Loading...
HomeMy WebLinkAboutLeeper Park East Rose Garden_AA 2022-0810Michele Gelfman, President HISTORIC PRESERVATION COMMISSION OF SOUTH BEND AND ST. JOSEPH COUNTY CERTIFICATE OF APPROPRIATENESS The Historic Preservation Commission of South Bend and St. Joseph County has approved the following work: Small staircase project, 3' wide flower bed on either side of pathway, connecting to existing stairwell on southern end of rose garden. Self / Volunteers, Contractor for the following location: 820 MICHIGAN ST South Bend, IN, 46601 Application No. 2022-0810 in the County of St. Joseph; State of Indiana; which is: Located in a Local Historic District A Local Historic Landmark and found this application to be appropriate according to the Standards pertaining to Local Historic Landmarks and/or Local Historic Districts. Regulations pertaining to the Historic Preservation Commission are found in Chapter 21 (Zoning), South Bend Municipal Code and Chapter 26 of the St. Joseph County Code. The issuance of this certificate does NOT in any manner, release the recipient from the responsibility of complying with the requirements of the zoning ordinances, building codes, safety codes, ADA or other requirements of the City of South Bend, the County of St. Joseph, the State of Indiana, or the United States Federal Government. This certificate is good for one year from the date of issuance and is effective from the date entered herein. Plans are on file and open for public inspection at the office of the Historic Preservation Commission of South Bend and St. Joseph County, 227 West Jefferson Blvd., Suite 1400 S, South Bend, Indiana, during normal business hours. THIS CERTIFICATE IS NOT TRANSFERABLE NAME OF APPLICANT:City of South Bend Venues Parks & Arts CERTIFICATE ISSUED BY: Adam Toering Historic Preservation Administrator POST IN A CONSPICUOUS PLACE ON THE STREET SIDE OF THE PROJECT UNTIL COMPLETION OF ALL WORK. Phone: (574) 235-9371 E-mail: SBSJCHPC@southbendin.gov ADAM TOERING Historic Preservation Administrator 8/10/2022DATE CERTIFICATE TAKES FORCE:8/10/2023DATE CERTIFICATE EXPIRES: ADMINISTRATIVE APPROVAL HISTORIC PRESERVATION COMMISSION OF SOUTH BEND AND ST. JOSEPH COUNTY County —City Building, South Bend, IN 46601 http://wwNv.southbendin.gov/government/department/community-investment Phone:574/235.9371 Fax:574/235.9021 Email: hpcsbsjc@south ben din. gov Sarah Andrews, President A Certified Local Government of the National Patio Service Adam Toering, Historic Preservation Administrator APPLICATION FOR A — CERTIFICATE OF APPROPRIATENESS OFFICE USE ONLY»»»DO NOT COMPLETE ANY ENTRIES CON'TAI:NEI) IN' TTIIS BO\«««OFFICE USE ONLY Date Received: Application Number: Past Reviews: ❑ YES (Date of Last Review) Staff Appr•oval authorized by: Historic Preservation Commission Review Date: ❑ Local Landmark ❑ National Landmark Certificate Of Appro riateness: f Denied ❑ Tabled ❑ Local Historic District (Name) ❑ National Register District (Name) ❑ NO Title: ❑ Sent To Committee ❑ Approved and issued: Address of Property for proposed work: PC— K AYZ `' t� T f / (Sheetm Number—Slreet Name —City —Zip) Name Name of Property Owner(s): V - Phone #: S / V Address of Property Owner(s): 30> �� S-F '"'- �/ J d] yb4. / 7 (Streel Nunzbei=Sd•eet ,Vame—Cily—Zip) Name of Contractor(s): kH u C(- I Phone #: Contractor Company Name: �C�' 1� ���� I t +r�j / f" Address of Contractor Company: �~ ��nj(Streel Ntanbei=Streel Nanie—City—Zip) Current Use of Building: ilm K (Single Fuiziiiiii.—ritulIti,-pFcanili,—Conznzercial—Governnient—Indiislrial—Vacant—etc) Type of Building Construction: � ( � ;( /'�'� (Mood Frame —Brick —Stone —Steel —Concrete —Other) Proposed Work: (inoire than one Landscape ❑ New ❑ Replacement (not in -kind) ❑ Demolition box may be checked) Description of Proposed Work: woodwork. r Owner e-mail: X Signature of Owner 54�F ?90_T� and/or Contractor a-mai . ' and/or X Sign By signing this application I agree to abide by all local regulations related to project jm/Lo obtain a Building Department Permit, if applicable —APPLICATION REQUIREMENTS ARE LISTED ON REVERSE SIDE— /V�� ---F, Resurrect the Roses, Inc. Re: Small Staircase Project in the Rose Garden July 18, 2022 Adam Toering Historic Preservation Commission: As we discussed, currently the small staircase on the southern edge of the Rose Garden leads nowhere —just into the grass surrounding the Rose Garden —but not actually into the beds. It doesn't actually "enter" the Rose Garden, and we want to correct that. (A large number of our older visitors use this small staircase, since the "main" staircase is much steeper, and longer.) Our project would add a pathway from the bottom of the stairs, into the gravel walkway that is within the Rose Garden. The new pathway would be six feet wide (the same width as the stairs), and be composed of the same #11 crushed limestone that we used for the upper pathway that we created several years ago, connecting the Michigan Street sidewalk to the larger staircase that flows into the Rose Garden, from the west. The new 6 foot pathway would have 3 foot wide flower beds, adjacent to the path on each side of the path; separated by steel edging. We would add steel railings to the staircase, designed by Evans Metal, with the same design used recently on the stairs in Leeper (west) that lead to the Studebaker Fountain. I have provided a copy of this proposal, with the attached sketch, to Aaron Perri, and asked him to review it, and send it on to you. Naturally, if you have any additional questions, I know that you will feel free to contact me. Respectfully subm Larry Cliffo 709 East WJsYington, 46617 Larryc709@gmail,com 574-850-1979 Enc: sketch CC: Aaron Perri John Martinez Patrick Sherman pSarM�l "hi t Qo,R'S. Resurrect the Roses, Inc. July 18, 2022 Re: Rose Garden Stairway to Nowhere Meeting of June, 13, 2022 Aaron; I wanted to set out an update from our discussion at your office: After our meeting of June 13, at which we discussed this project, I met with Adam Toering at HPC on June 16 at his office, and reviewed the project with him. He indicated that he was in favor of both this stairway project, and the water feature project that I have proposed for Spring, 2023. He indicated that he would give administrative approval for both projects, without the need for full Board approval/review by HPC. He advised me to submit a written proposal and basic drawing to him, signed off by VPA, and he would approve it. On June 16th, I also met on site with David Evans, of Evans Metal and reviewed the handrail part of this project. He took all of the necessary measurements, and will provide me with a bid for the handrails for the steps, identical to what they installed on the steps in Leeper Park (West), going down into the Fountain area. Adam has indicated that this style will be acceptable to him and HPC. Mr. Evans will be submitting a bid to me. In addition, I met this morning with Brad, from VPA, to look at the electrical needs for the water feature, on site. Brad was very helpful, and will be talking to the electrician about these requirements. I am attaching the proposal to HPC on the small staircase project, and would appreciate it if you would approve it, and either return it to me; or pass it on to Adam for his approval. Sincer Larry S 709 East Washington St, 46617 Enc: Cc: John Martinez Patrick Sherman Adam Toering, HPC David Evans, Evans Metal Ail i7 ik 1.w " tw 1 a % ftoov, �. m 4�.