTRACKAP1055E 12115/2017 N147,561,81 146,701,93 .146,701,94 (0,01) °0 AP1°0013 PAVER 10FTTRAcKAP1055E 12115/2817 N 147,561,82 APia0a0014 PAVER1aFrTRACKAP1a55E 12/15/2017 ' N 147,212,99 347,213,00 AP1ad00015 PAVER IaFI'TRACKAP1055E 12/15/2017 N 147,124,45 147,124.46 (0,01} AP100000i6 PAVER 10FTTRACKAP1055E 12/1512017 N 153,557,33 152,557,34 • (0,01) AP10000020 PAVERIOFTTRACK5200-21 4/1/2015 N 153 996,55 + 153 ,996,56 (0;01) APIOGQO043 PAVER IQFTTRACK PF5510 9/1712009 U 420,980,46 236,801,33 iB4,078,67 APi0000044 PAVER 10FTTRACK PF55i0 8/17/2009 U4/1/2806 125,000,00 125,°00,00 APC0000001 PAVER CURB ASPHALT U 34,600,00 - 30,000,80 APTO°00001 PAVER PULLTYPE 1.15008 414/1988 N 1;aaa,00 900,00 100,00 AT17713 ATTACHMENT BED WATER/FUEL 4/9/2008 N 12 ,695,37 11,605,83 1,289,54 BKr1000001 ATTACHMENT BUCKET 916/1995 N 55,704,62 55,704,62 BKr1000002 ATTACHMENT BUCKET 7[18[1995 N 6,983,55 6,2a5,19 698,36 - SLiS00000i LOADER BACKHOE 420F2 4j19f 2018 U 5,856,90 5,271.21 585,69 BL15000002 LOADER BACKHOE 42OF2 4/19[2018 U 5i,039,15 16,332,55 34 70 6,60 BL15000003 LOADER BACKHOE 420 W/FORKS 4/19J2die U 51,073,93 16,B43,%, 34,730,29 BL150000% 7-018 CATERPILLAR 42OF2 LOADER BACKHOE30,529,85 8/30/2019 N 8,359,44 22,170,41 BL25a00005 2018 CATERPILLAR 42OF2 LOADER BACKHOE 12/19%2019 N 5,500,00 1+222,24 4,277,76 BM6060a001 LIFnaoom Go- 711[2016 U 24,175,2fi 2,686,1a 21,489,10 0185000003 COMPRESSOR AIR 185 4[112000 U 4,393,00 9,953,70 439,30 0185000005 COMPRESSORAIR 4/1/2006. U 2,300.00 . 2,100,00 200,a0 C8RK000001 BREAKER CONCRETE 2125/2002 N 1+00°,04 1,000,00 CBRi(000002 BREAKERCDNCRE4E 4[2612002 N 41,825.75 37 ,943,37 31882.38 . CP80000002 COLD PLANER ROTOMILL 411[2013 N 58,275,00 52,447.50 5,827,50 CRBQOa000i PAVER CURB & GUTTER GT6300 4f 10/3997 N 98142,54 88 328,29 9+814,25 0980000002 PAVER CURB & GUTTER GT3600 712012000 N 151,320,00 136,188,00 15,132.00 CR8000a003 PAVER CURB & GUTTER GT3600 412312901 N 159 280,40 143 35236 15,928,04 'CRBOQa0004 PAVER CURB & GUTTER GT3600 .41112002 N 129 e617,55 116 ,655,79 12,961,76 CR80000005 PAVER CURB & GUTTERTP880 7[3%2011 N i3O,480,46 117,432,41 13,048,05 CR9000000fi PAVER CURB & GUTTER GT3600 413011997 U 60 660,x° + 40 ,440,00 24,220,00 CRSOUOCO07 PAVER CURB & GUTTER GT3600 B/112a16 U 17-7,880,08 17-7-,388;a0 4,788,08 CRB0000008 2017 POWER CURBER 5700-C CURB & GUTTER CONCRETE PAVER 41112817 N 65,000,00 65,000,00 CRa000=9 2018 POWER CURBER 5700-CMAX CURB & GUTTER CONCRETE PAVER 4/1[2018 N 339,550.63 127,332,80 212,219,66 CRS000010 2019 POWER CURB ER 5700-C CURB & GUTTER CONCRETE PAVER 4 fi[2019 N 463,440,54 115,860,24 347,580,30 . Csr"0000001 SPRcA•^ucR CH4r" CSP0000002 SPREADERCHIP 7/21/1977 4/112018 N 34",924.40 34,121,36 en ,,,. - -,�,. Jtf,04 84,121,36 •302,333,89 CST3a04aoi COMPACTOR STATICC330A 12 10 1987 U N 108,i23,50 54,061,68 54031,82 C5T3nr+0r.•°Z CQ- .�,4PS ,7-R y l j j.� 114L 29744,48 26.7 .5'.5 27LL - CST3000003 COMPACTOR STATIC 03308 � . i2Jiu"j19a7 8 [2311988 N N 29,744.00 26,769.6a 2,,9974.404a csT3a04Qa4 COMPACTOR STATIC casae 8/23/1988 N 28,8fi0,00 25,970,00 z,aas,aa csT3aadam COMPACTOR STATIC C3308 4130/2009 U 28,860,4a 2-9,874 00 2,886,00 CST3020006 COMPAcrORSTATIC C3308 413817-809 U 3,000,00 3,000,00 CST3000007 COMPACTOR STATICC330B 4130/2009 U 3,000,40 3,000,00 6T3000008 COMPACTOR STA TICBWSAS3/31/2005 U 3,000,00 -3,000.0c) CS13000009 COMPACTOR STATICC330A U 5,000.00 5,000,00 CWKT100001 ATTACHMENTTIE BAR INSERTS4/i�loa45 N 2,500,00 2,250.00 250,00 CWKT110a01 ATTACHMENT BURLAP DRAG W/6 5flafZa01 N,604.30 61340,66 55 206,59 6,134,07 cWKT3aoaai ATTAcHMENTCONV GOMAco W/s N 13 12,243,87 1,360,43 CWKT400001 ATTACHMENT EXTENSION W1537 ,�-sJ3ji9s7 7/2211994 N 22,745,ao 20,470,50 2,274,50 CWKT5a0001 FINISH ER FINALSIDWELLWJS 8/1511994 N 3,87°,03 9,483,03 387,00 CWKTSOQG02 FINISHER FINALBIDWELLWf5 211011995 N 28,432,50 25,589,25 2,843,25 CWKT500003 PAN HYDRAULIC VIBRATOR W[5 6114/2001 N 30,460,00 27 ,414,00 3,046,°4 CWKTfi00002-MOLD CURB W/fie94 312212000 N 3,591,31 3,232,1a - 359,13 CWM00003 MOLD PARAPETWjfii36 15,312,00 5128/2801 N 13,780,80 1,531,20 CWKT600004 MOLD CURB 31 IN F16894 PAV 8 /46 2003 N � 22,415A0 20 ,173,50 2,241,50 D08000a001 DOZER 70 HP FOS LT 711/2016 U 5,942,52 5,348,26 594,26. D0900a000i DOZER 85 HP D4K XL 1 N fi00,QO D090000002 DOZER90 HP D5G 3[i6/2009 U 121,771.74 54,4Q0,O0 66,974,46 ' D105000001 DOZER 1 aQ HP DSK2 LGP 12/15/2017 N 38000,00 , 34,200,00 3,800,00 D1aS000003 DOZER 0a0 HP D5K2 LGP 12/15/2017 N 45,650,61 27 3 ' 91,00 18,260,61 [}0°5000004, DOZER 100 HP DSK LGP 3118/2013 U 45,fi52,93 27,391,94 18,261,09 D105000005 DOZER 100 HP D5K LGP 3118/2013 U 70,8fi0,00 55,802,16 15,057,84 D105000006 2014 CATERPILLAR D5K2 LGP DOZER 12123 f 2019 N 831500,00 65,819,06 17,760,84 D105000007 DOZER i0a HP DSK LGP X41112017 U 23,433.56 21343,36 21,090,20 Di05Q°0008 DOZER 100 HP D5K2 LGP 4/1/2017 U 106,713,64 41,160,96 65,552,68 103,010,60 39,732.72 63,277,88 t • Rieth-Riley Canstructlan Ca,, Inc. Equipment list 3/31%2020 Asset DeZER Acquired New or 0 100 0105000009 DOZER 100 HP D5K2 LGP . Acquisition Date 4/1/2017 Used U Cast Accum De Pr NBV D1050a00iO DOZER 100 HP D5K2 LGP 4/1/2017 U 102,941.29 89,705,84 63,235,45 p1050000i1 DOZER 100 HP D5KZLGP WfRI 4/1/2017 U 109,873,34 42,379,68 67,493,66 D10500(3013 2015CATERPILLAR05K2LGP DOZER -USED 9/30/7019 U 118,547.46 45,725,40 72,822.06 D130000001 2017 CATERPILLAR 06K2LGPDOZER 12119/2119 U 89,880,00 7,864,50 82,015,50 D185aaaa0l DOZER 150 HP 750K LGP 12/2712017 12/27/2017 U 444.44 3,555,56 D185000002 DOZER 150 HP DGN LGP 6/17/2015 U 91,fi67,94 38 ,475,36 58,132,58 D225000001 2014 CATERPILLAR 06TXLDOZER 41:1012019 N 219,271.13 132,476,18 86,754,95 1322ta0002 2014CATERPILLARDGTXLDOZER 12/2312019 N 101,497.95 30,449,40 71,048,55 17CZ0000001 TRUCK TRACTOR TANDEM' 311/2006 N 54,390,35 5,439.04 48,951,31 Dcz0a00002 TRUCKTRACTaRTANDEM 4/1/2003 N 23,443,91 15,629,27 7,si4.s4 Dc2atlaaaa3 TRUCKT.RACIORTg60EM• 3/19Jiaa3 N 89,897.66 80,907.89 8,989,77 DC70tl6aoa4 TRUCKTRACTOR DUMP 8115/2(104 N 29,128.16 19,968,36 9,159 80 DC20aOOPGS TRUCKTRACTOR DUMP 3/15/2010 N 77,633,36 25,2sd,4a 69 07 ' 0.39 1fi,853,fia E,562,97 DC200a00a6 TRUCK TRACTORTANoEM , 3/31/2010 N31,227,28 8,426,80 DC2000a007 TRUCKTRACTOR•TANDEM 3/3112010 N 21, 407,28 91820,00 DC2000008 TRUCKTRACi'ORTANDEM 313 1/2010 N 31,227,28 21,407.28 9,820'aQ DC20aa00a9 TRUCKiRAcraRTANDEM • _ 3/3112010 N 31227,28 ' 21,407.28 9,821,()0 ❑czlaaaall TRUCKTRAcrORTANDEM 3 31 2010 • 31,227.28 2:1,407.2a 9,820,00 cz Dallooil TRUCK TRACTOR DUMP 411/2/013 N 28,850,52 19,862,52 5,978.()0 TRUCKTRACTOR DUMP 4/112013 18,359,40 16 '520'76 1.,835.64 DC20000013 TRUCK TRACTOR TANDEM 4/1/2013N .18 ,356.40 356.40 ' 16 520,76 ' 1;835.64 pc2aaaa114 TRt1cKTRACTORTANDEM 2297868 ,. 20,680.81 2,297,87 DC21000015 TRUCK.TRAC'rOR DUMP 2/5/2913 N 34,862,53 31 ,376.28 3,486,25 DC2a000016 TRUCKTRAGTOR DUMP 215/2/13 N 31,542.6a 28,388,34 3,154,26 DC20000%7 TRUCKTRACTOR DUMP 2/5/2013 N 29,527,51 2Ei ,574,76 2,952.75 DC2000001a TRUCK TRACTDUMP 9/3022013 N 27595.81 24,836,22 ' 2,759,58 Dc2aaa0019 TRUCK TRACTOR DUMP 311212010 N 33,173,90 , 29,956,53 3,317,39 DC20aaa02a TRUCKTRACTOR DUMP 311212016 Ni 28,191.90 28,191,90 TRUCKTRicTORTANDEM 3/112016 N 28,191,90 9l 28,191.90 _ DC20000022 TRUCKTRAcrORTANDEM 4J26f2aifi N 46,412.76 41,771.48 4,641,2a DC20090023 TRUCK TRACTOR TANDEM 412622016 N 155,329,40 69,898,20 85,431.2a DC20aaa024 TRUCKTRACTOR 412212(3ifi N 155,329,40 69,898,20 85,431,20 hC20003025 TRUCKTRACTOR 4122/2016 N .178,626,00 8(),381.76 98,244,24 OC20000026 TRUCKTRACTOR 4/2212018 N 178,676,00 '. 80,381.76 9a 244,24 DC20600027 TRUCKTRACTOR 4122 2016 1 N 178,626.00 80,381.76 98,244.24 OC20000028 TRUCKTRA,GTORT/A Sfief2al7 N 178,626,00 51381.76 , 98,244,24 pC20000029 TRUCKTRACIORTANDEM 421/2006 U 160,608,54 52,699.73 1a7,9a8,91 Dc2aaaaa3a TRUCK TRACTOR TANDEM 4/1/7006 U 5,730.00 583.0() DC29aaaa3l TRUCKTRACTOR TANDEM 4/if2aa6 U i3,78a.aa 2,402. 10,411.00( 3,279.00 pc20000032 TRUCKTRACTOR TANDEM 41112109 U 22,79a•aa 20,511,00 2,279,00 DC2000a033 TRUCKTRACTOR TANDEM 411/2006 U 63,fia1,00 97,240,00 6,360.00 DCZ000U034 TRUCK TRACTOR TANDEM 4/112006 U 71,190,0❑ 64,071,0( 7,119.00 pc2aaaaa35 TRUCK TRACTOR TANDEM. 1129 2Q08 / U 71,550,aa 64,395,00 7,155,0() DCZ00tl0036 TRUCK TRACTOR TANDEM 311612nna U 57,24a,aa 51,516,00 5,724.00 DC20000037 TRUCK TRACTOR TANDEMslip/2009 311 612 0 0 9 U 8,480,00 7,632,00 848,0() QC20a00038 TRUCK TRACTOR TANDEM 3 31 2x05 U 8,481,00 7,632,00 84S,00 DC310a0001 TRUCK TRACI'ORTRIAXLE 3 '312,50 — 2,981,25 931,25 So ..., ..�..�� 39'e,i� s , -• .. DC300a0aa4 TRUCK TRACTOR 4/22/2016 jv N 171,877.16 7895 s,is 92,921.01 ocza0a0a40 TRUCKTRACTOR 4122/2016 • N 17s,62s•aa 80,381.76 99,244,24 DCW200000i TRUCK WATER FIFTH WHEEL 5/1/7001 N 179,626.0a 8038 + 1.76 98,244,24 DCW2aadaa2 TRUCKWATER FIFTH WHEEL 6/312(302 N 23,150,89 16,020,77 7,13(,12 DCW,20aaa03 TRUCK WATER FIFTH WHEEL 61312002 N 34,281,75 32,781,78 1,400,❑( DCW20aaaa4 TRUCK WATER'FIFTH WHEEL 6 37002 f f N 84'281'78 25,732.7a 8,549.00 pcW2aaaaa5 TRUCK WATER FIFTH WHEEL 2/16/2004 N 34,281.78 21,066,47 25,732,78 8 549,00 ' , DCW300aa01 TRUCK WATER FIFTH WHEEL 5/1/1955 N 1(35 10,537,10 10,469,37 DCW3000002 TRUCK4YATER FIFTH WHEEL 2 /1 612 0 0 0 N 83,758,84 75 3 , 82,95 8,375,89 DCW3000003 TRUCKWATERFIFTHWHEEL 2/16/2000 IV 40,535,84 4(),615.86 3209s. 32,0926 6,436,58 DCW3aaaa04'TRUCKWATER FIFTHWHEEL 51112(301 N' 9'26 8,556.60 DCW30aa005 TRUCKWATER F1FrHWHEEL 5/112001 N 27,596,52 20,250.89 7,345,63 DCW3000005 TRUCKWATER FIFTHWHEEL 3/16/2014 N 27+912.98 20,250,89 7,661,99 DCW3agaaa7 TRUCK WATER FIFTH WHEEL 3fi/20io N 98,058,95 87.573,95 1(,485,00 DCW3000008 TRUCKWATER FIFTH WHEEL 321Jz()io N 32,086,22 21,047,41 11638,81 DD35aaaaa8 COMPACTOR VIER 35111' RD12A-9 51112017 N 37,123.93 S5,042.6.9, 2,081.28 DD-9500009COMPACTORVIBR 95101 RD12A 9 5/3/2018 N 17,596.00 11,547,43 6,048.57 DD480aa00i COMPACrORVIBR4811'ICB24EI 5/17/2116 N 17,914.0❑ 7,725,47 10198,53 D048106002 COMPACTOR VIER 4an11 CB2413 5/1712/19 N 42,191.1E 37 ,181,0( 51010,18 OD48100003 COMPACTOR VIER 4a111CB248 5/17/2016 N 42,589,21 37,531,73 51057.48 0a48adaa04 COMPACTORVIeR4a""CB248 511712016 N 42,589,21 37,531,73 5,057.48 D048000005 COMPACTOR VIBR 48111 CB248 5 f 1712016 N 42,191,18 37,181,00 5,Oi%ia 00480aaaa6 COMPACTORVIBR 481111 CB248 5/i7120113 N 42,i91,is 37,181,10 5,aia,la 0048000007 COMPACTOR VISR4all"CB24B42,589.21 5/2312016 N 37,531.73 5,057,48 0048/06008 COMPACTOR VIER 4a"'IC8248 512312016 N5,010,18 42,191.1a 37,101,aa D048000009 COMPACTOR VIBR 48111 CB24B 5123/2016 N 42,191,18 97,181.00 5,010.18 DD48aa00i0 COMPACTOR VIER 491111 C824 5/23/216 N 42,191,18 37,181,00 5,01a.is D048000011 COMPACTOR VIER 4alm CB248 5/23J20is N 42,191.is 37,181.01 5,610,18 42,589,21 37,531,73 5,057,48 Riel6-Riley Construction Co., Inc. ' Equipment Usi 9/31/2020 Acquired New or Asset 9 Description Acquisition Date Used ' Accum DeprREV D0481100012 COMPACTOR VIBR 4811" C824BCast 5/17/2016 N 42,191,18 37,181.00 13048000013 CQMPAcTOR VIBR 48"" 08248 5/17/2016 N 42,191,18 37,181,°0 5 010,18 D048000014 COMPACTOR VIBR 48"'! C8248 5/23/2015 N 5,Di0,18 D048QOOOi5 caMPAcrOR VIeR 4a""C824B 5/23/2016 N 42,589,21 37,531,73 5,057,48 DD48°0aai6 CdMPACI'ORVIER 48""C824B 42,191,16 217,181,aa 5,010,18 D04900QO17 COMPACTOR VIBR 48"" C824B 5/2412018 N42,191,18 37,161,00 5,aia,ie /3048000018 COMPACTOR VIBR 481111224 3/16/2009 U 42,574,90 18,360,44 24,214.46 13051000001 COMPACTOR VIBR 4111" 0834815,800,°0 4/2912016 N 15,800,°0 _ DD51000002 COMPACTOR VIBR 51"" C8340 4/29/2ai6 N 56,168,34 50,551,51 5,616,83 13051000003 COMPACTOR VIBR 51"" 08348 4/29/zai6 N 56 698,23 ' 51028,41 ' 5,669,82 13051000004 COMPACTOR VISh 51"" CB348 4169/2016, N 56,168,34 '56699,23 50,551,51 51028.41 5,616,83 /)051906405 CdMPAGTOR V18R 51"" C824B 4/29/2016 N L ' ' 5,669,82 D051000006 COMPAcroAV18R51""08348 130510°0°07 COMPACTOR VIBR 51"" 4/2912016 N 56,698,23 56,698,23 51,028,41 51,028,41 5,669,82 C8348 DD5i0°0008 COMPACTOR VIER Sill" C8348 5/6/2016 5/612°16 N N 5fi,1fi8,34 49,498,40 5,669.87. 6,669,94 DOSI000009 COMPACTOR VIBR 5111" C8348 5/6/2016 (I 561198.23 49,965,35 6,732,88 D051000610 COMPACTOR VIBR 51""'CB348 5/6/2016 N 56 698,23 + 49,498.40 6,732,88 D05ia00x11• COMPACTORVIBR51""CB348 8/3/2017 U 56,168,34 491498,4° 6,669,94 „ • DOC_.9=001 2019 CATERPILLAR CC34B 541 VIBR COMPACTOR 10/4/2019 N58,39-2.0412,108,°8 18,182.80 E,454.72 13059000001 COMPACTORVIBR 59"" CB7 5/2412018 N 3 284,58 ' 55,107.46 0059000002 COMPACTORVIBR59""C87 7/17/2018 N 123847,15 + 123 8 47,15 26,704,61 24,382,47 97,142,54 DD59aaa°03 COMPAcrORVIBR59""C87 7/17JZQi8 N , 123,847,15 24,382,47 99,4s4.se i„ 13Ds9aaoaa4 COMPACTOR VIE R59 087 6/3/2018 N 123 847,15 25,543,54 99,464,68 0059a00a05 2019 CATERPILLAR C87 59" VIBRATORY COMPACTOR 5/2412x19 N 123,847.15 11,610,70 98;303,fi1 0066000003 COMPACTORV161'6fi""08548 „ 4/30/2018 U 129,157,97 42 951,39 112,236,45 0066000005 2018 CATERPILLAR CBiQ 67 VIBR COMPACTOR 8/30/2019 N 21924,6° ' 80,206,58 DD66aaa006 2018 CATERPILLAR 0810 67" VIBR coMPAGTOR 8/3 012 0 1 9 N 4,872,1fi 17+x52,44 ,i„ D07800tl001 COMPACTORVieR78 CC522HF 3/31/2010 N fi,000,00 1933,3fi 4,666,64 D078tl00007. COMPACTORVIBR78""CC562HF 11/15/2012 N 42529' ,83 22,154.00 32584,83 ' 20,064.00 9,945,x° .13078000005 COMPACI'ORVIBR78""HO120V 4f242ZQa7 N 137,749,50 12-9,974-95 2,090,a0 • 0078Q000a6• COMPACTOR VIBR 78 HW20V 1125/2007 / N 137 749,5° , 123 974,55 13,774.95 D07800d007 COMPACTOR VIBR 78"" C8534D „�, 2/i/2010 N 5fi3Ofi8,0a ' 4456fi3OQ 13,774,95 130780000Q9 COMPACrOftV(BR78 C8534D ,,,• 421/2009 N 25,i67.i7 ' 25,167.57 11,502,00 13D7eaaoxla COMPACIORVIER 78 085340 41112009 N 25167,47 25,167.17 _ DD78000012 COMPAC.TORVIBR78""C854XW 3/5/2010 N 36542,64 -9 5,542. _ DD78000020 COMPACTOR VIBR 7811" CB54XW 4/261201(3' U 92 +60 7'05 55,564.32 0078000021 COMPACTORVIAR.78"'[CB54XW 4/26/2016 U 82735,22 37,°42,73 1)078000022 COMPACTORVIBR78""CB54XW 8/312017 U 74461.70 5969,28 8,273,52 D078000029 COM PACTORVIBR78 CB54XW 4/26/2016 U 19,897,85 ' 13,928,57 D079000024 CaMPAcTaR VIBR 78"" ca54 XW 4/26/2016 U 49,4$0,71 44,532.64 4,940,07 DD78000025 cam PAcrORV113R78""CB54XW 4/26/2016 U 81,Q58,58 72,952.72 8,705,86 ' 0078000026 COMPACTORVIBR78""CB54XW 6117/7016 U 79705,45 53+241.72 47,823,36 31,882.10 D078000027 COMPACTOR VIA R 7a"'1 CB -54 XW 5/12/2016 N ' 144749,60 47881,95 + 63,780,41 5 36°,17 13078=028 COMPACTOR VIBR 7&1 C13 54 XW 5112/2016 N 143+96'90 801969.19 ! 0078°00029 COMPACTORVIBR78""CB54XW 5/12/2016 N 144,749.Eu 63,184,33 63 80,212,47 DD780aaa30 COMPACTOR VIBR 78"" CB54 XW 511626016 N + 780,41 80 969,19 DD7800003i COMPACTOR VIBR 78"" CB54XW 813/6017 U 143,373,48 63,173,99 801199,49 7 �; 11 .11, . P o „ ;,";, �5A',,, - DOl f.:. __ `',l; ": :=i'f=:: V _i:: _, C�� : AT., q �- • , -'"" � � � �; 2G.aaz,48 1(lAa�96 , . 15;6[1 .5- 13078000033 COMPA.CTORVIBR78i'°CB54XW 5/12/2016 N , 44 743,50 144,749.60 63 78Q,4i 63,780,41 80,969,19 80,969,19 D0780°0034 COMPACTORVIBR78 C854XW ,,, 00780°0035 CoMPACTORVlBR78 CB64B 81312017 8/3/2017 U U50892,04 22,547,55 9 019,00 33,568,55 0078000036 COMPACTORVIOR78i"'C864B 8/312017 U 17,448,64 ,443.40 D0780°0037'COMPACTORVIER78 C854XW 4/19/2018 U 49,782.61 17068,36 1636.96 32'714,25 DD78Q00038 COMPACTOR VIE 78'lll C854XW '411912018 U.637.12 1,274.08 0078a00Q39 COMPACTORVISR 78""CB648 4130/2018 U 2114844 10 221,96 10'9Zfi,88 D078°aaa40 COMPACTOR VIER 78""CB648 4/3012018 U ia5190,06 10319°7.80 26109,72 25,791,47 79,°8x,34 1)D7saaaa4l COMPACTOR VIBR.7a"" CB648 4/30/2018 U ias 5 25,66 78,116,38 u1 0078000042 COMPACTORVIBR78 08648 4/30 2018 / U , 143,648,86 27,185,87 35,655,63 8233979 ' ' 13078°00043 COMPACTOR VIE R701106648 4/3 017 0 1 8 U 107,993,23 13078006044 COMPACTORVIBR78""CB64B 413012018 U 144,978,29 35 9$5,66 + 108,992,63 13078x°°°45 COMPACTOR VIBR 78"" CB648 4/30 2018 J U 152,169,55 156,790,68 37,770 ,65 38,917,66 114,398,90 0078000046 COMPACTOR VIER 78""CB64B 423Of 2018 U 153,568,85 38,117,94 117,873,02 /3078000047 COMPACTOR VIBR 78"" CB648 4/30/2018 U 156 529,53 39,349,27 115,450,91 D078000048 COMPACTOR VIBR 7811" 00120C 4/2712018 U1091275,89 28 095, 119,180.26 DD78000049 COWPACTORVIeR78""D0120C 4127/2018 U 1091296,22 28,104,72 D070000050 COMPACTORRVIBR78""ODi20c 4/27/2018 U ia4r686,66 26,919,3fi 81'176.45 +191,50 DD78000051 COMPACTOR VIBR 78"" DD120C 41271201EI U 108 989,13 29,025,76 77+767,34 DD78000052 COMPACTOR VIBR 78"" C8534C 3131/2005 U 1110x0,00 9+900,00 80,963,37 D08400000i COMPACTORVISR 84"CC722 11/i5/6012 N 3i1565,0a , 28,615,00 1,100,00 DD8 000002 COMPACTOR VIER `� 11/15/2012 N 31'565,00 28,615.00 2,950,00 13084°00003 COMPACTORVISR R4""C864 4/19/2018 U 36,735,07 fi;443,04 2,950,°0 00840x00°4 COMPACTOR VIER 0111 c864 4/19/2018 U 3,0 35,2fi5,fi8 10,692,03 ,,, 13084000005 COMPACTOR VIER a4 HO•�igal 4/30/2018 U i3,7627fi2.a5 '10,048,35 24,385,46 01=0000i TRUCK DISTRIBUTC) RSIN itLE 7/15/1996 N 5,151,94 g ,713,70 DISia00002 TRUCK DISTRIBUTO RSIN GLE 5/1/20°1 N 4,fi36,75 515.19 0151000003 TRUCK OISTRlBUToRSINGLE 5 1 B/i/2001 N 33,020,63 26,049,23 6,971,00 DI510aa004 TRUCK DISTRIBUTORSINGLE 5/3/2001 N 33,x20,23 2fi 049,23 + 6,971,a0 39,333,94 26,362,94 6471,00 Rieth-RileyConstruction Co,, Inc. ' .•- EquipmentList - 3%31/2020 • Description Acquisition Date Acquired New or Used Cast Accum De p r D5 D15100 0005 TRUCK DISTRIBUTOR RIBUTOR 51NGLE 5/1/2001 N Nav DI51700006 TRUCK DISTRIBUTOR SINGLE 5/1/2001 N 93,020,23 26,049,23 6197100 DI51a70007 TRUCK DISTRIBUTOR SINGLE 5/1/2001 N 33,333,94 26,362,94 fi,971,a0 DIS1000008 TRUCK DISTRIBUTOR SINGLE 5/1/2001 N 33,020,23 26,x49,23 6,971,00 DIS1000009 TRUCK DISTRIBUTOR SINGLE 5/1/2001 N 83,320,23 26, 6,971,00 DI5300007.0 TRUCK DISTRIBUTOR SINGLE 91311997 N 33,333,94 26,3049,2362,94 6,971,00 DISM00o11 TRUCK DISTRIBUTOR SINGLE 5/411998 N 37,592 40 29,727,90 7 864,50 DISi000012 TRUcKDisTRIeUTORsINGLE 712/2001 N 81,x90,00 7298100 ,, 8,109,x0 DIS1700013. TRUCK DISTRIBUTOR SINGLE 219120a4 N 41, 7,650,00 D1S1700014 TRUCK DISTRIBUTOR SINGLE 211/2005 N •.,, Z1,2aa 200.,00 13,529,61 13,100,06 8,10a,tl0 DI51a0tl07.5 TRUCK DISTRIBUTOR SINGLE 4f30f27G6 N8,50x,00 8 1,361.44 22,561,44 DIs103g016 TRUCK DISTRIBUTOR SINGLE 3/25/2010 N44,375,36 ' 27,379,90 27.,379,20 44375, _ DIS1000017 TRUCK DISTRIBUT611 SINGLE 3/1/2016 N , , 36 DI51000019 TRUCK DISTRIBUTOR SINGLE 411f2oa6 U 55,643,T3 50 079,54 5,564,39 DISI000020 TRUCK DISTRIBUTOR SINGLE 9/1612009 U 66,250,00 59,625.0a 6,625,00 DI51a00a21 TRUCK D15TRIBUTOR SINGLE 91161 2009 U 63,600,00 57,240.00 6,360,00 D151000022 TRUCK DISTRIBUTOR SINGLE � 8116 Z0o9 U 10,600,03 9,540,00 1060,00 J DI52000001 TRUCK DISTRIBUTOR TANDEM 8/5/22013 N 31,800.70 26,620,77 3;180,00 DI52000002 TRUCK DISTRIBUTOR TANDEM ' 3/5/2013 N 28,961'74 26,x65,57 2,896.17 Dl52a0a003 TRUCK 9/3012013 N 28,961.74 26,065,57 2x896,17 DIS200o004 TRUCK DISTRIBUTOR TANDEM 9/30/2313 N 22,292.83 25,463,60 •2 829,20 DI52000005 TRUCK 015TRIBUTOFCTANDEM 91301=3 N 55,717,46 5x,140,32 5,571.14 DI52030006 TRUCK 0lSTRIBUTOR TANDEM 12/27/2017 N 56,237,04 .50,613,34 5,623,70 D152000007 TRUCK DISTRIBUTOR TANDEM 12/27/2017 N 1i5 031.25 53 625,04 61,406.21 DI527a0008 TRUCK DISTRIBUTOR TJA 6/4/2017 N61,872,43 1i6,116,44 54,243,96 0152000309 TRUCK DISTRIBUTOR T/A 6/412017 N 215,510,16 68,593,94 146,816,22 DIS2000010 TRUCK DISTRIBUTOR T/A 61412017'1 215,510,16 68,693,94 146 816,22 DISzaoo011 TRUCKDISTRIBUTORTJA 7/23/2618 N 215,510,1fi 68,693,94 146,216,22 10152000= TRUCK DISTRIBUTOR T/A 7/23/2018 N 211,926.79 44,64621 1fi7,220,58 0152030013 2020KENWORTHT470TfADISTRIBUTORTRUCK 6/25/2019 N 2.79 44,646,22 1fi7,280,52 0152000014 2020KENWORTHT47a1'/ADISTRIBUTORTRUCK 6125 2719 N 224,072072.fi5 12,906,12 205136� ,53 DPT0000001 DISTRIBUTOR PULLTYPE 5/111997 N 224072,65 21006,81 203,065,84 DPTUaOGaO2 DISTRIBUTOR PULLTYPE 5/1/1997 N 21,451,50 19,306,35 2,145,15 DPToa0a003 DISTRIBUTOR PULLTYPE ` 511311998 N 21,451.50 19 306,35 2,145,15 DT100=12 TRUCK FLATBED DUMP 4/1/2006 U 23494,52 7d,32o,3a 21,145,07 62,01a,00 Z+349,45 DT2aoaa0Oi TRUCK DUMP TANDEM • 71212aai N42,770,47 8,310,30 DT200aax02 TRUCK DUMPTAN05M 2/912004 N 35 274.47 6,296,00 DT2000o0o3 TRUCK DUMP TANDEM 219/2aa47,1 N 22,37142 15,2aa,5z 6490 DT20000004 TRUCK DUMP TANDEM 41112xo3 U 22,396,75 55,'800.00 15,119,85 53,800,00 7,276'93 DT20000a05 TRUCK DUMP TANDEM 51212a15 U5,00x,00 10,5x0,00 .1Q500,o1 DT20000008 TRUCKDUMPTANDEM 41112m 5,300,00 4,770.00 DT20000009 TRUCK DUMP TANDEM 4/1%2006 U i0,600,70 9 540,01 537,70 WHOM= TRUCK.DUMP TANDEM 4/122006 U 47,700 00 42,933 o0 1,760,x0 DT200110011 TRUCK.DUMP TANDEM 4/1/2x06 u4,770,00 45,333,x3 43,545•x0 DT20000013 TRUCK DUMP TANDEM 3131/2005 U- 5,3xa.ax 4,773,01 4,505,x3 DT2gon0o:LA TPlIrK NIhAnTAhlDch.4 DT2000a0i5 TRUCKDUMPTANDEM 3131%23x5 3131/0005 U U 7,089,28 6 380,35 , 53n n0 718,93 DT3000a301 TRUCK DUMP TRIAXLE 2/1/2005 N ,949 8,28 40 908,91 7,334.35 29 768,91 814,93 DT30000002 TRUCK DUMPTRIAXLE 21119 p_q ra11,i4a.0x n"1301x1009 TRUCK DUMP YRIAXL6 /2005 N 40,908,91 29 7fi8,91 +'Ix,ax DT30000004 TRUCK DUMP TRIAXLE 4/1/2013N .11;L40.00 DT300000a5 TRUCK DUMP TRIAXLE 8f 2912x15 N 2fi 89fi,aa 1fi40 0 24,206,47 86 2,fi89,6x DT300a00a6 TRUCK DUMP TRIAXLE 812912015 N ,fi%0 164,6000 415,16 88,147,36 , 78,184,R4 DT30070007 TRUCK DUMP TRIAXLE 812912015 N 167,500.00 27 937,3fi 79,752.64 DT30q=08 TRUCK DUMP TRIAXLE Hf29f2015 N 168,153,x3 ' 88,278,8¢ 79,562,64 DT300a0009 TRUCK DUMP TRIAXLE 512912x15 N ifi7,25oXG 27,206,34 79,271.16 DT300x0010 TRUCK DUMP TRIAXLE 8/29/2015 N 1fi7,7fi2,0x 88,075,12 79,443,68 DT3000001i TRUCK DUMP TRIAXLE 812912015 N 167,550,00 B7 9fi3,6a 79,686.88 DT30aao012 TRUCK DUMP TRIAXLE 8129 f 2015 N 167 400.01 87 885,16 79,9816,42DT30000013 TRUCK DUMP TRIAXLE 412612016 U 120548,40 75,945,54 74+514.84 DT300ox014 TRUCK DUMP TRIAXLE '4fi/2x17 U 105,513,fi0 40,69a,o0 44,fi0Z,8fi DT3000a015 TRUCK DUMP TRIAXLE 411/2017 N 163,531,fi4 55,191,96 fi4,815,fio OT377a00ifi TRUCK DUMP TRIAXLE 4/1f2o17 N 163,531,64 55,191.96 1081339,68 DT30000017 TRUCK DUMP TRIAXLE 411J2aa6 U 25,500,00 23 85a,ad 108,339,68 DT40300001 TRUCK DUMP QUAD 9/1/2006 N 94,041,3o 22 694;21 2,fi57,aa DT40a00002 TRUCK DUMP QUAD 321/2006 N 34,041,30 22,694.20 11,347,10 DT40000003 TRUCK DUMP QUAD 3I1/2106 N 34,041.3o 22 694,2x 11,347,10 DT4001xx04 TRUCK DUMP QUAD 31112036 N 34,041.30 22694,20 ii,347,i0 DT47aoaoos TRUCK DUMP QUAD 3/122006 N 34 041,34 22'694 20 11,347,10 13*000006 TRUCK DUMP QUAD 311/2006 N 34041.30 2z 694,23 11,347,10 DT4a0oa/07 TRUCK DUMP QUAD 411/20x4 N 120,729;10 107,492.99 11,347,11 DT40000008 TRUCK DUMP QUAD 3/31/2010 N 41,689,36 28,899,38 i3+236.11 D%000009 TRUCK DUMP QUAD 7/3/2011 N ,79O,a0 DT400000i0 TRUCK DUMP QUAL) 713/2011 N 38,723,40 25,815,41 1Z0 DT40000011 TRUCK DUMP QUAD 713J20ii N 38,723,40 25,815,4 2,908,00 12,908, ,9oB ao DT47000012 TRUCK DUMP QUAD 713/2x11 N 38,723.40 25,815,43 i2,918,a1 DT400aa013 TRUCK DUMP QUAD 41112013 N 38 723,40 25 815,41 12,709,70 27,097,00 24,3a7,33 Rieth-Riley Construction Co., Inc. Equipment list 3/31j202Q Acquired New or Asset 11 Description p Acquisition Date Used Cast Accum Der DT40000OU TRUCK DUMP QUAD 4/1/2013 N 27,097,00 24,3s7,3o NBV DT4a00a015 TRUCK DUMP QUAD 4/112013 N 27,097.00 24,387,30 2'709.70 DT400000i6 TRUCK DUMP QUAD 4/1/2013 N 27,097.a0 24,387,30 2,709.70 DT4a0000i7 TRUCK DUMP QUAD Bfi/za16 N 60,243,87 54,219,48 DT4a000018 TRUCK DUMP QUAD 3/1/2016 N 80,243.97 54,219,48 6,024.39 6,024,39 DT40000019 TRUCK DUMP QUAD B/i/20= N 60,243.87 54,219.4a 6,024'39 DT4000a020 TRUCK DUMP QUAD AXLE ? 