HomeMy WebLinkAboutOpening of Bids - 2022 Community Crossings Road Rehabilitation Proj No. 122-024R - Rieth-RileyCITY OF SOUTH BEND, INDIANA
CONTRACTOR'S BID FOR PUBLIC WORK
Project Name 2022 Community Crossings Roadway Rehabilitation Project
Project No. 122-024R
For Bids Due August 4, 2022 at 9:OOAM Local Time
PART I
(Must be completed for all bids. Please type or print)
Date: August 4, 2022 Bidder (Firm): Rieth-Riley Construction Co., Inc.
Address: 25200 State Road
City/State/Zip: South Bend, IN. 46614 Telephone Number: ( 574 ) 288-8321
Agent of Bidder (if Applicable): Jacob K. Kwilasz
Pursuant to notices given, the undersigned offers to furnish labor and/or material necessary to complete the
public works project of:
2022 Community Crossings Roadway Rehabilitation Project, Project No. 122-024R
the City of South Bend, Indiana, in accordance with plans and specifications prepared by:
n/a
and dated n/a for the sum of (enter the Total Bid as shown on the Proposal)
Five million, five hundred nine thousand, one hundred twenty-four dollars ($ 5,509,124.00 )
(Enter sum of Total Base Bid plus Alternates shown on Proposal) (Numerical)
The undersigned further agrees to furnish a bond or certified check with this bid for an amount specified in
the notice of the letting. If alternative bids apply, the undersigned submits a proposal for each in accordance
with the notice. Any addendums attached will be specifically referenced at the applicable page.
If additional units of material included in the contract are needed, the cost of units must be the same as that
shown in the original contract if accepted by the City of South Bend. If the bid is to be awarded on a unit
basis, the itemization of the units shall be shown on a separate attachment.
The above bid is accepted this
Subject to the following conditions:
BOARD OF PUBLIC WORKS
Elizabeth A. Maradik, President
Gary A. Gilot, Member
By
ure)
Jacob K. Kwila anager
(Printed Name of Person Signing)
ACCEPTANCE
day of
Joseph R. Molnar, Member
Jordan V. Gathers, Member
Murray L. Miller, Member Attest: Theresa Heffner, Clerk
Version 09/29/2021 Contractor's Bid for Public Works - 2
20
Y. w, rnAe a
CITY OF SOUTH BEND, INDIANA.,.
CONTRACTOR'S BID FOR PUBLIC WORK µ.
CHECKLIST FOR BIDDERS
Project Name 2022 Community Crossings Roadway Rehabilitation Project
Project No. 122-024R
For Bids Due August 4, 2022 at 9:OOAM Local Time
From time to time the South Bend Board of Public Works finds it necessary to reject a bid because
it does not comply with statutory requirements. In preparing your bid, please use the following
checklist in order to make sure that your bid is done in the proper manner.
Proper bid security included. The bidder has the option of providing either a Certified Check
X or Bid Bond.
Bid prepared on the City of South Bend Contractor's Bid for Public Work Form, completely
X executed.
Contractor's Non -Collusion and Non -Debarment Affidavit, Certification Regarding Investments
with Iran, Employment Eligibility Verification, Non -Discrimination Commitment, and
X Certification of use of United States Steel Products or Foundry Products.
Proof of M/WBE Utilization Plans [MBE -1.0 and WBE-1.01. Also provide Evidence of Good
Faith Efforts Forms [MBE -2.0 and WBE-2.0] and M/WBE Contacted Forms [MBE -2.1 and
X WBE-2.1].
X Acknowledge Receipt of 1 Addendum(s) included with the bid.
X All required additional information is included with the bid.
Proposal statements and other affidavits all signed by the proper party with name either
X printed or typed underneath signature.
X This checklist submitted with the Bid.
This checklist is provided for bidder's use in assuring compliance with required
documentation; however, it does not include all specifications requirements and does not
relieve the bidder of the need to read and comply with the specifications.
Bidder: Rieth-Riley Construction Co., Inc.
By Authorized Representative:
Signature:
Print Name & Title
Date: August 4, 2022
Version 09/29/2021 Contractor's Bid for Public Works - 1
PART 11
(For projects of $100,000 or more — IC 36-1-12-4)
These statements to be submitted under oath by each bidder with and as part of his/her/its bid.
Attach additional pages for each section as needed.
SECTION I EXPERIENCE QUESTIONNAIRE
1. Attach information regarding projects your organization has completed for the period of one
(1) year prior to the date of the current bid.
2. Attach a listing of public works projects currently in process of construction by your
organization.
3. Attach information regarding any failure to complete any work awarded to you and the
location thereof. N/A
4. Attach references from private firms for which you have performed work.
SECTION II PLAN AND EQUIPMENT QUESTIONNAIRE
1. Attach an explanation of your plan or layout for performing proposed work. (Examples could
include a narrative of when you could begin work, complete the project, number of workers,
etc. and any other information which you believe would enable the City of South Bend to
consider your bid.) According to plan specifications
2. Attach a listing of the names and addresses of all subcontractors (i.e. persons or firms outside
your own firm who have performed part of the work) that you have used on public works
projects during the past five (5) years along with a brief description of the work done by each
subcontractor.
3. If you intend to sublet any portion of the work, attach the name and address of each
subcontractor, equipment to be used by the subcontractor, and whether you will require a
bond. However, if you are unable to currently provide a listing, please understand a listing
must be provided prior to contract approval. Until the completion of the proposed project, you
are under a continuing obligation to immediately notify the City of South Bend in the event that
i_ ii__ i_i_.____:__- ii__i _____ 'ii i___._i._ i_._ il_- t i
you suIDsZC. ue iiiy deteitiiine liicii you tivill use a subcontraC; o on i,rie proposed prOjeCt.
will submit upon award
4. Attach a listing of equipment you have available to use for the proposed project.
5. Have you entered into contracts or received offers for all materials which substantiate the
prices used in preparing your proposal? If not, attach an explanation for the rationale used
which would corroborate the prices listed. As required
SECTION III CONTRACTOR'S FINANCIAL STATEMENT
Attachment of bidder's financial statement is mandatory. Any bid submitted without said
financial statement as required by statute shall thereby be rendered invalid. The financial
statement provided hereunder to the City of South Bend awarding the contract must be specific
enough in detail so that said City of South Bend can make a proper determination of the bidder's
capability for completing the project if awarded.
Version 09/29/2021 Contractor's Bid for Public Works - 3
When the prospective Contractor is unable to certify to any of the statements below, it shall attach an explanation to this Affidavit.
CONTRACTOR'S NON -COLLUSION AND NON -DEBARMENT AFFIDAVIT, CERTIFICATION
REGARDING INVESTMENT WITH IRAN, EMPLOYMENT ELIGIBILITY VERIFICATION, NON-
DISCRIMINATION COMMITMENT AND CERTIFICATION OF USE OF UNITED STATES STEEL
PRODUCTS OR FOUNDRY PRODUCTS
(Must be completed for all quotes and bids. Please type or print)
STATE OF Indiana )
SS:
St. Joseph COUNTY )
The undersigned Contractor, being duly sworn upon his/her/its oath, affirms under the penalties of perjury
that:
1. Contractor has not, nor has any other member, representative, or agent of the firm, company,
corporation or partnership represented by him, entered into any combination, collusion or agreement with
any person relative to the price to be bid by anyone at such letting nor to prevent any person from bidding
nor to induce anyone to refrain from bidding, and that this bid is made without reference to any other bid and
without any agreement, understanding or combination with any other person in reference to such bidding.
Contractor further says that no person or persons, firms, or corporation has, have or will receive directly or
indirectly, any rebate, fee, gift, commission or thing of value on account of such sale; and
2. Contractor certifies by submission of this proposal that neither contractor nor any of its principals
are presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from
participation in this transaction by any Federal department or agency; and
3. Contractor has not, nor has any successor to, nor an affiliate of, Contractor, engaged in
investment activities in Iran.
a. For purposes of this Certification, "Iran" means the government of Iran and any agency
or instrumentality of Iran, or as otherwise defined at Ind. Code § 5-22-16.5-5, as
amended from time -to -time.
b. As provided by Ind. Code § 5-22-16.5-8, as amended from time -to -time, a Contractor
is engaged in investment activities in Iran if either:
i. Contractor, its successor or its affiliate, provides goods or services of twenty
million dollars ($20,000,000) or more in value in the energy sector of Iran;
or
ii. Contractor, its successor or its affiliate, is a financial institution that extends
twenty million dollars ($20,000,000) or more in credit to another person for
forty-five (45) days or more, if that person will (i) use the credit to provides
goods and services in the energy sector in Iran; and (ii) at the time the
financial institution extends credit, is a person identified on list published by
the Indiana Department of Administration.
4. Contractor does not knowingly employ or contract with an unauthorized alien, nor retain any
employee or contract with a person that the Contractor subsequently learns is an unauthorized alien.
Version 09/29/2021 Contractor's Bid for Public Works - 4
Contractor agrees that he/she/it shall enroll in and verify the work eligibility status of all of Contractor's
newly hired employees through the E -Verify Program as defined by I.C. 22-5-1.7-3. Contractor's
documentation of enrollment and participation in the E -Verify Program is included and attached as part of
this bid/quote; and
5. Contractor shall require his/her/its subcontractors- performing work under this public contract to
certify that the subcontractors do not knowingly employ or contract with an unauthorized alien, nor retain
any employee or contract with a person that the subcontractor subsequently learns is an unauthorized alien,
and that the subcontractor has enrolled in and is participating in the E -Verify Program. The Contractor agrees
to maintain this certification throughout the term of the contract with the City of South Bend, and understands
that the City may terminate the contract for default if the Contractor fails to cure a breach of this provision
no later than thirty (30) days after being notified by the City.
6. Persons, firms, partnerships, corporations, associations, or joint venturers awarded a contract by the
City of South Bend through its agencies, boards, or commissions shall not discriminate against any employee
or applicant for employment in the performance of a City contract with respect to hire, tenure, terms,
conditions, or privileges of contract or employment, or any matter directly or indirectly related to contracting
or employment because of race, sex, religion, color, national origin, ancestry, gender expression, gender
identity, sexual orientation, or due to age or disability that does not affect that person's ability to perform the
work.
In awarding contracts for the purchase of work, labor, services, supplies, equipment, materials, or any
combination of the foregoing including, but not limited to, public works contracts awarded under public
bidding laws or other contracts in which public bids are not required by law, the City, its agencies, boards,
or commissions will consider the Contractor's good faith efforts to obtain participation by those
subcontractors certified by the State of Indiana as a Minority Business ("MBE") or as a Women's Business
Enterprise ("WBE") as a factor in determining the lowest, responsible, responsive bidder.
Contractors seeking the award of a City contract cannot be required to award a subcontract to an MWBE;
however, they may not unlawfully discriminate against said MBE/WBE. On goal -eligible contracts,
Contractors are required to either meet both MBE and WBE utilization goals or demonstrate that the
Contractor has made good faith efforts to obtain participation from MBE and WBE subcontractors. A finding
of noncompliance or a discriminatory practice shall prohibit that Contractor from being awarded a City
contract for a period of one (1) year from the date of such determination, and such determination may also
be grounds for terminating the contact to which the discriminatory practice or noncompliance pertains.
7. The undersigned Contractor agrees that the following nondiscrimination commitment shall be made
a part of any contract which it may henceforth enter into with the City of South Bend, Indiana or any of its
agencies, boards or commissions.
Contractor agrees not to discriminate against or intimidate any employee or applicant for employment in the
performance of this contract with privileges of employment, or any matter directly or indirectly related to
employment, because of race, religion, color, sex, gender expression, gender identity, sexual orientation,
handicap, national origin or ancestry. Breach of this provision may be regarded as material breach of
contract.
I, the undersigned bidder or agent as contractor on a public works project, understand my statutory
obligations to the use of steel products or foundry products made in the United States (I.C. 5-16-8-1). I hereby
certify that I and all subcontractors employed by me for this project will use steel products or foundry
products made in the United States on this project if awarded. I understand I have an affirmative duty to
notify the City in my bid that my proposal does not include the use of steel products or foundry products
made in the United States. I understand it is my sole obligation and responsibility to provide a justification
to the City, subject to review and approval, why the cost of United States made steel or foundry products is
unreasonable. Prior to award and upon submission of bid which does not use steel products or foundry
products made in the United States, the City, through its director of public works, shall make a determination
if the price of United States made steel or foundry is unreasonable. I understand that violations hereunder
Version 09/29/2021 Contractor's Bid for Public Works - 5
may result in forfeiture of contractual payments.
I hereby affirm under the penalties of perjury that the facts and information contained in the foregoing bid
for public works are true and correct.
Dated this 4th day of August , 2022
Rieth-Riley Construction Co., Inc.
Contractor/Bidder (Firm)
ignature of C adder or Its Agent
Jacob K. Kwilasz, Area Manager
Printed Name and Title
Subscribed and sworn to before me this 4th dau ust ,
My Commission Expires 7/14/2029
Notary Public Dawn E. Armstrong
County of Residence Kosciusko
pi�� DAWN E. ARMSTRONG
.`�...... 0- Notary Public, State of Indiana
e-':SEAL Kosciusko County
tZ Commission Number NP0734858
q'OIAaPO`� My Commission Expires
,,,,,,ir` July 14, 2029
Version 09/29/2021 Contractor's Bid for Public Works - 6
BID/PROPOSAL
CITY OF SOUTH BEND
Project Name: 2022 Community Crossing Road Rehabilitation Project
Project Number: 122-024R
For Bids Due: August 4, 2022
Contractor Name: Rieth-Riley Construction Co., Inc.
DIVISION 1A - RAINBOW DRIVE BASE BID (FROM SOUTHLEA DR. TO CUL-DE-SAC)
Item
No.
Description
Quantity
Unit
Unit Price
Total Amount
1
Common Excavation
611
CYS
$ 50.00
$ 30,550.0
2
Concrete, Remove
2353
SYS
$ 20.00
$ 47,060.0
3
Subgrade Treatment Type II (Undistributed)
746
SYS
$ 25.00
$ 18,650.0
4
Compacted No. 53 Subbase
928
TON
$ 38.00
$ 35,264.0
5
Sidewalk, Concrete
73
SYS
$ 138.00
$ 10,074.0
6
Curb Ramp, Concrete
69
SYS
$ 350.00
$ 24,150.0
7
Milling, Concrete, 2"
22
SYS
$ 160.00
$ 3,520.0
-&.
Milling, 4 ins
4-2'
SYS
$ -
$
9
HMA Surface, 9.5 mm - Type B
195
TON
$ 120.00
$ 23,400.0
10
HMA Intermediate, 12.5 mm - Type B
324
TON
$ 112.00
$ 36,288.0
11
HMA Base, 25.0 mm - Type B
518
TON
$ 95.00
$ 49,210.0
12
Tack Coat
2
TON
$ 1.00
$ 2.00
13
Joint Adhesive, Surface
663
LFT
$ 1.20
$ 795.60
14
PCCP for Approaches, 6 in.
197
SYS
$ 200.00
$ 39,400.0
15
Combined Curb & Gutter, Type A
1412
LFT
$ 42.00
$ 59,304.0
16
Sodding, Nursery
506
SYS
$ 22.80
$ 11,536.8
17
Adjust Manhole Casting to Grade
3
EA
$ 300.00
$ 900.00
18
Adjust Water Valve Box to Grade
1
EA
$ 200.00
$ 200.00
19
Furnish and Adjust Casting to Grade
2
EA
$ 1,300.00
$ 2,600.0
20
Mailbox Assembly, Remove & Reset
12
EA
$ 350.00
$ 4,200.0
21
Fence, Remove & Reset
20
LFT
$ 475.00
$ 9,500.0
22
Construction Engineering
1
LS
$ 4,740.00
$ 4,740.0
23
Mobilization and Demobilization
1
LS
$ 30,000.00
$ 30,000.0
24
Clearing Right of Way
1
LS
$ 15,000.00
$ 15,000.0
25
Maintenance of Traffic
1
LS
$ 20,000.00
$ 20,000.0
26
Erosion Control
1
LS
$ 3,000.00
$ 3,000.0
DIVISION 1A - RAINBOW DRIVE BASE BID TOTAL $479,344.40
Version 09/29/2021 Contractor's Bid for Public Works - 7
BID/PROPOSAL
CITY OF SOUTH BEND
Project Name: 2022 Community Crossing Road Rehabilitation Project
Project Number: 122-024R
For Bids Due: August 4, 2022
Contractor Name: Rieth-Riley Construction Co., Inc.
DIVISION 2A - SOUTHLEA DRIVE BASE BID (FROM LILAC DR. TO EASTMONT DR.)
Item
No.
Description
Quantity
Unit
Unit Price
Total Amount
1
Common Excavation
1096
CYS
$ 50.0
$ 54,800.0
2
Concrete, Remove
4063
SYS
$ 20.0
$ 81,260.0
3
Subgrade Treatment Type II (Undistributed)
1317
SYS
$ 25.0
$ 32,925.0
4
Compacted No. 53 Subbase
1629
TON
$ 38.0
$ 61,902.0
5
Sidewalk, Concrete
354
SYS
$ 170.00
$ 60,180.0
6
Curb Ramp, Concrete
135
SYS
$ 300.00
$ 40,500.0
7
Milling, Concrete, 2"
22
SYS
$ 160.00
$ 3,520.0
Mid ng, 4 in
SYS
$
$
9
HMA Surface, 9.5 mm - Type B
335
TON
$ 120.00
$ 40,200.0
10
HMA Intermediate, 12.5 mm - Type B
559
TON
$ 112.00
$ 62,608.0
11
HMA Base, 25.0 mm - Type B
894
TON
$ 95.0
$ 84,930.0
12
Tack Coat
3
TON
$ 1.0
$ 3.0
13
Joint Adhesive, Surface
1366
LFT
$ 1.2
$ 1,639.2
14
PCCP for Approaches, 6 in.
531
SYS
$ 200.0
$ 106,200.0
15
Combined Curb & Gutter, Type A
2710
LFT
$ 42.0
$ 113,820.0
16
Sodding, Nursery
978
SYS
$ 22.9
$ 22,298.4
17
Adjust Manhole Casting to Grade
9
EA
$ 300.00
$ 2,700.0
18
Adjust Water Valve Casting to Grade
5
EA
$ 200.00
$ 1,000.0
19
Furnish and Adjust Casting to Grade
9
EA
$ 1,300.00
$ 11,700.0
20
Fire Hydrant Assembly
1
EA
$14,650.00
$ 14,650.0
21
Water Main Lowering, 6" DI
100
LFT
$ 250.00
$ 25,000.0
22
Mailbox Assembly, Remove & Reset
29
EA
$ 350.00
$ 10,150.0
23
Construction Engineering
1
LS
$10,000.00
$ 10,000.0
24
Mobilization and Demobilization
1
LS
$60,000.00
$ 60,000.0
25
Clearing Right of Way
1
LS
$15,000.00
$ 15,000.0
26
Maintenance of Traffic
1
LS
$30,000.00
$ 30,000.0
27
Erosion Control
1
LS
$ 3,000.00
$ 3,000.0
28
Water Main Line Stop
2
EA
$12,600.00
$ 25,200.0
DIVISION 2A - SOUTHLEA DRIVE BASE BID TOTAL $975,185.60
Version 09/29/2021 Contractor's Bid for Public Works - 8
BID/PROPOSAL
CITY OF SOUTH BEND
Project Name: 2022 Community Crossing Road Rehabilitation Proiect
Project Number: 122-024R
For Bids Due: August 4, 2022
Contractor Name: Rieth-Riley Construction Co., Inc.
DIVISION 3A - EASTMONT BASE BID (FROM RIVERSIDE DR. TO NORTHLEA DR.)
Item
No.
Description
Quantity
Unit
Unit Price
Total Amount
1
Common Excavation
2084
CYS
$ 50.0
$ 104,200.0
2
Concrete, Remove
7806
SYS
$ 20.0
$ 156,120.0
3
Subgrade Treatment Type II (Undistributed)
2371
SYS
$ 25.0
$ 59,275.0
4
Compacted No. 53 Subbase
2936
TON
$ 38.0
$ 111,568.0
5
Sidewalk, Concrete
408
SYS
$ 138.00
$ 56,304.0
6
Curb Ramp, Concrete
192
SYS
$ 350.00
$ 67,200.0
7
Milling, Concrete, 2"
22
SYS
$ 160.00
$ 3,520.0
1-8-
M W n a. -41R.
--22-2-
SYS
$ -
$ -
9
HMA Surface, 9.5 mm - Type B
644
TON
$ 120.00
$ 77,280.0
10
HMA Intermediate, 12.5 mm - Type B
1073
TON
$ 112.00
$ 120,176.0
11
HMA Base, 25.0 mm - Type B
1717
TON
$ 95.0
$ 163,115.0
12
Tack Coat
6
TON
$ 1.0
$ 6.00
13
Joint Adhesive, Surface
2323
LFT
$ 1.2
$ 2,787.6
14
PCCP for Approaches, 6 in.
736
SYS
$ 200.00
$ 147,200.0
15
Combined Curb & Gutter, Type A
4802
LFT
$ 42.0
$ 201,684.0
16
Sodding, Nursery
1660
SYS
$ 22.8
$ 37,848.0
17
Adjust Manhole Casting to Grade
26
EA
$ 300.001
$ 7,800.0
1A
Adil.:st 1/l/ater Valve Casting to Grade
v`nn
5
F/_1
r- -% nn
nrl
�;�^ !?!�
M i,vvv.vv
19
Standard Inlet
1
EA
$ 4,675.00
$ 4,675.0
20
Pipe, Type 2, 12 In.
29
LFT
$ 260.00
$ 7,540.0
21
Furnish and Adjust Casting to Grade
9
EA
$ 1,300.00
$ 11,700.0
22
Water Main Lowering, 6" DI
100
LFT
$ 250.00
$ 25,000.0
23
Mailbox Assembly, Remove & Reset
41
EA
$ 350.00
$ 14,350.0
24
Construction Engineering
1
LS
$ 20,000.00
$ 20,000.0
25
Mobilization and Demobilization
1
LS
$ 70,000.00
$ 70,000.0
26
Clearing Right of Way
1
LS
$ 20,000.00
$ 20,000.0
27
Maintenance of Traffic
1
LS
$ 50,000.00
$ 50,000.0
28
Erosion Control
1
LS
$ 31000.00
$ 3,000.0
Version 09/29/2021 Contractor's Bid for Public Works - 9
rtil �� iii
BID/PROPOSAL
CITY OF SOUTH BEND
Project Name: 2022 Community Crossing Road Rehabilitation Project
Project Number: 122-024R
For Bids Due: August 4, 2022
Contractor Name: Rieth-Riley Construction Co., Inc.
DIVISION 3A - EASTMONT BASE BID (FROM RIVERSIDE DR. TO NORTHLEA DR.)
29 1 Water Main Line Stop 1 2 EA $ 12,600.00 $ 251200.0
DIVISION 3A - EASTMONT DRIVE BASE BID TOTAL _$1,568,548.60
Version 09/29/2021 Contractor's Bid for Public Works - 10
BID/PROPOSAL i
CITY OF SOUTH BEND
Project Name: =%
1 2022 Community Crossing Road Rehabilitation Project
Project Number: 122-024R
For Bids Due: August 4, 2022
Contractor Name: Rieth-Riley Construction Co., Inc.
DIVISION 4 - HILL STREET BASE BID (FROM JEFFERSON ST. TO COLFAX ST.)
Item
No.
Description
Quantity
Unit
Unit Price
Total Amount
1
Common Excavation
692
CYS
$ 100.00
$ 69,200.00
2
Concrete, Remove
306
SYS
$ 110.00
$ 33,660.00
3
Inspection Hole, Greater Than 3'
4
EA
$ 3,000.00
$ 12,000.00
4
Inspection Hole, 3 ft Depth or Less
4
EA
$ 2,000.00
$ 8,000.00
5
Trolley Rail and Tie Removal
850
LFT
$ 125.00
$ 106,250.00
6
Subgrade Treatment Type II (Undistributed)
362
SYS
$ 30.0
$ 10,860.00
7
Compacted No. 53 Subbase
417
TON
$ 38.0
$ 15,846.00
8
Milling, Asphalt, 3." Max.
2373
SYS
$ 11.5
$ 27,289.50
9
HMA Surface, 9.5 mm - Type B
297
TON
$ 120.00
$ 35,640.00
10
HMA Intermediate, 12.5 mm - Type B
168
TON
$ 112.00
$ 18,816.00
11
HMA Base, 25.0 mm - Type B
539
TON
$ 95.0
$ 51,205.00
12
Tack Coat
6
TON
$ 1.0
$ 6.00
13
Joint Adhesive, Surface
3730
SYS
$ 1.2
$ 4,476.00
14
PCCP for Approaches, 9 in.
243
SYS
$ 165.00
$ 40,095.00
15
Sidewalk, Concrete
433
SYS
$ 138.00
$ 59,754.00
16
Curb, Concrete
1000
LFT
$ 60.0
$ 60,000.00
17
Header, Cement Concrete, Reconstruct
48
LFT
$ 185.00
$ 8,880.00
18
Sodding, Nursery
356
SYS
$ 22.8 0,
8,116.80
19
Adjust Manhole to Grade
2
EA
$ 300.00
$ 600.00
20
Adjust Inlet to Grade
8
EA
$ 300.00
$ 2,400.00
21
Adjust Monitoring Well to Grade
3
EA
$ 500.00
$ 1,500.00
22
Adjust Water Valve to Grade
2
EA
$ 200.00
$ 400.00
23
Adjust Water Curb Stop to Grade
4
EA
$ 200.00
$ 800.00
24
Adjust Water Meter to Grade
1
EA
$ 200.00
$ 200.00
25
Adjust Handhole to Grade
5
EA
$ 320.00
$ 1,600.00
26
Sanitary Manhole, Type A
2
EA
$ 12,000.00
$ 24,000.00
27
Pipe, Sanitary Sewer, 12 in.
25
LFT
$ 240.00
$ 6,000.00
28
Line, Thermoplastic, Solid, Yellow, 4 in.
1617
LFT
$ 1.75
$ 2,829.75
29
Line, Thermoplastic, Solid, White, 4 in.
1262
LFT
$ 1.75
$ 2,208.50
Version 09/29/2021 Contractor's Bid for Public Works -11
BID/PROPOSAL
CITY OF SOUTH BEND
Project Name: 2022 Community Crossing Road Rehabilitation Project
Project Number: 122-024R
For Bids Due: August 4, 2022
Contractor Name: Rieth-Riley Construction Co., Inc.
DIVISION 4 - HILL STREET BASE BID (FROM JEFFERSON ST. TO COLFAX ST.)
30
Grooving for Pavement Markings, 4 in.
2879
LFT
$ 1.20
$ 3,454.80
31
Transverse Marking, Thermoplastic, Stop Line,
24 in.
38
LFT
$ 11.45
$ 435.10
32
Transverse Marking, Thermoplastic, Crosswalk
Line, 6 in.
72
LFT
3
$ .65
$ 262.80
33
Transverse Marking, Thermoplastic, Crosswalk
Line, 24 in.
56
LFT
$ 13.75
$ 770.00
34
Detector Housing, Remove
2
EA
$ 320.00
$ 640.00
35
Signal Detector Housing
2
EA
$ 1,000.00
$ 2,000.00
36
Signal Cable, Roadway Loop, Copper, 1 C/14
GA
650
LFT
$ 0.65
$ 422.50
37
Saw Cutfor Roadway Loop Detector and
Sealant
205
LFT
$ 15.00
$ 3,075.00
38
Construction Engineering
1
LS
$ 10,000.00
$ 10,000.00
39
Mobilization and Demobilization
1
LS
$82,000.00
$ 82,000.00
40
Clearing Right of Way
1
LS
$ 30,000.00
$ 30,000.00
41
Maintenance of Traffic
1
LS
$ 30,000.00
$ 30,000.00
42
Erosion Control
1
LS
$ 3,000.00
$ 3,000.00
43
Tree, Remove, 4"
2
EA
$ 300.00
$ 600.00
44
Tree, Remove, 6"
2
EA
$ 300.00
$ 600.00
45
Tree, Remove, 8"
2
EA
$ 400.00
$ 800.00
46
Tree, Remove, 12"
2
EA
$ 600.00
$ 1,200.00
47
Tree, Remove, 15"
3
EA
$ 800.00
$ 2;400.00
48
1 Plant, Deciduous Tree, Single Stem, 2.0-2.5 In
22
EA
1 $ 725.00
$ 15,950.00
DIVISION 4 - HILL STREET BASE BID TOTAL $800,242.75
Version 09/29/2021 Contractor's Bid for Public Works - 12
/M ,<
BID/PROPOSAL '`�
CITY OF SOUTH BEND
Project Name: 2022 Community Crossing Road Rehabilitation Project
Project Number: 122-024R
For Bids Due: August 4, 2022
Contractor Name: Rieth-Riley Construction Co., Inc.
DIVISION 5 - JACKSON ROAD BASE BID (FROM FELLOWS ST. TO MIAMI ST.)
Item
No.
Description
Quantity
Unit
Unit Price
Total Amount
1
Common Excavation
4610
CYS
$ 38.0
$ 175,180.0
2
Excavation, Unclassified
748
CYS
$ 48.0
$ 35,904.0
3
No. 2 Stone
1247
TON
$ 56.0
$ 69,832.0
4
Subgrade Treatment Type II (Undistributed)
2799
SYS
$ 20.0
$ 55,980.0
5
Geogrid, Type 1 B
2243
SYS
$ 3.6
$ 8,074.8
6
Compacted No. 53 Subbase
3977
TON
$ 34.0
$ 135,218.0
7
Compacted Aggregate, No. 53
519
TON
$ 56.0
$ 29,064.0
8
Milling, Asphalt, 1.5 in.
703
SYS
$ 17.0
$ 11,951.0
9
HMA Surface, 9.5 mm - Type B
761
TON
$ 120.00
$ 91,320.0
10
HMA Intermediate, 12.5 mm - Type B
1289
TON
$ 112.00
$ 144,368.0
11
HMA Base, 25.0 mm - Type B
4260
TON
$ 95.0
$ 404,700.0
12
HMA for Approaches, Type B
77
TON
$ 200.00
$ 15,400.0
13
Tack Coat
6
TON
$ 1.0
$ 6.00
14
Joint Adhesive, Surface
3730
SYS
$ 1.2
$ 4,476.0
15
PCCP for Approaches, 6 in.
34
SYS
$ 250.00
$ 8,500.0
16
PCCP for Approaches, 9 in.
347
SYS
$ 150.00
$ 52,050.0
17
Combined Curb and Gutter, Type B
654
LFT
$ 55.0
$ 35,970.0
18
Sodding, Nursery
1544
SYS
$ 22.8
$ 35,203.2
19
HMA for Temporary Pavement, Type B
374
TON
$ 295.00
$ 110,330.0
20
Temporary Pavement Marking, Type 1, Solid
Yellow, 4 in.
3314
LFT
$ 1.15
$ 3,811.1
21
Temporary Pavement Marking, Type 1, Solid
White, 4 in.
3840
LFT
$ 1.15
$ 4,416.0
22
Line Remove
115
LFT
$ 1.25
$ 143.75
23
Temporary Pavement Marking, Type 1, Dotted
Yellow, 4 in.
40
LFT
$ 2.95
$ 118.00
24
Temporary Pavement Marking, Type 1, Dotted
White, 4 in.
40
LFT
$ 2.95
$ 118.00
25
Line, Thermoplastic, Solid, Yellow, 4 in.
506
LFT
$ 1.7
$ 860.20
26
Line, Thermoplastic, Broken, Yellow, 4 in.
560
LFT
$ 1.88
$ 1,052.8
27
Line, Thermoplastic, Solid, White, 4 in.
4512
LFT
$ 1.7
$ 7,670.46
Version 09/29/2021 Contractor's Bid for Public Works - 13
BID/PROPOSAL
CITY OF SOUTH BEND
Project Name: 2022 Community Crossing Road Rehabilitation Project
Project Number: 122-024R
For Bids Due: August 4, 2022
Contractor Name: Rieth-Riley Construction Co., Inc.
28
Transverse Marking, Thermoplastic,
Stop Line, 24 in.
17
LFT
$ 11.45
$ 194.65
29
Grooving for Pavement Markings, 4 in.
5578
LFT
$ 1.18
$ 6,582.0
30
Signal Cable, Roadway Loop, Copper,
1 C/14 GA
225
LFT
$ 0.65
$ 146.25
31
Detector Housing, Remove
1
EA
$ 320.00'
$ 320.00
32
Signal Detector Housing
1
EA
$ 1,000.00
$ 1,000.0
33
Saw Cut for Roadway Loop Detector
and Sealant
114
LFT
$ 15.00
$ 1,710.0
34
Construction Engineering
1
LS
$ 10,000.00
$ 10,000.0
35
Mobilization and Demobilization
1
LS
$ 90,000.00
$ 90,000.0
36
Clearing Right of Way
1
LS
$ 23,432.46
$ 23,432.46
37
Maintenance of Traffic
1
LS
$ 80,000.00
$ 80,000.0
38
Erosion Control
1
LS
$ 30,700.001
$ 30,700.0
DIVISION 5 - JACKSON ROAD BASE BID TOTAL $1,685,802.65
Version 09/29/2021 Contractor's Bid for Public Works - 14
BID/PROPOSAL
CITY OF SOUTH BEND
Project Name: 2022 Community Crossing Road Rehabilitation Project
Project Number: 122-024R
For Bids Due: August 4, 2022
Contractor Name: Rieth-Riley Construction Co., Inc.
DIVISION 1 B - RAINBOW DRIVE ALTERNATE #1 (FROM SOUTHLEA DR. TO CUL-DE-SAC)
Item
No.
Description
Quantity
Unit
Unit Price
Total Amount
1
Common Excavation
546
CYS
NO BID
NO BID
2
Concrete, Remove
2353
SYS
NO BID
NO BID
3
Subgrade Treatment Type II (Undistributed)
746
SYS
NO BID
NO BID
4
Compacted No. 53 Subbase
928
TON
NO BID
NO BID
5
Sidewalk, Concrete
73
SYS
NO BID
NO BID
6
Curb Ramp, Concrete
69
SYS
NO BID
NO BID
7
Milling, Concrete, 2"
22
SYS
NO BID
NO BID
8
M i_; irn g, 4 in
22
SyS
NO BID
NO BID
9
PCCP for Mainline, 7 in.
2354
SYS
NO BID
NO BID
10
D-1 Joints
1721
LFT
NO BID
NO BID
11
PCCP for Approaches, 6 in.
197
SYS
NO BID
NO BID
12
Combined Curb & Gutter, Type A
1412
LFT
NO BID
NO BID
13
Sodding, Nursery
506
SYS
NO BID
NO BID
14
Adjust Manhole Casting to Grade
3
EA
NO BID
NO BID
15
Adjust Water Valve Box to Grade
1
EA
NO BID
NO BID
16
Furnish and Adjust Casting to Grade
2
EA
NO BID
NO BID
17
Mailbox Assembly, Remove & Reset
12
EA
NO BID
NO BID
18
Constructinn Ennineerinn
1
LS
NO BID
NO BID
19
Fence, Remove & Replace
20
LFT
NO BID
NO BID
20
Mobilization and Demobilization
1
LS
NO BID
NO BID
21
Clearing Right of Way
1
LS
NO BID
NO BID
22
Maintenance of Traffic
1
LS
NO BID
NO BID
23
Erosion Control
1
LS
NO BID
NO BID
DIVISION 1B - RAINBOW DRIVE ALTERNATE #1 TOTAL NO BID
Version 09/29/2021 Contractor's Bid for Public Works -15
BID/PROPOSAL }
CITY OF SOUTH BEND
Project Name: 2022 Community Crossing Road Rehabilitation Project`s v
Project Number: 122-024R
For Bids Due: August 4, 2022
Contractor Name: Rieth-Riley Construction Co., Inc.
DIVISION 2B - SOUTHLEA DRIVE ALTERNATE #1 (FROM LILAC DR. TO EASTMONT DR.)
Item
No.
Description
Quantity
Unit
Unit Price
Total Amount
1
Common Excavation
983
CYS
NO BID
NO BID
2
Concrete, Remove
4063
SYS
NO BID
NO BID
3
Subgrade Treatment Type II (Undistributed)
1317
SYS
NO BID
NO BID
4
Compacted No. 53 Subbase
1629
TON
NO BID
NO BID
5
Sidewalk, Concrete
354
SYS
NO BID
NO BID
6
Curb Ramp, Concrete
135
SYS
NO BID
NO BID
7
Milling, Concrete, 2"
22
SYS
NO BID
NO BID
8
Milling, 4 .-
22
S-yS
NO BID
NO BID
9
PCCP for Mainline, 7 in.
4063
SYS
NO BID
NO BID
10
D-1 Joints
3552
LFT
NO BID
NO BID
11
PCCP for Approaches, 6 in.
531
SYS
NO BID
NO BID
12
Combined Curb & Gutter, Type A
2710
LFT
NO BID
NO BID
13
Sodding, Nursery
978
SYS
NO BID
NO BID
14
Adjust Manhole Casting to Grade
9
EA
NO BID
NO BID
15
Adjust Water Valve Casting to Grade
5
EA
NO BID
NO BID
16
Fire Hydrant Assembly
1
EA
NO BID
NO BID
17
Water Main Lowering, 6" DI
100
LFT
NO BID
NO BID
A
_ : _ �_
rurnis'n and Adjust l.:asting to vra-de
J
EA
NO pTTI
'NM RTT;
19
Mailbox Assembly, Remove & Reset
29
EA
NO BID
NO BID
20
Construction Engineering
1
LS
NO BID
NO BID
21
Mobilization and Demobilization
1
LS
NO BID
NO BID
22
Clearing Right of Way
1
LS
NO BID
NO BID
23
Maintenance of Traffic
1
LS
NO BID
NO BID
24
Erosion Control
1
LS
NO BID
NO BID
25
Water Main Line Stop
2
EA
NO BID
NO BID
DIVISION 2B - SOUTHLEA DRIVE ALTERNATE #1 TOTAL NO BID
Version 09/29/2021 Contractor's Bid for Public Works - 16
BID/PROPOSAL
CITY OF SOUTH BEND
Project Name: 2022 Community Crossing Road Rehabilitation Project
Project Number: 122-024R
For Bids Due: August 4, 2022
Contractor Name: Rieth-Riley Construction Co., Inc.
DIVISION 3B - EASTMONT DRIVE ALTERNATE #1
Item
No.
Description Quantity
Unit
Unit Price
Total Amount
1
Common Excavation
1868
CYS
O BID
NO BID
2
Concrete, Remove
7806
SYS
O BID
NO BID
3
Subgrade Treatment Type II (Undistributed)
2371
SYS
NO BID
NO BID
4
Compacted No. 53 Subbase
2936
TON
NO BID
NO BID
5
Sidewalk, Concrete
408
SYS
O BID
NO BID
6
Curb Ramp, Concrete
192
SYS
O BID
NO BID
7
Milling, Concrete, 2"
22
SYS
O BID
NO BID
8
Milling,
C�, 4 i
22
coca
NO BID
NO BID
9
PCCP for Mainline, 7 in.
7806
SYS
O BID
NO BID
10
D-1 Joints
6042
LFT
NO BID
NO BID
11
PCCP for Approaches, 6 in.
736
SYS
O BID
NO BID
12
Combined Curb & Gutter, Type A
4802
LFT
NO BID
NO BID
13
Sodding, Nursery
1660
SYS
O BID
NO BID
14
Adjust Manhole Casting to Grade
26
EA
NO BID
NO BID
15
Adjust Water Valve Casting to Grade
5
EA
NO BID
NO BID
16
Furnish and Adjust Casting to Grade
9
EA
NO BID
NO BID
17
Standard Inlet
1
EA
NO BID
NO BID
1 O
ripe, I ype 2, i LIi ii.
Ly
L@- i
Tn UTTI
---
T!% 1 -)TTI
- - ---
19
Water Main Lowering, 6" DI
100
LFT
NO BID
NO BID
20
Mailbox Assembly, Remove & Reset
41
EA
NO BID
NO BID
21
Construction Engineering
1
LS
O BID
NO BID
22
Mobilization and Demobilization
1
LS
O BID
NO BID
23
Clearing Right of Way
1
LS
O BID
NO BID
24
Maintenance of Traffic
1
LS
O BID
NO BID
25
Erosion Control
1
LS
O BID
NO BID
26
Water Main Line Stop
2
Eq
NO BID
NO BID
DIVISION 313 - EASTMONT DRIVE ALTERNATE #1 TOTAL NO BID
Version 09/29/2021 Contractor's Bid for Public Works - 17
r;
BID/PROPOSAL,
CITY OF SOUTH BEND:
Project Name: 2022 Community Crossing Road Rehabilitation Project N
Project Number: 122-024R
For Bids Due: August 4, 2022
Contractor Name: Rieth-Riley Construction Co., Inc.
Summary — Base Bid
Division #
Street Name
From
To
Amount
$479,344.40
1A
Rainbow Dr
Southlea Dr
Cut -de -sac
$975,185.60
2A
Southlea Dr
Lilac Dr
Eastmont Dr
$1,568,548.60
3A
Eastmont Dr
Riverside Dr
Northlea Dr
$8007242.75
4
Hill St
Jefferson St
Colfax St
$1,685,802.65
5
Jackson St
Fellows St
Miami St
$5,509,124.00
DIVISIONS 1A, 2A, 3A, 4 AND 5 TOTAL:
Contractor must bid on All Divisions of the Base Bid to be eligible for award.
Summary —Alternate Bid
Division #
Street Name
From
To
Amount
NO BID
1 B
Rainbow Dr
Southlea Dr
Cut -de -sac
NO BID
LS.J
M
VVUL! Ilea LJ -11
IN - M
&-IIQL L!1
LCSJLf t fVf !L �f
NO BID
313
Eastmont Dr
Riverside Dr
Northlea Dr
NO BID
4
Hill St
Jefferson St
Colfax St
NO BID
5
Jackson St
Fellows St
Miami St
NO BID
DIVISIONS 1 B, 2135 313, 4 AND 5 TOTAL:
Version 09/29/2021 Contractor's Bid for Public Works - 18
4�\ jJi
BID/PROPOSAL
CITY OF SOUTH BEND
Project Name: 2022 Community Crossing Road Rehabilitation Projectf,, ✓'
Project Number:
For Bids Due:
122-024R
August 4, 2022
Contractor Name: Rieth-Riley Construction Co., Inc.
Bidder (Firm): Rieth-Riley Construction Co., Inc.
Address: 25200 State Road 23
City/State/Zip: South Bend, In. 46614 Telephone Number: (574 ) 288-8321
By
ure)
Jacob K. Kwilasz, Area Manager
(Printed Name of Person Signing)
Version 09/29/2021 Contractor's Bid for Public Works - 19
CITY OF SOUTH BEND;,
tij c.#
MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN�.
FORM MBE -1.0
MBE UTILIZATION PLAN "-
This completed form should be supplied with Bids that pertain to City of South Bend Public Works Projects involving MBE participation. It is
the bidder's sole responsibility to verify whether any listed minority-owned business meets the MBE qualifications.
2022 Community Crossings Roadway Rehabilitation Project - Divisions 1A, 2A,
Project Number: 122-024R Project Name: 3A, 4 and 5
Bidder: Rieth-Riley Construction Co., Inc. Total Bid Amount: $5, 509, 124.00 MBE Goal: 2.9%
Page 1 of 1
Name & Address of MBE
Primary Contact Person
Scope of Work to be Performed
Dollar Amount of MBE
Percentage
of Total
(Name/Telephone)
(Attach scope/schedule if you need additional space)
Component
Bid/Proposal
1st Class Logistics, LLC
Bernard Coutee
2213 Saint Charles Avenue
Trucking / Hauling
$159,890.00
2.90%
South Bend, IN 46614
574-993-0071
Submitted by:
Drew Snodderly
Print Name
Signature
Version 09/29/2021 Contractor's Bid for Public Works - 19
8/4/2022
Date
This completed form should be supplied with Bids that pertain to City of South Bend Public Works Projects involving WBE participation. It is
the bidder's sole responsibility to verify whether any listed woman -owned business meets the WBE qualifications.
Project Number:
Bidder:
122-024R
Project Name
Rieth-Riley Construction Co., Inc
2022 Community Crossings Roadway Rehabilitation Project - Divisions 1A, 2A,
3A,4and 5
Total Bid Amount: $5,509,124.00 WBE Goal: 5.4%
Page 1 of l
Name & Address of WBE
Primary Contact Person
CITY OF SOUTH BEND
Dollar Amount of WBE
Percentage
of Total
,
MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN,
(Attach scope/schedule if you need additional space)
FORM WBE-1.0tiy
WBE UTILIZATION PLAN
This completed form should be supplied with Bids that pertain to City of South Bend Public Works Projects involving WBE participation. It is
the bidder's sole responsibility to verify whether any listed woman -owned business meets the WBE qualifications.
Project Number:
Bidder:
122-024R
Project Name
Rieth-Riley Construction Co., Inc
2022 Community Crossings Roadway Rehabilitation Project - Divisions 1A, 2A,
3A,4and 5
Total Bid Amount: $5,509,124.00 WBE Goal: 5.4%
Page 1 of l
Name & Address of WBE
Primary Contact Person
Scope of Work to be Performed
Dollar Amount of WBE
Percentage
of Total
(Name/Telephone)
(Attach scope/schedule if you need additional space)
Component
Bid/Pro osal
Montgomery Trucking, Inc.,
of Indiana
Karen Montgomery
Trucking / Hauling
$133,874.00
2.43%
2207 West Cook Rd., Ste. A
260-312-2632
Fort Wayne, IN 46818
Traffic Control Specialists,
Tracey Triska
Maintenance of Traffic,
Inc.
Grooving, and Pavement Markings
$148,894.89
2.70%
1810 W. Pacific Ave.
574-772-7001
Knox, IN 46534
Hawk Enterprises, Inc.
Caylee Carlson
Electrical
1850 East N. Street
$15,113.75
0.27%
Crown Point, IN 46307
219-662-8090
Submitted by:
Drew Snodderly
Print Name
Signature
Version 09/29/2021 Contractor's Bid for Public Works - 20
8/4/2022
Date
CITY OF SOUTH BEND
ca Zr
MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLANyE,}'''
FORM MBE-2.0ZF
EVIDENCE OF GOOD FAITH EFFORTS ✓"
This completed form should be included as part of the Bids documents related to City of South Bend Public
Works Projects requiring Good Faith Efforts to obtain MBE participation.
Project Number: 122-024R Date: 8/4/22
2022 Community Crossings Roadway Rehab. Project - Divisions 1A, 2A,
Project Name: 3A, 4 and 5
Bidder: Rieth-Riley Construction Co., Inc.
