HomeMy WebLinkAboutOpening of Bids - Morris Box Office Renovation Proj No. 121-029C - Larson Danielson Construction Co., Inc.Version 09/29/2021 Contractor’s Bid for Public Works - 1 CITY OF SOUTH BEND, INDIANA CONTRACTOR’S BID FOR PUBLIC WORK CHECKLIST FOR BIDDERS From time to time the South Bend Board of Public Works finds it necessary to reject a bid because it does not comply with statutory requirements. In preparing your bid, please use the following checklist in order to make sure that your bid is done in the proper manner. Proper bid security included. The bidder has the option of providing either a Certified Check or Bid Bond. Bid prepared on the City of South Bend Contractor’s Bid for Public Work Form, completely executed. Contractor’s Non-Collusion and Non-Debarment Affidavit, Certification Regarding Investments with Iran, Employment Eligibility Verification, Non-Discrimination Commitment, and Certification of use of United States Steel Products or Foundry Products. Proof of M/WBE Utilization Plans [MBE-1.0 and WBE-1.0]. Also provide Evidence of Good Faith Efforts Forms [MBE-2.0 and WBE-2.0] and M/WBE Contacted Forms [MBE-2.1 and WBE-2.1]. Acknowledge Receipt of _____ Addendum(s) included with the bid. All required additional information is included with the bid. Proposal statements and other affidavits all signed by the proper party with name either printed or typed underneath signature. This checklist submitted with the Bid. This checklist is provided for bidder’s use in assuring compliance with required documentation; however, it does not include all specifications requirements and does not relieve the bidder of the need to read and comply with the specifications. Bidder: Date: By Authorized Representative: Signature: Print Name & Title: Project Name Morris Box Office Renovation Project No. 121-029C For Bids Due July 26, 2022 X X X X X X X Larson-Danielson Construction Company, Inc. 7/26/22 X Brian T. Larson, President LARSON-DANIELSON CONSTRUCTION CO., INC. S T ATE OF INDIA AN SEAL C orporate 1 Version 09/29/2021 Contractor’s Bid for Public Works - 2 CITY OF SOUTH BEND, INDIANA CONTRACTOR’S BID FOR PUBLIC WORK Project Name Morris Box Office Renovation Project No. 121-029C For Bids Due July 26, 2022 PART I (Must be completed for all bids. Please type or print) Date: Bidder (Firm): Address: City/State/Zip: Telephone Number: ( ) Agent of Bidder (if Applicable): Pursuant to notices given, the undersigned offers to furnish labor and/or material necessary to complete the public works project of: the City of South Bend, Indiana, in accordance with plans and specifications prepared by: and dated for the sum of (enter the Total Bid as shown on the Proposal) ($ ) (Enter sum of Total Base Bid plus Alternates shown on Proposal) (Numerical) The undersigned further agrees to furnish a bond or certified check with this bid for an amount specified in the notice of the letting. If alternative bids apply, the undersigned submits a proposal for each in accordance with the notice. Any addendums attached will be specifically referenced at the applicable page. If additional units of material included in the contract are needed, the cost of units must be the same as that shown in the original contract if accepted by the City of South Bend. If the bid is to be awarded on a unit basis, the itemization of the units shall be shown on a separate attachment. ACCEPTANCE The above bid is accepted this day of 20 Subject to the following conditions: BOARD OF PUBLIC WORKS Elizabeth A. Maradik, President Joseph R. Molnar, Vice President Gary A. Gilot, Member Jordan V. Gathers, Member Murray L. Miller, Member Attest: Theresa Heffner, Clerk By (Signature) (Printed Name of Person Signing) 7/26/22 Larson-Danielson Construction Company, Inc. 302 Tyler Street LaPorte, IN 46350 219 362-2127 Morris Box Office Renovation 6/24/22 City of South Bend X Brian T. Larson, PresidentLARSON-DANIELSON CONSTRUCTION CO., INC. S T A TE OF INDIA AN SEAL C or porate 283,563.00Two Hundred Eight Three Thousand, Five Hundred Sixty Three & 00/100 BID/PROPOSAL CITY OF SOUTH BEND Project Name: Morris Box Office Renovation Project Number: 121-029C For Bids Due: July 26, 2022 Contractor Name: Version 09/29/2021 Contractor’s Bid for Public Works - 7 BASE BID Item No.Description Quantity Unit Unit Price Total Amount 1 Complete demolition, including: walls (full and partial), doors/windows, concrete step, ceiling systems, electrical, and mechanical components as noted on the demolition drawings. 1LS 2 New wall infill, new ceiling, and new finishes throughout Box Office Lobby and Box Office (including paint; trim at walls, openings and columns; installation of in-stock CPT1; floor leveling at CT2 transition to match existing ramp condition; SS1 at storefront bay ledges) 1LS 3 New exterior storefront Box Office window systems (including countertop at office desk) 1LS 4 New interior Box Office Window system (including countertop and surrounding trim) 1LS 5 Mechanical work as required in Box Office Lobby (not limited to: rerouting ductwork as necessary, etc.) 1LS 6 Electrical renovations as required in the Box Office Lobby and Box Office (not limited to relocating wiring and access panel, light fixture replacements, etc.) 1LS BASE BID TOTAL Bidder (Firm): Address: City/State/Zip: Telephone Number: ( ) By (Signature) (Printed Name of Person Signing) Larson-Danielson Construction Company, Inc. Larson-Danielson Construction Company, Inc. 302 Tyler Street LaPorte, IN 46350 219 362-2127 X Brian T. Larson, President LARSON-DANIELSON CONSTRUCTION CO., INC. S T A TE OF INDIA AN SEAL C orporate $29,575 $29,575 $150,047 $150,047 $17,162 $17,162 $44,027 $44,027 $19,556 $19,556 $23,196 $23,196 $283,563 Version 09/29/2021 Contractor’s Bid for Public Works - 3 PART II (For projects of $100,000 or more – IC 36-1-12-4) These statements to be submitted under oath by each bidder with and as part of his/her/its bid. Attach additional pages for each section as needed. SECTION I EXPERIENCE QUESTIONNAIRE 1. Attach information regarding projects your organization has completed for the period of one (1) year prior to the date of the current bid. 2. Attach a listing of public works projects currently in process of construction by your organization. 3. Attach information regarding any failure to complete any work awarded to you and the location thereof. 4. Attach references from private firms for which you have performed work. SECTION II PLAN AND EQUIPMENT QUESTIONNAIRE 1. Attach an explanation of your plan or layout for performing proposed work. (Examples could include a narrative of when you could begin work, complete the project, number of workers, etc. and any other information which you believe would enable the City of South Bend to consider your bid.) 2. Attach a listing of the names and addresses of all subcontractors (i.e. persons or firms outside your own firm who have performed part of the work) that you have used on public works projects during the past five (5) years along with a brief description of the work done by each subcontractor. 3. If you intend to sublet any portion of the work, attach the name and address of each subcontractor, equipment to be used by the subcontractor, and whether you will require a bond. However, if you are unable to currently provide a listing, please understand a listing must be provided prior to contract approval. Until the completion of the proposed project, you are under a continuing obligation to immediately notify the City of South Bend in the event that you subsequently determine that you will use a subcontractor on the proposed project. 4. Attach a listing of equipment you have available to use for the proposed project. 