2/29%2016 N 183,196,00 82,438,08 6,.324.39 DT40000021 TRUCK DUMP QUAD AXLE 4/1/2018 U 100,757,97- DT4000o022 TRUCK DUMP QUA❑ 7/23/2018 N B0,950.00 46;990,88 ' EX08000001 EXCAVATOR OW17308E2 4/112017U 17 185,701.aa39,151.35 M6,579.656579.fi5 . EX08000002EXCAVATO5OW17308ETC 411/pa7 U 85,392,25 81,820.14 32,937,12 9i,559,16 52,455.13 EX13000001 EXCAVATOR OW 25-3d 312CL 3/31/2005 U50,260,98 EXisiiaad0l EXCAVATOR OW 30=35 314ELCR 9/27/2013 U 76,50a,7a a 500.00 EX15000002 EXCAVATOR OW 30-35 314E LC 4/27/2018 U92,773,25 185,071,94 152,298,E9 EX23a00001 EXCAVATOR OW 40-55 32GEL 6/1/2016 N 59,397,86 22,868,16 36,529,70 EX23000002 EXCAVATOR ON/ 40-55 320ELRR 8/112016 N74,000.9a 106,623,27 312,122,76 70,371.40 36,251.87 EX23a00003 EXCAVATOR OW 40-55 32CELRR 8/1/2016 N 104,493,47 74 000,96 ' 68,965,60 38,121,80 EX23000004 EXCAVATOR OW 40-55 32CELRR 4/26/2036 U 167,949,13 100,409.40 35,527,87 EX23000005 EXCAVATOR OW 40-55 320ELRR I _ 7 .4129/2016 U .167,949.x4 Sao 769,88 66,939,73 • EX?3000.3.36 EXCAVATOR OW 4a-5532aELR 4/19/2018 U 8 255,61 67,179,96 EX23000009 EXCAVATOR 23 MT323F 1(1/2019 U 25,688,55 4,128,92 5,613.81 EX40000a01 EXCAVATOR OW 70-85 33 GEL 8/1/2016 N35 2,777,96 300 833, 8 21,560.03 EX40000002 EXCAVATOR OW 70;85 33GEL 6/1/2016 N 152 478.65 109 635,92 51'944.48 EX40aa0003 EXCAVATO11 OW 70-85 33 GEL 8(1/2416 N 152,495,15 ' 100,646,Sa• 51,x42.73 EX40000004 2014 CATERPILLAR336EL40MTON EXCAVATOR 12/2312019 N 54,143,74 5,414,36 51,948,35 EX4aaaaaa5 2014 CATERPILLAR 336EL40 M TON EXCAVATOR 12/2312019 N 57,837,89 5,783,80 48,754.39 EX40000006 EXCAVATOR OW 70-85 336EL. 2/1/2016 U 210,i48.00 126,ae8,80 57. ,054.09 EX4000s010 EXCAVATOR OW 70-65 32SOL C 4/1812018 U84,059,2.3 6,976.09 2,685,77 EX40a00013 EXCAVATOR 40 MT -136F 1/112.319 U 77,015,14 , 12,377,40 4,290,32 EX4000 014 EXCAVATOR 929D' UCR 40 METRICTON31512050 U 175,000,00 4,375,aa 64,63734 EX50000001 2013 CATERPILLAR349EL5OMETRICTONEXCAVATOR 12/23120i9 N ,1. 6,811.48 170,655.00 EX50000002 2013 CATERPILLAR 349 EL So M TON EXCAVATOR i7 -/7-i/2.319 N 79,418,40 7,941.94 61,373,38 FIN0000001 PAVER CONCRETE FINISHER SR 412611995 N 36,870.75 33,182 59 71,476,56 FINOO00002 PAVER CONCRETE FINISHER 36 3/2912.316 N3,687,80 368,889.44 86,203,37 FKL0000001 FORKLIFT 2/2 811 9 8 4 N 21,997,50 19,7.97,75 82,685.07 FKLouaaaa3 FORKLIFT 412312902 N • 22,832.72 18,627.72 21199.75 FRK4000001 ATEACHMENTFORK5 4JiJ2aaa U 400,ao 4,205,oa FUELGGOG FUELTANKSW/6578 DUMPTRK 11/21/2018 N 5,999.45 5,399,5.3 400,Oa GEN000000i GENERATOR 4/21/1976 N 10,413,52 10,413,57. 599.95 GENaooga02 GENERATOR 3/6/1978 N 38,734,50 38,734,50 GEN000aaa5 GENERATOR 7/29/1995 U 15,000,00 13,500,00 HOGZOa0001 TRAILER LOWBOY 5/2 811 9 8 7 N 40,415,58 36,624.54 1,500.00 HOGM0002 TRAILER LOWBOY 7/1511956 N x,249,49 5654,54 4'041'56 HDG2000GO3 TRAILER LOWBOY 5/1122.31. N 15l137,14 11533.14 654.59 HDG200a004 TRAILER LOWBOY HDG20a0205 TRAILER LOWBOY 411.31199'1 4/10/1997 Cj37,667.55 37 667,55 ' B3,900.79 VO4 nn B,766,76 HOGz0a0a06 TRAILER LOWBOY 4/1/2006 N U 37,667,55 19,080,0(1 33,900,79 17,172 oa 3,766,76 HDG300000i TRAILER LOWBOY 412211991. pl (rtna5 _ _ :;` _�_;= 1,978A0 HDG30aa0aZ TRAILER LOWBOYs. HOGM=03 TRAILER LOWBOY 511911 9 9 5 5/19/1995 N N . 49,234,98 48,458,76 v, llall ��7776,22 7 22 HDG3aa0004 TRAILER LOWBOY 5/1/20.31 N 30,296,02 21,211,01 91266.42 16,161,01 1,.329,6.3 HDG3000005 TRAILER LOWBOY40T 5/1/2001 N 21,211,71• 36161.01 5,050,00 HDG30a0006 TRAILER LOWBOY 5/1/2001 N 18,298,76' 33982,76 5,.350..30 HDG30a0007 'TRAILER LOWBOY 5/1/2001 N 18,298,76 13,992.76 4,31fi3Oa HDG30aa0ax TRAILER LOWBOY 4/1012007 N 17 022,22 11348.14 4,316,Oa HDG300a0tl9 TRAILER LOWBOY 3/19/2009 N 17,022,22 ilA69,32 HDG3000010 TRAILER LOWBOY 3131/2010 N 16,411,55 + 11,468,55 43.92'08 5,352,9.3 HOG3000011 TRAILER LOWBOY 4/112.3.39 N 24,012,41 24,717:41 4,943.00 HOG3000a1Z TRAILER LOWBOY GOOSENECK 4 3115/2010 N 20,223,00 20,223,00 HOG300a013 TRAILER LOWBOY 8/412015 N 82,607.73 43,369.2.3 HDG3000714 TRAILERLOWBOY 'TRAILER 814/2015 N 92,607,73 431369,2.3 99,298,53 HDG3000O15 LOW80YGOOSENECK 5 8/412015 N B3 309,09 ' 43 737,24 39,238,53 HOG3000016 TRAILER LOWBOY • 9/1/2015 U 44,520,78 ' 4a,oss.ao 39 ,572,85 HDG3000a17 TRAILER LOWBOYSOT 3/31%2.305 U 14 9afi,78 ' 13 416,10 4,452..3.3 HDG3000018 2017 XLTRAILER XLIIO LOWBOY TRAILER 6/312019 U Si,fii6,15 ' 7,651,50 1,490,88 HOG4000001 TRAILER LOWBOY 3/31/2005 U • 27,56a,0a 24,a04,00 73,964.s.9 HEV.0000001 TRUCKHY�ROVAC 2/1/2018 U 360025,80 90,637,56 2,756,0a H5T2000001 TRAILER LOWBOYHYDRAULICT 7/2412018 U Bz,iOD,aa 15,639,36 2693 88,24 HST -2000002 TRAILER LOWBOYHYDRAULICT 7/241201a U 32,ia0,00 12,652,5o 19,4E7.s4 NST2000003 iRAILERLoWBOYHYDRAULICT 3/31/2005 U 12,190,00 10,97100 11'447,50 LT30000001 LOADER TRACK 963KW/FORKS 4119120is U 68,940,87 22,a6i,04 ,214,07 MG2000000i GRADER 1200 3/3112.3.35 U 16,975,07 15,187,57 46'879,83 MG4=10001 'GRADER 140H 411/2004 U 217,043,47 189,039,12 1,687,50. MG40000002 GRADER 140H 411/2707 N z5z,346.7a 227,112,ia 21,004,35 MG40000003 2ai4CATERPILLAR 14aM2GRADER 12123 f 2019 N 6Z,fi18,2Z 6,261,a4 25,234,68 MG40000004 GRADER MOTOR i60M AWD 4/1912.319 U 496,13,* 496,13 56,356,38 MG400a7a0S GRADER 14.30 4/1/2006 U 40,0mcla 36,000,00 _ 4,800,00 Rieth-Riley Construction Co,, Inc, Equipment List 3/31/2020 Assetfa Description Acqufsitlon Date Acquired New or Used MG4,0000006 GRADER 140 3131/2005 U Cost Accum Depr NBV MG40000007 GRADER i40G 3/31/2005 U 20,188.00 18,169,20 2,018,80 MG40000003 GRADER140G 3/31/2005 U 28,125,00 25,312,50 2,812,50 MG4000GO09 GRADER165H 3/31/2075 U 61,500,00 55,350,00 6,150,00 M150000001 PATCHERJ,OINTSEALER 4/11/2013 N 1ai,aao,aa 90,9aO,0a 10,100,00 M1s00tlatla2 PATcHERJ01NTSEALER 4/11/2013 N 41,aia,25 41,810,25 MJSa000403 'PATCHER1ofNTSEALER 4%11/2013 N 4810,25 ' . ' 41,810,25 _ MIS000o004 PATCHER JOINT SEALER 4/11/2013 N 41,810,25 41,ala.2s _ M1Saax0705 pATCHERJOINT SEALER 4/1/2017 N 41,sia.25 41,810,25 _ M150000006 PATCHEftJOINT SEALER 4/1/2017 N .46,587,80 27,952,fi8 18,635,12 MIS0000007 2019 CINLINE M40HP10INT SEALER 121412019 U 46,587.80 27,952,fi8 18,635,12 MM950doad COLD PLANER ROTOMILL 3jif2d65 U 51,376,67 3,425,1z 47,951,55 MST0000o17 TRUCKSERVICE 711/2016 U 47,5ab,aa '15,000,00 42,75a,oa 4,750,aa MTA00a0001 MATERIALTRANSFER ASPHALT 12/15/2017 N 13,500,00 1,500.0c) MTAa9G0a02 MATERIAL TRANSFER ASPHALT 12/15%2017 U 171,415,61 114,277,08 57,138,53 MTA0000003 2012 WEILDER E2350 ASPHALTTRANSFER 12/23/2019 U _ 142,834.02 95,222168 47,611,34 MTA00aaG04 2012 WEILDER E2950 ASPHALTTRANSFER 12123 2019 U 75,039,06 8,337,68 66,701.38 MTA6000005 MATERIAL TRANSFER ASPHALT 4JaJ2ai5 N 65,520.38 7,280,04 58,240,34 MTAGaa00a6 MATERIALTRANSFER ASPHALT 4f2s12a1s N 519,680,31 324,800,28 194,880.03 MTA0000008 MATEftIALTRAN5FERASPHALT �^ 4/2 712 0 1 6 499 428,15 233 ,387,52 175,040,63 MTA0a00009 MATERIAL TRANSFER ASPHALT 512612ai6 ,N N 499,455,56 249,727,sa 245,727.sa MTAatlaatlia MATERIAL TRANSFER ASPHALT 5126 2016 499,455,56 244,525,02 254,930,54 MTc0aa00al MATERIAL TRANSFER CONCRETE 8121199460,13a 499,455,56 Zqq ,525,02 254,930,54 MTC(1000002 MATERIALTRANSFER CONCRETE 4%21/1995 N 179,694,00 19,s66,0a I4IT00000003 MATERIAL TRANSFER CONCRETE 11/5/2(101 N 243,376.79 243,376,79 .230,072,37 13,3a4.47 MTCOGGO004 MATERIAL7RANSFER CONCRETE ZJ2zjZais N 95,746.92 66,743,82 19,003,00 0078000001; COMPACTOR VIBR7a"'HDi20V 4'2%12/17_ 107,025,00 St17,Oz5,0a DD7aaaxtla2 COMPACTOR V►aR7s""HD12(1V 1211512017 N N • 32,677,00 29,410,02 3,267.78 0078000003 2014 HAMM HD120VO7s" VIER COMPACTOR 12/23/2019 U 25,304,16 11,808.60 13,495,56 OD78000004 2014 HAMM HD120VO 78" VIER CdMPA,CTOR 12/23/2019 U 25,853,40 2,585,36 23,268 04 0078000005 2014 HAMM HD12OVO 78" VIER COMPACTOR 12123/2019 U 24,783.13 2,479,32 22,374,61 0078000006 COMPACTORVIER 78""H❑+1201 4/3012018 U 24,783.13 2,478,32 22,304,81 0078000007 COMPACTOR. VIER 78"" HD+1201 4/30/2018 U 23,978,45 8,961,92 15,016,53 0078006018 20i9 CATERPILLAR Ca13.78" VIBRATORY COMPACTOR 5j24fZ039 N 29'417'09 10,620.94 17,796,15 0078000419 2019 CATERPILLAR 0813"78" VIBRATORY COMPACTOR 512412019 N 180,219.03 18,585,05 161 633,98 ' 4078x00020 2019 CATERPILLAR 0813 78 VIBRATORY COMPACTOR 5/2.412019 N 120,219.03 18,585,05 161,fi33,98 0078000021 2019 CATERPILLAR C813 78" VIHRAiORY COMPACTOR 512412019 N 18a,219,03 18 585,05 + 161,633,98 u 0078000022 2029 CATERPILLAR C813 78 VIBRATORY COMPACTOR 512412019 N 180,219,03 18,585'a.9 161,633,98 0078000023 2019 CATERPILLAR C813 78" VIBRATORY COMPACTOR 5124/2012 N 185,435,28 19 123,04 ! 