Contact Person: Drew Snodderly Telephone: 574-288-8321
Address: 25200 S.R. 23
City: South Bend State: IN Zip: 46114
Email: dsnodderly@rieth-riley.com
To determine whether a bidder has demonstrated good faith efforts to reach the MBE utilization goals set forth in
the City of South Bend Public Works Project Specifications, the City and its agencies, boards, or commissions,
REQUIRE ALL of the following Good Faith Efforts as listed in the table below*:
Version 09/29/2021 Contractor's Bid for Public Works - 21
EVIDENCE OF GOOD FAITH EFFORTS
MBE LIST(S): The bidder reviewed 1) the City of South Bend's Minority and Women Business Enterprise
"
Inclusion Program Plan; 2) the list of certified MWBEs provided by the City; and 3) the Indiana Department
of Administration list of Minority and Women Owned Businesses (both certified and non -certified) found
at: hftp://www.in.gov/idoa/.
GOOD FAITH EFFORTS TO OBTAIN MBE PARTICIPATION
The bidder shall initial each item below, as evidence of its good faith efforts to obtain MBE participation
in the awarded contract.
I affirm that I reviewed the City of South Bend's Minority and Women Business Enterprise
Inclusion Program Plan and the Indiana Department of Administration's certified list of
Indiana Minority and Women Business Enterprises, found on their website
(http://www.in.gov/idoa).
I affirm that I have made good faith efforts to select portions of the contract work to be
Performed by MWBEs, including, where appropriate, breaking out contract work items into
economically feasible units to facilitate MBE participation.
�.
I affirm that I have made good faith efforts to solicit through all reasonable and available
means the interest of all MBEs in the scopes of work of the contract.
I affirm that I attended all pre-bid meetings scheduled by the City of South Bend to inform
MBEs of contracting and subcontracting opportunities.
I affirm that I advertised in general circulation and/or trade association publications
concerning subcontract opportunities and allowed MBEs reasonable time to respond to
such advertisements.
I affirm that I performed any and all necessary steps to provide written notices in a manner
reasonably calculated to inform MBEs of subcontracting opportunities and allowed
sufficient time for MBEs to participate effectively.
1 affirm that I followed up on initial solicitations with interested MBEs.
I affirm that I negotiated with interested MBEs in good faith, including providing such MBEs
with adequate information about the plans, specifications and other requirements of the
subcontract.
I affirm that I have made good faith efforts to assist interested MBEs in obtaining bonding,
(%
lines of credit, or insurance as required by the City or the bidder, where appropriate.
Version 09/29/2021 Contractor's Bid for Public Works - 21
CITY OF SOUTH BEND
MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN
FORM MBE -2.0
EVIDENCE OF GOOD FAITH EFFORTS
*Proper demonstration of Good Faith Efforts requires your initials next to all of the above boxes. Any
omissions shall be considered grounds for rejection of the bid by the Board of Public Works. The City of
South Bend reserves the right to request additional information.
Version 09/29/2021 Contractor's Bid for Public Works - 22
I affirm that I have made good faith efforts to assist interested MBEs in obtaining necessary
equipment, supplies, materials, or related assistances or services, where appropriate.
I affirm that I did not reject any MBEs as unqualified without sound business reasons based
4�k
on a thorough investigation of their capabilities.
CONTRACT RECORDS: The bidder has maintained the following records for each MBE that has bid on
the subcontracting opportunity:
1. Name, address, and telephone number;
2. A description of information provided by the bidder or subcontractor; and
3. A statement of whether an agreement was reached, and if not, why not, including any reasons for
concluding that the MBE was unqualified to perform the job.
*Proper demonstration of Good Faith Efforts requires your initials next to all of the above boxes. Any
omissions shall be considered grounds for rejection of the bid by the Board of Public Works. The City of
South Bend reserves the right to request additional information.
Version 09/29/2021 Contractor's Bid for Public Works - 22
CITY OF SOUTH BEND
MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN
FORM WBE-2.0
EVIDENCE OF GOOD FAITH EFFORTS
This completed form should be included as part of the Bids documents related to City of South Bend Public
Works Projects requiring Good Faith Efforts to obtain MWBE participation.
Project Number: 122-024R Date: 8/4/22
2022 Community Crossings Roadway Rehabilitation Project - Divisions 1A,
Project Name: 2A, 3A, 4 and 5
Bidder: Rieth-Riley Construction Co., Inc.
Contact Person: Drew Snodderly Telephone: 574-288-8321
Address: 25200 S.R. 23
City: South Bend State: IN Zip: 46114
Email: dsnodderly@rieth-riley.com
To determine whether a bidder has demonstrated good faith efforts to reach the WBE utilization goals set forth in
the City of South Bend Public Works Project Specifications, the City and its agencies, boards, or commissions,
REQUIRE ALL of the following Good Faith Efforts as listed in the table below*:
Version 09/29/2021 Contractor's Bid for Public Works - 23
EVIDENCE OF GOOD FAITH EFFORTS
WBE LIST(S): The bidder reviewed 1) the City of South Bend's Minority and Women Business Enterprise
Inclusion Program Plan; 2) the list of certified MWBEs provided by the City; and 3) the Indiana Department
of Administration list of Minority and Women Owned Businesses (both certified and non -certified) found
at: http://www.in.gov/idoa/.
GOOD FAITH EFFORTS TO OBTAIN WBE PARTICIPATION
The bidder shall initial each item below, as evidence of its good faith efforts to obtain WBE participation
in the awarded contract.
4
I affirm that I reviewed the City of South Bend's Minority and Women Business Enterprise
A
,Inclusion Program Plan and the Indiana Department of Administration's certified list of
4
Indiana Minority and Women Business Enterprises, found on their website
(http://www.in.gov/idoa).
I affirm that I have made good faith efforts to select portions of the contract work to be
performed by WBEs, including, where appropriate, breaking out contract work items into
economically feasible units to facilitate WBE participation.
I affirm that I have made good faith efforts to solicit through all reasonable and available
Mann4z tha intarect of ail XAIPEc in thin cr-nrnac of ;Ainrk of thin i-nntrnrt
affirm that I attended all pre-bid meetings scheduled by the City of South Bend to inform
WBEs of contracting and subcontracting opportunities.
AVI
affirm that I advertised in general circulation and/or trade association publications
concerning subcontract opportunities and allowed WBEs reasonable time to respond to
such advertisements.
I affirm that I performed any and all necessary steps to provide written notices in a manner
reasonably calculated to inform WBEs of subcontracting opportunities and allowed
sufficient time for WBEs to participate effectively.
1 affirm that I followed up on initial solicitations with interested WBEs.
I affirm that I negotiated with interested WBEs in good faith, including providing such WBEs
with adequate information about the plans, specifications and other requirements of the
subcontract.
Version 09/29/2021 Contractor's Bid for Public Works - 23
CITY OF SOUTH BEND
MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN
FORM WBE-2.0
EVIDENCE OF GOOD FAITH EFFORTS
*Proper demonstration of Good Faith Efforts requires your initials next to all of the above boxes. Any
omissions shall be considered grounds for rejection of the bid by the Board of Public Works. The City of
South Bend reserves the right to request additional information.
Version 09/29/2021 Contractor's Bid for Public Works - 24
I affirm that I have made good faith efforts to assist interested WBEs in obtaining bonding,
lines of credit, or insurance as required by the City or the bidder, where appropriate.
1 affirm that I have made good faith efforts to assist interested WBEs in obtaining
necessary equipment, supplies, materials, or related assistances or services, where
appropriate.
&A
I affirm that I did not reject any WBEs as unqualified without sound business reasons
-based on a thorough investigation of their capabilities.
CONTRACT RECORDS: The bidder has maintained the following records for each WBE that has bid on
the subcontracting opportunity:
1. Name, address, and telephone number;
2. A description of information provided by the bidder or subcontractor; and
3. A statement of whether an agreement was reached, and if not, why not, including any reasons for
concluding that the MWBE was unqualified to perform the job.
*Proper demonstration of Good Faith Efforts requires your initials next to all of the above boxes. Any
omissions shall be considered grounds for rejection of the bid by the Board of Public Works. The City of
South Bend reserves the right to request additional information.
Version 09/29/2021 Contractor's Bid for Public Works - 24
IT B \
CITY OF SOUTH BEND
MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLANr� f'
FORM MBE -2.1 ` t
MBE CONTACTED
This completed form should be supplied with Bids that pertain to City of South Bend Public Works Projects
requiring Good Faith Efforts to contact MBEs. It is the bidder's sole responsibility to verify whether any listed
minority-owned business meets the MBE qualifications. Attach additional pages if necessary.
PAGE i. OF 1
Project Number: 122-024R MBE Participation Goal 2.9%
2022 Community Crossings Roadway Rehabilitation Project - Divisions 1A,
Project Name: 2A, 3A, 4 and 5
Bidder: Rieth-Riley Construction Co., Inc.
By: Estimator/Project Manager 8/4/22
(Signature) Drew snodde y (Title) (Date)
MBE Firm 1st Class Logistics, LLC
Owner or Contact at MBE Firm Bernard Coutee
Telephone: 574-993-0071 Fax: N/A Email: lstclasslogistics20l3@gmail.com
TYPE OF WORK SOLICITED FOR THIS PROJECT: Trucking/Hauling
RESULTS OF CONTACT WITH THE MBE FIRM: Firm is being utilized in our bid for this
project for trucking and hauling.
MBE Firm
Ow gar : r C:nnt;;nf at MRF Firm
Telephone: Fax: Email:
TYPE OF WORK SOLICITED FOR THIS PROJECT:
RESULTS OF CONTACT WITH THE MBE FIRM:
Version 09/29/2021 Contractor's Bid for Public Works - 25
CITY OF SOUTH BEND
MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN" �.
FORM MBE -2.1
WBE CONTACTED
This completed form should be supplied with Bids that pertain to City of South Bend Public Works Projects
requiring Good Faith Efforts to contact WBEs. It is the bidder's sole responsibility to verify whether any listed
woman -owned business meets the WBE qualifications. Attach additional pages if necessary.
PAGE 1 OF 2
Project Number: 122-024R WBE Participation Goal 5.4%
2022 Community Crossings Roadway Rehabilitation Project - Divisions 1A,
Project Name: 2A, 3A, 4 and 5
Bidder: Rieth-Riley Construction Co., Inc.
By: A
y Estimator/Project Manager 8/4/22
(Signature) Drew Sno derly (Title) (Date)
WBE Firm Montgomery Trucking, Inc., of Indiana
Owner or Contact at WBE Firm Karen Montgomery
Telephone: 260-312-2632 Fax: N/p, Email: karenmontgomery56@hotmail.com
TYPE OF WORK SOLICITED FOR THIS PROJECT: Trucking/Hauling
RESULTS OF CONTACT WITH THE WBE FIRM: Firm is being utilized in our bid for this
project for trucking and hauling.
WBE Firm Traffic Control Specialists, Inc.
Owner or Contact at WBE Firm Tracey Triska
Telephone: 574-772-7001 Fax: 574-772-7002 Email: tracey@tcspecialists.net
TYPE OF WORK SOLICITED FOR THIS PROJECT: Pavement Markings and Maintenance of Traffic
items.
RESULTS OF CONTACT WITH THE WBE FIRM: Firm is being utilized in our bid for this
project for pavement markings and Maintenance of Traffic Items.
Version 09/29/2021 Contractor's Bid for Public Works - 26
CITY OF SOUTH BEND
MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN
FORM MBE-2.1::>.sj
WBE CONTACTED
This completed form should be supplied with Bids that pertain to City of South Bend Public Works Projects
requiring Good Faith Efforts to contact WBEs. It is the bidder's sole responsibility to verify whether any listed
woman -owned business meets the WBE qualifications. Attach additional pages if necessary.
PAGE 2 OF 2
Project Number: 122-024R WBE Participation Goal 5.4%
2022 Community Crossings Roadway Rehabilitation Project - Divisions 1A,
Project Name: 2A, 3A, 4 and 5
Bidder: Rieth-Riley Construction Co., Inc.
By: ig Estimator/Project Manager 8/4/22
(Signature) -Drew Snod erly (Title) (Date)
WBE Firm Hawk Enterprises, Inc.
Owner or Contact at WBE Firm Caylee Carlson
Telephone: 219-662-8090 Fax: 219-662-8093 Email: caylee@hawk-inc.com
TYPE OF WORK SOLICITED FOR THIS PROJECT: Electrical Items.
RESULTS OF CONTACT WITH THE WBE FIRM: Firm is being utilized in our bid for this
project for Electrical Items.
WBE Firm
Owner or Contact at WBE Firm
Telephone: Fax: Email:
TYPE OF WORK SOLICITED FOR THIS PROJECT:
RESULTS OF CONTACT WITH THE WBE FIRM:
Version 09/29/2021 Contractor's Bid for Public Works - 26
�1(�� Fi3 lst��'
CITY OF SOUTH BEND (�
MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSIO �QR'1VI PLAN
FORM MBE -1.0.w
MBE UTILIZATION PLAN
This completed form should be supplied with Bids that pertain to City of South Bend Public Works Projects involving MBE participation. It is
the bidder's sole responsibility to verify whether any listed minority-owned business meets the MBE qualifications.
Project Number:
Bidder:
2022 Community Crossings Roadway Rehabilitation Project - Divisions 1 B, 213,
122-024R Project Name: 3B, 4 and 5
Rieth-Riley Construction Co., Inc. Total Bid Amount: N/A (NO BID)
MBE Goal: 3.1%
Page of
Name & Address of MBE
Primary Contact Person
(Name/Teleplione)
Scope of Work to be Performed
(Attach scope/schedule if you need additional space)
Dollar Amount of MBE
Component
Percentage
of Total
Bid/Proposal
Submitted by:
Print Name Signature
Version 09/29/2021 Contractor's Bid for Public Works - 27
Date
This completed form should be supplied with Bids that pertain to City of South Bend Public Works Projects involving WBE participation. It is
the bidder's sole responsibility to verify whether any listed woman -owned business meets the WBE qualifications.
Project Number:
Bidder:
122-024R Project Name
Rieth-Riley Construction Co., Inc
2022 Community Crossings Roadway Rehabilitation Project - Divisions 113, 2B,
313, 4 and 5
Total Bid Amount: N/A (No BID) WBE Goal: 5.5%
Page of
Name & Address of WBE
Primary Contact Person
(Name/Telephone)
Scope of Work to be Performed
(Attach scope/schedule if you need additional space)
Dollar Amount of WBE
Component
CITY OF SOUTH BEND
MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLANv
FORM WBE-1.0
WBE UTILIZATION PLAN
This completed form should be supplied with Bids that pertain to City of South Bend Public Works Projects involving WBE participation. It is
the bidder's sole responsibility to verify whether any listed woman -owned business meets the WBE qualifications.
Project Number:
Bidder:
122-024R Project Name
Rieth-Riley Construction Co., Inc
2022 Community Crossings Roadway Rehabilitation Project - Divisions 113, 2B,
313, 4 and 5
Total Bid Amount: N/A (No BID) WBE Goal: 5.5%
Page of
Name & Address of WBE
Primary Contact Person
(Name/Telephone)
Scope of Work to be Performed
(Attach scope/schedule if you need additional space)
Dollar Amount of WBE
Component
Percentage
of Total
Bid/Proposal
Submitted by:
Print Name
Signature
Version 09/29/2021 Contractor's Bid for Public Works - 28
Date
CITY OF SOUTH BEND
MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN
FORM MBE -2.0
EVIDENCE OF GOOD FAITH EFFORTS
This completed form should be included as part of the Bids documents related to City of South Bend Public
Works Projects requiring Good Faith Efforts to obtain MBE participation.
Project Number: 122-024R Date:
2022 Community Crossings Roadway Rehab. Project - Divisions 1 B, 213,
Project Name: 313, 4 and 5
Bidder: Rieth-Riley Construction Co., Inc.
Contact Person: N/A (NO BID) Telephone:
Address:
City: State: Zip:
Email:
To determine whether a bidder has demonstrated good faith efforts to reach the MBE utilization goals set forth in
the City of South Bend Public Works Project Specifications, the City and its agencies, boards, or commissions,
REQUIRE ALL of the following Good Faith Efforts as listed in the table below*:
Version 09/29/2021 Contractor's Bid for Public Works - 29
EVIDENCE OF GOOD FAITH EFFORTS
MBE LIST(S): The bidder reviewed 1) the City of South Bend's Minority and Women Business Enterprise
Inclusion Program Plan; 2) the list of certified MWBEs provided by the City; and 3) the Indiana Department
of Administration list of Minority and Women Owned Businesses (both certified and non -certified) found
at: http://www.in.goyfidoa/.
GOOD FAITH EFFORTS TO OBTAIN MBE PARTICIPATION
The bidder shall initial each item below, as evidence of its good faith efforts to obtain MBE participation
in the awarded contract.
I affirm that I reviewed the City of South Bend's Minority and Women Business Enterprise
Inclusion Program Plan and the Indiana Department of Administration's certified list of
Indiana Minority and Women Business Enterprises, found on their website
(http://www.in.gov/idoa).
I affirm that I have made good faith efforts to select portions of the contract work to be
performed by MWBEs, including, where appropriate, breaking out contract work items into
economically feasible units to facilitate MBE participation.
affirm that I have made good faith efforts to solicit through all reasonable and available
means the interest of all MBEs in the scopes of work of the contract.
I affirm that I attended all pre-bid meetings scheduled by the City of South Bend to inform
MBEs of contracting and subcontracting opportunities.
I affirm that I advertised in general circulation and/or trade association publications
concerning subcontract opportunities and allowed MBEs reasonable time to respond to
such advertisements.
I affirm that I performed any and all necessary steps to provide written notices in a manner
reasonably calculated to inform MBEs of subcontracting opportunities and allowed
sufficient time for MBEs to participate effectively.
I affirm that I followed up on initial solicitations with interested MBEs.
I affirm that I negotiated with interested MBEs in good faith, including providing such MBEs
with adequate information about the plans, specifications and other requirements of the
subcontract.
I affirm that I have made good faith efforts to assist interested MBEs in obtaining bonding,
lines of credit, or insurance as required by the City or the bidder, where appropriate.
Version 09/29/2021 Contractor's Bid for Public Works - 29
CITY OF SOUTH BEND
MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN
FORM MBE -2.0
EVIDENCE OF GOOD FAITH EFFORTS
`Proper demonstration of Good Faith Efforts requires your initials next to all of the above boxes. Any
omissions shall be considered grounds for rejection of the bid by the Board of Public Works. The City of
South Bend reserves the right to request additional information.
Version 09/29/2021 Contractor's Bid for Public Works - 30
affirm that I have made good faith efforts to assist interested MBEs in obtaining necessary
equipment, supplies, materials, or related assistances or services, where appropriate.
affirm that I did not reject any MBEs as unqualified without sound business reasons based
on a thorough investigation of their capabilities.
CONTRACT RECORDS: The bidder has maintained the following records for each MBE that has bid on
the subcontracting opportunity:
1. Name, address, and telephone number;
2. A description of information provided by the bidder or subcontractor; and
3. A statement of whether an agreement was reached, and if not, why not, including any reasons for
concluding that the MBE was unqualified to perform the job.
`Proper demonstration of Good Faith Efforts requires your initials next to all of the above boxes. Any
omissions shall be considered grounds for rejection of the bid by the Board of Public Works. The City of
South Bend reserves the right to request additional information.
Version 09/29/2021 Contractor's Bid for Public Works - 30
This completed form should be included as part of the Bids documents related to City of South Bend Public
Works Projects requiring Good Faith Efforts to obtain MWBE participation.
Project Number: 122-024R Date:
2022 Community Crossings Roadway Rehabilitation Project - Divisions 1 B,
Project Name: 213, 313, 4 and 5
Bidder: Rieth-Riley Construction Co., Inc.
Contact Person: N/A (No BID) Telephone:
Address:
City: State: Zip:
Email:
To determine whether a bidder has demonstrated good faith efforts to reach the WBE utilization goals set forth in
the City of South Bend Public Works Project Specifications, the City and its agencies, boards, or commissions,
REQUIRE ALL of the following Good Faith Efforts as listed in the table below*:
EVIDENCE OF GOOD FAITH EFFORTS
CITY OF SOUTH BEND
I'
MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN
Inclusion Program Plan; 2) the list of certified MWBEs provided by the City; and 3) the Indiana Department
FORM WBE-2.0
.:.s
EVIDENCE OF GOOD FAITH EFFORTS
at: http://www.in.gov/idoa/.
This completed form should be included as part of the Bids documents related to City of South Bend Public
Works Projects requiring Good Faith Efforts to obtain MWBE participation.
Project Number: 122-024R Date:
2022 Community Crossings Roadway Rehabilitation Project - Divisions 1 B,
Project Name: 213, 313, 4 and 5
Bidder: Rieth-Riley Construction Co., Inc.
Contact Person: N/A (No BID) Telephone:
Address:
City: State: Zip:
Email:
To determine whether a bidder has demonstrated good faith efforts to reach the WBE utilization goals set forth in
the City of South Bend Public Works Project Specifications, the City and its agencies, boards, or commissions,
REQUIRE ALL of the following Good Faith Efforts as listed in the table below*:
Version 09/29/2021 Contractor's Bid for Public Works - 31
EVIDENCE OF GOOD FAITH EFFORTS
WBE LIST(S): The bidder reviewed 1) the City of South Bend's Minority and Women Business Enterprise
Inclusion Program Plan; 2) the list of certified MWBEs provided by the City; and 3) the Indiana Department
of Administration list of Minority and Women Owned Businesses (both certified and non -certified) found
at: http://www.in.gov/idoa/.
GOOD FAITH EFFORTS TO OBTAIN WBE PARTICIPATION
The bidder shall initial each item below, as evidence of its good faith efforts to obtain WBE participation
in the awarded contract.
I affirm that I reviewed the City of South Bend's Minority and Women Business Enterprise
Inclusion Program Plan and the Indiana Department of Administration's certified list of
Indiana Minority and Women Business Enterprises, found on their website
(http://www.in.gov/idoa).
I affirm that I have made good faith efforts to select portions of the contract work to be
performed by WBEs, including, where appropriate, breaking out contract work items into
economically feasible units to facilitate WBE participation.
I affirm that I have made good faith efforts to solicit through all reasonable and available
MpAnc tha intarPc,t of :;I! 1,/111REc in tha crnrnr-q of Wnri{ of tha rnntrnrt
I affirm that I attended all pre-bid meetings scheduled by the City of South Bend to inform
WBEs of contracting and subcontracting opportunities.
I affirm that I advertised in general circulation and/or trade association publications
concerning subcontract opportunities and allowed WBEs reasonable time to respond to
such advertisements.
I affirm that I performed any and all necessary steps to provide written notices in a manner
reasonably calculated to inform WBEs of subcontracting opportunities and allowed
sufficient time for WBEs to participate effectively.
I affirm that I followed up on initial solicitations with interested WBEs.
I affirm that I negotiated with interested WBEs in good faith, including providing such WBEs
with adequate information about the plans, specifications and other requirements of the
subcontract.
Version 09/29/2021 Contractor's Bid for Public Works - 31
CITY OF SOUTH BEND
MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN
FORM WBE-2.0
EVIDENCE OF GOOD FAITH EFFORTS
*Proper demonstration of Good Faith Efforts requires your initials next to all of the above boxes. Any
omissions shall be considered grounds for rejection of the bid by the Board of Public Works. The City of
South Bend reserves the right to request additional information.
Version 09/29/2021 Contractor's Bid for Public Works - 32
I affirm that I have made good faith efforts to assist interested WBEs in obtaining bonding,
lines of credit, or insurance as required by the City or the bidder, where appropriate.
I affirm that I have made good faith efforts to assist interested WBEs in obtaining
necessary equipment, supplies, materials, or related assistances or services, where
appropriate.
I affirm that I did not reject any WBEs as unqualified without sound business reasons
based on a thorough investigation of their capabilities.
CONTRACT RECORDS: The bidder has maintained the following records for each WBE that has bid on
the subcontracting opportunity:
1. Name, address, and telephone number;
2. A description of information provided by the bidder or subcontractor; and
3. A statement of whether an agreement was reached, and if not, why not, including any reasons for
concluding that the MWBE was unqualified to perform the job.
*Proper demonstration of Good Faith Efforts requires your initials next to all of the above boxes. Any
omissions shall be considered grounds for rejection of the bid by the Board of Public Works. The City of
South Bend reserves the right to request additional information.
Version 09/29/2021 Contractor's Bid for Public Works - 32
This completed form should be supplied with Bids that pertain to City of South Bend Public Works Projects
requiring Good Faith Efforts to contact MBEs. It is the bidder's sole responsibility to verify whether any listed
minority-owned business meets the MBE qualifications. Attach additional pages if necessary.
PAGE OF
Project Number: 122-024R MBE Participation Goal 3.1%
2022 Community Crossings Roadway Rehabilitation Project - Divisions 1 B,
Project Name: 213, 313, 4 and 5
Bidder: Rieth-Riley Construction Co., Inc.
By:N/A (NO BID)
(Signature) (Title) (Date)
MBE Firm
Owner or Contact at MBE Firm
Telephone: Fax: Email:
TYPE OF WORK SOLICITED FOR THIS PROJECT:
RESULTS OF CONTACT WITH THE MBE FIRM:
MBE Firm
Owner or C_lntnnt ^t MBE Firm
Telephone: Fax: Email:
TYPE OF WORK SOLICITED FOR THIS PROJECT:
RESULTS OF CONTACT WITH THE MBE FIRM:
Version 09/29/2021 Contractor's Bid for Public Works - 33
CITY OF SOUTH BEND
MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLANK}r
FORM MBE -2.1_"'
MBE CONTACTED
This completed form should be supplied with Bids that pertain to City of South Bend Public Works Projects
requiring Good Faith Efforts to contact MBEs. It is the bidder's sole responsibility to verify whether any listed
minority-owned business meets the MBE qualifications. Attach additional pages if necessary.
PAGE OF
Project Number: 122-024R MBE Participation Goal 3.1%
2022 Community Crossings Roadway Rehabilitation Project - Divisions 1 B,
Project Name: 213, 313, 4 and 5
Bidder: Rieth-Riley Construction Co., Inc.
By:N/A (NO BID)
(Signature) (Title) (Date)
MBE Firm
Owner or Contact at MBE Firm
Telephone: Fax: Email:
TYPE OF WORK SOLICITED FOR THIS PROJECT:
RESULTS OF CONTACT WITH THE MBE FIRM:
MBE Firm
Owner or C_lntnnt ^t MBE Firm
Telephone: Fax: Email:
TYPE OF WORK SOLICITED FOR THIS PROJECT:
RESULTS OF CONTACT WITH THE MBE FIRM:
Version 09/29/2021 Contractor's Bid for Public Works - 33
This completed form should be supplied with Bids that pertain to City of South Bend Public Works Projects
requiring Good Faith Efforts to contact WBEs. It is the bidder's sole responsibility to verify whether any listed
woman -owned business meets the WBE qualifications. Attach additional pages if necessary.
PAGE OF
Project Number: 122-024R WBE Participation Goal 5.5%
2022 Community Crossings Roadway Rehabilitation Project - Divisions 1 B,
Project Name: 213, 313, 4 and 5
Bidder: Rieth-Riley Construction Co., Inc.
C
N/A (NO BID)
(Signature) (Title) (Date)
WBE Firm
Owner or Contact at WBE Firm
Telephone: Fax: Email:
TYPE OF WORK SOLICITED FOR THIS PROJECT:
RESULTS OF CONTACT WITH THE WBE FIRM:
WBE Firm
Owner or Contact at WBE Firm
Telephone: Fax: Email:
TYPE OF WORK SOLICITED FOR THIS PROJECT:
RESULTS OF CONTACT WITH THE WBE FIRM:
Version 09/29/2021 Contractor's Bid for Public Works - 34
CITY OF SOUTH BEND`
tai t�i�;
MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN
,1
FORM MBE -2.1
WBE CONTACTED
This completed form should be supplied with Bids that pertain to City of South Bend Public Works Projects
requiring Good Faith Efforts to contact WBEs. It is the bidder's sole responsibility to verify whether any listed
woman -owned business meets the WBE qualifications. Attach additional pages if necessary.
PAGE OF
Project Number: 122-024R WBE Participation Goal 5.5%
2022 Community Crossings Roadway Rehabilitation Project - Divisions 1 B,
Project Name: 213, 313, 4 and 5
Bidder: Rieth-Riley Construction Co., Inc.
C
N/A (NO BID)
(Signature) (Title) (Date)
WBE Firm
Owner or Contact at WBE Firm
Telephone: Fax: Email:
TYPE OF WORK SOLICITED FOR THIS PROJECT:
RESULTS OF CONTACT WITH THE WBE FIRM:
WBE Firm
Owner or Contact at WBE Firm
Telephone: Fax: Email:
TYPE OF WORK SOLICITED FOR THIS PROJECT:
RESULTS OF CONTACT WITH THE WBE FIRM:
Version 09/29/2021 Contractor's Bid for Public Works - 34
No. 0063
BID BOND TRAVELERS CASUALTY AND SURETY COMPANY OF AMERICA
Hartford, Connecticut 06183
KNOW ALL MEN BY THESE PRESENTS,
That we, RIETH-RILEY CONSTRUCTION CO., INC. as Principal, hereinafter called
the Principal, and TRAVELERS CASUALTY AND SURETY COMPANY OF AMERICA, of Hartford, Connecticut, a
corporation duly organized under the laws of the State of Connecticut, as Surety, hereinafter called the Surety, are held
and firmly bound unto City of gnnth Rana - Tnrii ana
, as Obligee, hereinafter called the Obligee, in the sum of
Fi N7a Percent (5%) of total bid Dollars
($ 5% of bid ), for the payment of which sum well and truly to be made, the said Principal and the said
Surety, bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these
presents.
WHEREAS, the Principal has submitted a bid for 2022 Community Crossings Road
Rehabilitation Project No. 122-024R
NOW, THEREFORE, if the Obligee shall accept the bid of the Principal and the Principal shall enter into a Contract with
the Obligee in accordance with the terms of such bid, and give such bond or bonds as may be specified in the bidding or
Contract Documents with good and sufficient surety for the faithful performance of such, or in the event of the failure of
the Principal to enter such Contract and give such bond or bonds, if the Principal shall pay to the Obligee the difference
not to exceed the penalty hereof between the amount specified in said bid and such larger amount for which the Obligee
may in good faith contract with another party to perform the Work covered by said bid, then this obligation shall be null
and void, otherwise to remain in full force and effect.
Signed and sealed this 4th day of August 2022
1W � rjzmw:5�
tness DawA E. Armstro
41 "
Witness Lori Patronite
RIETH-RILEY CONSTRUCTION CO., INC.
(Principal) (Seal)
Jacob
(Name TKw Area Manager
TRAVELERS CASUALTY AND SURETY COMPANY OF AMERICA
lJ
Geri Patronite Attor ,ey-in-F
' Travelers Casualty and Surety Company of America
Ilk Travelers Casualty and Surety Company
TRAVELERS
St. Paul Fire and Marine Insurance Company
POWER OF ATTORNEY
KNOW ALL MEN BY THESE PRESENTS: That Travelers Casualty and Surety Company of America, Travelers Casualty and Surety Company, and
St. Paul Fire and Marine Insurance Company are corporations duly organized under the laws of the State of Connecticut (herein
collectively called the "Companies"), and that the Companies do hereby make, constitute and appoint Geri Patronite of
CLEVELAND , Ohio , their true and lawful Attorney(s)-in-Fact to sign, execute, seal and
acknowledge any and all bonds, recognizances, conditional undertakings and other writings obligatory in the nature thereof on behalf of
the Companies in their business of guaranteeing the fidelity of persons, guaranteeing the performance of contracts and executing or
guaranteeing bonds and undertakings required or permitted in any actions or proceedings allowed by law.
IN WITNESS WHEREOF, the Companies have caused this instrument to be signed, and their corporate seals to be hereto affixed, this 21st day of April,
2021.y
T1� ""*'YC{�LT4 Ayb� p�
VA
�,
db
State of Connecticut
By:
City of Hartford ss. Robert L. Rane enior Vice President
On this the 21st day of April, 2021, before me personally appeared Robert L. Raney, who acknowledged himself to be the Senior
Vice President of each of the Companies, and that he, as such, being authorized so to do, executed the foregoing instrument for the
purposes therein contained by signing on behalf of said Companies by himself as a duly authorized officer.
IN WITNESS WHEREOF, I hereunto set my hand and official seal.
/ a
My Commission expires the 30th day of June, 2026
�u�aae Anna P. Nowik, Notary Public
This Power of Attorney is granted under and by the authority of the following resolutions adopted by the Boards of Directors of each of
the Companies, which resolutions are now in full force and effect, reading as follows:
RESOLVED, that the Chairman, the President, any Vice Chairman, any Executive Vice President, any Senior Vice President, any Vice
President, any Second Vice President, the Treasurer, any Assistant Treasurer, the Corporate Secretary or any Assistant Secretary may appoint
Attorneys -in -Fact and Agents to act for and on behalf of the Company and may give such appointee such authority as his or her certificate of authority
may prescribe to sign with the Company's name and seal with the Company's seal bonds, recognizances, contracts of indemnity, and other writings
obligatory in the nature of a bond, recognizance, or conditional undertaking, and any of said officers or the Board of Directors at any time may
remove any such appointee and revoke the power given him or her; and it is
FURTHER RESOLVED, that the Chairman, the President, any Vice Chairman, any Executive Vice President, any Senior Vice President or
any Vice President may delegate all or any part of the foregoing authority to one or more officers or employees of this Company, provided
that each such delegation is in writing and a copy thereof is filed in the office of the Secretary; and it is
FURTHER RESOLVED, that any bond, recognizance, contract of indemnity, or writing obligatory in the nature of a bond, recognizance,
or conditional undertaking shall be valid and binding upon the Company when (a) signed by the President, any Vice Chairman, any Executive
Vice President, any Senior Vice President or any Vice President, any Second Vice President, the Treasurer, any Assistant Treasurer, the
Corporate Secretary or any Assistant Secretary and duly attested and sealed with the Company's seal by a Secretary or Assistant Secretary;
or (b) duly executed (under seal, if required) by one or more Attorneys -in -Fact and Agents pursuant to the power prescribed in his or her
certificate or their certificates of authority or by one or more Company officers pursuant to a written delegation of authority; and it is
FURTHER RESOLVED, that the signature of each of the following officers: President, any Executive Vice President, any Senior Vice President,
any Vice President, any Assistant Vice President, any Secretary, any Assistant Secretary, and the seal of the Company may be affixed by facsimile to
any Power of Attorney or to any certificate relating thereto appointing Resident Vice Presidents, Resident Assistant Secretaries or Attorneys -in -
Fact for purposes only of executing and attesting bonds and undertakings and other writings obligatory in the nature thereof, and any such Power of
Attorney or certificate bearing such facsimile signature or facsimile seal shall be valid and binding upon the Company and any such power so executed
and certified by such facsimile signature and facsimile seal shall be valid and binding on the Company in the future with respect to any bond or
understanding to which it is attached.
1, Kevin E. Hughes, the undersigned, Assistant Secretary of each of the Companies, do hereby certify that the above and foregoing is a
true and correct copy of the Power of Attorney executed by said Companies, which remains in full force and effect.
Dated this q day of07M,
0�(i�-
Mon
COWL M
Wy
Kevin E. Hughes, A�s`si%taa'nttSSe—cretary
To verify the authenticity of this Power ofAttorney, please call us at 1-800-421-3880,
Please refer to the above-named Attorney(s)-in-Fact and the details of the bond to which this Power of Attorney is attached,
!ttv vut �r�ca�;vvr►
afflXBdy tfii5 22nd t
hered
mtl designee is purstant to Section.t}3 a the Amended and Res
61{the. "%statd.13y;1�a�vs"�,' and which RestatedB.y-I aws, as aft
an effect;
signed rind sealed; it equ�r d by lau+t, .bj+ facsimile under an.. by
f Rifh�Riieyanstr�tctian Via., Inc., at a'rneting held on fhe inti; d.
gat beeri.arnend d or, repealed and continue i'n full.force and eftec :
,ur�blrc r�r prryafe.
xuch directors end
cerci Icafe relating
irr�ile :seal sl �al� be '.
nrte signature and
rt is :attached
cot{ orate s'eafi to die her tc
YFACF
1316 COUNTY -CITY BUILDING PHONE 574/235-9251
227 W. JEFFERSON BOULEVARD rvv x FA_x 574/ 235-9171
SOUTH BEND, INDIANA 46601-1830 jg(;5 /r' TDD 574/ 235-5567
CITY OF SOUTH BEND JAMES MUELLER, MAYOR
BOARD OF PUBLIC WORKS
Date: August 2, 2022
To: All Plan Holders
From Theresa Heffner, Clerk, Board of Public Works
Subject Addendum Number: 1
Project Name: 2022 Community Crossings Roadway Rehabilitation Project
Project Number: 122-024R
ACKNOWLEDGEMENT OF RECEIPT OF ADDENDUM
Date Received:
This addendum is being forwarded to you for the above referenced project.
Please sign below and acknowledge receipt of this Addendum
by faxing this sheet to the Board of Public Works at (574) 235-9171
within 48 hours of receipt. A copy MUST also be included with your
bid package upon submittal.
THIS ADDENDUM MAY AFFECT YOUR BID.
Notes:
The attached documents are hereby added to the Specifications and Contract
Documents and become a part of herein.
Company: Wefh —/V",
Authorized Signature:
Date: 15( / % / 2
Version 4/2/2015
'r1'J_uC 21-,'011 re, . - Th C
CERTIFICATE OF QUALIFICATION
to provide
CONSTRUCTION SERVICES
for
PUBLIC WORKS PROJECTS
to the
STATE OF INDIANA
This Certification Board, having duly considered application for qualification in terms of apparent experience and financial
resources; and under the applicable Indiana Code 4-13.6-4 and adopted rules of this Board, hereby issues a
Certificate of Qualification to provide construction services to the State of Indiana for Public Works Projects to:
RIETH RILEY CONSTRUCTION CO INC
3626 ELKHART RD
PO BOX 477
GOSHEN IN 46527-0477
Phone 574-875-5183
Fax 574-875-8405
Company Official
KEITH ROSE
for the twenty-seven month period stated herein, unless revoked by this Board for cause,
and in the classifications of services stated below. This certificate supercedes any previous certificate.
1611.01 Concrete Construction of Roads & Curbing
1611.02 Asphalt Construction of Roads and Parking Lots
1622.01 Gen Contr-brdgs,vdcts,elvd hwys,rlwy,tnis
1623.03 Sewers and/or Water Lines
1771.01 Concrete Construction
1794.01 Earthmoving and Land Clearing
1794.02 Excavation
1795.02 Demolition of Pavements and Roads
CERTIFICATION DATE 6/20/2022
EXPIRATION DATE 9/20/2024
THIS CERTIFICATE ISSUED BY THE STATE OF INDIANA, PUBLIC WORKS DIVISION CERTIFICATION BOARD,
402 WEST WASHINGTON STREET, ROOM W467, INDIANAPOLIS, INDIANA 46204,
ALSO ACTS AS THE OFFICIAL NOTICE OF EXPIRATION.
K-� d • Ckz�
Tracy L. Cross, Ex tive Secretary
Certification Board
DAPW PQ2 State Form 3983R Rev. 07/06
MD
INDIANAPOLIS, IN November 05, 2021
TO
RIETH-RILEY CONSTRUCTION CO., INC. GOSHEN, IN
i i .e pa rf r� a� tri 'e of E rr ark Fir.,
tai t r t as
t'r Crider rust . - , is hereby ��al t � i� �t n Department T� t '. i
f tp ire asses Work �r �ioft.- r ttr iri n o � fig% t t r Iii
��rral� tlr � rot - the AggMpte
amo Unit d.,Aisaon rde . oeei r t r �r� of art x`r� ' c t i t� ��ir��l�� t ate tie
r r rr -r E �iet� and �e neral Conti l ion T [ e x�-� t r� � Ot ttale
p: } ��u tt {ms�zs yy pp**�� �+ �s-,x�.�y� # _ .g v� mitten
y
r� � C L 'E I E C [ LT # } 4 �lCt�� o t woit �kt� #`��t K i3��'
in jhpe in&r ndlfi titre -Wag frTn or otter M Ns sWh reVWon or,cr irt.
Valid November 06, 2021 Thru July 31, 2022
Aggregate Bidding Capacity:
0103 3 -SIDED BOX STRUCTURE(S) W/SPA N > 20 FT ...........................................................
A(A) CONCRETE PAVEMENT: GENERAL................................................................................
B(A) ASPHALT PAVEMENT: W/INDOT CERTIFIED HMA PLANT .............................................
C(A) HEAVY GRADING..............................................................................................................
D(A) HIGHWAY OR RAILROAD BRIDGE OVER WATER..........................................................
D(B) HIGHWAY OR RAILROAD BRIDGE OVER HIGHWAY .....................................................
D(C) HWY/RR BRIDGE REQ RR TRACK PROTECTION.........................................................
E(C) BRIDGE DECK OVERLAYAND MINOR BRIDGE REPAIR ...............................................
E(E) SMALL STRUCTURES AND DRAINAGE ITEMS..............................................................
E(F) SURFACE MASONRYAND MISCELLANEOUS CONCRETE ...........................................
E(H) DEEP SEWER AND/OR EXCAVATION..............................................................................
E(R) ASPHALT PAVEMENT MILLING.......................................................................................
E(T) DEMOLITION......................................................................................................................
PREQ At: FIC= N �N GlINEER
1,164, 594, 000.00
$99,999,999.00
$99,999,999.00
$99,999,999.00
$99,999,999.00
$99,999,999.00
$99,999,999.00
$99,999,999.00
$10,000,000.00
$10,000,000.00
$99,999,999.00
$99,999,999.00
$99,999,999.00
$99,999,999.00
O It�tl NE
August 30, 2021
CERTIFIED HOT MIX ASPHALT PRODUCERS
Specification Reference: 401, 402, 410 & SM Producer/Supplier Type: Certified HMA
Producer
ITM 583 SM Material Code: 401M34500 to 41OM34600
A certified hot mix asphalt producer is one who has complied with the requirements
set out in the above referenced specification. A producer accepted into this program may
supply asphalt mix for all projects beginning with the date approved as a certified hot
mix asphalt producer.
Source Producer Name
Code Location Comments
3342 API CONSTRUCTION CORP
1 of 7
Comments
A = Water Injection System Installed
B = In -Line Blending System Installed l
HUNTERTOWN, IN
3390
API CONSTRUCTION CORP
ANGOLA, IN
3321
ASPHALT SUPPLY CO.
SELLERSBURG, IN
3391
BABCOCK PAVING, INC
DEMOTTE, IN
3396
BARRETT PAVING MATERIALS, INC
CLEVES, OH
3560
BITUMEN SUPPLY, LLC
CHARLESTOWN, IN
3303
BROOKS CONSTRUCTION
CO INC
AUBURN, IN
3324
BROOKS CONSTRUCTION
CO INC
FT WAYNE, IN
3360
BROOKS CONSTRUCTION
CO INC
FT WAYNE, IN
3359
BROOKS CONSTRUCTION
CO INC
HOAGLAND, IN
3372
BROOKS CONSTRUCTION
CO INC
MARION, IN
3291
BROOKS CONSTRUCTION
CO INC
WARSAW, IN
3220
CAVE QUARRIES INC
PAOLI, IN
3119
CENTRAL PAVING
LOGANSPORT, IN
3381
C G S SERVICES, INC
MORRISTOWN, IN
1 of 7
Comments
A = Water Injection System Installed
B = In -Line Blending System Installed l
August 30, 2021
CERTIFIED HOT MIX ASPHALT PRODUCERS
Specification Reference: 401, 402, 410 & SM Producer/Supplier Type: Certified HMA
Producer
ITM 583 SM Material Code: 401M34500 to 41OM34600
3407
C & R CONSTRUCTION
CORYDON, IN
3393
DAVE O'MARA CONTRACTORS
INC
FLATROCK, IN
3377
DAVE O'MARA CONTRACTORS
INC
HAYDEN, IN
3192
DAVE O'MARA CONTRACTORS
INC
LEXINGTON, IN
3344
DAVE O'MARA CONTRACTORS
INC
NEW POINT, IN
3546
DAVE O'MARA CONTRACTORS
INC
ST. PAUL, IN
3326
DAVE O'MARA CONTRACTORS
INC
VERSAILLES, IN
3285
E & B PAVING LLC
ANGOLA, IN
3373
E & B PAVING LLC
BLOOMINGTON, IN
3349
E & B PAVING LLC
CHANDLER, IN
3375
E & B PAVING LLC
FT.WAYNE, IN
3355
E & B PAVING LLC
HUNTINGTON, IN
3340
E & B PAVING LLC
INDIANAPOLIS, IN
3279
E & B PAVING LLC
PLYMOUTH, IN
3366
E'& B PAVING LLC
KOKOMO, IN
3348
E & B PAVING, LLC
MARTINSVILLE, IN
3368
E & B PAVING LLC
MUNCIE, IN
3246
E & B PAVING LLC
2 of 7
Comments
B = In -Line Blending System Installed
August 30, 2021
CERTIFIED HOT MIX ASPHALT PRODUCERS
Specification Reference: 401, 402, 410 & SM Producer/Supplier Type: Certified HMA
Producer
ITM 583 SM Material Code: 401M34500 to 41OM34600
NOBLESVILLE, IN — SR 38
3339 E & B PAVING LLC
NOBLESVILLE, IN — RIVER RD
3257 E & B PAVING LLC
PENDLETON, IN
3302 E & B PAVING LLC
PERU, IN
3389 E& B PAVING LLC (I)
ROCKPORT, IN
3361 E & B PAVING, LLC
SWITZ CITY, IN
3341 E & B PAVING, LLC
WASHINGTON, IN
3371 GALLAGHER ASPHALT CORP,
THORNTON, IL
3196 GAUNT & SON ASPHALT INC
WABASH, IN
3367 GOHMANN ASPHALT & CONSTRUCTION INC (I)
DALE, IN
3145 HARDING ASPHALT MATERIALS
INDIANAPOLIS, IN
3404 HARDING ASPHALT MATERIALS
INDIANAPOLIS, IN (TIBBS AVE.)
3383 HOT MIX INC
GREENSBURG, IN
3387 IMI - CORYDON STONE & ASPHALT
CORYDON, IN
3298 IMI - SELLERSBURG STONE CO INC
SELLERSBURG, IN
3550 JENSTAR ASPHALT LLC
GARY, IN
3403 JERRY DAVID ENTERPRISES, INC
EVANSVILLE, IN
3405 JH RUDOLPH & CO, INC
DALE, IN
3 of 7
Comments
B = In -Line Blending System Installed
August 30, 2021
CERTIFIED HOT MIX ASPHALT PRODUCERS
Specification Reference: 401, 402, 410 & SM Producer/Supplier Type: Certified HMA
Producer
ITM 583 SM Material Code: 401M34500 to 41OM34600
3378 JH RUDOLPH & CO INC
ENGLISH, IN
3308 JH RUDOLPH & CO INC
EVANSVILLE, IN
3551 K -FIVE CORPORATION
MARKHAM, IL
3555 LOUSSVILLE PAVING CO
CRESTWOOD, KY
3398 LOUSIVILLE PAVING CO
LOUISVILLE, KY
3384 MAC CONSTRUCTION & EXCAVATION, INC
JEFFERSONVILLE, IN
3249 METZGER CONSTRUCTION -CO INC
BOONVILLE, IN
3251 METZGER CONSTRUCTION CO INC
BOONVILLE, IN
3332 MILESTONE CONTRACTORS LP
BLOOMFIELD, IN
3232 MILESTONE CONTRACTORS LP (2)
CAMBRIDGE CITY, IN
3315 MILESTONE CONTRACTORS LP
COLUMBUS, IN
3394 MILESTONE CONTRACTORS LP (I)
CRAWFORDSVILLE, IN
3397 MILESTONE CONTRACTORS LP
DALEVILLE, IN
3309 MILESTONE CONTRACTORS LP (I)
DECATUR, IN
3304 MILESTONE CONTRACTORS LP
INDIANAPOLIS, IN - HARDING ST (PLANT #11)
3317 MILESTONE CONTRACTORS LP
INDIANAPOLIS, IN - 9 6TH ST
3273 MILESTONE CONTRACTORS LP
KENTLAND, IN
3323 MILESTONE CONTRACTORS LP
LAFAYETTE, IN
4 of 7
Comments
B = In -Line Blending System Installed
August 30, 2021
CERTIFIED HOT MIX ASPHALT PRODUCERS
Specification Reference: 401, 402, 410 & SM Producer/Supplier Type: Certified HMA
Producer
ITM 583 SM Material Code: 401M34500 to 41OM34600
3347 MILESTONE CONTRACTORS LP
PLAINFIELD, IN
3345 MILESTONE CONTRACTORS LP
PORTLAND, IN
3248 MILESTONE CONTRACTORS LP
RICHMOND, IN
3158 MILESTONE CONTRACTORS LP
RIDGEVILLE, IN
3333 MILESTONE CONTRACTORS LP
VEEDERSBURG, IN
3363 MILESTONE CONTRACTORS LP
WHITESTOWN, IN
3336 MILESTONE CONTRACTORS NORTH, INC
GRIFFITH, IN
3406 MILESTONE CONTRACTORS NORTH, INC
LAPORTE, IN A
3388 MILESTONE CONTRACTORS NORTH, INC
LOWELL, IN
3351 MILESTONE CONTRACTORS NORTH, INC
SOUTH BEND, IN
3382 MILESTONE CONTRACTORS NORTH, INC
VALPARAISO, IN
3392 MILESTONE CONTRACTORS SOUTH, INC
CLOVERDALE, IN
3350 MILESTONE CONTRACTORS SOUTH, INC
TERRE HAUTE, IN
3334 NIBLOCK EXCAVATING INC
BRISTOL, IN
3296 NIBLOCK EXCAVATING INC
KIMMEL, IN
3402 OWENSBORO PAVING (I)
OWENSBORO, KY - (PLANT #1)
3533 OWENSBORO PAVING (I)
OWENSBORO, KY - (PLANT #2)
5 of 7
Comments
B = In -Line Blending System Installed
August 30, 2021
CERTIFIED HOT MIX ASPHALT PRODUCERS
Specification Reference: 401, 402, 410 & SM Producer/Supplier Type: Certified HMA
Producer
ITM 583 SM Material Code: 401M34500 to 41OM34600
3137 PHEND & BROWN INC
DISKO, IN
3171 PHEND & BROWN INC
LEESBURG, IN
3399 RIETH-RILEY CONSTRUCTION CO INC
MOORESVILLE, IN
3395 RIETH-RILEY CONSTRUCTION CO INC
DANVILLE, IN
3173 RIETH-RILEY CONSTRUCTION CO INC
ELKHART, IN
3353 RIETH-RILEY CONSTRUCTION CO INC
GARY, IN
3511 RIETH-RILEY CONSTRUCTION CO INC
HOWE, IN
3330 RIETH-RILEY CONSTRUCTION CO INC
INDIANAPOLIS, IN - KY AVE "B"
3184 RIETH-RILEY CONSTRUCTION CO INC
INDIANAPOLIS, IN - KY AVE "A"
3316 RIETH-RILEY CONSTRUCTION CO INC
INDIANAPOLIS, IN - 96TH ST
3386 RIETH-RILEY CONSTRUCTION CO INC
LAFAYETTE, IN
3365 RIETH-RILEY CONSTRUCTION CO INC
LAPORTE, IN
3300 RIETH-RILEY CONSTRUCTION CO INC
NOBLESVILLE, IN - (RIVER AVE)
3290 RIETH-RILEY CONSTRUCTION CO INC
SOUTH BEND, IN
3379 RIETH-RILEY CONSTRUCTION CO INC
VALPARAISO, IN
3288 TEMPLE & TEMPLE PAVING
SALEM, IN
3154 TRI -COUNTY ASPHALT
OTWELL, IN
3534 VALLEY ASPHALT CORP
CLEVES, OH -----------------------------------------B
6 of 7
Comments
B = In -Line Blending System Installed
August 30, 2021
CERTIFIED HOT MIX ASPHALT PRODUCERS
Specification Reference: 401, 402, 410 & SM Producer/Supplier Type: Certified HMA
Producer
ITM 583 SM Material Code: 40IM34500 to 41OM34600
3510 VALLEY ASPHALT CORP (I)
ROSS, OH
3543 WALLS MANUFACTURING CO (I)
BROOKVILLE, OH
3544 WALLS MANUFACTURING CO (I)
GREENVILLE, OH
3343 WAYNE ASPHALT AND CONST. CO INC
FORT WAYNE, IN
7 of 7
Comments
B = In -Line Blending System Installed
r.nNcTjwr-TinAi
100% Quality • 100% Employee Owned • Over 100 Years
August 4, 2022
To Whom It May Concern:
For your review we have included references from Private firms that
we have performed work for.
AM General Corporation
(574) 284-2728
Bosch Automotive Braking System/Navistar
(574) 654-2400
ITR Concessions LLC
574-674-5836
University of Notre Dame
574-631-7356
25200 S.R. 23 • South Bend, IN 46614 Phone: (574) 288-8321 • www.rieth-riley.com
RD
100% Quality • 100% Employee Owned * Over 100 Years
List names and addresses of subcontractors that we have used in public works projects
In the last five years:
Roadsafe Traffic Systems V&R Trucking Slusser's Green Thumb
3519 Harding Street 1845 North Elmer Street P.O. Box 33
Indianapolis, In. South Bend, In. Logansport, In.
Traffic Marking Trucking Landscaping/Erosion Control
Hawk Enterprises
1850 E. North Street
Crown Point, In.
Electric/Signage
R&R Excavating
2010 Went Avenue
Mishawaka, In.
Dirt/Excavating
C -Tech Corporation
5300 W. 100 North
Boggstown, In.
Guard rail/Fencing
P.O. Box 1775.25200 S.R. 23 . South Bend, IN 46634
Acorn Landscaping, LLC.
3680 W. Sample Street
South Bend, In.
Landscaping
Phone: (574) 288-8321 • www.rieth-riley.com
CITY OF SOUTH BEND, INDIANA
CONTRACTOR'S BID FOR PUBLIC WORK
RESPONSIBLE BIDDER CHECKLIST
Project Name: 2022 Community Crossing Road Rehabilitation Project
Project No.: 122-024R
For Bids Due: August 4, 2022 9:OOAM Local Time
Contractor Name: Rieth-Riley Construction Co., Inc.
The City seeks to enhance its ability to identify responsive and responsible bidders on all City public works
projects by institution of comprehensive submission requirements in compliance with State law. Quality
workmanship, efficient operation, safety, and timely completion of projects requires that all bidders meet
certain minimum requirements to be responsive and responsible bidders.
THIS FORM MUST BE SUBMITTED WITH YOUR BID.
INSTRUCTIONS:
If you are a pre -qualified bidder, complete Section I only.
If you are not a pre -qualified bidder, complete Section II only.
Section II acts as an application for pre -qualification. Submission of Section II will allow the bidder to be
considered for pre -qualification for bids with the City of South Bend Department of Public Works. Pre-
qualified bidders will then be exempt from a portion of the submission requirements outlined in Section 6-
63 of The Responsible Bidding Ordinance No. 10594-18 (hereinafter, "Responsible Bidding Ordinance")
for a period of twelve (12) months.
Thereafter, contractors who are pre -qualified must submit a complete application for continuation of "pre-
qualified" standing, on a form provided by the City ("Responsible Bidder Checklist (1) Pre -Qualified
Bidders") by December 31 st for the upcoming calendar year, or within twelve (12) months of obtaining pre-
qualified standing. If the status of any item changes within the twelve (12) months, it is the responsibility of
the contractor to notify the City. Failure by any pre -qualified contractor to submit its complete application
for continuation of "pre -qualified" standing within the time prescribed above shall result in automatic removal
of the designation, effective January 1 of the following year, or immediately following the twelve (12) months
of pre -qualified standing.
However, the "removed" contractor or subcontractor shall still be . permitted to bid on City public works
projects, though the contractor must submit all required documents under 6-63 until "pre -qualified" status
is re-established.
Please Note: The City reserves the right to request supplemental information from the bidder,
additional verification of any information provided by the bidder, and may also conduct random
inquiries of the bidder's current and previous customers regardless of pre -qualified standing.
It is the sole responsibility of the potential bidder to comply with all submission requirements applicable to
the bidder in Section 6-63 of the Responsible Bidding Ordinance no later than the date of the public bid
opening.
Version 10/13/2021 General Conditions - 10
POST BID SUBMISSIONS:
Post -bid submissions must be submitted in accordance with Section 6-64 of the Responsible Bidding
Ordinance. The post -bid submission requirements are as follows:
1. All bidders shall collect, maintain, and provide upon request, a current written list that discloses the
name, address, licensing status, and type of work for any subcontractor from whom the bidder has
accepted a bid and/or intends to hire on any part of the public work project, including individuals
performing work as independent contractors.
2. Each subcontractor, whose portion of the project is estimated to be at least one -hundred fifty
thousand dollars ($150,000.00), shall be required to adhere to the requirements of Section I of the
Responsible Bidder Ordinance as though it were bidding directly to the City, except that the
subcontractor shall submit the required information (including the name, address, and type of work)
to the successful bidder prior to the commencement of work.
3. Failure of a subcontractor to submit the required information shall not disqualify the successful
bidder from performing work on the project and shall not constitute a contractual default and/or
breach by the successful bidder. However, the City may withhold all payment otherwise due for
work performed by a subcontractor, until the subcontractor submits the required information and
the City approves such information.
4. The disclosure of a subcontractor list ("Disclosed Subcontractors)") to the City by a bidder shall
not create any rights in the Disclosed Subcontractor(s). Thus, a bidder may substitute another
subcontractor for a Disclosed Subcontractor by giving the City, upon request, written notice of the
name, address, licensing status, and type of work of the substitute subcontractor.
5. The successful bidder and all subcontractors on a public works project are required to submit
certified payroll utilizing the federal form known as WH -347 or a similar form on a bi-weekly basis,
submitted within 10 days after the end of each bi-weekly payroll period. Certified payrolls shall
identify the job title and craft for each employee. Certified payrolls shall be submitted
electronically.
Please Note: Submissions deemed inadequate, incomplete, or untimely by the City may result in
the automatic disqualification of the bid.
The City, after review of complete and timely submissions, shall, in its sole discretion, after taking into
account all information in the submission requirements, determine whether a bidder is responsive and
responsible, and provide a Pre -Qualification Verification Letter. The City specifically reserves the right to
utilize all information provided in the contractor's submission and any information obtained by the City
through its own independent verification of the information provided by the contractor.
Version 10/13/2021 General Conditions - 11
PRE -QUALIFIED BIDDER CHECKLIST
(a) Acknowledgements:
(i) X By checking this box, I hereby acknowledge that I am a pre -qualified bidder with
the City of South Bend and that I have met the pre -qualification requirements within
the last twelve (12) months. A copy of my Pre -Qualification verification letter
is attached.
X By checking this box, I hereby acknowledge that the City reserves the right to
request supplemental information, additional verification of any information
provided by me, and may also conduct random inquiries of my current and prior
customers.
(b) Attachments:
(i) X Indiana Secretary of State's on-line records (ie. Business verification) dated within
sixty (60) days of the submission of said document showing that business is in
existence, current with the Indiana Secretary of State's Business Entity Report,
and eligible for a certificate of good standing. (Not applicable to individuals, sole
proprietors or partnerships).
(ii) X Statement on staffing capabilities, including labor sources. This statement
indicates and ensures I have sufficient employees on staff to complete the work. It
outlines how I intend to meet the staffing needs of the work.
(iii) X List of projects of similar size and scope of work performed in all areas, including
the State of Indiana, within the last three (3) years.
(iv) X For every project, submit evidence of participation in apprenticeship and training
programs, applicable to the work to be performed on the project, which are
approved by and registered with the United States Department of Labor's Office of
Apprenticeship, or its successor organization.
Version 10/13/2021 General Conditions - 12
II. PRE -QUALIFICATION CHECKLIST (FOR BIDDERS THAT ARE NOT PRE -QUALIFIED)
(a) Acknowledgements:
(i) By checking this box, I hereby acknowledge that I am not a pre -qualified bidder
with the City of South Bend.
(ii) By checking this box, I hereby acknowledge that the City reserves the right to
request supplemental information, additional verification of any information
provided, and may also conduct random inquiries of my current and prior
customers. The City reserved the right to utilize all information provided in this
submission and all information obtained in inquiries or requests to determine if a
bidder is responsive and responsible. Additionally, I acknowledge that all
information provided to the City shall be regarded as public records.
(iii) By checking this box, I hereby acknowledge that copies of all Applicable
apprenticeship certificates or standards for training programs applicable to the
work performed on the project may be requested at any time and shall be furnished
upon request.
(iv) By checking this box, I hereby acknowledge and ensure that I and all sub-
contractors, from whom I have accepted a bid and/or intend to hire to perform work
on the public work project, are properly licensed. Furthermore, I acknowledge my
understanding that it is my responsibility to ensure that all sub -contractors have
the necessary licenses to undertake the work called for in this bid. If a sub-
contractor loses their license at any point, it is the responsibility of that sub-
contractor to notify the City.
(b) Attachments:
(i) Indiana Secretary of State's on-line records (ie. Business verification) dated within
sixty (60) days of the submission of said document showing that business is in
existence, current with the Indiana Secretary of State's Business Entity Report,
and eligible for a certificate of good standing. (Not applicable to individuals, sole
proprietors or partnerships).
List identifying all former business names.
Any determinations by a court or governmental agency any violations of federal
state, or local laws including, but not limited to, violations of contracting or antitrust
laws, tax or licensing laws, environmental laws, Occupational Safety and Health
Act (OSHA), or federal Davis -Bacon and related Acts, within the preceding five (5)
years.
(iv) Statement about staffing capabilities, including labor sources. This statement
indicates and ensures I have sufficient employees on staff to complete the work I
am bidding on OR outlines how I intend to meet the staffing needs of the work.
(v) Statement that individuals who will perform work on the public work project on my
behalf will be properly classified as an employee or as an independent contractor
under all applicable state and federal laws and local ordinances.
(vi) For every project, submit evidence of participation in apprenticeship and training
programs, applicable to the work to be performed on the project, which are
approved by and registered with the United States Department of Labor's Office of
Apprenticeship, or its successor organization.
(vii) Copy of a written plan for employee drug testing that covers all of my employees
who will perform work on the public work project and meets or exceeds the
requirements set forth in IC 4-13-18-5 or IC 4-13-18-6.
(viii) Evidence that I am utilizing a surety company which is on the Bureau of Fiscal
Service "Department of Treasury's Listing of Approved Sureties" as required in the
bid specifications or contract.
Version 10/13/2021 General Conditions - 13
(ix) _ Written statement of any federal, state or local tax liens or tax delinquencies owed
to any federal, state or local taxing body in the preceding three years.
(i) _ List of projects of similar size and scope of work performed in all areas, including
the State of Indiana, within three (3) years prior to the date on which the bid is due.
Date: August 4, 2022
n Here)
Jacob K. Kwilasz
(Print Name Here)
Rieth-Riley Construction Co., Inc.
(Name of Company)
25200 State Road 23
(Address of Company)
South Bend
(City)
Indiana
(State)
574-288-8321
(Telephone Number)
Version 10/13/2021 General Conditions - 14
CITY OF SOUTH BEND JAMES MUELLER, MAYOR
DEPARTMENT OF PUBLIC WORKS
ERIC HORVATH, DIRECTOR
December 9, 2021
Dawn Armstrong
Rieth-Riley Construction
darmstrt ong_@rieth-riley.com
RE: Pre -Qualification Verification
Dear Ms. Armstrong:
This letter serves as verification of Pre -Qualification status of your company for bidding
with the City of South Bend. This Pre -Qualification status is effective for twelve (12)
months from the date of this letter. Thereafter you are required to re -submit a complete
application for continuation of pre -qualification status prior to December 31 for the
upcoming calendar year.
A copy of this Verification Letter must be included with every bid exceeding $150,000
submitted to the City of South Bend Board of Public Works, along with your Pre -Qualified
Bidder Checklist and attachments.
If you have any further questions regarding this matter, please call this office at (574) 235-
9251.
Sincerely,
Oigllally elgned by Llz Horvath
0N: cn=Liz Horvath, o, ou=Englnee�ing,
Liz Horvathe, rUS
5ale:2021.12.10093730-05'00'
Liz Horvath, Permit Manager
BUSINESS INFORMATION
HOLLI SULLIVAN
INDIANA SECRETARY OF STATE
06/24/2022 01:35 PM
,
RIETH-RILEY CONSTRUCTION CO., Business ID: 192874AO67
Business Name: INC.
Entity Type: Domestic For -Profit Corporation Business Status: Active
Creation Date: 08/08/1952 Inactive Date:
Principal Office Address:
P.O. Box 477, POST OFFICE BOX 477, Expiration Date: Perpetual
Goshen, IN, 46527 - 0477, USA p p
Business Entity Report Due 08/31/2022
Jurisdiction of Formation: Indiana Date:
Name: ROBERT L. KONOPINSKI
Address: 3626 ELKHART RD., Goshen, IN, 46527, USA
Years Due: 2022/2023
I IN
L' Eq
m 'S
Title
Name
Address
Vice President
BRIAN A. INNIGER
3626 ELKHAR ROAD, P. 0. BOX 477, GOSHEN, IN, 46527 - 0477, USA
Director
RONALD G. POPE
1124 BARON DRIVE, MYRTLE BEACH, SC, 29577, USA
Vice President
Eugene E. Yarkie
3626 Elkhart Road, Goshen, IN, 46527 - 0477, USA
Director
Jack K. Matthys
57457 Pine Road, South Bend, IN, 46619, USA
Director
William J. Schmuhl, Jr.
1421 Honan Drive, South Bend, IN, 46614, USA
Director
WILLIAM P. JOHNSON
6310 TRUSDALE AVENUE, SYRACUSE, IN, 46567, USA
President
A. KEITH ROSE
3626 ELKHART ROAD, P. O. BOX 477, GOSHEN, IN, 46527 - 0477, USA
Vice President
Paul J. Tate
1751 W. Minnesota Street, Indianapolis, IN, 46221, USA
Director
Robert L. McCormick
3205 Wakefield Drive, Goshen, IN, 46528, USA
Secretary
ROBERT L. KONOPINSKI
3626 ELKHART ROAD, P. 0. BOX 477, GOSHEN, IN, 46527 - 0477, USA
CFO
Michael Weber
P.O. Box 477, Goshen, IN, 46527 - 0477, USA
NIM011
MOMI,;11�:"\17L�(qI%�\,Ik
ON
Type: Individual
Name: ROBERT L. KONOPINSKI
Address: 3626 ELKHART RD., Goshen, IN, 46527, USA
100% Quality * 100% Employee Owned • Over 100 Years
November 18, 2021
RE: City of South Bend, IN Contractor's Bid for Public Work: Pre -qualification Checklist
Prequalification Checklist
bj Attachments
iii. Rieth-Riley Construction Co., Inc. is a 100% union contractor, and recruits through union halls as
necessary to complete the work required.
iv. All individuals working for Rieth-Riley Construction Co., Inc. are subject to our policies and
procedures. Rieth-Riley Construction Co., Inc. participates in E -Verify, and requires all employees
to present proper identification.
V. Rieth-Riley Construction Co., Inc. is a 100% union contractor, and recruits through union hall
apprenticeship programs which are registered through the United States Department of Labor
Office of Apprenticeship.
Respectfully,
Rieth-Riley Construction Co., Inc.
Dawn Armstrong, Payroll Administrator
25200 S.R. 23 - South Bend, IN 46614
Phone: (574) 288-8321 - www.rieth-rfley.com
m
..'..: ....
.1 .... .... . i�:!.E:::.3�
:-:...: ........ 1. .; .
. .'
1 ?!Y-!�:*?�i':!
. .':I.�7�NFII.X';Si;'." '.�i�3�1�1; "-k�i r -!E��'�i � ;�
, "��?i '.i'.'.
.; , . ?� 5�.'!';�� :
.z -M, -- - ...' , , -."� i�.-.'�"'.*-'Wi:;
H. �111 ...... 1 `1-14-01;1.4.6'� 0--'.;�iii�;4;!.�
" .' A, Mg
::
.:
04/1/19 ';:;
i:
....:.;
m .:. :.:::'.-::.':"::-:':-.
: !
- " ..' -."'
1: -'
:. 03/31 / 24:!"; .:.;:..::�!i::!-'.'.'!I!i;:��:
. .;:i:i::!�:i!zT�O�Oi:.
- . ... ... .:: :::;: .
:. -.:.:
..' .. .... ... . . !'i!:::�!;:�.E�i.::o
'-!::o - "... ':�:;:§.".'��iiii
I I I I . . :".... .:.
:.:,:..,
:i:i::!�:�!��]i��;;�iiii:.iii....;;'.-�z:�F:!i::: ..;.:,:.:,;: .:.::
�
.. -.....::.:. ..': .: ....
':
. . I.-.:
I . . ... .::
...... 11 ::, . ., ��::.:.i....
i:::i:M
':I
: ': ::�'-
...'
.1-1-41-11.." ' :--::.:...:t:;.::: ...... .:
' -- 5.1"T.Wif -"'I`I'--'--" .. ............. ... .:::..;.;::;.:..
. . . I -:-- ..
. ..'
. .
.1 . -. .
. .12.11- , I ... ;;.;:! ..... .............. ::.::i ...... .. ... . .
MWIP, .
-. - .;..U-y'&f -T !. ....... .
'. . .. *
4� t .. -:..T.
. :-;. I .... ' : . . .. ..... . I . ... .. . ....... %
� . W1.
- .... . .....
I
aam'.
...
, I �'; ... ,.;, I �*;k
, .1 ..
.'I�.'ix. �.E��. .r:;:��-..'-.---..-
.. 1- ..... -.- - .-
- ..' - ... - I...
- , 7"'..';'.-'
ti::".�F: - . .. "',,'.'-..,...:..
- - -;�;;:!�'::':iI:i7:-:-!.:) ::' "i;ii-.i�:;��'i5;L'�:;.;
..... . ....:;
... '. - -�*--"; ............
. . .-I..
I. �o ',
"'. ..'::tr..'.'.
-.�.:...".. :'..iiii. ii,�:.::.;:�:���;:,.:::�.,*�.:.,!:..i'-��'.1
1: - 11- ,
1,11 . . . ................. -.1. .
...' ttt -,��:--�:i7,...,,.,-,�.�.-,::;,-;.
--- ... *-**'*' ..;
� - I .. .... ........ ...... . ...
.... :.::.;.m:.;�;;
:;::H;.;� i.:'!:....-�- ".
- .,
,:�:::Kf'.1 .K� -..i:.t
_-..-I. ,,�...::*"::...":",��..,,.,..'',.:
.. ... .. ..'......'..' 1��.-.-%; .,
- ,*i
mwo!:;."..�
.: --, - - .;f��, .
, �
E, - ii:---�
'.:!."', -.".-iz -.'!--'n.'.-..'?---:.
"
.; ..
-.A . .
,%.. .
.1 '.. !: i . .. ............ ; .. .,;;;;;;;;zL . .
ii. .
....... .. , �. , '. -... :: ...;...:....
-
- .. . . . . . . . . ::!.;..;--'�-,,.:��:�. X. .. : -11-.-:�::� !-'nr'.*; '..--.'Z`;I-'.-.I:I....
.v..n. �t .7.
'.'.. ..!:;.....-.;;:::;.-:;.: .. ..... .......... .. I ...... ::!;: .... ..-
- - -.: .:
- -, - .... 11
..:ii;.jii��f.-;-.'.. :: ...... :I:e.I,:f':-::'%;�...: w;.:::.:..:;::;;�I.-' %,
**, 'W-*-'-""`f-�A-p -
i�:i��:i::,i::�l-�i::Ii:.i�:.;��:'��.:-"i ,-.".""
. .
'p. .
- :
.......... ... ..... .
- - 1:::i;I:.�!��
I.........
.::.:'
�-
...:: .::.': .� . ... :..-':�.0::"..;;-�-':.'.
. _::: �;:::
-fii.::..F ..:.:t
, -q�.-�1.--;. iI!::i::'i.i�;'i.::
�! �:!i! ii!: �0::�F:i:�ji , .. -
. I . ....... . I..:.:.::. . . !.:
. : . - v.% .
.":U
:;i:
04/1/19 �T
: :..:.::�k�...�1.1'r,,:,;.�,:Kl:k�-ij.:I �:;i..;:!::-::.;'i;'-I.
-:w ...... ;
. .. :::-:::::.:..-:-
-f�'--'.'03/31/24:' .
-.1, ,."..�:�:.-:.l�:�:".�,-i.'�,*,;i.*.Z:,::,
. ..
- - .'..: ... . .. .. � w .'
......; �:i -
. . ....
I I.:.... - ,
'
w:
": " ' ' ' :..::�;i��!;H!;;V.
, �H��.".
..
, ..
, .-,;.,.
. .
ME.Si
-....?
, ::''*.,;";:,..
I , - .' - ` ;��' . : .I.: .K. ...','. I ......
f � ,A: ,
.' t-. .;. A...1i ... b . . .:::.:i � Y: �
p-
M
--� .. I '6
, t .
i .� -R.Po'. I - I....-affe.'i .6
- - 814, !, t. ,
I W! I I . ....niiiij; �i:jj!!;!�;'T�Iii:i:
. - .. ..-�::7 ..
I - ....:::.:::: ,!.;;:.!:: .:.V;-:: : ... :::: . ww : .. ...
� .. - .. - - - �
:::;::::.:: �'. - * ......
:.:..-:..'..:.--
. .;. '.' ':. .: - . . .
- . . ..... I.... ....
I .. .
... . . .::::.:..;:, :;
....:. . --:. ,:. . ..:. !: --:.;:::%:::, .: �:�
....... ...... ;...- .. -
.
: � : 7 - : ; - : ; t : : ; . : : . . .:::. , :�:� .:: 07��;;.�::.
. ... .. . . .... ..... : ... : �'i.,,ii,:::.:::!:::::!*:....:-
.. ; ::
:
. .
: ; W:.
- - - :;:
- -,.--
.
.. ... : :. -'-, :
:
....,.::.:,.: -;;:::.-:,.,::.
:-!..!MW:.::.,::;..:;' 4 "5'
,
..; ..
; .....
-
..-::.-.:�.;;-:;::::-:..:.': -
. ...- . ......
- . : . .A
::::: ...;:.::.t I..;::.::: ..:..f� .. ..... :.
.::::;. .... .. .. ..... . :.: . '*
,.; S.::.:.i.Ei::.�:::E' !i:i;iii:;�.... ..-.-..-..-..'.-�...::!�;!Ii.-
,i; - : :
I :.::..,.;:. !!-' o ..... I ..... ...
- ."
� ;:�:::::......................... ...::I- .. .
:.: .... . - - : i ..
. .. ... :..I:..:::;:.:.:�-:..'!. .-
;.�;.:��,.�:"..:",-:�l::,..�..�.. - .. .... .
" '.1 : : i".-*.-"": ",
,
::-;;::-- - ...
- - .
2-;;:; .:. . - . .. . ..
.. .. .. .
. ....... - !
: .... .
.'. ..' ........ ..
' ' � . .
,
:::: : I
R "am :.
- 2, -,A".'.' -.'. - "I
0 a ' a -v. -A.-
t,.,"? I � Ataa fb l .06/1/18
. ..
�it:�`
. .. -.
',
/23
.. - � -
-►
. .. - .. .. � I " - .. :i�::��;:'j:.j::�j:i :it��!i�.;.�;
� ��,
: " ;
,
�
.�!111:ikl
-..
.. .. -!..:-.-.::-
.' n.
�. , ...
.. -
. .. ..' ... I.. ... .. .I . . .... .,-....
. , � ......... ..... ...... I ....... I. .....- . ...... I .. ... ... . ..... .... -....:; :��1::: : .:. .: .. .... I.. . -:::;�;i.:�!�- , ...V.t::. " .:
A WI r 1
.-..:t.!:....
-
....... :.,�:;:.;�::i:�!1:�f����.'�Te,.,
. . .::05/31
. Ti
::,.: .
�'*".�-.'.N.'.""�.-.'X- :-...r:: ...
"' . 2, 90T ::1 "
,
.: .
. . ....
-.-1-
- ` --'-- ' *-
. � �.- : " ,::: --.::�;
.. . -
: -:-,-.--;'./.VIi -� ��:�' !,:.,;. .:�'.
"': . M ... :..
, ,
:':ii�:i.,��,-'*�'-s"....'�l...- '-
" �.'
.. ...... I . .... . ... ::::'.'�::-
--;M- 1
� : -::
'
�'
,jw.*,:
...." ��--- .q.,:,:,
. IM -.11 .:. � . . . - ..... �. ..
..I..... .. ....' ..... ... .... ... . .. ... .... :.::..:...:.I.:.. %:4 .! .;
f'.1..*.-.*.�" i-'�!�'�::;::':::-- .,...:,*: ... � .... ... �..i...
n!! --
.11
-AR �;':. %, �*.'!
-.1.........
!2!, <�.-.:.'..'.�
W. .
"
. -:01:11...,"..
: .�..t
I ly�k-.�Ilklp..- �.;.
. .. ;:;: - --- - - ... : -
- - ..... w: . . ....... . .... . ..... .... .
.......' . ..... ..... ... ... . ...
.'.."..--' * ... - - " - -.-..;::.,:...;i:4.:.....:::...::..: -
. ... .............. ....' - ..... ...
'-
" "
.
� ........ .... I,.::
;- .'. .'
�;. �.
:: . t:.!:.�...:t:.::,;.::.�::�::;.!..!::.!,:.:,
-:-.::�-;::t:;"�.'::;:'
.... .. � ..... ...... ..... .
. . � ... I
, ..: I."'I:
.,::::::::::.,.,: 'li"! .... ..': .......
.. . . :,,
.. .... .. ... ... ... ...I....
'':.' t.:...- , !:::
.. '�:.::�;:�!;;.ij��.�'�i
...
.,.,. . .- . ..... ...
.. �...
..: ... .. ......' ...... . ..... -....' .....
.m , . .' '
.. .;.:::
.... ...... ��.;;:��.: .
-.. ..... .-:�i!iii.:.:ii:!::.��:.,,��:;�... :::;:;:...!:..:f......;�...:,..:.::...........,..'�.....
:....:,....:::. :.:.
'ji,
.: ..;..m;�,...:: .
- -
........ ....-...........
.
....... : ..... ::=:.:t:;::!.::..:t!.::.:::::.:.�
-..-;�' -"-, :.:::......'�;..,...,.:�:;:-..�-;::::.::.:;:,;:..:.:-.:
......
�. ..,..::.
...'. ...".-.". ,: ...�:i;:
- . . . , ....... . .. :.....: -.. - .!::: .1.1-:. .1. ..... ..'�.i:i:'. .'.:.I�,-'.!'-':'��,:!--�7::.�i:..'� . .. ..... ..
.. . ...
"' - .. -1 ... ..... ., -v , ..
... m;.::.-:.:::�:�t.::; -..::::;:%.::...:. .- -..tl;. -:::- -::..::: ... ... :i::- -
.... � .. .. ............ .. . . ... --7-:-----.��.:,��i�:�;;::i;����:::it;:i:lli;;:����:������f::i.:, :'.. ..� ..
...I...I..
............ .... ..'.... -: ...
......... :: ... ..... . ..... : -.--:.i!-: ii.:�!::=� ..... �.... ..........
-
"::.:::....
�-'-Ii:;I--!:-
,n, ,:::!:
� e "',
. .11 ..' - i. I , , ', IAIM
":iiift'j, .i&h ,���.'tir-,?,�,q,!.�,;*,�.iA�?,!,�o�',.'�',,i�"-!.4. ' �
I "M
i �',-.--'�::
(
06/1,1 8 ;
.: .
o i*�'
: - -
' -
05/31/23 �.. -i::.;::::'i�i:
- . . .:::.
. - .";.
'L I i�j m -.'.:i'.:-:!�-::.iI:.- -i�..�;:Ii:�ii:::.!",."tp--?,,.�i�
,
. .. ": -..;
," - - !:*
i�'..��"..,,-,',":!....,.f���,!,,�";:;;ir�: . -
, . :
� '"".. .",
-- ".
'
.:....,.;;;
' ; .:..:.::
.i....*: "::.:!.:
.- I . -I.:.,:.;;::-: :- ..::.:...:.:..
..: ... �:;..:. .;::..� .: :. :.::. - -'
1. ,(iik:ii;i::���.;!i:i::�iiiii�::ii:!;!�;i' ** '- ... -, :::: i:;:.�*.;;-.:i:;�::I���;!::i:!:,.!���i:: .:i,i:.::-:.;!:.:- -;::� �:.*
�. .1 .. 1, .. -i.....::;:-�.::.::-:--:-:�:..:::::.i.:i::� - .:p-:.�..:.-..
�. -... ...........- . .... ...... . '�I:'!�i:!!:!! ij:�... - 1.
.
- .... - �i��i�:ii:�;:i:�;��:!:�,:!!T;;�;-.'i� "'' -
- .-=.
�-,.
.'�:i:.::!.:::':.�-:-
'
; ...-. -.1 -"..5-... - , �ii.�.'.'�.:��.--;'-'::
.� I., , ., ,
.. . 1-1, - P, , �'*'.' -*
-...'-?" ;-..----.Pn-" i"'R2, .".,�-.'�,.-.�.��-::::,*
. . f T,
-
;:
...... . -'...' .. ....
............ ,
" `*:::';*"!:";;:7;
, ::- ...
.. - -- - .::: ..;;::;.
-f':,.izi'�-.":..�. � . ... .. . .. ...
-j�!. ..' :
I .I..
, w
'...!;��."
.... . ... .. . .:.,.:....
-
.
' �-..'.JtI:'�;'ii!::i;!;'wi
.-.
, -
;- ,:.
�
w .. ,'.. .. -
...... . . ............ ............ .. ::.��:::....:�..::;:.:::::.:.I: .::.t..: ...... :..;.
V
.. ... .. .... ...... .... ...... .. . '
" .....
::��-M� -;:::-;:.-
S'.. , ..
, -n'�:;�
- -:-i-
;ii.".�. ii�
, I.-I.I..
S
. ""M
� ...... ��-"'�."::?::�:!:i.
"
.Z...6, ..� .. ... I
- . ......!
- Ai.i -W -
* -* t��i��
", .�;:!!.'I�-"*,If��'iii:i�','--'.�i*.:�!!:'.!:;;,.--,���:;:iii..".:.,...:.:-:.:;..:::.�:.:---:.;:-.;� -,
� -
", , ,.
A '� ...-
-"�;;
-:.'
-n-,;::!:!..,.
..?.
-�'-bildm-fl--- fi"bib"ITA". p j.'.
;::!:!
- mwp.",.....
"' : 11!
D.
.,
i-�':
;�. . 17
I I.
%..:..
.:
06/1/18 :
,
���� -=777'...".
... - ':
- ... ...
-05/31
i E;;�;
- /23;, '
jj , 'L .:,-...! ...... ,.:.:.:..
-"'z;'n'....k=��il;�� �;;
!:: '*:ti.:iI: ....... *!�in' �z.'.�."�.'-"�i��- Nww. �:; ,:....:
. . : .......
�..:':' ..... . . ... - :...
, ,
". ...-...... .......
:.. t . .-::.!::! ..... .;.:;-:,::::.
.. .. ..
-.1. . A0 ........-
M
I..
�-;�, .....
.�
��O'wg�
... t��!A�i;.i!"'.-'
.:��!.T ....t...�
:;-
-.i,",.��:.::.-.i.;.-:::.-'.�::�;.-.
� ' - . :::'
... � .. 'j-'.-..i:i:::;:.i�
-:,: . .
" .!,.,.
M..$-
� ....
� ... ......
I
. .. .:.:::
- :.g'
-*.�
...... ........ ...... ..I. ..-....- .... -.."..Ki�:�'��
..�=.=' .
.. . - .....
.
t.:;;K-. I '; ;
. �:,:::,�:.:!;:::.-.:.::.t!:.::-:...;.--.:;::!...t:;..; .. .... . :,;:.:..
.�iii.. n �t `:!*:�.:.:.,...
.in: =..
�' y .. ........ I . .•. .. ........... �.. -,... ..: .. .. ..... :;.:i:::::!::: . -, ..-....",.,:..,. .
I � ........ ... .. . ...... . ... .. .. .. ..
- --:............ .... ... * ;:., ........:.:.,, .
. . . . . . . -:1- T; � :
.: -� �
'
�'.�";:;.:.:
,
::-" '.' ......... :.:.
. . , ....
' '::-
. .. . .:
. , ..
.:. ..... :.....
.zr
.: .."C...
�; , ', ... .... :..:::
- I . : :'�
I . . ...... . :
.M., . ...... : .'.
, ...... ::.
.:i.......:..-::�
. , .
.... . '...
.,
. . . ...... ;wg
, ;
.It;i:.*g :4ir.t::.�.O ... .................. ... 11 ... . ... : ....... .::
:. --- � ... � ............ �iii:iii�ii".�ii;ii�:!!�i�!tiii:ili:i:i�:i.::,:::::::�
.� ��.;:::-::::.:�:�:-:::::::.::::: : .. I ..........
.... .. I . ... .............. .... . � .... ... ;;K::.;:.:-:.::::
-OAX-All- fof�4�!� -"n-...
.� , -- -
w. - tt !n! .-, ..
.. -
-,.!.".i.' - *ffp� ,�,,�,�'iiiii!���!.;!;i::::,:,*,* . ...
- - � ' ..-..
_;�� . .' �
:.:!; -".-;�i!-]'-k'j�i('�% `19�i, .
"a , ..'.tQ. ':
.:..
.... .1 .......... .. .. :.,..;:
;;:;-:::::;::::=:;:' -::.�m..:;!
.;;
' ...
I -T -I.-.-. -
--In
7 rr. �.'�r'.'.",
..... .... ".;,. ".. .:
.. ....
. . -
.-
�
. . ,.-,-:--:-:;. i";.:::
: .::.:.;.:;:m:.:::w:::
�mt '
., .-.- --7--- ::: v?,
50:1�1 .m. ." ", -1
'r -5 'P=�:
..:: ... .
: :
:4;�:�!!!:PiA
:' '
. ... .1
..... .. 1: .
-.i.t ...... . ... .. ... .: . ..... ::..
- --...-- . . ......
-:.::::':::::.--.;:.;.;:,!:..: ... ....... : ... ... .....
- -::z,:- .: ...... .. :�....w.:..!:
.. .. . .. ... .. ....... . ............ .. .. 1.11 . ...... . ... . . ........
1111--11111�1'm'ff� tn'....
-imt.Anntl�rn.!�-... ... I...-, .... -.
. .
. '�':� -.t:';::�ii::i.!:: ,;.i
.E.;.q.-:; f.,;i�;.i.�i,���;:".;..:,;:**"� .:.:.:i.:
' - 'k
, -
. ...IN � ....
-�-. :.'.....
-:;,...:.. -..::-t:::::.:..
I .............
.. .... ... ;;;::..:.i%::: -:::::!:;!.::;.::::::.t:.:::::;::
.i.
. . .
.:. ... --.iiiiml
,.i:. :!::I�..;: ;:
. .: .:..t.::;::
.. ---
.
! i:,
. . .....' .............
.. .. ...... .::: -::.: ..... :-;..
1. -.0 ....... . - . : .
:::%:::i:-::::m-�::i .................. ...... ... � ...................... .!.. .:: . .. -...
...... ....... .:.:::.:: .. ..... .... ::.;:.;:tt.:. .:. ..:.
. .: :: --
,...--:..
....' .. .. .;::: ............ --:..=-:::m�:
...-- -..��Ig�1�4Z�!��!*�".'..'.
: . .1 =
' _: -..
.:.��l��l.�.,.,.,.:�,-..'�,�'..,. -:-:::::�-%--:-
,
., ,.,.'. - li!::
--,. -::w; . . . . .
.1 Tt 711 w -...-:t-.:-:
, - ..
.*,.. - I
tK ..;..:; ... ::..:;:::
� ' ' " *'
' - I I
w:... .:.:.:.;..:::�:�:,:::!I:,.,.�i,,�;,..
.� . -'..... ..:r,
. . - . ...... ..:.
.'s ... .... ..
.
. -..... .
::., e..� .... !:..
. .
...... �
.. .f.:.::::::...
:i :
: . -0- ... jL::
-
. - , , ;;.:
... ..:
. - " , A- M . ..:T
. ::,; ... - V .- 'N Mi;
.. � ^ ��V-.;:;
-�::-. .. '&.� ..
. - , .. . ,
., 4 . �
- " , � . �� .. -
a
- .,.,;:., . U44 �'. ;
R
r. 06/1/1 8 !i!
.- ::.
.-.:, ..... - --
H.,-
-i '�-
.:�
05/31/23 ..:
i��..*..�. ...
;.- V.:
�::. ikv.-.�!:.il�r::::�:i :�.i�::�;';:::.:
e
.. i Ififfi....',R-fla.
....;.. ..; ..-I
-...
- -I-".;.-::-;,.t-
....'. ........ .. .. .....
1-1 ";;'.."m:i
, .
.,..w :..:;. .
a . .:
:: 1:
. . .
-
- � :.....' ... ........ .
: - -
jl...'..-!'� . .::...:.:.
% .. .. .4
7 ;��..-��.-..::::.::4.:;,.:::;;;::: F :5-:t *!
� -:% �.i�.f�.�.��:i�iii��i.i::i:;i--".-.'..- ..:.-!..:.::-: .....
� i -�-..IiiHii
..... .
:=.... -!P.--.�..-!� :S:.... .......... .. .
;;; . . ........... ....--.....�::: ...........
I -::-.--:t: �-:n-I.- ... :..: .,... , - ... ........ .....
'w, "
.'....
. ..........
. ..... =.-I-Iii
::. '.-....
.: .' .........::
.
.:.. . . .
. . .. .
.-
..�-... ..:,i!;?!
�:. ".'....... :
... .-
...-
... ;r: -I. -I. _..;;.-. .::.:*�..:"
*.
- "'m::"::!:It::-;:::;.: - ":,
ii�.,.,!.�:�.�-.."i�i!�,;i;�;..-.,i;ii::-.,-,,.!;:: �!:�!
'
,.�
.".
.....*i5
..
-� -.R'. ... ;:i,:,.....:>.._.:..:..,
.i'.".-�........
,........
. .
w!.-.:.:: ... ;: .... :.::::-.:;I;.-::
�'.; . .... .... '.. .. ..:
..
...
.
.�-
... ;: ... :..:::.::::--:::..:::::.::.. I.:--.i::.:!.t:�;-:�:..:-!.::;:::::::::::;:-:.........................
. . ............ � ....... � ..... . :-..; %:I .:7:otmi
- .. . ...... . .. I .... . .......I
.
...":y"'.'K w. 1...'...
..... ........ .i., M.`=:�.'^.�
.. . . .........
-;� -::.::;.::%! ... :.;;.!-:.::!:::%'!.;::.-.......
,:�;:�2ii:��:i:.':.�.
F�
.........;..:..:::! ...
t:.:.:-.:::.:::.......................................
� ...
:'..tit --, .1.1
. .......... f...:;:
.. ........;.;- ... �I.i:'.'� :i; � ..-
.:i;.-,:- .1 ----- -.I...... - I '..'
- . .. .. ....... WNRi ;.: .... ...........
..::-. .... ..
... -::::::::::-:::;: ... .... ..... ..... 1. I... .."..' ...
...................... . . ... ... - -.-:.-�
I ................. ................... ......................
. . - ...
: .... -,
..::..::;::.
.:.:...:..,�'1:]:!!i]��:'
:.:..;:.. I : -
, ...- .Y.- i�".= .."; A...
....' I,- ::: :.;:
n.. ';- .j ..
IVI�11 , ` - - --- . .:::.
1; � -: M.
;-.!i�i:; A O' '-`f'IIPIAiS* 'W" �� t ;; ... I . I.. �
Im Z.;...Ib6'.&
4, i 1,
- -t 6
- "''
...
o ::
6/1/18 : : :
;:.-,..'
..
... ..'':i:
. .�.
-::...:
i� .. .�a :..,:,.;:
: .1 9.
65/31/23 ;:: �'-
. � 1:
... :' . ..::
i..:..,,
*... :qt:.::;::� .-!...:!...::-
- iE;;
" ** *; . . -
' ::o::::
... :..�:
tt .... ;...:
.DgO." &"Wfii; . .�
!:.::! . . :.
.. :: ili:i:-�H'.!!'��.:�-
;"Y*Y'� I**- ":"'.*::-I'-
:.;:..: -)��'�:::
N75 "T !;it!i:�ii!��;�
�.-:;-i- '.
. ::
.I .:
' ' `
::
:'�. i:,
.....� -..
- .
.......... ......I ............ .............. � .............. I ................................... ........ .. .... �..
........ .
..!� .
, - ,
. -
! , - ,
-' " , *
: ...
.. - .;:
. Ml-
. . , > .....
�'.i.-�a M.'fif ..::.::.:..::...
... J� '
11 a �` --y .i
1� - -M r -7� .*,!,;�gi:im��i�,�;:��f"." --';-.-..-.'-141t�� f 1.1il :: . ................ .
N; !.-'� ..'&G. *" PO I � b i
- " ;
TIX
"
. .. .... ..
� �::..:'%.
......1
.1-1-1.11 .'
.,.I.,. ...... . �.
.....:?"..-'.-W.�' I ' ...
�. -
I.il� .M.,
- .* .
, '
'. ...... . " ---� ..:
�r,ma., ii! P.R. ",
` , . -:::mi-'-:
I �.�'� �� " �::-I','
...
�.' .!- - ...- -
.. . ::. `
�: -t ; �.:' .-VI.,".
-
-i� .....
:" ---
�'
. �
.1. :1
.... I ... I
, ." ..' ,
� ; �:,,
* I- - ---*
. .. ::.'.:.-.':'0"'�`.,'.-
..... ..... ..
