Loading...
HomeMy WebLinkAbout5B2 Budget Request (Western Streetscape Phase IV) Redevelopment Commission Agenda Item DATE: 7/26/2022 FROM: Leslie Biek, PE, Assistant City Engineer SUBJECT: Western Ph IV Prelim Design Supplement #1 Which TIF? (circle one) River West ; River East; South Side; Douglas Road; West Washington PURPOSE OF REQUEST: Supplement #1 for the Preliminary 10% Design of Western Streetscape Phase IV with HWC Engineering Specifics: Additional funds requested for the locates of private locates using a private locator for the preliminary design of Western Streetscape Ph IV for an addition of $1,300 to the contract price. This brings the revised contract price to $141,065. INTERNAL USE ONLY: Project Code: __ ____________ _________________________; Total Amount new/change ( inc/dec) in budget: __$1,300_________; Break down: Costs: Engineering Amt: ________________; Other Prof Serv Amt_________________; Acquisition of Land/Bldg (circle one) Amt: ___________; Street Const Amt ________________; Building Imp Amt_________; Sewers Amt_________; Other (specify) Amt: ________________ ___________________________________________. Going to BPW for Contracting? Y/N Is this item ready to encumber now? ____ Existing PO#__________ Inc/Dec $_____________ _________________________Pres/V-Pres ATTEST: __________________Secretary Date: ____________________ APPROVED Not Approved SOUTH BEND REDEVELOPMENT COMMISSION Confidence in the built environment. 5920 Hohman Ave Hammond, IN 46320 www.hwcengineering.com Indianapolis | Hammond | Lafayette | Muncie | New Albany | Terre Haute www.hwcengineering.com May 7, 2022 City of South Bend Department of Public Works Mr. Eric Horvath, Executive Director 227 West Jefferson Blvd. Suite 1300 N South Bend, IN 46601 Re: Geotechnical Investigation Utility Locates Western Avenue Streetscape Supplemental No. 1 for Private Utility Locates Dear Mr. Horvath, During the geotechnical investigation, insufficient utility location information was obtained through conventional methods. There were numerous underground utilities near the proposed boring locations that were unable to be accurately located/marked by the City. As such, we needed to contract a private locator to assist with advancing the borings to limit the risk of drilling into an underground utility for both our safety and for the convenience and safety of the residents and businesses affected by those utilities. The use of private locates was not anticipated and therefore not included in our original fee proposal. HWC is requesting reimbursement for the private locator fees in the amount of $1,300.00. If you have any questions or would like to discuss this further, please feel free to contact me. Sincerely, Joshua P. Grabijas, PE Project Manager