Loading...
HomeMy WebLinkAboutOpening of Proposal - Coal Line Trail, Phase IIB (CE Services) Proj No. 122-035 - HWC EngineeringAUTHORIZED NEGOTIATOR/OFFICER Terry Baker President tbaker@hwcengineering.com (317) 981-1271 - Office It’s Simple: We’re Indiana’s Path Experts. HWC has had the opportunity to manage over 20 different INDOT LPA path specific projects in the last five years. This number grows even further when considering the several dozen LPA roadway projects that had multi-use paths as part of their overall project construction. We consider path inspection to be an important aspect of the construction industry and HWC is a proven market leader within this niche. As you’ll see on future pages, HWC has inspected paths of all different dynamics, and we look forward to continuing our proud trail inspection record with the City of South Bend. HWC thrives when provided the opportunity to showcase our inspection team’s skill set. HWC maintains one of the largest inspection groups in the State of Indiana with a team of 40 qualified inspection staff members. Having over 10 team members with more than 15 years of construction experience and a mentoring mindset has allowed us to consistently exceed our clients’ expectations across the board. This experience, paired with our team’s consistency, has made our goal of building long standing relationships with our clients a relatively simple task. HWC has proven our hard work and inspection performance leaves our clients begging for more and leads to future work with repeat clients. Our team has recently provided inspection services for the City of South Bend on Olive Street Phase 1 and is actively working on leading Olive Street Phase 2 to completion. We are excited about this upcoming opportunity to show South Bend that HWC is a firm you can rely on.RESPONSIBLE OFFICE 5920 Hohman Avenue Hammond, Indiana 46320 HWC is partnering with McCormick Engineering to perform inspection on this trail project. Our continued and regular partnership on INDOT LPA projects allows our team to provide an exceptional level of service to our clients due to the familiarity and level of trust that has been developed by delivering successful projects on a consistent basis. We have chosen to perpetuate this partnership on several recent LPA projects within the La Porte District. Our pre-existing relationship with McCormick will be a key component to success on this project and will help ensure we meet the level of service expected by the City of South Bend. WHY THE HWC TEAM? CITY OF SOUTH BEND EXPERIENCED & SUCCESSFUL RESIDENT PROJECT REPRESENTATIVE Scott Carter has over 23 years of experience in construction inspection primarily focused in INDOT and LPA work. HWC is actively seeking to grow our inspection presence within this area of the State, and Scott is one of the strategic hires we have made to increase our number of staff while also targeting new staff members which can add to our already impressive skill set. Given that Scott is actively working in South Bend on another LPA project, he has already begun building a relationship with South Bend and familiarity with the City. HWC is proud of the work we have accomplished for South Bend and we look forward to Scott being a strong presence to help our firm continue to meet and exceed the expectations set forth. Actively working for the CITY OF SOUTH BEND EXPERTISE in subgrade and concrete testing methods 23+ YEARS of Experience PARTNERSHIP & UNDERSTANDING OUR COMMITMENT TO THE CITY HISTORY OF SUCCESS with South Bend and INDOT La Porte District CE Services for Coal Line Trail Phase IIB (Des # 2200199) I LA PORTE DISTRICT TEAM PROJECT APPROACH RELEVANT EXPERIENCE 2CITY OF SOUTH BEND | CE Services for Coal Line Trail Phase IIB (Des # 2200199)FIRM OVERVIEW FIRM OVERVIEW Our Path & Pedestrian Improvement Inspection Projects Include: • Fitzgerald Trail - New Castle, IN • Pedestrian System Improvements - Spencer, IN • Safe Routes to School - Clinton, IN • Kitselman Trail Phase I - Muncie, IN • Kitselman Trail Phase II - Muncie, IN • Adams Street Sidewalk & Intersection Improvements - Bloomington, IN • Bloomfield Avenue Improvements - Bloomington, IN • Creekside Corporate Park - Zionsville, IN • Muscatatuck Trail - North Vernon, IN • Toyota Trail - Princeton, IN • Heritage Trail Phase I - Princeton, IN • Heritage Trail Phase II - Princeton, IN • Midland Trace Trail - Noblesville, IN • Main Street Streetscape Phases I, II, & III - Lafayette, IN • Flat Rock Trail - Rushville, IN • Sugar Creek Trail - Crawfordsville, IN • Downtown Loop Trail - Crawfordsville, IN • Washington Street Trail - Delphi, IN • Interurban Trail - Delphi, IN • New Park Loop Trail - Remington, IN DYNAMIC • 40 full- and part-time Inspectors located in 16 Counties throughout Indiana • Lead projects from ground breaking to ribbon cutting CONSTRUCTION ENGINEERING • Construction observation services for roadway, trail, & bridge projects PLANNING, STUDIES, FUNDING • Transportation planning • Traffic studies • Environmental studies • Funding assistance (federal-aid highway funding for LPA projects) HWC has provided inspection services for a variety of local clients as well as INDOT. We are honored to have the opportunity to once again show that our firm is capable of, and regularly provides, an unmatched level of service. We pride ourselves on excellent communication, attention to detail, and dedication to the successful outcome of the projects we oversee to ensure our clients receive the long lasting projects they deserve. HWC anticipates continuing our track record of success and building our relationship with the City of South Bend. DESIGN • Bridge design • Road design (rural systems) • Street design (urban systems) • Highway design (arterial systems) • Signalization • Intersection upgrades & roundabouts INNOVATIVE • Field equipment and software upgrades ensure up-to-date industry technology • Several team members have INDOT Stormwater Level 1 Certifications and three have CESSWI Designations • 10 Hour and 30 Hour OSHA Training Certifications • National Highway Institute MOT Training and OSHA Fall Protection Training • Drone Pilot Licenses to take real-time photos on select projects STANDARD OF CARE EXPERIENCED • Extensive experience with standards and specifications • Team members regularly attend continuing education courses and INDOT training SPECIFIC SERVICES TEAM PROJECT APPROACH RELEVANT EXPERIENCE 3FIRM OVERVIEWCITY OF SOUTH BEND | CE Services for Coal Line Trail Phase IIB (Des # 2200199) 90% HWC ENGINEERING 13.1 Construction Inspection 10% MCCORMICK ENGINEERING, LLC (DBE) 13.1 Construction Inspection PROJECT TEAM CITY OF SOUTH BEND MELISSA WALKER, EI, CESSWI Deputy Director of Inspection HWC ENGINEERING TROY SWAN, PE Director of Inspection HWC ENGINEERING SCOTT CARTER Senior Resident Project Representative HWC ENGINEERING DARAY SHAHID Assistant Resident Project Representative HWC ENGINEERING TRACY MCCORMICK, PE Construction Inspector MCCORMICK ENGINEERING PROJECT MANAGER | FINNIAN CAVANAUGH, EI JOHN BEER Senior Construction Technician MCCORMICK ENGINEERING TEAM PROJECT APPROACH RELEVANT EXPERIENCE 4FIRM OVERVIEWCITY OF SOUTH BEND | CE Services for Coal Line Trail Phase IIB (Des # 2200199) Scott Carter SENIOR RESIDENT PROJECT REPRESENTATIVE PROJECT TEAM CERTIFICATIONS: • Stormwater Level 1 • SiteManager Certified • INDOT Certified Highway Technician and Project Engineer/Supervisor • 10 Hour OSHA • National Highway Institute Certifications -Maintenance of Traffic for Supervisors -Proper Joint Sealing Techniques for Pavement Preservation QUALIFICATIONS: Scott has more than 23 years of experience in the construction industry performing inspection services on a variety of project types. He is experienced in inspecting construction crews, work, and materials for compliance with State specifications. Scott is a proud Army veteran and is familiar with working in the South Bend area as he is currently working on the inspection of Olive Street Phase 2. *Previous Employer SCOTT will be able to commit 100% to this project. OF HIS TIME PROJECT EXPERIENCE • Construction Inspection Services for Intersection Safety Project (Des # 1702829) - La Porte County, IN • Inspection of Olive Street Phase 2 Road Improvements at Railroad Crossing (Des # 1902178) - South Bend, IN • ADA Upgrades and Resurfacing of SR 15 (R-40475) - Silver Lake, IN* • Inspection of Two Projects, Replace Approaches and Microsilica Bridge Deck Overlay and Thin Deck Overlay (B-41074) - Elkhart County, IN* • Inspection of a Series of Projects: Bridge Deck Replacement and Widening, Three CIPP Air- Inversion Steam Cure Pipe Liners, and Culvert Removal and Replacement (R-41079) - Various Counties, IN* • Roundabout at SR 13/CR 33/US 6 Intersection - Elkhart County, IN* • Rerouting US 33 Over Railroad Tracks, Lincoln Ave, and Cottage Avenue - Goshen, IN* DID YOU KNOW.... Scott Carter served as an INDOT employee for most of his career. TEAM PROJECT APPROACH RELEVANT EXPERIENCE 5FIRM OVERVIEWCITY OF SOUTH BEND | CE Services for Coal Line Trail Phase IIB (Des # 2200199) PROJECT TEAM QUALIFICATIONS Melissa has 15 years of experience in the construction industry, with two years of experience in road design. She has all required INDOT inspection and testing certifications and has consistently exceeded both LPA and INDOT expectations on similar projects. Melissa’s work experience includes both design and inspection involving roadway reconstruction and rehabilitation, bridge construction/repair, new road construction, storm sewer improvements, resurfacing, guardrail installation, trail construction, signing, utility coordination, and lighting. Melissa was named the 2021 City of Indianapolis Department of Public Works Resident Project Representative of the Year. RELEVANT EXPERIENCE • Interurban Deer Creek Trail Enhancement - Delphi, IN • Washington Street Gateway Trail, Phase II - Delphi, IN • Delphi Downtown Streetscape - Delphi, IN • Midland Trace Trail - Noblesville, IN • Kitselman Trail Phase II - Muncie, IN • Market Street East & Market Street West Reconstruction - Indianapolis, IN • Allisonville Road Reconstruction - Fishers, IN Melissa Walker, EI, CESSWI DEPUTY DIRECTOR OF INSPECTION QUALIFICATIONS With over 7 years of experience, Daray brings a lot of talent to HWC’s Transportation and Water Inspection group. She has an impressive skill set that includes performing asphalt binder, hot mix asphalt, and emulsion tests. As a Horizontal Construction Engineer for the Army National Guard, she delegates and trains other soldiers to guarantee correct work ethic at construction sites and also operates and maintains heavy construction equipment. RELEVANT EXPERIENCE • Olive and Sample Roadway Reconstruction Phase I - South Bend, IN • Bridge #95 - White County, IN • Park Ridge - Hebron, IN • Market Street West Reconstruction - Indianapolis, IN • US 421 Widening - Carroll County, IN Daray Shahid ASSISTANT RESIDENT PROJECT REPRESENTATIVE QUALIFICATIONS Tracy has more than 25 years of engineering experience in planning, design, and construction observation of civil engineering projects. Tracy is client-focused, self-directed, and results oriented. She is the co-founder of McCormick Engineering, LLC, a firm recognized by the State of Indiana as a Women’s Business Enterprise (WBE) and Disadvantaged Business Enterprise (DBE). RELEVANT EXPERIENCE • Olive and Sample Roadway Reconstruction Phase I - South Bend, IN • Gumwood Road Reconstruction Phase I & II - St. Joseph County, IN • Cleveland and Ash Roundabout - St. Joseph County, IN • Michigan Boulevard Reconstruction Project - Michigan City, IN • 169th Street Reconstruction - Hammond, IN • 45th Avenue Reconstruction - Lake County, IN • Edison Road - South Bend, IN • Old US 30 - Kosciusko County, IN • CR 400 N/Vale Park Road at SR 49 - Valparaiso, IN • Cleveland Road - St. Joseph County, IN • Kercher Road - Goshen, IN • McKinley Road and Ash Road - St. Joseph County, IN Tracy McCormick, PE CONSTRUCTION INSPECTOR QUALIFICATIONS John is a Technician with over 25 years of experience in the construction industry. His observation experience includes performing material testing, monitoring daily construction activities, and preparing Daily Work Reports for roadway reconstruction, bridge deck replacement, and telecommunication fiber installation projects. RELEVANT EXPERIENCE • Coal Line Trail - St. Joseph County, IN • Olive Street Reconstruction - South Bend, IN • Bendix Drive Reconstruction - South Bend, IN • INDOT On-Call, SR 331 over US 30 Bridge Deck Overlay - Marshall County, IN • INDOT On-Call, US 24 Bridge Bundle - Fulton County, IN • INDOT On-Call, US 31 Reconstruction - St. Joseph County, IN • INDOT On-Call, SR 49 Bridge Bundle - Porter County, IN • Indiana Toll Road Concessions, ITS Phase II, Lake - Elkhart, LaGrange, & Steuben County, IN • Handley Elementary Safe Routes to School - La Porte, IN • Maplecrest Road Widening - Fort Wayne, IN • Kercher Road Reconstruction - Goshen, IN • Bridge Rehabilitation Projects - DeKalb, Fulton, Huntington, Marshall, Kosciusko, LaGrange, & Tipton County John Beer SENIOR CONSTRUCTION TECHNICIAN TEAM PROJECT APPROACH RELEVANT EXPERIENCE 6FIRM OVERVIEWCITY OF SOUTH BEND | CE Services for Coal Line Trail Phase IIB (Des # 2200199) Project Understanding This project will involve the construction of a new trail over St. Joseph River from Riverside Drive to North Shore Drive. The intent of this project is to convert an existing abandoned railroad, Coal Line Trail Bridge, into a multi-use path. This project is one section of a multiple phase project connecting and expanding the trail system in South Bend. This specific phase will rehabilitate Coal Line Trail Bridge, creating a new path/trail which will ultimately connect a prior section of Coal Line Trail to an existing trail segment, Riverside Trail. Also, as a part of this project, a new plaza will be built on the West Bank at the trail connection point. This project will include a variety of site amenities including, but not limited to, lighting and benches. Upon performing a field visit of the proposed project location, several construction considerations come into play. These vital components include tree clearing, maintaining access to the adjacent neighborhood off of North Shore Drive, and performing work over St. Joseph River. Performing construction activities over a jurisdictional waterway requires attention to detail when considering the potential for contamination due to construction activities. With HWC staff having several personnel with level 1 stormwater certifications, as well as our Deputy Director of Inspection having a level 2 CESSWI certification, we are well equipped to assure that proper actions are taken to protect St. Joseph River. Our staff has also performed oversight of several past projects throughout Indiana which involved the conversion of inactive railroad crossings into multi-use paths, another of which was located in La Porte District. Our project experience is in both asphalt and concrete trail components, as well as several connecting elements such as ADA ramps, sidewalks, trail head areas, and a variety of site amenities such as lighting, benches, and decorative bike racks. Regardless of the components to be included in this project, our staff is knowledgeable and experienced to deliver a successful trail for the City of South Bend. HWC’s project approach is focused on continuing to grow the confidence the City of South Bend has in our firm by completing another path project on time and within budget. Our firm’s attention to detail and level of understanding in the area of path construction will seamlessly help guide this project to a successful finish. HWC also has a comprehensive understanding of maintenance of traffic needs and implementation. This will be a key component to completing this project effectively while implementing and maintaining the specified vehicular detour route in a safe manner. Each project has its unique components, but HWC is a step above the competition with an inspection team having experience in not only construction inspection, but also with team members certified in both utility and railroad coordination. PROJECT APPROACH OUR APPROACH BID SEPTEMBER 2022 PRE-CONSTRUCTION DECEMBER 2022 CONSTRUCTION WINTER/SPRING 2023 FINAL RECORDS FALL/WINTER 2023 Our team also possesses knowledge and course certifications in: HWC takes pride in our staff’s skill sets and intentionally continues to bolster those skill sets by consistently sending our team members to industry continuing education courses. This helps ensure our team has the most up-to-date certifications while advancing our knowledge on new construction practices and testing methods. Our team is versatile with the ability to inspect any type of project including road and bridge construction, stormwater and sanitary system installation, multi-use/decorative path projects, and pool and water park projects. Whatever our client’s inspection needs, HWC has the certified professionals to get the job done, and we will hit the ground running on this shared use path project. Our team is equipped and well versed in all testing methods applicable to this project. Stormwater Level 1 & 2 Maintenance of Traffic OSHA 10 & 30 hour Multiple Asphalt Courses TEAM PROJECT APPROACH RELEVANT EXPERIENCE 7FIRM OVERVIEWCITY OF SOUTH BEND | CE Services for Coal Line Trail Phase IIB (Des # 2200199) HWC knows path projects. Our extensive experience in this type of work provides our staff with a level of knowledge unmatched by the competition. Not only do we surpass other firms in general knowledge, but also in the quantity of path projects that we have been awarded. Our team is well versed in soil sampling/moisture testing, soil compaction testing (Dynamic Cone Penetrometer), compaction testing for aggregate (Lightweight Deflectometer), concrete testing (air, slump, and yield), and diagnosing and performing undercuts, etc. It takes a great level of expertise when diagnosing problem areas with existing soil conditions and knowing how to correctly remedy those issues. HWC will ensure the contractor is repairing all the necessary areas of the subgrade in its entirety prior to placing compacted aggregate and HMA for the path. This level of accurate testing couldn’t be possible without the right equipment. HWC has invested over $25,000 in new field equipment purchases in the last three years to better serve our clients. HWC has even purchased two drones to provide a unique perspective of projects often not seen from the ground level. We have two FAA licensed remote pilots on staff that will be on site periodically throughout construction operations to take aerial photos of the project. This will enable the City of South Bend to have a snapshot of construction activities throughout the duration of the project. PROJECT APPROACH MATERIAL & TESTING EQUIPMENT Trails or paths are unique in that they are built similar to roadways, but, ultimately, need to be much smoother with little to no imperfections in the asphalt. Any small imperfections in the asphalt could create a safety hazard for a bicyclist, roller bladder, or skateboarder. This can become an insurance liability if someone becomes seriously injured from a fall. The asphalt also needs to shed water properly to ensure there are no slick spots that could freeze or pond water. HWC will ensure these important aspects of the finished asphalt surface are constructed in a way to eliminate this concern about potential trips and falls. THE IMPORTANCE OF PEDESTRIANSAFETYSAFETY TEAM PROJECT APPROACH RELEVANT EXPERIENCE 8FIRM OVERVIEWCITY OF SOUTH BEND | CE Services for Coal Line Trail Phase IIB (Des # 2200199) PROJECT UNDERSTANDING & APPROACH HWC has had the opportunity to inspect numerous projects within the City of South Bend and throughout INDOT’s La Porte District. We have performed several different types of projects including a plethora of LPA trails in northwest Indiana. Our staff is very familiar with trail construction and is confident this is an area where our experience and skill set stand out in comparison to our peer firms. We look forward to using this platform as an opportunity to further strengthen our relationship within La Porte and make the City of South Bend one of our repeat clients for many years to come. We do not take any past opportunities for granted, and we look forward to once again showcasing our team’s talents to the City of South Bend on this trail project. HWC will continue to build these relationships and maintain the level of trust we have earned with the City through our high level of communication. Whether this is through regular daily interactions, bi-weekly progress meetings, or our weekly reports, Scott Carter will ensure that the City is up-to-date and well informed on project progress, any potential issues that may arise, as well as construction or value engineering options throughout construction. A CONTINUED RELATIONSHIP EXPERIENCED PARTNERSHIP HWC and McCormick Engineering have a long-standing working relationship which provides a cohesive team and also a varied level of experience to handle any field issues that may arise. We are a firm believer that this continued partnership carries forward to the benefit of our clients. Our team’s familiarity and experience specifically in the City of South Bend has also helped to build rapport with local utility companies and the contractors who execute this work. Our proposed inspection team is well versed in path construction and understands the specific needs of this project. They are prepared and ready to identify and solve issues during construction, but also to review and find any potential issues with the contract documents and plans. This assures constructibility concerns are addressed throughout the project. The level of attention to detail our team offers enables them to easily and quickly diagnose issues during each stage of construction to make sure that this project will be built to the expectations of the City and yield lasting, quality results. 40 INSPECTORS OVER THE PAST SIX YEARS OUR TRIPLED TO CONSTRUCTION INSPECTION TEAM HAS MORE THAN HWC has made several strategic hires over the last five years to help grow and maintain a diverse and experienced PE/PS staff. As a result of this strategy, nine of our key Senior Inspector staff have over 25 years of construction experience. We also have an additional seven staff members that possess 10 or more years of construction inspection experience. In total, this means over 2/3 of our entire inspection staff has a minimum of 10 years of direct inspection experience. Our PE/PS core team members are skilled in foreseeing and diagnosing problems before they occur in the field. By using various techniques learned over the years, our team is confident it can overcome any challenge that occurs during the course of any construction project. Being able to stay on top of project related issues, such as subgrade issues, errors/omissions in the contract documents, unforeseen conditions, etc., will help ensure the City gets a lasting product of which they can be proud. Our history performing work within the La Porte District and the City of South Bend has proven our ability in this area. Several different skill sets are required to successfully manage and inspect an INDOT project. Materials need to be tested and certifications obtained. Weekly erosion control reports, contractor payrolls, and traffic reports need reviewed for accuracy and compliance. But, ultimately, job success usually comes down to one word: MONEY. Budget control is imperative to success and INDOT makes it a focal point on their performance scoring. We coach our teams to constantly check and identify value engineering opportunities in both their inspection and construction budgets. Specific to projects performed within the La Porte District, our firm has regularly given back money on inspection budgets and sought ways to save our clients money in timely resolution of field issues and providing several options to solve constructibility issues. Prompt resolution of problems that arise during construction means less down time leading to projects being constructed on time and within budget. DIAGNOSING & SOLVING PROBLEMS CONSTRUCTION & INSPECTION BUDGET EMPHASIS$ THIS CORE TEAM HAS BEEN PART OF NUMEROUS LARGE PROFILE PROJECTS RANGING IN SIZE UP TO $40 MILLION TEAM PROJECT APPROACH RELEVANT EXPERIENCE 9FIRM OVERVIEWCITY OF SOUTH BEND | CE Services for Coal Line Trail Phase IIB (Des # 2200199) HWC was responsible for full-time inspection of the Kitselman Trail Phase 2 project in Muncie, Indiana. The project included new asphalt and concrete trail sections with corresponding curb, sidewalk, and ADA ramps. A portion of the trail was built on top of a former parking lot where fill material was built up to create an elevated trail section which connects into a newly restored pedestrian bridge. Communication conduits, fencing, and decorative items such as benches and a water fountain for both pedestrians and pets were implemented. A stone paver walking area surrounding several of the benches which contain notches for bike storage was installed. This is located adjacent to the newly constructed parking lot installed as a part of this project. New plantings and trees were also included. The trail splits into several sections and includes a decorative stone staircase leading down to a section of trail which is constructed adjacent to the White River. Sets of stairs with limestone bike channels and railings were also installed connecting trail segments. The project was funded by INDOT and the City of Muncie. Project cost was approximately $1,057,380. HWC provided full-time inspection of the Midland Trace Trail project in Noblesville, Indiana. This trail was installed from Hazel Dell Parkway to Willowview Road, converting what was formerly a railroad bed into a pedestrian and bike use trail. As part of this project, the existing culvert was replaced along with the installation of other storm drainage items. The trail itself was asphalt with sections of corresponding curb, sidewalk, and ADA ramps. Several decorative items such as stamped concrete, benches, and plantings were included. Hawk signals were implemented at each street crossing. These pedestrian/ bike crossings included crosswalk striping, stop bars, signage, and flashing lights on cantilever arms activated by pedestrian push buttons. The project was funded by INDOT and the City of Noblesville. Project cost was approximately $718,000. Midland Trace Trail RELEVANT EXPERIENCE: HWC Kitselman Trail Enhancement, Bike, & Pedestrian Facilities MUNCIE, IN NOBLESVILLE, IN TEAM PROJECT APPROACH RELEVANT EXPERIENCE 10FIRM OVERVIEWCITY OF SOUTH BEND | CE Services for Coal Line Trail Phase IIB (Des # 2200199) HWC was responsible for full-time inspection of the Fitzgerald Trail in New Castle, Indiana. This project included construction of .95 miles of new trail along Washington Street and Hillsboro Road and through portions of Osborne Park. This project included construction of new curb, installation of new ADA ramps, and new sidewalk. A large concrete node was poured at the end of the trail with benches for sitting, and a stone parking lot was installed at the node for people to park and then access the trail. Two lifts of HMA atop a stone subbase were utilized to construct this trail, and disturbed areas were seeded to deliver the finished product. The project was funded by INDOT and the City of New Castle. Project cost was approximately $600,000 and the project was completed in August of 2021 HWC was responsible for the full-time inspection of the Morgan Street Streetscape and the Flatrock Trail projects in Rushville, Indiana. These projects included a new terrain HMA trail along with a widened sidewalk for enhanced pedestrian travel. The projects ran from the Rushville City Library in downtown Rushville to Riverside Park, nestled along the Flatrock River. The projects included several new structural and decorative enhancements. Structural enhancements included storm sewer, concrete curb, HMA for the new trail, new concrete sidewalk, and new PCCP for drives. Decorative enhancements included traffic signage, enhanced pedestrian lighting through the corridor, historical markers and signs, decorative thermoplastic crosswalks, farmers market wayward striping, new benches, bicycle racks, trash receptacles, and decorative etched pavers throughout the walkways. Decorative elements also included new limestone seat walls, landscape beds, granite pavers, and a new amphitheater area with terraced limestone seat walls. This project was funded with INDOT LPA funds and by the City of Rushville. The total cost was $1.8 million and was completed in November of 2020. Fitzgerald Trail RELEVANT EXPERIENCE: HWC NEW CASTLE, IN RUSHVILLE, IN Morgan Street Streetscape & Flatrock Trail TEAM PROJECT APPROACH RELEVANT EXPERIENCE 11FIRM OVERVIEWCITY OF SOUTH BEND | CE Services for Coal Line Trail Phase IIB (Des # 2200199) HWC was responsible for the full-time inspection of the Interurban Deer Creek Trail project located along Deer Creek from Hamilton Street to US 421 in Delphi, Indiana. This project included construction of new sidewalk, curb/gutter, PCCP driveways, and drainage structures between Wabash Street and US 421. New terrain construction between Hamilton Street and Wabash Street requiring earth embankment fill and subgrade treatment was also performed before finishing the trail with full depth HMA pavement. This project was funded by INDOT and the City of Delphi with a total project cost of just under $280,000. HWC completed the Washington Street Gateway & Trail project in Delphi, Indiana. The project included installation of a multi-use path with period street lighting, handicap-accessible ramps, brick paver accents, site furnishings, wayfinding, and landscape areas. The multi-use path created critical connections between schools, historic neighborhoods, and other points of interest in the community. Federal aid funding was utilized for this project, which served to create a pedestrian-friendly downtown. The project was funded by INDOT and the City of Delphi. Total project cost was $1.5 million. Washington Street Gateway Trail Phase IIInterurban Deer Creek Trail RELEVANT EXPERIENCE: HWC DELPHI, IN DELPHI, IN TEAM PROJECT APPROACH RELEVANT EXPERIENCE 12FIRM OVERVIEWCITY OF SOUTH BEND | CE Services for Coal Line Trail Phase IIB (Des # 2200199) HWC provided design and construction inspection services for this project. The Muscatatuck Trail project connects the Muscatatuck County Park to downtown North Vernon, Indiana. This project was one component of the City’s $15.0 million Stellar Communities Pilot Program effort to revitalize downtown North Vernon. INDOT federal aid funds were utilized. The trail begins in downtown North Vernon and extends south through several neighborhoods along a former railroad right-of-way before ultimately connecting to the Muscatatuck County Park. The park has existing mountain biking and hiking trails, which serve as a natural connection to this multi-use trail. RELEVANT EXPERIENCE: HWC NORTH VERNON, IN Muscatatuck Trail HWC provided full-time inspection services for the Sugar Creek Trail project in Crawfordsville, Indiana. Project additions included an MSE wall structure spanning 223’ over an unnamed tributary that outlets into Sugar Creek and an 8’ wide HMA bike trail approximately 1,878’ in length from Schenck Road to the existing trailhead by the Animal Welfare League. The project also included installing 48” RCP in the MSE wall to divert the water for the unnamed tributary to Little Honey Creek. MSE wall envelope was backfilled entirely with #8 stone to ensure the MSE wall joints did not leak from typical structure backfill material. The $670,000 project was funded by INDOT and the City of Crawfordsville. Sugar Creek Trail CRAWFORDSVILLE, IN Standard RFP Form Ver. 3-01-2021 6 (Rev. 06/27/18) Des. #: 2200199 Affirmative Action Certification (AAC) for Disadvantaged Business Enterprises (DBE) I hereby certify that my company intends to affirmatively seek out and consider Disadvantaged Business Enterprises (DBEs) certified by the State of Indiana’s DBE Program and the Kentucky Transportation Cabinet (KYTC) DBE Program to participate as part of this proposal. An Agreement between INDOT and KYTC established reciprocal acceptance of certification of DBE firms in their respective states under the Unified Certification Program (UCP) pursuant to 49 CFR §26.81(e) and (f). I acknowledge that this certification is to be made an integral part of this proposal. I understand and agree that the submission of a blank certification may cause the proposal to be rejected. I certify that I have consulted the following DBE websites to confirm that the firms listed below are currently certified DBEs: INDOT: https://entapps.indot.in.gov/DBELocator/ KYTC: https://transportation.ky.gov/Civil-Rights-and-Small-Business-Development/Pages/Certified-DBE-Directory.aspx I certify that I have contacted the certified DBE’s listed below, and if my company becomes the CONSULTANT, these DBEs have tentatively agreed to perform the services as indicated. I understand that neither my company nor I will be penalized for DBE utilization that exceeds the goal. After contract award, any change to the firms listed in this Affirmative Action Certification to be applied toward the DBE goal must have prior approval by INDOT’s Economic Opportunity Division. I.DBE Subconsultants to be applied toward DBE goal for the RFP item: Certified DBE Name Service Planned Estimated Percentage to be Paid* % % % % II.DBE Subconsultants to be utilized beyond the advertised DBE goal for the RFP item: Certified DBE Name Service Planned Estimated Percentage to be Paid* % % % % Estimated Total Percentage Credited toward DBE Goal:___________ Estimated Percentage of Voluntary DBE Work Anticipated over DBE Goal:__________ Company Name: ____________________________________________________________________ Signature: ___________________________________________ Date: ________________________ ∗ It is understood that these individual firm percentages are estimates only and that percentages paid may be greater or less as a result of negotiation of contract scope of work. My firm will use good faith efforts to meet the overall DBE goal through the use of these or other certified and approved DBE firms. McCormick Engineering, LLC 13.1 McCormick Engineering, LLC 13.1 3 7 3% 7% Hannum, Wagle and Cline Engineering (HWC Engineering) 8/23/2022 Indiana DBE Certification Program In accordance with 49 CFR Part 26 as published in the code of federal regulations, the Indiana Department of Transportation acknowledges Elizabeth Kiefner Crawford, Director Economic Opportunity Division Derrick Casson, Certification Manager Economic Opportunity Division (Reference the Indiana Department of Transportation's DBE Public Search at http://www.in.gov/2674.htm for the most current information regarding this certification) as a certfied DBE in the State of Indiana. Date Issued:01/26/2017 No Change Affidavit Due:12/31/2022 McCormick Engineering, LLC