- -.'..:-:..I.'..IK::h?:i'.1. - ...... -
-.-.--.--.---. .
...... I ..... . ...... ; .
... ..;::":7i
: , . . .
.--. -Z -.-.,i�-:,�::.,-�.; �.::...
- � , " i"'i-1- `�;-'.:
- .. -- .
..*�.�.* .. ..... I ... Ii2: .",*:.:..
.. .... ...... � . . ............... � . ... .. � . .....
-7, ;:
'A - :
v: ....
--'� �:Z ";..,..
--..- ..o.,31R.I. '.
. ;
.:;:::".,
� . ..
-
�
.1.
.. .. .1 ..
... ': . ...
r
.... ". - - .. . ....... ................
.....;..!;:'C:..::I ........... 1�1'n 11 .... ..
"! ..:..,.:
. . ...-, - ...... :.-..::.:;.:.;.;
:.� .. ..... . .....
. -- , - - -
.....-'k-.7 ...
- .'� - -Iei:;...t�� m .
- L ; :I...�:.:.:.-...'.
- - . . . . . ...... ....... .... �. � � ::., .
- -.a..:�.�-...
:.:;: ;..: :.;; :
.
iT..::: .. . . ..... :
. ..... . :: _:..
i .; .:....;:.: ...
I :�,-.;..
.......... . ... -
. ;.:-,: ... . . ..... - . �
., '-, a
... i A "I. - !R..il
" ':03/31/22wi.:.
:
: : ... � -A-i�"f-:% I :.�If�;!; ....'.;.;i
I' 12"if. . . ... .. -..
-.%.-��:.t.....: .. . . ... ...... . .... .... � ......... --� ... ::!.:. ;:. I.........
V:...:
04/1 17
/
... .....
:!! !`��v!]f"::l!"'Iz
: �i :. ..,.::,..:::;
.:
-::.-:t
; ... .. --:.,
..'
I ... ...- ....... ,
, . .. .
. * . . �..
.
NMA' ��11.1 w.:.:.' ..; ,
.. . . :..
, , - . : �
.. .
t; .. ::.: : :.:': .
:: .V : 11; . ..... . .1-
.. ....; !: -.! .. .:..r.
................-- .. . ..... !..I. ...
-..:: ....- ...... �.... --
.... : ............ .. �
.:.... ...
.::::: -
* - Z:.::::,
-
- .:;:;:::.",.-
a L........
R
. "I
:: .: ..'
.;t ... :::
....
.. .... ...
...... ..
W.
.: :
�!.:�:-.'-'
... . ::.:::::%�=::.::;;:-.:;: ...... .. .... .... ..... .... A..... .
-...- .... ............. . ... ... .. .. ..i;i!!:;::I'i::i:!i . ...........-
.1 .......... ...- .... .. ..... .... I .... -
.1 ................ ........... ,:n- ...... . - a t:..::.-�: i::::
* ........ ...... ........... ..................... ::;..::::�:..!: E::;i:::... iP:!!�!'.:I!.!-....:.- .......... I ... .... . .... . :;-*:::::t::.-! - - - �::. -
.!..: -:::�.-:%t;!:.-%.::!-: ... -
:'.H!;:i;!i!'.]:!:i;iT! .; ......... -... .. -
- � ........ � .... � ... .. .. . .. ......... ���::.!:!Ii!!i;;i:ii:.i:jj�:!;�i;;;:;i�;.::.::....:..:;. ...... ..- ...... I ...... .. .
::r � ..-.. � .... ....... : .......... .. ...... ....... . t� :::;:;-p::- -.:...
.....:
I. :
I :::i...::!::-:-::::: t-::;
.. . ... ,
'. ....... - ......... :-:::;:::::::::::..:.:..:.:::::.:.:
-K V � . . . . . :.'H!;:i;!i!'.]:!:i;iT! --.
' ..'.... .. ::
ii::. '
..,
::.4:. ;..:::::;:;.;....�..:....::::::;:.::.::!..::i;��.
I
, ..
... -::...;.;i :
..
i .....I....
-:;.. :...............
.. -
. . . .:..: .. ..::-:-::::;7...:::::.:�;;-:::::-::a ---.-:t: �-.;=.:., ... . .. . .
. ...... . I... ... ....... ..-.-.... .....-... . ..... ...7 ... ::.:..!:::..-
-
;. .-... - - - ...... � I I
..- - -.-, . - - ...' ; - . I
�' 4;��i - :A.;�:
- -:;i
.1. :.,.,; - ..-.. ..
�'Nf"A":;F :: ;: I :
I - � � . . :::*
. W....
i .. I
, O "" � "
...Pcm. I ..' ; , . - 7.. V .t ;.: ....
- - . . . . . ....
:.: , ; ... I.,..:..
..... .. . --- : .:...,:... -:�. .:;.:.: 1. ..
.:..:.:...:..:..: m: u .'.I.. .:.:: ... ... I ..... . ... . . ....
.: ..
......--
�. ..... .-..
...... .. � .. ... .... ,- I
. - - ...
- ...=�..- ...... . ..............
a ..I. .
.
0411/17
. .... .. . .. .. .. . . .... ..... .
..... .......... ... ....�.....�
- , -
.. I. - ... - -.41 ....... 4 I
. .
.- . .'
. . .. .
-.---'-�V�'-���.
.�
.. :' . .:.
. t.
- ."":'�' 03/31 /22 .� - .'.
. : . I..
. � �
..
... .... -............ . .. .. - ...
-... ....... . ;%!; -�::'.:.:-'-!:;.::: ... ... :.: .. -:...::.';i.:...!::.
.'. �.'... ... ...... .... . . , . '_ '-I ...
..'
� ?. .. .
'� :.
�-- - -:. ra �;�mitii.,n-i:..;�n ;' - .
.. . : . :
...:..... ... ....... Ilk, .: :.::. . ::;:. .. :::
.�-rl. .. ,. .:. i ,:!
.1�!�:::; w:mm .
. . ... . .... :: w: ... :.!1:7
"; , . . . 1. .. - .:.;:V.o. � ..;
.. ;. ... , .. �----- * .:...:.:.. :.::!�
: ' I
.. ... -.......-
.: .:: ..
.� ::::::`:;:.'..�
_ -..... -w'. .:.
. '...'
!::::: : :::.:.....
I ,':�::mn I .. %% .
.w ,
. . -
."-,.
, -
---
*�..K
M --., -..
!-.i!'.� -
...........
.-!-;.-:;:...:::.:..::;.:... .......... ........ . .......
::: :.: . ; . :....- I ......... ... I ..... 1. - .....
. '.i.::!,
. �.: . .,:;. .. I .. .:: :, ........::..
. . : ..; ..'. I ...
.. : ... :. .. -.... . r� E: ..-::..n;: ..� .. . .. .. .. ....
-.....gZ� . .. .... .. :, .!. -:.
. .: -.. .: .
.:: ,.. . . -
...;. -,-:-:::.�:.;.:;.�..::: ..:
�:'ffgfz�.:
.. . .
. I .� .
- .�. .'
I . . ....
I ' . :
*.-
, '��
.1,
. . .;;:...
. . . ,..
. *� ;;;
44" ...
"..'..;,�I.I.M.I.I.:-�
_ "
-.�' .:
. :
. � -� .1
; - .:i:.:. .�..:�.--',�::..
.- -;t;::.I;;%-.:.':::-:-.
..F., . I I � --
- � - " .
- ;
,
I: "*,:. .. ..".....;7, -
---z ..,?.. -
'� ... ;.'.-...��'*'-:�';*.--- -"*'+
%.-,-.., � -
;.' . . . . . . . . 9.
.?�
mf
-.... . ...
: - I.:*.,...::.:..:. ... :M.... ; .. ..
.. .. ..... �. ,.' �
... ..
. .- I- .. - - ....... ::.--.
-".I.::'::-�..-.: ... f ....... -., ...... . �. 4..i."'
--- .. .".
---*"'.-
..I.....
- �.::.i*":i�.,.,I::,:.�::i:::�.:::;:
.;.. ..
: T::..!,
:..:.;i;.
... . .:..::,.
.." .. : . ... . ........ . .. W. .. -
: . ....p'%.'ti;i"-'-....*'
.. ....� - ,:.:,.
".,.,..-,:" .
... ...:....-.... ....,.....-....., .... . . -
.'
.. - - ..::.:::;.:.:: 1:
t
........... I .. . ... .... -.. .......•k^:>...�
'...--* .. ....... : a.:' �
:...;. ............ �. I I ... .
:
, :.
.:
04/1 /I 8 '
..� "..'."":
:::'..:::..:.
.:....
:.I:%:'03/31/2;.
"
: .: : U-
3 -
I � .- -
...... .. . zi.i;..--.'i-
.�..,.,;��.,.,.;..,f....111�.":
- ;i -ie ;"
. - - . ii
:..;::
,0
, .I,
": . MC40":::*::�.:�:."
- . .-
A" t,.,,::�.. :..z..,
A .6
. -
Vit.? I ..........-'1"
� ,�.**:i �i:r::i:i,
..*".:. �:,,,�,kl��i::]!,.:i..,.";....iz'
..:. �
' -
: .
,. "I
;. .'"I",
!-
:;.;:;,ii;�ifirt,
:. ''.-
.....
:.
:-
- - ...:7:;
- ............... -
. . . . . . ....: la.:i:... ,.::::.. � jilfz.? -I.....--,..;;.
��':":.;.:; ... ........... -.'..�
: ..... �..'x; *� I - ..: .-..., .... I.......
. w ..'.fir... �. .
'i '.';.�M' :R�'*�Z-�S':--:;`* .... :
. i - 'Ig F11 , , "
.. 1 4k 4- .*� I.; ..' - ,
,si�
I .--,
- it 'T �'re.-'...'O.*'?mr-- I.A. IN - , .,--., "�i , - z"*:IE:.:-.J :::�;;P:
I ... .� - ..'-R '..
.".1.-..I .,
" .n .- ffl'Ut"d ' I
..... ,
I ; ;-.
- M.N. -
.' -V�I. .". .. ....... -
. . - -
-.2"'"f- . ..'-, f."
- .
.-.1-1111i�azsmi��iz�� .'. I -. '-
0411/18[�'] 03/31/23
. 1:
F:.�:-....:.:
-��O ,
:;..i.......'
.. .:...:...w.:..:
. ......--.1-
$��!.-;
-m!..-- .... .. .. ..
... I ... . . ... - .....:M:"�
. - ...
............ .. .
. :::. ... .
...:.
. ..
� : .
- 05
.1
.� * .A...
...
...� 04/30/23 :' -':;:.-;!�-.`!f---`:!W
; -.1 .:. ..,
* . .
- . ...
K."."
.,-�.-:--.-:'
� W "I I. * . �....
*H4 - ..' ....
-.-..�. . .' .. �' , . i �.. . .=-= ...
B
��. --- AMM.. , ' --,:,-;
- .'
. ..... ... I - -
�.-.-.'...
�- . .. ..... .
..� .� -r N ;:��i:;;!�*-
..
-�::.-.w W:m: i-Y'.S
", :'
.
- --- -
.. .- '. ''. - ...
I....$. .1�-.;.;..;;.-.",�-.1-11;.,.....�l.;:,.�.;i... - '. . 1 :0 . ...t - '�*
.K".'. ...; ......... . � ........ 1, -.", .:-.x", *
. , ", . ,f :. -'...1 . . . . . . .
.� . . .. . . �� - '; i I, 3� �: ':� ** ....
-':;�'.......--g'.' ..'.�'K'
-t=:.:� .:::.w:m:- "
.. , . � aii. .. .' '% , " *-*e MR -E., � .....
� , , � � � . , ,
. , - i .-.. *'
-7-P?-.L- ambalt m ... a(em. :8'1�;' iadvat ." -
--I --e- - -"I
.:..;: - -
- -1 ' I
` "
..... .. -'� ..... ....... �; � , -."..."'. 7z.. .::.!.:..:..
" ...... .-
` "' -
-.. ....-.....
, ..-u' --� ..
, I
F..A...;:: I
; -i.....
.
".:
;.'...
-...
-�:.1%...... . ..,. .: ..... . ...
.::� t ...... -.. �.... .....'
.. .
:..:
;..:-T.::
-
- /I
..'
!. ..'
"',
' .
------- -
-
I - .... I
kl'i I - . ,
I ::
".I:: '�-- - ... .......
:"::"
:::
....;
....
.... ��
.,�rt[
..%
.' .'. .
. .
I
... �
. ..
.. .;::'T:: .-...
I . . .11'1.'.'� . 1; ...
.i .4
I.
I. I --
NO-.:.,
:;.:
I - -..:..:.:-.: -
,; :1 .;.t.:
.� �:
: .::: !;.*.:i �- --i::::.;:;�::*.::i
-:..i;;:.- .... I........ .:
...:
v:::-..;:: .:.: .- .:.:..::
�;;! ' :% -:
I..... : .:!:.:.... ....
- �..'
� .
1.: -
:� :X
I ..s .....
. ,
... "6�."�f.,;';-.... . .
..-I �
........ ......... .... ... .. ,
�.--- �;�
w- .
." ::::::::::;-:.':�: -
., 1.
. . . . . . . . IN - ...'
.
- i.
. .
. .
. .
. .
. .
. ...
� - . ....
-
-
-
-...-�
.. -
...;-.
.. . ... I .
.- .
; ........ . .
---
- . - .
. .'. ..
"
.. :. - ........
. . Lat-,
"ti. '� :. L`.:'� * ... :::,:*:
.. 1� ; ,::::."I::.:.:
..... !:.
--
- : .-.-..:;
' - . � - I :-;.n.:..
'I.'-'-. , ,..............
.:�'
- .
I ,..
F- .7-;:'-'
�:...-......:nl . .. ..... .. ... -
....... .. . i.--;----..:-:..;� .. .... .. :.:t....:.;:.:.;::;...;
.. :.:.;. .. 7 ... .
. i;:�: ..::., ... .1 ...
:;i,: ..,.::;: . : .. .:.:!.. - ...
...I.. � . .
.. . ... .... ..
": " " ''' " "* ' " '
. ... . .... ....
.:.. ::::..:.,.; .... :... -:I- ..�.::.' .:
... .:..:,. I :! ..... I. .... -
.
..: .... .:. - .
........ .. � .. - .,
..: - ..:
.m. �.. 1. .... il
: i :. .
..,.:...
�..
** 'i': ��
�. . :.: ;.
. .. �..
-
:.....:
.. I.
- .: ...:..
:. - ..;
.
---
. . �
. i
.... " ' ..... , .
.0
•..
;:..
" " '�� "',
. ..
. . � ..
' ! 04/1 /I 7
. .V�T�T!T;�� f?TMff *I!
A�' �'..J.1-1,11'.Irr � 7'TTTITN" t�'�'
.,
" ... .....
. ...i�:.-t:,:-� .
.::. , -, �;�.
'.: .;--.:;-rT':�.]i'----:
. .' '
. jf'- fb . � .. ...,'
... .: . . ... .
- ... .
, ij 't':Ri -W E
- ' � 03/31/22 Al .'- .1.6
I-.�! .".
-YiT. :' 1. -.::t
.... . '
.w.
..
....
I
.1.7�77=='
.,.I.I..'....%' -'-:-777'.-7:--F7�
:----.--%-
.::t .... �.' -'.�"'."�..'.K*. *:7E.
.11,
.:...; ..... :
..:;.: ....:.
� - . - ...:
� , . � ... ... ... - ' .. ........'.
.-r....., - -
. �.;.�.. -
I:--' --.1 *........ . ..". ..g. -1-
'... .. .'. . � �.-�--.--.-....-.-�-.---..-.--.�-.- �---.-�------.--.....-,,-.-..,... ---g!!gn�!!!!!!i�gft MT�i
. . . �2 ..-.: ...... ..�... i
-
. . � . �A ---zm�--"--
. i. , , , .. :
W.- pgq.'�---gtig ja . ...... -'. . ...' ... . -
... . , ..'� �'- pg' - , -- - if'�6 - m wd -. - I - .�.. I
. . ;- ; .." I X..'Ng' 4 .b -
A.D. d . '-frfulp . , � i
- , R od I 'I J.... y L
... 1--...... . .g , ...q
. k - .1
. ........ .", - ........ .-. 1. .i
%'. - - :- 4.:a:
' " i
. ....:.
.... .. .....
.
.. .. n :.::.::I- ;..:-:::
; .......
.::
� 4t."... :�!i.` ,-..,.:�:.;.!:!-�;i::....:.7!1.:.:....:-...,:.,:.....-..:...".....4:*:,�:,:."����'']!�.:t::::.i::::::
- .....-'.� ....
..... ; ..:.. -..::.:t ..
.. ......... ..::. ..i*
. .
.-
.. :.. -
.. -....
..
: .. *:-:: ...::.:-:....
f.:1:i:��:�'i�!:
: .
A,: ... . �
.. ... .
. ". .I:
..' ..:...:.!: ..
...... . ....
"
F., . -. , , , ::� .
. ,!;::N:i�.'--.'.-.i!
... - - � ------- -- ..-Im..'
� :::..� -
.- , .�.
.w-
.... - - .. ..:'
. .. .. ........ I .�':...-
.
.....
:;.:.:;i:';it.::::..
:;
�:--.i�.mm..-
"i.�i.*:i...ii ..-.---;�
... :.....
i .-';I-'.::.�
..":.-.. .:,.
:
- .."N' � .... ......
q ,., ....... .
- . . . . . '....;
� 4� ,
-- . *1 M: N � :. .�:.... -
, .... .::;.......,.
-';:'-"
'e..' . I I.. ... ti: -.-�;- .. --::-. ....
..
- - .. . ........ .. .. ..
.". - .. I
.. ` Or , A : :.:'.... 1:
- � !. . Ak .
"ki,IN '811-f'i -.-'� .. . '. . . : .iH::'.;'
I ,
- i Or %.. I.. ;::.. ..
. % *z ....-
--- M- �'
, � . . .
1: .. i
":fl;t 1j'. i ::.i:i,.:
..': .:.. ...:..
.
..
:: .7.::,i:::!:! ::!.: -17 * - .:,., . ... ". - . ...
,.. .:!..:.i.:..
. ...
.: ... .:..... : :::.,.
. .:..: if-
.... . .�
�. ...
'. -i ........ ........ . .
.:.. k
fliO4/1/17
- .. .. 1. -.1- I ..
: ...;A, 11 -1-1--.1 ... .... .. . , -1 ... I ...
KI. .
...
".'. .
:"�!;� 03/31/22 .. :. :'-.:i.�:i."�.
.. ...
I...... I ....... � . ....... .. I....., .... .. . ..... .........
. ....
;-I-w .... :.'.'P�:':'��.�"��: -
... !� .
- ..- - Z� - -'.. �
- - f. it -6-4;- .:.. ::. -.-
, "T, '. . "
W ti. to .J ' ;. . !;."'.
I :1 -t ** w.:
-'.:K!�, .1-IT.FNAR.": -* '
"
.. .. ......... ..... ...
- .. Z- - - I............ ... :.:::: ...... :::::.:: ... ... ... I
, :0
. --- -11 .:%
.11 �---. - : ... -
,--..- "...- .' . .
. ...... .�.� ,;, ... ... .
* ---% .I.... "
-"K5. HR�� .
� ' '
. . - ...... I . ...... .... -..... ...
. . � I
- I "I
- I. * I . ::: ...: ... �. ....' 1. .
.��i>.':��l:.,."i::il:....,',�:i:�i�i::;:i,.:�
.m....
-� :.� ...... -... .... I.-'..��'.'...I-'.--::
M.t:;:�!:;�� ;:.�.::;
.:I ..11;..'!�!:i�,�:.:!:.!:;!!:::Ii�!iLi,
-,
. ...:!t..: ....:
..'...-I.;.:......... .
;.:::.. � .;�M.;�......
. , --�'.;<.: ..�
! 1. "�' 1W.",�::%
, �aiNj �' i..
.;
A . �!I�r....:..:::'.;.:-':.!.
.
:n::*.:..:
. - z
4 tt��� ,
..: ...
, . ::..:....f
;:..:;-'::.:...:
i. - - -.:
... . ... ...... ... 1..:
. . .:; - t-.:.--:..:
I...-�,"...."..:7.11.�:1--l'..,
- ;:.:!�:ww-:. it- ����
-;:!: -: ... ... . :
:::-.:. � - ..::
--.-: --
I
.. :-;::. ..:
- - .::!:
- -*T..::::-;i.
.: ']!i�:!:ii;'.-."!
- ';'k�;.:�;:t-' ........
t .:.
, , , � '� ... .. . . , . ... .......
I -it . '.',�. � .... :.-A..: .
-AI-11'.�^--w. N.z I '.:;��
.
.F..'155i. -m I W-R.&I.M.31 t=
'
d 0""m j I xl
�
� I'-
.1i -'�1.,:�'-:�
-
!�.;��.�::::���!�.:i�,:.I!i�*.!�'i.:.;.-'���i...-,z:.--.-,;,-;-v;v..K�.�..-7--�f�-i��,.::;�!�..
..
.� i: i
, -
...� -.-.-
_g-j:;E-';.::.::!:�i:::.':;i:;
- -..:..;.: .. -
:T�:�'.'!-i:;:-i--;.:.-
...
- - :
.�!�::���:;:i�:!��!��:i��:i!��iii--p
:; 04/1/17
'...-
- ..
: -;-- 03/31/22
-
I.
v
. .N..-,.
' ' '.-
.......
:::�:.I::*;!.;:.;V-'
.
' �-..'.JtI:'�;'ii!::i;!;'wi
.-.
, -
.'!-.'�p%'-.%-..-:i.:.*;.,..,.
n"."i., . � ." ,
�'F..: - - "." " - I I i I [:;i�:ii-.��..:':::
-... '.. ......"�M* 11��.
.. I I ' :-:;;.='.."Idi!i��Pif;�
K�- �z! - -'-5. ,.' �'J:'%;
as I -
; "
.... .
'_: ,: .
`*�.:. :..::i:j..:t w;.: -,*::
.'-�'; : ... ::.::.-
... ..
........:.-.� --!-:�-.::--::..-: ..:.:
-.:.�.-,:.:.;.:;.-: ... . ... . ...... '......-
. .. .':..:..::..............
'. -:;
.. ............. I ....... . .... .. ... .. .. .. .... .. :
:.::;;
. 7
..: : :'
-t.:...:
L. ::�
.'..-. -m;:'.-.::-..I.
: 1. :.;
-....... :.::.,
1: -...
. .1,'- ::.;.
� [I -�..-.
. -I.:'I:::'.-:::: I...-::..::
. ,...::.;L:.:..,::;:.::�;::.'!..'. . - ....
. : ��;:- ..i-:*'::i;!.'-E*.'."i*:
-..� : . -
::::2.r.
: : . : . -.�� `.:..;: .. ..... �:.::��;
... ......... ... . -...:i:.. . .W.,
::;:!'i -;;;:--.'.R!.--
:...;:.i!..:.::.
.. -
.
.' ��';�".;.:%: t
.4�-..�-.. - -;:-t
. ....' .
1. . !!::
. .. - ---q-w;::.! - :
. ::�.
� ... a , , -ell, I "'t . ,
�..... .-: � . -::.:..
...- � , '�'"" 'A'7.' .:T.::i � ;
7 I ..,"-, I., ".
T� ;'.�.' ,
... IS 1; I 71. .',
I .. ..... :;::
- *A --- ::.:. - -.:.. .
........ ..:. � ..
05/1/17 :Jt- ,*.',* 04130/22
If(
RIETH—RILEY CONSTRUCTION CO., INC.
2018-2020
SAMPLE WORK COMPLETED
CONSTRUCTION
% OF WORK PERFORMED BY
CONTRACT
PROJECT NAME
OWNER
RR JOB #
MANAGER'
TITLE
PHONE
TYPE OF WORK
LIR
COMPLETION DATE
AMOUNT SURETY
R-28973
INDOT
3648076
Gannon Carnes
Project Engineer
765-307-8434
Asphalt Pavement
70%
6/30/2018
$23,068,538 TRAVELER'S CASUALTY
I-65
AND SURETY
RS -39572
INDOT'
3408052
ErikSeef
Construction Manageer
765-361-5218
Concrete Pavement
83%
5/1/2019
$10,334,676 TRAVELER'S CASUALTY
US 52 South Budget
ANDSURETY
R -41350-A
INDOT
32DB26B
Ling Gan
Project Engieeer
765-745-1717
Concrete Pavement
79%
12/12/2018
$9,158,700 TRAVELER'S CASUALTY
1465
ANDSURETY
R -37443'-A
INDOT
3208248
Don Yost
Inspection Supervisor/
317-443-7241
Asphalt Pavement
85%
10/29/2019
$4,711,574 TRAVELER'S CASUALTY
276th Steer Recons
RQAW Consultants
ANDSURETY
Elkhart County Highway
Elkhart County Highway Dept
370741
Rick Easton
Technician - Engjneerine Section
574-534-9394
Asphalt Pavement
93%
11/1/2019
$4,259,982 TRAVELER'S CASUALTY
2019 Paving Program
ANDSURETY
RS -41963-A
INDOT
3548127
Chrisi:len Reynolds
Area Engineer
219-325-7524
Asphalt Pavement
26%
10/1/2019
$3,738,878 TRAVELER'S CASUALTY
LaPorte Patch
ANDSURETY
Duke Energy Plainfield
Terracon
3200766
Anthony Zink
Program Director
937-763-7078
Asphalt Pavement
83%
6/28/2019
$3,531,558 TRAVELER'S CASUALTY
AND SURETY
RS -39978
INDOT
3408059
Paul Balaba
Construction Manager
765-375-9130
Asphalt Pavement
86%
7/1/2019
$3,355,045 TRAVELER'S CASUALTY
SR 28 Clinton Budget
ANDSURETY
80/90 PUSH
RR CONCESSION COMPANY LLC
•3681000 Brian Cherry
Infrastructure Manager
574-651-2464
ASPHALT OVERLAY
62%
.5/25/2018
$201,811,661 TRAVELER'S CASUALTY
CONSTRUCTION
ANDSURETY
R -33860-A
INDOT
3208207 Gary Kreutzjans
Construction Engineer
812-54-3739
ASPHALT OVERLAY
75%
6/3D12018
$28,592,864 TRAVELER'S CASUALTY
1-65 DESIGN BUILD
CONSTRUCTION
ANDSURETY
IR -30143-A
INDOT
3518019 David
Barich
Construction Engineer
219-362-6125
EARTHWORK,
50%
12/17/2018
$25,602,940 TRAVELER'S CASUALTY
US 31, US 30 TO US 2
CONCRETE, ASPHALT
ANDSURETY
I11 -30132-A
INDOT
3618011 David
Barich
Construction Engineer
219-362-6125
BRIDGES
39%
12/16/2018
$28,775,479 TRAVELER'S CASUALTY
U531 NORTH TO KERN ROAD
ANDSURETY
GARY AIRFIELD PAVING PROJECT
GARY CHICAGO INTERNATIONAL AIRPORT •3640934
Steve:Sandefur-NCG
Construction & Feld Service Mgr
317-258-ISSS
PCCP RUNWAY
41%
1/28/2018
$12,190,296 TRAVELER'S CASUALTY
EXPANSION
ANDSURETY
INDOT
3208224
CliffWalker
Project Engineer
76S-745-2759
EARTHWORK,
66%
12/10/18
$10,381,780 TRAVELER'S CASUALTY
I11 -35914-A
•
CONCRETE, ASPHALT
AND SURETY
US 31 SR 28
Ed Wilson
Project Supervisor
765-617-4357
Asphalt Pavement
97%
6/1/2020
$41,006,016 TRAVELER'S CASUALTY
R -39093-A
INDOT
3208260
AND SURETY
1-69 Design Build
Corp.
32PO735
Sri Venugopalan, P.E.
Director of Engineering
317-614-9305
Combined lob
53%
4/20/2021
$39,208,121 TRAVELER'S CASUALTY
Indygo Red Line
Indianapolis PubllcTransportatlon
&Construction
Without Asphalt
ANDSURETY
3208295
ling Gan
Project Engineer
765-745-1717
Bridges
59%
10/31/2020
$34,761,346 TRAVELER'S CASUALTY
R -40511-B
INDOT
ANDSURETY
1-70 South Split to 465W
Project Engineer
765-745-1731
Asphalt Pavement
87%
10/31/2019
$21,562,318 TRAVELER'S CASUALTY
R -41769-A
INDOT
3208280
Sean Hendrickson
ANDSURETY
1-465 Northwest
Project Engineer
765-745-1748 Concrete
Pavement Restoration
56%
9/30/2019
$15,636;213 TRAVELER'S CASUALTY
R -41351-A
INDOT
3208281
Dan Streib
AND SURETY
1.465 Restoration 2019
Mike Hoff
Sr. Inspector/
317-417-0256
Asphalt Pavement
94%
10/11/2019
CASUALTY
$12,420,988 TAN
RS -38664-A
INDOT
3208265
Project Engineer
SURETY
1-65 865 to Lebanon
Area Engineer
219-873-6322
Asphalt Pavement61%
5/10/2019
$10,610,066 TRAVELER'S CASUALTY
R -40878-A
INDOT
3648110
Cortney Beale
AND SURETY
SR 14
Director Hammond Po
219-808-8070
Asphalt Pavement, Earthwork, Bridge
25%
10/1/2019
$9,680,534 TRAVELERS CASUALTY
Wolf Lake 2019
Hammond PortAuthority
36412DB
Milan Krusznskl
of
ANDSURETY
Project Executive
317-661-1000
AsphaltPavement
90%
1113D/2021
$9,418,275 TRAVELER'S CASUALTY
Greenwood Park 65 South
Pepper Construction Company
3200814
David Allen
Curbs
AND SURETY
Building 2
RIETH-RILEY CONSTRUCTION CO., INC.
2021
SAMPLE WORK -IN -PROGRESS
Proiect Name
RRJob # HIDE
Owner
[onstruRion Manazer
Title
Phone
Email
SCOPE OF WORK
Contract Amount
%Comp)
Pro! Compl Date SURETY
R -41542-A
3208340,
INDOT
Kirk Stafford
Project Engineer
317-650-1890
kstafford@corradino.com
Asphalt Pavement
$181,601,711
6%
July 2025 TRAVELER'S CASUALTY
1-69 Section 4
3208342-48
& Bridges
AND SURETY
Toll Road Push 111
3681014
ITR Concession Company, LLC
Brian Cherry
Infrastructure Manager
574-651-2464
bcherry@indianatollroad.org
Asphalt Overlay
$61,168,876
41Y.
December 2028 TRAVELER'S CASUALTY
Construction
AND SURETY
Tall Road Push 11
3681010
ITR Concession Company, LLC
Brian Cherry
Infrastructure Manager
574-6S1-2464'
bcherry@indianatollroad.org
Asphalt Overlay
$61,112,626
88%
December2026 TRAVELER'S CASUALTY
Construction
AND SURETY
16 -ENG -05
3200713
City of Carmel
Timothy Conarroe, PE
Project Engineer
317-547-SS80
tconarroe@structurepoint.com
Interchange
$31,685,314
99%
May 2021 TRAVELER'S CASUALTY
96thStreet and Keystone
Construction
ANDSURETY
Const Inspection Section
R -39504-A
3208296
INDOT
Cory Mahan, P.E.
Manager
317-780-7262
cmahan@chacompanies.com
Asphalt Pavement
$30,090,075
26%
October2021 TRAVELER'S CASUALTY
146th Street Over SR 37 N
AND SURETY
R-37797
3408086
INDOT
Clayton Pergal
Inspector
765-376-0471
cpergal@indot.in.gov
Road
$27,227,764
1%
September2024 TRAVELER'S CASUALTY
SR 26 Clinton County
Reconstruct
AND SURETY
11016-130008
7118264
MDOT
Kenton McAndrew
Project Engineer
269-270-7313
McandrewKl@Michigan.gov
Asphalt Pavement
$23,784,327
7%
June2023 TRAVELER'S CASUALTY
1-94 Design/Build
AND SURETY
R -39500-A
3208283
INDOT
Greg Peterson
Project Supervisor
765-570-8003
gpeterson@indot.in.gov
Asphalt Pavement
$22,251,736
97%
June2021 TRAVELER'S CASUALTY
126th Street & SR 37
AND SURETY
R -31319-B
3408078
INDOT
Gannon Carnes
Inspector
765-307-8434
gcames@indot.in.gov
Road
$15,640,800
2%
September 2024 TRAVELER'S CASUALTY
Teal Road
Reconstruct
AND SURETY
210004
7508232
MDOT
Shaun Bates
Project Engineer
989-773-7756
batess2@michigan.gov
Hot Mix Asphalt
$13,247,055
0%
October2021 TRAVELER'S CASUALTY
US 127 Clare
Cold Milling & Resurfacing
AND SURETY
participate m. the, GI educational benefits program A copy of our approval
aloe ..:with .ahe...:_col ectiye. bar ain n a reement statin the xat .0.
— _of_ J:
g g::..::: g ..::<::.: ........:
g .:.:.::..:..................................................
h�:eh.1s::'one::1..: A rentice for .eve dive 5 Journe workers
A rentices . w P :.......Y::
__..................pP.............................._
.
11V_t;Glll lU 111V1L 11C1L ...t Z k 1V 11;1t+v,.lv1 :v Y,Vi, ,`.�. f .l vN1s1}r, rr vii�vt.�
after may
soup
Eric Halcamb,
James .m: srown, Id.
.....:........... ........... .
J uary...9
;Phone Toll Free (800)7400-4520 : Fa5((3l-7)434-8.744
::i
beax...amy.. ........ . . . T
m
rip.:H.9166ffib -::Gov
mes' -Q,w
n Director'
m -y...*9 . ..... 2-019
4ah
ViT. ...... ..... .
. ... ..... .........
ge
-hn.*:.--.-..- WM ofer.
Seale::&OA*$,`t 10"";
........... . ...........
... . .. ..... ... .. ..... ...... ..
'EA:CILITT;::"CODEt"tl:3.'O..004114:
.... . .... .. .... ..... ... .... .
. ......... ...
. .. ... ............... . ......
.. .... . .... ..... .... ...
.... ....... ...
3. hl' - A
effective *:Of
-.'C-:,o!*;,d& 6 `
....... ...... . .... .... Wjt....... .. ... ... ....... . . .
Ages ion
9P
6 f.0
-,V Th you ....... ..... Thank .. .. ..... ... ...
..... . .....
... . .. .... ...... .. ...
4. -4.
::.an qv.-q:a::. great ..Clay.:.
. and ..... . . ... .. ... . have: ..
Terern.. B o ve .:.:..:
F: :A xen ce..S : Co.ordu�atox
:....pp
Iuzana Laboeirs 'rang Trust F�.xa.d. Apprenticcsh7p
ton I11 Rd
ed o�rd I. :;4 :4 .
.Dear Jeexny
.x
;Eric Holcomb, Governor..
James:M.. 8f -MIT' Arector
.4 R
January 9, 2Q19.
This w� acknowledge reeex t of our evsed` Work Processes fob the Construction Craft
.
Y
:Lab:o� er program offered at:Haoslex Ener located ua Tedford Sndiana 'I'he State A xovn
gY� ....... _......... pp.. g
............. ..... _... .
gelcy has reVxewed the document as fisted Belo vv
This ap rova� zs made ursua.. to ani wader the rovxsaons o 1'xt�e . , U.. :. t:ode .b ./, w t an
p.:..:
:..
effective date of January ., 2U
7f ou have an uestions, pease contact me at 3 7 232.3:916..;
Y... Y q.. .......
Phoge 017)-2a4.7.6062 Toll:Free (800)-400-4520.. Fax C(317)=234-.8744
(j5: �^ £ Kh.T. Rt i l£<'.' p .i'!Y 3 •£
£ 1�:
�"S '•v4 t# kaf£
�
�t Z•Y"#e�y'tr<?'�l' 3'a' #Sr 31 6
"z^i"�' ��tt�4AY 'ri'iy t A�1ty
% :lt) N X•j !'!£dl leis Y:.,
gg
#J# st'x.
f ,{l<. FF si.� 3= £
<..f....., v4' n , <••. �
b£.rit...
...........
.3; Y 'xit :.vs•,;xt;•„ 3f!`.:u. .<t .
Y r?..,�•
2
� 0 29
.tYh.�g
tti�e Qu
•k:�iv�.I
<'S ""s
ffit..�/z.r'£{s�.5,�
..... .xt......£>...nt?t. 'i... .i., i>' }x..M..4 fro<45'-l:£g#'v,.wYI<.1 'n...,�d:'4.3
...... ........ ... .. ..... ..... .. ..... .....:...:::..::.'
L<,-rt}Y>m 'Sf x%F' S •aXVe
� �.E7G5lf"
f x%...... au'PryE Ytf
APPL10INT
_ 015
{� zS 1£%�zLz�Y•:E £z £�,r �J rs � �Y�^u�. �%�ts<�hn s
sJ
'�n } " .S` X'
�.v�,,e'"�s`s -���, iau yE R
�"�tS£�;'Iz�:i�L�s�t':<r'%�s������4
a"':C .✓ ..
��. 5� s ids: �• <,.�,k/. E��T K.,2
st3 s y��<.s
T Y iy£ S S9. N ..£` � Y/ �/>� r!a� y4
It x ..tt 'N .,.�' k,?... r:l a...<• <. ...5#n t£9St"4 5« ¢:tt. .....
.......................
... ........,ii
't L >
s k:k9 4 t;S. 'F .:3'
rya � Fi v. l:r .QnttK a"C fsg
:c•'i:ii:i: is?iriiiii i•:'_i:::
..:........
.......................................O g8
ii: .:::
Not. Registered
f' ✓ tEtj r£'� £ a r'u �c r� ; £ �r � I�
E� Tg' mg �# ' a
# £ a m t a
�.��i�.,�"�€�(r£�s�
.�'.s�-"i^n•<'is�.3r�w4t<•F) �<.•i Y£-7,�',�a...r..<.Kk��#t<`rt.F£',k�'
a.... ._............
�i<�,�.z•�.Y;�',s�s"3,�k��-�rx�'��'r`��%�6r�.��ss'7517�'
..:...,
....sa'£..k.•%£u,h..'``::w:< fT+k xs» 3'y E c
.. ...............
t�a',J��„s.em.�:a, 3
Suspended
:.::. ... ...:...:......:.. ..,.
0 59
�3'�''' �z'T-�Ii r �s'<•yt
Tetrted = ��
ri "S�3 -x 3
lu<.r 1'x £r3xi
x i'fT '# •1 a T �� t3 kt
-y FSyC,,,l
`£ x„ s...ro, 3ktFm SWdn:£ .<3 h"cizs`tz}.."z Vin'
�y£TSY••iu?<.`zjalv.?e.:.
...
I"°�rrnS
:::::::::s :....:.:.:........
1Iu withdraw
....:::::•::.:.:::..:.. ..r
191 %:
Total Indentured 6�1
PcttlEtat; Tusdtt�urrf0� .... .....
:...:.. .
ippr t �+ce atus epo By (indenture � f .
Apprentices.Indenture..d.Befween .11112017 And 5/13/2020.
Ap p nti ce P ro g r. a m:I N2
da
Year ....... ........... ....:.....:::.:.::..::... Apprentice Status.::: Appr n.... M" :..:...:. Psrcet.nta .e.:..
..
all �}
7 fA-x`r sz>yx
[-f � b vF 6� /
'#
k rf / 14
">!ar'
�✓ - c ( - !
f S
>X�
>:,....2.....r....... -...Z
fs 33 .'✓�' 6 �3.'!'
sel 3 .�'�r S f[5t��/y
��+Vi4t4ti�4T
:s .O LT f.
4i7a.eL.27eS� 1.
S'c4.i
>
A
oIt�4.
ffxi`'Y'.L-f•-'.
KK
" ...,.. SEt S,Mc.., rf'§'�.(....,.hS . . .!.E...W..k''.�.:'..s�.>.:?',,.,�.Ks�s� .r/....xkc �
(
.. E'. £ . C.....(.. .3 #/l.}tf :,
..n ., r:. 2l fY F3'� � b
'{� ',n k (!�� ))�Yppf 33i»>L�`g t'a',2 >` Y7 � t � aL �->✓ rf � /» 2 rs mCi°
4 '✓5�?� Gut�`�� �',
5+���fY�ii:;�l»,F
ssik 3� b' tis�.�F �✓>� � � TF �
t
� N� ,� �_ y �i i 4/at � �fi '
�f � � �
i'dilLs __�f'L D �'T,�" u�
t.Fy
.,Lw
y
'Cy r j.>r fi��,�,tk�,.
,,..
,f�{i�T`i k� 3' k §�:���� ',
;`'�..,`X K?,:>. X ..,x.... %�;:..: •.`Y,z S/
U. Lrt.
qs.�,.._.r.»,�:.
hiS Ei >.k� J 'flL >iF>fi
�.7'PS,.�.
p(
3l a bc2fyz>k>�>E�
_ �YZ"ff{/'S�'�,�` `i�9.
yf "Y ."i )ifr'Vytpf '.
'.� 4 rp
rz.:.t- / ,rx hf: >#'T''S.M,..s1�uw.s4 .'fa , i�.�.l,'r'1 ,�rs,`,E,"�,`ir
�..,..,.., ... ,.,.. "v^z
i
..r#
..........3y.r� 1v5 ; f
;int 4r . �?t>� k.....:.>^.... n>s...
Ct1G�
rN.
1
E xy F3
aSZ;>....,
MEN
��lq
.,......, r.,.......>... ... ..........
.....:..... . r
J t nr � $ abc S xr YE` jt�F7`k„k - � I 'aL prZ* ly `f � �xSrJ' s`> �'�l• �' E��a`,3�L E+�. f `:�' ��n€.3f' ... r � �5 � q�'.t,'y
'Tot�I.I d n used zgi
n :1 ! do ay, Iul 1 .2f}2i :.:.:::.:...........:::.. „ .......... Pad$ v
V, n. e
Report �''t*dt,ib::..'-.D'"':t�":
date::
Ap:p. . ..... . ................. .. ...... . .... ... ... ... ...
App kh. ices In....010
:A
.,00606- r pgra"",
.Year , ,> ,,Apprentice Status..., Apprentices Percentage
... . .. ... . ... . ....
Z!01::T
20-40'
..............
. ........................ I . . --., -
.....................
. . . . . . . . . . . . .
:Active ...... .......... ........ ..... ...
............... ... . ......... ...
-3 T...
. ... ........ . .... ...
...... .. ......
amig
-.0'. ol 110-1,
y.
k.
......... ... ....
Mce-q . .........
."..4
....... .. ................. .
0
�pgigg -1 So
'M "I
MONI MOM
rR. N
OR g
.............. .
�,msgmeq �Rm
Sag nu ��mg
an=%
.... ......
............... .
M
............... ........... ...........
. . .. ...............
.........................
......... ... ........ ..
... ....... . . ......
..... .. .... ..
Med
..... ... ..... .... ............. ...... ..... .. .. ......... ..
......
.... .. .. ..
IS
a OR M.
...... ....
...... . .
:suspended '
.......................
.. .. ..... ......
..... .. ...
... .......... .
......
. ...... ............ . .
.... ... ........ . . .. ......
..... . ... .. ......... .. .... .... .....
.. .......... .
ludgimmugg', gq:
4,
SO
6.6,011
BMW ...
Mlll 1 13011,2,1557,1 1
.................... .. ....
............. . .... ......... ...... ... ...... ........ . ........
-vo---.:tupao.N' ... . .
.3
!;
...........
............ . ". . ............ ...... . .....
Voluntary ......t......h....'...d..... ...................... ...
.. .............
.................. . . .
. ............ ....
........... ............ ......... .r
......... . . .. .. . ...........
... . .......... . ...................
Tot AlIndentured "'
...........
. ........................ I . . --., -
.....................
............ .. ....... . ....
A V6110 tyi! .... .... .. .. .... ... ... .. ... .... .....
...... ....... ........... ...
.. .... .... ...... ........ I ...... .. ...
.. .. ........ .. .. . E ....... .. ... ... ............ .......... . ........ .... . -
-3 T...
. ... ........ . .... ...
...... .. ......
r- ne M., aml Mg,
y.
k.
.. .... .. .. .. ...... ... ..... .. .... ....
. .............. .................. .. . ..........
..... ............. ... . . . ... ....... ......... .. .. ...
....... .... .............. . .... . ..... . ... .... .. .... .
Dec
......... .. .. .... ....
..... ........ . . .............. . ........ ..
....... . ........ ................. ..
. . . .... ..... .. ....
Jm.: 8/
.
.............................
.............. .
Inactive
.... ......
............... .
M
... ....... . . ......
..... .. .... ..
Med
..... ... ..... .... ............. ...... ..... .. .. ......... ..
......
.... .. .. ..
a OR M.
...... ....
. ....... ............
usmh.Md........ ...
.. .. ..... ......
... ..... ..... .. ..
��
'll k% Ilk,
SO
YE ba
.................... .. ....
............. . .... ......... ...... ... ...... ........ . ........
-vo---.:tupao.N' ... . .
.3
!;
.. ......... .... .... . .. ....... ....
.... ......... .... . . .... ..
... ................
Total Indentured 874. ...... .... .. .... ....
...........
. ..... . ...
U04W 0:100% �gwqo 0,
NOW3.4 b '-:"2'02'1
..... V�Jillll..LG..W
i
appy enticeship
eo 1e of Indi
throe bout the
addresses the e
".r iT'k � ir.:. ai AR-I.N:.�'K'' T{rs`sEr.'mw k ''...F,C��"f' ` A T.'.... �'n'+;,4 r .3'.T!.
. ws
t..e; -� s?a� max: x .:.. >s: i<, atLt�t'� L v, �:3..�s`. .-4 .i <_�`< INDr?a
Grua w baa tiM..i LsL 111E7ti�s w..
..
l,.r+a•9�•,-a+ a r. tty�.dm...- 's--•• to Sri .F•«.n .....,„,.—.-,� lr;us�•-css..r,(- � � .-< ,-r .:3. a F
;• �L�1G.-tHas-ua�. fSU�SMt t .... ... .. S/ .. �Y '?'.h,Y.. u^. �A'.: Ab_'..IK'w........ .. .. .. ��t..u,. ..n-!-cr... � .,.+!.s.
:<: �f)Jti, � �.td.�i'Yf:.jf'.•:'Y&`S { s �,5�,) 'rs ��..:. ....r .. .... Y�i. �:{
u.i t�l 33�.... . £ f' •,7:. ..Z-r-;,� ?:i rf. ... ' _::.. ;..:. :, �. �..: . �_... '. - .. .. - �LN�.� £' a ..f �
:; :yf�£t lt3ti •� _}1F,�3P�,��,, yFi�x.1�3.. �•� �. �': r. � u. m`,..ti .r.�K-, ;�-..;:-r mr. t? - 7'"`:: ..._,�' >+�.�A.ai.. :z.+ �vr»- .:.+r .r 7":...;�--..-,.,=.+:='.w....ufro(.r,.-,�.• � .c"TL � ffi- `x•;""^�y- � r,-,.;?
'Tti•�'S b( j .�3,�3 l'"�•�''F3 y�� �.y � r v 3� � Y � - ., ,,,.,.+• � . _.. s..-.<..•_+,--,. +,.>.... .... rrrs�,r. n«nK,.,',»!...:.. � � ..... .. .. W ., .. ... .. � , � .. .. .. ...
si#'kr nsf.„it Z 'i-
'j��=''ta'!1'f�i�r71�.'r'►.C��il /1litCGS�I� Ft�P7C�
YNO
,p f
.. a
{{•• A.-1c rte Efort•afLcrbar n -.-Mon .err�ert t ut�h rt Alm �ftrduxGry:
�
gJ '
yas'3rY'ax£s:gi
t #ry�
�sYr
.. -
op
u
Rieth RileyCansfi Co , Inein�c�ry cnaaria t(3 U�G1rC. laral,tr fihL3
.._.....
p�rtti l04'.a Ift..tf�� J �: Lae�i ��� �p�rer�����shlp ��d;tfCi �rra�ra:��►��rtt R��grarrr .(i��tP�,
i
Ats nal a fn Vtili(r iQ h/: 1"he Loc b 5dAPIPIs A pr nth
�t'a ram� r ern h fih� Lit i .:b l �v r -fit tour .:of
:.
mf trs pr t r d r3 °fh o-fr - o
e. f
-44
Zo�{ l
rdYt� the 1 U t a , Lr c 1-450k:
.roe toxoff. �ct:n
3,
Se
a
v -k K r
ASI k6rr� Coarrr�atdr°
:....... _..................
-w
201 ZK ,. e
i c l�tr� In t0i"IL 60481 7� tUWSur 14 a
.<
t
Y .K-
Rieth-Riley Construction Co,, Inc.
Equipment list
3%31/2020
Acquired New or
Asset# Descriptlon
Acquisition Date
Used
Cast
Accum De r
0185000006 2019SULLAIR 185-KUB-DPQAIR COMPR95SOR
3/28/2019•
N
19,581,00
p
NBV
' 0185000007 20195ULLAIfiie5=KUB-DPQAIR COMPRESSOR
3/2817-019
N19,581.00
4,895,28
14,685,72
0185000008 2019.5ULLAIR 185-KUB-DPQAIR COMPRESSOR
3
N
4,895.28
14,fi85,77-
C1850d0009 20195ULLAIR185-KUB-DPQAIR COMPRESSOR
3/28/2019
N
19/28/2019 ,581.00
4,895,28
14,685,72
C185000010 2019SULLAIRISS-KUB-DPQAIR COMPRESSOR
3f 28/2019
N
19 581.00
4,895,28
14,fi85,7Z
0185000011 2019 SULLAIR 185-KUB-DPQAIR COMPRESSOR 1
3 f 28/2019�
19 581.00
4,895.28
14,fi85.7Z
C185000012 20195ULLAIR185-KUB-DPQAIR COMPRESSOR
3128/2019
N
19,581.00
4,895,28
14,685,72
0185000013 2019SULLAIR185-KUB-❑PQAIRCOMPRESSOR
3/28/2019
N
19,581:Oa
4,895,28
14,154S,72
/3035000013 2019 WACKER R512A-90 35" VIBRATORY COMPACTOR
4118/2019
N
19,581,00
4,895,28
14,685.77-
M0000a01 TRUCKITON
2/1/2005
N
17,914.00
4,478.52
13,435,48
JT3aaaa0az TRUCKITON
9,fi67.Z0
6,627,20
3 040,00
JT3pbaaa03 TRUCKITON
12/11/2008.
N
10,278,15
7,046,15
3,232.00
JT3aaa0aa4 TRUCKITON
12/11/2008
N
•8,743,20
6,334.20
2,409,00
JT30P00005 TRUCK 1
12/11/2008
N
8,743.20
6,334.20
2,409,aO
JT30000006 TRUCKITbN
12/11/2000
N
11,TON
, 398,90
8,287,40
3,11i,5o
JT30030007 TRUCK ITON
12/1112008
N
11,398.90
8,287,40
3,ifi.s❑
JT30003006 TRUCKITON
12/11%2008
N
11398;90
8,297.40
3,:lilza
JT30000009 TRUCK 1TON
12/11/2008
N
11'292,37
s 180,87
3,111,50
1730000010 TRUCK 1 TON
12/1/2009
N
11,292,37
11,292,37
J73aaa0oil TRUCK !TON
12/1/2009
N
10,409,73
7,135,73
3,274:00
' 1T3aaaaai2 TRUCK 1TaN -
12/1/2009
N
10,409 73
7,135.73
3,274.00
1730000013 TRUCKITON
1211/2009
N
10 409,73
3,274.00
JT30000a14 TRUCKITON
12/1/2009
N
10 409,73
7,135.73
3,274.oa
]73aaaaal5 TRUCKITON
12/1/2009
N
10,409,73
7,135.73
3,274.00
JT30000016 TRUCK I TON
12/1/2009 •
N
10,507,94
7,233,54
3,274.00
JT30000017 TRUCKITON
1211/2009
N
10,507.94
7 2 33.94
3,274.00
/730000018 'TRUCKITON
1 2/112 0 0 9
N
10,507,94
7,233,94
3,274,00
JT30000019 TRUCK I TON
1211/2009
N
10,409.73
7,135,73
3,z74.0O
JT300a0a2a TRUCKITON UTILITY
613/2012
N
10,507'94
7,233.94
3,274.00
JT30060021 TRUCKITON UTILITY
6/3/2012
N
12,733.75
11,46aas
1,273,37
JT30000022 • TRUCKITON
6/3/2012N
12,733.75
ilAao,38
1,273.37
JT3ad00023 TRUCKiTON
61312012
N
12,135,08J-0,921,57
.1,213,51
JT304Ub024 TRUCKITON
613/2a12
N
12,021.67
10,819,50
1,202.17
JT36000025 TRUCKITON
6/3/2012
N
12 021.67
10 819,50
1'202.17
JT3a000026 TRUCKITON
6/15J20i1
N
12295,58
'
11+066,02
'
11229,56
JT3000a027 TRUCKiTON UTILITY
61i3J20i1
N
16,760,50
16,760,50
JT3000002a TRUCK UTILITY .
6113/zgii
N
14,193,77
14,193,77
r
/730000029 TRUCKITON
6113/2011
N
14,193,77
14,193,77
JT30000030 TRUCKITON UTILITY
6%13/2011
N
14,327,67
14,327,67
JT300aami TRUCKITON UTILITY
6113/2011
N
14,327.57
14,327,67
_
JT3aa00032 TRUCKITON UTILITY
6/1312011
N
14,327.57
143
, 27,67
-
IT30000033 TRUCK I TON UTILITY
6/i3120it
N
14,327,fi7
14,327,67
_
JT30000.. TRUCKITON
6/15/2011
N
14,327,67
14,327,67
]Tab 00035 TRUCK iTONN
6%15/2011
13,390,03
13,390,03
JT30000036 TRUCKiTON
6115/2011
N
13 390,03
13,390,03
13 390,03
13,390,03
JT30000037 TRUCK i TON
6115/2011
N
JT30000039 TRUCKiTON
8/2512017
•,N
13 390,03
'
17,536.43
13 390,03
,
-
JT4000 00i TRUCK 1,5 TOM
_.,_,�,,
-„
15792.79
,
1.753,54
JT40a00aoz TRUCKI,5TON
7/17/2017
N1,5fi2,45
15,878,80
_
.
JT40aaa13103 TRUCK 1,5TON UTILITY
• 12/28%2013N
14,290,92
1,587.88
JT40000004 TRUCK 1.5 ToN UTILITY
7j17/2017
N
44,910,02
44,910,02
JT4aaa0005 TRUCK 1.5 TON UTILITY
7/1712017
N
17,759,33
15,983,40
1,775,93
JT40000006 TRUCK 1.3 TON UTILITY
71i7120i7
N
19,039,15
17135,23
1,903.92-
/740000007 TRUCK 1.5 TON UTILITY
7/1812017
N
19,083.13
1:7,174.82
1,90831
moaaa00a TRUCK 1.5 TON QTILITY
12%15/2017
N
19,093,13
24,575;25
17,174,82
1'908.31
JT400013009 TRUCK 1,.9 TON UTILITY
12115/2017
N
25,35i,90
24,575,25
25,351,90
JT40000010 TRUCK I,STON UTILITY
12/15/2017
N
24,204.49
1740000011 TRUCK I.5TON UTILITY
12/15/2017
N
24,204.49
_
JT40000012 TRUCKI,5TON UTILITY
12/15/2017
N
25,351.89
25,351,89
JT4aaodan ' TRUCK 1.5 TON UTILITY
12/18/2017
N
23,868.76
23,868,76
JT40000014 TRUCK I.5 TON UTILITY
121 15 /2017
N
23,86836
23,868,76
JT40000015 TRUCK 1,5 TON UTILITY
12115/2017
N
24,204.49
2004,49
_
JT400000is TRUCK 1.5 TON UTILITY
12/15/2017
N
24,204.49
24,204,49_
JT40000017 TRUCK 1.5ToN UTILITY
12/1512017
N
23,978.28
7-3,978.28
JT40000019 TRUCK i,5 TON UTILITY
12/15/2017
N
25,174.45
25,174.45
IT40000019 TRUCK 1,5 TON UTILITY
12/1512017
N
25,174.45
25,174.45
JT40000020 TRUCK 1,5 TON60
41812018
N
24,204,49
24,204.49
.
JT4000002i TRUCK 1.5 TON •
4/s/2ais
-
N
, 230,30
47 431.44
,
17-,780,86
JT4000002z TRUCK 1.5 TON
4/812016
N
60,230.30
47,431.44
12,798,86
JT40000023 TRUCKI,5TON
41812ois
N
60 230,30
47 431.44
12 ,79s.s6
JT40000024 TRUCKi.STON
4/812016
N '
60,230,30
47,431,44
12,79s,s6
JT40000025 TRUCKi.STON
41812a16
N
60,230,30
47,431.44
12,798,86
JT40000026 TRUCK 1.5 TON
4/8/2a16
N
59,230.30
4fi,988,04
04
12,679.36
]740000027 TRUCKi.STON
4/8/2Oi6
N
fi0,230,30
47,431,44
12,798,86
JT40000028 TRUCKi.STON
3/28/2016
N
59,667.40
46,988,04
12,679.36
1740000029 TRUCKi.STON
3128/2016
N
59 ,667,40
46988,,04
12,679,36
T400000TRUCKI.STON
418/2016
N
59,667.40
46,988,04
12,67%36
60,230.30
47,431.44
12,798.86
Rieth-Riley Construction Co., Inc.
Equipment List
3/31/2020
Acqulred New or
Asset If Description
Acquisition Date
Used
Cast
Accum Depr
JT40000031 TRUCK 1.5 TON UTILITY
6/1/2017
N
JT40000032 TRUCK 1,5 TON UTILITY
4/20/2017
N
60,071.94
38,901,83NBV
21,17011
JT4a000033 TRUCK I,5 TON UTILITY
5/4/2017
N
60,071,94
40,548,60
19,523,34
JT4.0000034 TRUCK 1.5 TON UTILITY
4/20/2017
N
60,071,94
39:422,25
29,649,69
JT40000035 TRUCK 1.5 TON UTILITY
4/20/2017
N
60,071.94
40,548,60
19,523,34
JT40000036 TRUCK 1.5 TON UTILITY
6/1/2017
N
60,071.94
40,548,60
19,523,34
JT4000o037 TRUCK 1,5 TON UTILITY
4•/20/2017
N
60 071,94
S8902.41
21,169,53
IT40000038 TRUCK 1.5 TON UTILITY
6/112017
N
60,071-94
g0�548fia
,
19,523,34
JT40000039 TRUCK 1.5 TON UTILITY
5/4/2017
N
60,071,94
38,902.41
21,169,53
JT40000040 TRUCK- 1.5TON UTILITY
6/1/2017
N
60 071,94
39 422,25
20,649,69
JT40000041 TRUCK 1,5 TON UTILITY,
4.12012017
N
60,071,94
60 071,94
38,902.41
40
21,169,53 ,
JT4000ua42 TRUCK 1,5 TON UTILITY
6/1/2017
N
548,60
19,523,34
174p600043 TRUCK I,5TON'UTILITY
4/67/6017
N
60,071,94
38,902,41
21,169,53
JT40000044 TRUCK 1.5.T.ON UTILITY
6/1/2017
N
60,071.94
40,548,60
19
JT40000045 TRUCK 1,5 TON UTILITY
6/i/2017
N
60,071,94
38,902,41
21,523,34
,169,53
JT40000046 TRUCK 1,5 TON UTILITY
4/27/2717
N
60 071.94
3a,902.41
21,169.53
1790707047 TRUCK I,STON UTILITY
611/2017
N
• 60 071.94
40 598,60
21'163,34
JT4000.Q04b TRUCK 1.5 TOM UTILITY
4/2012017
N
60,071,94
38,902,41
,169,53
JT40000049 TRUCK 1.5 TON
1215/2018
N
59,51a,52
90,169,52
19'341,00
IT40000050 TRUCK 1.5 TON
12/8/2018
N
61,644,84
20,536,32
41,108,52
/740007051 TRUCK 1.5TON
12/5/2018
N
61,fi44.84
20,536,32
41,178,57.
JT40000052 TRUCK 1.5 TON
12/512018
N
61644.84
20174.64
41,470,20
JT40000053 TRUCK 1,5 TON
12/512018
N
61,644,84
20 536.32
41,178,52
JT40000054 TRUCK 1.5 TON
17./sf2a18
N
61,644,84
20,53s.32
41,iao,52.
]T4aa07755 TRUCK 1,5 TON
12/512018
N
61644,84
z0�536,36
41,108,52
/740000056 TRUCK 1,5 TON
12/5/2018
N
61644,84
•20 536,32
41,17A,5Z
JT40000057 TRUCK 1.5 TON
•12/1912018
N
61,644.84
20,536,32
41,ioa,52
JT40000058 2019 CHEVROLET45ao UTILITY TRUCK
8/21312019
N
61,644.84
'
20,536,36
41,1x0,52
aax
JT47059 2019 CHEVROLET4500 UTILITYTRUCK
1013/2019
N
61 746,58
'
10,291,12
,455.46
5154,028,24
JT40000060 2019CHEVROLEi'4500UTILITYTRUCK
8128/2019
N
61,746,58
7,718,34
17900a0061 2d19CHEVROLET 4597UTILITY TRUCK
812812019
•N
61,746.58
i0,291,12
51455,46
'
JT400QO062 2019CHEVROLET4500UTILITY TRUCK
10/4/2019
N
61,746.58
10,291,12
51 55, 6
4
JT4000ads3 2019 CHEVROLET45a0 UTILITYTRUCK
10/2/2019
N
81,746,18
7,718,34
544
,028,64
JT46axxo64 20i9 CHEVROLU4500 UTILITYTRUCK
1014/;019
N
fii,746,58
7,718,34
54,(328,24
JT400aaa65 2019 CHEVRCILEI"4500 UTILITYTRUCK
10/3/2019
N
6i,746.58
fii,746,58
7,718,34
7,718,34
54 ,0ie,z4
JT40000066 2x19 cHEVRoLET45ao UTILITY TRUCK
10/71=9
N
54,028.24
P127000701 TRUCK PICKUP 112 TON
2/2/2011
N
61746.59
7,718.34
54 028-24
+535
P120000002 TRUCK PICKUP 112 TON
7/312011
N
5,350,03
4,$15,03
00
P120000003 TRUCK PICKUP 112 TON
12/1512017
N
5,350,03
3,567,03
1,783,90
P120000004 TRUCK PICKUP 112 TON
12113/2017
N
14,714.45
14,714.45
M0000005. TRUCK PICKUP 112 TON
12/15/2017
N
14,714,45
14,714.45
P120000006 TRUCK PICKUP 1/7. TON
12li5/2017
N
14,714,45
14,714,45
14,714,45
1.4,714,45
P120000007 TRUCK PICKUP 1/2 TON
12/15/2017
N
14,714.45
14,714,45
P120000008 TRUCK PICKUP 1/2 TON
12115/6017
N
14,714,45
14,714,45
P120000009 TRUCK PICKUP 1/2 TON
12/15/2017
N
14,621,57.
14,621,52
P1200000io TRUCK PICKUP 112 TON
12/15/2017
N
15,199,37
15,199,37
P12xa7aa11 TRUCK PICKUP 112 TON
12/15/2017
N
15,199,37
15,199,37
MOM= TRUCK PICKUP 112 TON
-
Pizaaa7oi3 TRUCK PICKUP 112 ToN
12/15/2017
N
13,304.80
13,304,80
-
P120o00014 TRUCK PICKUP 11 2. TON
12/15/2017
N
13,753,85
13,753,85
P12a000015 TRUCK PICKUP i17. TON W/PRO
5118/2011
N
41,304,67
32,567,44
M00(1=6 TRUCK PICKUP 112 TON
411/2005
U
a ,777.23
P12aa000i7 TRUCK PICKUP 112 TON
4 1 2006
U
6,360,00
1,060;00
5 724 00
'
631,00
Pizaa7aai8 TRucK PICKUP 112 TaN •
418/2076
Ulafi.ax
954,00
Pi2a0000i9 TRUCK PICKUP 1/2 TON
1/29/2008
U
10,600,00
1,955,00
9,540,ao
1,669,50
1,ofi0,00
M20000020 2019 DODGE 1500 PICKUP TRUCK OA
412212019
N185,50
36,842,61
9,217,60
P140000001 TRUCK PICKUP 112 TON
6/3/2016
{V
17,052.46
9,047,21
27,fi3z,a1
Pi400000a6 TRUCK PICKUP 112 TON
61312016.
N
9,907.71
8,916,94
1,005,25
P140000003 TRUCK PICKUP 112 TON 4X4
17,917,9❑
16126,11
990,77
P140000004 TRUCK PICKUP 112 TON 4X4
613 f Zaifi
N
17,709,05
15938,14
1
P14a000aO5 TRUCK PICKUP 112 TON 4X4
6/312016
N
14,977,67
'
13,389,10
1'791.79
,770,91
P140000006 -TRUCK PICKUP 112 TON 4X4
12/15/2017
N
16,105,38
16,105,38
1,07.77
'
.M6000007 TRUCK PICKUP 112. TOM 4X4
12/15/2017
N
16,105,38
16,io5,3s
P147000008 TRUCK PICKUP 112 TON 4X4
8/18 12016
N
38,839,98
30,586,50
P220000001 TRUCK PICKUP 314 TON
2/3/2003
N
21,m,aa
19,110,42
8,253.49
P2200000a2 TRUCK PICKUP 3/4TON
2118/2008
N
6,632,75
2,123,39
P22a000003 TRUCK PICKUP 314 TON
4/29/2008
N
4,546.7.9
2,a86,a0
P22a000004 TRUCK PICKUP 3/4TON
12111/2006
N
7,791,59
5,341,59
2,450,Qa
P22=0005 TRUCK PICKUP 314 TON
1261/2008
N
6,735,30.
4,896,80
1 8
p22a000006 TRUCK PICKUP 3/4TON
12/.11/2008
N
6,672,35
4,833,85
1,838,50
'1326ao00007 TRUCK PICKUP 3f4TON
1211112008
N
6,699,21
4,853,61
1,846,00
P2=00008TRUCK PICKUP 3/4 TON
12/11/2008
N
6,699,21
4,a5a,21
1,846,Q0
P220000009 TRUCK PICKUP 314 TON
12/111200a
N
6,699,21
4,853,21
1,846,Qa
P220000M TRUCK PICKUP 314 TON
12/11/2008
N
6,699,21
4,853,21
1,a46,Q0
P220000011 TRUCK PICKUP 314 TON
12111/20x8
N
6,699,21
4,853,21
i,a46,90
13220000712 TRUCK PICKUP 314 TON
2/112010
N
6,699,21
4,853,61
1,846,00
P220000013 TRUCK PICKUP 314 TON
2/1/2010
N
6,227,40
4,2x7,40
1,940,0o
6,227,40
4,287.40
1,940,aa
Rieth-Riley Construction Co., Inc.
Equipment List;
3/31/2020
Acquired New or
Asset 9 Description
Acquisition pate
Used
Cast
ccunr
Ai De
pr
TRUCK PICKUP 314 TON
2/9/2010
N
6,227,40
4,287,40
NaV
P220000015 TRUCK PICKUP 314 TON
2/1/2010
N
1940,00
P220000016 TRUCK PICKUP 3/4 TON
21112010
N
6,227,40
4,287.40
1,940,00
P22000o017 TRUCK PICKUP 3/4 TON
2/1/2016
N
6,227,40
4287.4c)
'
1,940,00
P220000018• TRUCK PICKUP 3/4 TON
2/1/20113
N
6,227,40
4,287.40
1,940,00
p220000019 TRUcKPICKUP 3/4TON
2/1/2010
N
6,169,20
4229.20
,
1,940,00
P2200ad020 TRUCK PICKUP 3/4 TON
3/15/2010
N
6,169,20
4,229.20
1,940 00
P,220000021 TRUCK PICKUP 3/4 TON
7/3/2011
N
7,235,33
4,981.33
2,254,00
P220000622 TRUCK PICKUP 314 TON
7/3/2011
N
7,036,32
4,844.32
2,i92,aa
P22g6130023 TRUCK PICKUP 3/4 TON
2/2/2pi1
N
7,036,32
4,844.32
2192,aa
P22odaao24 TRUCK PICKUP 314 TON
7/3/2011
N
7,034,16
6,320.74
703,42
P220000d25 TRUCK•PICKUP3/4TON
7/3/2011
N
7,036,32
4,844.32
'
2,192,00
1322gaaam TRUCK PICKUP 3/4 TON
7/312011
N
7,036,32
•4,844.32
2'192,00
P220000027 TRUCK PICKUP 3/4 TON
2/2/2011
N
7,036,32
4,844.3-2
2,192,00
P22000028 TRUCK PICKUP 3/4 TON
7/3/2011
N
7,034,16
7,314,00
6,330,74
703,42
22ad00b29 TRUCK PICKUP 3/4 TON
7/3/2011
N
7,383,00
5014.00
'2'300.00
5,083,00
P22ada0a3a TRUCK PICKUP 3f4TON
7/3/2011
N
7,314,00
5,014.00
2300,00
�
/3220000031 TRUCK PICKUP 314 TON
713(2011
N
7,383,00
5,083.00
z3ao,oa
P220=032 TRUCK PICKUP 3/4 TON
7/3/2011
N
6,996,20
4664,20
2,300,00
P220000733 TRUCK PICKUP 3/4 TON
71312oii
N
2,337,00
13220007034 TRUCK PICKUP 314TON
7/3/2 011
N
7,073,24
4716,24
'
2,357,00
P220000035 TRUCK PICKUP 314TON
2/412012
N
6,708,19
4,673.19
2,115,00
/3220000036 TRUCK PICKUP 3/4 TON
2/4/2012
N
6,933,60
6,240,24
693,36
P220000037 TRUCK PICKUP 314 TON
2/4/2012
N
7,083,45
6 375,10
708,35
P220(100038 TRUCK PICKUP 3/4 TON
2/4/2012
N
7,083,45
6/375,10
637510
708,35
/3220000739 TRUCK PICKUP 314 TON
7,083,45
,
708,35
P220000040 TRUCK PICKUP 314 TON
214/2012
N
7,083,45
5,375,10
708,35
P220000041 TRUCK PIMP, 314 TON
6/8/2012
N
7,083,45
6 375,10
708,35
P2206aaa42 TRUCK PICKUP 314TON
6/3/2012
N
7,150,28
6 435,25
6375,10
715,03
P220000043. TRUCK PICKUP 3/4 TON•
6/3/2012
N
7,083,45
708,35
P220600044 TRUCK PICKUP 3/4 TON
6/3/2012
N
7,083,45
6,375,10
70a,35
/3220000045 TRUCK PICKUP 314TON
6/3/2012
N
7,083,45
6,375,10
P220000046 TRUCK PICKUP314TON
6/3/2012
N
7,083,45
6,375.10
708 35
P220000047 TRUCK PICKUP 314TON
7,083,45
6,375,10
708,35
P220600648 TRUCK PICKUP 314TON
5%3%2012
N
7,083,45
6,882.50
400.95
13220000049 TRUCK PICKUP 3f4TON
6/3/2712
N
7,083,45
7,083,45
6 375,10
6375,10
708,35
P220000050 TRUCK PICKUP 314 TON
6/3/2012
N
7,083,45
6,375.1(3
708,35
P220000051 TRUCK PICKUP 3/4 TON
6/312012
N
7,083,45
6,375,10
708,35
P.220000052 TRUCK PICKUP 3/4 TON
6/312012
N708,35
7,150,28
6,435,25
1322aa00o53 TRUCK PICKUP 314TON
6/3/2012
N
7,150,20
6 435,25
715,03
13220000054 TRUCK PICKUP3/4TaN
6/13/2011
N ..
9,311,7fi
'
9,311,76
715,a�
13220000055 TRUCK PICKUP 314TON
6/13/2011
N
9,311,76
9,311.76
P22aaa0056 TRUCK PICKUP 314 TON
6/1312011
N
9,224.73
9,224.73
P220000057 TRUCK PICKUP 314 TON
6113/2011
N
9,224.73
9,224.73
_
13220000(358 TRUCK PICKUP 314 TON
6/1312011
N
9,224,73
9,224.73
P22000a059 TRUCK PICKUP 314TON
6113/2011.
N
9,311.76
9,311,76
'
PZ20000060 TRUCK PICKUP3f4TON
lrvi�onrnu
n��nnnnneq 'rbltrVoq/ ...
6/22/2011
N9
�311,76
9,311,76
`
P220000062 TRUCK PICKUP 314 TON
6/2212011 '
N
9,311,76
9,311.76
'
13220000063 TRUCK PICKUP 3/4 TON
6/22/2011
N
9,860,67
9,86x,67
P220000064 TRUCK PICKUP 314 TON
612212011
N
9,860,67
9,860,67
p2zaaaaa65 TRUCK PICKUP 314 TON
6/22/2011
N
. 9,860.67
9,960,67
P2200d0066 TRUCK PICKUP 314 TON
6/2212011
N
9,860,67
9,860,67
P220000067' TRUCK PICKUP 314 TON
6/2212011
N
9,860,67
9,860,67
p220060068 TRUCK.PICKUP3/4TON
5/2212017
N
1i,832,15
10,648,94.
P220000069 TRUCK PICKUP314TON
5122/2017
N
13,358,54
12,022,72
1,183,21
P220000070 TRUCK PICKUP 314 TON
12115/2017
N
15,682,09
15,682,09
1,335,82
P229000071 TRUCK PICKUP 314 TON
12115/7.0i7 •
N
15,682.09
15,682.09
P227aa0072 TRUCK PICKUP 314 TON
12/15/2017
N
16,923,86
16,923,86
P220000073 TRUCK PICKUP 314 TON
12/1512017
N
16,157,91
:• 16,157,91
P22060(1074 TRUCK PICKUP 314TON
132200!]0075 TRUCK PICKUP3f470N
12/15/2017
N
96,970,19
16,177,19
P22aa00076 TRUCK PICKUP 314 TON
12/1512017
12/1512017
N
N
16,870,19
16,870.19
.
P220000077 TRUCK PICKUP 314 TON
12/15/2017
N
17,676,87
17,as9,a6
17,676,87
17,099,06
P22000a078 TRUCK PICKUP 314TON
12/15/2017
N
17,215,37
17,215,37
P220000079 TRUCK PICKUP 3/4 TON
4/8/2016
N
39,355,95
30,992.76
P220000080 TRUCK PICKUP 314 TON
4/8/2016
N
8,3fi3,99
13220000081 TRUCK PICKUP 314TON
4/812016
N
39,355,95
30,992,76
8,3fi3,19
P2zd000m TRUCK PICKUP 3/4TON
4/8/2016
N
38,988,13
95,089,32
9 8 98,81
P22aaaaom TRUCK PICKUP 314 TON
418/2016
N
38,988,13
30,703.J4
8,2B4,99
17220000084 TRUCK PICKUP 314TON
4/8/2016
N
39,355,95
30,992.76
8,363 19
P220000085 TRUCK PICKUP 314 TON
4/8/2016
N
38,98814
30,703,14
8,285,00
P22a713a786 TRUCK PICKUP 314 TON
4/8/2016
N
38,988,14
30,703,14
8,285,70
P220000087 TRUCK PICKUP 314 TON
418/2016
N
38,988,13
30,703,14
8,204,98
P220700088 TRUCK PICKUP 3/4 TON
41812016
N
30,980,13
30,773,14
8,284,99
P22a000089 TRUCK PICKUP 314 TON
3/28/2016
N
39 355,95
-90,992.76
8 3
i 63,19
P220000090 TRUCK PICKUP 314 TON
418120ifi
N
39,355,95
39,355,95
39,355,95
30,992,78
8,363,19
Rietb-Riley Construction Co,, Inc.
Equipment list
3/31/2020
AssetN DescrlpEion
Acquisitlan Date
Acquired New or
Used
P220000091 'TRUCK PICKUP 3/4 TON
4/1/2017
N
Cost
Accum De Fr
NSV
P220000092 TRUCK PICKUP 314 TOM
4/1/2017
N
39,846,01
26,896,08
12,949,93
P220000093 TRUCK PICKUP 3/4 TON
41112017
N
39 846,01
26 896,x8
12,949,93
P220000094 TRUCK PICKUP 314 TON
4/1/2017
N
39,846,al
26896,08
'
12,949,93 '
P220000095 TRUCK PICKUP 3/4 TON
4/1/2017
N
39,846,01
26,896,08
12,949,63
P22000096 TRUCK PICKUP 3/4TON W/LIF
4/1/2017
N12,949,93
39,846,01
24,896.08
P2200a0097 TRUCK PICKUP 314TON
4/1/2017
N
39,846,01
26,896,08
12,949,93
P220000098 TRUCK PICKUP 314 TON
4/1/2017
N
39,846,01
26,896,08
12,949,93
P220000099 TRUCK PICKUP 3/4TON
4/112017
N12,949,96
39,846.01
26,896,08
Pzzahaaiaa TRUCK PICKUP 3/4 TON
4/1/2017
N12,949,93
39,846,01
26,896,08
P220000101 TRUCK PICKUP 314TON4/1/2417
N
39 fl46,01
26 896,08
•+
12,949,93
P220000102 TRUCK PICKUP 3/4TON
411/2017
N
39,846,01
26,896,08
11,849,93
•P22000a103 TRUCK PICKUP 3/4 TON
4/1/2017
N
39,846.01
26,896,x8
12,949.93
P22axo0iO4 TRUCK PICKUP 311TON
4/1/2x17
N
39,846,01
2669608
12,949,93
P22(2006105 TRUCK PICKUP 314 TON
4/1/2017
N
39,846,01
39,94-6.01
2s,896,aa
12 949.93
P2z00aaia6 TRUCK PICKUP 314TON
4/112x17
N
26 896,x0
12,949.93
P2200ao507 TRUCK PIC KUP3/4TON
4/1/2017
N
39 846,01
26 896,08
12,949,93
Pzzaaaaiaa TRUCK PIcKUP3/4TON
` 411/2017
N
3sJ84s,61
26896,08
12,949,83
•P220000109 TRUCK PICKUP 314TON
4/1%2017
N
39,846.01
26,896,08
12+949,93
/`220000110 TRUCK'PICKUP3/4TON
41112017
N
36, 846.x1
2.s 898,60
12,949.93
•Pz20anaill TRUCK PICKUP3/4TON
4/1/2x17
N
39,846,012689
' 6,08
12,949,93
P220a00112 TRUCK PICKUP 3/4 TON
4/1/2017
N
39,846,01
26 896,08
'
12,949,93
P220000113 TRUCK PICKUP 314TON
4/1/2017
N
39,84fi,01
26,896,08
12,949.93
Pzzxa6xil4 TRUCK PICKUP 3j4TaN
4/1/2017
N
39,048,01
26,896,68
12,949,93
P220000115 TRUCK PICKUP 314TON
4/1/2017
N
39,846,01
26,896,08
12,949,93
1`220000116 TRUCK PICKUP 3/4TON
4/1/2017
N
39,846,01
26,896,08
12,949,99
P220=117 TRUc(CPICKUP3f47aNW/LIF
4/1/2017
N
39,846.01
26,•096,08
52,949.93
P220xdOlis TRUCK PICKUP 314TON
4/1/2017
N
42,272.61
28,533,66
13,738.41
1`220x06119 TRUCK PICKUP 3f4TON
39,473.62
26,644,68
12,828,94
P2200=20 TRUCK PICKUP 3f4TON
411/2017
N
39473,62
26644.68
12,028,94
P220000121 TRUCK PICKUP 314TON
4/1/2017
N
39,473.62
28,644,68
12,828,94
P220000122 TRUCK PICKUP 3/4 TON
4/1/2017
N
39 473.62 ,
26,644.6a
12,828,94
P220000123 TRUCK PICKUP 3/4 TON
411/2017
N
39,473.62
266 6a
12,828,94
P220000124 TRUCK PICKUP 314MN
4/1/2x17
N
39 473.62
26/94
,644,sa
12,828,94
P22x000125 TRUCK PICKUP 314 -TON
4/1/2017
N
39,473,52
26,644,68
52,928 94
P2200=26 TRUCK PIcICUP 3/4 TON
4/1/2017
N
39,473.62
26,644,6a
12,028,94
P220000i27 TRUCK PICKUP 314TON
411/2017
N
39,473.52
26,644.6a
12,828.94
P220000151 TRUCK PICKUP 314TON
8/2912018
N
39 ,473,53
26,644,68
12,828-94
/`220000152 TRUCK PICKUP 314 TON
8/15/2018
N
40,026,93
16 21x,92
'
23,816,01 '
P220000153 TRUCK PICKUP 314 TON
8115f20i8
N
40 026,93
C 23,81G,ol
P2200xai54 TRUCK PICKUP 314 TON
8 f 141 2010
N
40026,93
'
16,210,92
23 816,o1
P220000155 TRUCK PICKUP 3f4TON
91612018
N
40,026,93
16 210,92
'
23,816,01
P220(100156 TRUCK PICKUP 314 TON
8/23/2018
N
40 026,93
�
15,431,13
24595,80
P22aa06157, TRUCK PICKUP 3/4TON
s 15 ,201s
N
40,026,83
40,026,93
16,210,92
23,816.[11
P220000158 TRUCK PICKUP 314TON
915/1/018
N
40 026,94
16,210,92
15 431,13
23,516,01
P220000159 TRUCK PICKUP 314TON
8123120i8
N
4x,026,94
'
15,498,84
24,595,81
P22000a160 TRUCK PICKUP 314TON
814 2018
N
,
40,02fi,93
15,498,84
24,528,10
/`220000161 TRUCK PICKUP 314TON �
..,6,i/�.�
_
24,828,09
P220000162 TRUCK PICKUP 3/4 TON8/21/2018
,
N
40,404.56
15,645,00
25,610,20
P220000163 TRUCK PICKUP 314MN
811412018
N
40,404,56
15,64100
24759,56
P220000164 TRUCK PICKUP 314 TON
9/2112018
N
40,404,55
16, 645,00
24759,56
P220000165 TRUCK PICKUP 314TON
8114/2018
N
40 404,56
'
+
55 645,00
24759,55
P22Oo00166 TRUCK PICKUP 314TON
9/2312618
N
40,404.56
+
15 6 45,x0
24,759,5fi
P220000167 TRUCK PICKUP 314 TON
915/2018N
40,404,56
'
15,098,85
24,759,56
P22aaaai68 TRUCK PICKUP 314TON
8J291201a
N
40 404,56
'
15,645.00
25.305.71
'
P220000169 TRUCK PICKUP 314 TON
916/2018
N
40,404,56
15,a98:fl5
24,759,56
P220000170 TRUCK PICKUP 314 TON
/201B
N
40,404,56 •
15 645,06
25,305.71
P2200a6171 TRUCK PICKUP 314TON LIFTG
8/2a/2018
N
40,404.5
15,498,84
24,759,56
1`220000172 TRUCK PI'cKUP3j4TON :'
812!312018
N
40,404,56
156
24,528,09
P220000173 TRUCK PICKUP 314 TON
'311812009
U
19,335.89
17,645,aa
2,30
24,759,56
P220000174 TRUCK PICKUP 314 TON
3116/2009
U
,
14,101.68
11933,59
P22000Q175 2019 RAM 2500 TRUCK PICKUP
6/412019
N
42,768,53
42,76x,41
1,566,85
P22xaa6176 2019 RAM 2500 TRUCK PICKUP
6/27/2019
N
42,760,41
8,017,60
34,742.si
P22xxaoi77' 2019 RAM 2500 TRUCK PICKUP
614/2015
N
8,017.60
'
3 4,742.81
P220000178 2019 RAM 2500 TRUCK PICKUP
6/2712019
N
42,7fi0,41
42,760,41
8 017,60
+
8,617,60
34,742,81
P2Z000ai79 2019 RAM 2500 TRUCK PICKUP
8/14/2019
N
42,760,41
34 742.81
P220000180 2019 RAM 2500 TRUCK PICKUP
5/3112019
N
42,760,41
9,617.60
8,819,36
34+742,81
/`220000181 2x19 RAM zsax TRUCK PICKUP
614/2019
N
42,76x,41
33,94.1,05
P22aaaai8z 2019 RAM 2500 TRUCK PICKUP
6/27%2019
N
42,760,41
8,017.so
34,742.ai
/`220000193 2019 RAM 2500 TRUCK PICKUP W fLIFTGATE
6/2712019
N
45,949,01
8 017,so
34 ,742.81
P220000184 2019 RAM 2500 TRUCK PICKUP
5131/2019
N
42,760,41
s'6
/`220060185 2019 RAM 2500 TRUCK PICKUP
5/31 2019
N
42,760,41
8,819,40 36
'
33333,61
+941,05
1`22000=6 2019 RAM 2500 TRUCK PICKUP
6/4/2019
N
42,76x,41
8,819,36
33,941,05
P22000=7 2019 RAM 2500 TRUCK PICKUP
6/412619
N
8,x17.60
34,742.81
P220000188 2019 RAM 2500 TRUCK PICKUP
6/4/2.019
N
42,760,41
42,760,41
81617,60
34,742,81
P220000i89 2019 RAM 2500 TRUCK PICKUP
5/31/2019
N
42,760,41
8,017,so
34 742.al
P22(1000=2019 RAM 2500 TRUCK PICKUP
5/31/2019
N
42,760,41
81819,36
33,941.05
8,819.36 +
33,943„05
Rfeth-Riley Construction Co., Inc,
Equipment list
' 3/31/2020
Assetff )Description
Acquired New or
P220000191 2019 RAM 2500 TRUCK PICKUP
Acquisition Date
6/4/2019
Used
Cost
Accum Depr
1`2200=92 2019 RAM 2500 TRUCK PICKUP
/31/7019
5/14/7019
N
N
42,760,41
8,017.60
P220000193 2019 RAM 2500 TRUCK PICKUP
N
42,760,41
8,819,36•
P220000194 2019 RAM 2500 TRUCK PICKUP
6/4 f 2ai9
N
47,760.41
8,017,60
P220000195 2049 RAM 250b TRUCK PICKUP
6/14/2019
42,760,41
8,a17,60
P220000196 2019 RAM 2500 TRUCK PICKUP
6/14/2019
N
N
42,760,41
8,017,60
p220010197 2019 RAM 2x10 TRUCK PICKUP
s/4J2ai9
N
42,760,.41
8,017.60
P220000198 ' 2019 RAM 2500 TRUCK PICKUP
6/4/2019
N
42,760,41
8,017,60
/3240000001 TRUCK PICKUP 3/4 TON 4X4
2/3/2019
N
427,819
36
P240b00003 TRUCK PICKUP 354 TON 4X4
2/2/2011
24,65,61
21 ,749,22
P240000ag4 TRUCK PICKUP 314 TON 4X4
7/3/2011
N
10,243,30
91218,97
P240000005 • TRUCKPICKUP 3/4TON 4X4
x122/2011
N
N
7,869,00
Mum
P240000006TRUCK PICKUP 354 TON 4X4
.
6/22/2011
N
10,513,61
10,513,51
13240100107 TRUCK PICKUP 3/4 TaN 4X4
6/22 7011
J
N
10,859,37
10 ,859,37
P240000008 TRUCK PICKUP 314TON 4X4
5/22/2017
N12/1512017
10,85x,37
10,859,37
13240000009 TRUCK PICKUP 3f4TON 4X4
N
13,392,57
8,788.85
P240001010 TRUCK PICKUP 3J4TON 4X4
12/15/2017
N
18,268,76
18,268,76
P240000011 TRUCK PICKUP 314 TON 4X4
12/15/2017
N
18,846,61
18,846,61
VANaaaaall VAN PASSENGER
4/2/2016
N
18,846,61
18 ,84x.61
WRKr18d002 2di9 RbAD WIDENER FHDR DUAL SIDE ATTACHMENT
36,090,79
28,421,52
WRKrl9aao3 2019 CATERPILLAR 8KT320-48 GRAPTOR ATTACHMENT
4/24120is
711of2ai9
N
13,308,50
WRKr19b004 2019 CATERPILLAR SKT320-48 GRAPTOR ATTACHMENT
7/1/22019
N63,880,83
25,773,63
4,832.55
DTilb/0001 ' TRUCK FLATBED DUMP
5/112001
N
N
257,,62
73
4,832.55
DT10000002 TRUCK FLATBED DUMP
5111
N2001
16,735,33
12,751.33
DT10000003 TRUCK FLATBED DUMP
5/1/2001
16,735,33
82,751,33
DT10000604 TRUCK FLATBED DUMP
511/20/1
16,735,33
12,751,33
DT100p0005 TRUCK FLATBED DUMP
1
7/521996
18,011.82
14,027,82
DT11/(30006 TRUCK FLATBED DUMP
8/151999
N
N
8,963,49
8,067,14
DT10000007 TRUCK FLATBED DUMP
219/2104
N
31,823,66
28,223,66 '
DT1001)0008 TRUCK FLATBED DUMP
21912004
N
15,9aa,00
8,929.10
DT10000009 TRUCK FLATBED DUMP
614/2004
17,911.80•
11,940,90
DT10000010 TRUCK'FLATBED DUMP
N
59,855,02
53,869,52
DT10000011 TRUCK FLATBED DUMP
3/31/2010
3/3112010
N
21,762,38
13
DT10a00013 TRUCK FLATBED DUMP
613/zalz
N N
20,57 1'77
!775,18
13 025,04
DTIOOCO014 TRUCK FLATBED DUMP
61312012
N
24,164,56
21,748,10
DT10100015 TRUCK FLATBED DUMP
613 f 2012 • .
N
24,164,55
21,748,10
DT10060016 TRUCK FLATBED DUMP
913012013
'N
23,938,72
21 '544.85
DTIOCCO017 TRUCKFLATBED DUMP
3/Z5/Zoia
N
34,153,14
30 ,737.83
FB1000601 TRUCK FLATBED SIA
619 f1997
N
31,722.83
31,772.83
FB1aa10062 TRUCK FLATBED
41112006
U
42'694'54
38,425,09
FBSiaaaoal TRUCK FLATBED SERVICE
511//001
7,632,00
FBsiaaaa02 TRUCK FLATBED SERVICE
12///2002
N8,480.00
N
•17,902.41
13,942.41
F85W200001 TRUCK FLATBED SERVICE WATE
3131/2010
N
20,840.42
15,303,42
FGSW200002 TRUCK FLATBED SERVICE WATE
215/2013
24,146,07
15 ,204,81
FRM100000i TRUCK FORM
3 /1512010
N
N
23,x35,57
20,714.01
FRM1000002 TRUCK FORM
6/3/2012
N
is,iS7,71
11,932,71
/730000038 TRUCK MECHANIC17oN
1211522017
N
31,996,96
28,797.26
JT30aaa040 TRUCK MECHANIC 1 TON
12115/20:17
N
20,333,39
20,333,39
MST0000001 TRUCK MECHANIC 2TON
22,844,97
15,230,04
AMST,,,C.,,,,.... -m? Irk. .,..,..._..,.,..
32225/106
N
20,347.55
13onvae
MsT00000o3 TRucKMECCHAN[c2TaN
2 "
6
Fi
20,347,55
13,948,95
MSTOOOGO04 TRUCK MECHANIC 2TON
41712003
N
20,347.55
13,948.95
MST0000005 TRUCK MECHANIC 2TON
3117/2008
N
68,534.70
61,681.23
MSTO00006 TRUCKMECHANIC2TON
3/31/2010
N
21,952,07
14,363,07
MSTOGO0007 TRUCK MECHANIC 2TON
3/31//010
N
27'919.48
16,018.48
MW0000008• TRUCK MECHANIC 2TON
3/31/2010
N
24,iss.69='
17,193,69
MSTOOO0009 TRUCK MECHANIC 2TON
3/31/2010
N
24,782.90
17,469,91
MsTaaaaaia TRUCK MECHANIC 2,5 TON
5li z=
U
24,561,19
17,238,19
MsTaaaaoii TRUCKMECHANIC
5,8/0,00
MSTOa10o12 TRUCK MECHANIC
1Z5155Za17
46,42095
48,278,98
MSi'0000013 TRUCKMECHANIC'
12/15/2017
N
48,278,98
48,278,98
MST0000014 2016 HINO 268A SERVICE TRUCK
10/7/2019
U
48,278,98
48,278,98
MST0000015 2015 HINO 268A SERVICE TRUCK
10/702019
N
54,499.08
12,262,32
MST0000016 '2015 HIND 268A SERVICE TRUCK
101712019
N
54,499,08
12,262,32
MST0000018 TRUCKMECHANIC
5/18/2018
N
54,499,o8
12,262,32
MST0aaaoi9 TRUCKMECHANIC
154,514,42
45,114,69
M5Taaaal2o TRUCKMECHANIC
5/18Jzai8
N
154,514.42
45,114.69
M5T0000021 TRUCK LUBE
5/11/2018
N
154,514,42
45,114.69
TFW20aao03 TRUCK WATER FUEL
3/31J/010
Nr
152,988,60
44,869,24
TKMsaaalol TRUCK DRYER JE
4JiJ2aas
U
25,761,39
15,204,81
A03000000i TRUCK DUMP ARTICULATED
7/1/2016
U
25,000.00
25'000'00
A0350ab001 TRUCK DUMP ARTICULATED
7f 112016
U
250,000.00
142,788,44.
AD4600000i T IiUCK DUMP ARTICULATED
1211502017
125,000,00
i12,500,oa
A040000002 TRUCK DUMP ARTICULATED
12/iS/2017
N
N
190,970.80
117,313,88
AD40000003 TRUCK DUMP ARTICULATED
12/15/2017
N
190,970,81
121,526,88
AP06000oo1 PAVER 6 FTTRACKAP255E
4/19J2a18
U
195,165,95
130,110,68
AP08000001 PAVER BFTTRACK APS55D
5/3/2010
N
34,0/3,08
17,011,56
89,790.00
89,790,00
NBV
34,742,81
33,941,05
34,742,81
34,742,81
34,742.81
34,742,81
34,742,81
33,941,05
2,41sm
1,024,33
2,451.00
4,603,72
7,669,27
50,572,33
2a,941,a8
20,941,07
3,984.00
3,984,00
8,984.00
3,984.00
896,35
8,60a,aa
5,970,9a
5,970,90
5,985,50
7,987.20
7,546.73
2,416,46
2,416.46
• 2,393.87
3,415,31
4,269,45
848,00
3,960,00
5,537,00
$,941,26
2,301,56
6,255,00
3,199-70
7,614.93
6,398,60
fi,398,6b
6,853,47
6,589,00
6,901,00
6,992,00
7,323,00
7,323,00
Sao=
42,236.76
42,236.76
42,236,76
109,399,73
109,399,73
109,399,73
108,319,36
10,556,58
107,2ii,56
12,5a1,0a
63,656,92
69,443,93
65,055,27
17,011,52
Rieth-Riley CanstructIan Co., Inc.
Equipment List
3/31/2020
Asset# Description
Acquired New or
AP78aCo0a2 PAVER BFTTRACK AP655D
Acquisition Date
12/15/2017
used
Cost
Accum oe pr
NOV
AP08000010 PAVER 8 Fr TRACK P385B
8/37/017
N
N
140,394,96
140,394,97
(7,01)
AP09000015 PAVER'aFTTRACK PF4410
3/27%2009,
U
52,404.15
17,468,16
34,935,99
AP10000002 PAVER 10FTTRA•CK RP195
3/31/2010
N
120,000,00
120,000,00
AP200a0003 'PAVER 1aFT' RUB 8ER TIRED RP
3/31/2710
N
97,189,93
97 ,189,93
-_
APIGQO0004 PAVER 101 TTRACK PF5510 RE
6/16/2005
N
90,287 oa
90,280 00
AP100a0005 PAVER 10FTTRACK RP195
4/1/2013
332 ' a1a99
832 ,018,99
_
APldoaaa06 PAVER 10FTTRACK AP10551)
4/15/2009
N
69,308,80
69,308,80
AP10000007 PAVRR 1OFTTRACK A01055D
4/15/2009
N
80,273,65
80,273,65
AP10000008 PAVER 1OFTTRACK AP1055D
3/22/2010
N
72,381,82
72,381,82
_
AP100a0009 PAVER 101TTRACK AP1055D
3/22/2010
97,463,40
-
AP1000001i PAVER 10FTTRA(fK AP1655E
12/18/2017
N97,463,40
N
113,281.63
113,281,6
AP1006= PAVER iaFTTRACKAP1055E
12/15%2017
N
146,701.93
146,701,!14'
(4,71)
AP10000013 PAVER 1oFTTRACKAP105SE
12/15/2017
N
147,561,8f
147,561,82
(0,01)
APi0000014 PAVER 10FTTRACK AP1055E
12%15/2017 '
N
147,212,99
147,213,00
(O,Oi)
APladaa015 PAVER laFTTRACKAPi055E
12/15/2017
N
147,124,45
147,124.46
(0,01)
AP10000016 PAVER 1QFTTRACKAP1055E
12/15/2017
N
152,557,33
152,557,34
(0,01)
APIC000020 PAVER l0FTTRACK5200-21
4/1/2015
N420,980,07
153,996.55
153,996,56
(0;01)
APIOOG0043 PAVER 1gFTTRACK PF5510
3/1712008
U
236 ,801,33
184,178,67
AP100ao044 PAVER IOFTTRACK PF551a
3117/ 2009
U
125,000,00
125,aa4,7a
_
APC0000001 PAVER CURB ASPHALT
4/1//006
U
B0,600,a4
30,000,00
_
APT0000a01 PAVER PULL TYPE H5008
4/4/1988
N
1'000'00
900,00
100,00
ATT7713 ATTACHMENTBED WATER/FUEL
4/9/2998
N
12,895,37
11,605,83
1,289,54
BKT1000001 ATTACHMENTBUCKET
9/6/1995
N
55,704.62
55,704.62
BKTI000002 ATTACHMENT BUCKET
7/1811995
N
• .
6,285,19
698,36
131.15000001 LOADER BACKHOE 42OF2
4/1912618
U
5,983,55
,a5s,9a
5,271,21
585,69
81.35040002 LOADER BACKHOE51,039.13 420F2
4/19%2018
U
5103915
16,332,55
34,706,60
BL15aa1603 LOADER BACKHOE 420 WJFORKS
4/19/2018
U
51,073,93
16,343,64
34,730,29
81.15000004 2018 CATERPILLAR 42aF2 LOADER BACKHOE
8/30/2019
N'
30,529,85
8,359,44
22170,41
BL3540a0a5 2018 CATERPILLAR 42aF2 LOADER BACKHOE
12/1972019
5,500,00
1,222,24
4,Z7T,76 .
BM60600001 LIFT.BOOM 60'
7/172016
N
U
24,175,26
2,686,16
21,489,10
C135000003 COMPRESSOR AIR 185
411/2005
U
4,393.00
3,953,70
439,30
0185000005 COMPRESSOR AIR
411/2066.
U
2,300,00
2,100.00
200,00
CRKa00001 BREAKER CONCRETE
2/2 512 0 2
N
100006
,0
11000.00
CORKOOOOaZ BREAKER CONCRETE
4/26/2002
N
41,825,,75
37,943,37
3,882,38
. CP80000002 COLD PLANER ROTOMILL
4/1/2013
N
58 '275.00
52,447.5o
5,027,50
CR80000701 PAVER CURB & GUTTER GT6300
4/10/1997
N
98,142,54
88,328.29
9,814,25
CRB6000002 PAVER CURB & GUTTER GT3Ga0
7120 f 2000
N
151,320.00
136,188,00
15,132,00
CRB0000003 PAVER CURB & GUTTER GT3600
4/2312901
N
159,280,40
143,352,36
15,928,04
'CR86000004 PAVER CURB & GUTTER GT3606
4/1/2002
N
129,617,55
116,655,79
12,961,76
CRB0000605 PAVER CURB & GUTTERTP8807/3%2011
130,480.46
117,432.41
13,a4a65
CR80000606 PAVER CURB & GUTTER GT3600
4/3011997
N
U
60660,00
'
40,440,00
20,220,00
Mamaa07 PAVER CURB & GUTTER GT3600
8/1/2016
U
127,000.00
122,300.g()
4,700,00
C1180000008 2017 POWER CLIRBER 5700-C CURB & GUTTER CONCRETE PAVER
4/112017
N
65,470,06
65,000,00
CR80000009 20i8 POWER CURBER5700-CMAX CURB & GUTTER CONCRETE PAVER
4/1/2018
N
339,551.66
127,332,00
212,219,66
CR8000001a 2019 POWER CURBER 5700-C CURB & GUTTER CONCRETE PAVER
463,440.54
115,860,24
347,580,30
CSP0000001 SPREADER CHIP
7/21/1977
N
345,524.40
43,190,52
.302,333,88
CSP0000002 SPREADER CHIP
411/2018
U
34,i21,36
84,121,36
C5T3000001 COMPACI'ORSTATIC C330A
12/10/1987
N
178,123,50
54,061.68
54,061,82
CST3000003 COMPACTOR STATIC C330B
8123/1988
N
29744.00
'
26769
' .60
2,974,40
CST3000004 COMPACTOR STATIC C330B
S f 23 11988
N
28,Sfi0,70
25,974,06
2,886,(30
CST3700005 COMPACTOR STATIC C3308
4/30/2009
U
28,860.00
25,974.60
2,886,aa
CST30000Q6 COMPACTOR STATIC 03308
4130/2009
U
3'000.00
3,077,00
CST3000007 COMPACTOR STATIC C330B
4130/2005
U
3,000,a0
3,600,06
-
6T300a908 COMPACTOR STATICBW5A5
3/31j2a95
U
3,000,07
31000.00
CST3000009 COMPACTOR STATICC330A
3/1/2004
U
5,670.60
5.000.00
_
cWKTi0a0o1 ATTACHMENTTIE BAR INSERTE
4/1/2004
N
2,500.00
2,250,60
257,90
CWKT11o001 ATTACHMENT BURLAP DRAG W/6
S/3119971
N
61,340.66
55,206,59
fi 134.07
CWKT300001 ATTACHMENT CONV GOMACO WIG
1'6/311997
N
13,644.30
12,243,87
1,360.43
CWKT400001 ATTACHMENT EXTENSION W/537
7/22/1994
N
22,745,00
20,470,50
2,274.50
CWKT500aQl FINISHER FINALBIDWELLW/5
8715/1994
N
9,870,73
3,483,03
387.00
CWKTSO0042 FINISHER FINALBIDWELLW75
2/1071995
N
28,432,50
25,589.25
2,843,25
CWKTSQQC03 PAN HYDRAULIC VIBRATOR Wj5
6/14/2991
N
30,460,60
27,414,60
3,046.00
CWKT600002-MOLD CL1R8 W/6894
3/2212060
N
3,591,31
3,232.18
359,13
CWKT67a003 MOLD pARAPETW/6136
5/2072901
N
15,312.00
13,780,86
1531.20
CWK7600004 MOLD CURB 31 IN F/6894 PAV
8 /4/2003
82003
N
22 '415,00
20 '173.50
2,241.50
D080000001 DOZER 70 HP FDS IT
/4/
U
5,942,52
5,348,26
594,26.
D0906aaa0i DOZER 85 HP D4K XL
4/28/2016
N
6,701,70
5,400.6a
s0a,aa
Da9aa00002 DOZER 90 HP D5G
311612009
U
121,771,74
54,797,28
66,974.46
/3105000001 DOZER 100 HP D5K2 LGP
N
38,000,00
342Q0
,,aa12/15/2017
3,800,60
Dia5000003 DOZER 100 HP D5K2 LGP
12/1512017
N
45,651,61
27,391.61
18,260,fi1
b1a5000004. DOZER 100 HP DSK LGP
311812013
U
45,652,93
Z7 , ,84
39155,802.16
18,261,09
D105000005 DOZER 100 HP DSK LGP
3118/2013
U
70,860,00
15 057,84
/3105000006 2014 CATERPILLAR D5K2 LGP DOZER
12/23/2019
N
83,580,00
65,819,16
17,760,84
D105000007 DOZER 100 HP DSK LGP
4/1/2017
U
23,433,56
2,343.36
21,790 20
Di05000008 DOZER 100 HP D5K2 LGP
41ij20i7
U
103,010,60
39,732.72
65,552,68
•
103,010,fi0
39,732,72
63,277,88
Rietb-Riley Construction Co., Inc.
Equipment List
3/31/2020
Asset DZER
Acquisitlon Date
Acquired New or
Used
Di050O0009 DOZER 100 HP D5K2 LGP .
4/1/2017
U
Cost
Accum De Pr
NBV
Di050000i0 DOZER 100 HP D5K2 LGP
4/1/2017
U
102'941'29
39,705,84
63,235,45
D105000011 DOZER 100 HP D5K2 LGP W/RI
4/l/2917
U
109,873,34
42,379.63
67,493,66
D105000013 2015CATERPILLARD5K2LGP DOZER -USED
9/30/2019
U
118,547.46
45,725,40
72,822.06
D130000001 2017 CATERPILLAR D6K2 LGP DOZER
12/19/2019
U
89,880,00
7,864.50
82,015,50
DIS5000001 DOZER 150 HP 750K LGP
12/27/2017
U
4,000,00
444.44
3,555,56
D1S5000002 DOZER 150 HP D6N LGP
6/1712015
U
91,607,94
38,475,36
53,132.58
D72500000:1.2014 CATERPILLAR06TXLOOZER
4/1812019
N
219,271.13
132,476,16
86,794.95
D225aaaaa2 Ea14CATERPILLAR D6TXLDOZER
12123/2019
N
101,497,95
30,449,40
71,048,55
hC20400001 TRUCK TRACTOFlTAf4DEM'
3/1/2006
N
54,390,35
5,439,04
48,951,31
DC20000002 TRUCK TRACTOR TANDEM
41112003
2344991
, ,
15,fi29,27
7,814,64
DC26000663 TRUCKTRACTOR'TANOEM•
19 2aU3
N
89,897,66
80,907,89
8,989,77
DCZaa00004 TRUCK TRACTOROUMp
3/15/2004
N
29,125,16
19,968,36
9,159,80
DczaOappaS TRUCK TRAci'oRDUMP
311-9/2010
N
77,633,36
69 ,070,39
8,562.-97
DC20aa00as TRucKTRAcroRTANDEM
3131/2010
N
25,2sd.40
16,853,6a
8,426,80
DC20000007 TRUCKTRACTOR'TANDEM
3/31/2010
N
3i,227.28
21,407.28
9 820.00
DC20a00aa8 TRUCK TRACTOR TANDEM
3/31/2010
N
31227,28
,
21,407.28
9,820,00
DC20a00009 TRUCK TRACTOR TANDEM •
3/31/2010
N
31'227-28
21'407'28
-9,820,00
TRUCK TRACTOR TANDEM
3 31 Zola
J /
N
Sij227.28
'227,ze
21,407.20
9 sza,an
DC20000011 TRUCK TRACTOR DUMP
4/1/2013
N
28,850,52
19,862,52
8 988,00
DC20a00a12 TRUCK TRACTOR DUMP
4/1/2013
18,356.40
16,520.76
1,835.64
DC2a000013 TRucKTflAcroRTANDEM
4/1/2013
N
,18,356,40
16,520.76
1,825.64
DC20aa0014 TRUCK TRACTOR TANDEM
21512013
N
22,978.68
20,680,131
2,297.87
DC20000015 TRUCK.TRACTORDUMP
2151;013
N
34,862,53
31,376,28
3,486,25
DCZaa=16 TRUCK TRACTOR DUMP
21512013
N
31,542.60
28,388,34
3,154,26
DC200o0A17 TRUCKTRACTOR DUMP
2/5/2013
N
29,527,51
26 ,574.76
2,952.75
0020000018 TRUCKTRACTOR DUMP
9/30/2013
N
27 595.80
,
24,836,22
2 759,58
,
0020000019 TRUCK TRACTOR DUMP
3112/2010
N
33,173.92
29,856,53
3,317,39
DC20000020 TRUCKTRACTOR DUMP
3/1212010
N
28,191.90
28
78 ,191.90
-
DC20000021 7RUCK TRACTOR TANDEM
3/1/201-9
H
28,19190
,191,90
DC20a00022 79UCKTRACrORTANDEM
4/26/2016
N
46,412.76
41,771.48
4,641,28
0020000023 TRUCK TRACTOR TANDEM
412612016
N
155,32g..40
69 ,898.20
85,431,20
Dc26000024 TRUcKTRACTOR
4/2212016
N
155� 329.40
69 898,20
85431 ,20
DC2000a025 TRUCKTRACrOR
4122/2016
N
178,626.00
80,381.76
98,24-4'24
OC20000026 TRUCKTRACTOR
4f22f201fi
N
178+ fi26,00
'.
130 ,381.76
98,24 .24
0020600027 TRUCKTRACTOR
4f22/201fi
N
178 626.00
+
80,381,76
98,244,24
DC200=28 TRUCK TRACTOR T/A
5/1812017
N
178,626,00
80,381,76
98,244.24
DC20000029 TRUCKTAACTORTANDEM
4%1/2006
U
160,608,54
52,699,73
107,908,81
DCZd
TRUCK TRACTOR TANDEM 411/2006
U
5,830.00
5,247,x0
583,00
'a00030
0020000031 TRUCK7RAGTORTANOEM
4/iJ2006
U
13,780,00
1240200
'
i,378,aa
0020000032 TRUCKTRACTOR TANDEM
4/1/2006
u
22 ,790,00
20,511.00
2,279.00
Dc2axaxx33 TRUcKTRACTORTANDEM
4/i/zoos
U
fi3600OQ
, ,
57 ,24axa
63-90,00
,
DC20a0d034 TRUCK TRACTOR TANDEM
4/1/2006
U
71,190,00
64071.00
'
7,119.00
pCZ00o0035 TRUCK TRACTOR TANDEM.
1/2912008
U
71,550,00
64,395,00
7,155,00
DC2a000036 TRUCK TRACTOR TANDEM
3116/2009
U
57240, .00
815
, 1fi3Oa
5,724.x0
DC20000037 TRUCK TRACTOR TANDEM
311612009
U
8,480,00
7,63 z,aa
848.00
pC200000B8 TRUCK TRACTOR TANDEM
3/31/2005
U
8,480.00
7,632,00
848,x03,312,50
DC30aaaaai TRUCK TRACTOR TRIAXLE
3/1212010
N
2,981,25
331,25
Li r2nxn roL!`t•ro�r �n T" :LC
39,641.25
8q;64i,25
DC30000004 TRUCKTRACTOR
�(11_u;u.
4/22/2016
�'{
N
171877.X,
,
78,956,15
92,921,01
DC20000040 7RUCKTRACTOR
4/22/2016
N
178,626.00
80,381,76
98,244-24
DCW2000a0l TRUCK WATER FIFTH WHEEL
5/112001
N
178 ,626.00
80 ,38 1.76
98,244,24
DCW2aa40oz TRUCK WATER FIFTH WHEEL
81.3/2002
N
29 150,89
'
16 020,77
7,130,12
DCW,2aaa003 TRUCK WATER FIFTH WHEEL
613/2.002
N
34,281.78
32,801.7-9
1,400,00
DCWz0a0004 TRUCK WATER FIFTH WHEEL
6/3/2002
N
34
25,732.7a
s, 549.00
OCW2000a05 TRUCK WATER FIFTH WHEEL
2/1612004
N
34,281.78
25,732.78
8,281.78
'549,00
DCW3aaaaai TRUCK WATER FIFTH WHEEL
5/111995
N
21,066,47
10597,10
1.0,469,37
.DCW3000002 TRUCK WATER FIFTH WHEEL
2f 16/2000
N
83,758,84
75,382,95
8 375,89
DCW3000a03 TRUCK WATER FIFTH WHEEL
2fi6/2000
.
N
40,535,84
32,099,26
8436,58
DCW3aoaaa4'TRUCKWATER FIFTH WHEEL
5/1/2001
N
40,615,86
32,099,26
8,516,60
DCW3000005 TRUCK WATER FIFTH WHEEL
5/1/2001
N
27 '596,52
20,250.89
7,345,63
DCW30000013 TRUCK WATER FIFTH WHEEL
3 /1 612 0 0 4
N
27,912.88
20,250,89
7,661.99
DCW3000007 TRUCK WATER FIFTH WHEEL
3f 15/2010
N
98,058,95
87,573,95
10g85,0a
DCW3000008 TRUCK WATER FIFTH WHEEL
3/if 2Q1a
N
32,086.22
21,047,41
11,038.81
DD35000008 COMPACTORVISR35""RD12A-.9
8/112017
N
37,123,93
35,042.65.•0482,081.28
OQ35000009 coMPACTaRVIaR3s""RD12A-9
5/3/2918
N
17,596,Q0
11,547,43
6048,57
,
D048000001 COMPACTORVIBR4s""C82413
5/17/2016
17,914,00
7,725,47
10,188,53
D04saaaooz COMPACTOR VIBR4s""Cs24B
5/1712016
N
N08248
4z,isl.ia
37,181,ao
51010,18
0048000003 COMPACTOR VIBR48""
5/17/2016
N42,531,73
42,589,21
37,531,73
5,057,48
D048060004 COMPACTORVIBR48""C8240
8/17/2016
N '
,559,21
37
5,05 7.48
�
D04800a005 COMPACFORVI13R4808248
5/1712016
N
42,191,18
3718
, 1,00
5,010.1a
DD48000006 COMPACTORVISR48 C8248
5/17/2016
N
4z,191.is
27,181,00
5,aia,is
D048000007 COMPACTORVIBR4a C824B
512312016
N
42,589,21
37 531,73
'
5,057.48
D048ama08 COMPACTORVIBR48""CO24B
5/2312016
N
42,191.18
37,181,00
5,010.1a
0048000009 CDMPAGTORVIBR4a""00248
5/2312016
N
42,191,18
37,181,00
5,010,18
D048000010 COMPAGTORVIBR48""08248
5/23/2016
N
42,191,18
37,181,00
5 +0iods
D048000011 cOMPACTORVIBR4a""CBZ48
5/23/2016
N
4z,i91.is
37,181,x0
501a,1a
42,589,21
37,53133
5 057,48
,
Rieth-Riley Construction Co,, Inc.
Equipment List
3/31/2020
Acquired New or
Asset 9 Description
Acquisition Date
Used
Cast '
AccumDepr
D048000012 COMPACTOR VIBR 48""CB24B
5/17/2315
N
42,191,18
37,131.130
NBV
004s700013 COMPACTOR VIER 4811" ce240
5/17/2016
N
42,191,18
37,181.03
5,oi3.ia
p048a00014 COMPACTOR VIBR 48""CB24B
5/23 12016
N
51317,18
�
DD48000015 COMPACTOR VIER 48 CB24B
5/23/2016
N
42,589,21
37 531,73
'
5,057,48
13048000016 COMPACTOR VIER 48"" C8248
5/23/2016
N
42,191,18
37,181,03
5,010,18
p048000017 COMPACTOR VIBR 4a""CB24B
5/24/2018
N
42,191,18
37,181,00
5,010,18
0048000018 COMPACTOR VIBR 48l", 224
a/1612009
U
42,574,90
18,360,44
24,214.46
DO51000001 COMPACTOR VIBR51""CB34a412912015'
N
15800,00
15803,00
+
-
� �
D051000002 COMPACTORVIBR511111CB340
4/29/2016
N
56,168,34
50 551,51
5,616.83
0051000003 'COMPACTOR VIBR 51 C834B
4/29/2016
N
56,698.23
51028,41
'
5,669,82
D1)51000004 COMPACTOR VIBR 51'"' 08340
412912016.
N
56168' ,34
50 551,51
'
S,fi16,83
DD51000005 COMPACTOR VIBR 511"1 CB34B
4129/2hi6
N
56,698,23
51,028,41
5,669,82
•
p051000Q06 CONIPACTDft V1HR 51„�, CB34B
4f 29/2016
N
56,698,23
5102841
5,669,82
DD51000707 COMPACTOR VIBR 51"" CB34a
5/6/2016
56 698,23
'
51,028,41
'
5,669,82
DD51a00009 COMPACTOR VIBR 511". C9340
5/6/2016
N
N
56,1fi8,34
56 ti96.23
49,498,45
6,669 94
❑1)51300309 COMPACTOR VIBR 51"" 08348
5/612016
N
'
49,965,35
6,732,88
w5iaaadio COMPACTOR VIE R51""'CE134H
5/612016
N
56,698.23
49,965,35
.6,732,88
,,,,
0051000011. COMPACTORVIBR51 CB342
8/312017
U
56,168,34
49 498,43
;
6,669.94
DDC51aa001 2719 CATERPILLAR cC348 541" VIBR COMPACTOR
1314/2019
N
18162.80
5+454.72
12,728,08
OD59000001 COMPACTOR VIBR 591"1 CB7
5/24/2018
N
58392.04
,
123,847.15
3,784,58
26734,61
55,107,46
,,,,
DO59000sa2 COMPACTORVIBR59 CB7
7/17 2ai8
!
N
123,847.15
+
24,382,47
97,142,54
D05900aoa3 COMPACTOR VIBR 59"" CB7
7/17/2318
N
123,847.15
24'382'47
99,464.68
D059a00004 COMPACTOR VIER 59"" CB7
6/3/2713
N
129,847,15
25,543.54'
9e,464,68
D059000005 2019 CATERPILLAR CB7 59" VIBRATORY COMPACTOR
$/24/2019
N
123,847.15
11,610,70
98;303,fi1
OD6fi000003 COMPACTOR VIBr 66"" CS546
�
4130/2018
U
123,157,97
42951,39
112,236,45
DO66000005 2018 CATERPILLAR C0iO 67 VIBR COMPACTOR
8/30/2019
N
21,924.fi0
'
83,206,58
DD66000006 2018 CATERPILLAR C810 67" VIER COMPACTOR
8/30%2019
N1,333.35-
q,872.16
17,052.44
,,,,
DD78000001 COMPACTORVIBR78 CC522HF
3/31/2010
N32,584,83
fi,000,30
1333,3fi
'
4,946,64
D078000002 COMPACTOR VIER 781"' 6C522HF
1111512012
N
42529.83
3Z 584,83
9+945,00
.DD78000005 COMPACTOR VIeR 78 H17120V'
4/24/2007
N
22,154.00
20064.00
'
2,090,00
,,,,
DD78aa0006• COMPACrORVIBR78 HD120V
4/25/2007
N
137,749,50
123 974,55
'
13,774.95
34D
DD78000007 COMPACTOR VIBR 78"" CB-934D
2/1/2010
137 749.53
'
123,974,55
13,774,95
DD78000009 COMPACTOR VIBR 78"" CB534D
���-
4/1/2009
N
,36
2 255,1677.17A7
44;566,07
25,167,17
11,502,00
/3078000010 COMPACTOR VIBR 76 CB534D
4/1/2009
N
25,167,17
25 167,17
-
/1/)78000012 CoMPACTORVI0R78""CB54XW
3/5/2010
N
�36542.64
'
36,542:fi4
-
p0'78000020 COMPACTOR VIER 7a"" C13-94 XW
� 4/2612716•
u
92sa7,05
DD7800021 COMPACTOR VIBR 78"" CB -54 XW
4/26/2016
U
55 564,32-
'
37,347,53
pD78000022 COMPACTORVIBR78""CB54XW
8/3/2017
U
82,735.22
74,46
8,273,52
D078000023 COMPACTOR VIE R78,,,, CB54XW
4/2612016
U
19' ,897,85
49,48031
5 969928
.28
.
13,928,57
DD78000024 COMPACTOR VIBR 78"" C554 XW
4126/2016
U
81058,58
'
44532.a4
72,952.72
4+948,07
D078000025 COMPACTOR VIER 78""CB54XW
4126 2016
U
79705,46
'
'
47,923,3fi
0078000026 COMPACrORVIBR78""CB54XW
6/17/2016
U
53 241.72
47 981.55
31,882.13
0078000027 COMPACTOR VIBR 78""CB54XW
5/12/2316
N
144749,60
63780,4.1
5,320,17
DD78000028 COMPACTOR VI8R 7s"" CB -94 XW
5/12/2016
N
'
143
+
80,969,49
D078000029 COMPACTOR VIER 78"" CB54 XW
511212016
N
396,80
144,749,60
63,184,33
63,780,41
80,212,47
DD7aa00030 COMPACTOR VIER 78"" CB -54 XW
5/12/2016
N
'
B0,969,19
DD7800063i COMPACTORV1BR.78""CB54XW
81317017
U
143,373,ga
63,173,99
80,199,49
a on• o co u" e y
Fl[17..f?fI!!(1 7 �l7M, :.', Tn..• �t17R �BrA , tnt
- -- -
26,302.48
_
:.0,400.96 -
15,1131 e7
/3078000033 COMPA.CTORVIER 78""CB54XW
5/1212316
N
-tiw,it�•au
144,749,fi0
63'780'41
63,780,41
80,969,19
,,
0078000034 COMPACTOR VIER 78 CB54XW
813/2017
U
22 547,55
9,019.00
80,969,19
DD78000035 COMPACTORVIBR7a""CB64B
8/3/2017.
U
50892,04
17,448,64
13,528,55
DD78000036 COMPACTORVIBR7a""CB640
8/31=7
U49782,61
'
17068,36
33,443,40
D078000037'COMPACTORVIBR78""C854XW
4119/2018
U
1,274.38
'
32,714.25
�
0078000038 COMPACrORV1B78 CB54XW
4/1917018
U
636,96
637,12
D078000039 COMPACTORVIBR 7a"" 00648
4f3a,
/2ai8
U
2114 8,84
10 '221,96
10,926,88
D078000040 COMPACrORVIBR7B""CB64B
4/3o2oi8
U
105 '190,36
26'139,72
79,080,34
D0780a0041 COMPACTOR VIBR.78""CB64B
413012018
U
103 907,80
25,791,42
78,116,38,
D078000042 COMPACTORVIBR7a""C964B
413017.0:18
U
109,525,6fi
'
143,648,86
27,685,87
35,655,63
82,339,79
0078 s"" 000043 COMPACTOR VIBR 7 08640
41301Z0i8
U
107,993,23
/3/378000044 COMPACTORVIBR 78"" C864B
4/30/2018
U
144,978,29
35,985,66
178,992,fi3
13D78000045 COMPACTOR VIBR 78"" C864E
413 012 0 1 8
U
56,790.63
156793,fi8
3 7,770.65
38
114,398,90
D078000046 COMPACTORVIBR78""CB64B
41361201a
f
U
'
' 917.6fi
117,873,02
D078000047 COMPACTORVIBR 7B"" C864E
4/3012018
U
153,568,85
158529,53
38,117,94
39,349,27
315,4SQ,91
0072000048 COMPACTORVIHR 78"" DO120C
4/27/2018
U
109275,89
28,099,44
119,180,26
D079000049 COPAPACrORVIBR78""D0120C
4/27/2018
U
'
81,176,45
DD78000050 COMPACTORRVI8R78"" POW'd
412712018
U
iW 296,22
28,104.72
81 ,191.50
D07800005i COMPACTORVIBR7a""DD120C
412712018
U
104,686,66
'
108 989,13
26,919,36
28
77,767,3q
D078000052 COMPACTORVIBR711 C8534C
3/,31/2005
U
111000,00
025,76
80,963,37
0084000001 COMPACTORVIBR 84"" CC722
1:/15/2012
N
31,565,00
9,900,00
1,100,07
DD84000002 COMPACTORVIBR 84"" CC722
11/15/2012
N
31,565,00
28,615,00
'
28,615.00
2,95Q0a
2,95Q,00
/3/)84000003 COMPACTORVIBR84""CB 64
DD840oo074 COMPACTORVIBR 84"" 0864
4119/2018
4/19%2018
U
U
16
,735,07
6;443.04
10,292.03
,,
DD840000Q5 C7MPACTORVIBR 84 H1)•�14oi
4130/2018
U
39,651,14
15,265,fi8
•10,348,35
24,385,46
DIS1000001 TRUCK DISTRIBUTORSINGLE
711511 9 9 6
N
15,762,05
$ ,713,70
0151000002 TRUCK DISTRIBUTOR SINGLE
5/1/2001
N
5,151,94
4,fi3fi,75
DIS1000003 TRUCK DISTRIBUTOR SINGLE
51112001
N
33 720,23
2fi 04923
,049.23
6$15,19
'971,07
0151000074 TRUCK DISTRIBUTOR SINGLE
5/1/2071
N
33,020,23
33,933,94
26,
26,962.94
6,97100
Rleth-Ailey Construction Co,, Inc.
- Equipment List --•.
3%31/2020
Acquired New or
Assetlf Description
Ac Acquisition Date
q
Used
'Cost
Accum Depr
D151000005 TRUCK DISTRIBUTOR SINGLE
33,020,23
26,049.23
NOV
DI51ao0aa6 TRUCK DISTRIBUTOR SINGLE .
5/1/2001
N
33,333,94
26,362,94
6 ,971.00
DIS1000007 TRUCK D15791BUTOR SINGLE
S/1/2001
N
-93,020.23
213 049,23
6,971,00
1)[51000008 TRUCK DISTRIBUTOR SINGLE
5/1/2001
N
33,020,23
26,049,23
fi 971,00
DISI000009 TRUCK DISTRIBUTOR SINGLE
$1112001
N
33,333,94
26,362,94
,971.00
/3151000 010 TRUCK DISTRIBUTOR SINGLE
9/3/1997
N
6,971,ao
DI51000011 TRUCK DISTRIBUTOR SINGLE
5141998
N7,864.50
37,592.40
29,727,90
DIS10(J00i2 TRUCK D15TRIBUTC)g SINGLE
7/2/2001
N
81,090,00
72,981,00
8,109,00
10151000013. TRUCK DISTRIBUTOR SINGLE
2/9/2004
N
41,179,61
21,200,00
33 529.61
+
13,laa,ad
7,650,00
Wia00014 TRUCK 1115TRIBUTOR 5INGLE
211/2005
N ••.,�,
31,361.44
22,561,44
8,100,00
DIS10000iS TRUCK t?[STRIBUTOR SINGLE
4/30/2006
N
27,379.80
27.,379,80
8,800.00
DIS1000oi6 TRUCK DISTRIBUTOR SINGLE
3/25/2010
N
44,375,36
44,375,36
DIS1000017 TRUCK DISTRIBUTOR SINGLE
3/1/2016
N
55,50.00
50,679,54
_
DIS1200019 TRUCK DISTRIBUTOR SINGLE
4/1/2206
U
1313,2250.00
59,625,00
5,564,39
❑151000020 TRUCK DISTRIBUTOR SINGLE
i
3/16/2009U
63,600.60
57,240,00
6,625,00
Dlsia06021 TRUCK DISTRIBUTOR SINGLE
3/16/2009
U
10,600.06
9,540.00
6,360,00
DIS1000022 TRUCK DISTRIBUTOR SINGLE
3/161 2009
U
31,800,00
28,620,00
1,66a,a0
DIS2000001 TRUCK DISTRIBUTOR TANDEM
3/5/2013
N
28,961.74
26,065,57
3'180'06
D152000002 TRUCK DISTRIBUTOR TANDEM
315/2013
N
28,9131.74
26,065,57
2,896,17
D152000003 TRUCK DISTRIBUTOR TANDEM
0/3012013N
28,292.80
25,4133.130
2+896,17
Dls2000a04 TRUCK DISTRIBUTOR TANDEM
9/30/2013
N
55,711,46
50,146,32
2,029.20
DI52000005 TRUCK DISTRIBUTOR•TANDEM
9130/2013
N
56,237.04
5,571,14
D152000006 TRUCK0ISTRIBUTORTANDEM
12127/2017
N
115,031.25
.50,513,34
53,625,04
5,623.70
DIS200aa07 TRUCK D15TRIBUTOR TANDEM
12/27/2017
N
116116',44
54,243.96
61,466,21
DISZa20008 TRUCK DISTRIBUTOR T/A
614/2(117
'215,51[1.16
N
138,693,94
61,872,48
DI52000009 TRUCK DISTRIBUTOR T/A
6/4/2017
N
215,510.16
68,693,94
146,816,22
D152000010 TRUCK DISTRIBUTOR T/A
614/2017-,'
N
215,510,16
69,633,94
146 816,22
6152000011 TRUCK DISTRIBUTOR TfA
7/23/2018
N
211,926.79
44,646,21
146,81622
DISZ000012 TRUCK DISTRIBUTOR T/A
7/2312018
N
211,926.79
44,646.21
167 280,58
,
DIS2000013 2020KENWORTHT470T/A DISTRIBUTOR TRUCK
6/2512019
N
224,672.65
18,966,12
167,280,58
DI52000014 2020 KENWORTH T470T/A DISTRI 13 UTOR TRUCK
6/2512019
N
224,072.65
21006,81
20516
+ 6,53
❑PT0600001 DISTRIBUTOR PULLTYPE
5/1/1997
N
21,451,50
+
19,306,35
203,665,84
DPT0000002 DISTRIBUTOR PULLTYPE
5�13f198
21,451.50
19,306,35
2,145,15
DPTa0a0p03 DISTRIBUTOR PULLTYPE `
N
23,494.52
21/145,07
2,145,15
DT10Ga0012 TRUCK FLATBED DUMP
4/1/2006
U
70,326,30
62010,00
2,349,45
DT20000001 TRUCK DUMP TANDEM •
7/2/2001
N
42,770.47
35,874.47
0,3a
DT2000a002 TRUCKDUMPTANDEM
219/2004
N
22,373.42
15,208,52
6,896,00
DT20000003 TRUCK DUMP TANDEM
219/2004
N
22,396.75
15,119•x5
7,164,90
OT20000004 TRUCKDUMPTANDEM
4/1/2600
U
55,$00,00
50,806,00
7,276,90
DT20000005 TRUCK DUMP TANDEM
5/212015
U
10,500.00
.10,500,00
5,600,60
DT20000008 TRUCKDUMPTANDEM
411/2006
U
5,300,00
4,770.00
DT20000009 TRUCK DUMP TANDEM
4/112006
'U
10,600,00
9,540.00
530,00
D720000010 TRUCKDUMPTANDEM
41112006
U
47,700.00
42,930.06
1530,00
D720000011 TRUCKDUMPTANDEM
411/2606
U
45,050,00
40,545,00
4,770,02
DT20000013 TRUCK DUMP TANDEM
3/31/2mo5
U
5,300.00
4,770,00
e},505,00
DT20ab0014 TRUCK DUMP.TANDEM
3/31/2005
U
7,089,28
6,380.35
530,00
DT20000015 TRUCK DUMP TANDEM
3/31/2005
U
8,149,28
7,334.35
708.93
D130060001 TRUCK DUMP TRIAXLE
211/2005
N
40,908.91
29,768,91
814,93
ll,14a,aa
DT3a00aa02 TRUCK DUMP TRIAXLE
2/1/2005
N
nano �t
�___•=-
DT uC.'U"003 TRUCK DUMP TR ri:Lc
DT30000004 TRUCK DUMP TRIAXLE
2/112005
4f 1f 2013
N
N
40,908,91
24 768.91
'
4140,0a
DT3a0o0005 TRUCK DUMP TRIAXLE
Sf29/Z015
N
26,896,00
164,600.00
24,206,40
86,415.16
2,689,ea
DT3a000006 TRUCKDUMP TRIAXLE
e12912615
N
167,900,60
ea,147,36
78,184.fl4
DT30000007 TRUCK DUMP TRIAXLE
8/29/2015
N
1137,500.60
87,937313
,
7x,752,64
79 562.134
DT36000008 TRUCK DUMP TRIAXLE
812912015
N
168,356.00
'' 88,278,84
75,871.16
D13a00o009 TRUCK DUMP TRIAXLE
8/29/2015
N
167,250,60
87,8x6,32
79,443,6a
WHOM= TRUCK DUMP TRIAXLE
812912015
N
157,762,00
88,075.12
79,686.88
DT30000011 TRUCKDUMPTRIAXLE
8129/2615
N
167,550,60
87,963,68
79586,32
DT30066012 TRUCK DUMPTRIAXLE
5129/2015
N
167,406.06
87,885,16
79,514.84
DT30000013 TRUCK DUMP TRIAXLE
4/2612016
'41112017
U
120,548,40
75,945,54
44,6oz.ae
DT31300a014 TRUCK DUMP TRIAXLE •
U
165,513,136
40,698.00
DT30000015 TRUCK DUMP TRIAXLE
41112017
N
163,531.64
55,191,96
64815,130
108,339.68
D130000016 TRUCK DUMP TRIAXLE
4/112017
N
163,531.64
55,191.96
108,339.138
DT3o0a2Di7 TRUCK DUMP TRIAXLE
4/1/2006
U
26,500,00
23,850.00
DT46000001 TRUCK DUMP QUAD
3/112066
N
34,041,30
22,694;20
2,656.00
11,347,50
oT40000062 TRUCK DUMP QUAD
31112006
N
34,641,30
22,694,26
14347.10
DT40000003 TRUCK DUMP QUAD
311/2006
N
34,041.30
22,694.20
11,347,10
DT40000004 TRUCK DUMP QUAD
3/1/2006
N
34,641.30
22,694.20
i1,347,10
DT4aaaa0a5 TRUCK DUMP QUAD
3/1/2006
N
34,041.3d
22,694.20
11,347.16
DT40600006 TRUCK DUMP QUAD
3/112066
N
34,041.30
22,694,2.0
11,347,10
DT4000a067 TRUCK DUMP QUAD
411/2004
N
120,729;10
107,492,99
19,2313.11
DT40000008 TRUCK DUMP QUAD
313112010
N
41,1389,36
28,899,36
12,790,00
DT4a000069 TRUCK DUMP QUAD
7/3/2011
N
38,723.40
25,815.46
12,908,oa
DT40000010 TRUCK DUMP QUAD
7/3/2011
N
38,723,40
25,815,46
12,908,00
DT40000011 TRUCK DUMP QUAD
7/3/2011
N
38,723,40
25,815,40
12,906,66
DT40000012 TRUCK DUMP QUAD
7/3/2011
N
38,723,46
25,ai5.46
12,908,06
DT400000i3 TRUCK DUMP QUAD
411/2013
N
27,697.60
24,387,30
2709,70
Rieth-Riley Constructlan Co., Inc.
Equipment List
9/31/2020
Acquired New or
Asset Il Description
DT40000014 TRUCK DUMP CLUAD
Acquisition Date
4/112013
Used
Cast
Accum De r
p
NBV
DT40000015 ?RUCK DUMP QUAD
4/ 1/2013
N-
N
27,097.00
24,387,30
2,709,70
DT4,07aOO16 TRUCK DUMP QUAD
4/1/2013
N
27,097.00
24,387,30
2,7o9,7O
DT4000aai7 TRUCK DUMP QUAD
311/2a16
N
27,297.80
24,387,30
2,729,7-9
DT40000018 TRUCK DUMP QUAD
3/1/2016
N
60,243,87.
54,219,48
6,024.39
DT402000i9 'TRUCK DUMP QUAD
311/20i6
N
60,243.87
54,219,48
6,024.39
DT40000620 TRUCK DUMP QUAD AXLE
1212912016
N
60,243,87
54,219,48
6,-924,39
DT40000021 TRUCK DUMP QUAD.AXLE
4/1/2018
U
183,196,00
82,438,08
100,757,92
DT477-0aoz2 TR-uCK DUMP QUAD
7123/2218
N
90,950.00
43,959,12
46,990 88
EX08000001 EXCAVATOR OW1730SE2
4/1/2017
U
185,701,00
39,121,35
146,579,65 .
EX0800ao0Z' EXCAVATOR17
OW 308ETC
4/1/2017
U
85 392.25
32 937,12
52,455,13
EX13000001 EXCAVATOR OW 25-30 312CL
3131/2005
U
8i,820,i4
31,559,16
i
50,260,98
EX150a0d01 EXCAVATOR OW 30-35 314ELCR
9/27/2013
U
85,000,00
76,500,00
8 500,00
W5000002 EXCAVATOR OW 30-35 314E LC
4/2722018
U
185,071,94
152,298,69
32 773,25
EX23000001 EXCAVATOR OW 40-55 320EL
8/1/2016
N
36529,70
EX23000002 EXCAVATOR OVV40-553Z0ELRR
811/2016
N
06,397,86
1tl6,623,27
70,371.40
70,371,40
36,251,87
EX23000003 EXCAVATOR OW 40-55 320ELRR
8/1/2016
N
112,122.76
74,000,96
38,121,8❑
EX23000004 EXCAVATOR OW 40 55 320ELRR
4/2622016
U
104,493,47
68,9fi5,6-0
35,527.97
EX23000005 EXCAVATOR OW 40-55 320ELRR
U
167,349.13
100,409,40
66,939,73
1
EXZ3000006 EXCAVATOR OW 40-55 320EL R �
.4/2622016
4/19/201$
U
167,949,84
100 ,769,88
67,179,96
EX23000009 EXCAVATOR 23MT323F
1/1/2019
U
8,255.61
2,641,80
5613,81
EX40000001 EXCAVATOR OW 70-85 336EL
8/1/2016
N
25,688,55
Q,lzs,sz
21,560,03
EX400002 EXCAVATOR OW 70;85 336EL
008a3
8/1/2016
N
152,777,96
100 833,48
'
51,944,48
EX4aa00EXCAVATOR a+N 70-85 336EL
8/1/2016
N0
152 478,fi5
120 635,92
2014 CATERF'1LLAR336EL40 MTON EXCAVATOR
12/23/2019
N
152,495,15
100,646,80•
51848,35
EX40o00005 2014 CATERPILLAR33SEL40 M TON EXCAVATOR
12/2312019
N
54,143,74
5,
48,729,38
EX40000006 EXCAVATOR OW 70.85 336EL.
2/1/2016
U
57,837,89
5,783783,.8080
52 ,254.29
EX40000010 EXCAVATOR OW 70-85 3280LC4/18120:L8+
U
210,148,20
126 088 8-0
84,059,20
EX4tlaag213 EXCAVATOR 40 MT336F
i/1/2019
U
6,976,09
2,685,77
4,290,32
EX40000014 EXCAVATOR 3280I.CR 40 METRICTON
77,Oi5,14
, 12,377,40
64,637,74
EX50000001 2013 CATERPILLAR349EL50METRIC TON EXCAVATOR
12/23/2019
N
175,000,00
4'375'00
170,625,00
EX50000002 2013 CATERPILLAR 349EL50 M TON EXCAVATOR
12/23/201 9
N
68,414.86
6,811.49
61,373,38
FIN0000001 PAVER CONCRETE FINISHER 8R
4/26/1995
N
79,418,40
7,941.84
71 ,476,56
FIN0000002 PAVER CONCRETE FINISHER 36
3/2912016
N
36 870.75
33182,98
3 687,90
�
FKL0000001 FORKLIFT
� 2/2811984
N
168 888.44
21,997,50
B6,203,37
19,7.97,75
FKLoaaaaa3 FORKLIFT
4123/2202
N-
,82,685,07
2z,e3z.7z
18,627,72
2,199,75
FRK40a0001 Al-ACHMENTFORKS
4f 1/2000
U
47007
4,205,oa
FUEL6606 FUELTANKS W/6578 DUMP TRK
11/21/2018
N
5,999,45
$ 39 9,50
420.00
GEN0000001 GENERATOR
4f 21/1976
N
10,413,52
10,413,52
599 95
GEN0000002 GENERATOR
31611978
N
38,734,50
38,734.50
-
GEN0000005 GENERATOR
7/29/1995
U
15,020,00
13,5-00,00
8002002001 TRAILER LOWBOY5128113871,580.00
N
40,415,58
36 374.02
HOG2000002 TRAILER LOWBOY
7J15%199fi
N
6,249,49
4,041,56
HOG20000o3 TRAILER LOWBOY
5/1/2201.
N
15,137,14
5,624,54
11,533,14
624.95
HOG2000004 TRAILER LOWBOY
4/10/1997
N
37 667,55
33 900,79
3,604,00
HOG2000005 TRAILER LOWBOY
4/10/]997
N
37,667,55
3,766,76
HOG2000006 TRAILER LOWBOY
4/1/2006u
33,900,79
3,766,76
HOG3000aOl TRAILER LOWBOY1,908,00
N
19782 as
,
17,172.0a
n-u=u0uu== TnvitcsL-�.^'•'3u':'
8063000003 TRAILER LOWBOY
81191 1 3 9 5
5/1911 9 9 5
N
N
49,234,98
48,458,76
776,22
HDG3000004 TRAILER LOWBOY
5/112001
N
10,296,02
9,266,42
1,229,62
HDG3a0-0005 !RAILER LOWBOY 40T
21,211,01
16,ifi1,01
5 050,00
HDG3000006 TRAILER LOWBOY
511 2001
N
21,211,01
16,161.01
5,050,00
HDG3000007 TRAILER LOWBOY
5/1/2001
N
18 298,76'
13 982.76
4,316,aa
HDG3000008 TRAILER LOWBOY
4/is/zaa7
N
18,298,76
13,982,76
4,31G,OO
HDG3000009 TRAILER LOWBOY
3119/2009
N
17,222,22
11,348,14
5,674,08
HDG3000010 TRAILER LOWBOY
3 f 31/2010
N
17 ,022,22
11.669,34
+
5,352,92
8063207011 TRAILER LOWBOY
4/112009
N
16,411,55
11,468,55
4,943.02
HOG3000012 TRAILER LOWBOY GOOSENECK 4
3115/2010
N
24,01141
24,01241
-
HDG3000713 TRAILER LOWBOY
8/4/2015
N
20,223,00
20,223,00
_
HDG3000013 TRAILER LOWBOY
8/4/2015
N
82,607.73
43,369,20
39 238,53
HDG3000015 'TRAILER LOWBOY GOOSENECK 5
8/4/2015
N
82,607,73
43,369,20
39,238,53
HDG3000016 TRAILER LOWBOY
921/2215
U
83,309,09
43,737,24
39,571,85
HDG37272i7 TRAILER LOWBOY SOT
313112025
U
44,520,00
40,Ofi8,a0
4,452,00
HDG3000a18 2017 XLTRAILER XLiio LOWBOY TRAILER
6/3/2019
U,497,82
14,90fi,78
13,41fi,1a
1
HDG4000001 TRAILERLOWBOY
3 13 112 0 0 5
U
81,616,15.
7,651,5a
73,964,65
HEV.0000001 TRUCK HYOROVAC
21112018
U
27,560,00
24,804,00
HST2000001 TRAILER LOWBOY HYDRAULICT
7124/2018
U
36a,023,80
90 637,56
+
269�75s,00
,388,24
H5T2200202 TRAILERLOWBOY HYDRAULICT
712412018
U
32,1°°,07
12,639,36
19,46a,64
HST2000003 TRAILER LOWBOY HYDRAULICT
3131/2005
U
32,10a,a7
12,652,57
11,219.50
LT30000001 LOADERTRACK963KW%FORKS
421912018
U
12,192,00
10,971,00
MG20200001 GRADER 1206
3/31/2005
U
68,940,87
22,061,04
g6,219,Oa
MG40000001 'GRADER 14oH
411/2004
U
16,875,00
15,187,50
i�687,5a
MG400000OZ GRADER 140H
41112-007
N
210,043,4.7
189,039,12
21,004,35
MG40200003 2014 CATERPILLAR i4pM2GRADER
12/23/2019
N
252 '346,78
227,112,10
25,234.6a
MG40000004 GRADER MOTOR i60M AWD
4f1912a18
U
62,618,22
'
6,261,84
56,356,38
MG40000005 GRADER 14aG
4/1/2006
U
496,13
496,13
40,000,00
36xo,oa
4,0ao,aa
Rleth-Riley Construction Co,, Inc,
Equipment List
3/31/2020
AssetDescription
Acquisition Date
Acquired New or
Used
GRADER 14G
3/31/2005
U
Cost
Accum Depr
pr
NHV
MG40000007 GRADER 14OG
3/31/2005
U
20,188,00
18,169,20
2 0
MG40000CUS GR6DER140G
3/31/2005
U
28,125,00
25,312,50
2,812,50
MG40000009 GRADER I60H
3/31/2x05
U
61,500,00
55 ,350,00
6,150,00
M1S0000001 PATCHERJOINT SEALER
4/11/2013
N
1o1,006,00
9o,90o,00
1010 O.D❑
MJ50000002 PATCHERJOINT SEALER
4/11/2013
N
4181025
,,
41,810,2s'
_
MJS6000003 'PATCHERJOINTSEALER
4/11/2013
N
41,Bio,25
41,a1a,25
_
M1S0000004 PAT,CHERJOINT SEALER
4/11/2013
N
41,01025
41 810 .25
_
tltl
MJsooaas FATCHERJOINTSEALER
441/2017
N
41,810,25
41810' ,2.
_
M150000006 PATCHER101NTSEALER
4/142217
N
46,587.80
27,952,68
18,635,12
MISOCCOG07 2019 CINLINE M4DHPJOINTSEALER
46,587,80
27,952,68
18,635.:L2
MMxSodomi. COLD PLANER ROTOMILL
3�1/fzo�s9
51,376.67
3,425,12
47,951,55
MST00a007 TRUCK SERVICE
711/2016
U
47'500'00
42,750,00
4,750,00
MTA0000001 MATERIAL TRANSFER ASPHALT
12/15/2017
N
15,015,61
13,50o,Qo
1,500,00
MTA0g0a002 MATERIAL TRANSFER ASPHALT
12/15j2017
u
171,415,61
114,277,08
57138,53
M'CA0000003 2012 WEILDER E2850 ASPHALTTRANSFER
12/23%2019
U
142,834.02
95,222,68
47 6ii,34
'
MTAOOGCO04 2012W.EILDERE2850ASPHALTTRANSFER
12/23/2019
U
75 039,06
8,337,68
66,701,38
MTA0000005 MATERIAL TRANSFER ASPHALT
418/2Qi5
N
65520,38
7,Za0,Q4
58,840,34
MTA0000006 MATERIALTRAN5FERASPHALT
519,680,31
324,800,28
194,880,03
MTAaQQQoaS MATEAIAL TRANSFER ASPHALT �'
4/27/2016
N
498,428,15
233,387,52
175,046,63
MTA0000a09 MATERIAL TRANSFER ASPHALT
526201
N
499,455,56
249,727,68
249 727,88
MTA0000010 MATERIAL TRANSFER ASPHALT
5//264/20166
N
499 455,56
,
244 ,525,02
254•,93Q,54
MTCaa000ai MATER IALTRANSFER CONCRETE
8/9/1994
N
499,455,56
244,525,02
254,930,54
MTCOa00002 MATERIAL TRANSFER CONCRETE
4/21/1995
N
199,660,00
179,654,00
19,966,05
MTCOOCa003 MATERIAL TRANSFER CONCRETE
11/5/2001
N
24337679
,.
.230 0
.230, 072,37
13,304,42
MTC000aaQ4 MATERIALTRANSFER CONCRETE
2/22/2016N
85,746,92
66,743,92
19,003,00
OD780a0otl1 COMPACTOR VIER 78"" HDi20 V
107,025,00
107,025,00
00780000 02 COMPACTOR VIER 78"" HOi20 V
4/1/2017
12/15/2017
N
32,677,80
29 41x,02
_
3,267.78
OD78000603 2014 HAMM HD120V0 78 VIER COMPACTOR
12/23/2019
N
U
25,304.16
111 80 s,so
13,495,56
OD78000004 2014 HAMM HD120VO 78" VIER C6MPA.CTOR
12/23/2519
u
25,853,40
2,585,36
23,268,04
0078000005 2014 HAMM HD120VO 78" VIER COMPACTOR
114?3%2019
U
24,783,13
2,478,32
22,304,81
0078000006 COMPACTORVIBR78""HD+1201
4/30/2018
U
24,783,13
2,478,32
22,304,81
0078000007 COMPACTOR,.VIBR78""HD+1201
4/30%2018
U
23,978.45
8,961,92
1.016,53
0078000018 2019 CATERPILLAR C813 ,78" VIBRATORY COMPACTOR
512412019
N
28,417.09
10,620,94
17,796,13
0078006019 2019 CATERPILLAR C813'78" VIBRATORY COMPACTOR
5/24/2019
N
186,219,03
18,585,05
161,633,98
0078000020 2019 CATERPILLAR C813 78" VIBRATORY COMPACTOR
512412019
N
180 219,03
'
18 585,05
+
161;633,98
00780x0021 2oi9 CATERPILLAR 0813 78" VIBRATORY COMPACTOR185,219,03
5/2412019
N
18,585,05
1fi1,633,9s
�
00780x0022 2019 CATERPILLAR CB13 78 VIBRATORY COMPACTOR
5/2412019
N+
180,219,03
18,585,05
ifii fi33,98
0078000023 2019 CATERPILLAR CBi3 78" VIBRATORY COMPACTOR
5%24/2019
N
185,435,28
19,123,05
166,312,22
OD78000024 2019 CATERPILLAR 0813 78 VIBRATORY COMPACTOR
5/24/2019
N
185 ,435.28
191
, 23,06
1s6,3i2:2.z
u
0078060025 2019 CATERPILLAR CB13 78 VIBRATORY COMPACTOR
5/2.4/2019
N16.,312,22
185,435,28
19 123,06
0078600026 2019 CATERPILLAR CB13 78" VIBRATORY COMPACTOR
5%24/2019
N
185,435,28
19,123,06
166,312.22
0078000027 =9 CATERPILLAR CB13 78" VIBRATORY COMPACTOR
5/24/2019
N
185,435,28
17,384,60
168,050,68
PAC00xx020 CRUSHER �
24211971
N
185 +435,28
17 ,384.60
168 0$0,68
PA5000000i PLANTSCREEN
11/512001
N
5,066,67
4,560,00
506,67
PBF0000602 CONVEYOR BELT
2/1711978
N
48,295,44
37 +211,44
11,084.50
pBS0000605 CONVEYOR WEIGH BELT
7/22/1985
N
10 '456,00
10,45.,00
_
PCA0000017 CONVEYOR
t, ,,, , ,
is 787,63
+
10,787,63
_
FCA0000021 CONVEYOR BELT
PCA5060022 CONVEYOR
3/19/1975
N
12,115,43
11,173,32
942,11
FCA0000023 CONVEYOR
8/31/1978
8/31/1978
N
N
19,400,42
19,400,42
pCA0000036 CONVEYOR
2/1711978
N
19,400.42
16,456,60
19 ,400,42
_
PCAaaaa0fi3 CONVEYOR
9/28/1975
N
15,485,23
16 ,466,00
•14,281,08
_
PCCO0000Za CONVEYOR
312911980
N
14,35o.00
14,350,00
1,204,15
PCIV10006018. COMPRESSOR AIR 185
6/21/2017
U
13684,60
_
PCR5000011 CRUSHER
16/24/ 1976
N
,
13,000,00
12 ,384,60
33,000,00
1,300,60
PF84000001 COMPACTOR VIER GRADE 8411" C
12/15/2017
N121
PF84000002 COMPACTORVIBR GRADE 84"" C
iS/2017
N
35,632,68
23,755,14
PF84000003 2x14 CATERPILLAR CP56 84 PADFOOTSOIL COMPACTOR
12/23/2019
U
67,202 66
45,321.68
26,806,98
PF84000Q04 COMPACTOR VIER GRADE 84"" C
3/31 2005
1
U
30 '766'91
3,076,68
27,690,23
PN70000001 COMPACTOR PNETIREDPs300a
3/31%2005
U
50,006,06
45,ocom
51000;6Q
PN90000001 COMPACTOR PNETIRED PT140A
U
36,47140
32,823,90
3,647.10
PN90a00002 2013 CATERPILLAR PSISOC PNEU COMPACTOR
12/2 31 2 01
12/23/2015
U
21,915,11
19,723,60
219 1,51
PN90000003 2513 CATERPILLAR PSI55C PNEU COMPACTOR
12/23/2019
U
11,831,48
1,183,16
i0,fi48,32
PN90000004 COMPACTOR PNE TIRED PSISQC
8/3/2017
U
13,181,98
1,318,20
11,863,78
PN90060005 COMPACTOR PNETIRED P5150
4119/2018
U
689,26
689,26
PN9000a0a6 COMPACTOR PNE TIRED 530A
5,595,50
2,797,68
2797.82
,
PNSOOO0007
3/31/2005
U
9,000,00
8,100.00
8,100,00
900,00
PN9a000008 COMPACTOR PNETIRED C530A
3/31/2005
U
4,375,60
3,937,50
437,50
PN9000ao09 COMPACTOR PNE TIRED C530A
3/31/2005
U
9,375,00
°8;437,50
937,50
P520000001 PL4CERSPREADER
6/17/1992
N
3 750,00
'
3,375,00
375,00
P520000002 PLACERSPREADER
1145/2001
N
217,149,30
195,434,37
21,714.83
PS20000003 PLACERSPREADER
3/311 2005
U
1x5,753,84
76,032,84
'
28,72100
eS20000004 PLACERSPREADER
41112017•
N
139 519,38
129 67,45
,6,35
13,951,93
PSC0000002• SAND SCREW
3%2/19 79
N
97696,35
,
27,
_
PSSOOGO012 SCREEN AGGREGATE
4/2711991
N
34,500,00
34606
' 0,00
PTC0000009 CONVEYOR
71271196E;
N
41,861,41
37,675,27
4,186,14
11,778,79
10,862,87
915,92
Rieth-Riley Codstruction Co,, Inc.
Equipment List
9/31%2020
Acquired New or
Asset Description
Acquisition Date
Used
Cost
AcumDepr
PW50000006 WASHER EAGLE
9131974
J /
N
15,000.00
1
13,833,60
NeV
1166,40
PW500a1ao7 TANK CLASSIFYING
4/2/1989
N
105262,20
`
94735,98
'
f
10,526,22
RM00000001 GRADER MAINTAINER
t
4/1/2017
U
21,859,32
19,673,39
2,185,93
SCR11a0001 SCRAPER 6i3C
506fi000001 COMPACTOR VIER GRADE 66"" 8
3/31/2005
4/1/2000
U
U
31,875,80
28,687,50
3,187,50
5066000002 COMPACTOR VIER GRADE 66" C
3/16/2009
U
29,300,00
22,000,00
24,000,00
19,800,00
5,3a0,00 -
5od6000003 COMPACTOR VIER GRADE 66"" C
3/31/2005
U
2,200,00
SD84a0aea3 2014 CATERPILLAR C556B 84" SOIL COMPACTOR
12/2312819
.0
fi0,0o0,00
31564,47
54,000,00
3156.44
6,000,00
5D94000004 COMPACTOR VG 84"" C556B
4/1912018
U
'
28,4as,13
SD8ga00005 2016 CATERPILLAR C556B 84" SOIL COMPACTOR
• 8/30/2019
U
27,286,21
9,624,60
17,661.61
•SD84000006 2017 CATERPILLAR 05568 94Y ML COMPACTOR
12 19 2019
/ /
U
6,500,00
1,444,48
5,355,52
5F2aaaaam PAVER SLIPFORMSF45(3
.
5/4/1988
N
8,300,00
370,650,00
,922,24
333 585,00
7,377.7fi
5F20000002 PAVER SLIPFORM 2 TRACK 350
6/2811988
N
256,369,(30
230,732,10
37,065,00
SF2000o003 PAVER SLIPFORM5F550
4/2611991
N
405,623,35
3fi5,061,02
25 636,90
5F20a00004 PAVER SLIPFORM 2 TRACK GP2
4/1/2000
N
161,936,38
132,250.48
40562,33
Z9 685,90
SF408a7001 PAVER CONCRETE 4 -TRACK GT6
2/912004
N
179,845,72
153,52a,$2
26,324.9(3
SF40000062 PAVER CONCRETE 4 TRACK SF2
11115/2012
N
•103,057.40
103,057.40
SMM00063 PAVEK•CONCRETE4TRACKGTS
6/412010
N
200,189.23
200,ie9,23
_
SKLaaa0001 GRADER MAINTAINER 2345
4/1/zoaa
U
35 200,00
30,200.00
_
SKLo000002 GRADER MAINTAINER 2145
4/1/2006
U5,000,00
28,0(30.07
22,sed,a0
2,500,00
SKI.a=004 GRADER MAINTAINER 724
3/31/2005
U
6,250,00
5,625.0a
SKL0000005 GRADERMAINTAINER724
3/31/2005
U
7,Sao.00
6,750.00
625,00
SKU000006 GRADER MAINTAINER 724
3/31/2005
U
7,500,00
6,750.0a
750,00
SKLGQ00007 GRADER MAINTAINER724
3/3112005
U
7,500,00
6,750.00
750,00
5KL0800008 pRADER MAINTAINER 724
3/31/2005
U
7,5ao,0o
6,7.50,00
750,00
sPFaamaoi 2012CATERPILLARSiSFSHEEPSFOOTCOMPACrOR
12/23/2019
U
70875.43
70$7,5'6
757.80
SSLa00aao1 SKID STEER WHEEL
4f 1/2000
U
7,800.00
6,800,00
63,787,87
1,407,00
SSLOODa002 ,LOADER SKID STEER
713/2016
U
30,000,00
27,000,40
3,440,00
55L0000a06 SKID STEER WHEEL
4/1/2006
U.
20,000.00
18,000,00
2,000.00
SSL0000007 SKID STEER WHEEL
411/2006
U
20,000.00
18,000,00
2,000.00
SSL0000008 SKID STEER WHEEL
1/2912008
U
•19,750,00
17,775,00
1,975,00
551.0000009 SKID STEER WHEEL
3/31/2005
U
12,500.00
11,250Aa
1,250,00
5WP00a0001. SWEEPER ROAD
4/j/2000
U
8,500.00
4,000,00
1,500,0)
SWP0000002 SWEEPER ROAD
3131/2005
U
5,900.00
4,520.00
500,00
TB80000001 TRUCK BOOM Bo' —
. 3 f 24/2011
U
59,920,00
53,928,00
5,992.00
T000000001 TEXTURE CURE CONCRETE
4/26/1991
N
56 713.68
51042,31
Tca00aaa02 TEXT6RE CURE CONCRETE
3f14f200fi
N
.25 -
49,461,36
5,671;37•
TC00000003 TEXTURE CURE CONCRETE
4/1/2004
N
31,92
231,922.25
208,730,02
21,153,80
23,192.23
T1120000001 TRAILER PUMP SEMI
513/1995
N
6,288,97
5,fifi0,07
628,90
7020000002 TRAILER DUMP SEMI
Sf 1/2001
N
16,373.73
12,140,73
4,033,00
TD20000003 TRAILER DUMP SEMI
5fifZ071
N
16,173,73
12,140,73
4,033,00
TD20000004 TRAILER DUMP SEMI
5/112001
N
ifi,173.73
12,140,73
4,033,00
TD20a00005 TRAILER DUMP SEMI
5/112001
N
36,173,73
12,140,73
41033,00
TD20000006 TRAILER DUMP SEMI
5fi/Zpai
N
16,173,73
12,140.73
41033,aa
TD20000007 TRAILER DUMP SEMI
5/1/2001
N
16,173,73
12,147,73
4,033,00
TD20000008 TRAILER DUMP SEMI
SEMI
4/3012006
N
14,632,65
9,754.65
7020007009 TRAILER DUMP
4/30/20064,878,00
N
14,632.65
14,5=2.95
cO<Lcic;;ciiu TRi;iLETc ui.it.�P Cu�dSTTtLitu::c3
6/5/2006
N
26,888.72
24,199,85
.
2,688,87
TD20000011 TRAILER DUMP SEMI
9/1/2016
N
41,930,00
17,223,48
24,706.52
7020000032 TRAILER PUMP SEMI
9/112016
N
42,3$0,00
17,326,2$
24 853.72
TDRLo00ao1 TRUCK ITON DRILL
1113 0119 8 3
N
14,490,00
13,041,70
�
1+709.00
TEXa00000i EXCAVATOR TELESCOPINGSL41
7/i1J2008
N
277,091,48
249,382.33
27+779.15
TF20000003 TRUCK FUELTANDEM
7/2/2001
N
40,382.86
24 071,86
6311.00
TFW1000001 TRUCK WATER/FUELSfA
3/3112(305
U
15,900.00
14,310,70.
1,590,00
TFW1a00002 TRUCK WATER/FUEL.
3131/2005
U
_
15,900,0(3
14,31o.7D
1,590,07
TFW1a00003 TRUCKWATERIFUEL
313 112 0 0 5
U
16,R75,5a
14,906.25
1,656,25
TFWiao0004 TRUCKWATER/FUEL
313112005
U
19,R75,00
17,$87,50
1,487,50
TFW1000005 TRUCK WATER/FUEL
'3131/2ao5
U
27,825.00
25,042,5a
2,782,50
TFW2000001 TRUCK WATER/FUELTfA
2/16/2004
N
_ 20,099,94
11,929,94
8,100,00
TFW2000002 TEiUCK WATERf FUELT/A
2f 9/2004
N
18,311.94
9,513,00
TFW2000004 TRUCK WATERf FUELTfA
4/1/2013
N ,
27,975,15
25,177,63
8,798,94
TFW2000005 TRUCK WATER/FUELT/A
2/5/2013
N
29,723,78
26,751.47
2,797,52
2,972,38
TFW2000006 TRUCK WATER/FUELT/A
9/30/2013
N
51,508.80
46,357,92
5,150,88
TFW2000a07 TRUCK WATER/FUELT/A
3/1/2016
N
66,900,54
60,210.149
6,690,05
TFW2000008 TRUCK WATERf FUELT/A
3f i f 2016
N
66,900,54
60,210;49
TFW2000009 TRUCK WATER%FUELTfA
6/4/2017
N
232,729,74
74,182,56
6,690,05
158,547,18
TFW2000010 TRUCK WATER/FUELTfA
6/4/2017
N
232729,74
74,182,56
158,547.18
TFW200001i TRUCK WATER/FUELTfA
6/4/2017
N
234,702,03
74,811,22
159,890$1
TG10a00003 TRAILERTILTTOP
3/1612009
U
1,060,10
854,40
176,00
TG20 Da0001 TRAILER PULLTYPE26'
5/2/2015
N
23,126,10
12,955,44
10,170,66
TG20000002 TRAILER TILTTAG 20T
5/24/2018
N
24,478,37
5,278.04
19,200,26
TG2a0aa003 TRAILERTILTTOP
3/16/2009
U
10,600,00
91540,40
1,060,00
TG200a0004 TRAILERTILTTOP •
3/1612009
U
7,910,00
7,119,40
791,00
TGN3000001 TRMLERTILTTOP GOOSENECK
5/1/2001
N
13,960,79
10,667,79
TGN300000Z TRAILERTILTTOP GOOSENECK
3/20/1998
N
26,877,54
24,077,54
•3,293 ,40
TGN3000003 TRAILER TILTTOP GOOSENECK
7/2/2001
N
23,115,99
20,315,99
2,800,00
TGN3000004 TRAILER TILTTOPGOOSENECK
411212(117
N
43,698,57
14,748,24
28,950,33
Rieth ;Riley Construction Co., Inc.
Equipment list
3/31/2020
Acquired New or
Asset Description
Acquisition
q
Used
Cost
RccumDepr
TGN3000005 TRAILERTILTTOP GOOSENECK
3116/2009
U
23,320.00
NBV'
TGN3000006 TRAILER TILTTOP GOOSENECK
3/16/2009
U
20,988,00
2,332.00
TGN3000007 TRAILERTILTTOP GOOSENECK
3/16/2009
(J
3,180,00
.2,862,00
318,00
TLB40a000i TRAILER 4AXLE
4/1/2006
U41,340.00
8,480,00
7,632.0o
848,00
T1.1341](10002 TRAILER UXLE
4/1/2006
U
37,20fi,00
4,134,00
T68000001 TRAILER 8 AXLE
5/1/1989
U
41,340,00
37,206.00
4,134,00
TLI38000062 TRAILER 8 AXLE •
5/1/1989
U
84,240,00
84,240,00
75 816,00
75,816.00
8,424,00
TLBBO00003 TRAILER 9 AXLE
7/6/1992
N
8,424,00
TLOB000004 TRAILER 8 AXLE
7/16/1992
N
108,107,50
97,296,75
10,810,75
TL88000005 TRAILER 8 AXLE
4/5/1994
U10,810,75
108,107,50
97,296,75
TLBaoaaaa6 TRAILER8AXLE
4/5/1994
N
19,760,00
17,764,00
1,979,00
TLSSG00007 TRAILER 8 AXLE
4/51994
N
19,760,00
17,764,00
1,976,00
TL8aa00008 TRAILER 8 AXLE
4/5/1994
N
19,760,00
17,784.00
1,976,00
71.08000009 TRAILER S AXLE
4/5/1994
U
19,760,00
17,784.00
1,97fi,00
7198000030 TRAILER 6 AXLE
5/1/1997
U
19,760.00
17,784,00
1,976'00
TL68000011 TRAILER 8 AXLE
511/1997
U
10,143,45
0,33
10,143,12
TL68a0001Z TRAILER 8 AXLE
5/1/1997
U
8,362 97
0,22
8,362.75
71.88000013 TRAILER S AXLE
1/25/1999
N
8 404.45
40,539,81
0.22
33,924.81
6,414,23
TL88000Oi4 TRAILER aAXLE
5/1/1997
N
26,766.62
15,766.62
fi,fi15,00
TL88000015 TRAILER 8 AXLE
1/25/1999
N
40,539.81
33,924.81
11,000,01
TLa8000016 TRAILER 8 AXLE
5/111997
N
26,373,32
15,373.32
TLBSOOaOiZ TR4ILER 8 AXLE
8/24/1999
U
37,100,00
27,100,10
i,000,o0
11,000,00
TLB8000018 TRAILER 8 AXLE
6/24/1999
N
37,100.00
271ao,1a
10,000,00
TLBa0aao19 TRAILER a AXLE
6 29 1999
N
37,100,00
,
27,300,00
10,1300,10
TLBsoaoa20 TRAIL•ERaAXLE
6124/1999
N
,97,100.00
27,100.01
10,000,00
71.68000021 TRAILER a AXLE
6/2411999
N10,000,00
37,100,00
27,100,00
TLBB000022 TRAILER 8 AXLE
2/16/2000
N
47;216,20
36,674,90.
10'000.00
TLB800aO23 TRAILER a AXLE
2/16/2000
N
47,216,20
36,674,90
10,541,30
TLsB a0024 TRAILER8AXLE
2/16/2000
N
47,216,20
36,674.90
10,541.30
TL38000025 TRAILER a AXLE
2/16/2000
N
47,216,19
36,674.89
10+541,30
TL88ao0026 TRAILER 8 AXLE
2/16/2000
N
47 216,19
3,6
10,541,30
TLBSO00027 TRAILER 8 AXLE
2/16/2000
N
47,216.19
,674.89
B6,974.89
10,541,30
TLea000029 TRAILER aAXLE
51112001N
25,5133.z4
17,53x,24
10,541,30
TLB9000029 TRAILER 8 AXLE
5/1/2001
N
25,583,23
17,538.23
6,045,10
TLB8000030 TRAILER 8 AXLE
5/1/2001
N
25,583,24
•17 538,24
8,x45,00
TLa8000031 TRAILER 8 AXLE
5/1/2001
N
25 583,24
'
17 538.24
8,045,00
71.88000032 TRAILER 8 AXLE
5/1/2001
N
25,583.24
17,538,24
6,045,ao
TLB9000033 TRAILER 8 AXLE
5/1/2001
N
25,583,24
17,53x,24
$,045,00
TLBSOCCO34 TRAILER 8 AXLE
5/1%2001
N
25 583,24
17 538,24
,045,Oo
TLB8000035 TRAILER 8 AXLE
5/112001
N
25 583,24
17538,24
5,045,10
TLB8000036 TRAILER a AXLE
3/3112010
N
40,649,45
28,906,45
,045,00
TL•B8000037 TRAILER a AXLE
3/31/2010
N
40,649,45
28,906,45
11,743,00
TLB8000038 TRAILER a AXLE
4/1/2o06
U
77,812.05
70,03a,a5
31,79.00
TLSS000039 TRAILER 8 AXLE
6/6/2014
U
53 000,00
47,700,00
7,701120
TLBEOOQ040 TRAILER 8 AXLE
6/6/2014
U
45,050,00
40,545,00
5,300,Oa
T1.52000041TRAILER.aAXLE
6/6/2014
U
• 47,701,00
4z 930,11
4,505,00
7188000042 TRAILER 8 AXLE
5/30/2015
N
167,649,60
92,731,3s
4,771,00
TLOSO00043 TRAILER 8 AXLE
5/30/2015
N
167,fi49,60
92731,36
74,918,24
71.88000044 TRAILER a AXLE,
C:7.i tic
74,918,24
TLaaau"u""045 TRr1iL"cnaAXLE
TLE8000046 TRAILER 8 AXLE
5/30/2015
1/2/2016
N
N
yu:, I'M �
167,fi49,60
92,731,36
7 y•_ _ •
7 ,-in,L4
TLB800aO47 TRAILER a AXLE
1/2/2036
N
170,06122
7.70,063,22
81311.34
'
81,311,34
88'918,24
,751,88
71.8$000148 TRAILER SAXLE
112/2016
N
170,063.22
81,311,34
88,751.88
TLB8000049 TRAILER 8 AXLE
1/2/2016
N
170,063,22
81311,34
8875 l,sa
TLB80a0as0 TRAILER 8 AXLE
1/212016
N
170 063,22
811311,34
$$,751.s8
TLBSONOS1 TRAILER 8 AXLE
112/2016
N
17a,063,22
81,31134
,751.Ba
TL0000052 TRAILER 8 AXLE
4/1/2017
U
91236,52
35191.20
88,751,88
TLBS000053 TRAILER 8 -AXLE
4/1/2017
U
9i,236,52
35,191.20
56
TL68aao654 TRAILER 8 AXLE
4/1/2017
U
91,236,52
35191.20+045,32
5fi,045,32
TLBx000055 TRAILER 9 AXLE
4/1/2017
U
91,236,52
35,191,20
56'0 5,32
71.88000057 TRAILER 8 AXLE
4/1/2006
U
54,060,00
48,654.00
45,32
TLB8000058 TRAILER 8 AXLE
4/1/2006
u
54,0x0,00
da x94,00
5+
TLBSO00059 TRAILER 8 AXLE
4/1/7006
U
62,010.00
55,809,00
5,4as,aa
TL88aa0060 TRAILER a AXLE
4/1/2006
U
62,010.00
55 809,00
6+406,00
+201,x0
TL08000061 TRAILER 8 AXLE
4/3/2106
U
67,310,00
+
60
fi,201,0a
T1.138000062 TRAILER 8AXLE
3/3112005
U
31,800,00
,579,00
29,620,00
6 ,731,00
TLB9000063 TRAILER 8 AXLE
3 /3 112 0 05
U
31,800,00
281620 DO
3'180.00
TLOS000064 TRAILER 8 AXLE
3131/2005
U
31,800.00
28,620,00
1laox
TLOS000065 TRAILER B AXLE
3/31/2005
U
31,800,00
28,620,00
's,180.00
T1.880000613 TRAILER 8AXLE
3/31/2005
U
31,800,00
28,620,00
3,180,00
TLOS000067 2018 RED RIVER OLS84ONGH 8 AXLE LIVE BOTTOM TRAILER
5/7/2019
U
82,944,33
3180,00
T1.08000068 2018 RED RIVER OLB84ONGH 8 AXLE LIVE BOTTOM TRAILER
5/7/2019
U
90,303.60
8,553,60
74 390,73
TLBx000069 2018 RED RIVER OLB84ONGI l a AXLE LIVE BOTTOM TRAILER
517/2019
U
83,124,33
9,312.60
80,991,00
TLBa000070 '2018 RED RIVER OL8840NGH 8 AXLE LIVE BOTTOM TRAILER
5/7/2019
U
83,221,73
8,572,19
74,552A4
TLB8010071 2018 RED RIVER OLS84ONGH 8 AXLE LIVE BOTTOM TRAILER
5/712019
U
89,916,96
8,582.20
74 639,53
TRC0000001 COMPACTORTRENCHFABR
2/2111983
N
39 132,76
9 272,67
35,219,48
EO ,644.Z9
TRC0000002 COMPACTOR TRENCH TR -100
3/17/2010
N
30,495,00
30,495,00
3,913,2a
13-20
Rietb-Riley Construction Co., Inc,
Equipment List
• 3/31/2020
Asset ti Description
Acquisition Date
Acquired New or
Used
TRENCHER
7/9/2015
U
Cast
Accum Depr
pr
NeV
TRLD000001 TRAILER DUMP LEAD
4/1/2006
U
69,015,00
65,564.25
B,45035
TRLD00000Z 1988 EAST LEAD DUMP
1/29/2008
U
11,660.00
10,494,00
1,166,0❑
TRLD000003 TRAILER DUMP LEAD
1/29/2008
U
15,900,00
14,310,00
1,590.00
TRLD0000a4 TRAILER DUMP LEAD
1/29/2008
U
19,080,00
17,172,00
1,908,00
TRLD000005 TRAILER DUMP PUP
1/29/2008
U
21,200,00
19,080,00
2,120,00
TRLDaaaaa6 TRAILER DUMP PUP
1f 29/2008
U
26,500•a0
23,X50,00
2,650,00
TsF2000001 TRUCK WATER SPRA1(8AR
7/12/1988
N
31,800,00
28,620,00
3,180.00
TSF2000002 TRUCK WATER SPRAYBAR
70,634.27
59,452,67
11181.60
TSF2000003 TRUCK WATER SPRAYBAR
411591
N
80,136,46
72,122,82
8,013,64
TsF2aaaa04 TRUCK WATER SPRAYBAR
5/1/1995
N
01,927,03
72,806,97
91120,06
TSF2006005 TRUCE( WATER SPRAYBAR
5/1/2001
N
20,297.82
17,266.49
3,031,33
TSF2060005 TRUCK WATER 5PRA1f8AR
_ 5f i/zaal
N
28 797,73
21,957.73
6,840,00
TSF2000007 TRUCK WATER SPRAYBAR
5/1/2001
N
25 988,29
+
1fi 0
16,020.77
TSF2000008 TRUCKWATER'
4/1/2006
U9,540.00,
30 739,05
,
21,957,73
8,787,52
1,32
TSF2aaa0as TRUCK WATER
3/31/2005
U
8,569,00
954,00
TSF3000001 TRUCK WATER SPRAYBAR
5 1/1995
N
7,685.00
6,916,50
768.90
7710000001 TRAILERTILTTOP.
3/i6f2009
U
86 974,65
'
76,182,57
10 79
,2.o8
T1720000001 TRAILERTILTTOP
8131/1995
N17173,23
773,00
TT2aaaaad TRAILERTILTTOp
4/1/1597
N
15'957.00
,455,90
1,717,3a
TT20aaaao3 TRAILERTILTTOP
4/1/1997
N
17,043.64
15,339,28
1,704.36
TT2aaaa0a4 TRAILER TIlTTOp
4/1/1997
N
17,a43,64
15 339,28
' 1,704.36
7720000005 TRAILERTILTTOP
4/111997
N
16,897,33
15 ,20 7.60
1,689.73
TT2000aa06 TRAILERTILT7'O
3/20/1998
N
i6j897,33 ,897,33
15,207.60
1,689,73
TT20000007 TRAILERTILTTOP
3/20/1998
N
11370,18
'
9 720.18
'
1,650,00
7T20000008 TRAILERTILTTOP
3/2011998
N
11,370,18
9,7Zo.18
1,650.00
TT2aaaaa09 TRAILERTILTTOP
7/2%2001
N
11,370,18
9,720.18
1,650,00
7720000010 7'RAILERTILTTOP
7/2/2001
8 +941,a6
7,291.06
11650,00
TT2aa04a11 TRAILERTILTTOP
7/2/2001
N
8,856,73
7,2x6.73
1,650.00
7720000012 TRAILERTILTTOP
6/3/2002
N
8,856.73
7,206.78
1,650.00
20apaa13
TRAILERTILTTOP TT
6/3/2002
N
6,454,71
4,804,71
11650,00
TT20000014 TRAILERTILTTOp
8/2/1999
N
6,51fi,18
4,866.18
1,650,00
TT2a00a015 TRAILERTILTTop
1212/2002
N
14,369.32
12,724,92
i,B4s,0a
7720000016 TRAILERT
5/14/1999
N
4,363,21
ZILTTOP ,71 8.21
1,645,00
1720000017 TRAILERTILTTOP
5/912006
N
19,650,00
17,685 ,00
11965,00
TT20000019 TRAILERTILTTOP
4/1912010
N
26,403,25
23,762.92
2,640,33
TT20000019 TRAILERTILT20T
4/1/2017
N
15,565,04
14,008.54
1,556,50
TT2000020 TRAILERTILT20T
41112017
N
32,127,03
10,842,84
21,284.19
TT20000021 TRAILERTlLT20T
4/1/2017
N
31,857,05
10,751.76 ,
'10,751.76
21,105,29
1•. '20000 023 TRAILERTILTTOP
3Jifi/2009
U
31 ,857.05
21,itl5,29
TT20000024 TRAILERTILTTOP 20T
3/31/2005
U3131/2005
7, 730 ,00
6,957,00
773,00
7720000025 TRAILERTILTTOP ZaT
•U
2,517,50
2,265,75
251,75
TT2000a026 TRAILERTILTTOP 20T
3/31/2005
U
2,517,50
2,265,75
251.75
M0000077 TRAILERTILTTOP 20T
3 /3 112 0 0 5
U
2,517,50
2,265,75
251,75
TT2000002B TRAILERTILTTOP 2aT
3/31/2005
U
2,517,50
2,265.75
'265,75
251.75
7720000029 TRAILERTILTTOP
3/31/2005
U
2,517,50
2
251,75
TT20000030 TRAILERTILTTOP 207
3131/2005
U
2,517,50
2,517,50
_
TT20000031 TRAILERTILTTOP 207
3/31/2005
U
2,650,00
2,385,00
265,00
•tn.ni,n.n-,� T7;"',::r-" T:LT:` n ,'_..r
-
2,650,00
2,38800
1720000033 TRAILERTILT20T
djIVZvu5
3/31/2005
U
U
2,650,00
2,385,OQ
-
265,00
TT20000034 20i9XLTRAILERS XL40TILTTAGTRAILER
7/17/2019
N
4+770.00
4,293,00
477.00
TTZOtlaa035 2019 XL. TRAILERS XL40 TILTTAG TRAILER
7/17/2019
N
36,847,16
9,1(38,96
33,738,20
7720000036 2019 XLTRAILEPS XL40 TILTTAG TRAILER
7/1712 0 1 9
N
96,847.16
3,1a8,9fi
33,738.20
TT20a06037 2019 XLTRAILERS XL40 TILTTAG TRAILER
5 7/2019
U
36,847.16
3,108.96
33 758,20
,
7T250a0001 TRAILERTILTI'oP
s/isfi99fi
N
27,786,50
2
24,921,00
'7725000002 TRAILERTILTTOP
9/18/2007
N
22 973 9a
20'865,50
2,257,38
TT25000003 TRAILERTILTTOP
4f 2/2008
N
32741.00
29'676.40
+466,90
3,27410
7725000004 TRAILERTILTTOP
4/212(308
N
32741,0❑
29,466,90
3 !274,10
TTK000000i TRAILERTANKER
5/511988• •
32,741,00
29,466,90
3 )274.10
TW1a000001 TRUCKWATER
7/1f201fi
U
30,287,63
27,258,87
3,028,76
TW10000002 TRUCK WATER
3/16/2009
U
20,000.00
18,000.00
2,000,00
TWiaaaaam TRUCK WATER
3/31/2005
U
250,00
-
290,00
TW20ao0001 TRUCK WATER TANDEM
6/3/2002
N
11,925,00
10,732.50
1192,50
TWZOa00002 TRUCK WATER TANDEM
1212/2002
N
35,488,51
26,995.51
8,493.00
UTF0000003 TRACTOR FARM
711/20:16
U
29,372,33
21,155,33
8,217.0a
UTF0000007 TRACTOR FARM
3J3i f 2005
U
44,776,00
37 '947,66
6'828'34
WD08000001 WIDENERSPD-8
121212012
N
2,813,00
2,531.70
281.30
WD10aaaaol WIDENER RWi00
421/1987
N
20,823,48
18,877.36
1,946,12
WDi0aaaa02 WIDENER RW100A
12/2/2004
N
86,709,00
78,039,10
8,670,90
WDi0a00003 WIDENERW530
12/15/2017
N
72,005,68
72,005,68
W=000004 WIDENERW53a
4126/2ai6
U
77,691.66
51 ,794,40
25,897,26
WD10000005 WIDENER W53aA
4/26/2016
N
123,184,45
101,898,1a
21,286,27
W010000aQ6 2018 WEILER W530A WIDENER
9/3/2019
U
242,617,65
1fi0,p98,00
82,519,65
WD10000a08 2018 WEILER W530A WIDENER
9/3/2019
U
149,380,08
WD14000001 WIDENER RWi95D
4/28/1993
U
166,602.23
16'787,08
,197.44
150,404,79
W01000002 WIDENERRW195D
.11/1998
N
131,039,59
117,935,63
13,103,96
WD14000003 WIDENER RWi95D
7/2/2001
N
177,226,00
155,753:00
21,473.ao
1a9,609,12
94,127,12
15,482,00
Rieth-Riley Cansfruction Co., Inc.
Equipment List
3/31/2020
AsseEli Description
Acquisition Date
Acquired New or
Used
WD14000004 WIDENERRW195D
4/1/2006
U
Cost
AccumDe pr
NBV
WD14000005 WIDENER RW195D
11/2/2010
U
172,500,00
155,250,00
17,252,011
WD14000006 WIOENERFtW195
3/31/2005
U
32,527,50
32,527,50
_
WL01a00001 LOADER WHEEL,907H
8/3/2017
U
31,250,00
28,125,00
3,125,00
WL01000002 LOADERWHEEL908HZ
8/3/2017
U
20,279,37
18,251,43
2,027,94
WL01a00003 LOADER WHEEL 907M
4/19/2018
U
39,481.17
20,088.64
13,392,53
WL03000001 LOADER WHEEL938K
•8 1 2016
N
30,923,16
11,905,44
19,017,72
WL031100202 LOADER WHEEL938K
�
8/1/2016
N
103,895,57
68,571,04
35,324.53
WLa3aob003 LOADER WHEEL938K
12/27/2017
N
107,013,24
70,628,80
36,384.+}4
WL03000004 LOADER W HEEL938K
12/27/2017
N
1i945687
, .
50,.
17180
691265,07
WL03000005 LOADER WHEEL938K
1zfz�/2D17
N
119 '501,92
50 +190,84
69,311,08
%La306co6 LOADER!AlI1EEL938K
12/2712017
N
119,466;10
50,175,72
69,290,38
WL03a00007 LCIADERWIiEEL938K
12/27/2017
N
119 ,416,68
sai , 55,00
69,261,68
W1.0300=2 LOADERWHEEL938M
4/19/2018
U
130137',16
54,657.68
75,479,48
WL04200adLOADER
12/15/2017
N
221 '984;14 .
7354,92
15,629,22
WLa4000002,L0A0ERWHEEL950K
12/17/2018
N
93 '917,45
56,350.56
37,566,89
WL05000201 LOADER WHEEL962G
6/20/2005
N
124,662,36
40,798,56
83,863,80
WL0S0000112 LOADER WHEEL962H
4/28/2006
N
210,996,18
189,896,56
21,099,62
WLx5a00003 LOA05RWHEELS62H
4/28fzaa6
N
231897,2fi
+
208 ,701,53
23,189,73
WL060o00a1 LOADER WHEELWA48a-5
7/1/2016
U
243,416,28
219,074,65
24,341,63
WC07000001 LOADER WHEEL 972K
11/1/2016
N
30 000 00
+
27 ,00x,00
3,000,00
WL07000002 LOADERWHEEL972K
12/1514017
N
170,569.37
112,575,76
57,993,61
WL07oa0o03 LOADER WHEEL 95ZV Z
12/15/2017
N
179,740,12
73,644,08
49,096,02
NlL07'0000x4 LO,A0ERWHEEL 97ZK
3124/2014
N
119,790,73
55,902.28
63,888,45
WL07000005 LOADER WHEEL CAT 972K
3/6/2020
U
170,1172,76
55,660,12
114,412,64
WLa70a0006 2014 CATERPILLAR 972M WHEELLOADER
9/19/2019
U
148,400,00
2,782,5a
145,617,50
WL07000007 LOADER WHEEL 972MXE
7/112016
N
163,686,31
12,276,48
151,409,83
WL0700g008 LOADER WHEEL 972MXE
7/1/2015
N235705,37
413,130,21
177,424.84
WL07000009 LOADER WHEEL97ZM XE
811/2016
N
413,130,21
177,424,84
235,705,37
WLd7aa(lola LOADER WHEEL 972MXE
8/1/2016N
409+269'18
168,823,60
240,445,58
WL07000012 LOADER WHEEL WA50a 7 N.
7/1/2016
U
409,269,18
168,823,60
240,445,58
WL07000013 LCIAD ER* WHEEL WA500 7
(
220,aaa•0a
186,450.00
33,550,00
WL08000001 LOADER WREEL980H REBUILD .
4128f2aafi
N
415,000.Da
208,392,86
216,607,14
WL0800a002 LOADER WHEEL980H REBUILD
5/212/106
N
404,867,00
364,380,30
40,486,70
,WLa8098
000a3 LOADERWHEEL0HREBUILD
5/312/106
N
397 828,60
'
358 045,7 4
'
391782,86
WL•a8000a04 LOADER WHEEL980H REBUILD
4Ji5fzaas
N
401,426,24
361,283,62'
40,142,61
W1Q80000a5 LOADER WHEEL980HREBLiIL0
3/31/2009
N
472,743.50
440,968,19
31,775,31
WLaexaaaa6 LOAOERNlHEEL980H
41291-2009
N25,805,37
338 664.78
312 859.41
W08000007 LOADERWHEELSBOH
3/512010
N
74,759,48
74,759,48
_
WL08000008 LOADER WHHEL980H REBUILD
111412016
N
108,264.95
i08,264.95
WL08000009 LOADERWHEEL980H
11f4fZ01fi
N
37,188,80
33 209,51
'
3,979,29
WI.08000010 LOADER WHEEL980H
1114/2016
N
37,188,80
33,709,60
3,979 2a
WL08000012 LOADER WHEEL Sao M
4/27/2016
U
37'188'80
33+246.79
3 942,01
WL0fl000013 LOADERWHEEL980M
�
N
398,851.87
239311
, ,20
159540,67
WL09000001 LOADER WHEEL982M
,41281201fi
4/27/201 6
U
46570252
, ,
Z09,Sfi6,08
256,136,44
WL09000002 LOADER WHEEL 982M
4/28/2016
N
486,726,48
292,035,84
194,690,64
WL10000001 LOADER WHEEL 988G
11119/2014
N
535,252,52
240,863,52
294389,00
WLia0o00o2 LOADER WHEEL 10CY996H
1/112019
117,Stl11,x0
105,750,00
11,790,02
iiiuw, •, i, i, i,i{ u.i 1.1.1.1 i=u 11111,1 '�11
u
, 1R,414,Q7
•,�
_
WRKriaa002 BREAKER DIESEL ^y
21/0/2004
21111/2004
u
N
42,373.46
38,136.46
4,237,a2
WRKT100023 BREAKER DIESEL
211012004
N
39 432,110
�
35 488,611
'
3,943,20
WRKT100004 BREAKER LEADS
2/1012 0 0 4
N
75,ixi,xo
67,590,90
7,510,10
WRKT130001 ATTACHMENT PAN SCRAPER
7f 1/2016
U
17,172,x0
15 ,454,80
1,717,20
WRKT140001 ATTACHMENTSCREEb WEDGELOc
9/911997
N
15,x00,00
12,712,50
21297,5a
WRKT14op02 MATERIAL REFERENCE SKI
911012003
N
'37129,92 ,
33,416.93
3,712,99
WRKi160001 SPREADER BOX
N
6,914.84
6,223.351018/2001
691,49
WR000Z SPREADER BOX
A
5/3/2007
N
21,1x8,62
111,997,76
2 i1a,86
WRKT40KT4aa001 ATTACHMENTBRooM �
34,144,72
30,730.24
3,414,48
WROdaaol ATTACRMENTDISK
12/30/1975
N
16,296,99
14,667,20
1,629,69
WRKT7aaa0z ATTACHMENTDisk
4123/1999
u
5,524.56
5,094.96
, 429,90
WXi9000001 EXCAVATOR WHEEL M318F
4/3012018
U
3 559,81
'
3 +203,83
355,98
=90000032018 CATERPILLAR M317F CR WHEELED EXCAVATOR
8/3012019
110,357,56
34,71a,85
76,146,71
WX20000001 EXCAVATOR WHEEL M32OF
4130/2018
U
18 000,20
14,000,x0
WX22000001 EXCAVATOR WHEEL M322F
4/30/2018
U
106,436.62
32,995 47
73,441.2a
APTaOaotlxz PAVER BOX
4111112007
N86
122,847,48
38,082,65
84,764,83
ATT71ATTACHMENTSCREED W/6800
4130120i8
N
118,167,00
118,167,00
,
ATT7676 ATTACHMENTJOINTHSATER
6120 0 8
N
62,947,00
0
62,947.0312
,
AT17727 ATTACHMENTPAVER-AUTO1ifi3/7013
N
37,240,98
37,240,98
ATT7872 ATTACHMENT PAVER AUTOW/ix
1213/2015
N
25,964,70
25
25,964.70
ATT7946 ATTAC H M ENT PAVE R AUTO W/79
11/s/2018
N
20,156,00
20,156.00
BKT10013a03 ATTACHMENT BUCKET
51i6f2005
N
33,893,50
33,893,50
_
BKT1000004 ATTACHMENT BUCKET
5118/2005
N
9,574,45
8,617.00
957,45
CWKTi0x002 ATTACHMENTTIE BAR INSERTS
3125/2010.
N
5136,76
5,036
4 6]3,09
513,67
CWKTix0003 ATTACHMENTTIE BAR INSERTE
4/22/2010
N
06
24,620 00
,
cWKTzaaaai PAVING PACKAGE
4/22/2005
N
21,000,aa
21,705,90
CWKT6aa0a5 MOLD SIDEWALK 45 AND 9FT
6114/2006
N
12,402,68
11,162,41
1 2411,27
CWKT600006 ATl'ACHMENTMEDIAN MOLD
8/16/2006
N
20,070,80
18,063,72
2'00748
12,960,10
11,807,10
1,153,00
Riet6-Riley Construction Co., Inc.
Equipment list
3/31/2020
Acquired New or
Asset Description ,
CWK 0001 ATTACHMENT 2-4 FTSKEW W167
Acquisition Date
6120/2006
Used
Cost
Accum Depr
p
NBV
CWM00001 ATTACHMENT TINING SYSTEM
3/25/2010
N
N
19,159,00
17,243,10
1,815,90
PH00000009 HEATERASPHALT
ff
12,918,40
12,919.40
WRKT400007 ATTACHMENTBROOM
3/31/2005
U390.55
18,746.40
18,355,85
WRKI"60oaa1 ATTgcHMENTcoNVEYOR C-3 40
7/3/2011
N
5,575.00
5,017,50
WRKI'800001 ATTACHMENTGRABeIER
1/2912008
U
51500,00557,50
43,150.00
5,150,00
ELD16942 TRANSFORMER & METER
6/21/2002
N350.00
3,5Q0,00
'
ELD17133 PUMPACUNLOADING511512.004
511512 0 0 4
N
45,59,83
45,599.83
_
8L017036 I:LEGTflICAL•BUILDING UPGRADE
fi,194,48
6,194.48
_
81514179 TANKASPHALT
3/1/212
N
3,980,00
3980.00
'
-
OL516858 PLANTSETUP32760%
111912 0 0 1
U
18,834,55
18,834,55
_
BLS16947 INSULATION HOT OIL LINES
10/9/2002
N
63,501,67
11,830,0a
63,501.67
_
BLS17(24. BACK TRUCK SPRAY DOWN
4/112004
N
11,830,00
BL517059 RACK TRUGK SPRAY DOWN
4/1/2003
N
7,016,48
7,016,48
_
BLS17065 SAFETY CATWALK & STAIRS
8 /27/2003
U
3,85o,7i
_
BL517120 LADDERS & PLATFORMS SAFETY
4/1/2004
N
,0,71
790
7,900,00
7,900,00
_
BL51715B INSULATION HOT OIL LINES
$/19/20(24
N
41,432.63
41,432.63
_
BL517293 INSULATION HOT.OILLINES
$/1%2005
N
9,600,00
4,800,00
•9 600.aa
BLS17445 RACKTRUCK SPRAY DOWN
4,000,00
01517603 LIQUID ACTRANSFER SYSTEM
5119/2007
U
4,459,02
4 459,02
_
131.51704 LIQUID ACTRANSFER SET UP
511912007.
N
151,576,51
151,6/6,51
_
BLS17621 RACKTRUCK'SPRAY DOWN
N
284,655,59
284,655,59
_
BL517725 RACK TRUCK SPRAY DOWN
513/2008
N
20,108,76
20,108,76
_
DRAG000001 19788UCYRUS-ERlE88-B HDDRAGLINE
5/112019
N
9,304,65
9,304.65
GEN0000006 dENERATOR
4120/i998
N
119,063,52
21828,29
'
97,235,23
GEN0000007 GENERATOR
4/20/1998
N
85,012.20
76,511.20
8+501.00
GEN0000009 GENERATOR
3/2212000
U
30 395,68
27 355.68
'
3,040,00
GENOM1010 GENERATOR/
5,375,08
5,375,08
_
GENOOOaOii GENERATOR •
4/1/20083
U
55,759.45
55 75
_
GEN0000014 GENERATOR750 KW
3/7/2016
U
139,002,47
139,002,47
GEN0000015 GENERATOR SET825KW
4/1/2017
U
52,000,00
52,000.00
GEN0000016 GENERATOR 5ET• 125KW
41112017
U
85,162.67
51,097,68
34,064.99
GENOOOOOi7. GENERA7'ORNIGH'C56KW
7/112018
N
26,263,07
15,757,92
10,505.15
GEN0a00018 GENERATORNIGHT56KW
7/1/2018
N
31992,94
3732 ,54
28,260,40
GEN0000023 GENERATOR
'3/3112005
U
26+ 024,97
2 014.52
'
24,010,45
GENa000025 • GENERATOR sEr455KW.
7/1/2016
U
80ad,00
7,200.00
800,00
GEN0000026 GENERATORSEi 250 KW
7/112016
U
00000
26, .
10 000,00
4,976.94
'
21,023.06
GEN0000027 GENERATOR SET' 225KW
7/112016
U
1914.30
8,085.70
GEN0000028 • GENERATOR SET 100 KW
7/1/2016
U
24,000,00
9,398,56
14 601.44
GNT0000001 TRAILER GENERATOR
9121/1999
U
8,000,00
1531.26
6,468,74
GNT0000004 TRAILER GENERATOR
313112005
U
45,664,07
41997,66
4,666,41
GNT0000005 TRAILER GENERATOR
3 f 311 2005
U
493 96
444,56
49,40
GNTa000006 TRAILER GENERATOR
3/31/2005
U
212.00
190,80
LANI4549 WASTE RECOVERY SYSTEM
312 2119 8 2N
530,0021.20
116,299,13
477,00
104,669,22
53,00
PABa000001 CONTROLS PLANTIBLENDING
713012018
N
94,206,67
15,786.04
11,629,81
PA00000002 AUTO CONTROL
1211.4/2010
U
108,379;81
108,379.81
78,420.63
PABO000003 CONTROL HOUSE
7121/2oO7
N
87 532.03
63 242,31
PABa000004 AUTO CONTROL
--
'
24,289,72
PAB0000006 AUTO CONTROL & HOUSE
3/312012
U
99,835.00
__+
25 311,15
47,921.16
2,990,13
PAS0000007 AUTO CONTROL & HOUSE
3/3/2012
U
79,355,0
38 090,76
51,913.84
PAB0000008 AUTOCONTROL
4/1/1992
N38107,56
34296,70
41+264.24
PA800a0009 AUTOCONTROL
10/1/2006
N
15,680,01
15,680,01
3,810,$6
PA80000010 AUTOCONTROL
4/i/2009
N
46,978,67
46,978.67
PA80000011 CONTROLS BURN ER
4123f19a5
N
4,757.50
4,281.75
PARO000012 CONTROLS'PLANT/BLENDING
4/iJ2015
N
i14,454.08
57,226,92
475.75
PA80000013 AUTOCONTROL
6/1/1992
N
26,807,06
26,807,06
57227,16
PABOGOOO14 CONTROLS PLANTIBLENDING
4/112017
N
375
PA00000015 CONTROLS BURNER
4/112017
N
659.91.
112 698,00
7189,92
2i6'961,9i
PA80000016' AUTO CONTROL & HOUSE
4128/7008
N
23+966,78
+776.86
PAB0000019 AUTO CONTROL
1211511995
N
125,736,69
11,484,93
125,736,69'
11,48,93
PAB0000020 AUTO CONTROL & HOUSE
4f 1/2006
U
95,245 ,00
75 561,24
PAB000002i AUTO CONTROL
3/1622009
U
31000,00
'
23 017,92
19 ,683.76
PAB00a0022 AUTOCONTROL
4/411989
N
22,897,87
20,608,08
PABOG00023 AUTO CONTROL BLENDING SYST
2/16/2013
N
41,948,18
30,063,0-2
2' 289,79
PABOC00024 AUTO CONTROL
4/112000
N
24 364.65
21!928,18
11,885,16
PAROG00025 CONTROLS PLANT/BLENDING
4120120:17
N
4is,569,57
122,518,76
PAB0000026 CONTROLS BURNER
4/30/2017
N
23,836,78
6,977,24
296'436.47
PABO000027 CONTROLS PLANT/BLENDING
• 4/30/2017
N
367,431.69
107,550,35
16050,81
,859.54
PA80000028 CONTROLS PLANT/BLENDING
4/30/2017
N
380,370,65
111337,72
259,881,34
PAROO00029 CONTROLS PLANTIBLENDING
411/2018
N
46,364,25
9,272,88
269 ,032.93
PA00000030 CONTROLBURNER
3/31/2005
N
13,157,22
11+183,
37'051,37
PA80000032 CONTROL
3/31/2005
U
l0aa0,m0
8500 0Q
1,973,58
PAR0000033 CONTROLS PLANTIBLENDING
4130/2017
N
44,243,93
12,950,58
PA00000034 AUTO CONTROL,
411/2000
N
23,601,20
21,241,08
311293,35
2
PABOOOOD35 CONTROLS PLANT/BLENDING'
41112aia
N
42'216'17
8+443.20
,360,12
PAB0000036 AUTOCONTROL
5/2f 1998
N
31725,53
Z8 552,98
t33772,97
PAB0000040 AUTO CONTROL UPGRADE
7/26/2010
N
3a,593,73
37,szs,a5
31864
s8
Rieth-Riley Construction Co,, Inc,
Equipment List
3/31/2020
Asset 9 Description
AcquNlilan Date
Acquired New or
Used
PABO000042 AUTO CONTROL UPGRADE
6/30/2001
N
Cost'
Accum De
NBV
PABOG00043 AUTOCONTROL UPGRADE
5/31/2005
N
39,943,24
39,943,Z4r
FABO000044 AUTO C
CONTROL UPGRADE
4/3/2001
N
375986fi
, .
37,598,66
'°
PASOC00045 AUTO CONTROL UPGRADE
51212009
N
22,555,32
20,299,79
2,255.53
PABb00ao46 CONTROLPC UPGRADE
51212015
N
12,412,37
12,412,37
_
PA8a000047 AUTO CONTROL UPGRADE
4/22/2000
N
31,Oa0,0a
30,523,x8
476,92
0130000048 AUTO CONTROL UPGRADE
411/2aaz
N
48,365,94
43 5
' 29 34
4,536,60
PAC -0000001 HOPPER W/PLAT.E FEEDER
7/1/2016
U
34,037.50
94,837,50
_
PAC0000002 HOPPERAGG(t
7/1/2016
LJ
4,000,aO
765,86
3,234.14
PAC0000003 CRUSHER CONE 4.25
4/1/2016
N
4,ga0,0(
365.86
B,234,14
PACCO00004 CRUSHER AGGREGATE
3/24/2007
U
14160135
.
265,348,42
28 + 20.36
'173,582,22
113 280,99
,
PACO(o00o5 CRUSHER
af31/2005
U
is 0aa,oO9,000:001
91,766,20
PAC[l000006 CRUSHERIAW
7/if 2016
U
'
, 6aa ,aa
PAC0000007 CRUSFIERCONE
3f312O05
/
U
78,000,0063
14,931,1fi
068,84
PAC0000008 CRUSHERCONE
4119/2006
U
20,000.00
18,000,00
2,000,00
PAcaa0b0o9 cHuSHERCONE
3/31/2005
U
190,000,ao
114,Oao,36
75,999,64
PAcaa00010 CRUSHER -
3/31/2005
U
149,763,00
134 ,786,70
14,976,30
PAcooaa011 CRUSHER AGGREGATE
4/if2O06
U
57,609,00
51,848,10
5,760,90
PAC000a012 CRUSHER
3/31/2005
U
268,403,01
187,687,44
80,520,57.
PAC0000013 CRU5HERCONE
711/2616
U
252,930'00
227,637,00
25,293,00
m6aaaa14 CRUSHER CONE
.71112016
U
295'000.00
56'470'54
238,529,46
PAC0000015' CRU5HERJAW W/FEEDER
U
45,000.00
8,614.08
86,S85.92
PAC0000016 PLANTJAW
7/1/20ifi
U
590 323,22
'
678
' $7'26
522,435,96
PAcoa=17 PLANTCONE
7/1/20iG
U
305,000,00
58,384.50
246,615.50•
PAc0000019 CRUSHERSYSTEM'
6/24/1998
N
240 oao.00
47,527,04
192 472.96
PAP0000002' TRACKMOBILE RAILCAR MOVER
7/3/2000
N
11' 542.82
10+305,54
1,154.28
PAPOW0003 MA9NET24"+,
5/1712009•
N
zaz 556.x3
,
183,030,46
19 827,57
,
PAPo(g0a04 MAGNEI'42 INCH SELF CLEAN!
11/9/2007
U
6,494,69
4,726,41
1,766.21
pAP0000005 CYCLONE 2
7/1/2015
u
10 ,500,(0
10,500,00
PAsaaaaao2 pLANTscREENING
2/4/2003
U
5,000,00
574,20
2,425,72
PAsaa00003 PLANTSCREENING
4/1/2006
U
88,300,00
79,470,0(
8,830,00
PASaaaaaa4 SCREENERPLANT
2/22/2017
N
40,000,00
3s 000,00
�
4,000,00
PAS0000005 PLANT•SCREENING
2/412003
N
250,564.00
25,058,34
225,525,66
PAS0000006 PLANTSCREEN
7/112016
U
33,
29,970,00
3,330,a0
PA50000007, pLANTSCREENING
- 3/31/2005
lJ12,125,60
15 , 00300•a,x000
2,871.40
PAsaaaaaaa PLANTAGGR
7/1/2016
U
44,000,00
39,60a.a0
4,400,((
PA5000=9 PLANT RIP RAP 54X24
,519/2017
U
es aaa,Oa
'
16,271.90
68,728,70
ms0000410 PLANTTRACK SCREEN
7/1/lois
U
545,UtlO,00
53,593,75
191,406,25
PdMaoaoa1 BUCKETELEVATOR
31312012
U
125,000,00
231928.06
101,071.94
P1Ed=002 ELEVATOR BUCKET MODIFICATI712012015
7/3 012 0 1 5
N
5,621,00
2,699,44
21922.56
PBF0000001 FEEDER BELT RAW
U
15,838,12
15,046,17
791.95
PBFOOaooa3 CONVEYOR BELT
,3131/2005
2117/1978
N
9,500,00
1a,456,o0
8,550,00
950.00
P01-10000001 BAGHOUSE
3131/2005
U
10,45G,aa
_
PBH0000002 BAGHOUSE
12/14/2010
U
80,000.00
142,984.12.
72,(OO,aa
142,984.12
B4O00,OO
PBH0000003 BAGHOUSE
PBHQO00004 BAGHOUSE
4/4f20a3
N
98,994.68
89,095.2:j
9,899.47
PBHOOOOtl05 AIR DUST SYSTEM
3/312012
U
471,713,50
424,542,15
47,171.35
PeHaaapaa6 AIR DUSTSYSTEM
313/2012
U
99,835,00
.�
47,92:L.16
'
51,913,84
�ar�uuuuu7 n:�.G•r't:__c
PaHaoaoOtls BAGHOUSE
7/21/2007
4/18/7009
N
U
�., ,`0 ya
-°••�
361,592,24
535,320,15
-
-
261
o3;,i5,2u
100341,80
PBHOOCCG09 BAGHOUSE 76719 CFM
4/1/2016
N
535,35a'�
_
PGI -1000001a BAGHOUSE
6/3f201a
N
591,379,43'236,551.58015
354,827,75
• PBHOtla0011. SAGHOUSE
3128/2014
N
514,243,72
94,277,92
7.92
419 965,79
�
PBH0000012 BAGHOUSE
411/1992
N
99,232,12
856
13,562.68
PBH0040013 BAGHOUSE
6/3a/29x1
58 939,35
58939,44
58,939.3-9
_
P5H000a014 DUSTCOLLECTOR c & W MODEL
5114/19x9
N
N
53,525,00
53,525,00
_
P1H0000015 DUST COLLECTION SYSTEM
7/2911995
U
47,4(S,Oa
47,405,00
1'51-10000016 BAGHOUSE
5/312014
N
10,000,00
9,000,00
1,000,00
pBH0000017 BAGii0U5E
311 612 0 0 9
U
311,286,37
11i,908,64
199,377,73
PSH0000018 BAGHOUSE
4/2a/1999 ,
U
620 +000,0❑
159,893,40
qag ,200,00
143,904.06
210,800,00
p8H00000i9 BAGHOUSE
15,989,34
P13H0000020 BAGHOUSE
3/16/2009
u
2fi3' 021,11
23671 9,00
,
26,302,11
PBH0000021 DUST RECOVERY SYSTEM
7/27/2903
N
354,000,00
233,640,Oa
iZ0,3fi0,00
PBH0000022 BAGHOUSE
� 313 112 0 0 5
U
165100,00
148 5 90.00
16,510,00
PSHO000023 BAGHOUSE
•
3/31/2005
U
144,430,00
122' 5a
21,fifi4,50
PBH000ao24 BAGHOUSE
4/20/2008
U
59 780,00
58805
, z,aa
51978,00
PsHaaaa0z5 AIR DUSTSYsTEM
5113(1993
� N
209,942,69
209,942,69
PBH0000029 STACK EXTENSION 60-42
8/412018
N
194,073,06
174 6
, 65,76
19,407,30
PBHOO00030 SAGHOUSEUPGRADE
313ifi994
N
29,854.95
29,854,96
1'[31-1000031 AUGER DUST
511112013
N
972.75
3
1'697,27
PBHaaaao32 KNOCK OUT BOX W/DUCTWORK
4/112x16
N
3'548
'447,67
23 ,13 4,59
10,313,08
PBHOtla0033 AIR SYSTEM UPGRADE
41:1511996
N
65 985,95
129,485,79
26,394,24
39,591,71
PBH6000034 EXHAUSTSTACK FAN
411/2006
U
116,967,54
12,498,15
PSHO000035 EXHAUST FAN INSTALLW/DUCT
41112x15
N'
2s 00x,0(
12,515,55
12,083,42
PSH0000036 EHAUsT FAN
41112ai5
N
42,869,56
21,434,52
21,434,70
1`81-1000027 STACK
411/8015
N
137,179,56
68,589,72
68,589,84
PSHOO00038 CYCLONE
3/2812014
N
20,140,67
10,070.40
10070,27
33,425,02
28,879,20
4 545zz
Rieth-Riley Construction Co,, Inc.
Equipment List
3/31/2020
Asset H Description
Acquired New or
EXHAUST FAN ASSEMBLY
Acquisition Date
4/30/2017
Used
Cost
Accum Depr
pr
NBV
PSHC000040 BAGHOUSEDUCTWORK
4/19/2003
N
N
•43,146,15
12,629,25
30516,90
pBH0006041• EXHAUST STACK EXTENSION
4/24/zaO4
N
45,744.12
45 ,744.12
_
PSHO000042 STACK
4130/1994
N
6,710,04
6,710,04
_
PBHOOaaa43 STACK EXTENSION
5/26/2007
N
22,135.41
19,921;97 -
2,213,54
PSHOOaaa44 EXHAUSTSTACK FAN
0/11/2001
N
38,652.63
38,652,63
_
PBHOa00051 BAGHOUSE
11/28/0019
N
42,385,21
38,146,68
4,238,53
P131400110053 BAGHOUSE
11/2/2018
N
726,356,93
66,582,67
659,774.26
PBH0000055 BAGHOUSE
12/14/2018
N
796,030,73
789,105,08
66,335,90
729,994.83
4,83
PBS0000004 SCALE BELTAGGRREGATE
4/1/2010
N
65,750,80
723,346,28
PBS0000006 CONVEYOR SCALE COLD FEED
3/16/2009U
•17'401'07
17,401,07
_
P850000007 CONVEYOIi SCALE RECYCLE
3f16f2009
U
25,500,00
16,830,00
8,670.00
P850000008 SCALE DELT
�
412612003
N
35 000,00
+
23,100,00
11,900.00
POS0000009 CONVEYOR SCALE COLD FEED
3/16/2009
U
23,963•x4
23,963,04
_
PB500000ia CoNVEYORSCALE RECYCLE
3/16/2609
U
25,500,00
16,830,00
8,670.Ca
PBS0000011 CONVEYOR'SCALE COLD FEED
335,000,00
21622009
U
23,100,00
11,900,00
Posaaaa017- CONVEYOR SCALE RECYCLE
3/1610009
U
19,500.00
12,870,00
0.00
PB50000013 CONVEYORAGGSCALE
7/2i/1933
N
29,000,00
19 ,140,00
9,8
9,860,00
PBSa000014 SCALE BELTAGGRREGATE
112100003
N
26,320,75
21,688,67
4,632.08
PBSdO00015 SCALE BELTRECYCLE
5/14/2007 ••
N
13,473,36
13,473,36
PBS0000016' SCALE BELTAGGRREGATE
5/6/2006 '
13,186.81
13,186,81
_
PB5d000017 SCALE BELTAGGRREGATE
5f6f2ao6
N
7'808'49
•7,244.46
564.03
PBS0000019 CONVEYORSCALE
a/3112005
U
8,737.49
8,106,30
631,19
P8SQ000020 SCALE BELTAGGRREGATE
5/6/2006
N
5,350,00
4,815,00
535,00
P850000021 9ELT5AMPlER
.10%16/2004
N
8,396.02
606.78
PBSOOGO022 BELTSCALES
5/1812002
N
1 4,216;42
14'789'24
,215.42
_
PCAaadaaol CONVEYOR STACKER
0/22/2017
N
24,032.46
24,032;46
e
PCA0600012 CONVEYOR
4/1/2009
u
1.32,500.00
13 ,249,98
119+zsa=az
PCAOoogal4 caNVEYaR4z'"'X0000'
7/1/2016
u
B,5a0,Oa
3,500,00
P 00
CA00015 CONVEYOR CHANNEL FRAME
7/112016
U
450,000,00
x6,143.28
363,858,72
PCA0000di6 CONVEYOR
7/1/zais
U
27,000.00
5,168,52
21,831,48
Pca0000018 CONVEYOR
5/1811990
N
5,000,00.
956,98
4,043,Oz
PCA0000019 CONVEYOR UNLOADING
12/11/1987
N
57,097,35
57,097.35
_
PCA0000020 WEIGH BRIDGE
5/7-0/2000
N
21,717,03
19,545,33
1,171,76
PCA0000024 CONVEYORSYSTEM
6/24/1998
N
13 413,59
12 072,23
1,341,36
PCA0000025 WEIGH BRIDGE
7/22/2000
N
174246.74 •
156,8
,
17,424.67
PCA00a0026 CONVEYOR 2
i
5/30/2002
N
8,743.75
7,869,39
aas
874,36
PCA0000027 CONVEYORSANOSCREW
6231.2002
N
93,667.49
84'
'300'74
9,366,75
PCA0000028 CONVEYOR SYSTEM LATTICE
1232900006
U
51,099.44
81,099,44
_
PCA0000030 CONVEYOR.
323122005
U
31,312.64
31,312.64
_
PCA0000032 CONVEYOR
3/31/2005
U
8,410,00
7,569.00
s4i3Oo
PCA0000034 CONVEYOR
• 3/3122005
U
s,100.00
7,290,00
810,00
PCA0000035 CONVEYOR
331%2005
2
112009
U
9,600.00
8,640.00
960,00
PCA0000039 CONVEYOR
fi i
U
20,000.00
1a,000.00
2,000.60
PCA0000040 CONVEYOR TRI PACK
5/112010
N
154,103,67
120,761.18
73,342,49
PCA0000041 CONVEYOR SLIDE-PAC36 X 80
7/30/2018
N
106,450,00
70,869,60
35 580,40
PCA0000042 CONVEYOR RAW AGGRREGATE
U
132,316.92
14,753.403/31/2005
117,563,52
PCAo0a0a43 CONVEYOR
3/31/2005
U
4,900,00
4,320,ao
490,00
nr•+ynnn�nra r...,.......,.. .,.,., .., .,.,,.,,�..._�
•000.x0
Inn nn
pcA0000046 CONVEYOR"T=t �Vr"LUM1`L
J/71�LL'l7
313 122 0 0 5
U
U
0,00040
10,0(10.003131/2005
9,000.00
1,000,00
PCA0000048 CONVEYOR
3/31
U
3 365,00
'
3 028,50
'22005
336150
PCA0000049 CONVEYOR
3/31/2005
U
5,05tl,00
4,54540
505,00
PCA0000051 CONVEYOR SLIDE=PAC36 X 80
7/30/2018
N
3,385,00
3,046,50
338,50
PCA0000052 CONVEYOR
3/31/2005
U
132,316,91
14,753,40
117,563,51
PCA0000053 CONVEYOR
3/3:1/2005
U
7,385,00
'
6,646,50
738,50
PCA0000054 CONVEYOR
3/31/2005
u
6,760,00
6,094,00
676,aa
PCA0000055.CONVEYOR
3231%2005
U
6,100,00
5,490,00
610,00
PCA0000058 CONVEYOR
3131/0005
U
17,615,00
15,853,50
1,761,50
PCADCOU064 CONVEYOR
611/1009
N
39j485,00
35 , 5 36,50
3,948,50
PCA0000a69 CONVEYOR CHANNEL FRAME
711/2016
U
•10,000,00
igaao,aa
PCM000070 CONVEYOR
7/i/2016
U
0,000'00
1,531,26
6,46874
FCA0000071 CONVEYOR
7/1/2016
U
30,000,00
5,74240
24,257,20
PCA0000072 CONVEYOR7/ij2ais
u
20,000,00
3,828,38
16,171,62
PCA0000073 CONVEYOR FEEDING
7/1/2016
U
5,000,Oa
956,98
4,048 02
PCA0006074 CONVEYOR LATTICE FRAME
U
6,a0a,00
1,148,567/1/2016
4,951,44
PCA0000075 CONVEYORA FRAME
7/1/2016 '
U
8'000'00
1,531,26
6,468,74
pcA0000076 CONVEYOR FIELD
711/2016
U
10,000,00.
1, 30 914,
0,085,70
pcA0a0a077 CONVEYOR
7f1j2016
U
10,000,00
1,914,30
8,065,70
PCA0000078 CONVEYOR FEED
7/13201fi
U
4,000,00
765,86
3,234,14
pCA0000079 CONVEYOR FEEDER
7/i/20i6
8,000,00
fi,468,74
PcA0000080 CONVEYOR
7Ji/2x16
U
12,000,00
2,297.12
2,297.12
6,702,99
PCA0000081 CONVEYOR
711/2016
U
5 000,00
'
956,98
4,043,02
PCA0000082 CONVEYORFEEDER
X112016
U
5,000,00
956,98
4,043,02
PCA0000085 SUPER STACKER
8/1322019
N
10,000,00
1,914.30
9,085,70
Pcacomoo0 BATCHING SYSTEM CONCRETE
4/2/1989
N
269,839,54
245,386,64
PC80000001 BATCHING SYSTEM
4112 f 1996
N
69,939,54
69,839,54
69,839,54
PCC0000001 CONVEYOR
•
3/31/2005
U
169,615.77
169 6
_
1,480,00
97240
108,00
Rieth-Riley Construction Co,, Inc.
Equipment List:
3/31/2020
Asset N descrlpFlon
Acquired New or
Pccaaa0a0z CONVEYOR
Acquis(tion Date
3/31/2005
Used
Cost
Accum Depr
NEV
PCCaaa0003 CONVEYOR RECYCLE
3/31/2005
U
19,750.00
17,775.00
1,975.0a
PCC0000004 CONVEYOR COLD FEED
4/1/2009
N
16,700,00
15,030,00
1,670.00
PCC0000005 CONVEYOR �
3/29/1980
N
52,811,50
52,811,50
_
P000000006 CONVEYOR RECYCLE
6 22 f 1991
/
N
14,350,06
12,915,00
1,435,00
PCC0000007 CONVEYOR FEED BIN
N
19,487.37
17,538,63
1,948,746(31/1992
PCCo000008 CONVEYOR VIRGIN AGGREGATE
212512000
N
32,569,95.
32,569,95
-
PCCtl000009 CONVEYOR
11/3/1966
N
65,626,64
57,423,31
8,203 ,33,
PC00000610 CONVEYOR ,
11/3/1966
N
10,892,8a
10,892,80
`
PCC0000011 .CONVEYOR
11/311966
N
20,69 .80
10,892,80
_
PCC0000012 CONVEYOR RECYCLE
9/30/1982
N
2,H0
10;892.80
-
PCCa040a13, CCINVEYOR
3/29/1972
N
22,9A84
22,626,84
-
pCC0000014 CONVEYORAGGR FEED
7/29/1995
U
13,469,58
13 ,469,58
_
PC0006015 CONVEYORSAND FEED
7/29/1555
U
10,000,00
9,000,00
1,OOtl,00
Pc,C00atl016 CONVEYOR FEED BIN
2/4/2003
U
10,000'00
8,000,00
1,000,0a
PCCOCOOO17 CONVEYOR COLLECTING
3/16/2009
U
5,300,00
4,770,00
530.0o
• PCC0000018 CONVEYOR COLLECTING
3/16/2009
U
15,500,00
10,230,00
5,270,00
PCC0000019 CONVEYOR
3116/2009
U
15500,00
,
10,230,00
5,270,00
PCC0000021 CONVEYOR COLLECTING
3flfi/20x9
U
20,000,00
13,200,00
6,800.00
PCC0000022 CONVEYOR COLLECTING
3/16/2009
U
7,750,00
5,115,00
2,635,o0
PCC0000023 CONVEYOR COLLECTING
3/16/2009
U
7,750,00
5,115,00
2,635,00
P=00024 CONVEYOR COLLECTING
3/1612009
U
5,250,00
3,465,00
1,785.0a
PCC0000025 CONVEYOR COLD FEED
3/3112005
U
5,250,00
3,465,00
11785,00
PccaoaaozH CONVEYOR
3130005
�
83 500,00
,
70,97s,aa
12,525,00
PCC0600o29 CONVEYOR RECYCLE
3/31/2005
U
15,285,00
13,756,Sa
1,528,50
PCC0000030 CONVEYOR VIRGIN AGGREGATE
8/21%1999
U
28,75a,0a
25,875,a0
2,875,00
P000000001 DRUM MIXER CONCRETE
7/3/2011
19,736,34
2,192.92
PCD0000002 PLANTCONCRETE
11/3/1966
N21,929,26
N
150,213,00
131,436,66
18,77634
PCDtlaaa003 PLANTCONCRETE5/8/1972
N
122,199,00
122,199,00
-
PCD0000004 PL*T CONCRETE REX MODEL 5
7/29/1995
U
145,1305.21
145,605,21
_
P00000005 MIXER CONE
4/1712004
N
40,000,00
36,000,00
4,000,00
PCF0000001 BIN VIRGIN AGGREGATE
12/200099
N
46,094.66
46,094.66
-
PCF0000002. BIN VIRGIN AGGREGATE
12f21Jz009
N
'57,247.09
41,360,73
15,886.36
PCFa000003. BIN COLD,FEEDJG)
1.2f14/zo10
U
57,247.10
41,360,73
15,886.37
PCF0a00a04 BIN COLD FEED
411/1996
N .
111,638.24
111,638.24
-
PCM000005 BIN COLD FEED
512/1938
42,588.74
38,329,87
4,258,87
PCF0000006 BIN AGGREGATE
4/1/1985
N
33,23a,37
29,907,33
3,323,04
PCF0000007 BIN AGGREGATE
411/1985
•15,502.27
13,952,04
1,550.23
PCF0000008 BIN COLD FEED;SYSTEM
7/1/1987
N
15,502'27
13,952.04
1,550.23
PCF0000009 BIN COLD FEED
4/411989
N
110,103.73
99,093,36
11,010.37
PCF0000010 BIN COLD FEED
5/611995
N
35,409.06
31,868.15
B�94a,91
PCF0000011 81N COLD FEED (6) '
313/2012
U
34,992.82
31,493,54
3,499,28
PCF0090012 BIN colo FEED (6)
93,180.00
44,726.40
48,453,60
PCF0000013 BIN COLD FEED 14'
4/1/2018
99195.00
'
47,613,96
51581.04
�
PCFa000014 BIN COLD FEED (4)
7/21/2007
N
46,221.64
9,244.32
86,97732
PCFOOOOOgS BINCOCDFEEO(6)
4123/1999
U
279 235.47
`
201,178,38
78,057,09
PCF0000016 BIN COLD FEED
7/31fi9H2
N
102,791.86
92,512,67
10,279.19
PCM0000i7 BIN COLD FEED SYSTEM
6/2411998
N
4.1,583,98
37,425,58
4,158,40
--s,,,,.,,,,.a,, �,.,...,,,.,._,.,.,,.,,,.,•_„
_.--._.. 7 -".�.—,'mac....,-,—,
30233,95
27.21n,gq
'__
T0 -3.n
_.__-.1
PCF00000iH BIN COLD FEED
'` ! j
4/4/1989
N
N
143,997.77
129,597,99
143
14,399.78
PCFaa00020 BIN AGGREGATE
4/1/1985
N
3,184,29
2,865,86
318.43
PCFaoa002i BIN AGGREGATE
4/1/1985
N
12,861,14
11,575.03
i,28fi,i1
PCF0000022 BIN AGGREGATE.
4/1/1965
N
12,861.14
11,575,03
1,286,11.
PCF0000023 BIN AGGREGATE
4/1/1985
N
12,861.14
• 11,575,03
1,2es,ii
PCF0000024 BIN COLD FEED
4/1511996
N
12,fl61.14
11,575.03
11286,11
PCFtl000025 BIN COLD FEED
5/6/1995
N
43,6H9,9s
39,320,95
4,369,a0
PCF0000026 BIN COLD FEED (6)
4f 1/2007
N.
34,992.81
310493.53
3,4.99.28
PCF0000027 BIN COLD FEED (8)
2125/2000
N
95 680.59
'
6 ,243,34
35,437,25
PCF0000028 BIN COLD FEED (3)
2/19/2008
N
115,255,62
99,961.47
15,2.94,15
PCFGQQO029 BIN COLD FEED (5)
3/2812014
N
Sg7,758,fi7 •
117,758,67
PCF0000030 BINAGGREGATE
712911995
U
5fi81
S6,8i2.43
49,086,00
7726,43
�
PCF0000031 BIN COLD FEED (6)
411/2006
U
15,000.00
13,500,00
1,500,00
PCF�006032 BIN COLD FEED
4/3/22017
N
81,710.00
64,823.04
16,886,96
PCF0000033 BIN COLD FEED
413012017
N
59,587.50
17,441.76
42,145.74
PCF0000034 BIN COLD FEED 10
3/16/2009
U
59,587,50
17,141,76
42,145,74
PCF0000035 BIN COLD FEED SYSTEM
3/30/1981
N
226,100.00
149226,00
76,874,aa
PCF0000036 BIN AGGREGATE
4/111985
N
60,703,86
54,633.47
61070,39
PCF0000037 BIN AGGREGATE
4/i/im
N
12,861.14
i1,575,03
1,286.11
PCFa00003H BIN COLD FEED
4/411989
N
1Z +86 1.14
11,575,03
1286,11
PCFa000039 BIN COLD FEED (G)
5/8fi999
N
23,936.27
21,542,fi4
2,393,63
PCF000004a BIN COLD FEED (3)
4/411985
N
238,381.41
214,543,27
23,838.14
PCFtlatl1041 BIN COLD FEED
4/1/1992
N
109,082,67
98,174.40
10,908 27
PCF0000042 BIN COLD FEED (g0)
3/16/2009
U
35,281.94
31,753.74
3 528.20
pCF000Q043 BIN COLD FEED (4)
9/21/1999
U
141,0ao,0a
93,060,00
47,940.00
�
PCF1o00044 BIN COLD FEED (4)
819 f 2005
9/
U
72,631.93
65,368,74
7,2fi3,19
PCFa000045 BIN COLD FEED (9)
3 2009
U
35,658,48
3 5
5,658,48
PCF0000046 BIN COLD FEED
7127f 1983
N
136,150,00
,826,00
46,274,00
108,433,50
97,590,15
10,843,35
Rieth-Riley Construction Ca,, Inc.
Equipment List
3/31/2020
Asset N Description
I Acquired New or
PCF0000047 BIN AGGREGATE
Acquisition Date
6/24/1984
Used
N
Cast
Accum Depr
PCF0000o4a BIN AGGREGATE
6/24/1984
N
+165
13.70
11,13
,849
PCF0000050 BIN AGGREGATE
•
7/10/1979
N
13,165,69
11,849,12
PCF0000051 BIN COLD FEED
4/1/1992
N
30,0-00,00
21,000,00
PCF0000052 BIN COLD FEED
4/1/1992
N
25,780,42
23,202,38
PCF0000053 BIN COLD FEED (4)
5/30/
N
25,780.42
23,202,38
PCF0000054 BIN AGGREGATE
6124/1984
1984
N
100,670.13
90 603,12
PCF0000055 BIN AGGREGATE
6/24/1994
N
13,165,70
11,849,13
PCF0000056 BIN COLD FEED
8/29/1988
N
13,165,70
11,849,13
PCF0090057 BIN COLO FEED
5/13/1993'
N
6,642,14
5,977,93
PCFa00(3058 BIN HOPPER
.
3131/2005
U
30,111,27
27
P00000074 STARTING GEAR55o,00
5118/2°02
N
19,500.00
,100,15
17
PCH000000/ TRAILER CONTROL
3/3//2005
45,885.05
45,a85,o5
PCHGGOOG02 CONTROLHOUSE
5/2/9120
N
20,200.°0
18,18o,00'
PCH0000003 CONTROL HOUSE
11/z9/z°3a
U
177,577.00
159 ,819,30
PCHGGGGO04 CONTROLHaUSE
2/25/2000
N
3,405,00
3,405,00
PCH0030005 TRAILER CONTROL '
4f2//99a
N
125 ,6 45,49
111,570,71
PCHadaaa6' TRAILER CONTROL
4/2411991
N
15,161.87
15,161,87
PCHOo0a007 PLANT -BASE TRAILER
7129/ism
U
15,650.00
5650,007129/,1995
15,650.00
PCH0000008 PLANT - CEMENT SECTION TRA
,000,00
40,300,00
36,000,00
PCH0000tl09 TRAILER CONTROL
729/1995
/
U
30
27,000,00
PCH0000010 CONTROLHOUSE
3/16/2009
U
70,000.00
63,000,00
PCH0000011 9ONTROLHOU5E
10/14/1986
N
85,000.00
56,100,00
PCHOO00013 CONTROL. HOUSE
3116/2(309
U
18,813,60
16,932,24
PCHOGOOO14 CONTROLHOUSE
81912005
U
20,000,00
13,206,00
PCHO000015 CONTROLHOUSE
3/16/2°09
U
15,682.07
16,682,07
PCH6000016 CONTROLHOUSE
7/27/1983
N
20,0(30,00
13,200,00
PCHa(3a(3oi7 CONTROLHOUSE
7/27/1983
N
13,350,00
12 ,a/5,00
. PCH0000019 CONTROLHOUSE
9121/1999
U
19,230.75
17,307,67
PCHa000021 TRAILER CONTROL
412/2o07
U
44,330,29
39,897,26
PcH011(3(3021 TRAILER CONTROL
3/31/1005
N
21,734.21
21 ,734,21
PCH000a023 TRAILER CONTROL
4/18/1005
U
5 300,33
4,5°o•°°
PCM000dd0i COMPRESSORAIR3131/2005
U
19,538.18
18,236,04
PCM0000002 COMPRESSOR AIR
6/1/2013
N
320,00
298.00
PCM0000003 cDMpkEs5oRA1B
3/144/20/3
N
1i,ioaa3
.1i,/00,00
PCKOOOOOa4 COMPRESSOR AIR 75 HP
61212017
N
28,195.07
28,195,07
PCMOaaaao5 COMPRESSOR AIR
4112/1996
N
28+632.00
8,321.84
PCM0000006 COMPRESSOR 75 HP
4f 1/2016
N
8,532A0
'
8,532.10
PCMGOO0007 COMPRESSOR352CFM
715/2018
25
27,850,03
22,280,04
PCM0000008 COMPRESSOR AIR 75 HP
11/2018
N
+1/5,0°
4,622,74
PCMCCQO009 COMPRESSORAIR
412812010
N
26,965,00
8,089,56
PCM00000/1 COMPRESSOR 352 CFM
41112a18
N
4+043.00
4,040,00
PCM00001312 COMPRESSORAIR32,734,59
21116/2009
U
6,546.96
PCMOOOQO14 COMPRE550RAIR
3f1fif2009
U
2,000,00
11320,00
PCM0000015 COMPRE55ORAIR75HP
4102317
•1,000,00
660.00
PCMOODC016 COMPRE55ORAIR
1/2009
N
27,714.37
8,/12,17
PCMGOOG019 AIR COMPRESSOR 75 HP
1/112019
N
700,00
462,00
PCNI0000020 REGENERATIVE AIR DRYER
92 ,826,58
4,103,25
FCiAGG00021 AIR CONIFRESSORE4�
PCR0000001 CRUSHER SYSTEM
3/8/2019
5/15120Q4'
N
32,032,35
a ^----
7 J,a5
2,93634
•17CR0000002 CRUSHER SYSTEM
6/30/2000
N
N
i/9,384.61
119,384,61
PCRaaaaa03 BREAKER RECYCLE
4/33J2aia
N �
621,392.22
559
00
PCR00004 CRUSHER RECYCLE
6/22/1991
N
73,611,29
73'253,°3
,611,29
PCRa06aaas BREAKER RECYCLE •
'BREAKER
4/12/016
N
23,236,11
2%912,5a
PCR0000006 RECYCLE
4/1/2016
N
41,395.87
16,558,44
PCR(3tlaBREAKER RECYCLE
411/1016
N
50,548,09
20aao7 ,219,16
PCH0000008 CRUSHERSYSTEM
4122/2006
42,778.7B
17,111,52
PCROO00009 BREAKER RECYCLE
4/1/2018
N
230,469,42
230,469,42
PCR6000010 BREAKER RECYCLE
47,907,55
9,581.52
PCRO°0°°12 CRUSHER
4/1/2°36
U
43'282,87
7,935,18
PCR0000°i3 CRUSHER RECYCLE
4/1/1992
N
18,000,00
15,120,00
PCR0000015 RECYCLE BREAKER
2/1812019
N
18,365,00
1fi,528,50
PCRad3a(3is RECYciEBREAKER
2/1611019
87,200,32
7,993,37
P00000000i CONVEYOR DRAG
9129/2008
N
N
POCOGO0002 CONVEYOR DRAG
4/16/2010
N
104,000,03
1aq'S2a,a9
PDCOOG0003 CONVEYOR DRAG
4/22/2005
N
77,402.10
77'000,aa
PDCOOG0004 CONVEYOR DRAG
51412014
N
177 735.19
171'4°2'10
PDCOOO0005 CONVEYOR DRAG
3/16120(39
U
3 538
, 7013
,735,19
20a781,so
PDCOa00006 CONVEYOR DRAG SLAT CROSS
4 /3 012 0 1 8
N
89,000.00
58,740,°0
POCO000007 CONVEYOR DRAG
3/16/2009
U
.73988,00
'
14,249,63
PDC0000008 CONVEYOR DRAG
3 f 1612009
U
4z,033,3a
31,185,00
PD000aa°°9 CONVEYOR DRAG
5/la/2002
N
69,000,00
45,540,°°
• PDC0000010 STAIRIHANDRAIL FOR DRAG CO
6f 161994
/
N
/36,530,61
136,530,61
PD00000001 DRYER DRUM
3%3/2012
U
7,980,00
7,182,00
'127,788,36
P000000002 DRUM DRYER
7/2/2016
N
266,225,00
PD5aaama1 BURNER
3/3//2005
U
294,785,47
112,663,80
postl3aTANK BURNER FUEL
3/31/1035
U
14,65o,00
13,1133,00
13;500,30
12,150 00
NBV
1,316,57
1,316,57
9,000,00
2,578,04
2,578.04
10,067,01
1,316,57
1,316,57
664.21
3,011,12
1,95000
2,020,0a
17,757,70
14,074.78
4,000,00
3,000,d0
7,000,00
28,900.00
i, is a
61800.00
6,800.00
1,335,00
1,923.08
4,433,03
500.00
1,302,14
3200
20,3/0,1fi
5,569,96
20,592.26
18,87544
26,187.63
680•(30
340,00
19,602.70
238.00
28_,723.33
838.86
29,096.01
62,139.72
2,323,61
24,837,43
30,326,93
25,667,26
38,326,03
35,347.69
2,880,30
1,83fi,50
79,2a6,95
44,79768
144,09a,80
30,260,00
59,738,37;
10,815,0°
z3,d63`33
798,00
138,43fi,fiq
182,125,67
1,465,00
1,350,Oo