HomeMy WebLinkAboutIndustrial Wastewater Discharge Permit Renewal - Steel Warehouse Company LLC
August 30, 2022
Board of Public Works
City of South Bend
1316 County City Building
227 West Jefferson Boulevard
South Bend IN 46601
RE: Renewal of Industrial Wastewater Discharge Permit
Dear Board Members:
The Division of Environmental Services recommends approving the renewal of the Industrial
Discharge Permit for Steel Warehouse Company LLC at the September 13, 2022, Board of
Public Works Meeting.
Steel Warehouse Company LLC is classified as a Categorical Industrial User. Steel Warehouse
Company LLC performs Hydrochloric Acid pickling of steel which is covered by the Iron and
Steel Category 40 CFR 420.95 (b). Steel Warehouse Company LLC’s requirements were
reviewed for necessary changes to ensure the industrial permit remains legally substantiated.
After review of requirements and historical data, no changes were necessary.
If you should have any questions, please do not hesitate to contact me (574) 235-5798 or at
sshane@southbendin.gov. Please let me know if I need to attend the Board Meeting to present
this permit.
Sincerely,
Serena Shane
Pretreatment Manager
City of South Bend
Division of Environmental Services, Department of Utilities
(574) 235-5798
sshane@southbendin.gov
Enclosure(s)
- Industrial Discharge Permit Board of Public Works Signature Page, Part I- -Agenda Request
Form, Permit Briefing Memo
CITY OF SOUTH BEND JAMES MUELLER, MAYOR
DEPARTMENT OF PUBLIC WORKS
ERIC HORVATH, DIRECTOR
City of South Bend
Department of Public Works
Industrial Pretreatment Program
Significant Industrial User – Permit No. 014-1250.300
In accordance with all the terms of Chapter 17 of the City of South Bend’s Municipal Code, and with any
applicable provisions of federal or state law and regulations, permission is hereby granted to:
Steel Warehouse Company LLC
2722 West Tucker Drive
South Bend IN 46624
for the contribution of wastewater into the City of South Bend Publicly Owned Treatment Works.
This permit is granted in accordance with the application filed on 21, June 2022.
Effective on: 21 October, 2022
Expires on the: 20 October, 2027
Any violation of the terms and conditions of this permit shall be deemed a violation of the City of South
Bend Municipal Code and will subject the permittee to the sanctions set out in section 17-11 through 17-
13 of the Municipal Code.
The permittee shall file an application for a renewal permit, a minimum of 90 days prior to the expiration
date.
Approved By:
September 13, 2022
PERMIT BRIEFING MEMO
1. Facility Description
Steel Warehouse engages in the Hydrochloric acid pickling of hot-rolled steel. The hot-rolled steel
is not produced on site and is not conversion coated or painted.
2. Discharge Description
Discharge at final discharge location consists of process water and equipment washdowns. The
boiler/tower blowdown, and domestic wastewater are discharged after the final monitoring point.
This permit covers two sources of industrial wastewater discharge: two (2) rinse tanks from the
hydrochloric acid pickling process and one (1) from the hydrochloric acid fume scrubber.
From July 1, 2021 to June 30, 2022
Average Process Flow: 25,265 gpd
Maximum Process Flow: 52,599 gpd
Any wastewater not covered under this permit that is discharged by Steel Warehouse must meet
the General Prohibitions and the Specific Prohibitions as found in the South Bend Sewer Use
Ordinance i.e Chapter 17 of the South Bend Municipal Code.
3. Sample Site Description
Sample Site Outfall #062 is located inside the pickle plant building near the door located at the
center of the north side of the building. The wastewater discharge flows through an open topped
tank with a V-notch weir prior to discharge at the final discharge pipe. The flow is measured with
and Ultrasonic flow meter. Composite samples are collected inside the discharge pipe, and grab
samples are collected after the V notch weir of the opened topped tank. SS 062 is considered to be
end-of-process.
4. Wastewater Treatment
Pretreatment of wastewater consists of pH neutralization and settling. Wastewater is adjusted for
pH by adding Sodium Hydroxide in a neutralization tank prior to discharge. The neutralization
tank is continuously monitored for pH. When the pH of the wastewater is detected out of range, a
monitoring system automatically closes the wastewater discharge valve. Only authorized personnel
have the ability to by-pass the automatic system. There are alarms in place to alert personnel of the
following events: 1) pH is out of range, 2) The wastewater failed to open, and 3) The wastewater
valve failed to close. The neutralization tank doubles as a settling tank and there is an additional
settling tank near the main discharge location.
5. Classification
Steel Warehouse is classified as a Categorical Industrial User (CIU). Specifically, Steel Warehouse
performs Hydrochloric Acid pickling of steel which is covered by the Iron and Steel Category 40
CFR 420.95 (b). The City’s Industrial Pretreatment Program states that all Categorical Industrial
Users be classified at a minimum as a B. Therefore Steel Warehouse is classified as a B Industry.
6. Calculation of Limits
Wastewater discharged at SS 026 is subject to the Iron and Steel Categorical Standards at 40 CFR
420.95 {PSES} (I)(b)(2) and (I)(b)(4) {hydrochloric acid pickling (spent acid solutions and rinse
waters) strip, sheet, and plate and fume scrubber}. The more stringent of the limits provided in 40
CFR 420.95 or Chapter 17 of the City of South Bend Municipal Code have been applied without
modification.
7. Monitoring Frequency
Monitoring frequencies are based South Bend’s US EPA approved Industrial Pretreatment Program
Monitoring Plan.
8. Industrial Operator Certification Requirement
Industrial Operator Requirement: B
Industrial operator certification requirements are based on the criteria listed in Indiana
Administrative Code, Title 327, 5-22-5.
Permit Drafted by:
City of South Bend
Industrial Pretreatment Group
August 6, 2022
BOARD OF PUBLIC WORKS
AGENDA ITEM REVIEW REQUEST FORM
Date 8/30/2022
Name Serena Lozano-Shane Department UTILITIES
BPW Date 9/13/2022 Phone Extension 5798
Review and Approval Required Prior to Submittal to Board Diversity Compliance
and Inclusion Officer Officer Name BPW Attorney Attorney Name
Dept. Attorney Attorney Name
Purchasing
Check the Appropriate Item Type – Required for All Submissions
Professional Services Agreement Contract Proposal
Open Market Contract Amendment/Addendum Special Purchase, QPA
Bid Opening Bid Award Req. to Advertise Title Sheet
Quote Opening Quote Award Reject Bids/Quotes
Proposal Opening C/O & PCA No. PCA
Chg. Order, No. Traffic Control Resolution
x Other: Steel Warehouse Industrial Discharge Permit Renewal
Required Information
Company or Vendor Name
New Vendor Yes If Yes, Approved by Purchasing
No
MBE/WBE Contractor MBE
WBE Completed E-Verify Form Attached Yes
No
Project Name
Project Number
Funding Source
Account No.
Amount
Terms of Contract
Purpose/Description _______________________________________________________________
_______________________________________________________________
___________________________________________________
For Change Orders Only
Amount of
Increase
Decrease
$
($ )
Previous Amount $
Current Percent of Change:
Increase
Decrease
%
( %)
New Amount $
Total Percent of Change:
Increase
Decrease
%
( %)
Time Extension Amount:
New Completion Date: