Loading...
HomeMy WebLinkAboutOpening of Proposal - Coal Line Trail, Phase IIB (CE Services) Proj No. 122-035 - USI Consultants, Inc.CITY OF SOUTH BEND Construction Inspection for Coal Line Trail, Phase IIB 2 City of South Bend | Coal Line Trail, Phase IIB | Des. #2200199 USI MAIN OFFICE 8415 East 56th St. Indianapolis, IN 46216 317.544.4996 USI LAPORTE OFFICE 824 Lincolnway, Loft 3A LaPorte, IN 46350 219.369.6545 Dear South Bend Selection Committee, USI Consultants, Inc. (USI) is proud to offer our Construction Inspection services to the City of South Bend during the construction of the Coal Line Trail over the St. Joseph River. USI employees have had the pleasure of working with City of South Bend over the years – and we would love to continue that trend! USI has worked with the City of South Bend and has more than 30+ years of construction experience with INDOT. With Scott Dick at the helm, every Project Supervisor, and Inspector on our team will be made aware of vital project details and key concerns of the City, at the very beginning. We present Chris Holth as a perfect fit to serve as Project Supervisor. Chris has worked on South Bend local and FHWA funded projects and is experienced with bridge construction and INDOT procedures. Most recently, Chris and Justin teamed together to help manage Olive Street Phase I for the City. It is especially important to keep communication lines open with the City of South Bend and with Lawson-Fisher Associates, as this bridge ties into existing Coal Line Trail projects (Phase I and Phase IIA). Throughout his career, Chris has worked on several multi phased projects and understands the importance of being consistent between each phased project. As a bridge rehabilitation project, extensive knowledge will help to solve problems in a timely manner. Together Chris Holth and Justin Sherman have helped to build over 50 bridges including various types of rehabilitation. This team experience will help to deliver a smooth project while looking out for the best interests of the City of South Bend. USI’s team will have all hands-on deck with a combination of USI and our local partner firm McCormick Engineering. Our commitment to the City of South Bend is to be fully dedicated to this project’s path to success, so you won’t have to. We will keep the City up to date every step of the way, keeping all parties in sync from the very start-up! Thank you for considering our USI Team, as we look forward to completing this project with you. Sincerely, USI Consultants, Inc. Philip D. Beer II, PE, PS, FACEC President Scott Dick Project Manager Project Manager Scott Dick 28 Years of Experience sdick@usiconsultants.com Project Supervisor & Your Point of Contact Chris Holth 30 Years of Experience cholth@usiconsultants.com Project Inspector Justin Sherman 14 Years of Experience jsherman@usiconsultants.com Project Leadership you can count on! MCCORMICK OFFICE 234 N. Ironwood Drive South Bend, IN 46615 574.232.6800Maggie Dickerson Client Liaison 3 City of South Bend | Coal Line Trail, Phase IIB | Des. #2200199 Scott is responsible for initiating routine and proactive communication with the City officials. An immediate resolution may not be available, but we will always let you know when we’ll have the answer. 24-HOUR RESPONSE PROMISE USI is able to meet (and we strive to EXCEED) the proposed schedule. Each member of USI’s Team is committed to meeting all project challenges and schedules. Since 2019, USI’s technical staff has increased by 41%. WORK SPLIT CAPACITY USI Consultants, Inc. | 90% 13.1 McCormick Engineering, LLC | DBE | 10% 13.1 Team Overview & Availability USI Consultants Inspector Justin Sherman Zeke Rosado John Smith Brent Smith Chris Holth Project Supervisor Phil Beer, PE, PS Principal-In-Charge Scott Dick Project Manager Maggie Dickerson Client Liaison City of South Bend McCormick Tracy McCormick, PE John BeerInspector INSPECTOR CERTIFICATION Each member of our inspection team has all of the following certifications. INDOT Materials Testing Certified Sitemanager Certified Fully INDOT CTP Certified ABOVE AVERAGE USI construction inspection projects consistently receive above average scores during INDOT evaluations. Support Staff & Subconsultants 0 0.3 0.6 0.9 1.2 Quality Responsiveness Budget Schedule 0.42 0.95 0.23 0.17 0.51 1.07 0.43 0.46 Average Scores (as of 8/18/22) Consultant Average USI Average 4 City of South Bend | Coal Line Trail, Phase IIB | Des. #2200199 Team Leadership • Marshall County Bridge #73 • Olive Street Phase I – South Bend, IN * • Downtown streetscape – Delphi, IN * • Gary Marina Bridge Phases I - III – Gary, IN * • 169th Street Reconstruction Phases II - IV – Hammond, IN * • Whiting Lakeshore Park – Whiting, IN * (Included a large 315’ pedestrian pier into Lake Michigan) • Olive Street Reconstruction Phase I – South Bend, IN • Ignition Park Infrastructure Div A and B – South Bend, IN * • Bartlett Street Reconstruction Phase I – Various Divisions – South Bend, IN * • Whiting Lakeshore Park – Whiting, IN * (Included a large 315’ pedestrian pier into Lake Michigan) • INDOT SR 49 Bridge Deck Overlays, Bridge Painting, Bridge Deck Replacements – Porter County, IN • LaPorte County Bascule Bridge Maintenance Repairs – Michigan City, IN Scott brings nearly 28 years of experience in Construction Management and Inspection services in Indiana. His demand for quality workmanship is evident in projects completed for our clients throughout those years! Scott serves as USI’s Construction Services Department Manager and makes sure ALL projects are constructed in accordance with the plans, project scope, and specifications. Applying a “hands-on” approach in all responsibilities, Scott sees that all decisions and communications are clear between the owner/client and provides the information necessary for decisions to be made in a timely fashion. As conclusions and assessments based on in-field conditions arise, he coordinates all the information with the USI team. Tracy is an experienced engineer with 29 years in the planning, design and construction observation of bridge engineering projects. She is the co-founder of McCormick Engineering, LLC, a firm recognized by the State of Indiana as a Women’s Business Enterprise (WBE) and Disadvantaged Business Enterprise (DBE). She has worked with both bridges and trails for many projects for both INDOT and local LPA clients. Justin Sherman has over 14 years of experience in the construction inspection industry. He will be your on-site inspector and can fill in for Chris Holth whenever and wherever needed. Chris and Justin have worked on 9 large INDOT LPA projects together and have a great working relationship. Justin’s relevant experience includes daily records, on-site testing, and material record documentation. He has several INDOT certifications that are helpful when erosion or utility issues arise in the field. He also has extensive experience with INDOT specifications, plans, and procedures to help to deliver a seamless project. *Project completed with another firm Scott Dick | Project Manager Tracy McCormick, PE | Inspector Justin Sherman | Inspector Project Experience • City of Westfield - Midland Trace Trail with Pedestrian Bridge, Phase 2 • City of Noblesville - White River Greenway Trail Boardwalk & Bridge Repair • City of Anderson - Shadyside Trail over Killbuck Creek with Pedestrian Bridge Rehabilitation • City of La Porte - Stone Lakeshore Drive Trail Project • Town of Avon- Ronald Reagan Parkway Trail • Hendricks County - Avon Trails, Section 6-9 CERTIFICATIONS • INDOT Certified Technician, All Disciplines • INDOT SiteManager • INDOT Storm Water Management (Level 1) CERTIFICATIONS • Professional Engineer • INDOT Certified Technician, All Disciplines • INDOT SiteManager • INDOT Storm Water Certification CERTIFICATIONS • INDOT Certified Technician, All Disciplines • INDOT SiteManager • INDOT Storm Water Management (Level 1) • INDOT Utility Coordination • Certified UAS Pilot Christopher (Chris) Holth is a Construction Project Manager and INDOT Certified Project Supervisor with over 30 years of experience in the construction inspection industry. He will be your lead Project Supervisor and main point of contact throughout the project. His experience includes coordinating project schedules, changing and designing discrepancies, and managing communication. He has also managed on-site testing, mentored field inspectors, supervised the construction and budget requirements, and communicated with residents, public officials, and INDOT and FHWA personnel to answer project related questions and complaints. Chris Holth | Project Supervisor CERTIFICATIONS • INDOT Certified Technician, All Disciplines • INDOT SiteManager Project Experience Project Experience 5 City of South Bend | Coal Line Trail, Phase IIB | Des. #2200199 Project Approach Project Overview This phase of Coal Line Trail will rehabilitate the existing abandoned railroad bridge crossing the St. Joseph River and convert it into a multi-use path. This will consist of removing the old railroad track and rehabbing the existing girders. Existing structural steel will be field cut and rehabbed with new elastomeric bearing pads being installed. Bridge deck will utilize a concrete bridge deck with bridge expansion joints and ornamental railing. Existing piers will be rehabbed by utilizing pneumatically placed mortar and cracks in the piers will epoxy injected. Class 1 riprap will be placed around the piers and abutments for scour protection. The project will also construct a plaza on the West Bank connecting the Coal Line Trail to the existing Riverside Trail on the west side of the St. Joseph River and will connect with Coal Line Trail Phase IIA to the east. Project amenities will include a bench, lighting, drinking fountain, 4 bike racks with repair station, trash receptacle, bollard, trees, and shrubs. Project Schedule This project is scheduled to be bid on the INDOT letting in September 2022. Maintenance of Traffic (MOT) The project will be constructed off the roadway but could impact traffic on Riverside and North Shore Drive. It will be especially important to maintain traffic for local businesses and residences who do not have additional avenues to access their homes and facilities on North Shore Drive. Chris will manage close communication and coordination with everyone involved - the Owner(s), the contractor, and subcontractors - to provide delivery without delay! Looking Southeast at the North Face of the Coal Line Trail Bridge Looking North at the South Face of the Coal Line Trail Bridge Looking East over Coal Line Trail Bridge 6 City of South Bend | Coal Line Trail, Phase IIB | Des. #2200199 Accountability & Scheduling • Regular stakeholder meetings throughout construction to address questions • Distribute action items at the meetings to keep everyone on schedule and maintain accountability • Daily agreement on work completed with the contractor’s field personnel • Complete final construction records in 45 days or less Documentation • Pre-construction photos and documentation of existing conditions • Provide detailed project records using the SiteManager database Communication • Professionalism in dealing with City of South Bend, contractors, subcontractors, utility representatives, and local residents • Communication with area residents and businesses near the project site for resolving possible issues that may arise (while keeping City of South Bend in the loop!) • Negotiations with contractors and subcontractors being firm, but fair. Project Understanding • Complete, detailed understanding of the plans and specifications • Perform a QC/QA review of the plans before letting so that any issues can be addressed at the pre-construction meeting • Review all maintenance of traffic and construction plans • Provide value engineering solutions throughout construction so that South Bend receives the best financial investment Project Management Philosophy & Key Elements Existing Coal Line Trail Phase I Coal Line Trail Signage Phase I Riverside Trail - West Side of the Project Project Approach 7 City of South Bend | Coal Line Trail, Phase IIB | Des. #2200199 Project Experience USI has a rich history of construction inspection experience throughout Indiana. We pride ourselves in the extensive expertise of our staff, with hundreds of projects under our belt. The following project examples are presented to demonstrate that we have the relevant experience necessary to successfully complete all aspects of this project. Shelby Co. #13 Truss Bridge Rehab/Relocation to Blue River Trail Built in 1889, Shelby #13 is a 93’ long iron and steel Pratt truss built in 1889. In 2011, the bridge was closed to traffic due to damage and deterioration. The bridge was classified as a “Select” Historic Bridge and described as an outstanding example of its type but best suited for Non-Vehicular use based on condition and structural capacity constraints. The bridge is eligible for listing in the National Register of Historic Places. Due to technicalities, the Shelby County Bridge project was subjected to a full Section 106 process, including a Memorandum of Agreement. An Alternatives Analysis determined the most “prudent and feasible” alternative was replacement of the existing bridge and relocation of the historic truss. The bridge was marketed for re-use for a period of six months, followed by a public hearing to complete the public involvement process. The historic bridge was rehabilitated, including bridge painting, and relocated to carry Blue River Trail over a man-made water feature in Blue River Memorial Park, located in Shelbyville, Indiana. Shelby #13 closed to traffic Shelby #13 closed to traffic in Original Locationin Original Location Shelby #13 Ribbon Cutting on Shelby #13 Ribbon Cutting on Blue River Trail, August 2019. Blue River Trail, August 2019. Ditch and Towne Road Trails - City of Carmel City of Carmel Ditch Road Multi-Use Path from 106th to 116th Street (16-ENG-20) and Town Road Trail Construction and Culvert Replacement from 96th Street to 106th Street (16-SW-18) USI completed the design and construction management for a trail along Towne Road, and construction management for a path along Ditch Road. Both projects had large box structures, storm sewers, curb, curb ramps, and drive approaches. Construction required ongoing coordination for all utilities that were located near the trails. Soils required treatment using undercutting, geotextiles, and innovative use of paving equipment so that trucks did not damage the trail subgrade. 8 City of South Bend | Coal Line Trail, Phase IIB | Des. #2200199 Project Experience Historic Truss Bridge Reconstruction and Trail Construction - Hamilton County B-34227 Hamilton County Department of Parks and Recreation Strawtown – Kowteewi Twin Truss Bridge Reconstruction and Trail Construction USI completed the construction management for reconstruction of two historic structures from Washington and Wayne County that were reassembled to create a trail bridge over the White River. A third structure was built to recreate a bridge in Hamilton County that was demolished using the original plans. The construction methods used replicated the original methods used to build the bridges completed by skilled craftsman. The project was completed on schedule and under budget. Monon Trail Pedestrian Bridge over 146th Street USI provided construction management/ inspection for the Monon Trail over 146th Street in Hamilton County. A pre-fabricated five span bridge structure was used with modular block retaining walls that resemble old railroad abutments. The bridge has a concrete deck with snow melt system, and curbs. Many trail amenities are included in the project, such as benches at resting areas, signs, traffic signals, and drainage structures. (Rev. 03/28/2016) Request for Proposal Number: ___________ RFP Item Description: ___________________________________ Affirmative Action Certification (AAC) for Disadvantaged Business Enterprises (DBE) I hereby certify that my company intends to affirmatively seek out and consider Disadvantaged Business Enterprises (DBEs) certified in the State of Indiana to participate as part of this proposal. I acknowledge that this certification is to be made an integral part of this proposal. I understand and agree that the submission of a blank certification may cause the proposal to be rejected. I certify that I have consulted the following DBE website to confirm that the firms listed below are currently certified DBEs: http://www.in.gov/indot/2732.htm. I certify that I have contacted the certified DBEs listed below, and if my company becomes the CONSULTANT, these DBEs have tentatively agreed to perform the services as indicated. I understand that neither my company nor I will be penalized for DBE utilization that exceeds the goal. After contract award, any change to the firms listed in this Affirmative Action Certification to be applied toward the DBE goal must have prior approval by INDOT’s Economic Opportunity Division. I.DBE Subconsultants to be applied toward DBE goal for the RFP item: II.DBE Subconsultants to be utilized beyond the advertised DBE goal for the RFP item: Certified DBE Name to DBE Service Planned Estimated Percentage to be Paid* % % % % Certified DBE Name to DBE Service Planned Estimated Percentage to be Paid* % % % % Estimated Total Percentage Credited toward DBE Goal: __________ Estimated Percentage of Voluntary DBE Work Anticipated over DBE Goal: Company Name:_________________________________________________________________________ Signature: ____________________________________________ Date: _____________________________ *It is understood that these individual firm percentages are estimates only and that percentages paid may be greater or less as a result of negotiation of the contract scope of work. My firm will use good faith efforts to meet the overall DBE goal through the use of these or other certified and approved DBE firms. Indiana DBE Certification Program In accordance with 49 CFR Part 26 as published in the code of federal regulations, the Indiana Department of Transportation acknowledges Elizabeth Kiefner Crawford, Director Economic Opportunity Division Derrick Casson, Certification Manager Economic Opportunity Division (Reference the Indiana Department of Transportation's DBE Public Search at http://www.in.gov/2674.htm for the most current information regarding this certification) as a certfied DBE in the State of Indiana. Date Issued:01/26/2017 No Change Affidavit Due:12/31/2022 McCormick Engineering, LLC