5.Have you entered into contracts or received offers for all materials which substantiate the prices used in preparing your proposal? If not, attach an explanation for the rationale used which would corroborate the prices listed. SECTION III CONTRACTOR’S FINANCIAL STATEMENT Attachment of bidder’s financial statement is mandatory. Any bid submitted without said financial statement as required by statute shall thereby be rendered invalid. The financial statement provided hereunder to the City of South Bend awarding the contract must be specific enough in detail so that said City of South Bend can make a proper determination of the bidder’s capability for completing the project if awarded. NOTE: See attached to follow I.32 Q:\Patti LD\Financial\96A Reports\96A Financial Statement I.32 2021-12-31 (Updated 6-30-22).docx 2/14/18 TGeneral Form No. 96-a. Prescribed by the State Board of Accounts of Indiana. Revised 1949. Standard Questionnaires and Financial Statement for Bidders Prescribed by THE STATE BOARD OF ACCOUNTS OF INDIANA For use in investigating and determining the qualifications of bidders on public construction when the aggregate cost of any such work or improvement will be Five Thousand Dollars or more. These statements to be submitted under oath by each bidder with and as a part of his bid, as provided by Chapter 306, page 1248, Acts of 1947. Submitted to A Corporation By Larson-Danielson Construction Co., Inc. A Co-partnership An Individual Address 302 Tyler Street La Porte, IN 46350 Date submitted , Filed City of South Bend 7/26 2022 2 Sec. 2 of an Act entitled “AN ACT concerning the awarding of contracts for the performance of public work and authorizing the board of accounts to prescribe certain forms to be used in ascertaining the responsibility of contractors who submit bids for the performance of such work, providing for plans and specifications, providing for bids repealing certain laws and declaring an emergency.” (Approved March 13, 1947.) Sec. 2. Whenever the aggregate costs of any work or improvement will be five thousand dollars ($5,000.00) or more, for the purpose of enabling such board, commission,, trustee, officer or agent to ascertain and determine which of the bidders submitting bids for the performance of any such public work is, in the judgment of such board, commission, trustee, officer or agent, the lowest and/or best bidder and to exercise intelligently the discretion hereby conferred on such board, commission, trustee, officer or agent each bidder shall be required to submit under oath with and as a part of his bid a statement of his experience, his proposed plan for performing such work and the equipment which he has available for the performance of such work and a financial statement. The statements hereby required shall be submitted on forms which shall be prescribed by the stated board of accounts. The forms so prescribed shall be designated, respectively, as the experience questionnaire, the plan and equipment questionnaire and the contractor’s financial statement, and shall be based, so far as applicable, on the standard questionnaires and financial statement for bidders as approved and recommended by the joint conference on construction practices, for use in investigating the qualifications of bidders on public construction work, and the forms so prescribed are hereby prescribed as the forms which shall hereafter be used by all such boards, commissions, trustees, officers and agents in obtaining the information which is required in the administration of this act. If the information submitted by any bidder on the forms herein prescribed is found, on examination, to be unsatisfactory, the bid submitted by such bidder shall not be considered. (Burns Statutes 1933, Sec. 53-109) Sec. 2, Chapter 306, Acts of 1947. 3 TO THE BIDDER--- The following forms of questionnaires and financial statement are prescribed by the State Board of Accounts in conformity with the statute set out on the preceding page. These forms, properly filled out and attested, must accompany each bid of five thousand dollars or more on any public work. The forms are designed to cover all contracts for all kinds of work and the bidder is required to answer such questions as are pertinent to the work upon which his is bidding. The purpose of the questionnaire and financial statement, as set forth in the law, is to enable the awarding body to determine the qualifications of the bidder to carry out successfully the contract if the same is awarded to him. The bidder will find it to his advantage to answer fully all questions coming within the range of the work upon which he is bidding. Particular attention should be given the “Financial Statement” and the details relative to the assets and liabilities set out. This form is made in extensive detail to that the bidder may explain his assets and liabilities in proper sequence and in a uniform manner. T. M. HINDMAN, State Examiner Version 09/29/2021 Contractor’s Bid for Public Works - 4 When the prospective Contractor is unable to certify to any of the statements below, it shall attach an explanation to this Affidavit. CONTRACTOR’S NON-COLLUSION AND NON-DEBARMENT AFFIDAVIT, CERTIFICATION REGARDING INVESTMENT WITH IRAN, EMPLOYMENT ELIGIBILITY VERIFICATION, NON- DISCRIMINATION COMMITMENT AND CERTIFICATION OF USE OF UNITED STATES STEEL PRODUCTS OR FOUNDRY PRODUCTS (Must be completed for all quotes and bids. Please type or print) STATE OF ___________ ) ) SS: COUNTY ) The undersigned Contractor, being duly sworn upon his/her/its oath, affirms under the penalties of perjury that: 1. Contractor has not, nor has any other member, representative, or agent of the firm, company, corporation or partnership represented by him, entered into any combination, collusion or agreement with any person relative to the price to be bid by anyone at such letting nor to prevent any person from bidding nor to induce anyone to refrain from bidding, and that this bid is made without reference to any other bid and without any agreement, understanding or combination with any other person in reference to such bidding. Contractor further says that no person or persons, firms, or corporation has, have or will receive directly or indirectly, any rebate, fee, gift, commission or thing of value on account of such sale; and 2. Contractor certifies by submission of this proposal that neither contractor nor any of its principals are presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from participation in this transaction by any Federal department or agency; and 3. Contractor has not, nor has any successor to, nor an affiliate of, Contractor, engaged in investment activities in Iran. a. For purposes of this Certification, “Iran” means the government of Iran and any agency or instrumentality of Iran, or as otherwise defined at Ind. Code § 5-22-16.5-5, as amended from time-to-time. b. As provided by Ind. Code § 5-22-16.5-8, as amended from time-to-time, a Contractor is engaged in investment activities in Iran if either: i. Contractor, its successor or its affiliate, provides goods or services of twenty million dollars ($20,000,000) or more in value in the energy sector of Iran; or ii. Contractor, its successor or its affiliate, is a financial institution that extends twenty million dollars ($20,000,000) or more in credit to another person for forty-five (45) days or more, if that person will (i) use the credit to provides goods and services in the energy sector in Iran; and (ii) at the time the financial institution extends credit, is a person identified on list published by the Indiana Department of Administration. 4. Contractor does not knowingly employ or contract with an unauthorized alien, nor retain any employee or contract with a person that the Contractor subsequently learns is an unauthorized alien. Indiana LaPorte Version 09/29/2021 Contractor’s Bid for Public Works - 5 Contractor agrees that he/she/it shall enroll in and verify the work eligibility status of all of Contractor’s newly hired employees through the E-Verify Program as defined by I.C. 22-5-1.7-3. Contractor’s documentation of enrollment and participation in the E-Verify Program is included and attached as part of this bid/quote; and 5. Contractor shall require his/her/its subcontractors performing work under this public contract to certify that the subcontractors do not knowingly employ or contract with an unauthorized alien, nor retain any employee or contract with a person that the subcontractor subsequently learns is an unauthorized alien, and that the subcontractor has enrolled in and is participating in the E-Verify Program. The Contractor agrees to maintain this certification throughout the term of the contract with the City of South Bend, and understands that the City may terminate the contract for default if the Contractor fails to cure a breach of this provision no later than thirty (30) days after being notified by the City. 6. Persons, firms, partnerships, corporations, associations, or joint venturers awarded a contract by the City of South Bend through its agencies, boards, or commissions shall not discriminate against any employee or applicant for employment in the performance of a City contract with respect to hire, tenure, terms, conditions, or privileges of contract or employment, or any matter directly or indirectly related to contracting or employment because of race, sex, religion, color, national origin, ancestry, gender expression, gender identity, sexual orientation, or due to age or disability that does not affect that person's ability to perform the work. In awarding contracts for the purchase of work, labor, services, supplies, equipment, materials, or any combination of the foregoing including, but not limited to, public works contracts awarded under public bidding laws or other contracts in which public bids are not required by law, the City, its agencies, boards, or commissions will consider the Contractor’s good faith efforts to obtain participation by those subcontractors certified by the State of Indiana as a Minority Business (“MBE”) or as a Women’s Business Enterprise (“WBE”) as a factor in determining the lowest, responsible, responsive bidder. Contractors seeking the award of a City contract cannot be required to award a subcontract to an MWBE; however, they may not unlawfully discriminate against said MBE/WBE. On goal-eligible contracts, Contractors are required to either meet both MBE and WBE utilization goals or demonstrate that the Contractor has made good faith efforts to obtain participationfrom MBE and WBE subcontractors. A finding of noncompliance or a discriminatory practice shall prohibit that Contractor from being awarded a City contract for a period of one (1) year from the date of such determination, and such determination may also be grounds for terminating the contact to which the discriminatory practice or noncompliance pertains. 7. The undersigned Contractor agrees that the following nondiscrimination commitment shall be made a part of any contract which it may henceforth enter into with the City of South Bend, Indiana or any of its agencies, boards or commissions. Contractor agrees not to discriminate against or intimidate any employee or applicant for employment in the performance of this contract with privileges of employment, or any matter directly or indirectly related to employment, because of race, religion, color, sex, gender expression, gender identity, sexual orientation, handicap, national origin or ancestry. Breach of this provision may be regarded as material breach of contract. I, the undersigned bidder or agent as contractor on a public works project, understand my statutory obligations to the use of steel products or foundry products made in the United States (I.C. 5-16-8-1). I hereby certify that I and all subcontractors employed by me for this project will use steel products or foundry products made in the United States on this project if awarded. I understand I have an affirmative duty to notify the City in my bid that my proposal does not include the use of steel products or foundry products made in the United States. I understand it is my sole obligation and responsibility to provide a justification to the City, subject to review and approval, why the cost of United States made steel or foundry products is unreasonable. Prior to award and upon submission of bid which does not use steel products or foundry products made in the United States, the City, through its director of public works, shall make a determination if the price of United States made steel or foundry is unreasonable. I understand that violations hereunder Version 09/29/2021 Contractor’s Bid for Public Works - 6 may result in forfeiture of contractual payments. *** I hereby affirm under the penalties of perjury that the facts and information contained in the foregoing bid for public works are true and correct. Dated this day of , 20__ Contractor/Bidder (Firm) Signature of Contractor/Bidder or Its Agent Printed Name and Title Subscribed and sworn to before me this day of , 20 My Commission Expires Notary Public County of Residence 26th July 22 Larson-Danielson Construction Company, Inc. X Brian T. Larson, President 26th July 22 9/8/23 X Michele C. Dzielinski LaPorte LARSON-DANIELSON CONSTRUCTION CO., INC. S T A TE OF INDIA AN SEAL C or porate UBL P I CYRATON F I N D IANAOET ATS NOTARY SEAL MICHELE CECILIA DZIELINSKI La Porte County My Commission Expires September 8, 2023 CITY OF SOUTH BEND MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN FORM MBE-1.0 MBE UTILIZATION PLAN Version 09/29/2021 Contractor’s Bid for Public Works - 8 This completed form should be supplied with Bids that pertain to City of South Bend Public Works Projects involving MBE participation. It is the bidder’s sole responsibility to verify whether any listed minority-owned business meets the MBE qualifications. Project Number:121-029C Project Name:Morris Box Office Renovation Bidder: Total Bid Amount: MBE Goal: 3.1% Page_______of___ ____ Name & Address of MBE Primary Contact Person (Name/Telephone) Scope of Work to be Performed (Attach scope/schedule if you need additional space) Dollar Amount of MBE Component Percentage of Total Bid/Proposal Submitted by: Print Name Signature Date Larson-Danielson Const. Co., Inc. 1 1 Brian T. Larson, President X 7/26/22 LARSON-DANIELSON CONSTRUCTION CO., INC. S T ATE OF INDIA AN SEAL Corporate CITY OF SOUTH BEND MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN FORM WBE-1.0 WBE UTILIZATION PLAN Version 09/29/2021 Contractor’s Bid for Public Works - 9 This completed form should be supplied with Bids that pertain to City of South Bend Public Works Projects involving WBE participation. It is the bidder’s sole responsibility to verify whether any listed woman-owned business meets the WBE qualifications. Project Number:121-029C Project Name:Morris Box Office Renovation Bidder: Total Bid Amount: WBE Goal: 4.4% Page_______of___ ____ Name & Address of WBE Primary Contact Person (Name/Telephone) Scope of Work to be Performed (Attach scope/schedule if you need additional space) Dollar Amount of WBE Component Percentage of Total Bid/Proposal Submitted by: Print Name Signature Date Larson-Danielson Const. Co., Inc. 1 1 Brian T. Larson, President X 7/26/22 LARSON-DANIELSON CONSTRUCTION CO., INC. S T ATE OF INDIA AN SEAL C orporate CITY OF SOUTH BEND MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN FORM MBE-2.0 EVIDENCE OF GOOD FAITH EFFORTS Version 09/29/2021 Contractor’s Bid for Public Works - 10 This completed form should be included as part of the Bids documents related to City of South Bend Public Works Projects requiring Good Faith Efforts to obtain MBE participation. Project Number:121-029C Date: Project Name:Morris Box Office Renovation Bidder: Contact Person: Telephone: Address: City: State: Zip: Email: To determine whether a bidder has demonstrated good faith efforts to reach the MBE utilization goals set forth in the City of South Bend Public Works Project Specifications, the City and its agencies, boards, or commissions, REQUIRE ALL of the following Good Faith Efforts as listed in the table below*: EVIDENCE OF GOOD FAITH EFFORTS MBE LIST(S): The bidder reviewed 1) the City of South Bend’s Minority and Women Business Enterprise Inclusion Program Plan; 2) the list of certified MWBEs provided by the City; and 3) the Indiana Department of Administration list of Minority and Women Owned Businesses (both certified and non-certified) found at: http://www.in.gov/idoa/. GOOD FAITH EFFORTS TO OBTAIN MBE PARTICIPATION The bidder shall initial each item below, as evidence of its good faith efforts to obtain MBE participation in the awarded contract. I affirm that I reviewed the City of South Bend’s Minority and Women Business Enterprise Inclusion Program Plan and the Indiana Department of Administration’s certified list of Indiana Minority and Women Business Enterprises, found on their website (http://www.in.gov/idoa). I affirm that I have made good faith efforts to select portions of the contract work to be performed by MWBEs, including, where appropriate, breaking out contract work items into economically feasible units to facilitate MBE participation. I affirm that I have made good faith efforts to solicit through all reasonable and available means the interest of all MBEs in the scopes of work of the contract. I affirm that I attended all pre-bid meetings scheduled by the City of South Bend to inform MBEs of contracting and subcontracting opportunities. I affirm that I advertised in general circulation and/or trade association publications concerning subcontract opportunities and allowed MBEs reasonable time to respond to such advertisements. I affirm that I performed any and all necessary steps to provide written notices in a manner reasonably calculated to inform MBEs of subcontracting opportunities and allowed sufficient time for MBEs to participate effectively. I affirm that I followed up on initial solicitations with interested MBEs. I affirm that I negotiated with interested MBEs in good faith, including providing such MBEs with adequate information about the plans, specifications and other requirements of the subcontract. I affirm that I have made good faith efforts to assist interested MBEs in obtaining bonding, lines of credit, or insurance as required by the City or the bidder, where appropriate. 7/26/22 Larson-Danielson Construction Company, Inc. Brian T. Larson, President 219-362-2127 302 Tyler Street LaPorte IN 46350 btl@ldconstruction.com CITY OF SOUTH BEND MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN FORM MBE-2.0 EVIDENCE OF GOOD FAITH EFFORTS Version 09/29/2021 Contractor’s Bid for Public Works - 11 I affirm that I have made good faith efforts to assist interested MBEs in obtaining necessary equipment, supplies, materials, or related assistances or services, where appropriate. I affirm that I did not reject any MBEs as unqualified without sound business reasons based on a thorough investigation of their capabilities. CONTRACT RECORDS: The bidder has maintained the following records for each MBE that has bid on the subcontracting opportunity: 1. Name, address, and telephone number; 2. A description of information provided by the bidder or subcontractor; and 3. A statement of whether an agreement was reached, and if not, why not, including any reasons for concluding that the MBE was unqualified to perform the job. *Proper demonstration of Good Faith Efforts requires your initials next to all of the above boxes. Any omissions shall be considered grounds for rejection of the bid by the Board of Public Works. The City of South Bend reserves the right to request additional information. CITY OF SOUTH BEND MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN FORM WBE-2.0 EVIDENCE OF GOOD FAITH EFFORTS Version 09/29/2021 Contractor’s Bid for Public Works - 12 This completed form should be included as part of the Bids documents related to City of South Bend Public Works Projects requiring Good Faith Efforts to obtain MWBE participation. Project Number:121-029C Date: Project Name:Morris Box Office Renovation Bidder: Contact Person: Telephone: Address: City: State: Zip: Email: To determine whether a bidder has demonstrated good faith efforts to reach the WBE utilization goals set forth in the City of South Bend Public Works Project Specifications, the City and its agencies, boards, or commissions, REQUIRE ALL of the following Good Faith Efforts as listed in the table below*: EVIDENCE OF GOOD FAITH EFFORTS WBE LIST(S): The bidder reviewed 1) the City of South Bend’s Minority and Women Business Enterprise Inclusion Program Plan; 2) the list of certified MWBEs provided by the City; and 3) the Indiana Department of Administration list of Minority and Women Owned Businesses (both certified and non-certified) found at: http://www.in.gov/idoa/. GOOD FAITH EFFORTS TO OBTAIN WBE PARTICIPATION The bidder shall initial each item below, as evidence of its good faith efforts to obtain WBE participation in the awarded contract. I affirm that I reviewed the City of South Bend’s Minority and Women Business Enterprise Inclusion Program Plan and the Indiana Department of Administration’s certified list of Indiana Minority and Women Business Enterprises, found on their website (http://www.in.gov/idoa). I affirm that I have made good faith efforts to select portions of the contract work to be performed by WBEs, including, where appropriate, breaking out contract work items into economically feasible units to facilitate WBE participation. I affirm that I have made good faith efforts to solicit through all reasonable and available means the interest of all WBEs in the scopes of work of the contract. I affirm that I attended all pre-bid meetings scheduled by the City of South Bend to inform WBEs of contracting and subcontracting opportunities. I affirm that I advertised in general circulation and/or trade association publications concerning subcontract opportunities and allowed WBEs reasonable time to respond to such advertisements. I affirm that I performed any and all necessary steps to provide written notices in a manner reasonably calculated to inform WBEs of subcontracting opportunities and allowed sufficient time for WBEs to participate effectively. I affirm that I followed up on initial solicitations with interested WBEs. I affirm that I negotiated with interested WBEs in good faith, including providing such WBEs with adequate information about the plans, specifications and other requirements of the subcontract. I affirm that I have made good faith efforts to assist interested WBEs in obtaining bonding, lines of credit, or insurance as required by the City or the bidder, where appropriate. 7/26/22 Larson-Danielson Construction Company, Inc. Brian T. Larson, President 219-362-2127 302 Tyler Street LaPorte IN 46350 btl@ldconstruction.com CITY OF SOUTH BEND MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN FORM WBE-2.0 EVIDENCE OF GOOD FAITH EFFORTS Version 09/29/2021 Contractor’s Bid for Public Works - 13 I affirm that I have made good faith efforts to assist interested WBEs in obtaining necessary equipment, supplies, materials, or related assistances or services, where appropriate. I affirm that I did not reject any WBEs as unqualified without sound business reasons based on a thorough investigation of their capabilities. CONTRACT RECORDS: The bidder has maintained the following records for each WBE that has bid on the subcontracting opportunity: 1. Name, address, and telephone number; 2. A description of information provided by the bidder or subcontractor; and 3. A statement of whether an agreement was reached, and if not, why not, including any reasons for concluding that the MWBE was unqualified to perform the job. *Proper demonstration of Good Faith Efforts requires your initials next to all of the above boxes. Any omissions shall be considered grounds for rejection of the bid by the Board of Public Works. The City of South Bend reserves the right to request additional information. CITY OF SOUTH BEND MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN FORM MBE-2.1 MBE CONTACTED Version 09/29/2021 Contractor’s Bid for Public Works - 14 This completed form should be supplied with Bids that pertain to City of South Bend Public Works Projects requiring Good Faith Efforts to contact MBEs. It is the bidder’s sole responsibility to verify whether any listed minority-owned business meets the MBE qualifications. Attach additional pages if necessary. PAGE_______OF________ Project Number:121-029C MBE Participation Goal 3.1% Project Name:Morris Box Office Renovation Bidder: By: (Signature) (Title) (Date) MBE Firm Owner or Contact at MBE Firm Telephone: Fax: Email: TYPE OF WORK SOLICITED FOR THIS PROJECT: RESULTS OF