196,312,22 0078000024 2019 CATERPILLAR C913 78" VIBRATORY COMPACTOR 5124/2012 N 185,435,28 19,123,06 186,312,22 OD78000025 2019 CATERPILLAR 0313 7a" VIBRATORY COMPACTOR185,435,23 51 2 412 0 1 9 N 19,123,06 166 312,22 0078000026 2019 CATERPILLAR CB13 78" VIBRATORY COMPACTOR 512412019 N 185,435,29 19,129,06 166,312.22 1 0078000027 ZOi9CATERPILLARCBi378 VIBRATORY COMPACTOR 5f24f2x19 N 185435',28 17 ,38 4.60 188,750,68 PA000Oaam CRUSHER 212/i971 Pf 195,435,28 17,384,80 188,050,68 PAS000xx01 PLAN T SCRcEiy PBF000Ga02 CONVEYOR BELT 11/5/2001 2/17/1978 N N 5x8&:57 48',295.44 tom" "" 27,211,44,V�� 506,6 7 11,084.00 PB5O000005 CONVEYOR WEIGH BELT 7/22/1980 N 10,456,00 10,456,ao _ 10,787,63 10;787,63 _ PCA0000021 CONVEYOR BELT _ - �" jJ 3'219/1975 `" N 1�.,....,,... '+'_ " 14,357,50 _ PCAO000022 CONVEYOR 8131/1978 N 12,115.43 19,400,42 11 ,173,32 942.11 pCA0000023 CONVEYOR 8131/1978 N 19 ,400.42 _ PCA0000036 CaNVEYOR 2/17/1978 N 19,400.42 16,456,00 19,400,42 _ pCA00tl0063 CONVEYOR 3/2011975 N 10,458,00 _ PCC0000020 CONVEYOR 3129/1980 N 15,485,23 14,281,08 1,204,15 PCM0000018.COMPRES50R AIR 185 6/2112017 U 14,35a,a0 14,350,00 _ PcR00000ii CRUSHER PF84Gaaaxl COMPACf'ORVIBRGRADE 84""C 1D 2.4 1976 13,684,6a 13,x00,00 12 ,384.80 1,300,00 PFE4000002 COMPACTORVISR GRADE 84T' C 1211512017 12/1512017 N N 59,307,62 3 ,63x.00 35,632,68 _ 23 755,14 � �� PF94000003 2014 CATERPILLAR CPS6 B4 PADFOOTSOIL COMPACTOR 12123/2019 U 67 ,202,68 40,321,88 26,660,98 171`84000004 COMPACTORVIBR GRADE 84"" C 3/3112005 U 30 ,766,91 31076.68 27,690,23 PN70000001•COMPACTORPNETIREDP53008 3/31/2005 U 5x,000'aa 45,oaa,ao 5000;00 PN90000001 COMPACTOR PNETIRED PT140A -412311999 U 36j471.00 32 823.90 3,647,io PM90000002 2013 CATERPILLAR PS150C PNEU COMPACTOR 12/23 f 2019 U 21,915,11 19,723,60 2,191,51 PNSOaaaa03 2013 CATERPILLAR PS1S0C PNEU COMPACTOR 12123/2(119 U13'161 li 631,49 1 ,183,18 1tl,648,3z PN9aQxaxa4 COMPACTOR PNE TIRED PS150C 8/312017 U s9 ' 1,318,20 11,883.78 PN90000(1tl5 COMPACTOR PNE TIRED 178150 Za16 U 689,264119/ 889.28 PN9a00a0a6 COMPACTOR PNE TIRED 530A 41112006 U9'000'00 5,595,50 2,797,88 2 ,797,82 PN90000007 COMPACTOR PNE 71REDC530 3/3112x05 U 8,100.00 900,00 PN90aaam COMPACTOR PNE TIREDC530A 4+375'00 9,937,50 437,50 PN9aaa00o9 COMPACTOR PNE TIREDC-930A 3131/2005 U 9,375.00 ' 6;437,50 937,55 P52aaaaaai PLACERSPREADER 6117/1992 N 3,755,00 3,375.00 875,00 P520000aa2 PLACERSPREADER 11/5/2001 N 217149,301 2171 + 493 pS20aaaa03 PLACERSPREADER 313112005 U 105,759,84 76,032,84 29,721,55 P520500004 PLACERSPREADER 4/1/2017 N 139,519,38 125 '567'45 13,951,93 PSCOQQ0002* SAND SCREW 97,696,35 97,896,83 PSS000a012 SCREEN AGGREGATE 4/2711991 N 84 500,00 ' 34,575,00 _ PTc55Ga75s CONVEYOR 7/Z7%19fi6 N 41 ,661,41 37,675,27 4,108,14 11,778.79 10,862,87 81882 Rieth-RileyCadstruction Cc, Inc. Equipment List 3/31%2020 Acquired New or Asset/1 Description Acquisition Date Used Cost A,peps PWSOOO0006 WASHER EAGLE /1974 N 15,000,00 1 133,833,60 NeV PWsxa0aa07 TANKCLASSIFYING 218 4/2/1989' 4/ N 1o5262.20 94735,98 11166140 RM40000001 GRADER MAINTAINER 4/1/2017 U 21,859,32 19,673,39 10,526,22 SCRii00061 SCRAPER 613c 3/31/2005 U 3i 875,00 28 687,50 2,185,93 5066000001 COMPACTOR VIER GRADE 66"" 8 41112ax0 U 29,300,00 ' 24,000,00 3,187.5a SOfi6000002 COMPACTOR VIBRGRADE 66""C 3/1642009 U 22,000.00 19 800,00 5,300,00 - sod6aaaam COMPACTOR VIER GRADE 6610 C 3/91/2005 U 6o,d6x,41 ' 54,050,40 2'200'00 SD84a0aaaa 2a14 CATERPILLAR C556B a4" SOIL COMPACTOR 12/23 f 2019 .0 31564.47 3156,84 s,4ao,a6 wswaaa4 COMPACTOR VG 84Q1 CS568 4/1942010 11 z7 206.21 9,624,60 28'408,03 5084040005 2016 CATERPILLAR CS56B 34" SOIL COMPACTOR ' 8430/20i9 U 17,fi61,61 •5D84000o06 2017 CA#RPILLAR C556B 94" 401L COMPACTOR 12/1942019 U 6,500,00 a 300,00 1444.48 ' 5,055,52 smaaaam PAVER SLIPFORM sma 5/4/1988B70,650.00' N 922,24 333 585,00 7,377.76 SF20o00402 PAVER SLIPFORM Z T RACK350 6428 / 1988 • N 256,369,00 230,732,10 37,afi5.0a SF20000403 PAVER SLIPFORM SF550 44261!991 N , , 25,636,90 SF20a00004 PAERSLIPFORM2RACKGP2 161,936,38 , ,2 132,250,48 40,562,33N SI`0000001 PAVER CONCRETE 4 TRACK GT6 2/9/2004 N 179,845,72 153,520,82 29,695,90 51740000002 PAVER C09CRETE 4 TRACK 51`2 11f1sf2a12 N '103,057.40 143,457.40 26,324,94 SF4bOOa003 PAVER CONCRETE 4 -TRACK GT6 ' 6/412010 N 200;199,23 200,289,23 SKL0000001 GRADER MAINTAINER 2145 4/1/2400 u s5,200,04 30,204,00 _ SKLpaaoa02 GRADER MAINTAINER 2145 4/1/2006 U 25,000,00 22,5ad.aa 5'004.00 SKLaaa0a04 GRADER MAINTAINER724 313112(105 U 6,250,00 5,625,00 2,sa0,00 • 5KLaaa00a5 GRADERMAINTAINER724 3/3112005 U 7,500,00 6,750,00 625,00 SKLO000a06 GRADER MAINTAINER724 343112005 U y 7,500.60 6,750,40 75p,aa SKLQQGQ(107 GRADER MAINTAINER 724 3431/2405 U 7,500.00 6,750,04 750,40 SKL0000008 GRADER MAINTAINER 724 3/31/2005 U 7,500,aa 6,750,00 750,00 SPF(100000i 2012 CATERPILLAR 815F SHEEPSFOOT COMPACTOR 12423/2019 U 70,875.43 7,487,56 754,04 SSLaaa0001 SKID STEER WHEEL 4/112000 U 7,800,00 6 800,00 63,787,87 SSLaa00a02 LOADER SKID STEER 7/1/2016 U 30,aaa,aa 27,400,00 1,000,40 SSLaaaa4a6 SKID STEER WHEEL • 4/1/2006 U. 20,000,00 18,000,00 3,006,00 581.4000007 SKID STEER WREEL 411/2006 U 20,000',00. 18,000,00 2,000,00 551.0000008 SKID STEER WHEEL 1/2912008 U 19,750,00 17,775,00 2 440,00 551.4000009 SKIDSTEERWHEEL 3/31/2005 U 12,500,00 11,250;00 1,975,00 SWP(10a0401. SWEEPER ROAD 042aaa U 5,500.00 4,400,00 1,250,40 5WPa000002 SWEEPER ROAD 3/31/2005 U 5 0(30,00 4,500.aa 1,540.40 TB1aaa = TRUCK BOOM aa' 3/24/2011 LI 59,920,40 53,928,00 540,00 ' TCa0000001 TWORE CURE CONCRETE TEXTI]RE CURE CONCRETE 4/2611991 N 56,713,68 • 51,442,31 5'992'40 5,671.37 Ttoaaaaa42 TC00(100003 TEXTURE CURE CONCRETE 3/14/2006 4/1/2004 N N .70,615,16 231,922,25 49,461,36 208,730,07. 21,153,80 TD2040a001 TRAILER DUMP SEM( 513/1995 N 6,288.97 5,660,07 23,192.23 7020000002 TRAILER DUMP SEMI 5/1/2001 N 16,373,73 12,140,73 628,90 TD200oa003 TRAILER DUMP SEMI 5/1/2001 N 16,:L73.73 12,144,73 4,033,00 TD24aaaxa4 TRAILERDUMPSEMI 5/1/2a01 N 16,173,73 12,14a,73 4,433,44 TOZ4o0aao5 TRAILER DUMP SEMI 5/if200i N 16,173.73 12,140,73 4,433,a0 TD2aa4aaa6 TRAILER cUMP SEMI 51iluoi N j6 1-n 32 1410.73 41033,44 TD2a0000o7 TRAILER DUMP SEMI 5/112001 N ` 16,173.73 ' 12,140,73 4,033,00 702000(10(18 TRAILER DUMP SEMI 413012006 N 14,632,65 9,754,65 4,033,00 TD20000009 TRAILER DUMP SEMI 4(3012006 4,078.00 - --...---••-' Toz0Quxuuuw IHAILUR UUMF LUNh19Uj.11UN 6/5/2006 N 26,888,72 24,299,85 2,fi88,87 TD20000011 TRAILER DUMP SEMI 9f 1/2016 N 41,930,00 17,223,48 T•O26a00012 TRAILER DUMP SEMI Sji/20i6 N 42,1a0,ao 17,326.28 24,706,52 TDRL4a(1aoi TRUCK 1 TON DRILL 11/30/1983 N 14,490,00 13,041,00 24 853,72 TEX0000001 EXCAVATOR TELESCOPING5L41 7111/2008 N 277,091,46 249,382,33 1,449,00 TF2000000i TRUCKFUELTANDEM 7/2/2401 N 4x,382,86 34,071,1fi 27709,15 TFWio00001 TRUCKWATERIFUELSfA 3/31/2005 U 15,900,00 14,310,00. 6,311,00 TFW100a002 TRUCK WATERIFUEL. 313112005 U 15,900,00 14,31o,a0 1,590,40 TMW0603 TRUCKWATER/FUEL 3/31/2005 U 16,562,50 14,906,25 1,590,x0 TFW1000004 TRUCKWATER/FUEL 3/31/2405 U 19,875,00 17,887,50 i,fi56,Z5 TFW1a04405 TRUCK4VATEft%FUEL 9431/2005 U 27,825.00 25,042,50 1,987,50' TFW2000001 TRUCKWATER/FUELTIA 2/16/2004 N 20,029,94 11,929,94 2782,50 TFW2000002 TRUCK WATERJFUELT/A 2/912004 N _ 18,331.94 s,513,40 - 8,100,00 TFW2000004 TRUCK WATERIFUELTIA 41112(113 N , 27,975.15 25,177,63 8,798.94 TFW2(100005 TRUCK WATERIFUELTIA 2/5/2013 N 29,723,78 26,753,40 2797,52 TFW2000006 TRUCKWATERIFUELTfA 9/30/2013 N 5i,508,80 46,357,92 2,972,38 TFW2000007 TRUCK WATERIFUELTIA 3/i/2016 N 66,900,54 60,2iOAS 5,154,88 6,690,05 TFWZOOa008 TRUCK WATERIFUELTIA 3/112a16 N 66,900,54. 60,2149 TFW2000009 TRUCKWATER/FUELTJA 614/2017 N 232,729,74 74Aa2,56 6,690,05 TFWzaOOOio TRUCK WATERIFUELTIA 614/2017 N 232,70 74,112,56 l58,547,ia TFW2a040i1 TRUCK WATERIFUELTIA6/412017 1 234,7022,,0303 74,811,22 158,547,18 TGiaa00003 TRAILERTILTTOP 318 2009 1 / U 1,166,44 954,44 159,190,81 TG2(100000! TRAILER PULLTYPE 26' 5/2/2015 N 23,126,16 12,955,44_ 166,00 TG204axa02 TRAILER TILTTAG 20T 5/24/2018 N 24,478,30 5,278,44 ia,370, i9 24a,262fi TG2aaaaa03 TRAILERTILTTOP 3/iS/2009 U ia,606,aa 9,540,00 1,060,00 TG2000004 TRAILERTILTTOP 3116/2009 U 7,910,00 7,119,a4 TGN300000! 7RAILERTILTTOP GOOSENECK 5/1/2001 N 13,960,79 16,6fi7,7g 791,60 TGN3000002 TRAILERTILTTOP GOOSENECK 3120/1998 N 26,877,54 24,077,54 3,293,60 TGN3000003 TRAILER TILTTOPGOOSENECK 7/2/2001 N 23,115,99. 20,315,99 2 0x0,00 ' TGN3000004 TRAILER TILTTapGOOSENECK 4/12/2017 N 43,698,57 14,748,24 2,80x,60 28,950,33 Rieth ;Riley Ccastructian Co,, Inc. Equipment list 3/31/2020 Acquired Nevi or Asset# Description TRAILERTILTTOP GOOSENECK Acquisition Date 3116/2009 Used U Cast Accum Depr pr NBV' TGN3000tla6 TRAILER TILTTOP GOOSENECK 3/16/2009 U2,332,00 23,320.00 20,988,00 TGN300007 TRAILERTILTTOP GOOSENECK 3/16/2009 U 3,180,00 2,862,00 318,00 71.13401300018,480,00 0o01 TRAILER4AXLE 4!1/2006 U 7,632.00 848,x0 TL84000002 TRAiLER4AXLE 4/1/2006 U 41,340,00 37206,00. 4,134,00 TL8400000TRAILER H AXLE 5/l/i989 U 41,340,00 37,206,00 4,134,00 TLOS000062 TRAILER 9AXLE • 5/i/1989 U 84,240,00 64,240,00 75,81s,0a 8,424,x0 TLB9000003 TRAILER 8 AXLE 7/6/1992 N 75 a , 16,Oa 8,424,00 71.860000x4 TRAILER 8 AXLE 7116/1-992 N 108 107,5a 97 296,75 ' 10,810,75 71.860000x5 TRAIL R 8 AXLE 415/1994 U 108,,107,50 97,296.75 1.0,810,75 TLea6d0006 TRAILER 8 AXLE 4/ AS% N 19,760,00 17,784,00 1''976,00 TL860aa007 TRAILER 8 AXLE 415 1994 N/ 19,760,0017764x0 ,, 1.,976,00 TL88000008 TRAILER 8 AXLE 415!1994 N 19,760,00 17,784.0019 '17 1,976,00 , TL98000009 TRAILER 8 AXLE 4!5/1994 U '760,00 '78¢,00 1,976.00 TL80000010 TRAILER 8 AXLE 5/1/1997 U 19,760,00 17,784.00 1,976,00 TLeaaaaoil TRAILER 8 AXLE 5/1/1997 U 10143,45 10,143,12 TL680abOU TRAILER 8 AXLE 511/1-997 U 8,362,97 0 22 8,362,75' 71.88000013 TRAILER 8 AXLE 5/2511999 N 8,404.45 40,539,81 0,2Z 33,924.81 8404.23 71.88000014 TRAILERBAXLE /1119-97 N 6615,00 ' 71.88000015 TRAILER 8 AXLE 1125 f1999 N 26766,62 + 539,81 15,766,62 11,000,00 71.680x0016 TRAILER 8 AXLE 5/1/1997 N 40! 33 924.81 615,00 7LB90000A TRAILER 8AXLE 6/24!1999 U 26373,32 11,0x0,00 TL88000018 TRAILER 8 AXLE 6/24/1999 N10,000,00 37,1x0,00 27,10000 TL8800a0i9 TRAILER 8 AXLE 6J29J1999 N 37,100,00 27,100,00 10 000,0a 7LB8000020 TRAILER 8 AXLE 6/2411999 N 37,1x0,00 27,100,a0 110 0aa,00 ' TLB80x0a21 TRAILER a AXLE N ,37,100.00 27,1xo,0x 71.88000022 TRAILERBAXLE 2!2411999 /i6/2000 N 37,100,00 27,100,00 l0+ 00,00 ' 71.88000023 TRAILER B AXLE 2116/2000 N 47.216,20 47,216,20 3B 10,541,30 71.880/00024 TRAILER8AXLE 2fi6f2000 N 674.90 74.90 , 10,541,30 71.8800x025 TRAILER 3 AXLE 2!16/2000 N 47,216,20 36,674.90 10,541,30 7LB80a0026 TRAILER BAXLE 2fi6/2000 N 47,216.19 36,674,89 10,541,3a 71.89000027 TRAILER BAXLE 2!16!2000 N 47,216,19 36,674.8-9 10,541,30 71.88000028 *TRAILER BAXLE • 5!1!2001 N 47,216,19 386 74,99 1.0,541,30 TL88000029 TRAILER 8 AXLE 5/1/2001 N25583.23• 25,583,24 17,538,2¢ 8,045,x0 TLB80ax030 TRAILER 8 AXLE 5 /1/2001 N 17538,23 ` 8,045,aa 7188000031 TRAILER B AXLE , 5/1!2001 N8,04500 25,583,24 17,538,24 T1.88000032 TRAILER 8 AXLE 5/1%2001 N 25,583,24 17,538,24 8,045,00 IL138000033 TRAILER 8 AXLE 5/1%2001 N 25,583,24 17,538,24 8,045,0 TL88000094 TRAILER 8 AXLE 5/172001 N 25,583,24 25,583,24 17,53a,24 17,538,24 S,a45,a0 71.88000035 TRAILER a AXLE ' 5/1/2001 N 25,583,24 17 538,2¢ 8,045,00 71.88000036 TRAILER 8AXLE 3/31%2010 N 40,649,45 ' 28,906,45 8,045,00 IL•B0000037 TRAILER BAXLE 'r[.880000-98 3/31/2010 N 40,644,45 28,906,45 1i,743,00 TRAILER 8 AXLE 4/if zod6 U 77,812,05 70,030,85 11,743•,oa 71.88000039 ?RAILER 8 AXLE 6/6/2014 U 53,000,0 47,700,00 7,781.20 TL88000040 TRAILER 8 AXLE 'i:GannnnAi II 6/612014 U 4S 050,00 ' 40,549,oa 5,900,00 a L- TOA COOAVIG .�,...,.,.,.,n l„^,�",•��^". TLB8000042 TRAILER a AXLE / 6 6 2014 ! f 5/3012015 U N . 47,700,00 42920,0( ,,,, �,,., UIJ 4,770.00 TLBeaaa043 TRAILER 8 AXLE 513012x15 N 167,649,60 167 649,60 92,731,36 92 74,918,24 TL 8800004!. TRAILE9 B AXLE ,_ , _ 73 , 1,96 74,918,24 71.86000045 TRAILER BAXLE 5130/2015 N 167 649,60 ' --'iyyj6 92,731,36 74+91824 TL88000046 TRAILER 8AXLE 11212016 N 170,063,22 81,311,34 74,918,24 TL88000047 TRAILER 8 AXLE 11212ai6 N 1.70,x63,22 81,311,34 88 751,88 TLB8000048 TRAILER 8AXLE 1 f 212016 N 1.70,063,22 81,311.34 gay 751,88 TL080a0a49 TRAILER BAXLE `[RAILER8AXLE 1/2%2016 N 170,063,22 81,311,34 88 +751,88 TLB80gQ050 1!212016 N 170 063,22 81311,3 4 88,751,88 TLB8000051 TRAILER 8 AXLE 1/2/2016 N 170,063,22 81,31134 88,751,88 TI.08000052 TRAILER BAXLE 4/1/2017 U 91,236,52 35,191,20 88,751,88 71.88000053 TRAILER B'AXLE 41112ai7 U 91236,52 35,191,20 56,045,3z 71.88000054 TRAILER8AXLE 4/112017 U 91,236,52 35191,20 56,045,32 TLEB000055 TRAILERBAXLE 411/2017 U 91,236.52 ' 35,191,20 56,045,32 TLB8000057 TRAILER 8 AXLE 4/1/20(36 U ' 48,65¢,Oa -96,(345,37.54,Ofi0,00 71.88000058 TRAILER 8 AXLE 4/112006 U 54 Ofia,Ox 4 8 654,00 5 TLB8000059 TRAILER 8 AXLE 4f1120as U 621 0ix,00 ' 55, 5,406,00 406,00 TLB8x00060 T8 AXLE 4/1/2006 U fitRAILER +010,00 '6x9,0 55 ,Zoi,aa 7188000061 TRAILER 8 AXLE 4/1/2006 U 67 310,00 'H09,0a 60,579,00 61201,x0 TLBB000062 TRAILER 8 AXLE 3 /3 112 0 0 5 U 31,800 00 28 620,00 6,731.00 TLO8000063 TRAILER 8 AXLE alai/2005 U 31,8x0,00 ' 28,620,00 3.180,00 71.88000064 TRAILER BAXLE 3/31/2005 U 31,800,00 28,620,00 3,180,00 TLB8000063 TRAILER BAXLE alai/2005 U 31,800,00 28620,00 ,3,180,x0 TLB8000066 TRAILER 8 AXLE 3130005 U 31,800,00 ' 28,620,x0 8,180,00 71.880x0067 2018 RED RIVER oL884oNGH 8 AXLE LIVE BOTTOM TRAILER 5/7/2019 U 82,944,33 8,553,60 '3180,00 TLB8a00068 2018 RED RIVER C)LB84ONGH 8 AXLE LIVE BOTTOM TRAILER 5/7/2019 U 74,390,73 TLBaaaaa69 20i8 RED RIVER C)LB840NGH a AXLE LIVE BOTTOM TRAILER 5/7/2019 U 90,303,60 9,312,60 80 991;00 � TLB8a00070 '2018 RED RIVER OLS84ONGH 8 AXLE LIVE BOTTOM TRAILER 5/7/2019 U 83,124,33 8 572.19 74,552,14 TLBa000071 2018 RED RIVER OL884ONGH 8 AXLE LIVE BOTTOM TRAILER 51712019 U 83,221,73 89,916,96 8'582.20 ' 74,639,53 TRCa0ax0a1 COMPACTOR TRENCH FABR � 2/2111983 N 39,132,76 9 272,67 ' 35,219,48 80 6 44,29 TRC0000002 COMPACTOR TRENCH TR -100 3/17/2010 N 30,49S,00 30,495,00 3,913,Za ' , Rleth-Riley Construction Co,, Inc, Equipment List 3/31/2020 Asset B Description Acqulsitlon Date acquired New or Used TRENCHER 7/9/2015 U Cast Accum Depr pr NsV TRL0000001 TRAILER DUMP LEAD 4/112006 U 69,a15,0a 65,564.25 3,456,75 TRL00d0002 1988 EA SP LEAD DUMP TRAILER 1/29/2008 U i1,660,aa 10,494.00 1,166,00 TRLD000003 TRAILER DUMP LEAD 1/29/2008 U 15,900,00 14,310,00 1,590,00 TRLDaaao04 TRAILER DUMP LEAD 1/29/2008 U 19,080,00 17,172.00 1,908,00 1,B08100 TRLDauaaos TRAILER DUMP PUP 1/29/2008 U 21200,00 19,oeD,aa TRL0000006 TRAILER cUMP PUP U 26,500,aa 23,950,00 2,620,00 TSF20000a1 TRUCK WATER SPRAYBAR 7112/1988 711zJ19aa N 91,800,00 28,620,00 3,160.00 TSP200a0a2 TRUCK WATER SPRAYBAR 6/14/1990 70,634.27 59,452,67 11.,18160 T5FZ000003 TRUCK WATER SPRAYBAR 4%4/1991 N 80,136,46 72,122,82 8,013,64 T5F2aaa004 TRUCK WATER SPRAYBAR 5/1/1995 N 61,927,03 72,806,97 9,120,06 TSFZOOUOOs TftUCJ(WAT'ER SPRAYBAR N 20,297,62 17,266,49 3,031,33 T5F2aoa0as TRUCK WATER SPRAYBAR 5/1%2001 N 20,797.73 21,x57.73 6+s4a oa TSF2000007 TRUCKWATER SPRAYBAR 51112001 N 25,988,29 0.6,020,77 9,967,52 75FZ000008 TRUCKWATER' 4/1/2006 U 30,739,05 21,957,73 E,781.32 TSFz000009 TRUCKWATER 3/3 112 0 0 5 U 9,540.00 8,586,00 954.00 TsF3000001 TRUCK WATER SPRAYBAR 5/111995 N 7,685,00 6691s.50 768,50 TT10000001 TRAILERTILTTOP. 3/1 6120 0 9 U 66,974.65 76,18257 10,79Z.a8 7720000001 TRAILER7ILTTOP 8/31/1995 N 7,730,00 6,957.00 773,30 TTZOQa000Z TRAIlERTILTTOP 17,173,23 15,455,90 1,717,33 TT2000a003 TRAILERTILTTOP 411/,1997 N 17,043,64 15 ,339,28 1,704,36 TT2aaoaaa4 TRAILERTILTTOP 4/1/1997 N 17,043,64 1533 9,Za '1,704,36 TT20000005 -TRAILERTILTTOP 1997 4/111997 16,897.33 15,207.60 1689,73 TT2apaaao6 TRAIL'ERTILTToP 3j2o/is5s N i6 897,33 15,207.60 1,689,73 IT20600007 TRAILER7ILTTOP 3/20/1998 11,370,18 91720.18 1,650.0a ,650,00 T`1`2000=88 TRAILERTILTTOP 3/20/1998 N 11,370,18 9,720,18 1,650,00 TT2aaaaaa9 TRAILERTILTTOP 7Jz/2001 N 11,370,18 9,72o'ia 11650,00 TT20000010 TRAILERTILTTOP 7jz/2001 N 8,941.06 7,291.06 11650,00 TTZOOOnO11 TRAILERTILTTOP 7/2/2001 N 8,856,731,650,00 7,206,73 7720000012 TRAILERTILTTOP 6/3/Z002 N 8,85fi.73 7,206,73 1,650,00 TT2aaAoal3 TRAILERTILTTOP 6 3 2002 / / N 6 4,204.71 11650,00 IT20000014 TRAILERTILTTOP 812/199.9 fi516,ia,454.71 + 4,8fifi,18 1,650.00 TT20000615 TRAILERTILTTOP 12/2/2002 • N 14 369,32 12,724,32 1645,00 IT20000016 TRAILERTILTTOP 5/14/1999 N 4,363,21 , 2,71a,21 1,645.00 TTza000a17 TRAILERTILTTOP 5/9/2006 N 19,650,00 17,685.00 1965,00 TT2000Ooi8 TRAILERTILTTOP 4/19/2010 N 26,403,25 23,752,92 2,640,33 Ti'200000i9 IRAILERTILT20T 411/2017 N 15,565,04 14,008,54 1,556,50 1720000020 TRAILERTILT20T 4/1/2017 N 32127,03 + 1a,a4Z,a4 21,284,19 1720000021 TRAILERTILT20T 4/12017 f N 31857,05 , 10,751.76 21,105,29 71'20000023 TRAILERTILTTOP 311612009 U 81,657.05 10,751.76 21105,29 TT2ag0ao24 TRAILERTILTTOP 20T 3/31/2005 U 7,730,00 6,•957,00 773,00 7/20000025 TRAILER TILTTOp 207 6/3112005 •U 2,517.50 2,265,75 251,75 TT20000026 TRAILERTILTTOP 207 3/31/2005 U 2,517.50 2,265.75 251.75 TTZaa0ao27 TRAILERTILTTOP 20T 313112002 u 2,517,50 2,265,75 251,75 7720000026 TRAILERTILTTOP 207 3/31/2005 U 2,517,50 2,265,75 251,75 Tnnn00029 THA!LERTilaT0.0 T1`20000030 TRAILER TILTTOP 20T 313112005 2,517.50 2,517,50 7rZ6c �5 2,517,50 251,75 _ 7720000031 TRAILERTILTTOP 207 3/3112005 U i1 2650,00 ' 2,385,00 265,00 „•,,,,,,,,,,,z, •rnn„_DT-l- n .y 2;650,00 �as.an ,== �- TCZ0000033 TRAILERTILT20T J; 3131/2005 U 2,650,00 2,385,00 265,Da 71'20000034 2019 XLTRAILERS XL40 TILTTAG TRAILER 7/17/2019 N 4,77a.00 4,293.00 477.00 7720000035 2019 XLTRAILERS XL40 TILTTAG TRAILER 7%17 2019 36,847.16 9,1138,96 33,738,20 TMOGM036 2019 XLTRAILERS XL40 TILTTAG TRAILER 7J17J2ni9 N 36,E47.i6 3,108,96 33,738.2a TT2000a037 2019XLTRAILERS XL40TILTTAG TRAILER 517/2019 U 36,847.16 3,108,95 33,738,20 TT25aa0001 TRAILERTILTTOp 6f 181996 1 N 27,786,50_ 2,865,50 24,921,ma TT25a00002 TRAILERTILTI'OP 9/18fZtl07 N 22,973,80 20,676,42 2,297,3a TT25000003 TRAILERTILTTOP 4%2/2008 N 92,741,00 29,466,90 B,274,10 7125000004 TRAILERTILTTOP 41212 N 32 741,00 29 ,456,90 3,274,10 TTKOOOa00i TRAILERTANKER 515/1988• • N 32,008 ,741,00 29,g66,sQ 8,274,10 TWiaaaaaoi TRUCK WATER *TRUCK -711/2015 U 3a,Z87.63 27,258,87 9,028,76 TWIC000002 WATER 311fif2tl09 U 20,000.00 is,aa 2,000,Oa TWi0000003 TRUCKWATER 3/3112005 U 250,00a,0a '`250,00 TW20000001 TRUCK WATER TANDEM 6/312002 N 11,925,00 10,732,50 1,192,50 TW2aaaaa02 TRUCK WATERTANDEM 12/212002 N 35 488,51 + 261995.51 8,493.00 UTF0000003 TRACtORFARM 7/1/2015 U 29,372,33 21,155,33 8,217,00 UTFQaoaa07 TRACTOR FARM 3131/2005. U 44,776,00 97,947,66 6,828,34 WD08000a01 WIDENERSP❑-8 12 2 2O1Z 2,813,0❑ 2,531,70 281,30 WD1000000i WIDENERRWiOO 4JSf /11987 N 20,823,48 18,877.36 1,946,12 WDi000Q00Z WIDENER RWiOOA 10/2/2004 N 26,709,00 78,oaa,1a 6,570,20 W=000003 WIDENERW520 12/15/2017 N 72,605,68 72,aQS,6a _ W=000004 WIDENERW530 412612ai6 U 77,591,55 51,794,40 25,897.26 WDIM00005 WIDENERW530A 412612016 N 123,184,45 101,898,ia 21,285.27 WDIQOOQ006 2018 WEILERW530AWIDENER 9/312019 U 242,517,55 160,098,00 82,519,65 WD10000008 2018 WEILER W530A WIDENER 9f 3/2019 U 158,157.15 8,787,08 149,380,08 WDi4000001 WIDENERRW1950 4126/1993U 155502.23 1fi 150,404,79 WD14aQaaOZ WIDENER RW195D 71111998 N 131,039,59 117197,44 13,103,96 WD140Ga003 WIDENER RW19SD 7/2/2001 N 177 226,00 ' 1551935,53 ,753,00 21,4.73,00 1a9,6a9.12 94,127,12 i5,d82,00 Rieth-Riley Can Co,, Inc. Equipment list 3/31/2020 AsseEll Description Acquisition Date Acquired New or Used WD14000004 WIDENERRWI95D 4/1/20°6 U Cast AccumDepr NeV WD19000005 WIOENERRW195D 11/2/2010 U 172500.00 + 155)250.0017 ,250,00 WD14000006 WIDENER AW195 3131/2005 U 32,527,50 32,527,50 WLOi000a01 LOADER WHEE1907H 8/3/2017 U 31,250,0° 28,125,00 3,125,00 01.01000002 LOADERWHEEL908HZ 8/3/2017 U 20,279,37 18,251,43 2,027,94 Wma00(303 LOADERWHEELS07M 4/1912°18 u 33,481,17 20,088,64 13,392,53 WL0300000i LOADER WHEEL938K 8/1%2016 30,923'16 11,905,44 19 017,72 WL03000002 LOADER WHEEL938K - 8/1/2016 N 103,895,57 68,571,04 35,324,53 WL030a0003 LOADER WHEEL938K 12/27/2017 N 107,013,24 70,628,8o 4,44 3638K WL03000004 LOAD ER4VHEEL9 1212712°17 N 119,456,,38 87 50,171,80 69,285,07 W1.0300005 LOADERWHEEL939K 12/27/2017 N 119,501,92 50, 84 190, 159,311,08 WL63ddbo06 LOAdERWHEEL938K 12127/2°17 N 119,466;10 50175,7,2 ' 69,290,38 WL03000007 LOADER WHEEL938K 12/27/2017 N 119,416,68 5.0,155,0° 69,261,68 VILa3000012 LOADER 4UHEEL938M 4/19/2018 U 130,137,16 54,657,68 75,479,46 WI.Qilaoaa0f LOADER WHEEL950K 12/15/2017 N 22,984:14. 7,354.92 15,629,22 WL04000002 • LOADER WHEEL950K 12/17/2018 N 93,917,45 56,350,56 37,566,89 WL05000001 IOAOERWHEEL962G 6/20/2005 N83,863,80 124 6152,36 40 . WL05000002 LOADER WHEEL962H 412812006 N 210,996,18 189,8915515 21,099,62 WL05aa0003 LOADER WHEEL962H 4/28/2006 N 231,897,26 2°8,7°7•,53 23,169,73 WL06000001 LOADER WHEELWA430-5 711f70i6 U 243,416,28 219,074,65 24,341,63 WL070ao0di LOADERWHEEL972K $ Jif 2016 N 3(3,00(3,00 27,0(30,0(3 3,000,00 WL07000002 LOADERWHEEL972K 12/15/2017 N 170 569,37 ' 112 '575'76 57,993,61 WL07aa0003 LOADER WHEEL95ZV 2 N 122,790,1° 73,604,08 49 °915,02 WL67000004 LO,AoER WHEEL 977-K SJU12Z017 3124/2614 N 119,790,73 55,902,28 63,888,45 WL07000005 LOADER WHEEL CAT 972K 9/612020 U 170,072,76 55,6150,12 114412,6 , 4 WL07aa0006 2014 CATERPILLAR 972M WHEEL LOADER 911912019 U 148 40a,a(3 + 2,782,50 145 617,50 ' WL07000007 LOADER WHEEL 972MXE 7/1/2019 N 163 686,31 ' 12 ,279,40 i5i,4ag,03 WL07a0Q008 LOADER WHEEL 972MXE 7f 1/2016 N 413,130'21 177,424.84 235,705,37 WL07000009 LOAgERWHEEL472MXE 811/201/5 N 4.13,130,21 177 ,424,84 235,705,37 WL07000010 Lo 8 f 1/2016 N 409,269,18 168,823,6a 240445 ,58 WL(3a0a1 702 LOADER WHEELWA5a0 7 711/2016 U 4°9,269,18 1158,823,50 240r ,445,5a WL07000013 LOADER WHEELWA5a0 7 ( 7f 112016 U 220 OOO,Oo , 1815 ,450,00 33 55 ' °'00 WL08(300001 LOADER WREEL980H REBUILD . 4jzsj;do6 N 425 'O0a,00 208,392.86 216,607,14 WLOW000002 LOADER WHEEL980H REBUILD 51212(306 N 404,867,00 3641380,30 . 40,486,70 ,WL08000003 LOADER WHEEL980HREBUILD - 51312°06 N 397'828.6a 358,045,74 39782.815 WL'480a0004 LOADER WHEEL980H REBUILD 4/15f20a8 N 401,426,24 361,283,62' 40,142,62 WL08a00005 LOADER WHEEL990H REBUILD 3/31/2009 N 472,743,50 440 ,968.19 31,775,31 WL08000006 LOADERWHEEL980H 4/29/2°09 N 338,664.78 312,859,41 25,805,37 W08000007 LOADERWHEEL980H 74,759,48 74,759,48 WL08000008 LOADER WHEEL 980HREBUILD 11J4�2016 108,264,95 108,264.95 WL08000009 LOADER WHEEL98OH 1114/2016 N 37,188,80 33,209,51 3 979,29 , WL08000010 LDAOERWHEELSaaH 11/4/2016 N 37,188,80 33,2,09,6° 3,979,20 WLaa0a0012 LOADEF�WHEEL 98OM 4/2712016 U 37,i88,8a 33,246,79 39 3,942,Q1 WL(38(300013 LOADERWHEEL980M 412812016 N 398,851.87 239,311,20 159,540,67 WL09000001 LOADER WHEEL9a2M 4f27J2ai6 U 465,702,52 209,566,oa 7CA 4=e ea �r� �•yt WL09a000a2 LOAOERWHEEL982M - 4/28/2016 N 486,726,48 292,035,84 194,690,64 WLiO(3o0(301 LOADERWHEEL988G 1119 2014 N 535,252,52 240,863,52 294389,00 4, WLM000002 LOAD ER WHEEL 10 CY9a6H a rJr,a1 .•r+,{ 9 LI ii7,50a,ao 1a5,750,aa 1.,75o,0a 5n,'uw, i{;�aai :� i;i:;itR Vi9P'',�•i HAVT, Oi, 1212/zao4 U 11R ^i� 47 ,--•-• 7c cea az •• _. •,-c.,..,u Ell -Ti e -r WRKT100(3a2 BREAKER DIESEL 2fi0f2004 N 42,373,46 38,138,46 4,23700 WRKTiaa603 BREAKER DIESEL 2/1012004 N 39,432,00 35,4[luo 3,943,x° WRKT100004 BREAKER LEADS 211012004 N 75,101,00 67,59°,9° 7,510,10 WRKT130a°i ATTACHMENTPAN SCRAPER - 7/112(316 U 17,172,0° 15,454.80 1,717,20 WRKF14000i ATTACHMENTSCREEDWEDGELOC 919/1997 N 15,000,00 12,712,50 2,287,50 WRK714a002 MATERIAL REFERENCE SKI 9f 10/20°3 N 37,129,92 , 33,416,93 712.99 369149 WRKT160aai SPREADER BOX 1016/2001 . N 6,914,84 6,223,35 WRKT160002 SPREADER BOX 5 3 f JZ°07 N 21,108,62 111,997.76 2,11(3,815 WRKT4aaaai AmcKMENTBROOM 12A011997 N 34,144.72 30,73o,24 3 41 4,48 WRKr7da(3ai ATTACHMENT DISK � 1013°11975 N 16,296,89 14,15157,20 1,629,159 WRKT7aoo°2 ATTACHMENTDI9k •'EXCAVATOR 4/2311999 U 5,524,56 5,094.96 429,150 WX1960(3(30i WHEEL M31aF 4J3aJzala U 3,559,81 3,203,83 355,99 WX1900(3(303 2010 CATERPILLAR M317F CR WHEELED EXCAVATOR 5/30/2019 110,357,56 34,210,85 , WXzO(3(3a(3ai EXCgVATORWHEELM32aF 4/3012018 U U 18 000,00 , 4,0(30,00 1476146,71 ,000,00 WX2z00(3(301 EXCAVATOR WHEEL M322F 413012ai8 U 106,436.62 32,995,42 73,441,20 APT00(3(3(3Oz PAVER BOX ATT7186 ! ATTACH MENTSCREEDW/6800 4110120 N f847,48 122°7 118,167,00 38,082.6s 118,167,°° 04,7154,63 ATT7676 ATTACHMENTJOINT HEATER 4130/2016 a/2612 N 62,947,00 62,947,00 , , AM727 ATTACHMENTPAVER•AUTO 2013 N 37,240,98 37,z4o,ga , ATT7872 ATTACHMENT PAVER AUTO W/ia 12/312015 N 25,964.70 25,964,70 , ATT7946 ATTACHMENTPAVER AUTO WJ79 11%9%2018 N 20,i56,0o 20,156,00 _ BKT1000003 ATTACHMENT BUCKET' 5/16/2005 N 33,893,50 33,893,50 BICii°00004 ATTACHMENT BUCKET N 9,574,45 8,617,00 957,5 CWKT1(3(3002 ATTACHMENTTIEBAR INSERTE5/18/2006 312512010. N 5,136,76 4,623,09 513,67 CWKT100003 ATTACHMENTTIE BAR INSERTE 4122/2010 N 21,000,°0 21 ,000,00 , CWKT200001 PAVING PACKAGE 412212003 N 21,205,90 21,205,90 =17600005 MOLDSIQEWALK45AND 6FT 614 20062a 12,402.6a 11,162,41 1,240,27 CWKT600006 ATTACH(viENTMED [AN MOLD 811612 0 0 6 N +070,90 18,063,72 2,007,08 12,960,1° 11,807,10 1,153,00 Rieth-Riley Constructlan Co., Inc. Equipment List 3/31/2020 Asset# Description r Acquisition Date Acquired New at Used CWKT800101 ATTACHMENT 24 FTSKEW W/67 6/20/7006 N Cost AccurnDe P r NBA CWKi90000i ATTACHMENTTININGSYSTEM 9/25/2010 N 19,159.00 17,243,10 1,915,90 PH00000009 HEATERASPHALT 511/7016 �( 12,918,40 1,2,918,40 - WRKT400007 ATTACHMENTEIROOM 3f3i/2005 U 10,746.40 18,855,85 390,55 WRKr600001 ATrACHMENTCONVEYOR C-3 40/2011 7f3 7/39220/8 N 5,575,00 5,017.50 557,50 WRKreaaaal ATTACHMENT GRABBLER U 51,500,Oa 46,350,00. 5,150,00 SLO16942 TRANSFORMER & METER 6/21/ 2002 N 3,500.00 ' 3,150,00 350,00 ELD17133 PUMP C UMLOAOING 45,599,83 45,599,83 BL017Q36 ELECTRICAL BUILDING UPGRADE 811/22 034 6,194.48 6,194,48 _ BL514179 TANKASPHALT3,980,00 3/1/2012 N 3,980.00. _ OLSIG958 PLANTSETUP32760% 11/9/7001 U 18,834,55 18,834.55 _ 9LS16947 INSULATION HOT QILLINES 1019/2002 N 63,591,67 11,931,00 63,501.67 _ BL517024. RACK TRUCK SPRAY DOWN 4/112004 N 11,830,00 BLS17059 RACK TRUCK SPRAY DOWN 411/2003 N 7,016,48 7,416,48 BL517a65 SAFETY CATWALK&5rAIRS 8/27/2003 U 3,850,71 3,850,71 - BL517120 LADDERS & PLATFORM55AFETY 4/1/2004 N 7,900,00 7 90 41.317= INSULATION HOT OIL LINES 8 f 19 f 2004 N 0,432,633 41,432.63 81517293 INSULATION HOT•OILLINES 81112005 N 9,600,00 •9 60 , 0,00 _ BL517445 RAcKTRUCK SPRAY DOWN 4,aaa,aa 4,saa,11 _ ELS17603 LIQUID AC TRANSFER SYSTEM 5/19/2007 U 4,459,07 4,459,02 _ ELS17604 LIgUIDACTRAN5FERSETUP 511 912 0 07 N 151,676,51 , 151,676.51 _ BL517621 RACKTRUCK'SPRAYDOW# 511412001' N 284,655,59 384,655.59 - BL517725 RACK TRUCK SPRAY DOWN 513/2008 N- 20,108,76 20,108.76 DRAGtl00001 1978 BUCYRUS-ERIE 88-8 HD PRAGLINE 51112019 N 9,304.65 9,304.65 _ GENOOOGO06 dENERATOR 4/20/1998 N 119,063,52 21,828.2997 GENoaa0007 GENERATOR 4120/lssa N 85,012.21 76,511.20,235,23 8,50i•00 GENOOO0009 GENERATOR 3/22/2100 U3,140,00 30,395,6$ 27,355,68 6ENOaaa010 GENERATOR 6116/2003 U 5,375.08 5,375.08 _ GENtl000011 GENEflATOR • 4/1/20°8 U 55,759,45 55,759,45 _ . GENOM0014 GENERATOR 750 KW 3/722016 U 139,002.47 138,112,47 _ CiEN0000015 GENERATOR SET 825KW 4/112017 U 52,000,00 52,000,00 _ GENERATOR5ET125KW 41112017 U 85,162.67 51,097.68 34,064.99GENpaa0016 GEN9000017. GENERA7'ORNIGHT56KW 7/1/2018 N 26,263.07 15 10,505,15 GENalpaal8 GENERATOR NIGHTSGKW 7/1/2411 N 31,992,94 3,732.54 28,260,40 GEN0000023 GENERATOR 3/31/2005 U 26,a74.97 2,014.52 24,010,45 GEN6400025 • GENERATOR SET 455KW. • • 7/122/16 U800.10 8,00(1,01 7,200.00 GEN0000026 GENERATaR5ET250KW 71112/16 U 26,000.00 4 976,9 •' 4 21,423,06 GE90000027 GENERATOR SET'225KW 711/2016 • U 10,000,00 1`91.4.30 8,095,70 GEN0000028' GENERATOR SET 100 KW 7/1%2016 U 24'000.00 9'358'56 14,601.44 GNT0000001 TRAILER GENERATOR 912111999 U8,000,00 11531.26 6,468,74 GNT000004 TRAILER GENERATOR 3131/70/5 U 46,664.07 41,997,66 4,666.41 GNTOaatla45 TRAILER GENERATOR 3/31/2005 U 493,96 444.56 49.40 GNT060a006 TRAILER GENERATOR 3231/zaps U 212,00 190,80 21.21 LANI4549 • WASTE RECOVERY SYSTEM312211982 .. 312 2119 8 2 N 530,00 116,299,13 477.00 104,669,22 53,00 PA80000013i CONTROLS PI ANT%BLEND{NG 7%�vI20i8 94206.67 15,786,04 it 629,91 PABaaaaaoz AUTO CONTROL 12/1.4/2010 U 108,379,a1 1.08,379 81 78+421.63 PABa00aa03 CONTROLHOUSE 7/2112007 N 87,532,03 63,242,31 - PA.B0000004 AUTO CONTRQL r, i,C00 _ 24,289.72 PABOO00006 AUTO CONTROL& HOUSE 3/312012 U 99,835,0o G7,921.16 2,590,13 PAB004tl007 AUTO CONTROL & HOUSE 313/2012 U 99,835,00 47,921.Sfi 51,913,84 PABO000009 AUTO CONTROL 41111952 N 79,355•x0 38,090,76 41,264.24 PAeaoatl0a9 AUTO CONTROL a.a/1/2.006 N 38,107,56 15,680.41 34,296.70 15,680,01 3 810,86 ' PABOOaa010 AUTO CONTROL 41112aa9 N 46,978.67 46 9 7$.67 - PAS0400011 CONTROLS BURNER PABOOGO012 CONTROLS•PLANTfBLENDING 4/23/1985 41112/15 N 4,7s7,sa , 4,281.75 - 475.75 PABaa00a13 AUTO CONTROL 6/1f 1992 N N 114,454.08 572 ` 26'06 57,227,i6 PA130400014 CONTROLS PLANTIaLENDING 41112017 N 2fi,807.06 26,817,17 _ PABOatla015 CONTROLS BURNER 411/2017 N 375 659.91. 112 698,00 718992 262,961,91 PA80000016' AUTO CONTROL &HOUSE 4128/2008 N 23,966,78 16,776.86 PABOOGOO19 AUTO CONTROL :12115/1995 N 125,736,69 11,484,93 125,736,69' PAROGO0020 AUTO CONTROL & HOUSE 41112006 U,494,03 _ PAa/111021 Au70 CONTROL 311612009 U 95,245,aa 75,561,24 19 683,70 PABO000022 AUTO CONTROL 4/4/1989 N 31,000,00 73,017,92 7,9a2,a$ PABaaaaa23 AUTO CONTROL BLENDING sYST 2116/2013 N 22,597.87 20,60$,0$ 21289.79 PAB0a10024 AUTO CONTROL 4/112000 N 41,948.18 30,063,0-2 11,435.17 PABOG00025 CONTROLS PLANT/BLENDING 4/30%2017 N 24,364,65 21,928,18 2,436,47 PAaaaaa426 CONTROLS BURNER _ 4/30/2017 N 418,569,57 122,518,77 � 216,859,54 PAB0000027 CONTROLS PLANT/BLENDING 413012017 N 23,836.78 6,977,24 PABaaaa028 CONTROLS PLANT/BLENDING 4.73112117 N 367,431,69 107,550,35 zss 881,34 PAB000a029 CONTROLS PLANTIBLENDING 4/1/2018 N 380,370,65 111,337,72 269032,93 PABOa0003O CONTROLSURNER 3131/2005 N 46,364.2s 9,172.88 37,091,37 PABaaaa032 CONTROL 3/31/2005 U 13157,22 ' 11183, ' 1,973,58 PASOCCO033 CONTROLS PLANTIBLENDING 413 012 0 17 N 10,101,00 $,500,01 1,5aa,00 PASOC00034 AUTO CONTROL. 41112111 44,243,93 12,950,58 31,293,35 PA80000035 CONTROLS PLANT/BLENDING' 41112111 N 23,611,27 21,241,18 2,36a,i2 PAR0000036 AUTO CONTROL 5/211998 N 24 33,772,97 PABaaaa040 AUTO CONTROL UPGRADE 7/7612010 N 91725,53 Zg'S53 2.98 3,172,55 38,593,73 37,628 85 964,8$ Rieth-Riley Construction Co,, Inc. Equipment list 3/31/2020 Asset Descrlptlan PCC0000002 CONVEYOR PCCOOO0003 CONVEYOR RECYCLE PC00000004 CONVEYOR COLD FEED PCC0000005 CONVEYOR PCC0000006 CONVEYOR RECYCLE PCC0000007 CONVEYOR FEED BIN PCCa000008 CONVEYOR VIRGIN AGGREGATE PCCa000009 CONVEYOR PCCOOOOdiO CONVEYOR Pccaaaaaii .CONVEYOR PCC0000012 CONVEYOR RECYCLE PCC60000i3. CONVEYOR PCCQaaaa14 CONVEYORAGGR FEED PCCamad15 CONVEYOR SAND FEED PCCoaaa016 CONVEYOR FEED BIN PCCOOCOO17 CONVEYOR COLLECTING P000000018 CONVEYORCOLLECrm PCCOO00019 CONVEYOR PCC000021 CONVEYOR COLLECTING P000aaa022 CONVEYOR COLLECTING . PCC00011023 CONVEYOR COLLECTING PCca0aa024 CONVEYOR COLLECTING PCC0000025 CONVEYOR COLD FEED PCCO000029 CONVEYOR PCC0000h CONVEYOR RECYCLE PCC0000030 CONVEYOR VIRGIN AGGREGATE PC00000001 DFIUM MIXER CONCRETE PCD0000002 PLANTCONCRETE PCDa000003 PLANTCONCRErE PCD(1000004 PL4NTCONCRETEREX MODEL S PCOOaaaa05 MIXER CONE PCF0000o01 BIN VIRGIN AGGREGATE PCFo000002. BIN VIRGIN AGGREGATE PCF00aO003. BIN COLD -FEED i6) PCFGOOOQ04 BIN COLD FEED PCF0400005 BIN COLD FEED PCF0000006 BIN AGGREGATE PCFa000G07 BIN AGGREGATE PCFaaaaa0H BIN COLD FEEDSYSTEM PCF0000009 BIN COLD FEED PCF000a01a BIN COLD FEED PCF0000011 BIN COLD FEED (6) PCFaaaaoi2 BIN colo FEED (G) PCFOOQ0013 BIN COLD FEED 14' PCF0000014 BIN COLD FEED (4) PCF000aoi5 BIN COLD FEED (6) PCF0000016 BIN COLD FEED PCFOaaaw BIN COLD FEED SYSTEM PCFQa00019 BIN COLD FEED PCFQGGCO20 BIN AGGREGATE PCF000002i BIN AGGREGATE PCFCQOG022 BIN AGGREGATE PCFao00023 BIN AGGREGATE PCFQaaaa24 BIN COLD FEED PCFa000025 BIN COLD FEED PCFQ000026 BIN COLD FEED (6) PCFa00g027 BIN COLD FEED (8) PCFQ000028 BIN COLD FEED (3) PCFa000Q29 BIN COLD FEED (5) PCFaa00030 Blit AGGREGATE PCF0000a31 BIN COLD FEED (6) PCFpOadO32 BIN COLD FEED PCFQaaaa33 BIN COLD FEED PCF0000034 BIN COLD FEED 10 PCF0000035 HIM COLD FEED SYSTEM PCFa000d36 BIN AGGREGATE PCFQa00037 BIN AGGREGATE • PCFaaaa038 BIN COLD FEED PCF0000033 BIN COLD FEED (6) PCFaOOQQ40 BIN COLD FEED (3) PCF0000041 HIM COLD FEED. PCF0000042 BIN COLD FEED (10) PCFa000043 BIN COLD FEED (4) PCF0000044 BIN COLD FEED (4) PCFQa00a45 BIN COLD FEED (9) PCFaa00045 BIN COLD FEED Acquired New or Acquisition Date 8/31/2005 Used U Cost Accum Depr NBV 3/31/2005 U 19,750,00 17,775,00 1,975,00 4/1/2009 N 1.6,700,00 15,030,00 1,670,00 3/29/1980 N 52,811,50 52,811,50 6/2211991 N 14,350,o0 12,915,00 1,435.00 6/1/1992 N 19,487,37 17,538,63 1,948.74 2/25/2000 N 32,569,95 32,5fi9,95 _ 1113/1966 N8,203,33, 65,626,64 57,423,31 1.1/311966 N 10,892;HO 10,892,80 11/311 9 6 6 N 10,892,80 10,892,80 9/306982 N 10,892,80 10;892,80 _ 3/29/1972 N 22,626,84 22,626,fl4 7129/199S U 13,469,58 13,469,58 - 7/2911995 U 10,000,00 1a,oaQ,aa 9,000,00 9,QQo,Qa 1,000,00 2/4/20'0'3 U 5,300,00 4,770',00 1,aaa,aa 3/16/2009 3/16/2009 U530,00 U 15,500,00 10,230,00 5,270,00 366/2009 U 15,500,00 10,230,00 5,27a,oa 3/16/2009 U 20,aaa,0o 71750,0a 13,200,00 5,115,00 fi,H00,a0 3/ifif2QU9 3/16/2009 U U 7,750.00 5,115,00 2,635,00 2,635,a0 3/i6f2009 U 5,25a,aa 3,465,00 1,785,00 3/3112005 U 5,250',00 3,4fi5,tla 1,785.00 3/31/2005 }•I 8350000 ,, 15,285,00 70,975,00 13,756,50 12,525,00 3131/2005 9/21/1999 U U 28,750,00 25,875,00 1,528,50 2,875,00 7/312011 N 21,929,26 19,736,34 2,192,92 11/3/1966 N 150,213100 131,436,66 18,776,34 5/811972 N 122,199,00 122,199,0❑ _ ;.45,605.21 145,605,21 7/29/1995 41171=4 U N 40,000,00 ' 36,00-0.00 4,000,00' 12/21/2009 N 46,x94.66 4fi,094,66 _ 12/2i/2o09 N •57,247.09 41,360,73 15,886,36 1211412010 U 57,247.10 111,638,24 41,360,73 111,638,24 15,886,37 4/1/1996 512/1998 N N 42,588,74 38,329,87 4,258,87 4/1/1985 N 83,230,37 .15,502,27 29,907,33 13,952,04 3,323,04 4/1/1985 7/1/1987 N 15,502,27 13,952,04 1,550,23 . 1,550,23 4/4/1989 N N 110,103,73 99,093,36 11,010,37 5/6/1995 N 35,409,06 31,868,15 3 5qp 91 3/312012 U 34,992,82 31,493,54 ' 3,499,2a 31312012 U 93,180,00 44,726,40 48,453,so 4/if2a18 N 99,195,00 47,613,96 51,581,04 7/21/2007 PI 46,221.64 9,244,32 36,977.32 4/2311999 U 279,235.4r 102,791.96 201,178,38 92,512,67 78,057,09 7/3111982 6f7411ggH N •41,583,98 37,425,58 10,279,19 415 ,S-40 N gn �a❑ ac •,•, _ 2,,d1BS 3 n'9 na 4131 19.7 4/4/1989 i i N 143,997.77 129,597,99 14,399,78 4/1/1985 N 3,iH4,29 2,865,86 ,43 318319,11 4/1fig85 N 12,861.14 11,575,03 1 ' 4/1/1gm N 12,861,14 12,861,14 1.1,575,03 11,575,o3 1,286,11. 4/16985 4/15/1996 N 12lg6i,i4 • 11,575,03 2x 1,6,11 1,286,11 5/6/1995 N N 43,689,95 39,324,95 4,369,00 41!/2007 N. 34,992.81 31,493,53 Masao35,437 2125/2000 N 95,68d,59 115,255,62 EO,243,34 99,961,47 ZS 15,294,18 2/1912008 N 117,758,67 117,758,67 312812014 7/29 f i995 N U 56,812,43 49,oas,a0 7,726,43 4f 112006 U 15,000,09 13,500,00 1,800,0'0 4/3tl/2a17 N 81,710,00 64,823,04 16,886,96 4130/2017 N 59,587,50 17,441,76 42,145,74 3/16/2009 U 59,587,50 17,44,, 76 42,145,74 3/3011981 N 226,iQ0,00 1494226,00 76,874,a0 411/1985 N 60,703.86 54,633.47 6,070,39 4/1/1985 N 12,861••14 11,575,63 1,286,11 4/411989 N 12,861•i4 11,575,63 1,286,11 5/aliggg N 23,936,27 21,542,fi4. 2,393,63 414/1989 N 238,381,41 214,543,27 23,838,14 4/1/1992 N 1:09,082.67 98,174,40 10,908,27 3/1612009 U 95,281.94 31,753,74 3,528.20 , 912111999 U 141,000,00 93,060,60 47,940,00 8/9/2005 U 72,631.93 65,368,74 7,263,19 3 f ifi/2009 U 35,658,48 35,658,48 7/27/1983 N 136,100,Q0 89,826,00 46,274,00, i08,433,50 97,590,15 10,843,35 Rieth-Riley Construction Cm, Inc. Equipment List . s/s�/2020 Asset fi Acquisition Da(a Acquired New or Used BIN IN AAGGGRREE GATE 6/24/!984 N Cast Accum DE!pr* Pr NeV PCFa0A0048 BIN AGGREGATE 6/24/1984 N 13,165.70 11,849,13 1,316,57 • PCF0000050 BIN AGGREGATE 7/10/1979 N 33,000,69 11,849,12 1.,316,57 PCF0000051 BIN COLD FEED 4fiji992 N 30,000,00 21,000,00 9,000,00 pCFa00a052 BIN COLD FEED 4/1/1992 N 25 ,760,42 23+202,38 2,578,04 PcFaaaao53 BIN COLD FEED 4 N 25,780,42 23,202,38 2,578,04 PcFtlaaaa54 BIN AGGREGATE 6/24/1984 N/30/1998 1aa,670,13 90,603,12 ' 10,067,01 PCFn000055 BIN AGGREGATE 6/2411984 N 13,165,70 1.1,849,13 ! ,316,57 PCF0000056 BIN COLD FEED . 8/29/1988 N !316570 ,. 11 1,318,57 PCF00pao57 BIN COLD FEEa 511311993' N 6,642.14 $0,111,27 5,97793 27,100,15 664,21 PCF0000056 BIN HOPPER 3/31/2005 U 3+011,12 PCFaaa0074 STARTING GEAR S1l8j2G02 N 19,500.00 17,55a,a0 3,950.00 PcHGgxaQal TRAILER CONTROL U 45,885,05 45,885,05 PCH0007a02 CONTROL,HOUSE 5/31/2005 512/1997. 2a,2aa,ax 1.8,180,00' 2,020,0a PcHaap7a73 cON7ROLHOUSE U 177,577,00 159,819,30 17,757.70 PCHaa00004 CONTROLHPUSE 2/25120aa N 3,575,7710 _ PCH00atl0a5 TRAILER CONTROL ' 4/2/1990 N 125,645,49 111,570,3,405,00 14,074,78 PcHadoao6' TRAILER CONTROL 412.4Ji991 N 15,161,87 15 ,161,87 PCHCGGU007 PLANT-BASE TRAILER U 15650 ,,00 ' 1.5,650,70 . PCHoaaoaas PLANT - CEMENT SECTION TRA 7f29J1995, U7/29/.1995 40,000,00 36 ,000,07 4,00a,aa PCHa0aa0a9 TRAILER CONTROL 7/29/1995 U 30,7x0,00 27,000,00 B,aax,da PCH0a0a010 CONTROLHOUSE 3/16/2009 U 7a,Gaa,aa e3,a77,aa 71000,00 PCH0000011 CONTROLHOUSE 10/14/1986 N 85,x70.00 56,100,00 289aa,aa PCH0000a13 CONTROLHOUSE 3f16fZtl09 U 38,8!3,60 16,93 2.24 i,881,3fi PCH0000014 CONTROLHOUSE 0/911075 2a+070'00 13,274,70 6,800,00 paaaaaj]l5 CONTROLHOUSE 3/16/2009 U 16,682.07 16,682,07 _ PCHOQOOa16 CONTROLHOUSE 712711983 N 20,000,00 33 ,270,00 6,807 00 pcNaab0a17 'CONTROLHOUSE 7/27/1983 N17,307.67 13,350,00 12,015,a0 11335,00 .PCHaeo00i9 CONTROLHOUSE 9/21/1999 U '19230,75 17'3 07,67 1,923.08 PcHaaaa= TRAILER CONTROL 4/212007 U 44,330,29 39,897,26 4,433,03 PCH0000721 TRAILER CONTROL 3/31/2005 N 21,734.21 21,734,21 _ 'PCHO0TRAILER •4/18/2006 U 5,000.00a0023 4,500,00 500,00 PCMGaaad0i COMPRE5SORAIR 313112005. U 19,538,16 18,236.a4 1,302,14 PCMa000002 COMPRESSbRAIR 6/21/2710 N 320,07 288.07 82,00 PCMa000003 C005S50RAIR 3/14/2013 N6/2/2017 11,100.00 11,100,00 _ PCNI,Oa00004 COMPRE550RAIR 75HP N 28,195,07 28,195,07 _ PCMG7aaG75 COMPRESSOR AIR 4/1211996• N 28,632.00 8,321,84 20,310,16 ' PcMaaaaaa6 COMPRESSOR 75 HP 4/1/2016 N 8,532.10 B 53 2.17 _ PCMGOOOG07 COMPRESSOR•357 CFM 715/2018 N 27,850,00 22,280.04 5,5fi9,96 pcMaaa00a8 COMPRESSOR AIR 75 HP 4/1/2017 N 25,215,aa 4,622.74 20,592,26 PCMOCO0009 COMPR95SORAIR 4128/2010 N 26,965,x0 8,089,56 18,875,44 PCM00000ii COMPRESSOR 352 CFM 411 f 2038 N 4,x47,00 B _ PCMCQCC012 COMPRE5iORAIR 3/16/2709 U 32,734,59 ' 54fi 96 26,187.63 PCM0000014 COMPRE55oRAiR 3 /16%2709 U z 000,70 + 1,320,00 680,Q0 . PCiv10000015 COMPRESSOR AIR 75 HP 413012017 N 1 nnn nn 27,7!4,37 uaav,77 8,132,17 350,00 PCM0000a16 COMPRESSORAIR 3/16/2009 U 707,70 19,6aZ.2x PcMaaaaa19 AIR coNiPREssoR 75 HP 1/1120ls N 462,00 238,00 r :.nnnnnnn „-n nrn ,,- n p.iywuuuucu Rcicirrn�„vcnlR^uR`i'cR 7101 hrn' ,_ , a, ,v , � e 3 ,8 6,5 �o� a, 4,--3.70 .,--3;2- 2"a ,723.33 pG4iGGGa721 AIR COMPRESSOR 3f8f2019 N 32, .032,35 r,34955 2,936,34 838.86 PCRaaaaaOi CRUSHER SYSTEM PCRaaaaabz CRUSHER SYSTEM 5/15/2004' N ii9,384.61 1.19,384,61 29096.01 . PCROOGO003 BREAKER RECYCLE 613012000 413012018 N N62,i39,22 621,392,22 559,253,00 _ PCRGaa0004 CRUSHER RECYCLE 6/22/1991 N 73,611,29 73,61129 _ PCRaabxa05 BREAKER RECYCLE • 4/1/2016 N 29,236al 20,912,57 2,323,fi1 PCRGa00006 BREAKERRECYCLE N 41,395.87 16,558,44 24837,4 3 • PCRGa0a007 BREAKER RECYCLE 4/1/2016 N 50,558,09 20,Zi9,16 30,32893 PCRaa00008 CRUSHERSYSTEM 4122/2006 N 42'778'78 17,111.52 25,667,26 BREAKER RECYCLE 4/1J2ais N 230,469,42 47,907,55 230,46,42 Pada7aaia BREAKERRECYCLE 6f3j20i8 N e+Sal,sz , 1,52 38,326.03 PCRQa00012 CRUSHER 4/1/2006 U 43,282,87 7,935.18 35,347.69 PCRa0x00i3 CRUSHER RECYCLE 4/1/3992 N is xa0,ax 35,127.x0 2,880,00 PCM000015 RECYCLE BREAKER 2/18/2019 N i8�365.a0 16,528,50 31836.50 PCRad00a16 RECYCLE BREAKER 2/!8/2019 N 87,2x0,32 49,318,57 7,993.37 79,276,95 POCH00001 CONVEYOR DRAG 912912008 N 104,007,00 4,520,89 104,000,x0 44,797.68 POC7NO= CONVEYOR DRAG 4/15/2017 N 77,402.10 77,02a _ . PDCOGGO003 CONVEYOR DRAG 4122/2005 N 171,735.19 171, _ PD00000004 CONVEYOR DRAG 5/412014 N 352,870,10 ,735,19 208,781,30 _ PD00000005 CONVEYOR DRAG 3/16/2009 U 154,088,87 PDCQaaxxa6 CONVEYOR DRAG SLATCROSS89,700,00 4130f2a18 N 58,740,00 30,260,00 PDCQGa0xa7 CONVEYQRDRAG 3Jisfzaa9 U 73,988,00 lq2 , 49,63 59,738,37,• PDC0000aaB CONVEYOR DRAG 3%15/2009 U 42,070,00 31,185,07 30815,77 pacaaaa0as CONVEYOR DRAG 5f 18/2002 N 69,070.00 45,540,00 23,467.oa •PDCa000a10 STAIR HANDRAIL FOR DRAG Ca / 6f 161 3994 N 137,980,00 136,53a,fii _ POM000001 DRYER DRUM 3/3/2012 U 7,980,x0 7,182,00 '127,788,36 798,00 PD7Qa0QaQ2 DRUM DRYER 9/2/2016 N 266,225,00 138,136.64 PD50000001 BURNER3 f 3112005 U 254,789'47 112,663,80 182125,67 PDSOOOOOOZ TANK BURNER FUEL 3 /31/2005 U 14,650.00 13185,00 . 1,465,00 13,500,00 12,157 00 !,350,00 Rieth-Riley Construction Co,, Inc, Equipment List , 8131/2020 Asset 9 Descriptlon Acquis'itlon Date Acquired New or Used FABO000042 AUTO CONTROL UPGRADE 6/30/2001 N Cast Accum de �$V PABOG00043 AUTO CONTROL UPGRADE 5/31/2005 PI 39,943,24 39,943,24r PABOO00044 AUTO CONTROL UPGRADE 413/2001 N 37,598,66 37,598,66 PA800000.45 AUTO CONTROL UPGRADE 5/2/2009 N 22,555,32 20,299,79 2,255,53 PABatl00046 CONTROL PC: UPGRADE 5/222015 N 12,412,37 12,412,37 _ PA80004047 AUTO CONTROL UPGRADE 4/2222°00 ►y 31,000,08 30,523 ,08 476,92 A800000,18 AUTO CONTROL UPGRADE 4/1/2042 N 48,365,94 43 5 , 2.5'34 4,s36,6a PAC -000000i HOPPER W/PLATE FEEDER 7f 1/2016 U 34,W,50,34,837,50 _ PAca0a0aaz HOPPERAGGR 7/1/2817 U 4,000,00 765,86 3,34.14 PACOOOP003 CRUSHER CONE 4,25 4/122°16 N ¢,484,88 141 365.86 28173,582,22 3,294.14 PAC0000404 CRU5HERAGGREGATE " PACp000005 CRUSHER 3/2412047 U 265,348,42 '601,35 , 20,36 113,2fl0,99 PAcoaaaaa6 cRUSHERIAW .3/31fZtl05 7/1/2016 U U 30,000,00 9,000,0° 91,766,20 1 uaa,40 PACGO00007 CRUSfiERCONE 3233/2005 U 78,000,00 14,931,16 63'8 , fi8,84 PAC0000008 CRUSNERCONE 44ief2008 U 20800,0° 198,000,00 180 114,000,36 2,840,88 PAC0040009 CRUSHER CONE 3/31/2005 U 149,763,08 1347o 75'999.64 PAC0000010 CRUSHER - 3231 1 20°5 U 57,609,00 ,7fl6, 31,$48,10 14,976,30 PAc0400011 CRUSHER AGGREGATE 4f142tl06 U 268,403,01 187,882,44 5,760.94 PACGOOGO12 CRUSHER PAcaaaaQl3 cRUSHERcaNE 3/31/2005 721/zais U U 252 930.00 256+437,8° 80,520.57. 25,293,00 PAC6000014 CRUSHERCONE 7/1/2416 U 297,08888 45,oca'00 B6,470,54 8,614.08 238,529,46 PAC040a015 CRU5HERiAW W%FEEDER 5/31 f 2018 U 36 38 , 5.92 • PAc4aa0a16 pLANTJAW 7/3/2016 U 590,323,22 fi7,887,26 522,435,96 PACa°aaoi7 PLANTCONE 711/2016 U 305,000,00 58,384,50 246,615.50• PAcoma19 CRUSHERSY5TEM 617411998 N 24°,00°•00 47' 527,04 192,472.96 PAP0000002' TRACKMOBILE RAILCAR MOVER11,542,82 7/3/2000 N 10,388,54 1,154.28 • PAP000083 MAGNET24 "" 5/17/2009' N 282,858,03 183,030,46 19 827,57 PAPa000004 MAGNET42INCH SELF CLEANI 11/9/2007 U10,500.00 6094.69 4,72s,4a 1,768,21 PAPo040a05 CYCLONE(2) I) 7/322°37 • u 3,°°8,00 10,500.00 _ • PAS0000002 PLANTSCREENING21412003 U 574ze . 2,425.72 PASOOC0003 PLANTSCREENING 41112006 U 88,300.00 86'000'00 8,830,00 PA50a00004 SCREENER PLANT 2122/2017 N 40,000,Oa , 0'04 4,525.0° PAscoapo05 PLANTSCREENING 21412003 N 25°,584.00 25,058,34 225,525,66 PA50000006 PLANTSCREEN 7/112016 U 33,300.00 15,0°0,00 29,970,80 3,330,00 PAstl000407, pLANTscREENING - 3/3i/zaas it • 44 aaa,00 2,871,40 3s 12,128,68 PASa0a0aa8 PLANTAGGR 71312416 U ssa00,0o ' 704,80 162 ?1,34 4,4aa,°° PAS°°OO°09 PLANT RIP RAP 54X24 •5/912017 U 245,800,80 , 53,593,75 6s,72s,7a PAs4aaaa10 PLANTTRACK SCREEN 74112016 U 193,406,25 Pee0a00a01 BUCKETEiEVATOR 312/2012 U 125,000,00 23j928.06 101,071,94 pfledaa4aa2 ELEVATOR BUCKET MOD IF1cATl 7130/2015 N 5,621,08 2,698.44 21922,56 PSFOO°°001 FEEDERSELTRAW 323122°05 U 15,838.:L2 15,046.17 791'95 PBF0000003 CONVEYORBELT 2/17/1778 N 9,508,00 10,456,00 8,550•°° 10,456,°0 950,00 paHQ4aatl4i BAGHOUSE 312112005 U sa,0aa,0o 72,800,88 POHoomooz BAGHOUSE 12/14/2410 U 142,984.12. 14P,984A2 8,080,00 to2H0400443 0AGNOUSE PSHO°00004 BAGHOUSE 4/4/1989 4/412003 N N 98,994.68 89,095,21 9,899,47 PBHOQ4aOO5 AIRDUSTSYSTEM 3 f 3 f 2012 U 471,713,54 424,542,15 47,171,35 paH°4anaa6 AER D115T CYSTFLI • 3/3/203,2 L! 99 835,00 'l33�•!Ea n4 47,92i.16 51,913,9$ p8H0000007 BAGHOUSE PBH0000008 BAGHOUSE 7/2322007 4/1812009 N U 361 ,592.24 ' 6D.S __ 261250, t `is 6$+775,24 104,341,94 paH000aoa9 BAGHOUSE 76718 CFM 411122016 N 535,220,15 535,32°,15 P01-10000010 BAGHOUSE 62322018 N 591,379,43 514,243,71 236,551,68 94,277,92 354,827,75 PRI -10000011 BAGHOUSE ' 3/zsjz014 N 85,669,44 419,965,79 PBHa040012 BAGHOUSE PBHo0aa413 BAGHOUSE 4/1/1992 N99 58,232.32 58'938'35 13',562.68 P81-10000014 DUSTCOLLECTORC&4V MODEL fif30j2o01 6234/1989 N N 53,939,35 525,00 53,525,04 PBH0000015 DUSTCOLLEMON SYSTEM 7/2921995 U 47,405,00 405,00 47+°0000 y P8Ha0aa016 BAGHOUSE 5/3/2014 N 10,000,80 + 1,04°,0° ' PBHOO00017 BAGHOUSE 333,286,37 111,908,64 199,377.73 PBHOOM018 BAGHOUSE 4f 23/1999 U fi20,00a,0❑ 157 899,40 ' qpg 1439°8,00 142,904,06 210 840,°4 ' PBH040001g BAGHOUSE � 713239$7 N 263 °21,11 236719,00 15,989,34 PBHOa00020 BAGHOU5E 311612 0 0 9 U 354,°00,°0 233640,°0 26,302,11 PBHOaaao2l DUST RECOVERY SYSTEM 7/27/1983 712713983 N 16510°,00 ' ' 148,59°,°0 120,360,°0 PBHOC00022 BAGHOUSE , U 144,430,00 322,765,50 16,51°,00 PSHOOOOD23 BAGHOUSE 3/31 f 2005 U 39,780,00 53 80 2 00 21,664,50 PRI -1000004 BAGHOUSE412812005+ U 2°9,942,69 209,942.69 5,978,°0 pBH0000025 AIR DU5T5Y5TEM 5213/1993 N 194,073,06 174,665,76 PBHOa00az9 STACK EXTENSION sa 42 29,854,98 19 407 30 PSHOOMOSO SAGHOUSEUPGRADE 3130994 321 N 16 29,854,98 PSHO000031 AUGER DUST 5211/2013 N ,972,75 33,985.95 15,275,48 1,697,27 pBHoamo z KNOCK OUT BOX W/DUCTWORK 4/1/2016 N 23,134,59 10,313,08 PBNOtl00033 AIR SYSTEM UPGRADE 4/151199fi N 65,985,95 129,485,79 2639 _39,591,71 PBHQoaa034 EXHAUSTSTACK FAN 411/2006 U 116984,24 7,74 32,478,35 PBH0000035 EXHAUST FAN INSTALLW/DUCT 411/2015 N 25'°°°'00 42,869,22 12,916,58 12083,42 4f PBHOOGO036 EHAUSTFAN 1/2015 N 137,179,56 21,434,52 21,43470 pBHa0aa437 STACK 4/112015 N 2°,140,57 68,589,72 10,070,40 68,589,84 PBRO000038 CYCLONE 3/28 f 2014 N 33,425,02 28,879,20 10,07°,27 41545,82 Rieth-Riley Construction Co., Inc. ' Equipment List ' 3/31/2020 Asset]) Description AcpsiEion Date Acquired New or Used EXHAUST FAN ASSEMBLY 4/3012017 N Cast ACCUm De pr Pr NBV PSHOOCO040 BAGHOUSEDUCFWORK 4/19/2903 / N •43,146,15 12,629,25 80,5is.90 ' P91-10006041. EXHAUSrSTACK EXTENsioN " 4/24/2004 N4/30/1994 45,741,12 45,744,12 pBHa0oa042 STACK N 6,710,04 6,710,0¢ _ PBHOo00a43 STACK EXTENSION 5/26/2007 N 22,135,41 19,921,87 - 2213,54 ' FBI-10000,P44EXHAUSTSTACK FAN 8/11/2001 N 38,652.63 38,652,63 _ PBH0000051 SAGHOUSE 11/28/2019 N 42,385,21 88,146,68 4,238,53 PSHOO00053 BAGHOUSE 11/2/2018 N 726,356,93 66,582,67 659,774.26 P8Ho000055 OAGHOUSE �- 12/14/2018 N 796,030,73 789,105,08 66,335,90 729,694,83 PB5000a004 SCALE BELTAGGRREGATE 411/2010 N 65,758,a0 723,346,28 P6513000006 CONVEYOR SCALE COLD FEED 3/16/2009 U •17,401,07 17,401.67 'PBS13000007 CONVEY09SCALE RECYCLE 25,500,00 16,830,00 8,670.00 ' PB50000008 5CALEBELT 412612003 t N 35 +Oa0,00 ' 23,100,00 11900.00 , POS000O009 CONVEYOR SCALE COLD FEED 3116/2009 U 23,963,04 23,963,04 _ PBS0000010 CoNVEYORSCALE RECYCLE 3116/2009 U 9,6,830,00 670.00 PB50000011 CONVEYOR'SCALECOLD FEED 3Jis/zaas U 35,000,00 23,100,00 11'900,00 P8513000012 CONVEYOfLSCALE RECYCLE alis/2009 U 00 500.25,500,00 19, 12,870.00 6630,00 PBS0000013 CONVEYOft'AGG SCALE 7/27/1983 N 29 000,00 r 19,140,40 9 860,00 P850000014 SCALE BELTAGGRREGATE 1i/112003 N 26,320,75 21,688,67- 4,63208 PB50000015 SCALE BELTRECYCLE 511412007. N 13,473,36 , 13,473,36 PBSOD06016' SCALEBELTAGGRREGATE 516/20015 ' 13,i86,81 13,186,81 _ PBS0000017 SCALEBELTAGGRREGATE 51612006 N 7'808.49 •7,244.46 • 564.03 PBS0000019 CONVEYOR SCALE • 8131/2005 U ". 8,737.49 2,1063b 631,19 P650000020 SCALE BELTAGGRREGATE 5/612006 N 5,350,00 4,815,00 935,00 PBS0000021 BELTSAMPlER .10Jis/z0a4 N 8,396.02 7,789,2¢ 506,78 POS0000022 EELTSCALES 5/18/2002 N 14,216;42 14,216,42 ._ PCA0066001 CONVEYORSTACKER 2/22%2017 N 24,032AG 24,032;46 PCA0000012 CONVEYOR 4/1/2009 U 132500,00 + 13,249,98 119,250,02 PCADaagoi4 CONVEYOR 42.'.. X 2800' 7/1/2016 U 3,500,00 3,500,00 _ PCA00000i5 CONVEYOR CHANNEL FRAME 71112ai15 U 450,Oa0,00 8441 ,20 363 85 + 0,72 pcA0600616 CONVEYOR - 711/zaas U 27,000.00 5,168,52 21,831,48 PCA0000018 CONVEYOR 5/18/1980 N 5,000,00. 956,98 4,043,02 ' PCA0000019 CONVEYOR UNLOADING 12111/1987 N 57,097,35 57,097,35 PCA0000o20 WEIGH BRIDGE 5120 200013,413,592,171,76 / N 21,717,03 19,545,33 PCA000a024 CONVEYORSYSTEM 6%24/1998 N 12,072.2a + 1341,36 pCA00a0025 WEIGH 8R1DGE 7/22/2000 N 374,246,74 156,822,07 1742 467 PCA0000026 CONVEYOR (2) 5/30/2002 N 8,743,75 7,869,39 874.36 PCA0000027 CONVEYORSAND SCREW 6/3/2002 N 93,667,49 84;300,7¢ _ 9,366,75 PCA0006028 CONVEYOR SYSTEM LATTICE 12129/2006 U 81,099,44 81,039,44 PCA0000030 CONVEYOR. 3/31/2005 U 31,312,64 31,312,64 PCAGO00032 CONVEYOR , 3/3112005 U 8 410,00 ' 7 569,00 ' 841,00 PCA000003+} CONVEYOR 3/31/2005 U 8,100,00 7,290,00 810,00 PCA6000035 CONVEYOR000,00 3 f 31%2005 U 9,1500.00 8,640,06 960,00 PCA0000039 CONVEYOR s/112008 U 20,000,00 18, aaa,1s 2'0(30,60 PCA0000040 CONVEYOR TRI PACK 511h t n ;,+, 194,103,67 118 73;342.49 PCA0000041 CONVEYOR SLIDE -PAC 36 X 80 7/3a/zala N ;1.06,450.00 70,869,60 PCA0000042 CONVEYOR RAW AGGRREGATE 3/31/2005 U 132,316,62 14,7m,4035,580,40 117,563,52 PCAo000643 CONVEYOR 31..s1/2005 [I 4,800,00 4,320,00 480,00 -u PrcOn__n,.ig CO,&iV"ciOR Pv.'i Avv 7E 2;70c ,nn PCA0000046 CONVEYOR 3i2uua/15 3/31/2005 u U is 0(30,06 s 000,00 ' 1,0(30,00 PCA0000048 CONVEYOR 313 1126 0 5 U 3,365,06 3,028,50 336,50 PCA0000049 CONVEYOR 8/311 2005 U 5,050,00 4,545,00 505,00 PcAaaaaa5l CONVEYOR SLIDE -PAC 36X80 7/30/2018 N 3,385,00 3,0415.50 338,50 PCA0000052 CONVEYOR 3f3012a05 U 3,32,316,91 14,753,40 117,563,51 PCA0000053 CONVEYOR 3/31/2005 U 7,385,00 ' 6,646,50 738,50 PCAOCOOO54 CONVEYOR 3/31/2005 U 6,7150,00 6,094,04 676,00 PCA0000055 -CONVEYOR 3131,12005 U 6,100,00 5,490,00 610,00 PCA0000058 CONVEYOR 3/3112005 U 17,615,00 15,853,50 1,761,50 PCAQa00o64 CONVEYOR 6/1/2009 N 39 485,00 ' 35,536,50 3,948,50 PCAOa00a69 CONVEYOR CHANNEL FRAME 7f 1,120115 U 30,000,00 10,600,00 . PCA0000Q70 CONVEYOR 7/1/x616 U flc)(10,00 ' 1531.26 ' 6,468,74 PCAaaaoa7i CONVEYOR 711/201 6 U 3o,000,Q0 5,742,80 24,257,20 PCA0000072 CONVEYOR _ 7/1/2015 U 20,000,00 3,828,38 16,171,62 PCAO000Q73 CDNVEYORFEEDING 71112016 U 5' 000,00 956,98 4,043.02 pCA0006074 CONVEYOR LATTICE FRAME 7j1/2ai6 U4,851,44 6,000,Oa 1,148,56 PCApoaaQ75 CONVEYORAFRAME 7/1/2016 ' U 8,000.00 1,531,26 6,468,7¢ pcAOQa0o76 cONVEYORFiELd 7/1/2016 U 10,000,00 1,914.30 8,065,70 PCA000Q077 CONVEYOR 7/1120115 U t0,D0o,06 :1,914.3a 8,08S,70 8+085,76 PCAGO00078 CONVEYOR FEED 7/i/20ic U 4,000,00 3,234,14 PcAaUQo079 CONVEYOR FEEDER 7/1/2016 U 8,000,00 1,531,26 6,468,74 PCA0a000aa CONVEYOR 7/112018 U 12,000,00 s 2,297.12 9,7oz,ss PCA0000081 CONVEYOR 7/112016 U 0Q6,ao ' 856,98 4,043,02 pCA6000082 CONVEYOR FEEDER 7/112016 U 5,000,00 956,98 4'D43,Q2 PCAQQQa6a5 SUPERSTACKER 8/13/2019 N 10,000,00 1,914,30 5,085,70 PCB00000a0 BATCHINGSYSTEM CONCRETE 41211989 N 269,800,00 11,413,36 245,386,64 pC8000000i BATCHINGSYSTEM 4112/1996 N 159,839,5¢ 69,839.54 PCC0000001 CONVEYOR 3/31/2605 U 1159,615.77 169,615,77 _ 1,086,06 972,00 loam RIETH-RILEY CONSTRUCTION CO., INC. 2022 SAMPLE WORK -IN -PROGRESS ProieR Name RR Job #HIDE Owner Construction Manager Title Phone Email SCOPE OF WORK Contract Amount % Compl Proi Compl Date SURETY R -41542-A 3208340-48 INDOT Kirk Stafford Project Engineer 317-650-1890. kstafford@carradino.com Asphalt Pavement $186,823,857 50% July 2025 TRAVELER'S CASUALTY 1-69 Section 4 & Bridges AND SURETY Toll Road Push ill 3681014-15 ITR Concession Company, LLC Brian Cherry Infrastructure Manager 574-651-2464 bcherry@indianatollroad.org Asphalt Overlay $113,874,825 93% December 2028 TRAVELER'S CASUALTY Construction AND SURETY 3208325 INDOT Mike Wilmot Project Engineer 765-745-1764 mwilmot@indot.in.gov MSE, CRCP $49,494,573 2% October2024 TRAVELER'S CASUALTY R -38526-A 1-465 Clear Path Lane Addition AND SURETY 3408129 INDOT Samantha Blosser Project Manager 317-557-9340 sblosser@walshgroup.com New Construction $31,138,998 1% October2023 TRAVELER'S CASUALTY R-42909 Asphalt AND SURETY 1-65/SR 43 Interchange Const. Inspection Section 3208296 INDOT Cory Mahan, P.E. Manager 317-780-7262 cmahan@chacompanies.com Asphalt Pavement $28,241,582 715. June 2022 TRAVELER'S CASUALTY R -39504-A 146th Street Over SR 37 N - AND SURETY 3408086 INDOT Clayton Pergal Inspector 765-376-0471 cpergal@indot.in.gov Road $27,448,664 25% September2024 TRAVELER'S CASUALTY R-37797 SR 26 Clinton County Reconstruct AND SURETY 33031-210087 7408190 Kalin Construction Mike Kalin Project Manager 269-925-2746 mkalin@kalininc.com Asphalt Paving $24,054,890 0% September2024 TRAVELER'S CASUALTY US 127 2022 AND SURETY 11016-130008 7118264 -MOOT Kenton McAndrew - Project Engineer 269-270-7313 McandrewKl@Michigan.gov Asphalt Pavement $23,784,960 46% June 2023 TRAVELER'S CASUALTY 1-94 Design/Build AND SURETY R -39500-A 3208283 INDOT Greg Peterson Project Supervisor 765-570-8003 gpeterson@indot.in.gov Asphalt Pavement $22,259,680 99% June 2022 TRAVELER'S CASUALTY 126th Street & SR 37 AND SURETY SB AirportTaxi 3610736 South Bend Regional Airport Andrew Paneita Engineer, Aviation 517-301-9358 andrew.panetta@meanhunt.com Earthwork, HMA & $19,760,353 76% June 2022 TRAVELER'S CASUALTY Mead & Hunt Aggregate Placement AND SURETY INDOT - Justin Minardo Project Supervisor 317-701-7175 justin.minardo@wsp.com Road Construction & RABS $17,958,773 0% October 2024 TRAVELER'S CASUALTY R-41050 3208328 AND SURETY Mt Comfort Rd RIETH-RILEY CONSTRUCTION CO., INC. 2022 SAMPLE WORK COMPLETED %OFWORK COMPLETION CONTRACT CONSTRUCTION MANAGER TITLE PHONE EMAIL TYPE OF WORK PERFORMED BY RR DATE AMOUNT SURETY PROJECT NAME OWNER RR JOB # Project Supervisor 765-617-4357 slindway@indot.in.gov Asphalt Pavement 97% 2021 $41,006,016 TRAVELER'S CASUALTY R -39093-A INDOT 3208260 Ed Wilson AND SURETY 1-69 Design Build Project Engineer 765-745-1717 Igan@indot.in.gov Bridges 59% 2021 $34,761,346 TRAVELER'S CASUALTY R -40511-B INDOT 3208295 Ung Gan ANDSURETY 1-70 South Split to 465W Field Manager 317-501-8111 jdubyel@structurepointmm Interchange Construction 48% 2021 $32,009,154 TRAVELER'S CASUALTY 16 -ENG -O5 City of Carmel 3200713 Joe Dubyel ANDSURETY 96th Street and Ke stone Area Engineer 219-873-6322 cbeale@indotin.gov Asphalt Pavement 76% 2021 $27,348,623 TRAVELER'S CASUALTY R-33950 INDOT 3648090 Courtney Beale ANDSURETY 1-94 & 1-65 Bundle 3208280 Sean Hendrickson Project Engineer 765-745-1731 shendrickson@indot.in.gov Asphalt Pavement 87% 2021 $21,562,318 TRAVELER'S CASUALTY R -41769-A INDOT ANDSURETY 1-465 Northwest Martin Navarro Construction Project Manager 219-214-2934 mnavarro@indot.in.gov Asphalt Pavement 73% 2021 $21,440,373 TRAVELER'S CASUALTY R -34439-A INDOT 3648097 ANDSURETY US 30/51153 Bundle Simon Stachnik Project Manager 303-905-1340 simon.stachnik@plenarygroup.com Urban Street 100% 2021 $17,759,129 TRAVELER'S CASUALTY State Street Overhead Plenary Roads State Street, LLC 3200609 Construction AND SURETY Project Engineer 765-745-1748 dstreib@indot.in.gov Concrete Pavement Restoratio 56% 2021 $15,636,213 TRAVELER'S CASUALTY R -41351-A INDOT 3208281 Dan Streib ANDSURETY 1-465 Restoration 2019 Project Engineer 269-849-1496 jacobsc@michigan.com Multi -Lift Mill &Fill - 58% 2021 $14,559,230 TRAVELER'S CASUALTY 11111-115754 MOOT 7118236 Chrislacobs ANDSURETY 1-196 Ted Sowders Project Supervisor 317-437-2374 tsowders@hntb.com Asphalt Patching 73% 2021 $13,414,911 TRAVELER'S CASUALTY RS -41978-B INDOT 3208285 & Resurface ANDSURETY 1-70 Terre Haute Rehab 3208250 Brad Thompson Area Engineer 855-463-6848 Asphalt Patching 78% 2021 $11,595,077 TRAVELER'S CASUALTY RS -38655-A INDOT & Resurface & Deck Overlay ANDSURETY 1-74 Construction Engineer 231-777-3451 zackg@michigan.gov Asphalt Pavement 60% 2021 $10,672,450 TRAVELERS CASUALTY 122642 MDOT 7218235 Gregg Zack ANDSURETY US 31 Hart -Shelby 100% Quality 9 100% Employee Owned ® Over 100 Years August 23 12022 To whom It May Concern:, For your review we have included references from Private firms that we have performed work for. AM General Corporation (574) 284-2728 Bosch Automotive Braking System/Navistar (574)654.2400 ITR Concessions LLC 5.74-674-5836 University of Notre Dame 574-631-7356 25200 S.R. 23 - South Bend, IN 46614 Phone: (574) 288-8321 • www.rieth-riley.com `—" I 100% Quality * 100% Employee awned • Over 100 Years List names and addresses of subcontractors that we have used in public works projects In the last five years: Roadsafe Traffic Systems V&R Trucking Slusser's Green Thumb 3519 Harding Street 1845 North Elmer Street P.O. Box 33 Indianapolis, In. South Bend, In. Logansport, In. Traffic Marking Trucking Landscaping/Erosion Control Hawk Enterprises 1850 E. North Street Crown Point, In. Electric/Signage R&R Excavating 2010 Went Avenue Mishawaka, In. Dirt/Excavating C -Tech Corporation 5300 W. 100 North Boggstown, In. Guard rail/Fencing P.O. Box 1775.25200 S.R. 23 - South Bend, 1N 46634 Acorn Landscaping, LLC. 3680 W. Sample Street South Bend, In. Landscaping Phone; (574) 288-8321 - www.rieth-riley.com