Loading...
HomeMy WebLinkAboutTitle Sheet - Coal Line Trail, Phase IIB Proj No. 122-035BOARD OF PUBLIC WORKS AGENDA ITEM REVIEW REQUEST FORM Date: July 19th, 2022 Name: Finnian Cavanaugh Department of Public Works – Engineering Division BPW Date: July 26th, 2022 Phone Extension: 5961 or fcavanau@southbendin.gov Required Prior to Submittal to Board BPW Attorney X Attorney Name Clara McDaniels Dept. Attorney Attorney Name Purchasing Check the Appropriate Item Type – Required for All Submissions Professional Services Agreement Contract Proposal Open Market Contract Amendment/Addendum Special Purchase, QPA Bid Opening Bid Award Req. to Advertise Title Sheet Quote Opening Quote Award Reject Bids/Quotes Proposal Opening C/O & PCA No. PCA Chg. Order, No. Traffic Control Resolution Other: Ease./Encroach Required Information Company or Vendor Name New Vendor Yes If Yes, Approved by Purchasing No MBE/WBE Contractor MBE WBE Completed E-Verify Form Attached Yes No Project Name Coal Line Trail Phase IIB (INDOT DES#2200199) Project Number 122-035 Funding Source TIF River West Development (PROJ-00000018) Account No. Amount Terms of Contract Purpose/Description Signature of title sheet for INDOT-LPA project. To be bid by INDOT in September 2022. For Change Orders Only Amount of Increase Decrease $ ($ ) Previous Amount $ Current Percent of Change: Increase Decrease % ( %) New Amount $ Total Percent of Change: Increase Decrease % ( %) Time Extension Amount: New Completion Date: P.O.T.14+03.40 "PR-CLT 2"End Project 1401811WILBER ST.DIAMOND AVE.W. ANGELA BLVD.LINCOLN WAY W.PORTAGE AVE.N. MICHIGAN ST.363534123RIVERSIDE DR.P.O.T.10+00.00 "PR-CLT 2"Begin Project 1401811Coal Line Trail overSt. Joseph RiverProject LocationSHEETSofCONTRACTBRIDGE FILEPROJECTDESIGNATIONSURVEY BOOK-2200199-B-442921392200199File Name: P:\RD\C3D\16-406\Bridge\Dwg\Plans\Title Sheet.dwg Plot Date: 4/22/2022 Plotted By: Chris DyerScale 1" = 1,000'PROJECTDESIGNATIONCONTRACTINDIANA DEPARTMENT OF TRANSPORTATIONDATEDATEPHONE NUMBERFOR LETTING:APPROVEDCERTIFIED BY:PREPARED BY:PLANSBRIDGE FILEINDIANA DEPARTMENT OF TRANSPORTATIONSTANDARD SPECIFICATIONS DATED 2022TO BE USED WITH THESE PLANSINDIANA DEPARTMENTOF TRANSPORTATIONBRIDGE REHABILITATION PLANS-2200199B-442922200199HUC 14:Bridge Length:Trail Length (Phase IIB):Net Length:Maximum Grade:040500012400400.064 MI.0.012 MI.0.076 MI.2.00 %PROJECT LOCATION MAPCITY OF SOUTH BENDBRIDGE REHABILITATION OF ABANDONED NORFOLK SOUTHERN RAILROAD BRIDGEOVER ST. JOSEPH RIVER, LOCATED IN SECTION 35, TOWNSHIP 38 NORTH, ANDSECTION 2, TOWNSHIP 37 NORTH, RANGE 2 EAST, PORTAGE TOWNSHIP, CITY OFSOUTH BEND, ST. JOSEPH COUNTY, INDIANA.T 38 NT 37 NT 38 NT 37 N86°15'47" WLATITUDE:41°41'38" NLONGITUDE:PROJECT LOCATION SHOWN BYKIN DESIGNATION NUMBERSROADWAY2200199Coal Line Trail Phase IIB (Part 1 of 2)BRIDGEBridge Over St. Joseph River (Part 2 of 2)(PHASE IIB) P.E.FOR SPANS OVER 20 FEETPROJECT NO. 2200199COAL LINE TRAIL OVER ST. JOSEPH RIVERSTATIONSPAN AND SKEWOVERINDEXTYPESTRUCTURECOMBINATION:ROLLED STEEL &RIVETED PLATEGIRDERSCOAL LINE TRAIL7 SPANS:28'-8", 59'-11 5/8", 60'-4 3/4",43'-7 3/4", 49'-1 1/4", 49'-1", 39'-4 3/4"SKEW: 0°12+34.75"PR-CLT 2"2200199ST. JOSEPHRIVER8440 Allison Pointe Boulevard, Suite 200Indianapolis, IN 46250Phone 317-895-2585www.ucindy.comR 2 EFINNAN P. CAVANAUGH, E.I.TOY VILLAGARY A. GILOTJORDAN V. GATHERSJOSEPH R. MOLNARTHERESA M. HEFFNERMURRAY L. MILLERCITY OF SOUTH BENDAPPROVED BY BOARD OF PUBLIC WORKSDATECITY ENGINEERCONSTRUCTIONAPPROVED BY CITY STAFFPRESIDENTMEMBERMEMBERMEMBERCLERKMEMBERKARA M. BOYLES, Ph.D., P.E.ADMINISTRATION & DESIGN (ERC)ELIZABETH A. MARADIKB-44292PART 2 OF 2C:\Users\nora.rasche\Desktop\signatures.JPG..\Users\nora.rasche\Desktop\city staff.JPG..\Users\nora.rasche\Desktop\micheal R.JPG7/19/202207/19/20227/21/2022July 26, 2022