CONTACT WITH THE MBE FIRM: MBE Firm Owner or Contact at MBE Firm Telephone: Fax: Email: TYPE OF WORK SOLICITED FOR THIS PROJECT: RESULTS OF CONTACT WITH THE MBE FIRM: Larson-Danielson Construction Company, Inc. X Brian T. Larson, President 7/26/22 See attached Good Faith Effort LARSON-DANIELSON CONSTRUCTION CO., INC. S T A TE OF INDIA AN SEAL C orporate CITY OF SOUTH BEND MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN FORM MBE-2.1 WBE CONTACTED Version 09/29/2021 Contractor’s Bid for Public Works - 15 This completed form should be supplied with Bids that pertain to City of South Bend Public Works Projects requiring Good Faith Efforts to contact WBEs. It is the bidder’s sole responsibility to verify whether any listed woman-owned business meets the WBE qualifications. Attach additional pages if necessary. PAGE_______OF________ Project Number:121-029C WBE Participation Goal 4.4% Project Name:Morris Box Office Renovation Bidder: By: (Signature) (Title) (Date) WBE Firm Owner or Contact at WBE Firm Telephone: Fax: Email: TYPE OF WORK SOLICITED FOR THIS PROJECT: RESULTS OF CONTACT WITH THE WBE FIRM: WBE Firm Owner or Contact at WBE Firm Telephone: Fax: Email: TYPE OF WORK SOLICITED FOR THIS PROJECT: RESULTS OF CONTACT WITH THE WBE FIRM: Larson-Danielson Construction Company, Inc. X Brian T.Larson, President 7/26/22 See attached Good Faith Effort LARSON-DANIELSON CONSTRUCTION CO., INC. S T A TE OF INDIA AN SEAL C or porate Version 02/23/2022 General Conditions - 10 CITY OF SOUTH BEND, INDIANA CONTRACTOR’S BID FOR PUBLIC WORK RESPONSIBLE BIDDER CHECKLIST Project Name Morris Box Office Renovation Project No. 121-029C For Bids Due July 26, 2022 Contractor Name: The City seeks to enhance its ability to identify responsive and responsible bidders on all City public works projects by institution of comprehensive submission requirements in compliance with State law. Quality workmanship, efficient operation, safety, and timely completion of projects requires that all bidders meet certain minimum requirements to be responsive and responsible bidders. THIS FORM MUST BE SUBMITTED WITH YOUR BID. INSTRUCTIONS: If you are a pre-qualified bidder, complete Section I only. If you are not a pre-qualified bidder, complete Section II only. Section II acts as an application for pre-qualification. Submission of Section II will allow the bidder to be considered for pre-qualification for bids with the City of South Bend Department of Public Works. Pre- qualified bidders will then be exempt from a portion of the submission requirements outlined in Section 6- 63 of The Responsible Bidding Ordinance No. 10594-18 (hereinafter, “Responsible Bidding Ordinance”) for a period of twelve (12) months. Thereafter, contractors who are pre-qualified must submit a complete application for continuation of “pre- qualified” standing, on a form provided by the City (“Responsible Bidder Checklist (1) Pre-Qualified Bidders”) by December 31st for the upcoming calendar year, or within twelve (12) months of obtaining pre- qualified standing. If the status of any item changes within the twelve (12) months, it is the responsibility of the contractor to notify the City. Failure by any pre-qualified contractor to submit its complete application for continuation of “pre-qualified” standing within the time prescribed above shall result in automatic removal of the designation, effective January 1 of the following year, or immediately following the twelve (12) months of pre-qualified standing. However, the “removed” contractor or subcontractor shall still be permitted to bid on City public works projects, though the contractor must submit all required documents under 6-63 until “pre-qualified” status is re-established. Please Note: The City reserves the right to request supplemental information from the bidder, additional verification of any information provided by the bidder, and may also conduct random inquiries of the bidder’s current and previous customers regardless of pre-qualified standing. It is the sole responsibility of the potential bidder to comply with all submission requirements applicable to the bidder in Section 6-63 of the Responsible Bidding Ordinance no later than the date of the public bid opening. Larson-Danielson Construction Company, Inc. Version 02/23/2022 General Conditions - 11 POST BID SUBMISSIONS: Post-bid submissions must be submitted in accordance with Section 6-64 of the Responsible Bidding Ordinance. The post-bid submission requirements are as follows: 1. All bidders shall collect, maintain, and provide upon request, a current written list that discloses the name, address, licensing status, and type of work for any subcontractor from whom the bidder has accepted a bid and/or intends to hire on any part of the public work project, including individuals performing work as independent contractors. 2. Each subcontractor, whose portion of the project is estimated to be at least one-hundred fifty thousand dollars ($150,000.00), shall be required to adhere to the requirements of Section I of the Responsible Bidder Ordinance as though it were bidding directly to the City, except that the subcontractor shall submit the required information (including the name, address, and type of work) to the successful bidder prior to the commencement of work. 3. Failure of a subcontractor to submit the required information shall not disqualify the successful bidder from performing work on the project and shall not constitute a contractual default and/or breach by the successful bidder. However, the City may withhold all payment otherwise due for work performed by a subcontractor, until the subcontractor submits the required information and the City approves such information. 4. The disclosure of a subcontractor list (“Disclosed Subcontractor(s)”) to the City by a bidder shall not create any rights in the Disclosed Subcontractor(s). Thus, a bidder may substitute another subcontractor for a Disclosed Subcontractor by giving the City, upon request, written notice of the name, address, licensing status, and type of work of the substitute subcontractor. 5. The successful bidder and all subcontractors on a public works project are required to submit certified payroll utilizing the federal form known as WH-347 or a similar form on a bi-weekly basis, submitted within 10 days after the end of each bi-weekly payroll period. Certified payrolls shall identify the job title and craft for each employee. Certified payrolls shall be submitted electronically. Please Note:Submissions deemed inadequate, incomplete, or untimely by the City may result in the automatic disqualification of the bid. The City, after review of complete and timely submissions, shall, in its sole discretion, after taking into account all information in the submission requirements, determine whether a bidder is responsive and responsible, and provide a Pre-Qualification Verification Letter. The City specifically reserves the right to utilize all information provided in the contractor’s submission and any information obtained by the City through its own independent verification of the information provided by the contractor. Version 02/23/2022 General Conditions - 12 I. PRE-QUALIFIED BIDDER CHECKLIST (a) Acknowledgements: (i) ___ By checking this box, I hereby acknowledge that I am a pre-qualified bidder with the City of South Bend and that I have met the pre-qualification requirements within the last twelve (12) months. A copy of my Pre-Qualification verification letter is attached. (ii) ___ By checking this box, I hereby acknowledge that the City reserves the right to request supplemental information, additional verification of any information provided by me, and may also conduct random inquiries of my current and prior customers. (b) Attachments: (i) ___ Indiana Secretary of State’s on-line records (ie. Business verification) dated within sixty (60) days of the submission of said document showing that business is in existence, current with the Indiana Secretary of State’s Business Entity Report, and eligible for a certificate of good standing. (Not applicable to individuals, sole proprietors or