Loading...
HomeMy WebLinkAboutRejection of Bid - 2022 CCMG Road Rehab Proj No. 122-024 - Milestone Contractors North, Inc.  ELIZABETH A. MARADIK JOSEPH R. MOLNAR GARY A. GILOT JORDAN V. GATHERS MURRAY L. MILLER 1316 COUNTY-CITY BUILDING 227 W. JEFFERSON BOULEVARD SOUTH BEND, INDIANA 46601-1830 PHONE 574/ 235-9251 FAX 574/ 235-9171 CITY OF SOUTH BEND JAMES MUELLER, MAYOR BOARD OF PUBLIC WORKS July 12, 2022 Mr. Dustin P. Hilary Milestone Contractors North, Inc. 24358 State Road 23 South Bend, IN 46614 akrueger@milestonelp.com RE: Rejection of Bids – 2022 Community Crossings Road Rehabilitation Project No. 122-024 Dear Mr. Hilary: At its July 12, 2022 meeting, the Board of Public Works approved the rejection of your bid for the above referenced project, because it exceeded the project budget. This project will be re-advertised and re-bid. Thank you for bidding, and we hope you bid with us in the future. If you have any further questions, please call this office at (574) 235-9251. Sincerely, /s/ Theresa Heffner Theresa Heffner, Clerk Enclosures TH/lh INTER-OFFICE MEMORANDUM DEPARTMENT OF PUBLIC WORKS DIVISION OF ENVIRONMENTAL SERVICES TO: Board of Public Works Theresa Heffner, Clerk FROM: Leslie Biek, P.E., Assistant City Engineer SUBJECT: Reject Project No 122-024 2022 Community Crossings Roadway Rehabilitation DATE: July 6, 2022 On June 28, 2022 the Board of Public Works opened bids for the above project. The bids ranked as follows: Base Bid: Division 1A Division 2A Division 3A Division 4 Division 5 TOTAL Engineer’s Estimate 362,051 745,352 1,245,089 549,692 1,572,815 4,475,000 Milestone Contractors North 733,000 1,541,000 2,402,000 1,053,000 1,806,000 7,535,000 Alternate: Division 1B Division 2B Division 3B Division 4 Division 5 TOTAL Milestone Contractors North No Bid No Bid No Bid No Bid No Bid No Bid Upon review of the bid package, it is recommended the Board of Public Works reject the bid as non-responsive due to it exceeding the Engineers estimate for the base bid substantially and re- bid in accordance with IC 36-1-12-5. Thank you for your consideration of this request. July 12, 2022 SOUTH BEND 2022 CCMG ROAD REHABILITATION - RAINBOW DRIVE Page 1 of 1 CITY OF SOUTH BEND PROJECT NUMBER: 122-024 BID TABULATION SHEET Prepared by: A&Z Engineering Bid Date: 6/28/2022 $733,000.00 $0.00 $0.00 $347,610.00 $0.00 $0.00 $0.00 $385,390.00 $385,390.00 90.2%0.0%0.0% 0.0%100.0%100.0% Bid Form, All Pages Form 96 Financial Statement Bid Bond DIVISION 1A - RAINBOW DRIVE BASE BID (FROM SOUTHLEA DR. TO CUL-DE-SAC) Item Description Quantity Unit Unit Price Extension Unit Price Extension Unit Price Extension Unit Price Extension 1 Common Excavation 611 CYS $25.00 $15,275.00 $145.00 $88,595.00 $0.00 $0.00 2 Concrete, Remove 2353 SYS $14.00 $32,942.00 $14.00 $32,942.00 $0.00 $0.00 3 Subgrade Treatment Type II 3180 SYS $14.00 $44,520.00 $20.00 $63,600.00 $0.00 $0.00 4 Compacted No. 53 Subbase 928 TON $29.00 $26,912.00 $30.00 $27,840.00 $0.00 $0.00 5 Sidewalk, Concrete 73 SYS $108.00 $7,884.00 $250.00 $18,250.00 $0.00 $0.00 6 Curb Ramp, Concrete 69 SYS $280.00 $19,320.00 $385.00 $26,565.00 $0.00 $0.00 6A Milling, 2 In.22 SYS $20.00 $440.00 $250.00 $5,500.00 $0.00 $0.00 6B Milling, 4 In.22 SYS $30.00 $660.00 $250.00 $5,500.00 $0.00 $0.00 7 HMA Surface, 9.5 mm - Type B 195 TON $115.00 $22,425.00 $160.00 $31,200.00 $0.00 $0.00 8 HMA Intermediate, 12.5 mm - Type B 324 TON $105.00 $34,020.00 $180.00 $58,320.00 $0.00 $0.00 9 HMA Base, 25.0 mm - Type B 518 TON $100.00 $51,800.00 $105.00 $54,390.00 $0.00 $0.00 9A Tack Coat 2 TON $500.00 $1,000.00 $1.00 $2.00 $0.00 $0.00 9B Joint Adhesive, Surface 663 LFT $2.00 $1,326.00 $1.00 $663.00 $0.00 $0.00 10 PCCP for Approaches, 6 in.197 SYS $82.00 $16,154.00 $245.00 $48,265.00 $0.00 $0.00 11 Combined Curb & Gutter, Type A 1412 LFT $30.00 $42,360.00 $89.00 $125,668.00 $0.00 $0.00 12 Sodding, Nursery 506 SYS $9.00 $4,554.00 $36.00 $18,216.00 $0.00 $0.00 13 Adjust Manhole Casting to Grade 3 EA $888.00 $2,664.00 $2,200.00 $6,600.00 $0.00 $0.00 14 Adjust Water Valve Box to Grade 1 EA $686.00 $686.00 $300.00 $300.00 $0.00 $0.00 15 Furnish and Adjust Casting to Grade 2 EA $1,964.00 $3,928.00 $2,900.00 $5,800.00 $0.00 $0.00 16 Mailbox Assembly, Remove & Reset 12 EA $210.00 $2,520.00 $500.00 $6,000.00 $0.00 $0.00 17 Fence, Remove & Reset 20 LFT $150.00 $3,000.00 $340.00 $6,800.00 $0.00 $0.00 18 Construction Engineering 1 LS $6,800.00 $6,800.00 $4,200.00 $4,200.00 $0.00 $0.00 19 Mobilization and Demobilization 1 LS $17,000.00 $17,000.00 $36,600.00 $36,600.00 $0.00 $0.00 20 Clearing Right of Way 1 LS $6,800.00 $6,800.00 $35,000.00 $35,000.00 $0.00 $0.00 21 Maintenance of Traffic 1 LS $17,000.00 $17,000.00 $25,434.00 $25,434.00 $0.00 $0.00 22 Erosion Control 1 LS $3,400.00 $3,400.00 $750.00 $750.00 $0.00 $0.00 TOTAL BASE BID $385,390.00 $733,000.00 $0.00 $0.00 Date:7/6/2022 Nitin Timble, P.E. I herby certify to the best of my knowledge, that the bid tabulation presented is a true and correct copy of the bids received for this project. % over % Under Milestone Contractors North, Inc. Amount Over Amount Under Engineer's Estimate $385,390.00Base Bids Total Yes Yes Yes Yes N/A N/A N/A N/A N/A N/A N/A N/A SOUTH BEND 2022 CCMG ROAD REHABILITATION - RAINBOW DRIVE Page 1 of 1 CITY OF SOUTH BEND PROJECT NUMBER: 122-024 BID TABULATION SHEET Prepared by: A&Z Engineering Bid Date: 6/28/2022 NO BID $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $417,798.00 $417,798.00 0.0%0.0%0.0% 0.0%100.0%100.0% Bid Form, All Pages Form 96 Financial Statement Bid Bond DIVISION 1B - RAINBOW DRIVE ALTERNATIVE BID (FROM SOUTHLEA DR. TO CUL-DE-SAC) Item Description Quantity Unit Unit Price Extension Unit Price Extension Unit Price Extension Unit Price Extension 1 Common Excavation 546 CYS $25.00 $13,650.00 No Bid $0.00 $0.00 2 Concrete, Remove 2353 SYS $14.00 $32,942.00 No Bid $0.00 $0.00 3 Subgrade Treatment Type II 3180 SYS $14.00 $44,520.00 No Bid $0.00 $0.00 4 Compacted No. 53 Subbase 928 TON $29.00 $26,912.00 No Bid $0.00 $0.00 5 Sidewalk, Concrete 73 SYS $108.00 $7,884.00 No Bid $0.00 $0.00 6 Curb Ramp, Concrete 69 SYS $280.00 $19,320.00 No Bid $0.00 $0.00 6A Milling, 2 In.22 SYS $20.00 $440.00 No Bid $0.00 $0.00 6B Milling, 4 In.22 SYS $30.00 $660.00 No Bid $0.00 $0.00 7 PCCP for Mainline, 7 in.2354 SYS $46.00 $108,284.00 No Bid $0.00 $0.00 8 D-1 Joints 1721 LFT $20.00 $34,420.00 No Bid $0.00 $0.00 9 PCCP for Approaches, 6 in.197 SYS $82.00 $16,154.00 No Bid $0.00 $0.00 10 Combined Curb & Gutter, Type A 1412 LFT $30.00 $42,360.00 No Bid $0.00 $0.00 11 Sodding, Nursery 506 SYS $9.00 $4,554.00 No Bid $0.00 $0.00 12 Adjust Manhole Casting to Grade 3 EA $88.00 $264.00 No Bid $0.00 $0.00 13 Adjust Water Valve Box to Grade 1 EA $686.00 $686.00 No Bid $0.00 $0.00 14 Furnish and Adjust Casting to Grade 2 EA $1,964.00 $3,928.00 No Bid $0.00 $0.00 15 Mailbox Assembly, Remove & Reset 12 EA $210.00 $2,520.00 No Bid $0.00 $0.00 16 Fence, Remove & Reset 20 LFT $150.00 $3,000.00 No Bid $0.00 $0.00 17 Construction Engineering 1 LS $7,400.00 $7,400.00 No Bid $0.00 $0.00 18 Mobilization and Demobilization 1 LS $18,400.00 $18,400.00 No Bid $0.00 $0.00 19 Clearing Right of Way 1 LS $7,400.00 $7,400.00 No Bid $0.00 $0.00 20 Maintenance of Traffic 1 LS $18,400.00 $18,400.00 No Bid $0.00 $0.00 21 Erosion Control 1 LS $3,700.00 $3,700.00 No Bid $0.00 $0.00 TOTAL ALTERNATIVE BID $417,798.00 NO BID $0.00 $0.00 Date:7/6/2022 Nitin Timble, P.E. I herby certify to the best of my knowledge, that the bid tabulation presented is a true and correct copy of the bids received for this project. % over % Under Milestone Contractors North, Inc. Amount Over Amount Under Engineer's Estimate $417,798.00Alternative Bids Total Yes Yes Yes Yes N/A N/A N/A N/A N/A N/A N/A N/A SOUTH BEND 2022 CCMG ROAD REHABILITATION - SOUTHLEA DRIVE Page 1 of 1 CITY OF SOUTH BEND PROJECT NUMBER: 122-024 BID TABULATION SHEET Prepared by: A&Z Engineering Bid Date: 6/28/2022 $1,541,000.00 $0.00 $0.00 $762,175.00 $0.00 $0.00 $0.00 $778,825.00 $778,825.00 97.9%0.0%0.0% 0.0%100.0%100.0% Bid Form, All Pages Form 96 Financial Statement Bid Bond DIVISION 2A - SOUTHLEA DRIVE BASE BID (FROM LILAC DR. TO EASTMONT DR.) Item Description Quantity Unit Unit Price Extension Unit Price Extension Unit Price Extension Unit Price Extension 1 Common Excavation 1096 CYS $25.00 $27,400.00 $190.00 $208,240.00 $0.00 $0.00 2 Concrete, Remove 4063 SYS $14.00 $56,882.00 $14.00 $56,882.00 $0.00 $0.00 3 Subgrade Treatment Type II 5799 SYS $14.00 $81,186.00 $20.00 $115,980.00 $0.00 $0.00 4 Compacted No. 53 Subbase 1629 TON $29.00 $47,241.00 $30.00 $48,870.00 $0.00 $0.00 5 Sidewalk, Concrete 354 SYS $108.00 $38,232.00 $250.00 $88,500.00 $0.00 $0.00 6 Curb Ramp, Concrete 135 SYS $280.00 $37,800.00 $385.00 $51,975.00 $0.00 $0.00 6A Milling, 2 In.22 SYS $20.00 $440.00 $250.00 $5,500.00 $0.00 $0.00 6B Milling, 4 In.22 SYS $30.00 $660.00 $250.00 $5,500.00 $0.00 $0.00 7 HMA Surface, 9.5 mm - Type B 335 TON $115.00 $38,525.00 $160.00 $53,600.00 $0.00 $0.00 8 HMA Intermediate, 12.5 mm - Type B 559 TON $105.00 $58,695.00 $180.00 $100,620.00 $0.00 $0.00 9 HMA Base, 25.0 mm - Type B 894 TON $100.00 $89,400.00 $105.00 $93,870.00 $0.00 $0.00 9A Tack Coat 3 TON $500.00 $1,500.00 $1.00 $3.00 $0.00 $0.00 9B Joint Adhesive, Surface 1366 LFT $2.00 $2,732.00 $1.00 $1,366.00 $0.00 $0.00 10 PCCP for Approaches, 6 in.531 SYS $82.00 $43,542.00 $245.00 $130,095.00 $0.00 $0.00 11 Combined Curb & Gutter, Type A 2710 LFT $30.00 $81,300.00 $89.00 $241,190.00 $0.00 $0.00 12 Sodding, Nursery 978 SYS $9.00 $8,802.00 $31.00 $30,318.00 $0.00 $0.00 13 Adjust Manhole Casting to Grade 9 EA $888.00 $7,992.00 $2,200.00 $19,800.00 $0.00 $0.00 14 Adjust Water Valve Box to Grade 5 EA $686.00 $3,430.00 $300.00 $1,500.00 $0.00 $0.00 15 Furnish and Adjust Casting to Grade 9 EA $1,964.00 $17,676.00 $2,900.00 $26,100.00 $0.00 $0.00 16 Fire Hydrant Assembly 1 EA $7,500.00 $7,500.00 $13,300.00 $13,300.00 $0.00 $0.00 17 Water Main Lowering, 6" DI 100 LFT $200.00 $20,000.00 $700.00 $70,000.00 $0.00 $0.00 18 Mailbox Assembly, Remove & Reset 29 EA $210.00 $6,090.00 $500.00 $14,500.00 $0.00 $0.00 19 Construction Engineering 1 LS $13,600.00 $13,600.00 $10,400.00 $10,400.00 $0.00 $0.00 20 Mobilization and Demobilization 1 LS $33,900.00 $33,900.00 $77,000.00 $77,000.00 $0.00 $0.00 21 Clearing Right of Way 1 LS $13,600.00 $13,600.00 $39,791.00 $39,791.00 $0.00 $0.00 22 Maintenance of Traffic 1 LS $33,900.00 $33,900.00 $35,000.00 $35,000.00 $0.00 $0.00 23 Erosion Control 1 LS $6,800.00 $6,800.00 $1,100.00 $1,100.00 $0.00 $0.00 TOTAL BASE BID $778,825.00 $1,541,000.00 $0.00 $0.00 Date:7/6/2022 Nitin Timble, P.E. I herby certify to the best of my knowledge, that the bid tabulation presented is a true and correct copy of the bids received for this project. Yes Yes Yes Yes N/A N/A N/A N/A N/A N/A N/A N/A % over % Under Milestone Contractors North, Inc. Amount Over Amount Under Engineer's Estimate $778,825.00Base Bids Total SOUTH BEND 2022 CCMG ROAD REHABILITATION - SOUTHLEA DRIVE Page 1 of 1 CITY OF SOUTH BEND PROJECT NUMBER: 122-024 BID TABULATION SHEET Prepared by: A&Z Engineering Bid Date: 6/28/2022 NO BID $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $856,011.00 $856,011.00 0.0%0.0%0.0% 0.0%100.0%100.0% Bid Form, All Pages Form 96 Financial Statement Bid Bond DIVISION 2B - SOUTHLEA DRIVE ALTERNATIVE BID (FROM LILAC DR. TO EASTMONT DR.) Item Description Quantity Unit Unit Price Extension Unit Price Extension Unit Price Extension Unit Price Extension 1 Common Excavation 1096 CYS $25.00 $27,400.00 NO BID $0.00 $0.00 2 Concrete, Remove 4063 SYS $14.00 $56,882.00 NO BID $0.00 $0.00 3 Subgrade Treatment Type II 5799 SYS $14.00 $81,186.00 NO BID $0.00 $0.00 4 Compacted No. 53 Subbase 1629 TON $29.00 $47,241.00 NO BID $0.00 $0.00 5 Sidewalk, Concrete 354 SYS $108.00 $38,232.00 NO BID $0.00 $0.00 6 Curb Ramp, Concrete 135 SYS $280.00 $37,800.00 NO BID $0.00 $0.00 6A Milling, 2 In.22 SYS $20.00 $440.00 NO BID $0.00 $0.00 6B Milling, 4 In.22 SYS $30.00 $660.00 NO BID $0.00 $0.00 7 PCCP for Mainline, 7 in.4063 SYS $46.00 $186,898.00 NO BID $0.00 $0.00 8 D-1 Joints 3552 LFT $20.00 $71,040.00 NO BID $0.00 $0.00 9 PCCP for Approaches, 6 in.531 SYS $82.00 $43,542.00 NO BID $0.00 $0.00 10 Combined Curb & Gutter, Type A 2710 LFT $30.00 $81,300.00 NO BID $0.00 $0.00 11 Sodding, Nursery 978 SYS $9.00 $8,802.00 NO BID $0.00 $0.00 12 Adjust Manhole Casting to Grade 9 EA $888.00 $7,992.00 NO BID $0.00 $0.00 13 Adjust Water Valve Box to Grade 5 EA $686.00 $3,430.00 NO BID $0.00 $0.00 14 Furnish and Adjust Casting to Grade 9 EA $1,964.00 $17,676.00 NO BID $0.00 $0.00 15 Fire Hydrant Assembly 1 EA $7,500.00 $7,500.00 NO BID $0.00 $0.00 16 Water Main Lowering, 6" DI 100 LFT $200.00 $20,000.00 NO BID $0.00 $0.00 17 Mailbox Assembly, Remove & Reset 29 EA $210.00 $6,090.00 NO BID $0.00 $0.00 18 Construction Engineering 1 LS $14,900.00 $14,900.00 NO BID $0.00 $0.00 19 Mobilization and Demobilization 1 LS $37,300.00 $37,300.00 NO BID $0.00 $0.00 20 Clearing Right of Way 1 LS $14,900.00 $14,900.00 NO BID $0.00 $0.00 21 Maintenance of Traffic 1 LS $37,300.00 $37,300.00 NO BID $0.00 $0.00 22 Erosion Control 1 LS $7,500.00 $7,500.00 NO BID $0.00 $0.00 TOTAL ALTERNATIVE BID $856,011.00 NO BID $0.00 $0.00 Date:7/6/2022 Nitin Timble, P.E. I herby certify to the best of my knowledge, that the bid tabulation presented is a true and correct copy of the bids received for this project. Yes Yes Yes Yes N/A N/A N/A N/A N/A N/A N/A N/A % over % Under Milestone Contractors North, Inc. Amount Over Amount Under Engineer's Estimate $856,011.00Alternative Bids Total SOUTH BEND 2022 CCMG ROAD REHABILITATION - EASTMONT DRIVE Page 1 of 1 CITY OF SOUTH BEND PROJECT NUMBER: 122-024 BID TABULATION SHEET Prepared by: A&Z Engineering Bid Date: 6/28/2022 $2,402,000.00 $0.00 $0.00 $1,074,585.00 $0.00 $0.00 $0.00 $1,327,415.00 $1,327,415.00 81.0%0.0%0.0% 0.0%100.0%100.0% Bid Form, All Pages Form 96 Financial Statement Bid Bond DIVISION 3A - EASTMONT DRIVE BASE BID (FROM RIVERSIDE DR. TO NORTHLEA DR.) Item Description Quantity Unit Unit Price Extension Unit Price Extension Unit Price Extension Unit Price Extension 1 Common Excavation 2084 CYS $25.00 $52,100.00 $145.00 $302,180.00 $0.00 $0.00 2 Concrete, Remove 7806 SYS $14.00 $109,284.00 $14.00 $109,284.00 $0.00 $0.00 3 Subgrade Treatment Type II 10220 SYS $14.00 $143,080.00 $20.00 $204,400.00 $0.00 $0.00 4 Compacted No. 53 Subbase 2936 TON $29.00 $85,144.00 $30.00 $88,080.00 $0.00 $0.00 5 Sidewalk, Concrete 408 SYS $108.00 $44,064.00 $190.00 $77,520.00 $0.00 $0.00 6 Curb Ramp, Concrete 192 SYS $280.00 $53,760.00 $385.00 $73,920.00 $0.00 $0.00 6A Milling, 2 In.22 SYS $20.00 $440.00 $250.00 $5,500.00 $0.00 $0.00 6B Milling, 4 In.22 SYS $30.00 $660.00 $250.00 $5,500.00 $0.00 $0.00 7 HMA Surface, 9.5 mm - Type B 644 TON $115.00 $74,060.00 $160.00 $103,040.00 $0.00 $0.00 8 HMA Intermediate, 12.5 mm - Type B 1073 TON $105.00 $112,665.00 $180.00 $193,140.00 $0.00 $0.00 9 HMA Base, 25.0 mm - Type B 1717 TON $100.00 $171,700.00 $105.00 $180,285.00 $0.00 $0.00 9A Tack Coat 6 TON $500.00 $3,000.00 $1.00 $6.00 $0.00 $0.00 9B Joint Adhesive, Surface 2323 LFT $2.00 $4,646.00 $1.00 $2,323.00 $0.00 $0.00 10 PCCP for Approaches, 6 in.736 SYS $82.00 $60,352.00 $245.00 $180,320.00 $0.00 $0.00 11 Combined Curb & Gutter, Type A 4802 LFT $30.00 $144,060.00 $89.00 $427,378.00 $0.00 $0.00 12 Sodding, Nursery 1660 SYS $9.00 $14,940.00 $41.00 $68,060.00 $0.00 $0.00 13 Adjust Manhole Casting to Grade 26 EA $888.00 $23,088.00 $2,200.00 $57,200.00 $0.00 $0.00 14 Adjust Water Valve Box to Grade 5 EA $686.00 $3,430.00 $500.00 $2,500.00 $0.00 $0.00 15 Standard Inlet 1 EA $2,500.00 $2,500.00 $4,600.00 $4,600.00 $0.00 $0.00 16 Pipe, Type 2, 12 In.29 LFT $164.00 $4,756.00 $290.00 $8,410.00 $0.00 $0.00 17 Furnish and Adjust Casting to Grade 9 EA $1,964.00 $17,676.00 $2,900.00 $26,100.00 $0.00 $0.00 18 Water Main Lowering, 6" DI 100 LFT $200.00 $20,000.00 $700.00 $70,000.00 $0.00 $0.00 19 Mailbox Assembly, Remove & Reset 41 EA $210.00 $8,610.00 $500.00 $20,500.00 $0.00 $0.00 20 Construction Engineering 1 LS $23,100.00 $23,100.00 $9,600.00 $9,600.00 $0.00 $0.00 21 Mobilization and Demobilization 1 LS $57,800.00 $57,800.00 $120,000.00 $120,000.00 $0.00 $0.00 22 Clearing Right of Way 1 LS $23,100.00 $23,100.00 $34,000.00 $34,000.00 $0.00 $0.00 23 Maintenance of Traffic 1 LS $57,800.00 $57,800.00 $26,154.00 $26,154.00 $0.00 $0.00 24 Erosion Control 1 LS $11,600.00 $11,600.00 $2,000.00 $2,000.00 $0.00 $0.00 TOTAL BASE BID $1,327,415.00 $2,402,000.00 $0.00 $0.00 Date:7/6/2022 Nitin Timble, P.E. I herby certify to the best of my knowledge, that the bid tabulation presented is a true and correct copy of the bids received for this project. % over % Under Milestone Contractors North, Inc. Amount Over Amount Under Engineer's Estimate $1,327,415.00Base Bids Total Yes Yes Yes Yes N/A N/A N/A N/A N/A N/A N/A N/A SOUTH BEND 2022 CCMG ROAD REHABILITATION - EASTMONT DRIVE Page 1 of 1 CITY OF SOUTH BEND PROJECT NUMBER: 122-024 BID TABULATION SHEET Prepared by: A&Z Engineering Bid Date: 6/28/2022 NO BID $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $1,458,160.00 $1,458,160.00 0.0%0.0%0.0% 0.0%100.0%100.0% Bid Form, All Pages Form 96 Financial Statement Bid Bond DIVISION 3B - EASTMONT DRIVE ALTERNATIVE BID (FROM RIVERSIDE DR. TO NORTHLEA DR.) Item Description Quantity Unit Unit Price Extension Unit Price Extension Unit Price Extension Unit Price Extension 1 Common Excavation 2084 CYS $25.00 $52,100.00 NO BID $0.00 $0.00 2 Concrete, Remove 7806 SYS $14.00 $109,284.00 NO BID $0.00 $0.00 3 Subgrade Treatment Type II 10220 SYS $14.00 $143,080.00 NO BID $0.00 $0.00 4 Compacted No. 53 Subbase 2936 TON $29.00 $85,144.00 NO BID $0.00 $0.00 5 Sidewalk, Concrete 408 SYS $108.00 $44,064.00 NO BID $0.00 $0.00 6 Curb Ramp, Concrete 192 SYS $280.00 $53,760.00 NO BID $0.00 $0.00 6A Milling, 2 In.22 SYS $20.00 $440.00 NO BID $0.00 $0.00 6B Milling, 4 In.22 SYS $30.00 $660.00 NO BID $0.00 $0.00 7 PCCP for Mainline, 7 in.7806 SYS $46.00 $359,076.00 NO BID $0.00 $0.00 8 D-1 Joints 6042 LFT $20.00 $120,840.00 NO BID $0.00 $0.00 9 PCCP for Approaches, 6 in.736 SYS $82.00 $60,352.00 NO BID $0.00 $0.00 10 Combined Curb & Gutter, Type A 4802 LFT $30.00 $144,060.00 NO BID $0.00 $0.00 11 Sodding, Nursery 1660 SYS $9.00 $14,940.00 NO BID $0.00 $0.00 12 Adjust Manhole Casting to Grade 26 EA $888.00 $23,088.00 NO BID $0.00 $0.00 13 Adjust Water Valve Box to Grade 5 EA $686.00 $3,430.00 NO BID $0.00 $0.00 14 Standard Inlet 1 EA $2,500.00 $2,500.00 NO BID $0.00 $0.00 15 Pipe, Type 2, 12 In.29 LFT $164.00 $4,756.00 NO BID $0.00 $0.00 16 Furnish and Adjust Casting to Grade 9 EA $1,964.00 $17,676.00 NO BID $0.00 $0.00 17 Water Main Lowering, 6" DI 100 LFT $200.00 $20,000.00 NO BID $0.00 $0.00 18 Mailbox Assembly, Remove & Reset 41 EA $210.00 $8,610.00 NO BID $0.00 $0.00 19 Construction Engineering 1 LS $25,400.00 $25,400.00 NO BID $0.00 $0.00 20 Mobilization and Demobilization 1 LS $63,400.00 $63,400.00 NO BID $0.00 $0.00 21 Clearing Right of Way 1 LS $25,400.00 $25,400.00 NO BID $0.00 $0.00 22 Maintenance of Traffic 1 LS $63,400.00 $63,400.00 NO BID $0.00 $0.00 23 Erosion Control 1 LS $12,700.00 $12,700.00 NO BID $0.00 $0.00 TOTAL ALTERNATIVE BID $1,458,160.00 NO BID $0.00 $0.00 Date:7/6/2022 Nitin Timble, P.E. I herby certify to the best of my knowledge, that the bid tabulation presented is a true and correct copy of the bids received for this project. Yes Yes Yes Yes N/A N/A N/A N/A N/A N/A N/A N/A % over % Under Milestone Contractors North, Inc. Amount Over Amount Under Engineer's Estimate $1,458,160.00Alternative Bids Total SOUTH BEND 2022 CCMG ROAD REHABILITATION - HILL STREET Page 1 of 1 CITY OF SOUTH BEND PROJECT NUMBER: 122-024 BID TABULATION SHEET Prepared by: A&Z Engineering Bid Date: 6/28/2022 $1,053,000.00 $0.00 $0.00 $478,497.00 $0.00 $0.00 $0.00 $574,503.00 $574,503.00 83.3%0.0%0.0% 0.0%100.0%100.0% Bid Form, All Pages Form 96 Financial Statement Bid Bond DIVISION 4 - HILL STREET BASE BID (FROM JEFFERSON ST. TO COLFAX ST.) Item Description Quantity Unit Unit Price Extension Unit Price Extension Unit Price Extension Unit Price Extension 1 Common Excavation 692 CYS $66.00 $45,672.00 $145.00 $100,340.00 $0.00 $0.00 2 Concrete, Remove 306 SYS $24.00 $7,344.00 $50.00 $15,300.00 $0.00 $0.00 3 Inspection Hole, Greater Than 3'4 EA $1,520.00 $6,080.00 $2,900.00 $11,600.00 $0.00 $0.00 4 Inspection Hole, 3 ft Depth or Less 4 EA $876.00 $3,504.00 $2,900.00 $11,600.00 $0.00 $0.00 5 Trolley Rail and Tie Removal 850 LFT $55.00 $46,750.00 $90.00 $76,500.00 $0.00 $0.00 6 Subgrade Treatment Type II 1689 SYS $33.00 $55,737.00 $20.00 $33,780.00 $0.00 $0.00 7 Compacted No. 53 Subbase 417 TON $46.00 $19,182.00 $30.00 $12,510.00 $0.00 $0.00 8 Milling, Asphalt, 3" Max 2373 SYS $5.00 $11,865.00 $16.00 $37,968.00 $0.00 $0.00 9 HMA Surface, 9.5 mm - Type B 297 TON $115.00 $34,155.00 $200.00 $59,400.00 $0.00 $0.00 10 HMA Intermediate, 12.5 mm - Type B 168 TON $105.00 $17,640.00 $310.00 $52,080.00 $0.00 $0.00 11 HMA Base, 25.0 mm - Type B 539 TON $100.00 $53,900.00 $150.00 $80,850.00 $0.00 $0.00 11A Tack Coat 6 TON $500.00 $3,000.00 $1.00 $6.00 $0.00 $0.00 11B Joint Adhesive, Surface 3730 LFT $2.00 $7,460.00 $1.00 $3,730.00 $0.00 $0.00 12 PCCP for Approaches, 9 in. 243 SYS $100.00 $24,300.00 $295.00 $71,685.00 $0.00 $0.00 13 Sidewalk, Concrete 433 SYS $82.00 $35,506.00 $140.00 $60,620.00 $0.00 $0.00 14 Curb, Concrete 1000 LFT $48.00 $48,000.00 $150.00 $150,000.00 $0.00 $0.00 15 Header, Cement Concrete, Reconstruct 48 LFT $50.00 $2,400.00 $305.00 $14,640.00 $0.00 $0.00 16 Sodding, Nursery 356 SYS $30.00 $10,680.00 $45.00 $16,020.00 $0.00 $0.00 17 Adjust Manhole Casting to Grade 2 EA $888.00 $1,776.00 $2,200.00 $4,400.00 $0.00 $0.00 18 Adjust Inlet Casting to Grade 8 EA $1,408.00 $11,264.00 $2,300.00 $18,400.00 $0.00 $0.00 19 Adjust Monitoring Well Casting to Grade 3 EA $800.00 $2,400.00 $900.00 $2,700.00 $0.00 $0.00 20 Adjust Water Valve Casting to Grade 2 EA $686.00 $1,372.00 $500.00 $1,000.00 $0.00 $0.00 21 Adjust Water Curb Stop Casting to Grade 4 EA $200.00 $800.00 $500.00 $2,000.00 $0.00 $0.00 22 Adjust Water Meter Casting to Grade 1 EA $200.00 $200.00 $1,600.00 $1,600.00 $0.00 $0.00 23 Adjust Handhole to Grade 5 EA $800.00 $4,000.00 $400.00 $2,000.00 $0.00 $0.00 24 Sanitary Manhole, Type A 2 EA $6,500.00 $13,000.00 $16,600.00 $33,200.00 $0.00 $0.00 25 Pipe, Sanitary Sewer, 12 in.25 LFT $164.00 $4,100.00 $530.00 $13,250.00 $0.00 $0.00 26 Line, Thermoplastic, Solid, Yellow, 4 in.1617 LFT $1.00 $1,617.00 $1.65 $2,668.05 $0.00 $0.00 27 Line, Thermoplastic, Solid, White, 4 in. 1262 LFT $1.00 $1,262.00 $1.65 $2,082.30 $0.00 $0.00 28 Grooving for Pavement Markings, 4 in.2879 LFT $1.00 $2,879.00 $1.15 $3,310.85 $0.00 $0.00 29 Transverse Marking, Thermoplastic, Stop Line, 24 in. 38 LFT $13.00 $494.00 $11.25 $427.50 $0.00 $0.00 30 Transverse Marking, Thermoplastic, Crosswalk Line, 6 in.72 LFT $2.00 $144.00 $3.35 $241.20 $0.00 $0.00 31 Transverse Marking, Thermoplastic, Crosswalk Line, 24 in. 56 LFT $10.00 $560.00 $13.25 $742.00 $0.00 $0.00 32 Detector Housing, Remove 2 EA $650.00 $1,300.00 $320.00 $640.00 $0.00 $0.00 33 Signal Detector Housing 2 EA $1,300.00 $2,600.00 $1,000.00 $2,000.00 $0.00 $0.00 34 Signal Cable, Roadway Loop, Copper, 1C/14 GA 650 LFT $2.00 $1,300.00 $0.65 $422.50 $0.00 $0.00 35 Saw Cut for Roadway Loop Detector and Sealant 205 LFT $12.00 $2,460.00 $15.00 $3,075.00 $0.00 $0.00 36 Construction Engineering 1 LS $14,600.00 $14,600.00 $10,200.00 $10,200.00 $0.00 $0.00 37 Mobilization and Demobilization 1 LS $24,400.00 $24,400.00 $75,800.00 $75,800.00 $0.00 $0.00 38 Clearing Right of Way 1 LS $9,800.00 $9,800.00 $36,000.00 $36,000.00 $0.00 $0.00 39 Maintenance of Traffic 1 LS $34,100.00 $34,100.00 $26,911.60 $26,911.60 $0.00 $0.00 40 Erosion Control 1 LS $4,900.00 $4,900.00 $1,300.00 $1,300.00 $0.00 $0.00 TOTAL BASE BID $574,503.00 $1,053,000.00 $0.00 $0.00 Date:7/6/2022 Nitin Timble, P.E. I herby certify to the best of my knowledge, that the bid tabulation presented is a true and correct copy of the bids received for this project. Yes Yes Yes Yes N/A N/A N/A N/A N/A N/A N/A N/A % over % Under Milestone Contractors North, Inc. Amount Over Amount Under Engineer's Estimate $574,503.00Base Bids Total SOUTH BEND 2022 CCMG ROAD REHABILITATION - JACKSON ROAD Page 1 of 1 CITY OF SOUTH BEND PROJECT NUMBER: 122-024 BID TABULATION SHEET Prepared by: A&Z Engineering Bid Date: 6/28/2022 $1,806,000.00 $0.00 $0.00 $149,682.00 $0.00 $0.00 $0.00 $1,656,318.00 $1,656,318.00 9.0%0.0%0.0% 0.0%100.0%100.0% Bid Form, All Pages Form 96 Financial Statement Bid Bond DIVISION 5 - JACKSON ROAD BASE BID (FROM FELLOWS ST. TO MIAMI ST.) Item Description Quantity Unit Unit Price Extension Unit Price Extension Unit Price Extension Unit Price Extension 1 Common Excavation 4610 CYS $36.00 $165,960.00 $75.00 $345,750.00 $0.00 $0.00 2 Concrete, Remove 748 SYS $60.00 $44,880.00 $50.00 $37,400.00 $0.00 $0.00 3 No. 2 Stone 1247 TON $55.00 $68,585.00 $35.00 $43,645.00 $0.00 $0.00 4 Subgrade Treatment Type II 11209 SYS $19.00 $212,971.00 $15.00 $168,135.00 $0.00 $0.00 5 Geogrid, Type 1B 2243 SYS $3.00 $6,729.00 $3.00 $6,729.00 $0.00 $0.00 6 Compacted No. 53 Subbase 3855 TON $27.00 $104,085.00 $25.00 $96,375.00 $0.00 $0.00 7 Compacted Aggregate, No. 53 324 TON $53.00 $17,172.00 $75.00 $24,300.00 $0.00 $0.00 8 Milling, Asphalt, 1.5 In.703 SYS $5.00 $3,515.00 $20.00 $14,060.00 $0.00 $0.00 9 HMA Surface, 9.5 mm - Type B 731 TON $115.00 $84,065.00 $140.00 $102,340.00 $0.00 $0.00 10 HMA Intermediate, 12.5 mm - Type B 1239 TON $105.00 $130,095.00 $120.00 $148,680.00 $0.00 $0.00 11 HMA Base, 25.0 mm - Type B 4099 TON $100.00 $409,900.00 $80.00 $327,920.00 $0.00 $0.00 12 HMA for Approaches, Type B 77 TON $195.00 $15,015.00 $200.00 $15,400.00 $0.00 $0.00 12A Tack Coat 6 LFT $500.00 $3,000.00 $1.00 $6.00 $0.00 $0.00 12B Joint Adhesive, Surface 3730 SYS $2.00 $7,460.00 $1.00 $3,730.00 $0.00 $0.00 13 PCCP for Approaches, 9 in. 34 SYS $142.00 $4,828.00 $210.00 $7,140.00 $0.00 $0.00 14 PCCP for Approaches, 6 in. 347 LFT $96.00 $33,312.00 $245.00 $85,015.00 $0.00 $0.00 15 Combined Curb and Gutter, Type B 654 SYS $35.00 $22,890.00 $73.00 $47,742.00 $0.00 $0.00 16 Sodding, Nursery 1544 TON $6.00 $9,264.00 $38.00 $58,672.00 $0.00 $0.00 17 HMA for Temporary Pavement, Type B 164 LFT $284.00 $46,576.00 $135.00 $22,140.00 $0.00 $0.00 18 Temporary Pavement Marking, Type 1, Solid, Yellow, 4 In.3314 LFT $1.00 $3,314.00 $1.09 $3,612.26 $0.00 $0.00 19 Temporary Pavement Marking, Type 1, Solid, White, 4 In.3840 LFT $1.00 $3,840.00 $1.09 $4,185.60 $0.00 $0.00 20 Line Remove 115 LFT $1.00 $115.00 $1.20 $138.00 $0.00 $0.00 21 Temporary Pavement Marking, Type 1, Dotted, Yellow, 4 In.40 LFT $1.00 $40.00 $2.85 $114.00 $0.00 $0.00 22 Temporary Pavement Marking, Type 1, Dotted, White, 4 In.40 LFT $1.00 $40.00 $2.85 $114.00 $0.00 $0.00 23 Line, Thermoplastic, Solid, Yellow, 4 in.506 LFT $1.00 $506.00 $1.65 $834.90 $0.00 $0.00 24 Line, Thermoplastic, Broken, Yellow, 4 in.560 LFT $1.00 $560.00 $1.82 $1,019.20 $0.00 $0.00 25 Line, Thermoplastic, Solid, White, 4 in. 4512 LFT $1.00 $4,512.00 $1.65 $7,444.80 $0.00 $0.00 26 Transverse Marking, Thermoplastic, Stop Line, 24 in. 17 LFT $13.00 $221.00 $11.25 $191.25 $0.00 $0.00 27 Grooving for Pavement Markings, 4 in.5578 LFT $1.00 $5,578.00 $1.15 $6,414.70 $0.00 $0.00 28 Signal Cable, Roadway Loop, Copper, 1C/14 GA 225 LFT $2.00 $450.00 $0.65 $146.25 $0.00 $0.00 29 Detector Housing, Remove 1 EA $650.00 $650.00 $320.00 $320.00 $0.00 $0.00 30 Signal Detector Housing 1 EA $1,300.00 $1,300.00 $1,000.00 $1,000.00 $0.00 $0.00 31 Saw Cut for Roadway Loop Detector and Sealant 114 LFT $35.00 $3,990.00 $15.00 $1,710.00 $0.00 $0.00 32 Construction Engineering 1 LS $42,500.00 $42,500.00 $26,176.04 $26,176.04 $0.00 $0.00 33 Mobilization and Demobilization 1 LS $70,800.00 $70,800.00 $96,400.00 $96,400.00 $0.00 $0.00 34 Clearing Right of Way 1 LS $28,400.00 $28,400.00 $14,000.00 $14,000.00 $0.00 $0.00 35 Maintenance of Traffic 1 LS $85,000.00 $85,000.00 $68,000.00 $68,000.00 $0.00 $0.00 36 Erosion Control 1 LS $14,200.00 $14,200.00 $19,000.00 $19,000.00 $0.00 $0.00 TOTAL BASE BID $1,656,318.00 $1,806,000.00 $0.00 $0.00 Date:7/6/2022 Nitin Timble, P.E. I herby certify to the best of my knowledge, that the bid tabulation presented is a true and correct copy of the bids received for this project. Yes Yes Yes Yes N/A N/A N/A N/A N/A N/A N/A N/A % over % Under Milestone Contractors North, Inc. Amount Over Amount Under Engineer's Estimate $1,656,318.00Base Bids Total SOUTH BEND 2022 CCMG ROAD REHABILITATION Page 1 of 1 CITY OF SOUTH BEND PROJECT NUMBER: 122-024 BID TABULATION SUMMARY SHEET Prepared by: A&Z Engineering Bid Date: 6/28/2022 $7,535,000.00 $0.00 $0.00 $2,812,549.00 $0.00 $0.00 $0.00 $4,722,451.00 $4,722,451.00 59.6%0.0%0.0% 0.0%100.0%100.0% Bid Form, All Pages Form 96 Financial Statement Bid Bond BASE BIDS Division Description 1A Rainbow Dr (From Southlea Dr to Cul-de-sac)$0.00 $0.00 2A Southlea Dr (From Lilac Dr to Eastmont Dr)$0.00 $0.00 3A Eastmont Dr (From Riverside Dr to Northlea Dr)$0.00 $0.00 4 Hill St (From Jefferson St to Colfax St)$0.00 $0.00 5 Jackson St (From Fellows St to Miami St)$0.00 $0.00 TOTAL BASE BIDS $4,722,451.00 $7,535,000.00 $0.00 $0.00 NO BID $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $4,962,790.00 $4,962,790.00 0.0%0.0%0.0% 0.0%100.0%100.0% Bid Form, All Pages Form 96 Financial Statement Bid Bond ALTERNATIVE BIDS Division Description 1B Rainbow Dr (From Southlea Dr to Cul-de-sac)$0.00 $0.00 2B Southlea Dr (From Lilac Dr to Eastmont Dr)$0.00 $0.00 3B Eastmont Dr (From Riverside Dr to Northlea Dr)$0.00 $0.00 4 Hill St (From Jefferson St to Colfax St)$0.00 $0.00 5 Jackson St (From Fellows St to Miami St)$0.00 $0.00 TOTAL BASE BIDS $4,962,790.00 NO BID $0.00 $0.00 Date:7/6/2022 Nitin Timble, P.E. I herby certify to the best of my knowledge, that the bid tabulation presented is a true and correct copy of the bids received for this project. $1,656,318.00 NO BID $856,011.00 NO BID $1,458,160.00 NO BID $574,503.00 NO BID Amount Amount Amount Amount $417,798.00 NO BID Yes N/A N/A Yes N/A N/A Yes N/A N/A Yes N/A N/A % Under Engineer's Estimate Milestone Contractors North, Inc. Alternative Bids Total $4,962,790.00 Amount Over Amount Under % over $778,825.00 $1,327,415.00 $574,503.00 $1,656,318.00 $733,000.00 $1,541,000.00 $2,402,000.00 $1,053,000.00 $1,806,000.00 Amount Amount Amount Amount $385,390.00 % over % Under Milestone Contractors North, Inc. Amount Over Amount Under Engineer's Estimate $4,722,451.00Base Bids Total Yes Yes Yes Yes N/A N/A N/A N/A N/A N/A N/A N/A BOARD OF PUBLIC WORKS AGENDA ITEM REVIEW REQUEST FORM Date 7/6/2022 Name Leslie Biek, PE Department PW BPW Date 7/12/2022 Phone Extension 9323 Review and Approval Required Prior to Submittal to Board Diversity Compliance and Inclusion Officer Officer Name BPW Attorney Attorney Name Clara McDaniels Dept. Attorney Attorney Name Purchasing Check the Appropriate Item Type – Required for All Submissions Professional Services Agreement Contract Proposal Open Market Contract Amendment/Addendum Special Purchase, QPA Bid Opening Bid Award Req. to Advertise Title Sheet Quote Opening Quote Award Reject Bids/Quotes Proposal Opening C/O & PCA No. PCA Chg. Order, No. Traffic Control Resolution Other: Ease./Encroach Required Information Company or Vendor Name Milestone Contractors North, Inc New Vendor Yes If Yes, Approved by Purchasing No MBE/WBE Contractor MBE WBE Completed E-Verify Form Attached Yes No Project Name 2022 Community Crossings Roadway Rehabilitation Project Number PN 122-024; PROJ 324 Funding Source PR-16955 Account No. Amount Terms of Contract Purpose/Description Roadway Reconstruction on various streets. For Change Orders Only Amount of Increase Decrease $ ($ ) Previous Amount $ Current Percent of Change: Increase Decrease % ( %) New Amount $ Total Percent of Change: Increase Decrease % ( %) Time Extension Amount: New Completion Date: