Loading...
HomeMy WebLinkAboutEncroachment & Revocable Permit - 117 E. Wayne St. - Four Stones, LLC - The Early Bird Eatery  ELIZABETH A. MARADIK JOSEPH R. MOLNAR GARY A. GILOT JORDAN V. GATHERS MURRAY L. MILLER 1316 COUNTY-CITY BUILDING 227 W. JEFFERSON BOULEVARD SOUTH BEND, INDIANA 46601-1830 PHONE 574/ 235-9251 FAX 574/ 235-9171 CITY OF SOUTH BEND JAMES MUELLER, MAYOR BOARD OF PUBLIC WORKS July 26, 2022 Ms. Jennifer Stone The Early Bird Eatery / Four Stones, LLC 917 Leland Ave. South Bend, IN 46616 jenn@theearlybirdeatery.com RE: Encroachment into Public Right-of-Way – 117 E. Wayne St. Dear Ms. Stone: At its July 26, 2022 meeting, the Board of Public Works approved your request for the installation of makeup unit (HVAC system) and concrete bollards to protect the gas line on the HVAC unit at 117 E. Wayne St. This encroachment was approved subject to the improvements not becoming a safety hazard. Enclosed please find copies of the permit and application. The encroachment will be permitted to remain and continue until such time as the Board of Public Works of the City of South Bend shall determine that such encroachment is in any way impairing or interfering with the highway or with the free and safe flow of traffic thereon. Said encroachment shall not in any way prejudice or preclude the City’s rights with respect to the future use of that portion of the right-of-way. If you have any further questions, please call this office at (574) 235-9251. Sincerely, /s/ Theresa Heffner Theresa Heffner, Clerk Enclosures TH/lh INTEROFFICE MEMORANDUM BOARD OF PUBLIC WORKS DATE: TO: June 1, 2022 Matt Longfellow, Engineering Department Gerard Ellis, Fire Department Chris Dressel, Community Investment FROM: Theresa Heffner, Clerk SUBJECT: ENCROACHMENT RECOMMENDATION Revocable Encroachment – The Early Bird Eatery/ Four Stones LLC. LOCATION: 117 E Wayne St. PLEASE INSERT YOUR RECOMMENDATIONS IN THE APPROPRIATE FIELD BELOW, BASED ON THE FOLLOWING CRITERIA: 1. It has been determined that this encroachment in no way impairs the highway or with the free and safe flow of traffic thereon, and it is recommended that the encroachment be permitted to remain. 2. Said encroachment shall not in any way prejudice or preclude the City’s rights with respect to the future use of the portion of the right-of-way. PUBLIC WORKS: Favorable, pending Applicant meeting with Board of Public Works at Agenda Review COMMUNITY INVESTMENT : Favorable, pending Applicant meeting with Board of Public Works at Agenda Review FIRE: Favorable 117 E Wayne St, South Bend, IN 46601 (574) 208-3806 | www.theearlybirdeatery.com Jennifer Stone | jenn@theearlybirdeatery.com May 31, 2022 Board of Public Works City of South Bend To whom it may concern: Regarding the mechanical HVAC unit that was installed for The Early Bird Eatery in the alley adjacent to 117 E Wayne St, South Bend, IN 46601 we are providing the additional details below in response to questions which arose following the application for installation of bollards at the same location. 1. Could the HVAC unit have been installed on the 2nd floor of the parking garage? Per our installation contractor, BW Cook, we could not install a kitchen make-up unit on the 2nd floor of the parking garage. The way the system was decided and the specifications for installation that came from Captive Aire, the manufacturer, the location on the second floor would not have been feasible and would have also hindered the operation of the unit 2. Could the unit have been installed higher up on the wall, above alley traffic? Once again, per our contractor, they could not mount the unit on the side of the wall due to weight restrictions. The unit is currently sitting on a stand that is 4 feet high which should be out of the way of traffic. They installed the system as close as they could to the wall to ensure it would not obstruct any oncoming traffic 3. Would those costs have added thousands of dollars to the effort, making it impossible to open a restaurant in that location? If we would have installed a unit on the second floor, we would have had to get additional permissions from the parking garage in order to do so which would have dramatically increased lead times and caused us to close the restaurant for weeks if not months. Also, per our contractor, in order to install the unit on the second floor of the parking garage, we would needed to 117 E Wayne St, South Bend, IN 46601 (574) 208-3806 | www.theearlybirdeatery.com eliminate up to four parking spots for clearance. This also would have required additional approvals from a structural engineer in order to run ductwork through the garage concrete and down the side of the building back into the opening where the alley is located. We would also have needed to redesign the make-up unit. The current unit required a 5 month lead time and altering the make-up air would have required additional time for production. Our contractor discussed the location of the make-up unit in the alley with both Mechanical inspectors from the City of South Bend building department. We were under the impression that this was approved based on the original drawing location of the make-up unit. Both Mike and Damien were there for the discussion on the location of the exhaust and were informed where the make-up was going to be installed. Our contractor was informed that as long as the Unit was not protruding past the line of the current dumpsters that it would be fine. Also, I would like to reiterate that there is a sidewalk and exit ramp further down the alley, which boarder the only other exit to the alley, and which encroach on the right of way, reducing it to a 9ft 4in pathway for entering and exiting vehicles. I have included pictures of this as well, since these are permanent structures which reduce the right of way much more than our make-up air and dumpsters do. I am happy to answer any other questions and can be reached via email at any time. Sincerely, Jennifer Stone July 26, 2022