HomeMy WebLinkAboutOpening of Proposal - Coal Line Trail, Phase IIB (CE Services) Proj No. 122-035 - USI Consultants, Inc.CITY OF SOUTH BEND Construction Inspection for
Coal Line Trail, Phase IIB
2 City of South Bend | Coal Line Trail, Phase IIB | Des. #2200199
USI MAIN OFFICE
8415 East 56th St.
Indianapolis, IN 46216
317.544.4996
USI LAPORTE OFFICE
824 Lincolnway, Loft 3A
LaPorte, IN 46350
219.369.6545
Dear South Bend Selection Committee,
USI Consultants, Inc. (USI) is proud to offer our Construction Inspection services to the City of
South Bend during the construction of the Coal Line Trail over the St. Joseph River. USI employees
have had the pleasure of working with City of South Bend over the years – and we would love to
continue that trend!
USI has worked with the City of South Bend and has more than 30+ years of construction
experience with INDOT. With Scott Dick at the helm, every Project Supervisor, and Inspector on our
team will be made aware of vital project details and key concerns of the City, at the very beginning.
We present Chris Holth as a perfect fit to serve as Project Supervisor. Chris has worked on South
Bend local and FHWA funded projects and is experienced with bridge construction and INDOT
procedures. Most recently, Chris and Justin teamed together to help manage Olive Street Phase I
for the City.
It is especially important to keep communication lines open with the City of South Bend and with
Lawson-Fisher Associates, as this bridge ties into existing Coal Line Trail projects (Phase I and Phase
IIA). Throughout his career, Chris has worked on several multi phased projects and understands the
importance of being consistent between each phased project. As a bridge rehabilitation project,
extensive knowledge will help to solve problems in a timely manner. Together Chris Holth and
Justin Sherman have helped to build over 50 bridges including various types of rehabilitation. This
team experience will help to deliver a smooth project while looking out for the best interests of the
City of South Bend.
USI’s team will have all hands-on deck with a combination of USI and our local partner firm
McCormick Engineering. Our commitment to the City of South Bend is to be fully dedicated to this
project’s path to success, so you won’t have to. We will keep the City up to date every step of the
way, keeping all parties in sync from the very start-up! Thank you for considering our USI Team, as
we look forward to completing this project with you.
Sincerely,
USI Consultants, Inc.
Philip D. Beer II, PE, PS, FACEC
President
Scott Dick
Project Manager
Project Manager
Scott Dick
28 Years of Experience
sdick@usiconsultants.com
Project Supervisor
& Your Point of Contact
Chris Holth
30 Years of Experience
cholth@usiconsultants.com
Project Inspector
Justin Sherman
14 Years of Experience
jsherman@usiconsultants.com
Project Leadership you can count on!
MCCORMICK OFFICE
234 N. Ironwood Drive
South Bend, IN 46615
574.232.6800Maggie Dickerson
Client Liaison
3 City of South Bend | Coal Line Trail, Phase IIB | Des. #2200199
Scott is responsible for
initiating routine and
proactive communication
with the City officials. An
immediate resolution may
not be available, but we will
always let you know when
we’ll have the answer.
24-HOUR
RESPONSE
PROMISE
USI is able to meet (and we strive to EXCEED) the proposed
schedule. Each member of USI’s Team is committed to
meeting all project challenges and schedules.
Since 2019, USI’s technical staff has
increased by 41%.
WORK SPLIT
CAPACITY
USI Consultants, Inc. | 90%
13.1
McCormick Engineering, LLC | DBE | 10%
13.1
Team Overview & Availability
USI Consultants
Inspector
Justin Sherman
Zeke Rosado
John Smith
Brent Smith
Chris Holth
Project Supervisor
Phil Beer, PE, PS
Principal-In-Charge
Scott Dick
Project Manager
Maggie Dickerson
Client Liaison
City of South Bend
McCormick
Tracy McCormick, PE John BeerInspector
INSPECTOR
CERTIFICATION
Each member of our
inspection team has all of
the following certifications.
INDOT Materials Testing Certified
Sitemanager Certified
Fully INDOT CTP Certified
ABOVE AVERAGE
USI construction
inspection projects
consistently receive
above average
scores during INDOT
evaluations.
Support Staff & Subconsultants
0
0.3
0.6
0.9
1.2
Quality Responsiveness Budget Schedule
0.42
0.95
0.23 0.17
0.51
1.07
0.43 0.46
Average Scores (as of 8/18/22)
Consultant Average USI Average
4 City of South Bend | Coal Line Trail, Phase IIB | Des. #2200199
Team Leadership
• Marshall County Bridge #73
• Olive Street Phase I – South Bend, IN *
• Downtown streetscape – Delphi, IN *
• Gary Marina Bridge Phases I - III – Gary, IN *
• 169th Street Reconstruction Phases II - IV –
Hammond, IN *
• Whiting Lakeshore Park – Whiting, IN * (Included
a large 315’ pedestrian pier into Lake Michigan)
• Olive Street Reconstruction Phase I –
South Bend, IN
• Ignition Park Infrastructure Div A and B
– South Bend, IN *
• Bartlett Street Reconstruction Phase I –
Various Divisions – South Bend, IN *
• Whiting Lakeshore Park – Whiting, IN * (Included a
large 315’ pedestrian pier into Lake Michigan)
• INDOT SR 49 Bridge Deck Overlays, Bridge Painting,
Bridge Deck Replacements – Porter County, IN
• LaPorte County Bascule Bridge Maintenance Repairs
– Michigan City, IN
Scott brings nearly 28 years
of experience in Construction
Management and Inspection
services in Indiana. His demand for
quality workmanship is evident in projects
completed for our clients throughout those
years! Scott serves as USI’s Construction Services
Department Manager and makes sure ALL projects
are constructed in accordance with the plans,
project scope, and specifications.
Applying a “hands-on” approach in all responsibilities, Scott sees that all
decisions and communications are clear between the owner/client and
provides the information necessary for decisions to be made in a timely
fashion. As conclusions and assessments based on in-field conditions arise,
he coordinates all the information with the USI team.
Tracy is an experienced engineer
with 29 years in the planning, design
and construction observation of
bridge engineering projects. She is the
co-founder of McCormick Engineering, LLC, a firm
recognized by the State of Indiana as a Women’s
Business Enterprise (WBE) and Disadvantaged
Business Enterprise (DBE). She has worked with
both bridges and trails for many projects for both
INDOT and local LPA clients.
Justin Sherman has over 14 years of experience
in the construction inspection industry. He
will be your on-site inspector and can fill in for
Chris Holth whenever and wherever needed.
Chris and Justin have worked on 9 large INDOT LPA projects
together and have a great working relationship. Justin’s
relevant experience includes daily records, on-site testing,
and material record documentation. He has several INDOT
certifications that are helpful when erosion or utility issues arise in the field. He also has extensive
experience with INDOT specifications, plans, and procedures to help to deliver a seamless project.
*Project completed with another firm
Scott Dick | Project Manager
Tracy McCormick, PE | Inspector
Justin Sherman | Inspector
Project Experience
• City of Westfield - Midland Trace Trail with Pedestrian Bridge, Phase 2
• City of Noblesville - White River Greenway Trail Boardwalk & Bridge Repair
• City of Anderson - Shadyside Trail over Killbuck Creek with Pedestrian
Bridge Rehabilitation
• City of La Porte - Stone Lakeshore Drive Trail Project
• Town of Avon- Ronald Reagan Parkway Trail
• Hendricks County - Avon Trails, Section 6-9
CERTIFICATIONS
• INDOT Certified
Technician, All
Disciplines
• INDOT
SiteManager
• INDOT
Storm Water
Management
(Level 1)
CERTIFICATIONS
• Professional
Engineer
• INDOT Certified
Technician, All
Disciplines
• INDOT
SiteManager
• INDOT
Storm Water
Certification
CERTIFICATIONS
• INDOT Certified Technician, All
Disciplines
• INDOT SiteManager
• INDOT Storm Water
Management (Level 1)
• INDOT Utility Coordination
• Certified UAS Pilot
Christopher (Chris) Holth is a Construction Project
Manager and INDOT Certified Project Supervisor with
over 30 years of experience in the construction inspection
industry. He will be your lead Project Supervisor and main point
of contact throughout the project. His experience includes coordinating
project schedules, changing and designing discrepancies, and managing communication. He has
also managed on-site testing, mentored field inspectors, supervised the construction and budget
requirements, and communicated with residents, public officials, and INDOT and FHWA personnel to
answer project related questions and complaints.
Chris Holth | Project Supervisor CERTIFICATIONS
• INDOT Certified
Technician, All
Disciplines
• INDOT SiteManager
Project Experience
Project Experience
5 City of South Bend | Coal Line Trail, Phase IIB | Des. #2200199
Project Approach
Project Overview
This phase of Coal Line Trail will rehabilitate the existing abandoned railroad bridge crossing
the St. Joseph River and convert it into a multi-use path. This will consist of removing the old
railroad track and rehabbing the existing girders. Existing structural steel will be field cut and
rehabbed with new elastomeric bearing pads being installed. Bridge deck will utilize a concrete
bridge deck with bridge expansion joints and ornamental railing. Existing piers will be rehabbed
by utilizing pneumatically placed mortar and cracks in the piers will epoxy injected. Class 1
riprap will be placed around the piers and abutments for scour protection. The project will also
construct a plaza on the West Bank connecting the Coal Line Trail to the existing Riverside Trail
on the west side of the St. Joseph River and will connect with Coal Line Trail Phase IIA to the
east. Project amenities will include a bench, lighting, drinking fountain, 4 bike racks with repair
station, trash receptacle, bollard, trees, and shrubs.
Project Schedule
This project is scheduled to be bid on the INDOT letting in September 2022.
Maintenance of Traffic (MOT)
The project will be constructed off the roadway but could impact traffic on Riverside and
North Shore Drive. It will be especially important to maintain traffic for local businesses and
residences who do not have additional avenues to access their homes and facilities on North
Shore Drive. Chris will manage close communication and coordination with everyone involved -
the Owner(s), the contractor, and subcontractors - to provide delivery without delay!
Looking Southeast at the North Face of
the Coal Line Trail Bridge
Looking North at the South Face of
the Coal Line Trail Bridge
Looking East over Coal Line Trail Bridge
6 City of South Bend | Coal Line Trail, Phase IIB | Des. #2200199
Accountability & Scheduling
• Regular stakeholder meetings throughout construction to address questions
• Distribute action items at the meetings to keep everyone on schedule and maintain
accountability
• Daily agreement on work completed with the contractor’s field personnel
• Complete final construction records in 45 days or less
Documentation
• Pre-construction photos and documentation of existing
conditions
• Provide detailed project records using the SiteManager
database
Communication
• Professionalism in dealing with City of South Bend, contractors, subcontractors, utility
representatives, and local residents
• Communication with area residents and businesses near the project site for resolving
possible issues that may arise (while keeping City of South Bend in the loop!)
• Negotiations with contractors and subcontractors being firm, but fair.
Project Understanding
• Complete, detailed understanding of the plans and
specifications
• Perform a QC/QA review of the plans before letting so that
any issues can be addressed at the pre-construction meeting
• Review all maintenance of traffic and construction plans
• Provide value engineering solutions throughout construction
so that South Bend receives the best financial investment
Project Management Philosophy & Key Elements
Existing Coal Line Trail Phase I Coal Line Trail Signage Phase I Riverside Trail - West Side of the Project
Project Approach
7 City of South Bend | Coal Line Trail, Phase IIB | Des. #2200199
Project Experience
USI has a rich history of construction inspection experience throughout Indiana. We pride ourselves in the extensive expertise of our staff, with hundreds of projects under our belt. The
following project examples are presented to demonstrate that we have the relevant experience necessary to successfully complete all aspects of this project.
Shelby Co. #13 Truss Bridge Rehab/Relocation to Blue River Trail
Built in 1889, Shelby #13 is a 93’ long iron and steel Pratt truss built in 1889. In 2011, the bridge was
closed to traffic due to damage and deterioration. The bridge was classified as a “Select” Historic
Bridge and described as an outstanding example of its type but best suited for Non-Vehicular use
based on condition and structural capacity constraints. The bridge is eligible for listing in the National
Register of Historic Places. Due to technicalities, the Shelby County Bridge project was subjected
to a full Section 106 process, including a Memorandum of Agreement. An Alternatives Analysis
determined the most “prudent and feasible” alternative was replacement of the existing bridge and
relocation of the historic truss.
The bridge was marketed for re-use for a period of six months, followed by a public hearing to
complete the public involvement process. The historic bridge was rehabilitated, including bridge
painting, and relocated to carry Blue River Trail over a man-made water feature in Blue River
Memorial Park, located in Shelbyville, Indiana.
Shelby #13 closed to traffic Shelby #13 closed to traffic
in Original Locationin Original Location
Shelby #13 Ribbon Cutting on Shelby #13 Ribbon Cutting on
Blue River Trail, August 2019. Blue River Trail, August 2019.
Ditch and Towne Road Trails - City of Carmel
City of Carmel Ditch Road Multi-Use Path from 106th to 116th
Street (16-ENG-20) and Town Road Trail Construction and Culvert
Replacement from 96th Street to 106th Street (16-SW-18)
USI completed the design and construction management for a trail
along Towne Road, and construction management for a path along
Ditch Road. Both projects had large box structures, storm sewers,
curb, curb ramps, and drive approaches. Construction required
ongoing coordination for all utilities that were located near the
trails. Soils required treatment using undercutting, geotextiles, and
innovative use of paving equipment so that trucks did not damage
the trail subgrade.
8 City of South Bend | Coal Line Trail, Phase IIB | Des. #2200199
Project Experience
Historic Truss Bridge Reconstruction and Trail Construction - Hamilton County
B-34227 Hamilton County Department of Parks and Recreation Strawtown – Kowteewi Twin
Truss Bridge Reconstruction and Trail Construction
USI completed the construction management for reconstruction of two historic structures
from Washington and Wayne County that were reassembled to create a trail bridge over
the White River. A third structure was built to recreate a bridge in Hamilton County that was
demolished using the original plans. The construction methods used replicated the original
methods used to build the bridges completed by skilled craftsman. The project was completed
on schedule and under budget.
Monon Trail Pedestrian Bridge over 146th Street
USI provided construction management/ inspection for the Monon Trail over 146th Street
in Hamilton County. A pre-fabricated five span bridge structure was used with modular
block retaining walls that resemble old railroad abutments. The bridge has a concrete deck
with snow melt system, and curbs. Many trail amenities are included in the project, such as
benches at resting areas, signs, traffic signals, and drainage structures.
(Rev. 03/28/2016)
Request for Proposal Number: ___________
RFP Item Description: ___________________________________
Affirmative Action Certification (AAC) for Disadvantaged Business Enterprises (DBE)
I hereby certify that my company intends to affirmatively seek out and consider Disadvantaged Business
Enterprises (DBEs) certified in the State of Indiana to participate as part of this proposal. I acknowledge that
this certification is to be made an integral part of this proposal. I understand and agree that the submission of a
blank certification may cause the proposal to be rejected. I certify that I have consulted the following DBE
website to confirm that the firms listed below are currently certified DBEs:
http://www.in.gov/indot/2732.htm.
I certify that I have contacted the certified DBEs listed below, and if my company becomes the
CONSULTANT, these DBEs have tentatively agreed to perform the services as indicated. I understand that
neither my company nor I will be penalized for DBE utilization that exceeds the goal. After contract award, any
change to the firms listed in this Affirmative Action Certification to be applied toward the DBE goal must have
prior approval by INDOT’s Economic Opportunity Division.
I.DBE Subconsultants to be applied toward DBE goal for the RFP item:
II.DBE Subconsultants to be utilized beyond the advertised DBE goal for the RFP item:
Certified DBE Name to DBE Service Planned Estimated Percentage to be Paid*
%
%
%
%
Certified DBE Name to DBE Service Planned Estimated Percentage to be Paid*
%
%
%
%
Estimated Total Percentage Credited toward DBE Goal: __________
Estimated Percentage of Voluntary DBE Work Anticipated over DBE Goal:
Company Name:_________________________________________________________________________
Signature: ____________________________________________ Date:
_____________________________ *It is understood that these individual firm percentages are estimates only and that percentages paid may be greater or less as a result of
negotiation of the contract scope of work. My firm will use good faith efforts to meet the overall DBE goal through the use of these or other
certified and approved DBE firms.
Indiana DBE Certification Program
In accordance with 49 CFR Part 26 as published in the code of federal regulations, the Indiana
Department of Transportation acknowledges
Elizabeth Kiefner Crawford, Director
Economic Opportunity Division
Derrick Casson, Certification Manager
Economic Opportunity Division
(Reference the Indiana Department of Transportation's DBE Public Search at
http://www.in.gov/2674.htm for the most current information regarding this certification)
as a certfied DBE in the State of Indiana.
Date Issued:01/26/2017 No Change Affidavit Due:12/31/2022
McCormick Engineering, LLC