partnerships). (ii) ___ Statement on staffing capabilities, including labor sources. This statement indicates and ensures I have sufficient employees on staff to complete the work. It outlines how I intend to meet the staffing needs of the work. (iii) ___ List of projects of similar size and scope of work performed in all areas, including the State of Indiana, within the last three (3) years. (iv) ___ For every project, submit evidence of participation in apprenticeship and training programs, applicable to the work to be performed on the project, which are approved by and registered with the United States Department of Labor’s Office of Apprenticeship, or its successor organization. X X X X X X Version 02/23/2022 General Conditions - 13 II. PRE-QUALIFICATION CHECKLIST (FOR BIDDERS THAT ARE NOT PRE-QUALIFIED) (a) Acknowledgements: (i) ___ By checking this box, I hereby acknowledge that I am not a pre-qualified bidder with the City of South Bend. (ii) ___ By checking this box, I hereby acknowledge that the City reserves the right to request supplemental information, additional verification of any information provided, and may also conduct random inquiries of my current and prior customers. The City reserved the right to utilize all information provided in this submission and all information obtained in inquiries or requests to determine if a bidder is responsive and responsible. Additionally, I acknowledge that all information provided to the City shall be regarded as public records. (iii) ___ By checking this box, I hereby acknowledge that copies of all Applicable apprenticeship certificates or standards for training programs applicable to the work performed on the project may be requested at any time and shall be furnished upon request. (iv) ___ By checking this box, I hereby acknowledge and ensure that I and all sub- contractors, from whom I have accepted a bid and/or intend to hire to perform work on the public work project, are properly licensed. Furthermore, I acknowledge my understanding that it is my responsibility to ensure that all sub-contractors have the necessary licenses to undertake the work called for in this bid. If a sub- contractor loses their license at any point, it is the responsibility of that sub- contractor to notify the City. (b) Attachments: (i) ___ Indiana Secretary of State’s on-line records (ie. Business verification) dated within sixty (60) days of the submission of said document showing that business is in existence, current with the Indiana Secretary of State’s Business Entity Report, and eligible for a certificate of good standing. (Not applicable to individuals, sole proprietors or partnerships). (ii) ___ List identifying all former business names. (iii) ___ Any determinations by a court or governmental agency any violations of federal state, or local laws including, but not limited to, violations of contracting or antitrust laws, tax or licensing laws, environmental laws, Occupational Safety and Health Act (OSHA), or federal Davis-Bacon and related Acts, within the preceding five (5) years. (iv) ___ Statement about staffing capabilities, including labor sources. This statement indicates and ensures I have sufficient employees on staff to complete the work I am bidding on OR outlines how I intend to meet the staffing needs of the work. (v) ___ Statement that individuals who will perform work on the public work project on my behalf will be properly classified as an employee or as an independent contractor under all applicable state and federal laws and local ordinances. (vi) ___ For every project, submit evidence of participation in apprenticeship and training programs, applicable to the work to be performed on the project, which are approved by and registered with the United States Department of Labor’s Office of Apprenticeship, or its successor organization. (vii) ___ Copy of a written plan for employee drug testing that covers all of my employees who will perform work on the public work project and meets or exceeds the requirements set forth in IC 4-13-18-5 or IC 4-13-18-6. (viii) ___ Evidence that I am utilizing a surety company which is on the Bureau of Fiscal Service “Department of Treasury’s Listing of Approved Sureties” as required in the bid specifications or contract. Version 02/23/2022 General Conditions - 14 (ix) ___ Written statement of any federal, state or local tax liens or tax delinquencies owed to any federal, state or local taxing body in the preceding three years. (i) ___ List of projects of similar size and scope of work performed in all areas, including the State of Indiana, within three (3) years prior to the date on which the bid is due. Date: ___________________________________________ ________________________________________________ (Sign Here) ________________________________________________ (Print Name Here) ________________________________________________ (Name of Company) ________________________________________________ (Address of Company) ________________________________________________ (City) ________________________________________________ (State) ________________________________________________ (Telephone Number) 7/26/22 X Brian T. Larson, President Larson-Danielson Construction Company, Inc. 302 Tyler Street LaPorte IN 46350 219-362-2127 LARSON-DANIELSON CONSTRUCTION CO., INC. S T ATE OF INDIA AN SEAL C orporate  'HFHPEHU  )URP 0LNH6]\PDQVNL'LUHFWRU&DSLWDO3URMHFWV   7R 0LFKHOH']LHOLQVNL   68%-5HVSRQVLEOH%LGGHU3UH4XDOLILFDWLRQ  0U5DKPDQ-RKQVRQ'LUHFWRURI3XUFKDVLQJDQG,KDYHUHYLHZHG\RXU5HVSRQVLEOH%LGGLQJ 3UDFWLFHVGRFXPHQWDWLRQVXEPLWWHGZLWK\RXUFRPSDQLHVELGGLQJGRFXPHQWVRQIRU -DFNVRQ0LGGOH6FKRRO6HFXUH(QWU\3URMHFW:HDJUHHWKDW/DUVRQ'DQLHOVRQ&RQVWUXFWLRQ &R,QFKDVVXEPLWWHGDOOWKHUHTXLUHGLQIRUPDWLRQUHODWLQJWR%RDUG3ROLF\DQGPHHWV DOOLWVUHTXLUHPHQWV/DUVRQ±'DQLHOVRQ&RQVWUXFWLRQ&R,QFLVQRZSUHTXDOLILHGIRUDOO6RXWK %HQG&RPPXQLW\6FKRRO&RUSRUDWLRQ3URMHFWVFRVWLQJRYHUIRUWKHQH[WWZHOYH PRQWKVH[SLULQJRQ:KHQELGGLQJRQSURMHFWVSOHDVHDWWDFKDFRS\RIWKLVOHWWHUDQG FKHFN³\HV´IRUEHLQJSUHTXDOLILHGRQWKH5HVSRQVLEOH%LGGLQJ3UDFWLFHV)RUP    5HVSHFWIXOO\    0LNH6]\PDQVNL   &RS\WR 5DKPDQ-RKQVRQ'LUHFWRURI3XUFKDVLQJ .HOO\7RSSHQ$GPLQLVWUDWLYH$VVLVWDQW            WZK:d͗^ŽƵƚŚĞŶĚ͕ŝƚLJŽĨͲDŽƌƌŝƐŽdžKĨĨŝĐĞZĞŶŽ ŝĚĂƚĞ͗ϳͬϮϲͬϮϮ Z͗ZĞƐƉŽŶƐŝďůĞŝĚĚŝŶŐWƌĂĐƚŝĐĞƐ^ƵďŵŝƚƚĂů   ůů>ĂƌƐŽŶĂŶŝĞůƐŽŶůĂďŽƌŝƐƉƌŽǀŝĚĞĚƚŚƌŽƵŐŚůŽĐĂůƚƌĂĚĞƵŶŝŽŶƐ͘  /ŶĚŝǀŝĚƵĂůƐƚŚĂƚǁŝůůƉĞƌĨŽƌŵǁŽƌŬŽŶƚŚĞƉƵďůŝĐǁŽƌŬƉƌŽũĞĐƚŽŶďĞŚĂůĨŽĨ>ĂƌƐŽŶĂŶŝĞůƐŽŶ ŽŶƐƚƌƵĐƚŝŽŶŽŵƉĂŶLJ͕/ŶĐ͘ǁŝůůďĞƉƌŽƉĞƌůLJĐůĂƐƐŝĨŝĞĚĂƐĞŝƚŚĞƌ;ϭͿĂŶĞŵƉůŽLJĞĞŽƌ;ϮͿĂŶŝŶĚĞƉĞŶĚĞŶƚ ĐŽŶƚƌĂĐƚŽƌ͕ƵŶĚĞƌĂůůĂƉƉůŝĐĂďůĞƐƚĂƚĞĂŶĚĨĞĚĞƌĂůůĂǁƐĂŶĚůŽĐĂůŽƌĚŝŶĂŶĐĞƐ͘  ͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺ ƌŝĂŶd͘>ĂƌƐŽŶ͕WƌĞƐŝĚĞŶƚ ϯϬϮdLJůĞƌ^ƚƌĞĞƚ>ĂWŽƌƚĞ͕/ŶĚŝĂŶĂϰϲϯϱϬ  ;ϮϭϵͿϯϲϮͲϮϭϮϳ&Ădž;ϮϭϵͿϯϲϮͲϮϴϰϴ  LARSON-DANIELSON CONSTRUCTION CO., INC. S T A T E OF INDIA AN SEAL C orporate Construction in Progress Client: Project: Architect: Value: L:\Filing System\Marketing\18- QUALIFICATIONS & PROPOSALS\3 - PRE-QUALIFICATIONS\AEP\2021 RFQ\A305 Current Project Experience List I_41.docx 1 of 4 6/17/2021 1007 La Porte Properties La Porte Hospital MOB Gresham Smith Architects $ 7,731,250 La Porte, IN Nashville, TN 215 Buffalo, LLC Building Renovations Larson-Danielson $ 121,980 New Buffalo, MI Construction Co., Inc. La Porte, IN Barton Malow UND Women’s Residence Mackey Mitchell Architects $ 1,337,000 Hall – Concrete Package St. Louis, MO Notre Dame, IN Community Foundation of SMMC 4th Floor Surgical Design Alliance Architects $ 3,280,270 Northwest Indiana Pavilion Buildout Hammond, IN Hobart, IN Cissel Mueller Company, LLC Dollar General Falk Liggett Design $ 946,000 Chesterton, IN Portage, IN Cissel Mueller Company, LLC Dollar General Falk Liggett Design $ 971,000 Gary, IN Portage, IN Cissel Mueller Company, LLC Dollar General Falk Liggett Design $ 889,262 Hammond, IN Portage, IN Crown Point Community Additions & Renovations Gibraltar Design $ 3,413,670 School Corporation Existing Classrooms & Indianapolis, IN Offices Crown Point, IN GAF Materials Corporation Distribution Center & Larson-Danielson $ 99,300 Storage Yard Construction Co., Inc. Michigan City, IN La Porte, IN GAF Materials Corporation Renovation to Plant Larson-Danielson $ 489,417 Offices & Administration Construction Co., Inc. Building Kitchen La Porte, IN Michigan City, IN Goshen Health Tower Addition Site Hagerman (CM) $ 2,780,000 Concrete Bona Vita Architecture Goshen, IN Fort Wayne, IN Grace College Alpha Hall Dining Fanning/Howey Associates $ 2,491,093 Additions & Renovations Indianapolis, IN Winona Lake, IN Grimmer Construction INDOT Road Plans 3rd BFS Engineering $ 195,000 Street & Center Street Indianapolis, IN Hobart, IN November 3, 2021 C/O Larson-Danielson Construction Co., Inc. 302 Tyler St LaPorte, IN 46350 To Whom It May Concern, This is a letter of recommendation on behalf of LLarson-Danielson Construction Co., Inc. The BAC 4 IN/KY Apprenticeship & Training Program is a statewide program that was established in 11994 and is recognized by and in good standing with the U. S. Department of Labor. The Apprentice Program utilizes numerous Ivy Tech Community College facilities statewide and is considered in good standing. Larson-Danielson Construction Co., Inc. has been a “signatory union contractor” since 1996 and currently employ enrolled apprentices. LLarson-Danielson Construction Co., Inc. has continued to follow the guidelines set forth in Collective Bargaining Agreement with BAC Local #4 IN/KY meeting the required Journeyman/Apprentice ratio on their jobs. Should you have any further questions please feel free to contact the State office at (219) 525-4443. Sincerely, Roger Jones Managing Director BAC 4 IN/KY Apprenticeship & Training Fund                  #+CI,DI19I?2/I %I #CI96; 1I7I <@71+E*I"@I !I9G=597I H7AI$I C;97C:I 9I +7I9@8I -.%I IC+I C38@I9I>;@7)E0I C1&F'I(I4BI 9I9@I #$ !& &" %&  & & $GT &)$  November 30, 2018 TRAVIS JAMES BEAL Bricklayer BAC 4 IN/KY APPRENTICESHIP & TRAINING PROGRAM 1791508                  #+CI,DI19I?2/I %I #CI96; 1I7I <@71+E*I"@I !I9G=597I H7AI$I C;97C:I 9I +7I9@8I -.%I IC+I C38@I9I>;@7)E0I C1&F'I(I4BI 9I9@I #$ !& &" %&  & & $GT &)$  May 07, 2021 PETER MASON LEONARD Bricklayer BAC 4 IN/KY APPRENTICESHIP & TRAINING PROGRAM 2024926                  #+CI,DI19I?2/I %I #CI96; 1I7I <@71+E*I"@I !I9G=597I H7AI$I C;97C:I 9I +7I9@8I -.%I IC+I C38@I9I>;@7)E0I C1&F'I(I4BI 9I9@I #$ !& &" %&  & & $GT &)$  November 15, 2017 JAIME MONREAL Bricklayer BAC 4 IN/KY APPRENTICESHIP & TRAINING PROGRAM 1685562                  #+CI,DI19I?2/I %I #CI96; 1I7I <@71+E*I"@I !I9G=597I H7AI$I C;97C:I 9I +7I9@8I -.%I IC+I C38@I9I>;@7)E0I C1&F'I(I4BI 9I9@I #$ !& &" %&  & & $GT &)$  December 18, 2019 MICHAEL TOMOTHY PATTERSON Bricklayer BAC 4 IN/KY APPRENTICESHIP & TRAINING PROGRAM 1923713                  #+CI,DI19I?2/I %I #CI96; 1I7I <@71+E*I"@I !I9G=597I H7AI$I C;97C:I 9I +7I9@8I -.%I IC+I C38@I9I>;@7)E0I C1&F'I(I4BI 9I9@I #$ !& &" %&  & & $GT &)$  May 28, 2020 NICOLE SHARPE Bricklayer BAC 4 IN/KY APPRENTICESHIP & TRAINING PROGRAM 1914724             !                       ! ""  # $  ! ""  # $  ! ""  # $  ! ""  # $  ! ""  # $ " ## $## $## %## $## & # ''"" $ # # & # # $ # # ( # # & # # & # ) *+ $ # # & # # & # # , # # - # # & # . " ( # # &, # # $/ # # -$ # #  # # &- $ 0+  & # # 1 # # - # # & # # & # # - # 2'"" , # # % # # # $ # # 1 # # % # # / # 3 ""'"" - # # , # # &# # # &# # # / # # 1 & 32 -## ## 1## 1## $## & # 42 . /## ,## /## (## $##  #  52 $ # # & # # $ # # $ # # $ # # # # " -( # # ( # # , # # 1, # # -- # # -% -  !%                       ! ""  # $  ! ""  # $  ! ""  # $  ! ""  # $  ! ""  # $ " -## ,## /## ## &## & # ''"" & # # $ # # , # # $ # # & # # $ # ) *+ - # # 1 # # , # # ( # #  # # & # . " , # # $ # # $- # # &( # #  # # $# $ 0+  - # # / # # $ # # , # # & # # $ # 2'"" / # # &# # # # 1 # # 1 # # / # # 1 # 3 ""'"" , # # % # # &$ # # / # #  # #  $ 32 -## (## 1## &## -## $ # 42 . -## 1## &&## ## ,##  #  52 $ # # - # # $ # # $ # # $ # # # # " -/ # # 1$ # # 1( # # ( # # -- # #    !&                       ! ""  # $  ! ""  # $  ! ""  # $  ! ""  # $  ! ""  # $ " ,## ,## -## $## ## # & ''"" 1 # # 1 # # & # # $ # # & # # & # ) *+  # # &# # # ( # # / # # - # # & & . " / # # $1 # # &, # # &$ # # , # # $# - 0+  & # # $ # # , # # & # # & # # $ # 2'"" - # # / # # # 1 # # 1 # # ( # # % # 3 ""'"" 1 # # &, # # 1 # #  # # ( # # , & 32 -## ,## &## ## $## $ # 42 . -## ,## /## -## %## ( #  52 ( # #  # # - # # $ # # & # # & # " 1 # # %- # # (1 # # ( # # -/ # # / ,  !'                       ! ""  # $  ! ""  # $  ! ""  # $  ! ""  # $  ! ""  # $ " & # #  # # & # # - # # # # # # & ''"" $ # # $ # # $ # # # # #  # # & # ) *+  # # 1 # # % # # 1 # # , # # & & . " $ # # && # # & # #  # # $ # # ( # 0+  $ # #  # # $ # # & # # & # # $ # 3 ""'"" , # # - # # / # # , # # , # # $ & 32 -## (## -## -## ### # # 42 . (## (## %## 1## ,## $ #  52 & # #  # # & # # - # # # # # & # " $, # # , # # 1 # # -, # # $( # # & -  !(                       ! ""  # $  ! ""  # $  ! ""  # $  ! ""  # $  ! ""  # $ " - # # $ # #  # # & # # # # # # & ''"" $ # # $ # # # # # , # # & # # # # ) *+ - # # , # #  # # / # # $ # # & & . " ( # # 1 # # &# # # , # # - # # , & 0+  # # # - # # $ # # & # # & # # & # 3 ""'"" , # # - # # / # # , # # / # # & # 32 &## (## -## &## ###  # 42 . - # # ( # # && # # / # # , # # # #  52 & # # & # # $ # # $ # # # # # # # " $ # # -( # # - # # -/ # # $# # # &- -     !)                       ! ""  # $  ! ""  # $  ! ""  # $  ! ""  # $  ! ""  # $ " - # # - # # & # # # # # & # # & # ''"" # # # & # #  # # $ # # $ # # # # ) *+ $ # # ( # # , # # - # #  # # & & . " $ # # $ # # &( # # &# # # / # # - & 0+  & # # $ # # - # # - # # $ # # # # 3 ""'"" ( # # / # # / # # &- # # $ # # # # 32 &## -## -## ## $## # # 42 . $## 1## ## ,## /## # #  52 & # # $ # # $ # # $ # # & # # # # " &/ # # -- # # ( # # - # # $1 # # ( $     !                       ! ""  # $  ! ""  # $  ! ""  # $  ! ""  # $  ! ""  # $ " # # # - # # & # # # # # & # # & # ''"" # # # $ # # $ # # - # # & # # $ # ) *+ & # # - # #  # # - # # & # # # # . " # # # $ # # &- # # , # # , # # $ & 0+  & # # - # #  # # - # # & # # # # 3 ""'"" &# # # &# # # % # #  # # $ # # # & 32 ### $## $## $## $## # # 42 . &## 1## ## ,## -## # #  52 # # #  # # & # # - # # & # # # # " &- # # -/ # # # # # -# # # &1 # # ( $     !                       ! ""  # $  ! ""  # $  ! ""  # $  ! ""  # $  ! ""  # $ " $ # # $ # # & # # $ # # $ # # & # ''"" # # # $ # # $ # # $ # # $ # # & # ) *+ & # # $ # # # # # - # # # # # # # . " & # # / # # % # # - # # $ # # $ & 0+  & # # - # # - # # & # #  # # # # 3 ""'"" &# # # &# # # / # #  # # ( # # # & 32 $## $## $## ### &## # # 42 . &## -## /## ## -## # #  52 # # # $ # # $ # # $ # #  # # # # " &1 # # -- # # -- # # $& # # $- # #  $ Plasterers & Cement Masons #692 J.A.T.C. Merrillville, IN See program standards for occupations May 22, 1995 IN010950002 Construction in Progress Client: Project: Architect: Value: L:\Filing System\Marketing\18- QUALIFICATIONS & PROPOSALS\3 - PRE-QUALIFICATIONS\AEP\2021 RFQ\A305 Current Project Experience List I_41.docx 2 of 4 6/17/2021 Hagerman, Inc. Culver Lauridsen Hebard & Hebard Architects $ 430,492 Barrack BP # 7 & 8 South Bend, IN Culver, IN Hagerman, Inc. Union Center Elementary Barton, Coe, Villamaa $ 711,590 Additions Fort Wayne, IN Valparaiso, IN Hammond, School City of New MS/HS BP #1 & Schmidt Associates $ 1,768,000 BP # 2 Concrete Indianapolis, IN Hammond, IN Hanover Community School Middle School Additions & Gibraltar Design $ 2,296,705 Corporation Renovations BC 01 Indianapolis, IN General Trades Cedar Lake, IN Hanover Community School Middle School Additions & Gibraltar Design $ 1,131,176 Corporation Renovations BC 02 Indianapolis, IN Masonry Cedar Lake, IN Healthcare Foundation HFL New Facility Shive Hattery $ 5,133,000 of La Porte La Porte, IN Valparaiso, IN HealthLinc Harbor Square Clinic Larson-Danielson $ 802,620 Buildout Construction Co., Inc. East Chicago, IN La Porte, IN Hearthside Food Solution Interior Renovations Not Applicable $ 1,805,080 New Oven Line Michigan City, IN Hobart, School City of New Elementary School Gibraltar Design $ 8,362,500 Hobart, IN Indianapolis, IN Horizon Bank Building Renovations Wightman $ 297,367 Gary, IN Benton Harbor, MI Indiana University Harper Hall Basement BSA LifeStructures $ 3,162,000 Renovations Indianapolis, IN South Bend, IN Indiana University Northside Hall Renovations Design Collaborative, Inc. $ 1,615,660 Phase III Fort Wayne, IN South Bend, IN Indiana University Marram Hall Glass Block Hutton & Hutton Arch & Engs $ 1,143,000 Replacement Hammond, IN South Bend, IN Construction in Progress Client: Project: Architect: Value: L:\Filing System\Marketing\18- QUALIFICATIONS & PROPOSALS\3 - PRE-QUALIFICATIONS\AEP\2021 RFQ\A305 Current Project Experience List I_41.docx 3 of 4 6/17/2021 Kankakee Valley School Elementary School Odle McGuire & Shook $ 2,681,855 Corporation Vestibule Improvements Indianapolis, IN Wheatfield, IN Kenneth J. Allen Law Group New Multi-Story Larson-Danielson $ 10,000,000 Tenant Building Construction Co., Inc. Valparaiso, IN La Porte, IN Kiewit Energy Center PEMB Water Treatment Kiewit Energy Company $ 5,312,000 Building, Administration Lenexa, KS Warehouse & Gas Compressor Building Niles, MI Knox Community School Renovations & Additions Schmidt Associates $ 15,360,000 Corporation to Schools & Academy Indianapolis, IN Knox, IN La Porte County Public Library Renovation of Telephone MKM Architecture & $ 2,608,200 Building Design La Porte, IN Logansport Community School New Intermediate Gibraltar Design $ 1,337,736 Corporation School BC # 2 Indianapolis, IN Logansport, IN Merrillville, Town of Community Center & American StructurePoint $ 352,879 Concessions Building Indianapolis, IN Merrillville, IN Michigan City Port Authority MCPA 400-600 Redecking Edgewater Resources $ 1,295,567 Michigan City, IN St. Joseph, MI Monon, Town of Monon Park Splash Pad The Troyer Group $ 334,800 Monon, IN Mishawaka, IN New Prairie United School New Half-Time Building DLZ Indiana, LLC $ 1,247,866 Corporation New Carlisle, IN South Bend, IN Penn Township Fire Station BP # 2, 3 & 4 Epoch Architecture $ 972,334 Mishawaka, IN South Bend, IN Pepper Construction University of Notre Dame SLAM Collaborative $ 1,031,044 Remick Hall Concrete Glastonbury, CT Foundations Notre Dame, IN Peoples Bank Lower Level & 1st Floor Shive Hattery $ 1,684,000 Renovations Valparaiso, IN Munster, IN Construction in Progress Client: Project: Architect: Value: L:\Filing System\Marketing\18- QUALIFICATIONS & PROPOSALS\3 - PRE-QUALIFICATIONS\AEP\2021 RFQ\A305 Current Project Experience List I_41.docx 4 of 4 6/17/2021 Phoenix Metals Office & Restroom Larson-Danielson $ 379,157 Expansion Construction Co., Inc. Hammond, IN La Porte, IN Smith Ready Mix Smith Batch Plant Larson-Danielson $ 357,908 Enclosure (DB) Construction Co., Inc. South Bend, IN La Porte, IN South Bend, City of Howard Park Alliance Architects $ 17,855,000 Redevelopment South Bend, IN South Bend, IN South Bend, City of Pulaski Park Troyer Group, Inc. $ 898,000 Improvements Mishawaka, IN South Bend, IN St. Joseph County Public Additions & Renovations Arkos Design $ 2,169,000 Library Main Library BP 4B Mishawaka, IN South Bend, IN St. Joseph County Public Public Library Trim Arkos Design $ 1,473,997 Library Packager Mishawaka, IN South Bend, IN Tonn and Blank Construction La Porte County American StruturePoint $ 1,426,891 Courthouse BP # 4 & 6 Indianapolis, IN Michigan City, IN University of Notre Dame Acoustic Modifications SLAM Collaborative $ 379,875 O'Neill Hall Glastonbury, CT Notre Dame, IN Walbridge Construction UND McKenna Hall HBRA Architects $ 344,551 Site Concrete Chicago, IL Notre Dame, IN Weigand Construction Goshen Community Barton, Coe, Villamaa $ 592,863 Schools – Middle School Fort Wayne, IN Additions & Renovations Goshen, IN    7\OHU6WUHHW/D3RUWH,QGLDQD   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¶VRUJDQL]DWLRQVDQGRWKHUFRPPXQLW\JURXSV    $VVXUH WKDW FXUUHQW OHJDO LQIRUPDWLRQ DIIHFWLQJ DIILUPDWLYH DFWLRQ LV  GLVVHPLQDWHGWRUHVSRQVLEOHRIILFLDOV       'LVVHPLQDWLRQRI3ROLF\  $ $OOPHPEHUVRIWKH&RPSDQ\¶VVWDIIZKRDUHDXWKRUL]HGWRKLUHVXSHUYLVH SURPRWHDQGGLVFKDUJHHPSOR\HHVRUZKRUHFRPPHQGVXFKDFWLRQ ZLOO EH PDGH IXOO\ FRJQL]DQW RI DQG ZLOO LPSOHPHQW WKH FRPSDQ\¶V HTXDO HPSOR\PHQWRSSRUWXQLW\SROLF\DQGFRQWUDFWXDOUHVSRQVLELOLWLHV7RLQVXUHWKDW WKHDERYHDJUHHPHQWZLOOEHPHWWKHIROORZLQJDFWLRQVZLOOEHWDNHQ DV D PLQLPXP    3HULRGLFPHHWLQJVRIVXSHUYLVRU\DQGSHUVRQQHORIILFHHPSOR\HHVZLOOEH FRQGXFWHGQRWOHVVWKDQHYHU\VL[PRQWKVDWZKLFKWLPHWKH&RPSDQ\¶V HTXDO HPSOR\PHQW RSSRUWXQLW\ SROLF\ DQG LWV LPSOHPHQWDWLRQ ZLOOEH UHYLHZHG DQG H[SODLQHG 7KH PHHWLQJV ZLOO EH FRQGXFWHG E\ WKH ((2 2IILFHURURWKHUNQRZOHGJHDEOH&RPSDQ\RIILFLDO    $OO QHZ VXSHUYLVRU\ RU SHUVRQQHO RIILFH HPSOR\HHV ZLOO EH JLYHQ D WKRURXJK LQGRFWULQDWLRQ E\ WKH ((2 2IILFHU RU RWKHU NQRZOHGJHDEOH &RPSDQ\ RIILFLDO FRYHULQJ DOO PDMRU DVSHFWV RI WKH &RPSDQ\¶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¶VHTXDOHPSOR\PHQWRSSRUWXQLW\SROLF\NQRZQ WR DOO HPSOR\HHV SURVSHFWLYH HPSOR\HHV DQG SRWHQWLDO VRXUFHVRI HPSOR\HHV LH VFKRROV HPSOR\PHQW DJHQFLHV ODERU XQLRQV FROOHJH SODFHPHQWRIILFHUVHWFWKH&RPSDQ\ZLOOWDNHWKHIROORZLQJDFWLRQ    1RWLFHV DQG SRVWHUV VHWWLQJ IRUWK WKH &RPSDQ\¶V HTXDO HPSOR\PHQW  RSSRUWXQLW\SROLF\ZLOOEHSODFHGLQDUHDVUHDGLO\DFFHVVLEOHWRHPSOR\HHV  DSSOLFDQWVIRUHPSOR\PHQWDQGSRWHQWLDOHPSOR\HHV    7KH&RPSDQ\¶VHTXDOHPSOR\PHQWRSSRUWXQLW\SROLF\DQGWKHSURFHGXUHV  WRLPSOHPHQWVXFKSROLF\ZLOOEHEURXJKWWRWKHDWWHQWLRQRIHPSOR\HHVE\  PHDQVRIPHHWLQJVHPSOR\HHV¶KDQGERRNVRURWKHUDSSURSULDWHPHDQV    7KHFRPSDQ\ZLOOVHQGHDFKODERUXQLRQRUUHSUHVHQWDWLYHRIZRUNHUVZLWK  ZKLFK LW KDV D FROOHFWLYH EDUJDLQLQJ DJUHHPHQW RU RWKHU FRQWUDFW RU  XQGHUVWDQGLQJ D QRWLFH DGYLVLQJ WKH ODERU XQLRQ RU ZRUNHU¶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³$Q (TXDO 2SSRUWXQLW\ (PSOR\HU´7KH&RPSDQ\ZLOOLQVHUWDOOVXFKDGYHUWLVHPHQWLQQHZVSDSHUVRU RWKHU SXEOLFDWLRQV KDYLQJ D ODUJH FLUFXODWLRQ DPRQJ PLQRULW\ DQG IHPDOH JURXSVLQWKHDUHDIURPZKLFKWKH&RPSDQ\¶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³SURWHFWHGJURXSV´  8QLRQV    7KH&RPSDQ\ZLOOXVHLWVEHVWHIIRUWVWRREWDLQWKHFRRSHUDWLRQRIWKHXQLRQVZLWK  ZKLFK LW KDV FRQWUDFWHG UHODWLRQV WR LQFUHDVH ³SURWHFWHG JURXS´ RSSRUWXQLWLHV  ZLWKLQ WKH XQLRQV DQG WR HIIHFW UHIHUUDOV E\ VXFK XQLRQ RI ³SURWHFWHG JURXS´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¶VVWDWXVLQDOOHPSOR\PHQW SUDFWLFHV  3RVW$ZDUG&RPSOLDQFH   ,WLVXQGHUVWRRGWKDWDQDJHQF\PD\UHYLHZRXUHPSOR\PHQWSUDFWLFHVDVZHOO  DV DQ\ VXEFRQWUDFWRUV¶ ZH KDYH HPSOR\HG GXULQJ WKH SHUIRUPDQFHRIWKH  FRQWUDFW,IWKHJRDOVVHWIRUWKLQWKHDIILUPDWLYHDFWLRQSURJUDPDUHEHLQJPHWZH  DQG RXU VXEFRQWUDFWRUV ZLOO EH SUHVXPHG WR EH LQ FRPSOLDQFH ZLWK WKH  UHTXLUHPHQWVRI([HFXWLYH2UGHUDQGDVDPHQGHGXQOHVVLWFRPHV  WRWKHDJHQF\¶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¶VDWWHQWLRQWKDWWKHJRDOVDUHEHLQJXVHGLQD  GLVFULPLQDWRU\PDQQHUE\WKHXQLRQWKH&RPSDQ\VKDOOUHSRUWLWWRWKHDJHQF\¶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orporate Brian T. Larson LARSON-DANIELSON CONSTRUCTION CO., INC. S T A TE OF INDIA AN SEAL C orporate Brian T. Larson, President Jeff R. Jensen, Secretary-Treasurer BOARD OF PUBLIC WORKS AGENDA ITEM REVIEW REQUEST FORM Date 7/19/2022 Name Becca Plantz Department Public Works BPW Date 7/26/2022 Phone Extension 5998 Review and Approval Required Prior to Submittal to Board Diversity Compliance and Inclusion Officer Officer Name Michael Patton BPW Attorney Attorney Name Clara McDaniels Dept. Attorney Attorney Name Purchasing Check the Appropriate Item Type – Required for All Submissions Professional Services Agreement Contract Proposal Open Market Contract Amendment/Addendum Special Purchase, QPA Bid Opening Bid Award Req. to Advertise Title Sheet Quote Opening Quote Award Reject Bids/Quotes Proposal Opening C/O & PCA No. PCA Chg. Order, No. Traffic Control Resolution Other: Ease./Encroach Required Information Company or Vendor Name New Vendor Yes If Yes, Approved by Purchasing No MBE/WBE Contractor MBE WBE Completed E-Verify Form Attached Yes No Project Name Morris Box Office Renovation Project Number 121-029C Funding Source Morris Capital Fund 416 Account No. PR-17674, PROJ-345 Amount Terms of Contract Lump Sum Purpose/Description Renovations to the box office in the Morris Performing Arts Center. For Change Orders Only Amount of Increase Decrease $ ($ ) Previous Amount $ Current Percent of Change: Increase Decrease % ( %) New Amount $ Total Percent of Change: Increase Decrease % ( %) Time Extension Amount: New Completion Date: