Loading...
HomeMy WebLinkAboutRatify Contracted Emergency Work - EPO Napoleon Blvd Repair – Selge Construction Co., Inc.  ELIZABETH A. MARADIK JOSEPH R. MOLNAR GARY A. GILOT JORDAN V. GATHERS MURRAY L. MILLER 1316 COUNTY-CITY BUILDING 227 W. JEFFERSON BOULEVARD SOUTH BEND, INDIANA 46601-1830 PHONE 574/ 235-9251 FAX 574/ 235-9171 CITY OF SOUTH BEND JAMES MUELLER, MAYOR BOARD OF PUBLIC WORKS September 27, 2022 Mr. Robert Kuhns Selge Construction Co., Inc. 2833 South 11TH St. Niles, MI 49120 aswinehart@selgeconstruction.com RE: Ratify Contracted Emergency Work Dear Mr. Kuhns: At its September 27, 2022 meeting, the Board of Public Works approved the above referenced contracted work for the emergency repairs for the sewer lines at 417 Napoleon Blvd. in the amount of $23,519.23. Enclosed please find a copy for your records. If you have any further questions, please call this office at (574) 235-9251. Sincerely, /s/ Theresa Heffner Theresa Heffner, Clerk Enclosures TH/lh INTER-OFFICE MEMORANDUM DEPARTMENT OF PUBLIC WORKS DIVISION OF ENVIRONMENTAL SERVICES TO: Members of the Board of Public Works Michael Schmidt, Assistant City Attorney Public Works Theresa Heffner, Clerk FROM: Jacob M. Klosinski, P.E., Assistant City Engineer SUBJECT: Emergency Repair – Napoleon Street Sanitary Sewer Repair (PO-0018024) Agenda Request – Ratify Emergency Repair Contract DATE: September 19, 2022 The Department of Public Works Division of Engineering and Street/Sewer teams contacted Selge Construction Company to assist with emergency repairs following a sewer collapse and sewer back-up concerns at 417 Napoleon Street. Assessment The root cause of the sanitary sewer collapse was a result of a failed 4-inch clay lateral at the entry point into the 10-inch clay sanitary sewer pipe at the centerline of Napoleon Boulevard. Emergency Repair Scope of Work Selge Construction was contracted to excavate and assist the City of South Bend Engineering to repair the sanitary sewer and lateral connection using 10-inch SDR-35 pipe and fittings to connect the clay lateral. Selge Construction and its paving subcontractor provided base and intermediate pavement. City crews performing milling and paving work in the vicinity of the repair location provided HMA surface and completed the street patch repairs. For questions regarding the subject agenda request and emergency repair, contact Jacob M. Klosinski (Ext. 9496) at the Division of Engineering. September 27, 2022 BOARD OF PUBLIC WORKS AGENDA ITEM REVIEW REQUEST FORM Date: 09-19-2022 Name: Jacob M. Klosinski Department of Public Works – Engineering Division BPW Date: 09-27-2022 Phone Extension:9496 Required Prior to Submittal to Board BPW Attorney X Attorney Name Michael Schmidt Dept. Attorney Attorney Name Michael Schmidt Purchasing Michael Schmidt Check the Appropriate Item Type –Required for All Submissions Professional Services Agreement Contract Proposal Open Market Contract Amendment/Addendum Special Purchase, QPA Bid Opening Bid Award Req. to Advertise Title Sheet Quote Opening Quote Award Reject Bids/Quotes Proposal Opening C/O & PCA No. PCA Chg. Order, No. Traffic Control Resolution Other: Ratify Contracted Emergency Work Ease./Encroach Required Information Company or Vendor Name Selge Construction Company, Inc. (V-00001471) New Vendor Yes If Yes, Approved by Purchasing No MBE/WBE Contractor MBE WBE Completed E-Verify Form Attached Yes No Project Name Emergency Repair – Napoleon Boulevard Sewer Repair Project Number Funding Source 641-06-602-509-439001 Account No. PO-0018024 Amount Original Estimate $25,000.00; Final Cost: $23,519.23 Terms of Contract Lump Sum (T&M) Special Contract Provisions None Purpose/Description City Engineering and Streets/Sewer, contracted Selge Construction to provide emergency repairs at Napoleon Boulevard after a sanitary sewer lateral and sewer collapse. See Memorandum for description of services. For Change Orders Only Amount of Increase Decrease $ ($ ) Previous Amount $ Current Percent of Change: Increase Decrease % (%) New Amount $ Total Percent of Change: Increase Decrease % (%) Time Extension Amount: New Completion Date: