Loading...
HomeMy WebLinkAboutRatify Contracted Emergency Work - EPO CSO 27-28 Outfall Pipe and Water Main Repair – Selge Construction Co., Inc.  ELIZABETH A. MARADIK JOSEPH R. MOLNAR GARY A. GILOT JORDAN V. GATHERS MURRAY L. MILLER 1316 COUNTY-CITY BUILDING 227 W. JEFFERSON BOULEVARD SOUTH BEND, INDIANA 46601-1830 PHONE 574/ 235-9251 FAX 574/ 235-9171 CITY OF SOUTH BEND JAMES MUELLER, MAYOR BOARD OF PUBLIC WORKS September 27, 2022 Mr. Robert Kuhns Selge Construction Co., Inc. 2833 South 11TH St. Niles, MI 49120 aswinehart@selgeconstruction.com RE: Ratify Contracted Emergency Work Dear Mr. Kuhns: At its September 27, 2022 meeting, the Board of Public Works approved the above referenced contracted work for the emergency repairs for the CSO 27/28 Outfall Pipe and Water Main in the amount of $251,360.23. Enclosed please find a copy for your records. If you have any further questions, please call this office at (574) 235-9251. Sincerely, /s/ Theresa Heffner Theresa Heffner, Clerk Enclosures TH/lh INTER-OFFICE MEMORANDUM DEPARTMENT OF PUBLIC WORKS DIVISION OF ENVIRONMENTAL SERVICES TO: Members of the Board of Public Works Michael Schmidt, Assistant City Attorney Public Works Theresa Heffner, Clerk FROM: Jacob M. Klosinski, P.E., Assistant City Engineer SUBJECT: Emergency Repair – CSO 27/28 Outfall Pipe and Water Main Repair (PO-0017455) Agenda Request – Ratify Emergency Repair Contract DATE: September 19, 2022 The Department of Public Works Division of Engineering, Utility and Street/Sewer teams contacted Selge Construction Company to assist with emergency repairs following two sewer collapses at the CSO 27/28 outfall pipes. The root causes of the sanitary sewer outfall pipes were identified to be caused by construction work occurring at the East Bank Trail along vacated Sorin Street where American Electric Power (AEP) / Indiana-Michigan Power (I&M) was installing duct bank for a new 69 kV electrical service extending north along the east bank trail to the University of Notre Dame. 04/01/2022 CSO 28 Outfall Pipe Collapse Location 1: During the afternoon of 04/01/2022, Newkirk (general contractor for AEP) and Kokosing were working at vacated Sorin Street near a manhole structure that carries outfall pipes for CSO 27 and CSO 28. A pavement area east of the manhole structure collapsed while a skid steer was traversing the area exposing the sanitary sewer, water main and manhole structure. 04/12/2022 CSO 28 Outfall Pipe Collapse Location 2: During the morning of 04/12/2022, Newkirk (general contractor for AEP) and Kokosing were working on concrete placement work at the East Bank Trail north of vacated Sorin Street. Ozinga Concrete trucks were using vacated Sorin Street as the truck route for concrete. Concrete trucks were traversing over the top of the CSO 27 and CSO 28 sanitary sewer outfall pipes which run parallel and under vacated Sorin Street. At approximately 9:00 A.M., An Ozinga concrete trucks rear wheels fell into the asphalt pavement causing collapse location number two. Assessment The root causes of the combined sewer overflow outfall pipe collapses are generally believed to have been caused by AEP / Newkirk / Kokosing during the construction of the electrical duct bank, construction equipment, and delivery vehicle loadings. With the amount of soil that migrated into the outfall pipe, the initial date of start of the damage and blockages in the CSO outfall pipes are not clear. Migration of soil into the pipe would have occurred over a period of time that could date back to the installation of the duct bank through this section of AEP’s electrical duct bank extension work. An exact reason for the 48-inch and 42-inch brick outfall pipe failures is not known. City of South Bend Legal Department placed AEP on notice and have requested compensation for the repairs. Emergency Repair Scope of Work Selge Construction was contracted to excavate and assist the City of South Bend Engineering with assessment of the damage. Collapse Location 2 was excavated to accommodate repair. Upon review of the location of the 42-inch outfall pipe and 48-inch outfall pipe, City Engineering determined that the 48-inch brick sewer could not be repaired without removing a section of the 42-inch outfall pipe due to worker safety and potential for collapse. The pipes were repaired with available materials. During work a segment of water main collapsed and had to be repaired during the work. Collapse Location 1 was excavated to accommodate repair. Upon review of the location of the 42-inch outfall pipe and 48-inch outfall pipe, City Engineering determined that the 48-inch brick sewer could not be repaired without removing a section of the 42-inch outfall pipe due to worker safety and potential for collapse. The pipes were repaired after extensive cleaning as it took almost ten days to extract the sand and soil out of the pipe via vacuum assisted trucks and high- pressure water jetting. In addition, a section of the brick manhole structure had to be removed and rebuilt due to the condition of the structure. Pavement and curbing removed during construction were restored to original (or better) conditions upon completion of the repairs. For questions regarding the subject agenda request and emergency repair, contact Jacob M. Klosinski (Ext. 9496) at the Division of Engineering. September 27, 2022 BOARD OF PUBLIC WORKS AGENDA ITEM REVIEW REQUEST FORM Date: 09-19-2022 Name: Jacob M. Klosinski Department of Public Works – Engineering Division BPW Date: 09-27-2022 Phone Extension:9496 Required Prior to Submittal to Board BPW Attorney X Attorney Name Michael Schmidt Dept. Attorney Attorney Name Michael Schmidt Purchasing Michael Schmidt Check the Appropriate Item Type –Required for All Submissions Professional Services Agreement Contract Proposal Open Market Contract Amendment/Addendum Special Purchase, QPA Bid Opening Bid Award Req. to Advertise Title Sheet Quote Opening Quote Award Reject Bids/Quotes Proposal Opening C/O & PCA No. PCA Chg. Order, No. Traffic Control Resolution Other: Ratify Contracted Emergency Work Ease./Encroach Required Information Company or Vendor Name Selge Construction Company, Inc. (V-00001471) New Vendor Yes If Yes, Approved by Purchasing No MBE/WBE Contractor MBE WBE Completed E-Verify Form Attached Yes No Project Name Emergency Repair – CSO 27/28 Outfall Pipe Repair & Water Main Repair Project Number Funding Source 641-06-602-509-439001 Account No. PR # 00017375; PO-0017455 Amount Original Estimate $155,000.00. Final Cost: $251,360.23 Terms of Contract Lump Sum (T&M) Special Contract Provisions None Purpose/Description City Engineering, Utilities (Wastewater) and Streets/Sewer, contracted Selge Construction to provide emergency repairs at CSO 27/28 after a sewer collapse caused by AEP-Newkirk-Kokosing during their electrical duct bank installation at vacated Sorin Street and the East Bank Trail corridor. See Memorandum for description of services. For Change Orders Only Amount of Increase Decrease $ ($ ) Previous Amount $ Current Percent of Change: Increase Decrease % (%) New Amount $ Total Percent of Change: Increase Decrease % (%) Time Extension Amount: New Completion Date: