HomeMy WebLinkAboutOpening of Bids - WWTP Compressor Building Masonry Improvements Proj No. 121-046 - Slatile Roofing & Sheet MetalCITY OF SOUTH BEND, INDIANA CONTRACTOR'S BID FOR PUBLIC WORK RESPONSIBLE BIDDER CHECKLIST Project Name Wastewater Treatment Plant Masonry Improvements at Building 5 Project No. 121-046 For Bids Due September 13, 2022 Contractor Name: Slatile Roofing & Sheet Metal Co., Inc. The City seeks to enhance its ability to identify responsive and responsible bidders on all City public works projects by institution of comprehensive submission requirements in compliance with State law. Quality workmanship, efficient operation, safety, and timely completion of projects requires that all bidders meet certain minimum requirements to be responsive and responsible bidders. THIS FORM MUST BE SUBMITTED WITH YOUR BID. INSTRUCTIONS: If you are a pre -qualified bidder, complete Section I only. If you are not a pre -qualified bidder, complete Section II only. Section II acts as an application for pre -qualification. Submission of Section II will allow the bidder to be considered for pre -qualification for bids with the City of South Bend Department of Public Works. Pre- qualified bidders will then be exempt from a portion of the submission requirements outlined in Section 6- 63 of The Responsible Bidding Ordinance No. 10594-18 (hereinafter, "Responsible Bidding Ordinance") for a period of twelve (12) months. Thereafter, contractors who are pre -qualified must submit a complete application for continuation of "pre- qualified" standing, on a form provided by the City ("Responsible Bidder Checklist (1) Pre -Qualified Bidders") by December 31s' for the upcoming calendar year, or within twelve (12) months of obtaining pre- qualified standing. If the status of any item changes within the twelve (12) months, it is the responsibility of the contractor to notify the City. Failure by any pre -qualified contractor to submit its complete application for continuation of "pre -qualified" standing within the time prescribed above shall result in automatic removal of the designation, effective January 1 of the following year, or immediately following the twelve (12) months of pre -qualified standing. However, the "removed" contractor or subcontractor shall still be permitted to bid on City public works projects, though the contractor must submit all required documents under 6-63 until "pre -qualified" status is re-established. Please Note: The City reserves the right to request supplemental information from the bidder, additional verification of any information provided by the bidder, and may also conduct random inquiries of the bidder's current and previous customers regardless of pre -qualified standing. It is the sole responsibility of the potential bidder to comply with all submission requirements applicable to the bidder in Section 6-63 of the Responsible Bidding Ordinance no later than the date of the public bid opening. Version 02/23/2022 General Conditions - 10 POST BID SUBMISSIONS: Post -bid submissions must be submitted in accordance with Section 6-64 of the Responsible Bidding Ordinance. The post -bid submission requirements are as follows: 1. All bidders shall collect, maintain, and provide upon request, a current written list that discloses the name, address, licensing status, and type of work for any subcontractor from whom the bidder has accepted a bid and/or intends to hire on any part of the public work project, including individuals performing work as independent contractors. 2. Each subcontractor, whose portion of the project is estimated to be at least one -hundred fifty thousand dollars ($150,000.00), shall be required to adhere to the requirements of Section I of the Responsible Bidder Ordinance as though it were bidding directly to the City, except that the subcontractor shall submit the required information (including the name, address, and type of work) to the successful bidder prior to the commencement of work. 3. Failure of a subcontractor to submit the required information shall not disqualify the successful bidder from performing work on the project and shall not constitute a contractual default and/or breach by the successful bidder. However, the City may withhold all payment otherwise due for work performed by a subcontractor, until the subcontractor submits the required information and the City approves such information. 4. The disclosure of a subcontractor list ("Disclosed Subcontractor(s)") to the City by a bidder shall not create any rights in the Disclosed Subcontractor(s). Thus, a bidder may substitute another subcontractor for a Disclosed Subcontractor by giving the City, upon request, written notice of the name, address, licensing status, and type of work of the substitute subcontractor. 5. The successful bidder and all subcontractors on a public works project are required to submit certified payroll utilizing the federal form known as WH -347 or a similar form on a bi-weekly basis, submitted within 10 days after the end of each bi-weekly payroll period. Certified payrolls shall identify the job title and craft for each employee. Certified payrolls shall be submitted electronically. Please Note: Submissions deemed inadequate, incomplete, or untimely by the City may result in the automatic disqualification of the bid. The City, after review of complete and timely submissions, shall, in its sole discretion, after taking into account all information in the submission requirements, determine whether a bidder is responsive and responsible, and provide a Pre -Qualification Verification Letter. The City specifically reserves the right to utilize all information provided in the contractor's submission and any information obtained by the City through its own independent verification of the information provided by the contractor. Version 02/23/2022 General Conditions - 11 PRE -QUALIFIED BIDDER CHECKLIST (a) Acknowledgements: (i) x By checking this box, I hereby acknowledge that I am a pre -qualified bidder with the City of South Bend and that I have met the pre -qualification requirements within the last twelve (12) months. A copy of my Pre -Qualification verification letter is attached. (ii) x By checking this box, I hereby acknowledge that the City reserves the right to request supplemental information, additional verification of any information provided by me, and may also conduct random inquiries of my current and prior customers. (b) Attachments: (i) x Indiana Secretary of State's on-line records (ie. Business verification) dated within sixty (60) days of the submission of said document showing that business is in existence, current with the Indiana Secretary of State's Business Entity Report, and eligible for a certificate of good standing. (Not applicable to individuals, sole proprietors or partnerships). (ii) _Y Statement on staffing capabilities, including labor sources. This statement indicates and ensures I have sufficient employees on staff to complete the work. It outlines how I intend to meet the staffing needs of the work. (iii) Y List of projects of similar size and scope of work performed in all areas, including the State of Indiana, within the last three (3) years. (iv) x For every project, submit evidence of participation in apprenticeship and training programs, applicable to the work to be performed on the project, which are approved by and registered with the United States Department of Labor's Office of Apprenticeship, or its successor organization. Version 02/23/2022 General Conditions - 12 PRE -QUALIFICATION CHECKLIST (FOR BIDDERS THAT ARE NOT PRE -QUALIFIED) (a) Acknowledgements: (i) x By checking this box, I hereby acknowledge that I am not a pre -qualified bidder with the City of South Bend. (ii) x By checking this box, I hereby acknowledge that the City reserves the right to request supplemental information, additional verification of any information provided, and may also conduct random inquiries of my current and prior customers. The City reserved the right to utilize all information provided in this submission and all information obtained in inquiries or requests to determine if a bidder is responsive and responsible. Additionally, I acknowledge that all information provided to the City shall be regarded as public records. (iii) x By checking this box, I hereby acknowledge that copies of all Applicable apprenticeship certificates or standards for training programs applicable to the work performed on the project may be requested at any time and shall be furnished upon request. (iv) x By checking this box, I hereby acknowledge and ensure that I and all sub- contractors, from whom I have accepted a bid and/or intend to hire to perform work on the public work project, are properly licensed. Furthermore, I acknowledge my understanding that it is my responsibility to ensure that all sub -contractors have the necessary licenses to undertake the work called for in this bid. If a sub- contractor loses their license at any point, it is the responsibility of that sub- contractor to notify the City. (b) Attachments: (i) x Indiana Secretary of State's on-line records (ie. Business verification) dated within sixty (60) days of the submission of said document showing that business is in existence, current with the Indiana Secretary of State's Business Entity Report, and eligible for a certificate of good standing. (Not applicable to individuals, sole proprietors or partnerships). x List identifying all former business names. Y Any determinations by a court or governmental agency any violations of federal state, or local laws including, but not limited to, violations of contracting or antitrust laws, tax or licensing laws, environmental laws, Occupational Safety and Health Act (OSHA), or federal Davis -Bacon and related Acts, within the preceding five (5) years. (iv) x Statement about staffing capabilities, including labor sources. This statement indicates and ensures I have sufficient employees on staff to complete the work I am bidding on OR outlines how I intend to meet the staffing needs of the work. (v) X Statement that individuals who will perform work on the work public project on my behalf will be properly classified as an employee or as an independent contractor under all applicable state and federal laws and local ordinances. (vi) v For every project, submit evidence of participation in apprenticeship and training programs, applicable to the work to be performed on the project, which are approved by and registered with the United States Department of Labor's Office of Apprenticeship, or its successor organization. NO x Copy of a written plan for employee drug testing that covers all of my employees who will perform work on the public work project and meets or exceeds the requirements set forth in IC 4-13-18-5 or IC 4-13-18-6. (viii) X Evidence that I am utilizing a surety company which is on the Bureau of Fiscal Service "Department of Treasury's Listing of Approved Sureties" as required in the bid specifications or contract. Version 02/23/2022 General Conditions - 13 Ox) x Written statement of any federal, state or local tax liens or tax delinquencies owed to any federal, state or local taxing body in the preceding three years. (i) x List of projects of similar size and scope of work performed in all areas, including the State of Indiana, within three (3) years prior to the date on which the bid is due. Date: 09/13/22 (Sign Here) Gerald Longerot - President (Print Name Here) Slatile Roofing & Sheet Metal Co., Inc. (Name of Company) 1703 S. Ironwood Drive, South Bend, IN 46613 (Address of Company) (City) (State) 574-233-7485 (Telephone Number) Version 02/23/2022 General Conditions - 14 1316 COUNTY -CITY BUILDINGlrJ 1!`'_ PHONE 574/235-9251 227 W. JEFFERSON BOULEVARD Uisl`' FAx 574/235-9171 SOUTH BEND, INDIANA 46601-1830 +"^� TDD 574/ 235-5567 CITY OF SOUTH BEND JAMES MUELLER, MAYOR BOARD OF PUBLIC WORKS Date: 09-06-2022 To: All Planholders From Theresa Heffner, Clerk, Board of Public Works Subject Addendum Number: 1 Wastewater Treatment Plant Compressor Building Masonry Project Name: Improvements Project No.: 121-046 ACKNOWLEDGEMENT OF RECEIPT OF ADDENDUM Date Received: 2o -a This addendum is being forwarded to you for the above referenced project. Please sign below and acknowledge receipt of this Addendum by faxing this sheet to the Board of Public Works at (574) 235-9171 within 48 hours of receipt. A copy MUST also be included with your bid package upon submittal. THIS ADDENDUM MAY AFFECT YOUR BID. Notes: The attached documents are hereby added to the Specifications and Contract Documents and become a part of herein. Company: Slatile Roofing & Sheet Meth-qo., Inc. Authorized Signature: Date; September 06, 2022 Addendum #1 Date: September 1, 2022 To: All Bidders and others to whom Plans & Specifications have been issued From: Kil Architecture/ Planning Gregory A. Kil, AIA, NCARB Architect RE: Wastewater Treatment Plant Compressor Building Masonry Improvements Project 121-046 City of South Bend, Indiana, Board of Public Works County -City Building, Room 1316 227 West Jefferson Blvd. South Bend, IN 46601 This addendum forms part of the Contract Documents and modifies the original Bidding Documents only as noted below. The remainder of the drawings and Specifications are to remain in their entirety. Acknowledge receipt of this addendum in the space provided on the Bid Form. This addendum consists of the following changes identified in bold: PROJECT MANUAL: A. Notice to Bidders: 1. Bidder Questions Due Date Revision: "Any questions about bidding conditions must be addressed to the Owner in writing no later than 4:00pm September 71h 2022." B. Bid/Proposal Form: 1. Bid/Proposal Form to be reissued — See Attachment 1 DRAWINGS: A. Drawings A1.1,& A1.2 FLOOR PLANS 1. Key Note 1, Add to end of note the following: "AT GLASS BLOCK, REMOVE AND PROTECT INTERIOR METAL AND WOOD TRIM IN ORDER TO DO LINTEL WORK, AND REINSTALL TRIM AFTER LINTEL WORK IS COMPLETE." K I L ARCHITECTURE PLANNING www.kilarchitecture.com Addendum #1 Page I of 2 1126 LINCOLNWAY EAST SOUTH BEND I N 46601 (574) 288.2654 VOICE 289. 2420 FA X 1316 COUNTY -CITY BUILDING 227 W. JEFFERSON BOULEVARD SOUTH BEND, INDIANA 46601-1830 PHONE 574/235-9251 FAx 574/235-9171 TDD 574/ 235-5567 CITY OF SOUTH BEND JAMES MUELLER, MAYOR BOARD OF PUBLIC WORKS Date: 09-08-2022 To: All Planholders From Theresa Heffner, Clerk, Board of Public Works Subject Addendum Number: 2 Wastewater Treatment Plant Compressor Building Masonry Project Name: Improvements Project No.: 121-046 ACKNOWLEDGEMENT OF RECEIPT OF ADDENDUM Date Received: September 08, 2022 This addendum is being forwarded to you for the above referenced project. Please sign below and acknowledge receipt of this Addendum by faxing this sheet to the Board of Public Works at (574) 235-9171 within 48 hours of receipt. A copy MUST also be included with your bid package upon submittal. THIS ADDENDUM MAY AFFECT YOUR BID. Notes: The attached documents are hereby added to the Specifications and Contract Documents and become a part of herein. Company: Slatile Roofing & Sheet Metal Co., Inc. Authorized Signature: Date: September 08, 2022 Addendum #2 Date: September 8, 2022 To: All Bidders and others to whom Plans & Specifications have been issued From: Kil Architecture/ Planning Gregory A. Kil, AIA, NCARB Architect RE: Wastewater Treatment Plant Compressor Building Masonry Improvements Project 121-046 City of South Bend, Indiana, Board of Public Works County -City Building, Room 1316 227 West Jefferson Blvd. South Bend, IN 46601 This addendum forms part of the Contract Documents and modifies the original Bidding Documents only as noted below. The remainder of the drawings and Specifications are to remain in their entirety. Acknowledge receipt of this addendum in the space provided on the Bid Form. This addendum consists of the following changes identified in bold: DRAWINGS: A. Drawings A2.1, A2.2, A2.3, & A2.4 ELEVATIONS 1. General Note 7, Add to end of note the following: " CLEANING IS TO BE LIMITED TO EXTERIOR WALLS, AND DOES NOT INCLUDE INTERIORS NOR GARAGE 0507." 2. Elevation Keynote #9, Add to end of note the following: " DOES NOT APPLY TO LOWER LINTEL AT CURVED GLASS BLOCK WALL IN STAIR 0518, ONLY TO TOP LINTEL IN THIS LOCATION." B. Drawing A4.1 DETAILS 1. Detail #1 Note: Replace Note: " WOOD TRIM W/ METAL FACING TO BE PROTECTED & REMAIN IN PLACE. REPAIR AS NECESSARY" with: "AT GLASS BLOCK, REMOVE AND PROTECT INTERIOR METAL AND WOOD TRIM IN ORDER TO DO LINTEL WORK, AND REINSTALL TRIM AFTER LINTEL WORK IS COMPLETE." END OF ADDENDUM #2 K I L ARCHITECTURE PLANNING www.kilarchilecture.com Addendum #2 Page 1 of I 1126 LINCOLNWAY EAST SOUTH BEND I N 46601 (574) 288.2654 VOICE 289. 2420 FA X BID/PROPOSAL CITY OF SOUTH BEND Project Name: Wastewater Treatment Plant Masonry Improvements at Building 5 Project Number: For Bids Due: 121-046 September 13, 2022 Contractor Name: Slatile Roofing & Sheet Metal Co., Inc. BASE BID Item No. Description Quantity Unit Unit Price Total Amount 3 Masonry Improvements for Building #5: b cs per unit 7 Glass Block Replacement per unit 4 Masonry scope includes brick masonry 1 LS 1 22'-0" Steel Lintel Replacement d� repointing (1200sf), brick replacement 1 (1,000 units), glass block replacement 1 LS (130 units), limestone replacement (140 sf), complete cleaning of exterior of brick and stone masonry surfaces, 2 Construction Contingency Allowance 1 LS $10,000.00 $10,000.00 ALTERNATE #1 BASE BID TOTAL i!s ' (� e-) ck)� Item No. Description Quantity Unit Unit Price Total Amount 3 Replacement of stud wall with CMU b cs per unit 7 Glass Block Replacement per unit 4 block infill between rooms 500 and 504 1 LS 1 22'-0" Steel Lintel Replacement d� ALTERNATE #1 TOTAL l ALTERNATE #2 Item No. Description p Quantity Unit Unit Price Total Amount 6 Prepare existing concrete floor slab for b cs per unit 7 Glass Block Replacement per unit 4 an install new epoxy floor coating for per sf 9 1 22'-0" Steel Lintel Replacement f mezzanine 0517 UNIT PRICING ALTERNATE #2 TOTAL$1/ O&D Gl Item No. Description Unit Add Deduct 5 Brick Masonry Repointing per sf 6 Brick Replacement b cs per unit 7 Glass Block Replacement per unit 8 Limestone Replacement per sf 9 1 22'-0" Steel Lintel Replacement per unif3' F00 -1PJ -t The City of South Bend will review the Base Bid and any combination of Alternate #1, Alternate #2 and Unit Pricing Values in its evaluation of pricing to determining the lowest, responsive, responsible bidder. The City of South Bend shall be the sole judge in awarding the Base Bid work plus any combination of the Alternates and Unit Price work, in whole or in part, based on available funding for the project. BID/PROPOSAL CITY OF SOUTH BEND Project Name: Wastewater Treatment Plant Masonry Improvements at Building 5 Project Number: 121-046 For Bids Due: September 13, 2022 Contractor Name: Slatile Roofing & Sheet Metal Co., Inc. Bidder (Firm): Address: City/State/Zip: Slatile Roofing & Sheet Metal Co., Inc. 1703 S. Ironwood Drive South Bend, IN 46613 Telephone Number: ( 574) 233;7485 By ignATure) (Printed Name of Persdn' Signing) PRE-BID MEETING SIGN -IN SHEET Meeting Date: 08/24/2022 Project No.: 121-046 Project Name: Wastewater Treatment Plant Compressor Building Masonry Improvements Der Buret 227 V1 So NAME J ORGANIZATION TELEPHONE (Office/Mobile) E-MAIL lxar%� f f iiif" M: �"Ie 6 Z`y �l'`7'c�'? 1� A %u -� O: M:.f7J/ -g �� o sk � -�� �� �� �� S f � .� �7 ► � M: 5-74/- n --s w.� 7 .J e (,r v l�� `i a-47/ �, ' �r M: s- 7y - 51' 2 Y M G _ `I l 47 33� _39dGQ M. �l II O: M: / O: ��8 Ni . tvsr� SIG( C1 or .f �E�o M: 5�4 235 S4gG � j k-1 osis M: O: M: O: M: a .AIA Document A310TM -2010 CONTRACTOR: (Name, legal status and address) Slatile Roofing & Sheet Metal Co., Inc. 1703 S. Ironwood Drive South Bend, IN 46613 SURETY: (Name, legal status and principal place of business) Hudson Insurance Company 100 William Street, 5th Floor New Vnrk NV inn3R Uw1YtK: (Name, legal status and address) City of South Bend, Board of Public Works 227 West Jefferson Boulevard South Bend, IN 46601 BOND AMOUNT: ***FIVE PERCENT OF AMOUNT BID*** PROJECT: (Name, location or address, and Project number, if any) Wastewater Treatment Plant Compressor Building - Masonry This document has important legal consequences. Consultation with an attorney is encouraged with respect to its completion or modification. Any singular reference to Contractor, Surety, Owner or other party shall be considered plural where applicable. The Contractor and Surety are bound to the Owner in the amount set forth above, for the payment of which the Contractor and Surety bind themselves, their heirs, executors, administrators, successors and assigns, jointly and severally, as provided herein. The conditions of this Bond are such that if the Owner accepts the bid of the Contractor within the time specified in the bid documents, or within such time period as may be agreed to by the Owner and Contractor, and the Contractor either (1) enters into a contract with the Owner in accordance with the terms of such bid, and gives such bond or bonds as may be specified in the bidding or Contract Documents, with a surety admitted in the jurisdiction of the Project and otherwise acceptable to the Owner, for the faithful performance of such Contract and for the prompt payment of labor and material furnished in the prosecution thereof, or (2) pays to the Owner the difference, not to exceed the amount of this Bond, between the amount specified in said bid and such larger amount for which the Owner may in good faith contract with another party to perform the work covered by said bid, then this obligation shall be null and void, otherwise to remain in full force and effect. The Surety hereby waives any notice of an agreement between the Owner and Contractor to extend the time in which the Owner may accept the bid. Waiver of notice by the Surety shall not apply to any extension exceeding sixty (60) days in the aggregate beyond the time for acceptance of bids specified in the bid documents, and the Owner and Contractor shall obtain the Surety's consent for an extension beyond sixty (60) days. If this Bond is issued in connection with a subcontractor's bid to a Contractor, the term Contractor in this Bond shall be deemed to be Subcontractor and the term Owner shall be deemed to be Contractor. When this Bond has been furnished to comply with a statutory or other legal requirement in the location of the Project, any provision in this Bond conflicting with said statutory or legal requirement shall be deemed deleted herefrom and provisions conforming to such statutory or other legal requirement shall be deemed incorporated herein. When so furnished, the intent is that this Bond shall be construed as a statutory bond and not as a common law bond. Signed and sealed this 13th day of September 2022 ,,/)/J,, J „ „ I , Slatile Roofing & Sheet Metal Co., Inc. N Al ri r, r (Witness 1� Hudson Insufance (Surety) (Title) Todd SchaaD, Attornev-in-Fact (Seal) (Seal) Init. AIA DocumentA310- — 2010. Copyright® 1963, 1970 and 2010 by The American Institute of Architects. All rights reserved. WARNING: This AIA' Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution ofthis AIA° Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible underthe law. / Purchasers are permitted to reproduce ten (10) copies of this document when completed. To report copyright violations of AIA Contract Documents, e-mail The American Institute of Architects' legal counsel, copyright@aia.org. 061110 HUDSON INSURANCE GROUP POWER OF ATTORNEY KNOW ALL MEN BY THESE PRESENTS: That HUDSON INSURANCE COMPANY, a corporation of the State of Delaware, with offices at 100 William Street, New York, New York, 10038, has made, constituted and appointed, and by these presents, does make, constitute and appoint Thomas O. Chambers and Todd Schaap of the State of Wisconsin its true and lawful Attorney(s)-in-Fact, at New York, New York, each of them alone to have full power to act without the other or others, to make, execute and deliver on its behalf, as Surety, bonds and undertakings given for any and all purposes, also to execute and deliver on its behalf as aforesaid renewals, extensions, agreements, waivers, consents or stipulations relating to such bonds or undertakings provided, however, that no single bond or undertaking shall obligate said Company for any portion of the penal sum thereof in excess of the sum of Twenty Five Million Dollars ($25,000,000.00). Such bonds and undertakings when duly executed by said Attomey(s)-in-Fact, shall be binding upon said Company as fully and to the same extent as if signed by the President of said Company under its corporate seal attested by its Secretary. In Witness Whereof, HUDSON INSURANCE COMPANY has caused these presents to be of its Senior Vice President thereunto duly authorized, on this 3rd day of June 20 22 at New York, New York. ;ea HUDSON INSURANCE COMPANY Attest.......... ....... By...................................................4- Corporate ...... Dina Daskalakis Michael P. Cifone Secretary Senior Vice President STATE OF NEW YORK COUNTY OF NEW YORK. SS. On the 3rd day of June 2022 before me personally came Michael P. Cifone to me known, who being by me duly swom did depose and say that he is a Senior Vice President of HUDSON INSURANCE COMPANY, the corporation described herein and which executed the above instrument, that he knows the seal of said Corporation, that the seal affixed to said instrument is such corporate seal, that it was so affixed by order of the Board of Directors of said Corporation, and that he signed his name thereto by like order. M. ..... .............. I.!�r'................................... (Notarial Seajj p�N...... v 90 s ANN MURPHY t%0. Tq: y{ = Notary Public, State of New York _ No. 01 MU6067553 '.ALeL 1C + Qualified in Nassau County =,7.t+ Commission Expires December 10, 2025 v'oF ^'EVV Y0,#�"" CERTIFICATION STATE OF NEW YORK COUNTY OF NEW YORK SS. The undersigned Dina Daskalakis hereby certifies: That the original resolution, of which the following is a true and correct copy, was duly adopted by unanimous written consent of the Board of Directors of Hudson Insurance Company dated July 27h, 2007, and has not since been revoked, amended or modified: "RESOLVED, that the President, the Executive Vice Presidents, the Senior Vice Presidents and the Vice Presidents shall have the authority and discretion, to appoint such agent or agents, or attorney or attorneys -in -fact, for the purpose of carrying on this Company's surety business, and to empower such agent or agents, or attorney or attomeys-in-fact, to execute and deliver, under this Company's seal or otherwise, bonds obligations, and recognizances, whether made by this Company as surety thereon or otherwise, indemnity contracts, contracts and certificates, and any and all other contracts and undertakings made in the course of this Company's surety business, and renewals, extensions, agreements, waivers, consents or stipulations regarding undertakings so made; and FURTHER RESOVLED, that the signature of any such Officer of the Company and the Company's seal may be affixed by facsimile to any power of attorney or certification given for the execution of any bond, undertaking, recognizance, contract of indemnity or other written obligation in the nature thereof or related thereto, such signature and seal when so used whether heretofore or hereafter, being hereby adopted by the Company as the original signature of such officer and the original seal of the Company, to be valid and binding upon the Company with the same force and effect as though manually affixed." THAT the above and foregoing is a fill, true and correct copy of Power of Attorney issued by said Company, and of the whole of the original and that the said Power of Attorney is still in full force and effect and has not been revoked, and furthermore that the Resolution of the Board of Directors, set forth in the said Power of Attorney is now in force. Witness the hand of the undersigned and the seal of said Corporation this 13th day of September 2022 (f` S� i' d ...meq! By...............................�41 ......................... Dina Daskalakis, Corporate Secretary STATE OF WISCONSIN ) COUNTY OF Kenosha ) ON THIS 13th day of September 2022 before me, a notary public, within and for said County and State, personally appeared Todd Schaap to me personally known, who being duly sworn, upon oath did say that he is the Attorney -in -Fact of and for the Hudson Insurance Company , a corporation of Delaware created, organized and existing under and by virtue of the laws of the State of Delaware • that the corporate seal affixed to the foregoing within instrument is the seal of the said Company; that the seal was affixed and the said instrument was executed by authority of its Board of Directors; and the said Todd Schaap did acknowledge that he/she executed the said instrument as the free act and deed of said Company. "AA.f Megan ORO, Notary Public, Kenosha County, Wisconsin My Commission Expires 3/3/2024 CITY OF SOUTH BEND, INDIANA CONTRACTOR'S BID FOR PUBLIC WORK CHECKLIST FOR BIDDERS Project Name Wastewater Treatment Plant Masonry Improvements at Building 5 Project No. For Bids Due 121-046 September 13, 2022 4 pUTH RA 1865 From time to time the South Bend Board of Public Works finds it necessary to reject a bid because it does not comply with statutory requirements. In preparing your bid, please use the following checklist in order to make sure that your bid is done in the proper manner. Proper bid security included. The bidder has the option of providing either a Certified Check or Bid Bond. Bid prepared on the City of South Bend Contractor's Bid for Public Work Form, completely x executed. Contractor's Non -Collusion and Non -Debarment Affidavit, Certification Regarding Investments with Iran, Employment Eligibility Verification, Non -Discrimination Commitment, and x Certification of use of United States Steel Products or Foundry Products. Proof of M/WBE Utilization Plans [MBE -1.0 and WBE-1.0]. Also provide Evidence of Good Faith Efforts Forms [MBE -2.0 and WBE-2.0] and M/WBE Contacted Forms [MBE -2.1 and x WBE-2.11. x Acknowledge Receipt of 2 Addendum(s) included with the bid. x All required additional information is included with the bid. Proposal statements and other affidavits all signed by the proper party with name either X printed or typed underneath signature. x This checklist submitted with the Bid. This checklist is provided for bidder's use in assuring compliance with required documentation; however, it does not include all specifications requirements and does not relieve the bidder of the need to read and comply with the specifications. Bidder: Slatile Roofing & Sheet Metal Co., Inc. Date: 09/13/22 By Authorized Representative: Signature: Print Name & Title: Gerald Longerot Version 09/29/2021 Contractor's Bid for Public Works - 1 CITY OF SOUTH BEND, INDIANA CONTRACTOR'S BID FOR PUBLIC WORK Project Name Wastewater Treatment Plant Masonry Improvements at Building 5 Project No. 121-046 For Bids Due September 13, 2022 PART I (Must be completed for all bids. Please type or print) Date: 09/13/22 Bidder (Firm): Slatile Roofing & Sheet Metal Co., Inc. Address: 170' S [LQnwood Drive City/State/Zip: South Bend 46613 Telephone Number: ( 574-2B3-7485 Agent of Bidder (if Applicable): Pursuant to notices given, the undersigned offers to furnish labor and/or material necessary to complete the public works project of: the City of South Bend, Indiana, in accordance with plans and specifications prepared by: anddated � _ �' for tl�e suW-00f,(.en t�al.own on the Proposal) UCS Z� (Enter sum of Total Base Bid plus 111ternaterhbwn on Proposal) (Numerical) The undersigned further agrees to furnish a bond or certified check with this bid for an amount specified in the notice of the letting. If alternative bids apply, the undersigned submits a proposal for each in accordance with the notice. Any addendums attached will be specifically referenced at the applicable page. If additional units of material included in the contract are needed, the cost of units must be the same as that shown in the original contract if accepted by the City of South Bend. If the bid is to be awarded on a unit basis, the itemization of the units shall be shown on a separate attachment. /% A By The above bid is accepted this Subject to the following conditions: BOARD OF PUBLIC WORKS tllzabeth A. Maradik, President Gary A. Gilot, Member (Signature) �J Gerald Longerot - President (Printed Name of Person Signing) ACCEPTANCE day of 20 Joseph R. Molnar, Vice President Jordan V. Gathers, Member Murray L. Miller, Member Attest: Theresa Heffner, Clerk Version 09/29/2021 Contractor's Bid for Public Works - 2 PART II (For projects of $100,000 or more — IC 36-1-12-4) These statements to be submitted under oath by each bidder with and as part of his/her/its bid. Attach additional pages for each section as needed. SECTION I EXPERIENCE QUESTIONNAIRE 1. Attach information regarding projects your organization has completed for the period of one (1) year prior to the date of the current bid. 2. Attach a listing of public works projects currently in process of construction by your organization. 3. Attach information regarding any failure to complete any work awarded to you and the location thereof. 4. Attach references from private firms for which you have performed work. SECTION II PLAN AND EQUIPMENT QUESTIONNAIRE Attach an explanation of your plan or layout for performing proposed work. (Examples could include a narrative of when you could begin work, complete the project, number of workers, etc. and any other information which you believe would enable the City of South Bend to consider your bid.) 2. Attach a listing of the names and addresses of all subcontractors (i.e. persons or firms outside your own firm who have performed part of the work) that you have used on public works projects during the past five (5) years along with a brief description of the work done by each subcontractor. 3. If you intend to sublet any portion of the work, attach the name and address of each subcontractor, equipment to be used by the subcontractor, and whether you will require a bond. However, if you are unable to currently provide a listing, please understand a listing must be provided prior to contract approval. Until the completion of the proposed project, you are under a continuing obligation to immediately notify the City of South Bend in the event that you subsequently determine that you will use a subcontractor on the proposed project. 4. Attach a listing of equipment you have available to use for the proposed project. 5. Have you entered into contracts or received offers for all materials which substantiate the prices used in preparing your proposal? If not, attach an explanation for the rationale used which would corroborate the prices listed. SECTION III CONTRACTOR'S FINANCIAL STATEMENT Attachment of bidder's financial statement is mandatory. Any bid submitted without said financial statement as required by statute shall thereby be rendered invalid. The financial statement provided hereunder to the City of South Bend awarding the contract must be specific enough in detail so that said City of South Bend can make a proper determination of the bidder's capability for completing the project if awarded. Version 09/29/2021 Contractor's Bid for Public Works - 3 When the prospective Contractor is unable to certify to any of the statements below, it shall attach an explanation to this Affidavit. CONTRACTOR'S NON -COLLUSION AND NON -DEBARMENT AFFIDAVIT, CERTIFICATION REGARDING INVESTMENT WITH IRAN, EMPLOYMENT ELIGIBILITY VERIFICATION, NON- DISCRIMINATION COMMITMENT AND CERTIFICATION OF USE OF UNITED STATES STEEL PRODUCTS OR FOUNDRY PRODUCTS (Must be completed for all quotes and bids. Please type or print) STATE OE SS: �! C TY ) The undersigned Contractor, being duly sworn upon his/her/its oath, affirms under the penalties of perjury that: 1. Contractor has not, nor has any other member, representative, or agent of the firm, company, corporation or partnership represented by him, entered into any combination, collusion or agreement with any person relative to the price to be bid by anyone at such letting nor to prevent any person from bidding nor to induce anyone to refrain from bidding, and that this bid is made without reference to any other bid and without any agreement, understanding or combination with any other person in reference to such bidding. Contractor further says that no person or persons, firms, or corporation has, have or will receive directly or indirectly, any rebate, fee, gift, commission or thing of value on account of such sale; and 2. Contractor certifies by submission of this proposal that neither contractor nor any of its principals are presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from participation in this transaction by any Federal department or agency; and 3. Contractor has not, nor has any successor to, nor an affiliate of, Contractor, engaged in investment activities in Iran. a. For purposes of this Certification, "Iran" means the government of Iran and any agency or instrumentality of Iran, or as otherwise defined at Ind. Code § 5-22-16.5-5, as amended from time -to -time. b. As provided by Ind. Code § 5-22-16.5-8, as amended from time -to -time, a Contractor is engaged in investment activities in Iran if either: Contractor, its successor or its affiliate, provides goods or services of twenty million dollars ($20,000,000) or more in value in the energy sector of Iran; or ii. Contractor, its successor or its affiliate, is a financial institution that extends twenty million dollars ($20,000,000) or more in credit to another person for forty-five (45) days or more, if that person will (i) use the credit to provides goods and services in the energy sector in Iran; and (ii) at the time the financial institution extends credit, is a person identified on list published by the Indiana Department of Administration. 4. Contractor does not knowingly employ or contract with an unauthorized alien, nor retain any employee or contract with a person that the Contractor subsequently learns is an unauthorized alien. Version 09/29/2021 Contractor's Bid for Public Works - 4 Contractor agrees that he/she/it shall enroll in and verify the work eligibility status of all of Contractor's newly hired employees through the E -Verify Program as defined by I.C. 22-5-1.7-3. Contractor's documentation of enrollment and participation in the E -Verify Program is included and attached as part of this bid/quote; and 5. Contractor shall require his/her/its subcontractors performing work under this public contract to certify that the subcontractors do not knowingly employ or contract with an unauthorized alien, nor retain any employee or contract with a person that the subcontractor subsequently learns is an unauthorized alien, and that the subcontractor has enrolled in and is participating in the E -Verify Program. The Contractor agrees to maintain this certification throughout the term of the contract with the City of South Bend, and understands that the City may terminate the contract for default if the Contractor fails to cure a breach of this provision no later than thirty (30) days after being notified by the City. 6. Persons, firms, partnerships, corporations, associations, or joint venturers awarded a contract by the City of South Bend through its agencies, boards, or commissions shall not discriminate against any employee or applicant for employment in the performance of a City contract with respect to hire, tenure, terms, conditions, or privileges of contract or employment, or any matter directly or indirectly related to contracting or employment because of race, sex, religion, color, national origin, ancestry, gender expression, gender identity, sexual orientation, or due to age or disability that does not affect that person's ability to perform the work. In awarding contracts for the purchase of work, labor, services, supplies, equipment, materials, or any combination of the foregoing including, but not limited to, public works contracts awarded under public bidding laws or other contracts in which public bids are not required by law, the City, its agencies, boards, or commissions will consider the Contractor's good faith efforts to obtain participation by those subcontractors certified by the State of Indiana as a Minority Business ("MBE") or as a Women's Business Enterprise ("WBE") as a factor in determining the lowest, responsible, responsive bidder. Contractors seeking the award of a City contract cannot be required to award a subcontract to an MWBE; however, they may not unlawfully discriminate against said MBE/WBE. On goal -eligible contracts, Contractors are required to either meet both MBE and WBE utilization goals or demonstrate that the Contractor has made good faith efforts to obtain participation from MBE and WBE subcontractors. A finding of noncompliance or a discriminatory practice shall prohibit that Contractor from being awarded a City contract for a period of one (1) year from the date of such determination, and such determination may also be grounds for terminating the contact to which the discriminatory practice or noncompliance pertains. 7. The undersigned Contractor agrees that the following nondiscrimination commitment shall be made a part of any contract which it may henceforth enter into with the City of South Bend, Indiana or any of its agencies, boards or commissions. Contractor agrees not to discriminate against or intimidate any employee or applicant for employment in the performance of this contract with privileges of employment, or any matter directly or indirectly related to employment, because of race, religion, color, sex, gender expression, gender identity, sexual orientation, handicap, national origin or ancestry. Breach of this provision may be regarded as material breach of contract. I, the undersigned bidder or agent as contractor on a public works project, understand my statutory obligations to the use of steel products or foundry products made in the United States (I.C. 5-16-8-1). I hereby certify that I and all subcontractors employed by me for this project will use steel products or foundry products made in the United States on this project if awarded. I understand I have an affirmative duty to notify the City in my bid that my proposal does not include the use of steel products or foundry products made in the United States. I understand it is my sole obligation and responsibility to provide a justification to the City, subject to review and approval, why the cost of United States made steel or foundry products is unreasonable. Prior to award and upon submission of bid which does not use steel products or foundry products made in the United States, the City, through its director of public works, shall make a determination if the price of United States made steel or foundry is unreasonable. I understand that violations hereunder Version 09/29/2021 Contractor's Bid for Public Works - 5 may result in forfeiture of contractual payments. I hereby affirm under the penalties of perjury that the facts and information contained in the foregoing bid for public works are true and correct. Dated this 13 day of SepteEbM 22 \ >>>>"'°'11n,, Slatile Roofing & Sheet Metal Co., Inc. \\��`���,, • tractor/Bidder C) ' Z Sr[ature of Contractor/Bidder or Its Agen .;;k rald Longerot �0v- printed Name and Title Subscribed and sworn to before me this /3� day of, 20 aD My Commission Expires c ); ,,;(\P �a) � mw Notary Public County of Residence Version 09/29/2021 Contractor's Bid for Public Works - 6 BID/PROPOSAL CITY OF SOUTH BEND Project Name: Wastewater Treatment Plant Masonry Improvements at Building 5 !" Project Number: 121-046 For Bids Due: September 13, 2022 Contractor Name: Slatile Roofing & Sheet Metal Co., Inc. BASE BID Item No. Description Quantity Unit Unit Price Total Amount 3 Masonry Improvements for Building #5: $25 6 Brick Replacement 4 Masonry scope includes brick masonry 1 LS Glass Block Replacement $8,500.00 1 repointing (1200sf), brick replacement (1,000 units), glass block replacement 1 LS per sf ` (130 units), limestone replacement (140 22'-0" Steel Lintel Replacement per unit 3 'J U� sf), complete cleaning of exterior of brick and stone masonry surfaces, 2 Construction Contingency Allowance 1 LS $10,000.00 $10,000.00 BASE BID TOTAL ALTERNATE #1 Item No. Description p Quantity Unit Unit Price Total Amount 3 Replacement of stud wall with CMU $25 6 Brick Replacement 4 block infill between rooms 500 and 504 1 LS Glass Block Replacement $8,500.00 ALTERNATE #2 ALTERNATE #1 TOT� 8 , 5 0 0� Item No. Description Quantity Unit Unit Price Total Amount Brick Masonry Repointing Prepare existing concrete floor slab for $25 6 Brick Replacement 4 an install new epoxy floor coating for 7 Glass Block Replacement per unit $80 mezzanine 0517 8 Limestone Replacement per sf $9,000.00 ALTERNATE #2 TOTAL < ' C)()O < TO UNIT PRICING Item No. Description Unit Add Deduct 5 Brick Masonry Repointing per sf $25 6 Brick Replacement per unit $30 7 Glass Block Replacement per unit $80 8 Limestone Replacement per sf $30 9 22'-0" Steel Lintel Replacement per unit 3 'J U� The City of South Bend will review the Base Bid and any combination of Alternate #1, Alternate #2 and Unit Pricing Values in its evaluation of pricing to determining the lowest, responsive, responsible bidder. The City of South Bend shall be the sole judge in awarding the Base Bid work plus any combination of the Alternates and Unit Price work, in whole or in part, based on available funding for the project. 'yiU 1 H 1T.� BID/PROPOSAL ( CITY OF SOUTH BEND Project Name: Wastewater Treatment Plant Masonry Improvements at Building 5 Project Number: 121-046 For Bids Due: September 13, 2022 Contractor Name: Slatile Roofing & Sheet Metal Co., Inc. Bidder (Firm): Address: Slatile Roofing & Sheet Metal Co., Inc. 1703 S. Ironwood Drive City/State/Zip: South Bend, IN 46613 Telephone Number: 574 233-7485 By (Signpure) � I�Ll (Printed Name of Perso 4 igning) N; PRE-BID MEETING SIGN -IN SHEET Meeting Date: 08/24/2022 Project No.: 121-046 Project Name: Wastewater Treatment Plant Compressor Building Masonry Improvements City of South Bend Department of Public Works Division of Engineering Bureau of Public Construction 227 West Jefferson RM# 1316 South Bend, Indiana 46601 NAME ORGANIZATION TELEPHONE (Office/Mobile) E-MAIL ADDRESS / M: 5,-1q 6 Zy 1-fvyc ? Jn xC? _0: M: _r I,/ _CR I$,1s�ti►�iS�_Z-iS1}_L���O O: M: ,�-;'7q-6-3c - ?6x0 3 ` AS 1 1 L—L)vt�{?vc� S�a• ,_�� O: M:5.7q-yq'2 •-97"27 )qgl v,, Lem9eraT OSIq}, ,jerry�v � �i Gy l r O: M: S 7y - 4/VO S yz y �--�`�1!>_��� � —/� �-1•I.Z?'T LYu Fes._ O: M: I? II O: `i lg 331-39d(a M: `ll 4- Aa` _&'ggso ' -G ir54aSyS - (� O: 5'7 *;.3 3 T f e e- M: 't 0 5923 lug�eyd-- M: Cyt - 9 �9lp sir o1-' .Ia err '66)0 O: 5�4 Z3S• 944G M: j It l osins@jau e�d,'�� 0: M: O: M: M: , COf"'-